1 NUREG-0580 Vol.12, No. 3 1
l REGULATORY LICENSING i
STATUS
SUMMARY
REPORT 1
i NUCLEAR POWER PLANTS l
DATA FOR DECISIONS l
(BLUE BOOK)
MARCH 1_ MARCH 31,1983_ _ _ _ _ _ _ _ _ _ _ _ _ - _
!ished7 pri 198I ate Prepared for: OFFICE OF NUCLEAR REACTOR REGULATION i
Prepared by: OFFICE OF RESOURCE MANAGEMENT i-U.S. NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 i
f-g i
s i
i
- 884A5AH4
- 4 j
0580 R PDR
1 l
F0REW0RD THIS MANAGEMENT REPORT, REGULATORY LICENSING STATUS
SUMMARY
REPORT, IS DESIGNED TO PROVIDE THE NECESSARY INFORMATION FOR CONTROLLING THE PROGRESS OF REVIEW PROCESSES FOR CENTRAL STATION NUCLEAR REACTOR APPLICATIONS. IT UTILIZE 5 DATA COLLECTED FROM THE OFFICE OF NUCLEAR REACTOR REGULATIDH, OFFICE OF THE EXECUTIVE LEGAL DIRECTOR, DFFICE OF INSPECTION & ENFORCEMENT, AND THE NATIONAL LABORATORIES, AND ANALYZED BY THE OFFICE OF RESOURCE MANAGEMENT IN THE IMPLEMENTATION OF THE REGUL ATORY INFORMATION SYSTEM.
SECTION I 0F THIS EDITIDH CONSISTS OF THE THREE
SUMMARY
OF ACCOMPLISHMENTS, THE NEW APPLICATION FORECAST FOR OL'S AND CP'5, AND AN ABBREVIATION KEY.
SECTION II REPRESENTS THE MAIN B0DY OF THE REPORT AND CONSISTS OF THE FACILITY INFORMATION. ALL OL'S ARE LISTED FIRST, FOLLOWED BY CP'5, STANDARD DESIGN REVIEWS, OTHER REVIEWS, AND FINALLY, A NDH-POWER REACTOR
SUMMARY
. EACH PROJECT CONSISTS OF GENERAL FACILITY DATA, CURRENT STATUS FOR ALL PHASES OF THE REVIEW, AND TARGETED AND ACTUAL COMPLETION DATES FOR ALL KEY MILESTONES IN THE REVIEW.
LICEN5ING 0F MUCLEAR REACT 0RS THE U.S. NUCLEAR REGULATORY COMMISSION RE90 IRES TWO SEPARATE LICENSES - ONE T3 BUILD THE FACILITY AND ANOTHER TO OPERATE IT.
LISTED BELOW ARE THE STEPS IN THE PROCESS OF OBTAINING A CONSTRUCTION PERMIT AND OPERATING
. LICENSE.
THE UTILITY SUBMITS A FORMAL APPLICATI0M DESCRIBING THE DESIGN, LOCATION, AND ENVIRONMENTAL IMPACT OF THE-PROPCSED PLANT AND THE SAFEGUARDS TO BE PROVIDED. THE APPLICATION ALSO COVERS THE UTILITY'S FINANCIAL
.9UALIFICATIONS.
THE MRC MARES CDPIES OF THE APPLICATION AVAILABLE TO THE ACRS AND TO THE PUBLIC DOCUMENT ROOM.
TECHNICAL EXPERTS ANALYSE THE APPLICATION, AND PREPARE A SAFETY EVALUATI0h AND AM ENVIRONMENTAL IMPACT STATEMENT. THE5E DOCUMENTS ARE ALSO MADE AVAILABLE IN THE PUBLIC DOCUMENT ROOM.
THE STAFF'S ANALYSIS IS SUBMITTED TO THE MRC'S STATUTORY ADVISORY CDMMITTEE ON REACTOR SAFEGUARDS, A COMMITTEE OF INDEPENDENT EXPERT 5.
ACRS STUDIES THE APPLICATION IN DETAIL AND HOLDS CONFERENCE 5 WITH THE.
APPLICANT, THE LICEM5ING STAFF AND OTHERS. THE ACRS FINDINGS ARE REPORTED TO THE NRC AND MADE PUBLIC.
A PUBLIC' HEARING 15 HELD, USUALLY MEAR THE PROPOSED SITE, BY AN MRC APPOINTED ATOMIC SAFETY 8 LICEN5ING
-BOARD.
PRIVATE CITIZEMS, STATE AND LOCAL OFFICIALS,-AMD COMMUNITY GROUP 5 MAY PARTICIPATE.
AFTER REVIEWING THE HEARING RECORD INCLUDING THE MRC STAFF AND ACRS FINDINGS, THE BOARD DECIDES FOR OR AGAINST GRANTING A CONSTRUCTION PERMIT.
THE BOARD'S DECISION IS REVIEWED BY THE ATOMIC SAFETY AND LICEMSING APPEAL BOARD, AMD IS SUBJECT TO REVIEW BY THE FIVE-MEMBER HUCLEAR REGULATORY COMMISSION.
IF THE LICENSING BOARD AUTHORIZES THE ISSUANCE OF A CONSTRUCTION PERMIT, THE DIRECTOR OF THE DIVISION OF LICENSING WILL ISSUE A CONSTRUCTION PERMIT. AM EARLIER LIMITED WORK AUTHORIZATION TO DO PRELIMINARY SITE CONSTRUCTION MAY HAVE BEEN GRANTED IF THE SITE HAD BEEN DETERMINED TO BE SUITABLE BY THE NRC STAFF AND THE
~)
BOARD HAD RULED FAVORABLY ON THE ENVIRONMENTAL IMPACT ANALYSIS, tCbHSTRUCTION IS SUBJECT TO INSPECTION BY THE 1
0FFICE OF INSPECTION AMD EMFORCEMENT.
A5 CONSTRUCTION PROGRESSES, ADDITIONAL INFORMATION IS DEVELOPED AND THE UTILITY APPLIES TO THE MRC FOR AN OPERATING LICENSE. ~THE SAME CAREFUL ANALYSIS A5 IS MADE AT THE COMSTRUCTION PERMIT STAGE IS MADE BY THE MRC IN DECIDING WHETHER OR MOT TO ISSUE THE OPERATING LICENSE.
IN THE OPERATING LICENSE REVIEW PROCESS, OPPORTUNITY FOR HEARING Ib PROVIDED. CONTRASTED WITH THE' CONSTRUCTION PERMIT REVIEW PHASE, A HEARING IS HELD ONLY IF INTERVENTION IS GRANTED. FINAL ISSUANCE OF AN OPERATING PERMIT 15 $UBJECT TO THE APPROVAL OF.BOTH THE DIRECTOR OF THE DIVISION OF LICENSING AND OF THE COMMISSION.
.l
TABLE DF C0NTENT5 PRINTED IN THE ORDER LISTED 5ECTION I
SUMMARY
OF ACCOMPLISHMENTS OL
SUMMARY
OF ACCOMPLISHMENTS CP
SUMMARY
OF ACCOMPLISHMENTS COMBINED NUMERICAL
SUMMARY
OF ACCOMPLISHMENTS TARGET DATES OF LICENSING STEPS FOR PLANTS JEEKING OPERATING LICENSES IN THE NEXT FIVE YEARS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING CONSTRUCTIDH PERMITS IN THE NEXT FIVE YEARS NEW APPLICATION FORECAST
- OPERATING LICENSE REVIEWS CONSTRUCTIDH PERMIT REVIEWS SPECIAL REVIEWS COMMON ABBREVIATIONS USED WITHIN THE PUBLICATION 5ECTION II PROJECT INDEX OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS NON-POWER REACTORS SECTION III EXAMPLE REVIEW 7
l m
E O
M la U
kJ en i
l i
i
0L 5UMMARY 0F ACC0MPLISHMENTS AS OF MARCH 31, 1983 MARCH FISCAL YEAR TO DATE FACILITY SCHEDULED ACTUAL F4CILITY SCHEDULED ACTUAL SER ' S SER ' S SEABROOK 1 & 2 03/07/83C CATAWBA 1&2 02/06/83 02/09/83C SEABROOK 1 & 2 01/12/83 03/07/83C SSER'S SSER's CDMAHCHE PEAK 1&2 03/11/83C BYRON 1 8 2 12/10/82 01/31/83C PALO VERDE 1,2,3 03/15/83 03/15/83C CDMANCHE PEAK 1 8 2 03/11/83C ST LUCIE 2 03/23/83 EHRICO FERMI 2 02/04/83C SUSQUEHANNA 1 03/01/83 MCGUIRE 2 02/14/83 02/28/83C SUSQUEHANNA 2
.03/01/83 11/12/82C MIDLAND 1 8 2 10/06/82 10/06/82C SUSQUEHANNA 2 03/31/83 PALO VERDE 1,2,3 03/15/83 03/15/83C WATERFORD 3 03/31/83 PERRY 1 & 2 12/29/82 01/19/83C SHOREHAM 01/15/83 02/04/83C ST LUCIE 2 03/23/83 SUMMER I 11/12/82 11/12/82C SUSQUEHANNA 1 03/05/83 SUSQUEHANNA 2 03/01/83 11/12/82C SUSQUEHANNA 2 03/31/83 WASHINGTON HUCLEAR 2 12/21/82 12/21/82C WATERFORD 3 10/22/82 10/29/82C WATERFORD 3 03/31/83 DES'S DES ' S HARRIS 1 & 2 03/31/83 HARRIS 1 & 2 03/31/83 FES 'S FES ' S HOME CAThMBA 1 8 2 01/07/83 01/ 07/83C SEABROOK 1 &2 12/08/82 12/08/82C 0L
'S ISSUEDM 0L ' S ISSUEDN HOME SUMMER 1 11/12/82 11/12/82C SUSQUEHANNA 1 11/12/82C M FULL POWER 1
l C
C 3
2 L
8 8
A
/
/
U 1
0 T
1 3
C
/
/
A 3
2 8
1 D
E E
3 2
T L
8 8
A U
/
/
D D
1 0
E 1
3 O
H
/
/
T C
3 1
S 8
1 R
AE Y
S L
A T
C S
H I
F 2
E 4
D 1
M Y
T D
E H
I R
L R
O U
S I
E F
C V
N S
I A
I A
F R
H S
L
/
H S
T I
P 3 C
I G
S E
S E
E 8
s N
M 9 I
A M
M N
1 L
R K
O O
S O
0 C
S H
H M
R E
S S
C 1
3 E
S E
E P
C H
S S
D F
C A C R
AM F
F 0 O S
A C
Y 3
L 8
R A
/
U 1
A T
1 C
/
M A
3 0
M U
S D
E 3
L 8
U
/
P D
1 E
1 C
H
/
C 3
S 8
H C
R AM D
Y T
E I
L R
U I
E C
V S
A I
F R
S H
S I
C S
N E
S E
S E
E I
N N
M M
L R
O O
O S
O C
N N
N N
R E
S S
E S
E E
P S
S D
F C
W i
lllil
L A
UT2 1
2 1
8 0 2 e 2
0 C
1 A
D E
L EU TD2 1
4 1
1 0
2 e 1
e AE 1
DH C
OS T
RAE Y
S L
M T
A D D C
H S
3
)
E E I
E F
)
)
L P 3
)
)
)
U U M
L P 0 C L P L P S S H
0 C
(
(
0 C 0 C S S 5
(
(
S S
(
(
(
(
I I I
S 5 S S S S 3
L 8 R R S S 9
P 1
R R E E S S S S M,
E E S S E E E E L P 1
0 3 S S S 5 5 D F F o C C H C C RA A M FO F
L S
A 8 A U
T1 1
3 0 8 e 8 e e 0 CA Y
R A
M M
D U
E L
na 0 1
6 0 1
e 8 e e 8 w
S
=D D H
3 3
E E C
R 3
3 L P 3
)
3
)
U U AM L P 0 C L P L P S S 0 C
(
(
0 C 0 C S S
(
(
S S
(
(
(
(
I I R
S S S S S S E
M R R S S OP R R E E S S S S L
E E S S E E E E t P LU
$ S S S D D F F o C F
N I
llll
LICENSING SCHEDULES FOR ALL PENDING OL APPLICATIONS REPORT AS OF 03/31/83 (INCLUDES SCHEDULES FOR ADDITIONAL UNITS WITH PROJECTED CONSTRUCTION COMPLETION IN CY 1983-1984)
(LISTED IN ORDER OF FACILITY HAME)
SER SSER EST.
STAFF TECH STAFF TECH ASLB COMMM APPL.
DELAY ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.
CONST.
PLANT (MONTHS) El TO DL 1B Big H1 TO DL lig 0F HRG DECISION MH
.G9ttfl.
BYROM 1 3
11/81C 01/82C 02/82C 03/82C 04/82C 08/82C 01/83C 03/83C 11/83 11/83 08/83 BYROM 2 0
11/81C 01/82C 02/82C 03/82C 04/82C 08/82C N/S 03/83C 11/83 04/84 04/84 CALLAWAY 1 0
09/81C 09/81C 10/81C 11/81C 01/82C 01/82C 04/83 11/31C 10/83 03/84 04/84 CATAWBA 1'
O 38/82C 01/83C 02/83C 03/83C 01/83C 04/83 04/83 10/83 05/84 05/84 05/84 l
CLINTON 1 0
12/81C 12/81C 02/82C 03/82C 05/82C 06/82C 04/83 08/83 12/83 12/83 01/84 COMANCHE PEAK 1 2
05/81C 07/81C 07/81C 11/81C 09/81C 02/83C 10/83 12/81C 11/83 11/83 09/83 COMANCHE PEAK 2 0
05/81C 07/81C 07/81C 11/81C 09/81C 02/83C 11/83 12/81C 11/83 11/84 12/84 DIABLO CANYOH 1
~ 0 12/72C 01/75C 10/74C 07/76C 05/76C 02/83C 04/83 12/76C 07/81C DIABLO CANYOH 2 0
12/72C 01/75C 10/74C 07/76C 05/76C 02/83C N/S 12/76C 07/81C ENRICO FERMI 2 0
04/81C 05/77C 09/77C 08/81C 09/81C 01/83C 02/83C 03/82C 10/82C 05/83 08/83 GRAND GULF 1 0
05/81C 08/81C 09/81C 10/81C 10/81C 03/83C 04/83 N/A N/A 96/83 06/82C LASALLE 2 0
03/78C 02/CIC 03/81C 04/81C 11/78C 05/83 06/83 N/A N/A 07/83 08/83 HCGUIRE 2 0
10/75C 01/78C 03/78C 04/78C 04/76C 02/83C 02/83C 03/77C 06/81C 05/83 03/83C MIDLAND 1 0
02/82C 04/82C 05/82C 06/82C 07/82C 08/82C 10/82C 11/82C 11/83 11/83 12/83 MIDLAND 2 0
02/82C 04/82C 05/82C 06/82C 07/82C 08/82C 10/82C 11/82C 10/83 10/83 07/83 PALD VERDE 1 0
10/81C 10/81C 11/81C 12/81C 03/82C 02/83C 03/83C 04/82C 12/82C 07/83 08/83 PALO VERDE 2 0
10/81C 10/81C 11/81C 12/81C 03/82C 02/83C 10/83 04/82C 12/82C 07/84 08/84 PERRY 1 0
02/82C 05/82C 05/82C 07/82C 08/82C 04/83 04/83 05/83 08/83 10/83 11/83 SAN OHOFRE 3 0
01/81C 01/81C 02/81C 02/81C 04/81C 04/83 05/83 06/81C 05/82C 03/83 11/82C SEABROOK 1 0
05/82C 12/820 03/83C 04/83 12/82C 05/83 06/83 08/83 06/84 08/84 09/84 I
SHOREHAM 1
03/77C 03/81C 04/81C 10/81C 10/77C N/S 05/83 05/82C 07/83 06/83 g
ST LUCIE 2 0
10/81C 09/81C 10/81C 11/81C 04/82C 03/83 03/83 N/A N/A 03/83 03/83 SUSQUEHANNA 2 0
03/81C 03/81C 04/81C 08/81C 07/81C 02/83C 03/83 10/81C 04/82C 12/83 01/84 WASHINGTCH HUCLEAR 2 0
07/81C 05/82C 03/82C 10/82C 12/81C 11/82C 04/83 N/A N/A 08/83 09/83 WATERFORD 3 0
05/81C 05/81C 07/81C 08/81C 09/81C 03/83 03/83 03/82C 03/83 04/83 05/83 WATTS BAR 1 0
06/78C 06/82C 07/82C 08/82C 12/78C 09/82C 04/83 N/A N/A 12/83 01/84 WATTS BAR 2 0
06/78C 06/82C 07/82C 08/82C 12/78C 09/82C 06/84 M/A N/A 12/84 01/85 WOLF CREEK 1 0
01/82C 03/82C 04/82C 05/82C 06/82C 08/82C 08/82C 06/83 11/83 09/84 10/84 ZIMMER 1 0
10/76C 12/77C 01/79C 03/79C 06/77C 08/82C 08/82C 02/82C 06/82C 88/83 09/83 ELICENSING SCHEDULES AND DECISION DATES DO NOT REFLECT POTENTIAL DELAY FROM EMERGENCY PREPAREDHESS REVIEW.
7
LICENSING SCHEDULES FOR ALL TENDERED OL UNITS TO BE ISSUED AFTER CY 1984 ISSUE APPL. CONST.
PLANT 11ER COMPLETE BEAVER VALLEY 2 02/85 12/85 BELLEFONTE 1 12/84 05/85 BELLEF0HTE 2 N/S 05/86 BRAIDWOOD 1 05/84 04/85 BRAIDWOOD 2 04/86 CATAWBA 2 N/S 10/86 CLINTON 2 N/S FERMI 2 (FSAR RESUB)
GRAND GULF 2 N/S N/S HARRIS 1 04/84 06/85 HARRIS 2 N/S H/S HOPE CREEK 1 01/86 LIMERICK 1 10/83 08/84 LIMERICK 2 04/88 MARBLE HILL 1 04/85 06/86 MARBLE HILL 2 12/87 MILLSTONE 3 11/84 11/85 HINE MILE POIHT 2 03/86 PALO VERDE 3 09/85 11/85 PERRY 2 N/S 05/87 4
RIVER BEND 1 05/84 04/85 RIVER BEND 2 N/S SLABROOK 2 12/86 SOUTH TEXAS 1 01/86 12/86 SOUTH TEXAS 2 N/S 12/88 WASHINGTOH HUCLEAR 1 N/S N/S WASHINGTON HUCLEAR 3 12/84 12/85
3 8
/
f 3
/
3 0
r F
M.g O
MCl OEA SS S
CDD //
A NH T
R LH O
A0 P
BII 3
E LTS 8
R SII
/9 "'
ANC IE 0P D
G C
TR 2
RH 8
A
/S TF 8/
SO 0H E
C UR 32 S
SE 88 N
/ /
O IS 52 I
01 T
R A
E H
C S
C I
S E
C L
TTL 32 P)
//
AM FHO 41 A
AIT 01 PH T
C S
Y GT E
C NI U1 73 IL Sg 78 DI SE //
NC I
A S
33 R
RS 88 RE CI //
S EN LI E
CC U
U8 37 DD S1 87 EE S1 //
HT I
R H
G(
E C
N S
E CC I
TTL 37 S
UD 87 N
//
E FNO 27 C
AIT 00 I
T L
S E
I 25 00 2
8 1
D R
RO EF VH T
IA N
RH A
/
L HT P
NEW APPLICATION F 0 R E C A S T --- O P E R A T I N 6 LICEN5E REVIEWS (ANTICIPATED TENDER DATES FOR ALL UNITS WITH CONSTRUCTION PERMITS)
AS OF WEEK ENDING: 03/31/83 LICENSING APPL.
APPL.
tST UNIT DOCKET PROJECT SUOMITS SUBMITS CONST.
FACILITY NUMBER UTILITY MANAGER FSAR ENV. RPT. COMPLETE COUNSEL l
FYS3 MILLSTONE 3 050-00423 NORTHEAST NUCLEAR ENERGY E.DOOLITTLE 10/29/82C 10/29/42C 11/01/85 M.ROTNSCNILD MARBLE MILL 182 054680547 PUBLIC SERVICE OF INDIANA P.0 CONNOR 1t/23/82C 1t/23/82C 06/08/86 E.CNEN BEAVER VALLEY 2 050-00412 DU4UESNE LIGHT L.LAZO Of/26/83C 01/26/83C 12/31/85 J.GUTEIRREZ MIME MILE POINT 2 059-00410 NIAGARA MOHAWK POWER M.HAUGHEY 01/31/83C Of/31/83C 03/01/86 B.BORDENICK HOPE CREEK 1 050-80354 PUBLIC SERVICE ELECTRIC S GAS D. WAGNER 83/04/83C 03/04/83C 01/3t/86 R.00DDARD V0GTLE I S 2 0424-0425 GEORGIA POWER M. MILLER 87/08/83 09/08/83 09/08/86 B.30RDENICK
._-b,a-m A..
