. - . . _ . .

,s. .

ULNRC- 30 71 1

t I

t ATTACHMENT FOUR

?

PROPOSED TECHNICAL SPECIFICATION CHANGES i

Page 3/4 3-20a Page 3/4 3-36a Page 3/4 3-37 Page 3/4 8-9 l

-1 Page 3/4 8-12 l l

Page 3/4 8-13 l Page 3/4 8-14 Page 3/4 8-15 j

-Page B 3/4 8-1 i

l

'I 9409200367 940909 PDR ADDCK-05000483 P. PDR

i e.

i

~

~

TABLE 3.3-3 (continued) .!

ACTION STATEMENTS (continued)  :

ACTION 18 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to '

OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within i the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b

, ACTION 19 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may  ;

proceed provided the following conditions are satisfied: >

a. The inoperable channel is placed in the tripped condition within l' 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />, and
b. The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for ,

surveillance testing of other channels per Specification 4.3.2.1. t

-> For Functional Unit 8.b. (Loss of Power - grid degraded voltage) tie breaker 52 NG0116 between busses NG01 and NG03 or the tie t breaker 52 NG0216 between busses NG02 and NG04 may be closed ,

for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. Closing an NG bus tie breaker makes the'4 bus degraded voltage channels for the respective NB bus inoperable. When ,

the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> time is exceeded apply Specification 3.0.3. l With less than the Minimum Channels OPERABLE, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> I ACTION 20 -

determine by observation of the associated permissive annunciator  ;

window (s) that the interlock is in its required state for the existing i plant condition, or apply Specification 3.0.3.  !

ACTION 21 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within -  :

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; '

however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2.1 provided the other channelis OPERABLE.

ACTION 22 - With the number of OPERABLE channels one less than the Total ,

Number of Channels, restore the inoperable channel to OPERABLE: I status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next-  !

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

l t

ACTION 23 - With the number of OPERABLE channels one less than the Total =!

Number of Channels, restore the inoperable channel to OPERABLE --

status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or declare the associated valve inoperable and ,

take the ACTION required by Specification 3.7.1.5.

ACTION 24 - With the number of OPERABLE channels one less than the Minimum-Channels OPERABLE requirement, declare the affected auxiliary feedwater pump inoperable and take the ACTION required by Specification 3.7.1.2.

^

CALLAWAY - UNIT 1 3/4 3-20a Amendment No. 64,85 Correction letter of 1/6/94

.t'

TABLE 4.3-2 (Continued) .

ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUh1ENTATION SURVEILLANCE REOUIREMENTS TRIP MODES ANALOG ACTUATING FOR WHICH CilANNEL DEVICE MASTER SLAVE SURVEILLANCE CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION RELAY RELAY IS FUNCTIONAL UNIT CHECK CALIBRATION TEST TEST LOGIC TEST TEST TEST REOUIRED

6. Auxiliary Feedwater (Continued)
f. loss-of-Offsite Power N.A. R N.A. M N.A. N.A. N.A. 1, 2, 3
g. Trip of All Main Feedwater N.A. N.A. N.A. R N.A. N.A. N.A. 1, 2 Pumps
h. Auxiliary Feedwater Pump S R M N.A. N.A. N.A. N.A. 1, 2, 3

(.e Suction Pressure-low ta 7. Automatic Switchover to b

c3 Containment Sump E

~

a. Automatic Actuation legic N.A. N.A. N.A. N.A. M(1) M(1) Q(3) 1, 2. 3, 4 and Actuation Relays (SSPS)
b. RWST level - low-Low S R Q N.A. N.A. N.A. N.A. 1, 2, 3, 4 Coincident With Safety injection See item 1 above for all Safety Injection Surveillance Requirements.
8. loss of Power
a. 4 kV Undervoltage-loss of N.A. R N.A. M N.A. N.A. N.A. 1, 2, 3, 4, Voltage 5++,6++
b. 4 kV Undervoltage-Grid h k- R N.A. M N.A. N.A. N.A. 1,2,3,4, Degraded Voltage 5++,6++

t

{ W(4) }

f TABLE 4.3-2 (Continued)

ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTAT10N .