6s<--s_.e.m._-m.
-mAa_.
s
_. em m
l NEW APPLICATION F0RECA5T-5PECIAL REVIEW A5 0F MEEK ENDING 03/31/83 5TANDARDIZATISM REVIEW 5 PROJ PROJECT TENDER TH h
-Ha E!Mlitib5E M MI f%n 9
l l
l l
l COMMON ABEREVIATIONS USED WITHIN THE PUBLICATION ACRS: ADVISORY COMMITTEE ON REACTOR SAFEGUARDS L.A.:
LICENSING ASSISTANT AE8 ARCHITECT / ENGINEER LESRs LIMITED EARLY SITE REVIEW (ALSO ABBREVIATED LES)
AEB8 ACCIDENT EVALUATION BRANCH LGR LICENSING GUIDANCE BRANCH ASBs AUXILIARY SYSTEMS BRANCH LMFBRs LI9UID METAL FAST BREEDER REACTOR ASLBs ATDMIC SAFETY LICENSING BOARD LGB:
LICENSEE QUALIFICATIONS BRANCH 38R8 BURNS & ROE MES:
MECHANICAL ENGINEERING BRANCN 88V BLACK & VEACH MPA MANAGEMENT AND PROGRAM ANALYSIS B&W:
BABCOCK & WILCOX MTEBs MATERIALS ENGINEERING BRANCH BECN BECHTEL MWEs MEGAWATTS ELECTRIC BRRT: BROWN 8 ROOT MWT*
MEGAWATTS THERMAL BWRs BOILING WATER REACTOR NSSS: NUCLEAR STEAM SYSTEMS SUPPLIER CEB8 CHEMICAL ENGINEERING BRANCH OL:
OPERATING LICENSE COMB 8 COMBUSTION ENGINEERING OLB OPERATOR LICENSING BRANCH CP8 CONSTRUCTION PERMIT OPS:
OFFSHORE POWER SYSTEMS CPBt CORE PERFORMANCE BRANCH CSB8 CONTAINMENT SYSTEMS BRANCH CWE COMMONWEALTH EDISON PDA PRELIMINARY DESIGN APPROVAL PG8Es PACIFIC GAS 8 ELECTRIC DES 8 DRAFT ENVIRONMENTAL STATEMENT PID:
PARTIAL INITIAL DECISION PM:
PROJECT MANAGER PS:
POWER SYSTEMS BRANCH EEB ENVIRONMENTAL ENGINEERING BRANCH PSAR PRELIMINARY SAFETY ANALYSIS REPORT EPA 8 ENVIRONMENTAL PROTECTION AGENCY PTRBs PROCEDURES AND TEST REVIEW BRANCH EPLB8 EMERGENCY PREPAREDNESS LICENSING BRANCH PWRt PRESSURIZED WATER REACTOR ER:
ENVIRONMENTAL REPORT EQB EQUIPMENT QUALIFICATION BRANCH ESR8 EARLY SITE REVIEW QAB QUALITY ASSURANCE BRANCH ETSB8 EFFLUENT TREATMENT SYSTEMS BRANCH RAB RADIOLOGICAL ASSESSMENT BRANCH F.R.*
FEDERAL REGISTAR RSBs REACTOR SYSTEMS BRANCH FDAt FINAL DESIGN APPROVAL FES:
FINAL ENVIRONMENTAL STATEMENT FSAR*
FINAL SAFETY ANALYSIS REPORT 58La SARGENT & LUNDY
$8W:
STONE 8 WEBSTER SAB SITING ANALYSIS BRANCH G8H GIBBS 8 HILL SAR:
SAFETY ANALYSIS REPORT GNDRs GIBBS 8 HILL SDA:
STANDARD DESIGN APPROVAL GIL:
GILBERT COMMONWEALTH SEB STRUCTURAL ENGINEERING BRANCH GSB GEOSCIENCES BRANCH SER:
SAFETY EVALUATION REPORT SIB:
SYSTEMS INTERACTIDH BRANCH SPs SPECIAL PROJECT
~
HGB HYDROLOGIC AND GE0 TECHNICAL BRANCH SSCs SOUTHERN SERVICES COMPANY HTGR HIGH TEMPERATURE GAS COOLED REACTOR SSER: SUPPLEMENT TO SAFETY EVALUATION TVA TENNESSEE VALLEY AUTHORITY ICB INSTRUMENTATION AND CONTROL BRANCH UEC UNITED ENG. 8 CONSTRUCTORS UFB UTILITY FINANCE BRANCH WEST: WESTINGHOUSE
9 M
E O
M 0-U W
en
PR0 JECT INDEX SECTION II OPERATING LICENSE REVIEW CONSTRUCTIDH PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS 2-1 BEAVER VALLEY 2 2-38 CLINCH RIVER 2-40 (HSS)CESSAR SYSTEM 80 2-2 BELLEFONTE 1 8 2 2-39 SKAGIT/HANFORD 182 2-41 (HSS)GESSAR SEVERE ACC 2-3 BRAIDWCOD 1 82 2-42 (HSS)GESSAR-238 NI 2-4 BYRON 1-8 2 2-5 CALLAWAY 1 2-6 CATAWBA 1&2 I
2-7 CLINTON 1&2 2-8 COMANCHE PEAK 1 & 2 2-9 DIABLO-CANYON 182 2-10 ENRICO FERMI 2 2-11 FERMI 2 (FSAR RESUB) 2.12 GRAND GULF 1 &2 2-13 HARAIS 1 &2 2-14 HOPE CREEK 1 2-15 LASALLE 2 2-16 LIMERICK 182 2-17 MARBLE HILL 1&2 2-18 MCGUIRE 2 2-19 MIDLAND 182 2-20 MILLSTONE 3 2-21 NIHE MILE POINT 2 2-22 PALO VERDE 1,2,3 2-23 PERRY 1 82 2-24 RIVER BEND 182 2-23 SAM ONOFRE 3 2-26 SEABROOK 1 82 2-27 SHOREHAM 2-28 SOU1H TEXAS 1 82 2-29 ST LUCIE 2 2-30 SUSQUEHANNA 2 2-31 WASHINGTON NUCLEAR 1 2-32 WASHINGTON huCLEAR 2 2-33 WASHINGTON NUCLEAR 3 2-34 WATERFORD 3 2-35 WATTS BAR 1&2 2-36 WOLF CREEK 1 2-37 ZIMMER 1
HRR LICEHSIHG SYSTEM PAGE H0: 2-1 BEAVER VALLEY 2 0L CURRENT STATUS REPORT REPORT AS OF 03/31/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET HO:
05000412 LIC. PM:
L. LAZO ASLB CHAIR: N/A
-APPLICANT:
DUQUESHE LIGHT LIC. EC G. KNIGHTON MEMBER 1:
LOCATION:
5 MI E OF E. LIVERPOOL, OH LIC. LA.:
E. HYLTON MEMBER 2:
REGION:
1 AE 58W COUNSEL:
J. GUTEIRREZ CONST. INSP S, FOLSON REAC. TYPE: PWR HSSS: WEST ANTITRUST:
J. RUTBERG RESID. INSP DESIGN PWR 2774 MWT/08S2 MWE CONST S8W RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The FSAR was tendered on 01-26-83.
ER DOCKETED:
04/31/83 ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
05/31/84 ISSUE DES:
07/31/84 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
12/31/84-CURRENT ENV. STATUS:
The ER was tendered on 01-26-83.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
01/26/83 01/26/83C SAR DOCKETED:
04/31/83 SAR Q'S RECEIVED BY PM:
07/31/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 10/31/83 CURRENT HRG. STATUS:
IhPUT TO DRAFT SER TO PM:
01/31/84 Opportunity for Hearing will be published in the Federal ISSUE DRAFT SER:
02/28/84 Register.
INPUT TO SER:
08/31/84 ISSUE SER:
10/31/84 ACRS FULL COMMITTEE MEETING:
12/31/84 IMPUTS TO 55 SUPPLEMENT 1:
ISSUE SE SUPPLEMENT 18 02/28/85 FEMA LETTER RECEIVED:
CURRENT ANTITRUST '
The information for antitrust review of operating HEARING STARTED:
04/30/85 Ilconse application was tendered 12/15/82.
ASLB INITIAL DECISION:
11/30/85 COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISIGHz 02/28/86 ISSUE LIC. WITH POWER RESTK1CTIDH LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
SCHED. DATE RECEIPT DATE CONSTRUCTION COMPLETION - APPL.:
12/31/85 07/30/82
i-l
[
NRR LICENSING SYSTEM PAGE N0s 2-2 BELLEFONTE 1 8 2 0L CURRENT STATUS REPORT REPORT AS OF 03/31/83 PLANT C H A R A C T E R I S T I C 58 KEY PERS0NNELa
)
DOCKET N08 043880439 LIC. PM:
R. HERMAN ASLB CHAIR N/A APPLICANTS TENNESSEE VALLEY AUTh0RITY LIC. BCs E. ADENSAM MEMBER is N/A r
LOCATION:
6 MI ME OF SCOTTSBORO. ALA LIC. LA.8 M. DUNCAN MEMBER 28 N/A REGION:
2 AE8 TWA COUNSEL:-
B. PATON CONST. INSPs R. CRLENJAK REAC. TYPE: PWR NSSS: 58W ANTITRUST J. RUTBERG RESID. 1MSP J. WILCOX DESIGN PWR 3768 MWT/1235 MWE CONST8 TVA RM ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE As a result of applicant's construction delay, the review schedule has been delayed. The appitcant has ER DOCKETED:
06/12/78 86/12/74C announced a delay in loading fuel to 05/85.
The ER SITE VISIT CDMPLETE:
02/20/82 06/17/82C staff has evaluated the impacts of this delay on the INPUT TO DES TO PMs 11/04/83 safety and environmental review schedules and issued ISSUE DES:
f2/16/83 new schedule on 01/25/83.
RESPONSE TO CDMMENTS ON DES:
83/05/84 ISSUE FES8 85/18/84 CURRENT ENV. STATUS:
As a result of appilcant's construction delay, the review schedule was delayed, and has been re-evaluated.
SAFETY / NEARING MILESTONES:
The environmental site visit was completed on 6/17/82.
APPLICATION TENDERED
07/03/88 11/01/82C SAR APPL. RESPONSE TO 4'S RECEIVED: 12/02/83 INPUT TO DRAFT SER TO PM 01/20/84 CURRENT NRG. STATU$s ISSUE DRAFT SER*
83/16/84 No hearing is anticipated.
IMPUT TO SER:
06/15/84 ISSUE SER 38/17/84 ACRS FULL CDMMITTEE MEETING:
09/28/84 IMPUTS TO SE SUPPLEMENT 18 10/95/84 ISSUE SE SUPPLEMENT 18 12/14/44 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
NEARING STARTFD*
N/A Pending determination ASLB INITIAL DECISION:
N/A CDMMISSION EFFECTIVENESS DECISION 8 TECH SPECS COMPLETED
- 02/01/85
~~
COMMISSION DECISION:
04/15/85 ISSUE LIC. WITH POWER RESTRICTION:
ISSUE FULL POWER LICENSE AMEND:
95/08/85 LATEST AMENDMENT:
No. 23 (12/17/82).
SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
On 07/06/82 TVA revised fuel load date to 5/85.
Staff has CONSTRUCTION COMPLETION - APPL.
05/08/85 07/96/82 evaluated impact on safety and environmental review schedules and issued new schedule on 41/25/83.
i I
-m i
l NRR LICENSING SYSTEM PAGE N08 2-3 BRAIDWOOD 1 8 2 0L CURRENT STATUS REPORT REPORT AS OF8 03/31/83 PLANT CHARACTERISTICS KEY PERS0NNEL8 DOCKET NO:
045680457 LIC. PM:
J. STEVENS ASLB CHAIR:
M. MILLER APPLICANT:
COMMONWEALTH EDISON LIC.-BC:
J. YOUNGOLOOD MEMBER 1:
R. COLE
' LOCATION:
24 MI SSW OF JOLIET, ILL LIC. LA.8 M. RUSNBROOK MEMBER 2 D. CALLIHAM REGION:
3 AE 58L COUNSEL:
D. NASSELL CONST. INSP J. NEISLER
'REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP L. MCGREGOR DESIGN PWRs. 3425 MWT/1120 MWE CONST: CWE RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Several portions are under contract review.
ER DOCKETED:
11/30/78C ER SITE VISIT CDMPLETE:
04/15/83 INPUT TO DES TO PM:
11/01/83 ISSUE DES:
01/08/84 RESPONSE TO COMMENTS ON DES:
04/01/84 1
ISSUE FES:
06/00/84 CURRENT ENV. STATUS:
Inactive.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/26/78 06/26/78C SAR DGCKETED:
11/09/78 11/30/78C SAR Q'S RECEIVED BY PM:
12/31/82 12/31/82C SAR APPL. RESPONSE TO Q'S RECEIVED 8 03/30/83 CURRENT MRG. STATUS:
INPUT TO DRAFT SER TO PM:
05/01/83 Opportunity for Hearing was publi shed in the Federal ISSUE DRAFT SER:
09/20/83 Register on 06/13/79. There will be a contested hearing.
INPUT TO SER:
11/01/83 ISSUE SER:
12/01/83 ACRS FULL COMMITTEE MEETINGS 01/08/84 4
INPUTS TO SE SUPPLEMENT 18 04/01/84 ISSUE SE SUPPLEMENT 18 05/08/84 FEMA LETTER RECEIVED 8 N/S CURRENT-ANTITRUST NEARING STARTED:
10/08/84 Applicant has submitted antitrust information pursuant to
+
ASLB-INITIAL DECISION:
03/08/85 COMMISSION EFFECTIVENESS DECISION: 04/00/85 TECH SPECS COMPLETED:
04/08/85 COMMISSION DECISION:
04/08/85 i-ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMENDS-04/08/85 FSAR Amendment No. 38 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
04/09/85 04/14/82 L
i e
HRR LICEN$ING SYSTEM PAGE NO: 2-4 BYROM 1 &2 0L CURRENT STATUS REP 0RT RCPORT AS OF 03/31/83 PLANT CHARACTERISTICSt KEY PERS0NNEL DOCKET NO:
045480455 LIC. PM:
L. OLSNAN ASLB CHAIR
- f. SMITH APPLICANT:
COMMONWEALTH EDISON LIC. BC:
J. YOUNGBLOOD MEMBER 18
- k. COLE LOCATION:
17 MI SW OF ROCKFORD, ILL LIC. LA.:
M. RUSHBROOK MEMBER 2 D. CALLIHAN REGION:
3 AE:
58L COUNSEL:
S. GOLDBERG CONST. INSP M. RING REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP W. FCRNEY DESIGN PWR 3425 MWT/1120 MWE CONST: CWE RM ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER and Supplements 1 and 2 have been issued. Several outstanding and confirmatory issues remain to be ER DOCKETED:
11/30/78C resolved prior to licensing.
ER SITE VISIT COMPLETE:
05/31/81 05/31/81C INPUT TO DES TO PM:
08/15/81 08/15/81C ISSUE DES:
11/05/81 11/05/81C RESPONSE TO COMMENTS UN DES:
03/01/82 03/01/82C ISSUE FES:
04/05/82 04/05/82C CURRENT ENV. STATUS:
Environmental review completed and FES (HUREG-0848) publi shed in April 1982.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/26/78 06/26/78C SAR DOCKETED:
11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:
08/15/81 08/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/15/81 10/15/81C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
11/07/81 11/07/81C Hearing began March 1,
1983.
ISSUE DRAFT SFR INPUT TO SER:
01/07/82 01/07/82C-ISSUE SER:
02/07/82 02/07/82C ACRS LETTER RECEIVED:
03/10/82 03/10/82C INPUTS TO SE SUPPLEMENT 23 08/20/82 08/20/82C ISSUE SE SUPPLEMEN7 2:
12/10/82 01/31/83C FEMA LETTER RECEIVED:
CURRENT ANTITRUST Applicant has submitted antitrust information oursuant HEARING STARTED:
03/00/83 03/01/83C to Reg. Guide 9.3.
ASLB INITIAL DECISIONS 11/00/83 COMMISSION EFFECTIVENESS DECISION: 11/00/83 TECH SPECS COMPLETED:
11/00/83
~~
COMMISSION DECISION:
11/00/83 ISSUE LIC. WITN POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
11/08/83 FSAR - Amendment 41 ER - Amendment 3 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
08/31/83 07/14/82
HRR LICENSING SYSTEM PAGE NO: 2- - S CALLAWAY 1.
OL CURRENT STATUS REP 0RT-REPDAT AS OF 03/31/43 PLANT CHARACTERISTIC 5 KEY' PERS0NNELa DOCKET N0:
05000483 LIC. PM:
G. EDISON ASLB CHAIR:
J. GLEASON.
APPLICANT:
UNION ELECTRIC LIC. BC:
B. YOUNGBLOOD MEMBER 1:
G. BRIGHT LOCATION:
10 MI SE OF FULTON, M0 LIC. LA.:
M. RUSNBROOK MEMBER 28 J. KLINE REGIDH 3
AE BECH COUkSEL:
B. PERLESS CONST. INSP J. KONKLIN 4
REAC. TYPE: PWR HSSS: WEST ANTITRUST 3-B. V0GLER RESID..INSP J. HEISLER DESIGN PWR 3425 MWT/1188 MWE CONST DANIEL RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SAR was docketed 08/08/80. The SER was issued by NRC on 10/07/81 and the SER Supplement No. I was issued on ER DOCKETED:
12/12/80 12/12/80C 91/15/82. SSER 2 is scheduled for 4/83.
ER SITE VISIT COMPLETE:
12/00/81 12/08/81C i
INPUT TO DES TO PM:
08/01/81 08/01/81C ISSUE DES:
09/29/81 09/29/81C RESPONSE TO COMMENTS ON DES:
12/01/81 12/01/81C ISSUE FES:
01/29/82 01/29/82C CURRENT ENV. STATUS:
ER was docketed 12/12/80. The DES was issued by MRC on 09/29/81-and the FES was issued on 01/29/82.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
10/25/79 10/25/79C SAR DOCKETED:
08/08/80 08/08/80C SAR 9'S RECEIVED BY PM:
12/18/80 12/18/80C SAR APPL. RESPONSE TO 9'S RECEIVED: 10/01/81 10/01/81C CURRENT HRG. STATUS:
IMPUT TO DRAFT SER TO PM:
Hearings were held on limited issues during November 1981 ISSUE DRAFT SER N/A.
The hearing on the one remaining contention, emergency
. INPUT TO SER:
09/11/81 09/11/41C preparedness, is scheduled for May, 1983.
A deci sion on ISSUE SER:
10/07/81 10/07/81C these limited issues was rendered by the licensing board
[
Joint intervenors filed exceptions on ACRS LETTER RECEIVED:
11/19/81 11/19/81C on 12/13/82.
~;
-January 31, 1983.
INPUTS.T0 SE SUPPLEMENT 28 01/01/82 01/01/82C-IS5UE SE SUPPLEMENT 28 04/30/83 6
FEMA LETTER RECEIVED:
03/09/83 CURRENT ANTITRUST:
OL review is in progress.
HEARING STARTED:
11/17/81 11/17/81C ASLB: INITIAL DECISION:
10/08/83 CDMMISSION EFFECTIVENESS DECISION:
11/08/83.
l TECH SPECS COMPLETED:
N/S COMMISSION DECISION:.
03/08/84
-ISSUE LIC. WITH POWER RESTRICTION: 04/09/84 LATEST AMENDMENT -
ISSUE FULL POWER LICENSE-AMEND:
07/08/84 4 -
SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
The Caseload Forecast Panel is reviewing construction CONSTRUCTION COMPLETION - APPL.:
04/09/84 08/23/82 progress in order to make-a new construction completion schedule estimate. An April 1984 estimate is based on, the==alleant's recent1v *evised fuel load date.
i
NRR LICEN$ING SYSTEM PAGE NOS 2-6 CATAWBA 1 8 2 0L CURRENT STATUS REP 0RT REPORT t.S OF 03/31/83 l
l l
PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:
041380414 LIC. PM:
K. JABBOUR ASLB CNAIR:
J. KELLEY f
APPLICANT:
DUKE PDWER LIC. BC:
E. ADENSAM MEMBER 1 D. CALLINAM LOCATION:
6 MI NHW OF ROCK HILL. SC LIC. LA.:
M. DUNCAN MEMBER 2 R. FOSTER l
REGIDH 2
AE DUKE COUNSEL:
G. JOHNSON CONST. INSP P. VAND00RN REAC. TYPE: PWR NSSS: WEST ANTITRUST:
- 8. V0GLER RESID. INSP P. VAND00RN l
DESIGN PWR 3582 MWT/1145 MWE CONST DUKE RM ANALYST L. LAMIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER was issued on February 9, 1983.
ER DOCKETED:
06/11/81 06/11/81C ER SITE VISIT COMPLETE:
10/15/81 10/15/81C INPUT TO DES TO PM:
06/25/82 07/29/82C ISSUE DES:
C8/05/82 OA/11/82C
~
RESPONSE TO COMMENTS ON DES:
11/30/82 11/30/82C ISSUE FES:
01/07/83 01/07/83C CURRENT ENV. STATUS:
. DES was issued on 08/11/82. FES was issued on 1/7/83.
SAFETY / NEARING MILESTONES:
APPLICATI0H TENDKRED:
03/26/79 03/26/79C SAR DOCKETED:
06/11/81 06/11/81C SAR Q'S RECEIVED BY PM:
12/15/81 12/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/10/82 12/10/82C CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
07/02/82 12/30/82C Combined hearing anticipated to start 09/83.
ISSUE DRAFT SERT 11/19/82 11/19/82C IMPUT TO SFR:
01/09/83 01/19/83C ISSUE SER:
02/06/83 02/09/83C ACRS LETTER RECEIVED:
03/18/83 03/18/83C INPUTS TO SE SUPPLEMENT 18 04/12/83 ISSUE SE SUPPLEMENT 18 04/30/83 FEMA LETTER RECEIVED:
04/30/83 CURRENT ANTITRUST:
Operating Ilconse antitrust review is in progress.
HEARING STARTED:
10/00/83 ASLB INITIAL DECISION:
05/00/84 COMMISSIDH EFFECTIVENESS DECISIDH 04/00/84 TECH SPECS COMPLETED:
05/00/84
~~
COMMISSION DECISION:
05/00/84 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
05/00/84 Revision 7 dated 02/22/83.
SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
.CP Amend. Issued 12/23/80 indicating change in ownership.
CONSTRUCTION COMPLETION - APPL.:
05/00/84 05/08/82 Staff is reassessing standard assumptions for projecting
"~
hearing schedules for plants with const. completion dates bevond '82.
This re-assess. may result in a new schedule.
y
NRR LICEN5ING SYSTEM PAGE N08 2-7 CLINTON 1 4 2 0L CURRENT 5TATUS REPORT REPORT AS OF 03/31/83 PLANT CHARACTERI5 TIC 5:
KEY PERSONNELa DOCKET NO:
046180462 LIC. PM:
N. ABELSON ASLB CHAIR M. CLARK APPLICANT:
ILLINOIS POWER LIC. BC:
A. SCHWENCER MEMBER 1:
G. FERGUSON LOCATION:
6 MI E OF CLINTON, ILL LIC. LA.:
E. HYLTON MEMBER 28
- 0. PAR'S REGION:
3 AE S8L COUNSEL:
R. GODDARD CONST. INSP F. JABLONSKI REAC. TYPE: BWR NSSS: GE ANTITRUST B. V0GLER RESID. INSP H. LIVERMORE DESIGN PWR 2894 MWT/0950 MWE-CONST BALDWIN RM ANAL)ST:
M. KING-CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES 8 SCHED. DATE ACTUAL DATE FSAR was docketed 09/08/80. SER was issued 02/17/82.
Supplement No. 1 was issued 07/22/82. SSER No. 2 is ER DOCKETED:
03/01/81 09/08/80C' scheduled for April 1983.
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
12/08/81 12/08/81C ISSUE DES:
12/18/81 12/28/81C RESPONSE TO COMMENTS ON DES:
02/22/82 03/25/82C ISSUE FES:
05/20/82 05/20/82C CURRENT ENV. STATUS:
The draft environmental statement was completed December 1981.
The FES was completed May 1982.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
12/01/79 12/01/79C SAR DOCKETED:
09/08*80 09/08/80C SAR 9'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Two petitions for' leave to intervens were fiIed. The ISSUE DRAFT SER:
State of Illinois filed under 13 CFR 2.715(c).
INPUT TO SER:
12/05/81 12/05/81C Prehearing conferences were held on 04/14/81 and on ISSUE SER:
01/05/82 02/17/82C 05/04/82. ASLB Memorandum and Order on 11/10/82 ruled on proposed supplemental contentions,' proposed issues, motion
-ACRS LETTER RECEIVED:
02/12/82 03/09/82C for summary disposition, and dismissed a previously-INPUTS TO SE SUPPLEMENT 28 06/30/82 06/30/82C admitted contention. Start of hearing estimated for 8/83.
ISSUE SE SUPPLEMENT 28 04/08/83 FEMA LETTER RECEIVED:
N/$
CURRENT ANTITRUST:
Operating Ilconse antitrust review completed
-HEARING STARTED:
08/08/83 March 18. 1982 (SECY-82-120).
ASLB INITIAL DECISION:
12/08/83 COMMISSION EFFECTIVEME55 DECISION: 12/08/83 TECH SPECS CDNPLETEDs 11/08/83 COMMISSION DECISION:
12/08/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
01/08/84 FSAR Amendment 021, 12/82.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
IPC still shows a fuel load date of 1/84 in its letter dated CONSTRUCTION COMPLETION - APPL.:
01/08/84 01/24/83 01/24/83. Stop work orders associated with construction
- GA. may impact fuel load date.
IPC expected'to submit revised fuel load date in Snrina 1983.
1 NRR LICENSING SYSTEM PAGE N0s 2-8 CDMANCHE PEAK 1 82 0L CURRENT STATUS REPORT REPORT AS OF8 03/31/83 PLANT CHARACTERISTICSt KEY PERSONNELa DOCKET N08 044580446 LIC. PM:
S. BURWELL ASLB CHAIR:
M. MILLER APPLICANT TEXAS UTILITIES GENERATING LIC. BC:
B. YOUNGBLOOD MEMBER 12 R. COLE LOCATION:
4 MI N OF GLEN ROSE TEX LIC. LA.:
M. RUSHBROOK MEMBER 2 K. MCCOLLOM REGIDH 4
AE G8H COUNSEL:
M. ROTHSCHILD CONST. INSPs R. TAYLOR REAC. 1YPE: PWR HSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP: D. KELLY DESIGN PWR8 3411 MWT/1150 MWE CONSTt BRRT RM ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The SER was issued 07/14/81. The staff deferred scheduling the Comanche Peak review by the ACRS until sufficient ER DOCKETED:
01/19/79 01/19/79C information was provided to resolve a large number of open ER SITE VISIT COMPLETE:
06/20/80 08/07/80C issues.
SSER 91 was issued 10/16/81.
Application was INPUT TO DES TO PM 08/15/80 04/27/81C reviewed by the ACRS on 11/13/81 SSER 92 responding to ISSUE DFS:
04/30/81 05/22/81C the ACRS was issued on 01/20/82. SSER 83 containing RESPONSE TO COMMENTS ON DES:
07/19/81 et/28/81C emergency preparedness was issued 03/ft/83.
ISSUE FES8 09/18/81 09/24/81C CURRENT ENV. STATUS:
The DES was issued on 05/22/81 The EPA Federal Register Notice was printed on 05/29/81 and the comment period SAFETY / HEARING MILESTONES:
ended 07/13/81. The FES was issued on 09/24/81.
APPLICATION TENDERED:
03/01/78 03/01/78C SAR DOCKETED
- 05/12/78 05/12/78C
'SAR Q'S RECEIVED BY PM:
12/30/78 02/22/79C SAR APPL. RESPONSE TO Q'S RECEIVED: C5/08/79 01/31/80C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
04/13/79 03/11/81C The first hearing session was held 12/02/81 in Fort Worth.
ISSUE DRAFT SER8 03/31/81 03/31/81C Issues heard were financial. qualifications and the INPUT TO SER:
05/22/81 07/08/81C operating QA program.
A second, third, and fourth hearing ISSUE SER8 07/14/81 07/14/81C sessions on QA/QC during construction were held 06/07-11/82, 07/26-30/82, and 09/13-17/82.
The fourth hearing session ACRS LETTER RECEIVED 8 11/17/81 11/17/81C completed the remaining contention, emergency plans.
IMPUTS TO SE SUPPLEMENT 4 8 07/02/82 02/22/83C The fifth hearing session is scheduled for 4/4-8/83.
ISSUE SE SUPPLEMENT 4 05/00/83 FEMA LETTER RECEIVED:
06/00/83 CURRENT ANTITRUST ALJ appointed on 02/23/82 to replace ASLB. Prehearing HEARING STARTED 12/02/81 12/02/81C conference held 04/13/82 to determine status of parties.
ASLB INITIAL DECISIDH8 11/00/83 i
Briefs filed 05/04/82 request immediate imposition of COMMISSION EFFECTIVENESS DECISION: 11/00/83 settlement license conditions. A Memorandum and Order TECH SPECS COMPLETED 8 05/00/83
~
approving settlement agreements 4 proposed license COMMISSIDH DECISION 11/00/83 conditions 8 dismissing proceedings was issued 05/06/82.
ISSUE LIC. WITH POUER RESTRICTION: 06/00/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
11/00/83 37 HEW SLIPS / NOTES:~
CONSTRUCTION COMPLETION - APPL.8 09/00/831 03/03/83 1
l w
NRR LICENSING SYSTEM PAGE NO: 2-1 DIABLO-CANYON 182 0L CURRENT STATUS REP 0RT REPORT AS OF 03/31/83
~i PLAMT CHARACTERISTICS KEY PERSONNEL:
DOCKET NO:
827580323 LIC. PM:
B. BUCKLEY ASLB CNAIRs. J. WOLF APPLICANT:
PACIFIC GAS 8 ELECTRIC LIC. BC G. KNIGHTON MEMBER 18 J. KLINE LOCATION:
12 MI WSW OF SAM LUIS OBISPO LIC. LA.:
J. LEE MEMBER 2 G. BRIGHT.
REGION:
5 AEs PG8E COUH3EL L. CHANDLER CONST. INSPs.D. KIRSCM REAC. TYPE PWR NSSS: WEST ANTITRUSTs J. RUTBERG RESID. INSP J. CARLSON DESIGN PWR8 3338 MWT/1084 MWE CONST8 PG8E RM ANALYSTS B. ST MARY CURRENT SAF.-STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE -ACTUAL DATE SSER 15 (Equip. Qualification) was issued on 10-02-81
$$ER 16 is estimated for 04/15/83 (indicated as SSER9 ER DOCKETEDs.
11/09/71 11/09/71C on schedule). Favorable ASLB Initial' Decision on a ER SITE VISIT COMPLETf2 full power license was issued on August 31, 1982.
Low IMPUT TO DES TO PM 10/09/72 10/09/72C Power license was issued on 09-22-81 and suspended on ISSUE DEST-12/12/72 12/12/72C November 19, 1981.
RESPONSE TO COMMENTS ON DES:
04/27/73 04/27/73C ISSUE FES:
09/15/75 05/28/76C CURRENT ENV. STATUS:
Complete SAFETY / NEARING MILESTONES:
APPLICATION TENDERED 8 07/10/73 07/10/73C SAR DOCKETED:
10/02/73 10/02/73C SAR O'S RECEIVED BY PM:
01/04/74 01/04/74C i
SAR APPL. RESPONSE TO 9'S RECEIVED: 11/01/74 11/01/74C 1
CURP.INF MRG. STATUS:
INPUT TO DRAFT SER TO PM8 01/24/75 01/24/75C LP hearings were held 05-19-81 through 05-22-81.
A ISSUE DRAFT SER:
favorable PID on low power operation was issued July INPUT TO SER8 01/24/75 01/24/75C 17 1941.
A full power hearing was completed on January ISSUE SERT 10/04/74 10/16/74C 26,' 1982.
In August an Initial Decision was issued authorizing issuance of a full power operating Ilconse.
ACRS LETTER RECEIVED:
05/09/78 07/18/78C
(
INPUTS TO SE SUPPLEMENT 98 02/18/83 02/18/83C 1
ISSUE SE SUPPLEMENT 9:
04/15/83 FEMA LETTER, RECEIVED N/S 1
CURRENT ANTITRUST:
Not required MEARING STARTED 8 10/29/75 12/07/76C ASLB INITIAL DECISION:
07/17/81 07/17/81C COMMISSION EFFECTIVENESS DECISION: 06/09/83 TECM SPECS COMPLETED:
09/15/81.
09/15/81C COMMISSION DECISION:
ISSUE LIC. WITH POWER RESTRICTION: 09/22/81 09/22/81C
' LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
06/30/33 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
Est. of dates from end of LP hrg to lic. complete CONSTRUCTION COMPLETION - APPL.:
e dependent upon dev./ approval of State and local Emergency Plans. Ongoing Design Verif. Program Ilkely to identify l
niant modifications.
Const. comolation deoendent on mods.
..--. - - - - _ -. - ~. _ ~ _ - - -.-. _ - -, _ _ _.--. _ -. _ - - - _ _ _.~. -
NRR LICENSINO
$YSTEM PATE NO: 2-10 ENRICO FERMI 2 0L CURRENT STATUS REP 0RT REPORT AS OF 03/31/83 PLANT CHARACTERI5TICSt KEY P E R S O N N E La DOCKET NO:
85000341 LIC. PM:
D. LYNCH ASLB CHAIR:
G. MILLHOLLIN APPLICANT:
DETROIT EDISON LIC. BC:
J. YOUNGBLOOD MEMBER 1 P. MORRIS i
LOCATION:
LAGUNA BEACH, MICH LIC. LA.:
M. RUSMBROOK MEMBER 2 D. SCHINK l
REGION:
3 AE Sal COUNSEL:
C. WOODNEAD CONST. INSP P. PELKE REAC. TYPE: BWR NSSS: GE AhTITRUST A. NODGDON RESID. INSP B. LITTLE DESIGN PWR 3292 PGIT/1993 PedE CONST DANIEL RM ANALYST:
S. HEDLUND CURRENT SAF. S'TATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE An interim SER was issued on 09-29-77 and a final SER was issued on 07-10-81.
(See second page for milestone ER DOCKETED:
04/04/75 04/04/75C summary.) SSER No. I was issued 09-25-81.
SSER No. 2 was ER SITE VISIT COMPLETE:
09/27/78 te/31/78C issued 01-29-82 with 7 prelicensing issues outstanding.
INPUT TO DES TO PM:
07/31/81 04/24/81C SSER No. 3 was issued on 02-24-83.
ISSUE DES:
05/01/81 04/30/81C RESPONSE TO COMMENTS ON DES:
07/31/81 06/29/81C ISSUE FES:
08/31/81 09/04/81C l
CURRENT ENV. STATUS:
Addendum No. I to the FES was issued 03-03-82.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
10/22/74 10/22/74C SAR DOCKETED:
04/05/75 04/05/75C SAR Q'S RECEIVED BY PM:
06/13/75 08/11/75C SAR APPL. RESPONSE TO 9'S RECEIVED: 08/29/75 01/12/76C CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/24/75 03/08/76C A hearing on two issues began on 03-31-82 and ended on ISSUE DRAFT SER:
04-02-82.
The two contentions were (1) 9A/9C during IMPUT TO SER:
03/05/76 05/20/77C i
construction and (2) adequacy of evacuation plans for ISSUE SER:
88/01/77 09/29/77C l
the local community. Monroe County, Michigan petitioned i,
for leave to reopen hearings on the evacuation issue.
ACRS LETTER RECEIVED:
08/20/81 08/11/81C ASLB issued initial decision on 10/29/82 authorizing INPUTS TO SE SUPPLEMENT 38 08/22/82 01/05/83C operating Ilconse issuance.
ISSUE SE SUPPLEMENT 38 09/01/82 02/04/83C l
FEMA LETTER RECEIVED:
05/01/83 L
CURRENT ANTITRUST An ASLB decision on antitrust matters was issued en NEARING STARTED:
12/02/81 03/31/82C l
84-25-78.
ASLB INITIAL DECISION:
10/09/82 10/29/82C COPW1ISSION EFFECTIVENESS DECISION:
12/22/82C TECH SPECS COMPLETED:
05/01/83 C0f91ISSION DECISION:
05/09/83 ISSUE LIC. WITH POWER RESTRICTION: N/A tATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
88/01/83 Thw latest final Safety Analysis Report Amenht is number 46.
SCHED. DATE RECEIPT DATE i
NEW SLIPS / MOTES:
CONSTRUCTION COMPLETION APPL.:
98/01/83 10/01/82 l
j mP "
'%m HRR LICEN5ING SYSTEM PAGE H0 2-11 FERMI 2 (FSAR RESUB)
OL CURREN1 STATUS REPORT REPORT AS OF 03/31/83 1
PLAHT C H A R A C T E R I S T I C S:
KEY P E R S O H N E L:
DOCKET H0:
00007341 LIC. PM:
D. LYNCH ASLB CHAIR:
G. MILLHOLLIM APPLICANT:
DETROIT EDISON LIC. BC:
J. YOUNGBLOOD MEMBER 1:
P. MORRIS LOCATION:
LAGUHA BEACH, MICH LIC. LA.:
M. RUSHBROOK MEMBER 2 D. SCHINK REGION:
3 AE SSL COUNSEL:
C. WOODHEAD CONST. INSP P. PELKE REAC. TYPE: BWR HSSS: GE ANTITRUST A. H0DGDON RESID. INSP B. LITTLE DESIGH PWR 3292 MWT/1093 MWE CONST: DANIEL RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
SCHED. DATE ACTUAL DATE All information on this page reflects the FSAR resubmittal. The SAR resubmittal was docketed on 06-01-78 and the safety review was completed. A final SER was issued on 07-10-81.
Summary of later milestones is on previous page.
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/22/74 10/22/74C SAR DOCKETED:
06/01/78 06/01/78C SAR Q'S RECEIVED BY PM:
07/01/78 08/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/78 10/02/78C CURRENT HRG. STATUS:
IHPUT TO DRAFT SER TO PM:
09/08/78 03/27/81C ISSUE DRAFT SER:
INPUT TO SER:
06/10/81 06/23/81C ISSUE SER:
06/30/81 07/10/81C CURRENT ANTITRUST:
LATEST AMENDMENT:
HEW SLIPS / NOTES:
All information on this page reflects the FSAR resubmittal. The schedule for input to the SER slipped due to slippage in the fuel load date because of TMI nause.
l NRR LICEN$ING SYSTEM PAGE Not 2-12 GRAND GULF 1&2 LIC CURRENT STATUS REP 0RT REPORT AS OF 03/31/83 PLANT CNARACTERI5TICSt KEY PERS0NNELa i-DOCKET NO:
041680417 LIC. PM:
D. HOUSTON ASLB CHAIR:
J. LAURENSLN APPLICANT MISSISSIPPI POWER & LIGHT COMPANY LIC. BC A. SCHWEhCER MEMBER 1:
G. BRIGHT LOCATION:
25 MI S OF VICKSBURG, MISS LIC. LA.:
E. NYLTON MEMBER 28 J. MARBOUR REGION:
2 AE8 BECM COUNSEL:
M. WAGNER CONST. INSPs R. VANDORM
.REAC. TYPE: BWR NSSS: GE ANTITRUST B. V0GLER RESID. INSPs A. WAGNER DESIGN PWR 3833 MWT/1250 MWE CONST BECM RM ANALYST B. ST MARY l
l l
CURRENT SAF. STATUSS ENVIRONMENTAL MILESIONES:
SCHED. DATE ACTUAL DATE l
SER was issued on September 10, 1981.
SSERs were issued in December 1981 and in June and July 1982.
The ACRS ER DOCKETED:
06/05/78 06/30/78C report on full power operation for Unit 1 was issued ER SITE VISIT COMPLETE:
12/14/79C August 18, 1982.
Interim FEMA letter was received INPUT TD DES TO ?M 04/30/81 04/30/81C 12/17/82. Final letter is expected in March.
ISSUE DES:
05/31/81 05/31/81C RESPONSE TO COMMENTS ON DES:
08/15/81 08/15/81C ISSUE FES:
09/15/81 10/09/81C CURRENT ENV. STATUS:
i DES was issued in May 1981.
FES was issued October 9, 1931 SAFETY / HEARING MILESTONES:
APPLICATION TENDERED 04/28/78 04/28/78C SAR DOCKETED:
06/05/78 06/30/7EC SAR Q'S RECEIVED BY PM 04/24/79C.
SAR APPL, RESPONSE T0 Q'S RECEIVED: 07/01/80 09/30/80C CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM N/S No hearing.
Petition was filed by the State ISSUE DRAFT SER:
09/18/81C of Louisiana' on basis of Court of Appeals, District of INPUT TO SER:
04/01/81 08/14/81C Columbia, opinion on S-3 Table issue. Board denied petition ISSUE SER8 06/00/81 09/10/81C for intervention on October 20, 1982.
The State of Louisiana flied an appeal to the Board's denial. Appeal ACRS LETTER RECEIVED 07/00/81 08/18/82C Beard upheld the denial for intervention in a decision INPUTS TO SE SUPPLEMENT 48 04/01/82 03/15/83C
. issued December 8, 1982.
ISSUE SE SUPPLEMENT 48 04/05/83 FEMA LETTER RECEIVED:
03/00/83 CURRENT ANTITRUST OL review is in progress. No significant changes have NEARING STARTED:
N/A.
occurred since the CP.
ASLB INITIAL DECISION:
h/A COMMISSION EFFECTIVENESS DECISI0H TECM SPECS COMPLETED:
09/01/81 06/16/82C COMMISSION DECISION:
06/08/83 ISSUE LIC. WITN POWER RESTRICTION 04/23/82 06/16/82C LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
06/15/83 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:.
06/16/82.
CONSTRUCTION COMPLETION - APPL.:
06/16/82C OL ISSUED Unit.1 OL authorizing fuel load to 5% power issued "I
Full power delayed to complete number of outstanding items, maintenance 4 mods for first refueling outage. Appilcant not readv to no above 5% until Maw or June 1983.
I a '
m..
1 l
l l
HRR LICEHSIHG SYSTEM PAGE HO 2-13 HARRIS 1 &2 0L CURREHT STATUS REPQRT REPORT AS OF: 03/31/83 PLAHT CHARACTERISTICSt KEY P E R S 0 N H E La DOCKET NO:
0400-0401 LIC. PM:
P. KADAMBI ASLB CHAIR J. KELLEY APPLICANT:
CAROLIHA POWER 8 LIGHT LIC. BC:
G. KNIGHTON MEMBER 1:
G. BRIGHT LOCATION:
20 MI SW OF RALEIGH, NC LIC. LA.:
J. LEE MEMBER 28 J. CARPEHTER REGION:
2 AE EBASCO COUNSEL:
C. BARTH CONST. INSP REAC. TYPE: PWR HSSS WEST ANTITRUST J. RUTBERG RESID. INSP G. MAXWELL DESIGH PWR 2775 MWT/0915 MWE CONST DANIEL RM ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE FSAR was docketed on 12/22/81 Questions were sent to the applicant between 4/26/82 and 7/30/82. Most of ER DOCKETED:
12/22/81 12/22/81C applicant's responses were received by 08/31/82. Draft ER SITE VISIT COMPLETE:
04/08/82 04/08/82C SER issued 2/1/83.
IHPUT TO DES TO PM:
01/14/83 02/08/83C ISSUE DES:
03/31/83 RESPONSE TO COMMENTS ON DES:
06/10/83 ISSUE FES:
08/15/83 CURRENT ENV. STATUS:
ER was docketed on 12/22/81. The site visit was complete on 04/08/82 and questions were sent to applicant on SAFETY / HEARING MILESTONES:
04/28/82. Most of the applicant's responses were received by October 15, 1982.
DES was issued February 8, 1983.
APPLICATION TENDERED:
06/26/80 06/26/80C SAR DOCKETED:
12/22/81 12/22/81C SAR Q'S RECEIVED BY PM:
07/09/82 07/09/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/08/82 11/ 0 8/8T.C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
02/28/83 Notice for Opportunity for Hearing was published in the ISSUE DRAFT SER:
01/03/83 02/01/83C Federal Register on January 27, 1982.
Several petitions INPUT TO SER:
09/01/83 to intervene were filed.
Prehearing conference on petitions ISSUE SER:
11/01/83 was held on July 13-14, 1982.
Board decision on contentions issued September 23, 1982. Further clarification issued ACRS FULL COMMITTEE MEETING:
01/0?/84 January 11, 1983.
A pre-hearing conference was held on INPUTS TO SE SUPPLEMENT 18 03/01/84 February 24, 1983 on discovery and scheduling.
ISSUE SE SUPPLEMENT 18 04/02/84 FEMA LETTER RECEIVED:
04/00/84 CURRENT ANTITRUST Status to be determined.
HEARING STARTED:
01/04/84 ASLB IHITIAL DECISIDH 05/01/85 COMMISSIDH EFFECTIVENESS DECISIDH 05/00/85 TECH SPECS COMPLETED:
05/01/85 COMMISSIGH DECISI0Hz 05/00/85 ISSUE LIC. WITH POWER RESTRICTION: 12/01/84 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
06/03/85 FSAR Ho. 4 ER Ho. 5 SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:
Staff schedule based on fuel load date of 06/03/85.
CONSTRUCTION COMPLETI0H - APPL.
06/03/85 10/06/82
m _ _ _ _.
__.m...
_.._.___._..-.___....--.___..._._m..
,_.._.,m NRR LICENSING SYSTEM PAIE N08 2-14, NOPE CREEK 1 0L CURRENT STATUS REPORT REPORT AS OF8 03/31/83 PLANT CHARACTERISTIC 5:
KEY PERS0NNELa DOCKET NO:
05000354 LIC PMt D. WAGNER ASLB CHAIR *. M/A APPLICANT:
PUBLIC SERVICE ELECTRIC a GAS LIC. BC8 A. SCHWENCER MEMBER 18 LOCATION:
18 MI SE OF WILMINGTON. DEL LIC. LA.:
J. LEE MEMBER 2 REGION:
1 AE BECM COUNSEL:
R. GODDARD CONST. INSPs S. FOLSDM l
REAC. TYPE: BWR HSSS: GE ANTITRUST:
RESID. INSP DESIGN PWRt 3440 MWT/1967 MWE CONST8 BECM RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE FSAR was tendered on March 4, 1983.
ER DOCKETED:
ER SITE VISIT COMPLETE:
t INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS ER was tendered on March 4, 1983.
SAFETY / NEARING MILESTONES:
APPLICATI0H TENDERED:
03/31/83 03/04/83C SAR DOCKETED:
SAR 9'S RECEIVED BY PM SAR APPL. RESPONSE TO 9'S RECEIVED:
CURRENT HRG. STATUS:
IMPUT TO DRAFT SER TO PM:
Notice of Opportunity for Hearing is to be published in ISSUE DRAFT SER:
the Federal Register.
INPUT TO SER:
ISSUE SER:
ACRS FULL COMMITTEE MEETING:
INPUTS TO SE SUPPLEMENT ISSUE SE SUPPLEMENT FEMA LETTER. RECEIVED:
' CURRENT ANTITRUST Status to be determined.
NEARING STARTED:
ASLB INITIAL DECISIDH COMMISSION EFFECTIVEMESS DECISION:
TECM SPECS COMPLETED:
~~
COMMISSION DECISION:
N/S ISSUE LIC. WITN POWER RESTRICTION:
(ATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND 8 SCHED. DATE RECEIPT DATE CONSTRUCTION COMPLETION - APPL.:
01/31/86 06/30/82 7
.m. _.
.._..___m
_m._..___.
l NRR LICEN5ING SY5 TEM PAGE NO: 2-15 LASALLE 2 0L CURRENT 5TATUS REP 0RT REPORT A5 0F 03/31/83 PLANT CHARACTERI5 TIC 5 KEY P E R 5 0 N N E La DOCKET NO:
65008374 LIC. PM:
A. 80URNIA ASL8 CHAIR:
M. MILLER APPLICANT:
COMMOMWEALTH EDISON LIC. SC:
A. SCHWENCER MEMBER 18 F. SHON LOCATION:
11 MI SE OF OTTAWA, ILL LIC. LA.:
E. HYLTON MEMBER 28
- 0. PARIS REGION:
3 AE 58L COUNSEL:
C. WOODNEAD CONST. INSP: M. WESCOTT REAC. TYPE: 8WR H555: GE ANTITRUST B. V0GLER RESID. INSP W. GULDEMOND DESIGN PWR 3293 MWT/1978 MWE CONST: CWE RM ANALYST:
- 5. HEDLUND CURRENT SAF. STATUS ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE 55ER-1 was issued in June 1981.
55ER-2 was issued in February 1982.
55ER-3 was issued on April 16, 1982.
ER DOCKETED:
01/17/77 05/12/77C 55ER-4 was issued on July 14, 1982.
55ER-5 i s scheduled ER SITE VISIT COMPLETE:
for 06/83.
INPUT TO DES TO PM:
02/17/78 02/17/78C ISSUE DES:
03/22/78 03/29/78C RESPONSE TO COMMENTS ON DES:
07/14/78 07/14/78C ISSUE FES:
09/22/78 11/03/78C CURRENT ENV. STATUS:
Environmental Protection Plan has been issued with Unit 1 license.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
09/01/76 09/01/76C SAR DOCKETED:
04/08/77 05/12/77C SAR 9'S RECEIVED BY PM:
07/22/77 87/27/77C SAR APPL. RESPONSE TO 9'S RECEIVED: 12/15/77 08/18/78C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/06/78 11/08/78C No hearing.
ISSUE DRAFT SER:
INPUT TO SER:
12/29/78 02/27/81C ISSUE SER:
09/05/88 03/05/81C ACRS LETTER RECEIVED:
04/09/81 04/16/81C INPUTS TO SE SUPPLEMENT 58 05/08/83 ISSUE SE SUPPLEMENT 58 06/09/83 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
Complete.
HEARING STARTED:
N/A ASL8 INITIAL DECISION:
N/A COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
04/12/82 04/12/82C COMMISSION DECISION:
07/08/83 ISSUE LIC. WITH POWER RESTRICTION: N/5 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
07/08/83 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
Lasalle Unit 1 criticality was achieved on June 21, 1982.
CONSTRUCTION COMPLETION - APPL.:
08/08/83 02/01/83
~~
Construction completion date for Unit 2 has been reassessed by applicant and has slipped to 08/83.
NRR LICEN$ING SY$ TEM PAGE NO: 2-16 LIMERICK 1 & 2 0L CURRENT STATUS REP 0RT REPORT AS OF 03/31/83 PLANT CHARACTERI$TICSt KEY PERSONNELa DOCKET NO:
035280353 LIC. PM:
R. MARTIN ASLB CHAIR:
L. BREMMER APPLICANT:
PHILADELPHIA ELECTRIC LIC. BC:
A. SCHWENCER MEMBER 1 R. COLE LOCATION:
35 MI NW OF PHILADELPHIA, PA LIC. LA.:
E. HYLTON MEMBER 2 P. MORRIS REGION:
1 AE BECH COUNSEL:
A. H0DGDON CONST. INSP REAC. TYPE: BWR HSSS: GE ANTITRUST:
- 8. V0GLER RESID. INSP S. CHAUDHARY DESIGN PWR: 3440 MWT/1065 MWE CONST: BECH RM ANALYST L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Applicant submitted Probabilistic Risk Assessment with FSAR on March 17, 1981 SAR was docketed on 07/27/81.
ER DOCKETED:
07/27/81 07/27/81C PRA under review by Brookhaven National Laboratory; ER SITE VISIT COMPLETE:
08/20/82 08/20/82C HUREG/CR on PRA issued by Board Hotification on 03/04/83.
INPUT TO DES TO PM:
03/25/83 ISSUE DES:
05/06/83 RESPONSE TO COMMENTS ON DES:
09/06/83 ISSUE FES:
10/31/83 CURRENT ENV. STATUS:
ER was tendered with the FSAR on March 17, 1981 and was docketed on 07/27/81 ER site visit was completed SAFETY / HEARING MILESTONES:
on 8/20/82.
DES inputs are due 03/25/83.
APPLICATI0H TENDERED:
01/00/81 03/17/81C SAR DOCKETED:
07/27/81 07/27/81C SAR Q'S RECEIVED BY PM:
07/08/82 02/01/83C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER 10 PM:
N/S Notice of Opportunity of Hearing was published in the ISSUE DRAFT SER:
03/04/83 Federal Register on August 21, 1981.
Early hearings on INPUT TO SER:
07/01/83 three contentions related to Point Pleasant diversion ISSUE SER:
08/08/83 were held 10/04/82.
A partial initial decision was issued on these contentions on March 8, 1983.
A special ACRS FULL COMMITTEE MEETING:
09/08/83 prehearing conference for the purpose of further INPUTS TO SE SUPPLEMENT 18 10/07/83 specifying conditionally admitted contentions is scheduled ISSUE SE SUPPLEMENT 1:
10/30/83 for May 9, 1983.
FEMA LETTER RECEIVED:
10/07/83 CURRENT ANTITRUST:
Status to be determined.
HEARING STARTED:
01/00/84 ASLB INITIAL DECISION:
03/00/85 COMMISSION EFFECTIVENESS DECISION: 03/00/25 TECH SPECS COMPLETED:
N/S
~~
COMMISSION DECISIDH 03/00/85 ISSUE LIC. WITH POWER RESTRICTION: 03/00/85 t4TFST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
03/00/85 Rev. 10, March'14, 1983 (ER OL); Rev. 7, March 14, 1983 (FSAR); Rev. 4, December 30, 1982 (EP).
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Several inputs to Draft SER have been delayed. Applicant C^NSTRUCTIDH COMPLETION - APPL.:
08/00/84 12/27/82
"~
estimates 2 month improvement in construction completion schedule. ASLB estimates that 17 montFs are necessary for hearino.
l
l NRR LICENSING S.Y S T E M
-PAGE NO: 2-17 MARBLE HILL'1 & 2 0L CURRENT STATUS REP 0RT REPORT AS OF 03/31/83 PLANT CHARACTERI$TICSt KEY P E R S O N N E Lt-DOCKET NO:
054680547
.LIC. PM:
P. O CONNOR ASLB CHAIR
' APPLICANT:
PUBLIC SERVICE OF INDIANA LIC. BC:
J. YOUNGBLOOD MEMBER 1:
LOCATION:
10 MI S OF MADISON, IM LIC. LA.:
M. RUSHBROOK MEMBER 28 REGIOM 3
AE 58L COUNSEL:
E. CHEN CONST. INSP P. PELKE REAC. TYPE:
PWR' HSSS: WEST ANTITRUST J. RUTBERG RESID. INSP J. SCHAPKER DESIGN PWR 3415 MWT/1130 MWE CONST PSI RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Application was Docked on 02/25/83.
ER DOCKETED:
03/01/83 02/25/83C ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
05/30/84
\\
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
11/30/84 CURRENT ENV. STATUS:
Application was docketed on 02/25/83.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED *.
03/01/83 02/25/83C 12/01/82 11/23/82C SAR DOCKETED:
SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
IMPUT TO DRAFT SER TO PM:
CURRENT HRG. STATUS:
. ISSUE DRAFT SER:
04/06/84 Notice of 0pportunity for Hearing ulII be published in the Federal Register.
IMPUT TO SER:
ISSUE SER:
12/07/84 ACRS FULL COMMITTEE MEETING:
01/10/85 INPUTS TO SE SUPPLEMENT 1:
ISSUE SE SUPPLEMENT 18 04/15/85 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
HEARING STARTED:
09/15/85 Tendered 2/25/83. - Under' acceptance revi ew.
ASLB INITIAL DECISI0Hz 05/15/86 COMMISSION EFFECTIVEMESS DECISIDH N/S TECH SPECS COMPLETEDs.
COMMISSIDH DECISION:
06/09/86 ISSUE LIC. WITH POWER RESTRICTIDM LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
CONSTRUCTION COMPLETION - APPL.
06/08/86 12/15/82.'
_.___.__..___________..__m._m.___
MQR LICEN$ING SYSTEM PATE NO: 2-18 MCGUIRE 2 LIC CURRENT STATUS REPORT REPORT AS OF 03/31/83 i PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:
85000370 LIC. PM:
R. BIRKEL ASLB CHAIR:
R. LAZO APPLICANT:
DUKE POWER LIC, BC:
E. ADENSAM MEMBER 1:
X. HAND LOCATION:
17 MI N OF CHARLOTTE, NC LIC. LA.:
M. DUNCAN MEMBER 2:
E. LUEBKE REGION:
2 AE DUKE COUNSEL:
J. CUTCHIM CONST. INSP M. HUNT REAC. TYPE: PWR NSSS WEST ANTITRUST:
B. V0GLER RESID. INSP W. ORDERS DESIGN PWR 3411 MWT/1980 MWE CONST DUKE RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SSER No. 6 was issued 02/28/83. NPF-17 was issued on 03/03/83 restricted to 5X pending Commission final ER DOCKETED:
05/31/74 05/31/74C approval.
ER SITE VISIT COMPLETE:
01/30/75 01/30/75C IMPUT TO DES TO PM:
08/29/75 08/29/75C ISSUE DES:
11/07/75 10/29/75C RESPONSE TO COMMENTS ON DES:
ISSUE FES:
05/07/76 04/20/76C CURRENT ENV. STATUS:
Complete.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
04/05/74 04/05/74C SAR DOCKETED:
04/29/75 05/05/73C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Complete.
ISSUE DRAFT SER:
INPUT TO SER:
06/01/77 OI/16/78C ISSUE SER:
02/21/78 03/01/78C ACRS LETTER RECEIVED:
04/14/78 04/14/78C INPUTS TO SE SUPPLEMENT 6:
12/01/82 02/28/83C ISSUE SE SUPPLEMENT 68 02/14/83 02/28/83C FEMA LETTER RECEIVED:
CURRENT ANTITRUST Complete.
HEARING STARTED:
03/15/77 03/28/77C AT* 3 INITIAL DECISION:
06/09/81 06/08/8tC CoranlSSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
03/03/83
'03/03/83C
~~
COMMISSION DECISION:
05/08/83 ISSUE LIC. WITH POWER RESTRICTION: 03/03/83 03/03/83C LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
05/02/83 No. 70 (December 15, 1982)
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION CDMPLETION - APPL.
03/03/83C 05/20/82 f
-. _ -.- - - _ = -. - - -. - _ - -
HRR LICEN$IHG SYSTEM PAGE HO 2-19 MIDLAND 1 & 2 0L CURRENT STATUS REP 0RT REPORT AS OF 03/31/83 PLAHT CHARACTERISTICSt KEY PERS0NHELa DOCKET HO:
033080329 LIC. PM:
D. HOOD ASLB CHAIR:
C. BECHHOEFER APPLICANT:
CONSUMERS POWER LIC. BC:
E. ADENSAM MEMBER 1 F. COWAN LOCATION:
SW BOUNDARY OF MIDLAND, MICH.
LIC. LA.:
M. DUNCAN MEMBER 22 J. HARBOUR REGIDH2 3
AE BECH COUNSEL:
W. PATON CONST. INSP R. LANDSMAN REAC. TYPE: PWR HSSS: B8W ANTITRUST:
B. V0GLER RESID. INSP R. COOK
. DESIGN PWR 2452 MWT/0818 MWE CONST: BECH RM ANALYST B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Utilization of National Laboratories or other agencies to complete some review areas is currently ER DOCKETED:
04/01/78 04/14/78C in progress. CP extension was issued 12/28/81. ACRS ER SITE VISIT COMPLETE:
09/08/78 09/08/78C Full Committee Meeting was held 06/04/82. SSER St INPUT TU DES TO PM:
02/03/82 02/05/82C responding to ACRS letter was issued 6/30/82. SSER 82 ISSUE DES:
02/05/82 02/05/82C on soils settlement problems was issued 10/06/82.
RESPONSE TO COMMENTS OH DEta 07/08/82 07/08/82C ISSUE FES:
07/30/82 07/30/82C CURRENT ENV. STATUS:
The DES was issued 02/05/82. The FES was issued on July 30, 1982.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
08/31/77 08/31/77C SAR DOCKETED:
09/30/77 11/18/77C SAR Q'S RECEIVED BY PM:
03/20/78 10/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/08/78 12/08/78C CURRENT HRG. STATUS:
IMPUT TO DRAFT SER TO PM:
11/01/78 12/01/78C Three prehearings ending 04/27-28/81 were held for a ISSUE DRAFT SER:
N/A separate hearing on soils settlement. Hearing on soils IHPUT TO SER:
04/23/82 04/23/82C settlement began July 7, 1981 and is continuing. Combined ISSUE SER:
05/11/82 05/11/82C hearings for soils issues and OL issues commenced on 11/15/82 and are continuing.
ACRS LETTER RECEIVED:
06/15/82 06/08/82C INPUTS TO SE SUPPLEMENT 28 08/16/82 08/16/82C ISSUE SE SUPPLEMENT 2 10r06/82 10/06/82C FEMA LETTER RECEIVED:
01/14/83 01/14/83C CURRENT ANTITRUST:
Proceeding completed. License was amended 10/20/80.
HEARING STARTED:
11/15/82 11/15/82C ASLB INITIAL DECISIDH 10/00/83 COMMISSIGH EFFECTIVEMESS DECISIDH 10/00/83 TECH SPECS COMPLETED:
08/00/83 COMMISSIDH DECISIDH 10/00/83 ISSUE LIC. WITH POWER RESTRICTION: 09/00/83 LATEST' AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
11/06/83 110 SCHED. DATE RECEIPT DATE
.NEW SLIPS / MOTES:
Applicant announced on 11/16/82 that July 1983 completion CONSTRUCTION COMPLETION - APPL.:
07/00/83 03/31/82 date has slipped by "some months".
Applicant will develop i
revised schedule in first calendar quarter of 1983.
l
NRR LICEN$ING SYSTEM PAGE N08 2-20 MILLSTONE 3 0L CURRENT STATUS REPORT REPORT AS OFs 03/31/83 PLANT CHARACTERISTIC $8 KEY P E R S O N N E L8 DOCKET N08 05000423 LIC. PM:
E. DOOLITTLE ASLB CHAIRS APPLICANT:
MORTMEAST NUCLEAR ENERGY LIC. BC:
B. YOUNGBLOOD MEMBER 18 l
LOCATIOMt 3.2 MI WSW OF MEW LONDON CT.
LIC. LA.
M. RUSNBROOK MEMBER 28 l
REGIOM8 1-AE:
58W COUNSEL:
M. ROTHSCHILD CONST. INSP REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSPs J. MATTIA DESIGN PWR8 3565 MWT/1156 MWE CONST: 58W RM ANALYST 8 L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Application was tendered on 10/29/82, and was docketed on 02/03/83.
ER DOCKETED:
02/01/83 02/03/83C ER SITE VISIT COMPLETE 8 04/21/83 INPUT TO DES TO PM:
ISSUE DES:
13/15/83 RESPONSE TO COMMENTS ON DEss ISSUE FES:
04/15/84 CURRENT ENV. STATUS:
ER was docketed on February 3, 1983.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
11/01/82 10/29/82C SAR DOCKETED:
02/01/83 02/03/83C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO 9'S RECEIVED:
CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:
12/01/83 Federal Register.
INPUT TO SER:
ISSUE SERT.
07/15/84 ACRS FULL COMMITTEE MEETING:
08/15/84 INPUTS TO SE SUPPLEMENT 1:
ISSUE SE SUPPLEMENT 18 11/15/84 FEMA LETTER RECEIVED:
CURRENT ANTITRUST 8 NEARING STARTED 04/15/85 ASLB INITIAL DECISION:
10/15/85 COMMISSION EFFECTIVEMESS DECISION: N/S
~
TECH SPECS COMPLETED:
COMMISSION DECISION:
11/01/85 ISSUE LIC. WITH POWER RESTRICTION:
14fEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
Amendment 1 to FSAR received 03/04/83. Amendment 1 to ER received 03/04/83.
'SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
CONSTRUCTION COMPLETION - APPL.:
11/01/85 09/30/82 k
~
l C
~
.......... ~... ~. +.. _. -... -.. - - - -. _ _ _ _
_. _. -. -. ~ -
NRR LICEN$ING SYSTEM PAGE NO: 2.21 NINE MILE POINT 2 0L CURRENT STATUS REP 0RT REPORT AS oft 03/31/83 PLANT CHARACTERISTICSt KEY PERS0NNEL8 DOCKET NO:
65000410 LIC. PM:
M. HAUGNEY ASLB CHAIR:
APPLICANT 8 NIACARA MOHAWK PDWER LIC. BCs A. SCHWENCER MEMBER 18 LOCATION 8 MI NE OF OSWEGO, NY LIC. LA.8 E. HYLTON MEMBER 28 REGION:
1 AE 58W COUNSEL:
B. BORDENICK CONST. INSP2 L. MARROW REAC.- TYPE 8 BWR NS$$a GE ANTITRUSTs L. DEWEY
.RESID. INSP8 DESIGN PWRt 3489 MWT/1980 MWE CONST* S&W RM ANALYST B. ST MARY CURRENT SAF. STATUS 8 ENVIRONMENTAL MILESTONES 8 SCH20. DATE ACTUAL DATE
.The FSAR was tendered on 01-31-83.
ER DOCKETED:
03/31/83 ER SITE VISIT COMPLETE
- INPUT TO DES TO PM:
ISSUE DES:
03/16/84 RESPONSE TO COMMENTS ON DES:
ISSUE FES*
07/16/84 CURRENT ENV. STATUS:
The ER was tendered on 01-31-83.
SAFETY / HEARING MILESTONES:
I APPLICATION TENDERED:
01/31/83 01/31/83C SAR DOCKETED:
03/31/83 SAR 9'S RECEIVED BY PM:
SAR APPL. RESPONSE TO 9'S RECEIVED:
CURRENT HRG. STATU$s IMPUT TO DRAFT SER TO PM:
Opportunity for_ Hearing will be published in the Federal ISSUE DRAFT SER8 02/16/84 Register.
INPUT TO SER:
ISSUE SER8 10/05/84 ACRS FULL CDMMITTEE MEETING:
11/08/84 IMPUTS TO SE SUPPLEMENT
CURRENT ANTITRUST HEARING STARTED:
06/17/85 ASLB INITIAL DECISION:
02/14/86 4
COMMISSIDH EFFECTIVENESS DECISION: N/S TECH SPECS COMPLETED:
COMMISSION DECISION:
02/28/86 ISSUE LIC. WITN POWER RESTRICTION:
.tATEST AMENDMENT:
ISSUE FULL POWER LICEMSE AMEND:
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES Following-C0i4STRUCTION CDMPLETION - APPL.8 03/01/86 01/31/83 A tentative schedule has been established.
~~
the acceptance review, an approved schedule will be
-established.
m r - -
HRR LICEHSING SY$ TEM PA!E HO: 2-22 PALD VERDE 1,2,3 0L CURRENT STATUS REPORT REPORT AS OF 03/31/83 l
PLANT CHARACTERI5TICSt KEY PERS0HHELa DOCKET NO:
0528-0530 LIC. PM:
E. LICITRA ASLB CHAIR:
R. LAZO APPLICANT:
ARIZONA PUBLIC SERVICE LIC. BC:
G. KNIGHTCH MEMBER 1 R. COLE LOCATIDH 36 MI W OF PHOENIX, AZ LIC. LA.:
J. LEE MEMBER 2:
D. CALLIHAM REGIDH 5
AE:
BECH COUNSEL:
L. DEWEY CONST. INSP L. VBRUEGGEN REAC. TYPE: PWR NS$$8 COMB ANTITRUST B. V0GLER RESID. INSP G. FIORELLI DESIGN PWR 3817 MWT/1304 MWE CONST: BECH RM AHALYST S. HEDLUHD CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Several " Independent Design Review" meetings have been completed. The SER was issued on Hovember 11, 1981.
SER ER DOCKETED:
07/01/80 06/20/80C supplement Hos.
1,2, and 3 were issued on February 5, 1982 ER SITE VISIT COMPLETE:
01/30/81 01/30/81C and May 17, 1982, and September 23, 1982 respectively.
INPUT TO DES TO PM:
10/05/81 10/05/81C Supplement No. 4 was issued on March 15, 1983.
ISSUE DES:
10/26/81 10/26/81C RESPONSE TO COMMENTS ON DES:
02/25/82 02/25/82C ISSUE FES:
03/11/82 03/11/82C j
CURRENT ENV. STATUS:
The ER (OL) review is complete. A site visit was completed on January 30, 1981 The DES was issued on SAFETY / HEARING MILESTONES:
October 26, 1981 and the FES was issued on March 11, 1982.
APPLICATION TENDERED:
10/05/79 10/05/79C SAR DOCKETED:
06/20/80 06/20/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
The hearing started 4/27-30, 1982, resumed on 5/25-28 and ISSUE DRAFT SER:
on 6-22.
Hearing record was closed on 6-25-82.
A late INPUT TO SER:
10/30/81 10/30/81C petition, dated 10-13-82 dealing with salt drift on ISSUE SER:
11/11/81 11/11/81C farm crops, was filed by W. Valley Agri. Protection Council. On 12-30-82, the Board issued a favorable ID ACRS LETTER RECEIVED:
12/18/81 12/18/81C but reopened the hearing on Units 2 and 3 to consider INPUTS TO SE SUPPLEMENT 48 02/14/83 02/14/83C late petition by W.
Valley. Board's decision authorizes ISSUE SE SUPPLEMENT 48 03/15/83 03/15/83C full power license for Unit 1.
FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST Antitrust OL review has resulted in a finding of no HEARING STARTED:
04/27/82 04/27/82C significant antitrust changes since CP review.
A ASLB INITIAL DECISION:
12/30/82 12/30/82C Federal Register of the finding was published 2-9-83.
COMMISSION EFFECTIVENESS DECISION: 03/00/83 TECH SPECS COMPLETED:
08/01/83 COMMISSIDH DECISION:
07/00/83 ISSUE LIC. WITH POWER RESTRICTION: 08/01/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
08/20/83 FSAR Amendment No. 10 ER Supplement No. 4 10 SED. DATE RECEIPT DATE HEW SLIPS / MOTES:
CONSTRUCTIDH COMPLETIDH - APPL.:
?./00/83 07/13/82 1
3 r
~
L MRR LICENSIN6 SYSTEM PAGE NO: 2-23 PERRY 1 4 2 0L CURRENT 5TATUS REPORT REPORT AS OF 03/31/83 L
PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:
844080441 LIC. PM J. STEFAHO ASLB CHAIR P. BLOCH APPLICANT:
CLEVELAND ELECTRIC ILLUMINATING LIC. BC:
J. YOUNGBLOOD MEMBER 18 J. KLINE LOCATIDH 7 MI NE OF PAINESVILLE, OHIO LIC. LA.:
M. RUSHBROOK MEMBER 2:
G. BRIGHT REGIDH 3
AE GIL COUNSEL:
J. CUTCHIH CONST. INSP P. PELKE REAC. TYPE: BWR NSSS: CE ANTITRUST J. CUTCHIH RESID. INSP M. GILDNER i
DESIGH PWR 3759 MWT/1205 MWE CONST: KAISER RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE i
The Safety Evaluation Report was issued in May 1982.
The ACRS Report was issued on July 13, 1982. SSER Ho. 1 ER DOCKETED:
06/26/81 06/19/81C was issued in August 1982.
SSER No. 2 was issued in ER SITE VISIT COMPLETE:
Jan. 1983.
SSER Ho. 3 targeted for 4/83.
INPUT TO DES TO PM:
01/01/82 Of/01/82C ISSUE DES:
02/26/82 02/26/82C RESPONSE TO COMMENTS ON DES:
06/30/82 06/30/82C ISSUE FES:
08/f3/82 08/13/82C CURRENT ENV. STATUS:
Environmental acceptance review was completed on June 9,
1981.
The ER was docketed June 19, 1981.
FES SAFETY / HEARING MILESTONES:
Issued in August 1982.
APPLICATION TENDERED:
06/26/80 06/26/80C SAR DOCKETED:
01/09/81 Ot/30/81C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
IMPUT TO DRAFT SER TO PM:
02/24/82 02/24/82C Conference call between Board, intervenor, applicant, and ISSUE DRAFT SER:
02/26/82 02/26/82C staff attorneys on 1/5/83 targeted start of hearing for INPUT TO SER:
04/10/82 05/10/82C 5/23/83. ASLB decision slipped to 8/83 due to delay in ISSUE SER:
05/10/82 05/24/82C hearing start.
ACRS LETTER RECEIVED:
07/13/82 07/13/82C IMPUTS TO SE SUPPLEMENT 3 04/01/83 ISSUE SE SUPPLEMENT 38 04/15/83 FEMA LETTER RECEIVED:
04/00/83 CURRENT ANTITRUST:
CP antitrust review has been completed. OL antitrust HEARING STARTED:
05/23/83 status is under review.
ASLB INITIAL DECISIDH 08/00/83 COMMISSIDH EFFECTIVENESS DECISIDH 09/08/83 TECH SPECS COMPLETED:
3/08/83 COMMISSIGH DECISI0H
.0/00/83 ISSUE LIC. WITH POWER RESTRICTION: N/S IATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
12/08/84 Humber 11 (2-15-83).
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Start of hearing has slinped to 5/83.
FEMA letter has COMSTRUCTION COMPLETION - APPL.:
11/08/83 "I
slipped to 4/83 due to incomplete offsite plans.
I
. l
.- /+
5,.
~,.
.,u
/-
a.
... ': + _
.V
. ~.
.. x "s
2
'e h).'
g-,- -
1 4
+
r.
- -., j ; [.
p.
's,. A' t
y
'[
.,J
~
~
J f
,e i
.g a
g t
HRR LICEH$ING SYSTEM PAGE HO: 2-24 RIVER BEND 1 82 0L CURREHT STATUS REPORT REPORT AS OF 03/31/83 PLAHT CHARACTERISTIC 5:
KEY P E R S 0 N N E La DOCKET HO 045880459 LIC. PM:
E. WEINKAN ASLB CHAIR B. COTTER APPLICANT:
GULF STATES UTILITIES LIC. BC:
A. SCHWENCER MEMBER 1 G. LINENBERGER LOCATION:
24 MI HHW OF BATON ROUGE, LA LIC. LA.:
E. HYLTON MEMBER 2:
R. COLE
, REGIDH 4
AE:
58W COUNSEL:
J. GUTIERREZ CONST. INSP:
UNASSIGNED REAC. TYPE: BWR HSSS: GE ANTITRUST:
B.
V0GLER RESID. INSP R. BROWN DESIGN PWR 3015 MWT/0934 MWE CONST S8W RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Applicant tendered FSAR for docketing on 04/24/81.
i FSAR was docketed on 08/25/81.
Draft SER targeted for ER DOCKETED:
08/25/81 08/25/81C l
09/83.
Construction permit extension requested and granted ER SITE VISIT COMPLETE:
01/22/82 01/22/82C from 03/83 to 12/85.
INPUT TO DES TO PM:
12/09/83 ISSUE DES:
01/09/84 RESPONSE TO COMMENTS OH DES:
ISSUE FES:
06/08/84 l
CURRENT ENV. STATUS:
Applicant tendered ER for docketing on 04/24/81.
ER was docketed on 08/25/81. DES targeted for 01/09/84.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
04/24/81 04/24/81C SAR DOCKETED:
08/25/81 08/25/81C SAR Q'S RECEIVED BY PM 12/07/81 06/01/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/31/83 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
03/30/83 Hotice of Opportunity for Hearing was published in the ISSUE DRAFT SER:
04/06/83 Federal Register on 09/04/81 Prehearing conference INPUT TO SER 11/04/83 scheduled for 02/08/83, rescheduled to 05/24/83.
ISSUE SER:
12/02/83 ACRS FULL COMMITTEE MEETING:
01/13/84 INPUTS TO SE SUPPLEMENT 18 04/00/84 ISSUE SE SUPPLEP.t.HT 18 05/00/84 FEMA LETTER RECEIVED:
05/01/84 CURRENT ANTITRUST Status to be determined.
HEARING STARTED:
10/00/84 ASLB INITIAL DECISION:
03/00/85 COMMISSION EFFECTIVENESS DECISIDH 04/00/85 TECH SPECS COMPLETED 10/00/84 COMMISSIDH DECISIDH 04/00/85 ISSUE LIC. WITH POWER RESTRICTION:
j LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
04/00/85 Humter 6.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
HRR/0L revised the priority of the review on this case due CONSTRUCTION COMPLETION - APPL.:
04/00/85 01/14/83 "I
to 18 month slip in construction schedule.
(
n
l l
(
HRR LICENSING SYSTEM PAGE N08 2-25 SAN ONOFRE 3 LIC CURRENT 5TATUS REP 0RT REPORT AS OF* 03/31/83 PLANT C H A R A C T E R I.S T I C 58 KEY P E R S 0 N N E La i
DOCKET NO '
05000362 LIC. PM:
H. ROOD ASLB CHAIR J. KELLEY APPLICANT: _ SOUTHERN CALIFORNIA EDISON LIC. BC:
G. KNIGHTON MEMBER 18 C. HAND LOCATION:
5 MI $ OF SAN CLEMENTE, CA LIC. LA.:
J. LEE MEMBER 2:
E. JONHSON I
REGION 5
-AE
'BECH COUNSEL -
L. CHANDLER CONST. INSP D.' KIRSCH REAC. TYPE: PWR NSSS: COMB ANTITRUSTs J. GOLD 0 ERG RESID. INSP: A. CHAFFEE
. DESIGN PWRt 3410 MWT/1100 MWE CONST: BECH RM ANALYST:
L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER on geological and seismological matters was issued on 12/31/80. ACRS subcommittee meetings were held 01/30/81 and ER DOCKETED:
03/01/77 03/23/77C
,03/11/81 and full committee meetings were held 02/5/81 and ER SITE VISIT COMPLETE:
05/20/77 05/20/77C
.03/12/81.
SER (Non-TMI matters), was issued on 02/06/81.
INPUT TO DES TO PM:
10/01/77 12/01/80C SER supplement on TMI issues was issued on 02/25/81. SER ISSUE DES:
01/27/78 01/20/ SIC supplement No. 2, 3, 4, 5, and 6 addressing open items were RESPONSE TO COMMENTS ON DES:
Issued 05/08/81, 09/16/81, 01/22/82, 02/16/82, and 06/30/82.
ISSUE FESt-04/00/81 04/29/81C
. Supplement No. 7 is scheduled for 05/01/83.
i CURRENT ENV. STATUS l
DES addressing class 9 accidents was issued 01-20-81, FES was issued 04-29-81 SAFETY / NEARING MILESTONES APPLICATION-TENDERED:
11/29/76C SAR DOCKETED 8 03/01/77 03/23/77C SAR O'S RECEIVED BY PM:
08/15/77 09/29/77C SAR APPL. RESPONSE TO O'S RECEIVED: 11/18/77 12/08/77C CURRENT HRG. STATU$t IMPUT TO DRAFT SER TO PM:
02/10/78 08/tt/78C Motions for-summary disposition were granted by ASLB.
-ISSUE DRAFT SER:
01/15/81 01/15/8tC Hearing started 06/22/81 and ended 09/31/81. ASLB PID INPUT TO SER:
06/23/78 01/15/81C was rendered on 01/11/82 and ID on 05/14/82. ASLAB ISSUE SER:
08/01/80 02/06/81C
' Deci sion ( AL AB-717) was issued on 03/04/83.
ACRS LETTER RECEIVED:
03/17/81 03/97/81C INPUTS TO SE SUPPLEMENT 78 04/01/83 ISSUE SE SUPPLEMENT 78 05/01/83 FEMA LETTER RECEIVED:
12/01/81 12/01/8 tC
' CURRENT ANTITRUST
- The antitrust review is complete.
HEARING STARTED
- 06/22/81 06/22/81C~
ASLB INITIAL DECISION 8 05/14/82 05/14/82C CDMMISSION EFFECTIVEMESS DECISION: 05/14/82-05/14/82C TECH SPECS COMPLETEDs.
11/15/82 11/15/82C COMMISSION DECISION 03/08/83 ISSUE LIC. WITH POWER RESTRICTION: 11/15/82 11/15/82C
. LATEST' AMENDMENT:
ISSUE FULL POWER LICENSE AMEND 8 04/15/83 SCHED. DATE. RECEIPT DATE-NEW SLIPS / MOTES:
CONSTRUCTION COMPLETION - APPL.8' 11/15/82C 09/27/82 l
l
NRR LICENSING SYSTEM PAGE Nos 2-26 SEABROOK 1 8 2 OL CURRENT STATUS REP 0RT REPORT AS OFs 03/31/83 PLANT CHARACTERI$TICSt KEY PERSOMNELt DOCKET N08 044380444 LIC. PM:
L. WHEELER ASLB CHAIR:
H. H0YT APPLICAMT PUBLIC SERVICE OF MEW HAMPSHIRE LIC. BCs G. KMIGHTON MEMBER 18 E. LUEBKE LIC. LA.8 J. LEE MEMBER 28 J. HARBOUR LOCATION:
10 MI S OF PORTSMOUTH, NH CDUMSEL:
R. LES$Y CONST. INSPs A. TOTH REGION:
1 AE UEC REAC. TYPE: PWR MSSS8 WEST ANTITRUST:
- 8. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTOMES:
SCHED. DATE ACTUAL DATE The FSAR acceptance review was completed in September 1981.
The FSAR was docketed October 5, 1981.
Appilcant has ER DOCKETED:
10/05/81 10/05/81C responded to round 1 t's.
SER was issued 03/07/83.
ER SITE VISIT COMPLETE:
12/02/81 12/02/81C INPUT TO DES TO PM:
03/01/82 03/01/82C ISSUE DES:
05/14/82 05/14/82C RESPONSE TO COMMENTS ON DES:
08/18/82 09/15/82C ISSUE FES:
12/08/82 12/08/82C CURRENT ENV. STATUS:
ER was tendered June 1981.
ER acceptance review was completed September 1981.
The ER was docketed SAFETY / HEARING MILESTONES October 5, 1981 DES was issued in May, 1982.
FES APPLICATION TENDERED:
06/29/81 06/29/81C was issued in December 1982.
SAR DOCKETED:
10/05/81 10/05/8tC SAR O'S RECEIVED BY PM:
01/20/82 03/05/82C SAR APPL. RESPONSE TO 9'S RECEIVED: 03/12/82 04/13/82C IMPUT TO DRAFT SER TO PM:
05/07/82 10/08/82C CURRENT HRG. STATUS:
Motice for Opportunity for Hearing was published in ISSUE DRAFT SER:
07/30/82 08/13/82C the Federal Register on October 19, 1981.
First prehearing IMPUT TO SER:
11/30/82 12/29/82C conference was held May 6-7, 1982. Second prehearing ISSUE SER:
01/12/83 03/07/83C conference was held July 15-16, 1982.
ASLB order ACRS FULL C0f91ITTEE MEETING:
04/09/83 identifying parties, contentions and prehearing schedule was issued September 13, 1982.
Discovery is in progress.
INPUTS TO SE SUPPLEMENT 18 05/08/83 ISSUE SE SUPPLEMENT 18 06/08/83 FEMA LETTER RECEIVED:
04/08/83 CURRENT ANTITRUST
- HEARING STARTED:
88/08/83 Status to be determined.
ASLB INITIAL DECISIOM8 06/08/84 ColWIISSION EFFECTIVEMESS DECISION: N/S TECH SPECS COMPLETED:
07/08/84
~
C0f91ISSION DECISION:
88/09/84 s
ISSUE LIC. WITN POWER RESTRICTION 8 ISSUE FULL POWER LICENSE AMEND:
09/09/84 1
LATEST AMENDMENT:
l 47 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES 8 Fuel Ioad slipped to 9/84 per appilcant Ietter of 12/02/82.
CONSTRUCTION C0FFLETION - APPL.*
09/30/84
.12/t2/82
NRR LICEHSIHG SYSTEM PAGE HO: 5-27 SHOREHAM 0L CURREHT STATUS: ' REP 0RT
- REPORT AS OF 03/31/83 PLANT CHARACTERISTICSt KEY PERS0HHELa DOCKET HO:
05000322 LIC. PM:
R. CARUS 0 ASLB CHAIR:
L. BRENNER APPLICANT:
LOHG ISLAND LIGHTING CD.
LIC. BC A. SCHWENCER MEMBER 1:
P. MORRIS LOCATION:
BROOKHAVEH, NY (LI)
LIC. LA.:
E. HYLTON MEMBER 28 J. CARPENTER REGICH:
1 AE
$8W COUNSEL:
B. BORDENICK CONST. INSP L. HARROW REAC. TYPE: BWR HSSS: GE ANTITRUST J. RUTBERG RESID. INSP J. HIGGINS DESIGH PWR - 2436 MWT/0820 MWE CONST 58W RM ANALYST:
L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The ACRS meeting was held in October 1981.
SER Supplement 2 was issued in March 1982.
SER 83 was ER DOCKETED:
01/26/76 01/26/76C issued 02/04/83.
ER SITE VISIT COMPLETE:
08/06/76 08/03/76C INPUT TO DES TO PM:
11/22/76 11/29/76C ISSUE DES:
03/11/77 03/24/77C RESPONSE TO COMMENTS OH DES:
07/22/77 07/22/77C ISSUE FES:
10/21/77 10/18/77C CURRENT ENV. STATUS:
The environmental review is complete.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
09/00/75 09/04/75C SAR DOCKETED:
12/15/77 01/26/76C SAR Q'S RECEIVED BY PM:
06/04/76 07/09/76C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/23/76 07/23/76C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
07/15/77 08/01/77C After a brief recess, hearings resumed in Hauppauqe on ISSUE DRAFT SER:
January 10, 1983.
They will remain on Long Island INPUT TO SER:
03/10/81 03/10/81C indefinitely.
ISSUE SER:
04/10/81 04/10/81C ACRS LETTER RECEIVED:
09/18/81 10/19/81C INPUTS TO SE SUPPLEMENT 4 N/S ISSUE SE SUPPLEMENT 4:
05/01/83 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Not required.
HEARING STARTED:
05/04/82 05/04/82C ASLB IHITIAL DECISIDH 07/00/83
~~
COMMISSIDH EFFECTIVENESS DECISIGHz 10/00/83 TECH SPECS COMPLETED:
06/00/83 COMMISSIGH DECISIDH:
10/00/83 ISSUE LIC. WITH POWER RESTRICTION: 06/30/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
10/00/83 FSAR Amendment 27 SCHED. DATE RECEIPT DATE HEW SLIPS /HDTES:
The current estimate for a partial initial ASLB decision CONSTRUCTION COMPLETION - APPL.:
06/00/83 31/19/83 "I
on all ma';ters except offsite emergency planning is i
July, 1983.
A complete initial decision may not 1
be available orlor to October. 1983.
t I
HRR LICEH$IHG SVSTEN PAGE HO 2-28 SOUTH TEXAS 1 82 0L CURRENT STATUS REPORT REPORT AS OF 03/31/83 PLAHT CHARACTERISTICSt KEY PERS0HHELa DOCKET HO:
049880499 LIC. PM:
H. SCHIERLING ASLB CHAIR:
C. BECHHOEFER APPLICANT:
HOUSTON LIGHTING 8 POWER COMPANY LIC. BC G. KNIGHTON MEMBER 18 J.
LAMB LOCATIDH 12 MI SSW OF BAY CITY, TEX LIC. LA.:
J. LEE MEMBER 2:
E. HILL REGIDH 4
AE BECH COUNSEL:
R. PERLIS CONST. INSPs REAC. TYPE: PWR HSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP W. HILL DESIGH PWR 3800 MWT/1250 MWE CONST: EBASCO RM ANALYST:
L. LAHIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE BRRT has been replaced by Bechtel as the A/E.
BRRT has been replaced by Ebasco as the constructor.
ER DOCKETED:
07/17/78C Hon-safety related construction restarted on June 15, 1982.
ER SITE VISIT COMPLETE:
09/26/78 09/26/78C Safety related construction restarted on August 15, 1982.
INPUT TO DES TO PM:
08/00/85 Current FLD is 12/86. Milestones now reflect a 12/86 FLD.
ISSUE DES:
09/00/85 RESPONSE TO COMMENTS OH DES:
01/00/86 ISSUE FES:
02/00/86 CURRENT ENV. STATUS:
Schedule revised to reflect new 12/86 FLD.
SAFETY / HEARING MILESTONES:
APPLICATI0H TENDERED:
05/10/78 05/10/78C SAR DOCKETED:
07/17/78C SAR Q'S RECEIVED BY PM:
01/22/79 02/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURREHT HRG. STATUS:
IHPUT TO DRAFT SER TO PM:
02/01/85 As provided in a Commission Order of 9/22/80, an ISSUE DRAFT SER:
02/01/85 expedited hearing on QA programs and management was INPUT TO SER:
10/01/85 held.
The record of this phase of the hearing ISSUE SER:
12/01/85 was closed on June 17, 1982.
Phase II of hearing will consider all aspects of Quadrex Report.
ACRS FULL COMMITTEE MEETING:
01/00/86 Phase II is expected to begin in the Spring of '83.
INPUTS TO SE SUPPLEMENT 1:
01/00/86 ISSUE SE SUPPLEMENT 18 01/00/86 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Memo and Order issued May 6, 1982 approving settlements and HEARING STARTED:
06/06/86 proposed license conditions and dismissing proceeding.
ASLB INITIAL DECISI0Hz 11/00/86 COMMISSIGH EFFECTIVENESS DECISIDH 12/00/86
~~
TECH SPECS COMPLETED:
12/00/86 COMMISSION DECISIDH 12/00/86 ISSUE LIC. WITH POWER RESTRICTIDH:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
12/00/86 FSAR amendment 029 was issued 12/29/82.
ER amendment 06 was issued 12/01/82.
SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:
All schedules now reflect new official FLD of 12/86.
CONSTRUCTIDH COMPLETI0H - APPL.:
12/00/86 03/00/82
--.-.._--..~.~-~--._---_--...-..-_-.-_w..-.-,...-
NRR LICEN5ING SYSTEM PAGE Nos 2-29 ST LUCIE 2 0L CURRENT STATUS REP 0RT REPORT AS OF 03/31/83 PLANT CHARACTERISTICSt KEY P E R S 0 N N E La l
DOCKET NO:
65000389 LIC PM:
V. HERSES ASLB CHAIR E. BOWERS APPLICANT:
FLORIDA POWER & LIGHT LIC. BC:
G. KNIGHTON MEMBER 1:
P. MORRIS.
LOCATION:
12 MI SE OF FT. PIERCE. FLA LIC. LA.:
J. LEE MEMBER 28
- 0. PARIS REGION:
2-AE EBASCO COUNSEL:
W.~PATTON CONST. INSP R. WRIGHT REAC. TYPE: PWR NSSS: COMB ANTITRUST 8 B. V0GLER RESID. INSP S. ELROD l
DESIGN PWR 2700 MWT/0842 MWE CONST8 EBASCO RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Status of 9-1 and 9-2 review is complete. The SER was issued on 10/09/81. SE Supplement No. I was issued ER DOCKETED:
02/17/81C on 12/30/81. SE Supplement No. 2 was issued on 09/30/82.
ER SITE VISIT COMPLETE:
02/18/81 02/18/ SIC INPUT TO DES TO PM:-
08/07/81 08/07/81C ISSUE DES:
10/16/81 10/16/81C RESPONSE TO COMMENTS ON DES:
02/08/82 02/08/82C ISSUE FES:
04/23/82 04/23/82C I
CURRENT ENV. STATUS:
The DES was issued on 10/16/81 and the FR Notice was pub 11shed.10/30/81. The FES was issued on 04/23/82.
SAFETY / NEARING MILESTONES:
APPLICATI0H TENDERED 03/31/80 03/31/80C SAR DOCKETED:
02/17/81C SAR 9'S RECEIVED BY PM:
06/15/81 06/15/81C SAR APPL. RESPONSE TO 9'S RECEIVED:
I CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
08/03/81 08/03/81C There have been no petitioners on matters dealing with ISSUE DRAFT SER:
08/10/81 08/10/81C health.. safety and environment.
INPUT TO SER:
09/11/81 0 9/11/81C ISSUE SER:
10/09/81 10/09/81C ACRS FULL COMMITTEE MEETING 11/12/81 11/12/81C INPUTS TO SE SUPPLEMENT 38 -
03/21/83 ISSUE SE SUPPLEMENT 3 03/23/83 FEMA LETTER RECEIVED:
08/20/82 08/20/82C
' CURRENT ANTITRUST:
Settlement among the Department of Justice, the NRC Staff HEARING STARTED '
N/A
~
and the licensee has been agreed upon.. Case dismissed ASLB INITIAL DECISION:
N/A 3/82 following summary disposition and settlement agreement.
COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
03/21/83 CDMMISSION DECI5IOH8 03/08/83 ISSUE LIC. WITN POWER RESTRICTION: 03/23/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
05/23/83 No. 13 (FSAR)
No. 5 (ER)
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Caseload Forecast Panel estimates 08/83 core load date.
CONSTRUCTION COMPLETION.- APPL.
03/01/83
"~
Applicant, in meeting with NRC on 09/30/82, estimates 03/83 core Ioad date.
1 o
- m.._
...-_..__._.._._..___.-_._____.._.____-.._..m_.__
I l
NRR LICENSINO 5YSTEM PAGE NO: 2-30
'SUSQUENAMMA 2 0L CURRENT STATUS REP 0RT REPORT AS OF 03/31/83 PLAHT CHARACTERISTICSt KEY P E R S 0 N N E L8 DOCKET N08 05000388 LIC. PMt R. PERCH ASLB CHAIR J. GLEASON
. APPLICANT: -PENHSYLVANIA POWER 8 LIGHT LIC. BC:
A. SCHWENCER MEMBER 18 LOCATIDH 7 MI ME OF BERWICK, PA LIC. LA.:
E. HYLTON MEMBER 2:
P. PURDOM i
REGIDH:
1 AE BECH COUNSEL:
J. CUTCHIM CONST. INSP L. MARROW-REAC. TYPE: BWR HSSS GE ANTITRUST:
A. HODGDON RESID. INSP G. RHOADS DESIGN PWR
'3440 MWT/1952 MWE CONST* BECH RM ANALYST 8 L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SSER 85 is scheduled for 03/01/83.
06/10/78C SER was issued 04/06/81. SSER 81 was issued 07/07/81.
ER DOCKETED:
Post ACRS SSER 82 was issued 09/10/81. SSER 83 was ER SITE VISIT COMPLETE:
10/20/78 10/20/78C issued 07/17/82. SSER 84 was issued 11/12/82. SSER 85 IMPUT TO DES TO PM is scheduled for 03/31/83.
ISSUE DES:
03/30/81 03/30/81C RESPONSE TO COMMENTS ON DES 05/21/81 05/21/81C ISSUE FES:
06/15/81 07/02/81C CURRENT ENV. STATUS:
DES was issued on 03-30-81 FES was issued 07-02-81 SAFETY / HEARING MILESTONES 8 APPLICATION TENDERED:
06/05/78 04/10/78C SAR DOCKETED:
07/31/78 07/31/78C SAR Q'S RECEIVED BY PM SAR APPL. RESPONSE TO 4'S RECEIVED:./S IMPUT TO DRAFT SER TO PMt 04/07/80 04/07/80C CURRENT HRG. STATUS:
The OL hearing'is complete: Initial Decision issued on ISSUE DRAFT SER:
INPUT TO SER:
03/23/81 03/23/81C 04-12-82.
ISSUE SER:
04/06/81 04/06/81C ACRS LETTER RECEIVED:
08/15/81C IMPUTS TO SE SUPPLEMENT 5 02/01/83 02/03/83C ISSUE SE SUPPLEMENT 52 03/31/83 FEMA LETTER RECEIVED:
06/00/82 06/00/82C
' CURRENT ANTITRUST
- HEARING STARTED:
10/06/81 10/06/81C Complete.
ASLB INITIAL DECISION:
04/12/82 04/12/82C COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
12/00/83 COMMISSIGH DECISIGHz 12/00/83 ISSUE LIC. WITH POWER RESTRICTION:
ISSUE FULL POWER LICENSE AMEND:
01/08/84 LATEST AMENDMENT:
FSAR:
No. 30s-ER:
No. 5 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES 8 CONSTRUCTION COMPLETION - APPL.:
01/08/84 7
l NRR LICENSING SYSTEM PAGE NO: 2-31 WASHINGTON NUCLEAR 1 0L CURRENT STATUS REPORT REPORT AS OF8 03/31/83 P L A N'T C H A R'A C T E R I 5 T I C 5:
KEY P E R S 0 N N E L8 DOCKET NO 05000460 LIC, PM:-
M. THADANI ASLB CHAIR M. GROSSMAN i
APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:
E. ADENSAM MEMBER 1 G. BRIGHT LOCATION:
10 MI N OF RICHLAND, WA LIC. LA.:
M. DUNCAN MEMBER 28 J. MARBOUR REGION:
5 AE UEC COUNSEL:
M. YOUNG CONST. INSP J. OLIN REAC. TYPE: PWR HSSS: 58W ANTITRUST:
RESID. INSP A. TOTH DESIGN.PWR 3760 PedT/1266 PedE CONST BECH RM ANALYST:
L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE I
' Application was tendered on 11-25-41 Application was docketed on July 16, 1982.
The reviews will be ER DOCKETED:
07/08/82 07/16/82C performed on " manpower available asis.
The SER ER SITE VISIT COMPLETE:
issuance will be scheduled follt ing the resumption INPUT TO DES TO PM:
of construction.
Appl. has requested an amendeent ISSUE DES:
N/$
to construction permit extending the construction RESPONSE TO C0ffiENTS ON DES:
completion date from 01/01/82 - to 06/01/91. Staff's ISSUE FES:
N/S reviewing the applicants basis for requested amendments
,against the regulatory requirements.
CURRENT'ENV. STATUS:
The staff reviews will lae performed on " Manpower available" basis. DES issuance will be scheduled SAFETY / NEARING MILESTONES:
following resumption of construction.
SAR DOCKETED:
07/08/82 07/16/82C SAR 9'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Motice of.9pportunity for Hearing was published in the ISSUE DRAFT SER:
Federal Register on August 16, 1982.
A petition to INPUT TO SER:
. Intervene has been received from the Coalition for ISSUE SER:
N/S Safe Power. A prehearing conference was held
.in Richland,.Wa..,on January 26 and 27, 1983.
ACRS FULL. CofftITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 1:
ISSUE SE SUPPLEMENT 18 N/S FEMA LETTER RECEIVED:
CUERENT ANTITRUST
+
E HEARING STARTED:
N/S ASLB INITIAL DECISION '
N/S C0ff1ISSION EFFECTIVENESS DECISION: N/S TECM SPECS COMPLETED:
COPMISSION DECISION:
ISSUE LIC. WITH POWER RESTRICTION:
LATEST" AMENDMENT:
1982 received in Document ISSUE FULL POWER LICENSE AMEND:
N/S FSAR amendment 1, dated Oct. 18, Control System Nov.
1, 1982.
ER amend. 1 was rec'd 2/11/83.
SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:-
Construction delay of from 2 to 5 years was announced CONSTRUCTION COMPLETION - APPL.:
N/S' 04/29/82 7
~on 4/29/82.
i i
-. ~ ~. - - -.
_ -.-. - - - - n -. _ - -
l PAYE'NO 2-32 NRR LICEN5ING SYSTEM WASHINGTON NUCLEAR 2 0L CURRENT 5TATUS REPORT REPORT'AS OF 03/31/83 PLANT CHARACTERISTIC 5 KEY P E R S 0 N N E La DOCKET NO:
05000397 LIC. PM:
R. AULUCK ASLB CHAIR:
E. BOWERS APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC A.
SCHWENCER MEMBER 18 R._ COLE LOCATIDM
~30 MI MW OF RICHLAND, WASH LIC. LA.:
E. HYLTON MEMBER 28-E.-HILL
, REGION:
5
-AE:
B8R COUNSEL:
W. PATCM.
CONST. IMSP A. TOTH-REAC. TYPE: BWR HSSS: GE ANTITRUST B. V0GLER RESID. INSPs R. FEIL.
DESIGH PWR 3323 MWT/1103 MWE CONST BECH RM ANALYST L. LANIER CURRENT..SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE 4
i SER was issued 3/31/82. Geology / Seismology reviews were included in SSER Ho. 1 issued August 11, 1982.
ACRS ER DOCKETED:
02/28/77 04/20/77C meeting was held on October 7, 1982.
SSER No. 2 was ER SITE VISIT COMPLETE:
07/13/77
,07/14/77C-issued 12/21/82. SSER 83 scheduled for 04/29/83.
IMPUT TO DES TO PM:
06/30/81 06/30/81C ISSUE DES:
07/31/81 07/31/81C RESPONSE TO COMMENTS DM DES:
09/28/81 09/28/81C ISSUE FES:
12/31/81 12/31/81C CURRENT ENV. STATUS:
FES was issued 12-31-81.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/30/76 12/30/76C SAR DOCKETED:
04/01/78 06/22/78C SAR Q'S RECEIVED BY PM:
01/05/79 03/07/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/11/79 07/26/79C INPUT TO DRAFT SER TO PM:
10/12/81 10/12/81C CURRENT HRG. STATUS:
11/17/81 11/17/81C A prehearing conference on CP extension order was held ISSUE DRAFT SER:
-on January 26. 1983, in Richland, Wa.
On February 22, INPUT TO SER:
05/30/82 05/30/82C 1983, the ASLB denied.the request for hearing filed by ISSUE SER:
03/31/82 03/31/82C the Coalition for Safer Power and dismissed the proceeding.
ACRS LETTER RECEIVED:
11/13/82' 11/13/82C No OL hearings scheduled.
INPUTS TO SE SUPPLEMENT 38.
11/22/82' 11/22/82C ISSUE SE SUPPLEMENT 38 04/29/83 FEMA LETTER RECEIVED:
05/01/83
. CURRENT. ANTITRUST:
N/A HEARING STARTED:
Not required ASLB INITIAL DECISION:
N/A COMMISSION EFFECTIVENESS DECISIDH TECH SPECS COMPLETED:
07/08/83
~~
COMMISSION DECISIDH 08/00/83 ISSUE LIC. WITH POWER RESTRICTION:
ISSUE FULL POWER LICENSE AMEND 09/00/83 LATEST AMENDMENT:
SCHED. DATE RECEIPT DATE
- NEW SLIPS / NOTES:
. CONSTRUCTION COMPLETION - APPL.:
09/08/83 05/07/82
~~
=
mm_
MRR LICEM$ING SYSTEM PAGE MO: 2-331 WASHINGTON NUCLEAR 3 0L CURRENT 5TATU5 REP 0RT REPORT A5 0F 03/31/83-PLANT CHARACTERI5 TIC 5:
KEY PERS0NNELa DOCKET NO:
05000508 LIC. PMt A. VIETTI ASLB CHAIR R. LAZO APPLICANT:
WASHIhGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:
G. KNIGHTON MEMBER 18 E. LUEBKE LOCATION:
26 MI W OF OLYMPIA, WA LIC. LA.:
J. LEE MEMBER 28-D. SCHINK REGIOM8 5
AE EBASCO COUNSEL:
D. SWANSON CONST. IMSP D. KIRSCH
.REAC. TYPE 8 PWR NSSS: COMB ANTITRUST B. V0GLER RESID. INSP W. ALBERT DESIGN PWR 3800 MWT/1242 MWE CONST* EBASCO RM ANALYST L. LANIER CURREMT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE
. Application was tendered on June 2, 1982, and was
. docketed on 08/27/82. Safety review has started.
ER DOCKETED:
08/27/82 08/27/82C ER SITE VISIT COMPLETE:
IMPUT TO DES TO PM:
07/08/83 ISSUE DES:
09/07/83 RESPONSE TO COMMENTS ON DES:
ISSUE FES8 04/06/84 CURRENT ENV. STATUS 8 Appilcation was tendered on June 2, 1982, and was docketed on 08/27/82. Environmental review has SAFETY / HEARING MILESTONES:
started.
APPLICATION TENDERED 8 06/02/82 06/02/82C' SAR DOCKETED 2 08/27/82 08/27/82C SAR O'S RECEIVED BY PM:
04/05/83 SAR APPL. RESPONSE TO 9'S RECEIVED 07/13/83 CURRENT HRG. STATUS
- IMPUT TO DRAFT SER TO PM:
10/28/83 Notice of Opportunity for Hearing was pubilshed in the ISSUE DRAFT SER:
12/01/83 Federal Register on 09/15/82.
IMPUT TO SER:
06/05/84 ISSUE SER:
08/09/84 ACR$ FULL COMMITTEE MEETING 09/09/84 INPUTS TO SE SUPPLEMENT 18 11/06/84 ISSUE SE SUPPLEMENT le 12/13/84 FEMA LETTER RECEIVED:
CURRENT ANTITRUST Notice of Opportunity for Hearing was published in the HEARING STARTED:
05/08/85 Federal Register on October 15, 1982.
ASLB INITIAL DECISION:
11/08/85
' COMMISSION EFFECTIVENESS DECISION:
12/08/85 TECH SPECS COMPLETED 8 12/00/85 COMMISSIDH DECISI0H8 12/08/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND
- M/S SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
i Detailed review schedule has been approved.
CONSTRUCTION COMPLETION - APPL.:
12/00/85 10/01/82
.m i
NRR LICEN5ING SY$ TEM PAGE N0: 2-34 WATcRFORD 3 OL CURRENT STATUS REPORT REPORT AS OF 03/31/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:
65000382 LIC. PM:
J. WILSON ASLB CHAIR S. WOLFE APPLICANT:
LOUISIANA POWER 4 LIGHT LIC. BC:
G. KNIGHTON MEMBER 1:
W. JORDAN LOCATIDH 20 MI W OF MEW ORLEANS, LA LIC. LA.:
J. LEE MEMBER 2:
H. FOREMAN REGION:
4 AE EBASCO COUNSEL:
S. TURK CONST. INSP
. UNASSIGNED REAC. TYPE: PWR NSSS: COMB ANTITRUST B. V0GLER RESID. INSP L. CONSTABLE DESIGN PWR 3560 MWT/1151 MWE CONST: EBASCO RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The safety review was expedited. Fuel load date
. delayed until 05/83 by applicant. SSER 84 issued ER DOCKETED:
12/00/78 12/00/78C i
10/29/82.
ER SITE VISIT COMPLETE:
12/05/80 12/ 0 5/8 0 C-INPUT TO DES TO PM:
04/06/81 04/06/81C' ISSUE DES:
05/01/81 05/01/81C RESPONSE TO COMMENTS ON DES:
07/24/81 08/19/81C ISSUE FES:
09/30/81 09/30/81C CURRENT ENV. STATUS:
The DES was completed in May 1981.
FES was completed September 1981 SAFETY / NEARING MILESTONES:
j APPLICATION TENDERED:
09/28/78 09/28/78C SAR DOCKETED:
12/18/78C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/80 12/15/80C CURRENT HRG. STATUS:
IMPUT TO DRAFT SER TO PM:
10/03/80 05/15/81C Contested hearing started 03/82. Discovery among the ISSUE DRAFT SER:
parties has been held. Partial initial decision issued INPUT TO SER:
05/08/81 05/15/81C 2
11/03/82. Nearing for remaining item (emergency ISSUE SER:
07/09/81 07/09/81C 1
preparedness) was held February 7-11, 1983.
Record closed February.11, 1983.
ACRS LETTER RECEIVED:
08/08/81 08/08/81C IMPUTS TO SE SUPPLEMENT 58 03/31/83 ISSUE SE SUPPLEMENT 58 03/31/83 i.
FEMA LETTER RECEIVED:
03/31/83 CURRENT ANTITRUST:
Staff is reviewing OL entitrust information.
HEARING STARTED:
03/08/82 03/23/82C ASLB INITIAL DECISION:
03/00/83 COMMISSION EFFECTIVENESS DECISION: 04/00/83 TECH SPECS COMPLETED:
03/31/83 COMMISSION DECISIDH:
04/30/83 ISSUE LIC. WITH POWER RESTRICTION:
lATFST AMENDMENT:
ISSUE FULL. POWER LICENSE AMENDS.
05/00/83 ER 83 - 8/81 FSAR 838
.12/82.
SCHED. DATE RECEIPT DATE~
NEW SLIPS / NOTES:
To date State of Louisiana does not have an approved CONSTRUCTION COMPLETION - APPL.:
05/08/83 08/24/82 emergency plan.
I i
-e
m,------___-__,,
HRR LICEHSING SYSTEM PAGE HO 2-35 WATTS BAR 182 0L CURRENT STATUS REP 0RT REPORT AS OF 03/31/83 PLAHT CHARACTERISTICSt KEY PERS0HHELa DOCKET NO:
039080391 LIC. PM:
T. KEHYON ASLB CHAIR: N/A APPLICANT:
TENNESSEE VALLEY AUTHORITY LIC. BC:
E. ADENSAM MEMBER 1 N/A LOCATION:
10 MI S OF SPRING CITY, TENN LIC. LA.:
M. DUNCAN MEMBER 28 N/A REGION:
2 AE TVA COUNSEL:
M. YOUNG CONST. IHSP W. SWAN REAC. TYPE: PWR HSSS: WEST ANTITRUST J. RUTBERG RESID. INSP T. HEATHERLY DESIGH PWR 3411 MWT/1165 NWE CONST: TVA RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CFP predicted earliest Unit I completion date at 06/84.
SER published 07/82.
ACRS subcommittee meetings held ER DOCKETED:
01/05/77 11/23/76C 04/30/82 and 08/10/82.
ACRS full committee meeting ER SITE VISIT COMPLETE:
03/18/77 02/25/77C held 08/13/82.
ACRS letter received 08/16/82.
Supplement INPUT TO DES TO PM:
07/06/77 08/18/77C 51 to SER published 09/22/82. Supplement 52 to SER ISSUE DES:
11/29/77 06/02/78C scheduled 04/22/83.
RESPONSE TO COMMENTS OH DES:
N/A ISSUE FES:
11/24/78 12/29/78C CURRENT ENV. STATUS:
Complete except for environmental tech specs.
SAFETY / HEARING MILESTONES:
APPLICATI0H TENDERED:
06/30/76 06/30/76C SAR DOCKETED:
10/04/76 10/04/76C SAR Q'S RECEIVED BY PM:
12/15/76 05/20/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/23/77 02/10/78C 1
l CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
06/18/80 12/18/81C 1
No hearings are assumed.
ISSUE DRAFT SER:
12/30/81 12/30/81C l
INPUT TO SER:
06/C4/82 06/04/82C l
ISSUE SER:
07/01/82 07/01/82C ACRS LETTER RECEIVED:
09/00/82 08/16/82C IHPUTS TO SE SUPPLEMENT 22 08/27/82 09/03/82C ISSUE SE SUPPLEMENT 28 04/22/83 FEMA LETTER RECEIVED:
04/00/83 CURRENT ANTITRUST:
Complete HEARING STARTED:
N/A ASLB INITIAL DECISIDH N/A COMMISSIDH EFFECTIVENESS DECISIDH TECH SPECS COMPLETED:
07/00/83 COMMISSIGH DECISION:
12/00/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENTt ISSUE FULL POWER LICENSE AMEND:
03/00/84 FSAR Ho. 46 SCHED. DATE RECEIPT DATE HEW SLIPS /HOTES:
CONSTRUCTION COMPLETI0H - APPL.:
01/00/84 02/25/83
.. -. - --- -. -. - _ -. - ~. _ -
NRR LICEN5ING SYSTEM PAGE NO: 2-36 WOLF. CREEK 1 0L CURRENT STATUS REPORT REPORT AS OF 03/31/83
~
PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:
05000482 LIC. PM:
J. HOLONICH' ASLB CHAIR:
J. LAURENSON B. YOUNGBLOOD MEMBER 1:
G. ANDERSON APPLICANT:
KANSAS GAS 8 ELECTRIC LIC. BC LOCATION:
3.5 MI ME OF BURLINGTON,.KAN LIC. LA.:
M. RUSHBROOK MEMBER 2
'H.
PAXTON REGION:
4 AE BECH COUNSEL:
M. KARMAN CONST. INSP: H. ROBERDS REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP S. SCHUM DESIGN PWR 3425 MWT/1150 MWE CONST DANIEL RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The SER was issued in April 1982.
SSER-1 was issued in August 1982.
SSER is scheduled for 4/83.
ER DOCKETED:
11/25/80 11/25/80C ER SITE VISIT COMPLETE:
07/28/81 04/21/61C INPUT TO DES TO PM:
10/01/81 10/01/81C 4
ISSUE DES:
01/05/82 01/05/82C RESPONSE TO COMMENTS ON DES:
05/14/82 05/14/82C ISSUE FES:
06/11/82 06/11/82C CURRENT ENV. STATUS:
The DES was issued in January 1982. The FES was issued in June 1982.
SAFETY / HEARING MILESTONES:
APPLICATI0H TENDERED:
02/21/80 02/21/86C SAR DOCKETED:
08/07/80 08/07/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
03/12/82 03/12/82C i
Motice of Opportunity for Hearing was published in the ISSUE DRAFT SER:
. Federal Register on 12/18/80. Two petitions for INPUT TO SER:
03/19/82 03/19/82C leave to intervene were filed. A.special combined ISSUE SER:
04/07/82 04/07/82C prehearing conference was held on 4/15/81. A second prehearing conference was held on March 10, 1983.
ACRS LETTER RECEIVED:
05/11/82 05/11/82C IMPUTS TO SE SUPPLEMENT 18 08/10/82 08/10/82C ISSUE SE SUPPLEMENT 13 08/26/82 08/26/82C.
FEMA LETTER RECEIVED:
04/01/83 CURRENT ANTITRUST:.
HEARING STARTED; 06/00/83 OL antitrust review is in progress.
ASLB INITIAL DECISIDH 11/00/83
. COMMISSION EFFECTIVENESS DECISION:
12/00/83 TECH SPECS COMPLETED:
M/S COMMISSION DECISION:
.09/08/84 ISSUE LIC. WITH POWER RESTRICTION: N/S ISSUE FULL POWER LICENSE AMEND:
10/09/84 tATEST AMENDMENT:
9; SHUPPS FSAR - No. 10; Wolf Creek Site Addendum - No.
ER - No. 4.
SCHED. DATE RECEIPT DATE j
'NEW SLIPS / MOTES:
CONSTRUCTION COMPLETI0M - APPL.:
10/00/84 08/24/82 t
4 MRR LICEN5ING SYSTEM PAGE NO: 2-37 ZIMMER't 0L CURRENT STATUS REP 0RT
' REPORT AS OF 03/31/83 P.L A N'T C H A R'A C T E R I S T I C St KEY
.P E R S 0 N N E La l
I~
_ DOCKET NO: ~05000358 LIC. PM:
L. KINTMER ASLB CHAIR:
J. FRYE APPLICANT:
CINCIMMATI GAS & ELECTRIC LIC. BC:
'B. YOUNGBLOOD MEMBER 1 F. HOOPER LOCATION:
24 MI SE OF CIMCIMMATI OH LIC. LA.:
M. RUSHBROOK MEMBER 2:
M. LIVINGSTON REGION:
3 AE 58L COUNSEL -
C. BARTH-CONST. INSP D. HUNTER D
'REAC. TYPE:
BWR-NSSS: GE ANTITRUST:
S. LEWIS RESID. INSP F. CHRISTIANSON
. DESIGN PWR - 2436' MWT/0810 MWE CONST: KAISER RM ANALYST:
B. ST MARY
. CURRENT SAF.! STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SE Supplement 01 was issued on 06/04/81. SE Supplement 92 was issued 10/81 SE Supplement 93 issued on 08/23/82.
ER DOCKETED:
09/10/75 09/10/75C HRR is assisting Region IV in-its vendor inspection of the ER SITE VISIT COMPLETE:
10/09/75 10/09/75C main steam line and its supporting structures in the INPUT TO DES TO PM:
08/20/76 08/19/76C turbine building. Resolution of open items in the safety ISSUE DES:
10/15/76 10/15/76C review is continuing.
RESPONSE TO COMMENTS ON DES:
03/25/77 04/01/77C ISSUE FES:
06/10/77 06/10/77C CURRENT ENV. STATUS -
Complete SAFETY / HEARING MILESTONES:
-APPLICATI0M TENDERED:
08/15/75 05/09/75c' SAR DOCKETED:
09/15/75 09/10/75C SAR Q'S RECEIVED BY PM: -
10/29/76 01/06/77C.
SAR APPL. RESPONSE TO Q'S RECEIVED: 12/31/76 07/29/77C
' CURRENT HRG.. STATUS:
INPUT TO DRAFT SER TO'PM:
01/28/77
.08/11/77C
.?
Hearing completed 3/5/82. Board decision was rendered in ISSUE DRAFT SER:
N/A June.~1982.
The Board exercised sua sponte authority to INPUT TO SER:
05/20/77 12/07/77C 4
admit as Board issues 8 new contentions. The Commission ISSUE SER:
07/29/77 01/31/79C i
. reviewed the action and directed the Board to issue an
't appropriate order dismissing the 8 contentions from the ACRS LETTER RECEIVED:
09/16/77 03/13/79C proceeding..On 11/12/82 the Commission issued an order to IMPUTS TO SE SUPPLEMEht 38 06/17/82 08/02/82C
~Show Cause and Order Immediately Suspending Construction.
ISSUE SE SUPPLEMENT 38 08/23/82 08/23/82C -
On 12/8/82, applicant consented to the Order.
. FEMA, LETTER RECEIVED:
04/15/82 04/15/82C i
CURRENT ANTI 7 RUST l
Antitrust review is now closed.
HEARING STARTED:
02/26/82 02/26/82C ASLB IMITIAL DECISIGHz 06/21/82 06/21/82C COMMISSION EFFECTIVENESS DECISION: N/S
. TECH SPECS COMPLETED:
05/08/83 COMMISSION DECISION:.
08/08/83 ISSUE LIC. WITH POWER RESTRICTION -
LATEST AMENDMEtiT ISSUE FULL POWER LICENSE AMEND:
09/09/83 Application amendment 143.-FSAR Revision 90-SCHED. DATE RECEIPT DATE
.NEW SLIPS / NOTES:
-Appilcant letter of 99/24/82 revised construction completion CONSTRUCTION COMPLETION - APPL.:
09/09/83 09/24/82
.date to the third quarter of 1983.
Applicant letter of-01/24/82 requested latest constrrction completion date of 4
12/31/84.
i
1 NRR LICENSIN8 5Y$ TEM PAGE N08 2-38 CLINCH RIVER CP CURRENT 5TATUS RE70RT REPORT A5 0F 03/31/83
.I PLANT CMARACTERI5 TIC $8 KEY PERSOMNELt DOCKET NO:
65000537 LIC. PM:
R. STARK ASLB CHAIR:
M. MILLER APPLICANT:
PROJECT MANAGEMENT CORP.s DOEsTVA LIC. BC:
M. GRACE MEMBER 18 G. LINEMBERGER LOCATION:
25 MI W OF KNOXVILLE, TN LIC. LA.:
P. SMUTTLEWORTH MEMBER 28 C. HAND REGION:
2-AE 88R COUNSEL:
- 5. TREBY CONST. IMSP8 REAC. TYPE: LMFBR NS$58 WEST ANTITRUST:
J. RUTBERG RESID. IMSPt DESIGN PWRt 0975 falT/0350 PEdE CONST 58W RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIROIW9 ENTAL MILESTOMES:
SCHED. DATE ACTUAL DATE Safety rewleu was reinitiated in October 1981 A revision to the Site Suitability Report was issued June 11, 1982.
ER DOCKETED:
04/11/75 04/11/75C On August 17, 1982, NRC issued an order granting Clinch ER SITE VISIT COMPLETEt 4
River's request to begin site preparation activities.
INPUT TO DES TO PM:
The Site Suitability Report hearing sessions esere held ISSUE DES:
02/12/76C in Oak Ridge during the seeek of August 23, 1982.
SER esas RESPONSE TO C0f91ENTS OM DES:
Issued 3/11/83. The ACRS meeting was held 4/14/83.
ISSUE FES:
02/07/77 02/07/77C LWA-2 will not be requested. Safety hearing is to commence June 20, 1983.
CURRENT ENV. STATUS
- The FES was issued in February 1977.
A draft supplement'to the.FES was issued on July 19, 1982.
-A final supplement SAFETY / NEARING MILESTOME58 was issued on October 29, 1982.
APPLICATION TENDERED:
10/15/74 10/15/74C SAR DOCKETED:
06/13/75 06/13/75C 5AR O'S RECEIVED BY PM:
04/09/82 04/09/82C 2 -
SAR APPL. RESPONSE TO 9'S RECEIVED 8 05/15/82 05/15/82C CURRENT HRG. STATUS-INPUT TO DRAFT SER TO PM:
07/16/82 07/16/82C Hearing sessions on the SSR took place on August 23-27, ISSUE DRAFT SER*
09/27/82 09/27/82C 1982.
The FES hearings were held Howeeber 15-19, 1982, INPUT TO SER:
01/14/83 02/04/83C December 13-17, 1982, and on January 9-5, 1983..The safety ISSUE SER8 03/11/83 03/11/83C hearings are forecasted for June 20, 1983. PID was issued on 02/28/83 on the FE5 hearing.
ACRS FULL C0fW91TTEE MEETING 04/14/83 INPUTS TO SE SUPPLEMENT 18 04/22/83 ISSUE SE SUPPLEMENT 18 05/02/83 CURRENT ANTITRUST
- MEARING STARTED:
08/23/82 08/23/82C ASLB INITIAL DECISION:
09/00/83 Cof91ISSION EFFECTIVEMESS DECISION: N/S TECH SPECS COMPLETED:
CerttISSION DECISION 8 M/S CP ISSUED:
12/08/83 iATEST AMENDMENT
- I NEW SLIPS / MOTES:
l ll l
NRR LICEN$ING SY$ TEM PAGE NO: 2-39 SKAGIT/HANFORD 182 CP CURRENT STATUS REP 0RT REPORT AS OF 03/31/83
+
PLANT CHARACTERISTICS KEY PERSONNEL:
DOCKET NO:
052280523 LIC. PM:
C. MOON ASLB CHAIR J. WOLF APPLICANT:
PUGET SOUND POWER 8 LIGHT LIC. BC:
E. ADENSAM MEMBER 18 F. HOOPER LOCATION:
30 MI. NW OF RICHLAND, WA.
LIC. LA.:
M. DUNCAN MEMBER 2 G. LINEMBERGER REGION 8
-5 AE BECH COUMSEL:
L. DEWEY CONST. INSPs REAC. TYPE: BWR MSSS GE ANTITRUST:
B. V0GLER RESID. IMSP DESIGN PWRt 3833 MWT/1277 MWE COMST BECH RM ANALYST S. HEDLUMD CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Supplement-Mo. 2 to the SER was issued 10/81 on TMI-related action items. Site relocation ER amendment and PSAR ER DOCKETED:
09/30/74 09/30/74C l
amendment were submitted on 12/31/81 The applicant is ER SITE VISIT COMPLETE:
02/05/82 02/05/82C relocating the site to the Hanford Reservation.
IMPUT TO DES TO PM:
04/09/82 04/09/82C i
Supplement 3 to the SER was issued in 12/82.
The staff ISSUE DES:
05/04/82 05/04/82C j
recommends additional investigations of the May Junction RESPONSE TO COMMENTS ON DES:
08/06/82 09/30/82C Monocline..An ACRS subcommittee site visit and meeting ISSUE FES8 06/08/83 was complete on 01/24-25/83.
The ACRS completed its review in a meeting on 02/10/83 and reported the results of its review in a letter to the chairman on 02/16/83.
CURRENT ENV. STATUS:
Site relocation (to Hanford) DES was issued on 5/4/82.
FES was delayed to 2/83 to follow issuance of the draft report SAFETY /HEARTNG MILESTONES:
on need for power by the Regional Power Council (RPC).
The RPC's draft report of 1/26/83 did not include Skagit/
APPLICATION TENDERED:
08/06/74 08/06/74C Hanford as a generating unit needed in the next 20 years.
SAR DOCKETED 01/15/75 01/15/75C In response to the applicant's request of 2/4/83, issuance SAR 9'S RECEIVED BY PM8 02/10/82 02/10/82C of the FES has been defered vntil after issuance of the SAR APPL. RESPONSE TO %d3 RECEIVED: 10/01/82 10/01/82C the Final Plan by the RPC in April 1983.
p CURRENT HRG. STATUS:
INPUT TO ORAFT SER To PM:
A prehearing schedule on safety matters was established on ISSUE DRAFT SER:
1 1/18/83 including a tentative date of 5/17/83 for beginning IMPUT TO SER:
07/11/77 07/11/77C of hearing. Applicants on 2/4/83 and the intervenors on ISSUE SER:
08/31/77 08/31/77C 2/10/83 submitted motions to suspend the. safety prehearing schedule. On 2/18/83 the Board suspended the prehearing ACRS LETTER RECEIVED:
01/08/83 02/16/83C schedule (Safety). including the filing of new contentions IMPUTS TO SE SUPPLEMENT 38 11/30/82 11/30/82C pending adoption of the Final Regional Power Plan and until-ISSUE SE SUPPLEMENT 38 11/30/82 12/30/82C the conclusion of hearings on " Meed for Power".
CURRENT ANTITRUST
- Complete HEARING STARTED:
07/15/75 07/15/75C ASLB IMITIAL DECISION:
N/S COMMISSION EFFECTIVEMESS DECISION 8 N/S TECH SPECS CDMPLETED8 M/A COMMISSION DECISION:
N/S CP ISSUED:
N/S LATEST AMENDMENT:
NEW SLIPS / MOTES:
~~
i 1
1 l
NRR LICENSING SYSTEM PAGE NO: 2-40 (HSS)CESSAR SYSTEM 80 FDA CURREHT STATUS REP 0RT REPORT AS OF 03/31/83 PLANT CHARACTERISTICSt KEY PERS0HHELa DOCKET NO3-05000470 LIC. PM:
G. MEYER ASLB CHAIR APPLICANT:
COMBUSTION ENGINEERING LIC. BC:
C.
THOMAS MEMBER 1 LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
REGION:
0 AE COUNSEL:
M. WAGNER CONST. INSP REAC. TYPE: PWR HSSS: COMB ANTITRUST:
RESID. INSP:
DESIGN PWR 3800 MWT/1295 MWE CONST:
RM ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER (NUREG-0852) issued 11/81.
Awaiting documentation to resolve ACRS, open, and confirmatory issues. SSERI was ER DOCKETED:
Issued 03/30/83. A revision to the supplement is ER SITE VISIT COMPLETE:
scheduled for May 31, 1983.
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
N/A.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/27/78 10/27/78C SAR DOCKETED:
12/21/79 12/21/79C SAR Q'S RECEIVED BY PM:
09/01/80 09/01/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 01/01/81 07/15/81C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S N/A, ISSUE DRAFT SER:
N/S INPUT TO SER:
11/01/81 11/13/8tC ISSUE SER:
05/01/82 11/10/8tC ACRS LETTER RECEIVED:
06/21/82 12/15/81C INPUTS TO SE SUPPLEMENT 2:
03/01/83C ISSUE SE SUPPLEMENT 2 05/31/83 CURRENT ANTITRUST:
HEARING STARTED:
N/A ASLB INITIAL DECISION:
H/A COMMISSION DECISION:
07/00/83 SPECIAL PROJECT COMPLETE:
07/29/83 LATEST AMENDMENT:
NEW SLIPS / MOTES:
7
_..-.._._._.._.___m_
HRR LICENSING SYSTEM PAGE HO: 2-41 (HSS)GESSAR SEVERE ACC FDA CURRENT STATUS REP 0RT REPORT AS OF 03/31/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:
00007447 LIC. PM D. SCALLETTI ASLB CHAIR: N/A APPLICANT:
GENERAL ELECTRIC COMPANY LIC. BC:
C. THOMAS MEMBER 1 N/A LOCATIDH N/A LIC. LA.:
P. ANDERSON MEMBER 2 N/A REGIDH 0
AE BRAUH COUNSEL:
B. BORDENICK CONST. INSP REAC. TYPE: BWR HSSS: GE ANTITRUST:
RESID. INSP DESIGH PWR 3579 MWT/1220 MWE CONST:
RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82; revi ew i s in progress.
Dates shown reflect review for the severe accident ER DOCKETED:
design.
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
03/31/80 03/31/80C SAR DOCKETED:
02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:
09/01/82 10/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/01/83 02/01/83C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
ISSUE DRAFT SER:
INPUT TO SER:
02/01/84 ISSUE SER:
03/01/84 ACRS FULL COMMITTEE MEETING:
04/06/84 INPUTS TO SE SUPPLEMENT 1 04/21/84 ISSUE SE SUPPLEMENT 1:
05/25/84 CURRENT ANTITRUST FDA antitrust review is in progress.
HEARING STARTED:
N/A ASLB INITIAL DECISIDH N/A COMMISSIDH DECISIDH:
N/A SPECIAL PROJECT COMPLETE:
05/00/84
~~
LATEST AMENDMENT:
FDA Amendment No. 9 was received in November, 1982.
HEW SLIPS / MOTES:
=
j l
q
_-r NRR LICEN5IN6 5YSTEM PAGE NO: 2-42 (NSS)SESSAR-238 NI FDA CURRENT STATU$
REP 0RT REPORT AS OF 03/31/83 PLANT CNARACTERI$TICSt KEY PERS0NNELa DOCKET NO:
65000447 LIC. PM:
D. SCALETTI ASLB CHAIR: N/A APPLICANT:
GENERAL ELECTRIC C0fe'ANY LIC. BC:
C. THOMAS MEMBER 18 N/A LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 28 N/A REGION:
0 AE BRAUN COUNSEL:
B. BORDEMICK CONST. INSP:
REAC. TYPE: 94 5 NSSS: SE ANTITRUST:
RESID. INSP DESIGN PNR 3579 ftfT/1220 f58E CONST:
RM ANALYST B. ST MARY CURRENT SAF. STATUS:
ENVIR0059 ENTAL MILESTONES:
SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82. The foundation analysis issue will require special attention. PRA for severe ER DOCRETED:
accident design was sutamitted 4/82.
Severe accident ER SITE VISIT COMPLETE:
design modifications esere sutseitted 6/82 in A h t INPUT TO DES TO PM:
No. 4.
GE has requested the EDO to accelerate the ISSUE DES:
PRA rewlene schedule to celacide with the FDA.
RESPONSE TO C0fflENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY /NEARIIIS MILESTONES APPLICATION TENDERED:
03/31/80 03/31/80C SAR DOCKETED:
02/22/82 02/22/82C SAR O'S RECEIVED BY PM 10/15/82 10/08/82C SAR APPL. RESPONSE T0 t'S RECEIVED: 11/12/82 02/11/83C CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
ISSUE DRAFT SER:
IIIPUT TO SER:
03/25/83 ISSUE SER:
04/01/83 ACRS FULL C0fWIITTEE MEETING:
05/12/83 IIIPUTS TO SE SUPPLEMENT 18 05/27/83 ISSUE SE SUPPLEMENT 18 06/17/83 CURRENT ANTITRUST:
FDA antitrust reviene is in progress.
ISEARIIIS STARTED:
N/A ASLB INITIAL DECISI001:
N/A CSIWIISSION DECISION:
N/A SPECIAL PROJECT COMPLETE:
06/09/83 LATEST ARENOMENT:-
FDA Amendment IIe. 9 eens received in Iloweetser, 1982.
NEM SLIPS /IIOTES:
7 l
l
_~
MRR LICENSING SYSTEM AS OFs93/31/83 M0N-POWER RENEWALS INPUT ISSUE DOCKET EARLIEST ISSUEM TER ISSUE FES OR START ISSUE MON-PDMER FACILITY NUMBER DOCKET RE1 TO PM 11R Ela HEARING RL COMMENTS AFRRI 45000170 10/80C N/A 09/81C 01/82C N/A 06/83 N/S COMTESTED CASE 1000.0000KW TRIGA CORNELL U.
85000097 10/78C h/A 02/83C 06/83 06/83 N/A 06/83
.1000KW CRITI i.
CORMELL U.
05000157 05/80C N/A 02/83C 06/83 06/83 N/A 06/83 100.0000KW TRIGA
-GE TEST REACT'R 85000070 07/77C N/S N/S N/S M/S N/S M/S ORDER TO SHOW CAUSE.
ASLAG MEARINGS.
50.6 J0KW TAMK GE, NTR 95000073 11/79C N/A 06/84 09/84 09/84 M/A 09/84 100.0000KW POOL IDWA STATE 05000116 09/79C N/A 09/83 12/83 12/83 N/A 12/83 10.0000KW ARGMT MANHATTAN COLLEGE 05000199 08/83 N/A 08/84 10/84 10/84 M/A 10/84
.0001KW CRITI MICHIGAN STATE 05000294 09/77C N/A 09/83 12/83.
N/A N/A 12/83 250.0000KW TRIGA NBSR 85000184 12/80C 02/82C 09/82C 06/83 09/82C M/A 06/83 POWER INCREASE TO 20 MW INCLUDED IN REMEWAL 10.0000KW TANK RENSSELAER 05000225 05/79C
.H/A 05/83 09/83 09/83 N/A 09/83 i
.0000KW CRITI STATE U OF NEW YORK 05000057 06/79C M/A 12/82C 04/83 N/A N/A 94/83 2000.0000KW PULSR TEXAS A8M 05000128 07/79C N/A 07/82C 03/83 03/83 N/A 04/83 1000.0000KW TRIGA U. OF KANSAS-05000148 03/80C N/A 02/84 04/84 04/84 N/A 94/84 250.0000KW POOL 18 OF MD.
05000166 05/80C N/A 07/83 09/83 N/A N/A 09/83
~
250.0000KW TRIGA U. OF MO., ROLLA 05000123 10/79C N/A 04/84 06/84 M/A N/A 06/84 200.0000KW POOL U. OF OKLA.
05000112 10/78C M/A 95/83 08/83 08/83 N/A 08/83
.0150KW AGM
. ~. -.
HRR LICENSING SY$ TEM AS OFs 03/31/83 H0N-POWER RENEWAL 5 INPUT ISSUE DOCKET EARLIEST ISSUEN TER ISSUE FES OR START ISSUE NON-POWER FACILITY HUMBER DOCKET Eli TO PM 118 Eli HEARING RL COMMENTS U. OF TEXAS 05000192 05/80C N/A 03/83 06/83 08/83 N/A 06/83 250.0000KW TRIGA U. OF UTAH 05000407 03/83 N/A 11/83 02/84 N/A N/A 02/84 100.0000KW TRIGA U. OF VA., CAVALIER 05000396 06/84 N/A 07/84 09/84 N/A N/A 09/84
.1000KW POOL UCLA ARGONAUT 05000142 02/80C N/A 10/82C 06/81C 06/81C 09/80C N/S C3NTESTED CASE' 100.0000KW ARGHT UNION CARBIDE 05000054 05/80C N/A 10/82C 07/83 07/83 N/A 07/83 5000.0000KW POOL VA HOSPITAL 05000131 01/80C N/A 05/83 07/83 N/A N/A 07/83 18.0000KW POOL VA. POLY. INSTITUTE 05000124 10/79C N/A 10/83 12/83 12/83 N/A 12/83 100.0000KW ARGHT WEST., TRAINING REACTOR 05000087 12/81C N/A 11/83 02/84 02/84 N/A 02/84 10.0000KW (ANK 1
M FOR. TEST-REACTORS ONLY
~ :
Y
)
t i
M M
M E
O M
U W
n h
x-NRR L I-C E N S I N G SYSTEM PAGE NO: 2-0L CURRENT STATUS REPORT REPORT AS OF:
PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:
DOCKET NO:
Docket No.or Project No.,if not docketed LIC. PM:
Licensing Project Manager ASL B CHAIR: ASLB Chairman APPLICANT:
Utility LIC. BC:
Licensing Branch Chief MEMBER 1:
on panel L0 CATION:
Miles and direction from nearest major town LIC. LA.:
Licensing Assistant MEMBER 2 on panel i
REGION:
1 through 5 AE:
Architect / Engineer COUNSEL:
Attorney assipied to case CONST. INSP Construction inspector REAC. TYPE: PWR, BWR, HTGR or LMFBR NSSS: Nuclear Steam Systems Supplier ANTITRUST Antitrust Attorney RESID INSP Resident Inspector DESIGN PWR:
m electric & thermal CONST: Constructor MPA ANALYST MPA analyst assigned to track prog,ect CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE' ACTUAL DATE-Safety status for this reporting period only. It consists of accompliJiments and schedule dianges occurring since the last issue of Blue Book. Outstanding issues and late input from ER DOCKETED:
Environmental Report review inanches should be indicated, along with indication of the critical path.
P O
T Project Manage
- ISSUE DES:
Draft Environmental Statement RESPONSE TO COMMENTS ON DES:
ISSUE FES:
Final Environmental Statement CURRENT ENV. STATUS:
Environmental status for this reporting period only. It consists of accomplishments and schedule changss occurring since the last issue of Blue Book. Outstanding issues and late SAFETY / HEARING MILESTONES:
input from review branches'should be indicated.
APPLICATION TENDERED:
SAR DOCKETED Safety Analysis Report SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
-CURRENT HRO. STATUS:
INPUT TO DRAFT SER TO PM:
Changes in the hearing :letes since the last issue of Blue Book. Changes in intervention and ISSUE DRAFT SER:
Safety Evaluation Report l
content.ons should be indicated.
ER:
ACRS LETTER RECEIVED:.
Advisory Committee INPUTS TO SE SUPPLEMENT 3:
on Reactor Safeguards ISSUE SE SUPPLEMENT 3:
CURRENT ANTITRUST:
Changes in the antitrust status since the last issue of Blue Book.
HEARING STARTED:
ASLB INITIAL DECISION:
Atomic Safety & Lscensing Board ASLB FINAL DECISION:
TECH SPECS COMPLETED:
C0t!!!ISSION DECISION:
ISSUE PARTIAL. POWER LICENSE:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE:
The lotest amendment submitted by the applicent.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES :
A Slips or potential problems that should be brought to management's attention.
CONSTRUCTION COMPLETION - APPL.:
,,8,,P,,',
_ %*I,,"
const,uct.on m construct 7S.
completion i.y g--
g r
i
l NR e ow 335 U.S. NUCLE AR REcULATORY COMMISSir1N BIBLIOGRAPHIC DATA SHEET NUREG-0580 Vol.12, No. 3
- 4. TITLE AND SUET lTLE (Add Voowme Na, otappropreastl
- 2. fLeave blmkl Regulatory Licensing Status Sumary Report (Bluebook)
- 3. RECIPIENTS ACCESSION NO.
i
- 7. AUTHOR ($1 S. DATE REPORT COMPLE TED MONTH l YEAR April 1983
- 9. PERFORMING ORGANIZATION NAME AND MAILING ADDRESS (lactudr IW Codel DATE REPORT ISSUED Office of Resource Management
{pr"il" l $3 Management Infonnation Branch U. S. Nuclear Regulatory Comission
- s. Itee<< oreaal Washington, D.C.
20555
- 12. SPONSORING ORGANIZATION NAME AND MAILING ADORESS Ilactude IW Codel
- 10. PROJECT / TASK / WORK UNIT NO.
Office of Resource Management Management Information Branch it. CONTRACT NO.
U. S. Nuclear Regulatory Comission Washington, D.C.
20555
- 13. TYPE OF REPORT et mioD cove RE D (taelusive daars; March 1, 1983 - March 31, 1983
- 15. SUPPLEMENTARY NOTES
- 14. (Leere o/mkl
- 16. ASSTR ACT 200 words or dess; Provide a review of the status of the progress of the licensing reviews for all construction permits, operating license, special project and non-power reactor renewals under review, as reported to Congress.
j
- 17. KE Y WORDS AND DOCUMENT ANALYSIS 17a DESCRIPTORS
{
l l
i i
17tt 4DENTIFIERS OPEN ENDED TERMS I
i
- 18. AVAILAsiLITY ST ATEMENT
- 19. SE CuRITY CLAS$ (rars eraorts 21 NO 08 P AGE S Unlimited Unclassified j
zo gi,T,Y CgA,Sg ara,s aws 22, PRICE
(
- U.S. 00VERietBil? PRIllTIIIG OPPICIe 1903 341 299:122 I
l NUREG-0580 Vol.12, No. 3 l
l l
l REGULATORY LICENSING l
STATUS
SUMMARY
REPORT l
NUCLEAR POWER PLANTS l
DATA FOR DECISIONS l
[ BLUE BOOK?
l MARCH 1 - MARCH 31,1983 l
l
}
UNITED STATES NUCLEAR REGULATORY COMMISSION e na p
f
I t
i UNITED STATES l
,,,3, gi,33 33 NUCLEAR REGULATORY COMMISSION F05f LGI & filS Tf.iD WASHINGTON. D.C. 20%5
..'s',', '[ c f
essuit 4 1,11 C
OFFICIAL BUSINESS 2
PENALTY FOR PRIVATE USE. $300 U
C.
CU O
.C 9
W
'i 2
O s
1 i
1 F
ri i
C C
r 3.-
C':
i r.
C l
[
l C
a 3l l
5l
<-l I
[
t..,
l
[.
I e.
i.