SURVEILLANCE REOUIREMENTS TRIP MODES r ANALOG ACTUATING FOR WHIC11 -

C11ANNEL DEVICE MASTER - SLAVE ' SURVEILLANCE CilANNEL- CHANNEL OPERATIONAL OPERATIONAL ACTUATION - RELAY RELAY IS FUNCTIONAL UNIT- CHECK CALIBRATION TEST TEST LOGIC TEST - TEST TEST REOUIRED -

9. Control Room isolation
a. Manual Initiation N.A. N.A. N.A. R N.A. N.A. N.A. All
b. Automatic Actuation logic N.A. N.A. N.A. N.A. M(1) M(1) Q(3) 1, 2, 3, 4 and Actuation Relays (SSPS) <
c. Automatic Actuation logic N.A. N.A. N.A. N.A. M(1)(2) N.A. N.A. All N and Actuation Relays (BOP ESFAS) w w d. Phase "A" Isolation See Item 3.a. akve for all Phase ."A" Isolation Surveillance Requirements.
10. lead Shedder Emergency N.A. N.A. N.A. N.A. M(1)(2) - N.A. N.A. 1, 2, 3, 4, 5 + ,

lead Sequencer 6+

Il.' Engineered Safety Features Actuation System Interlocks

a. Pressurizer Pressure, P-11 N.A. R Q N.A. N.A. N.A. N.A. 1, 2, 3
b. Reactor Trip, P-4 N.A. N.A. N.A. R N.A. N.A. N.A. 1, 2, 3 TABLE NOTATIONS (1) Each train shall be tested at least every 62 days on a STAGGERED TEST BASIS.

(2) Continuity check may be excluded from the ACTUATION LOGIC TEST.

(3) Except Relays K602, K620, K622, K624, K630, K740, and K741, which shall be tested at least once per 18 months during refueling and during each COLD SHUTDOWN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless they have been tested within the previous 90 days.

-+ '

  1. {(4) Re Tiespecified breakers 18 month 52 NGeli6frequencyand 52waived may be NG0216 for Cycle shall i pmv be verified open}ided the surveillance is performed prior to restart following the
  • June 1,1986, whichever occurs first. He provisions of Specification 4.0.2 are rest from performance of this surveillance.

+ Only the shutdown portion of one sequencer is required to be OPERABLE in Modes 5 and 6 which corresponds to the OPERABLE Emergency Diesel Generator.

++ Ope'rability is only required for associated OPERABLE bus in Modes 5 and 6.

- _ . , _ _ , _ _ . . - - _ . - _ _ - . . . - , . _ - . - . - . _ . . . . _ . - _ - - - _ - ~ _ ~ . . - - . - -_2--._ _ _ _ _ _ _ _ _ - _ __--- _- - - - - - _ _ _ _

ELECTRICAL' POWER SYSTEMS 3/4.8m2 D.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.1 As a minimum, the following D.C. electrical sources shall a.125- volt D C. Busses NK01 and NK03 be OPERABLE: enagized from Banenes NKH and NK13 c4 and associated Full-Capacity Chargers c 4-26-Vell-BatterpBank NK' 1 and NK13, and its ccccciated NK21. NK23 or installed swing Charge Full-Gapacity Chcrgers NK21 cad NK23. cad NK25 powacd from N001, and h.125 volt D,C. Husses NK02 and NK04

b. 1-26-VOft-BatterpBank NK12 and NK44 rand its acccciated energized from Batteries NK12 and NK14 Full-Gapacity Chargers NK22 and NK24. c, and assuiated ruu - Capacity Chargers APPLICABILITY: MODES 1, 2, 3, and 4. n22. NG w inMaHed swing Charga NK26 powered frun NG04.

ACTION:

With one of the required batterpbanks-endler-full capacity chcrgers o D.C. electrical sources inoperable, restore the inoperable batterebcrk and/or fu!! capacity C D.C. electrical source eharger to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT "ITANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.8.2.1 Each 446 vc!: batterpbank and charger shall be o required D.C. electrical demonstrated OPERABLE:

source

a. At least once per 7 days by verifying that:
1) The parameters in Table 4.8-2 meet the Category A limits, and
2) The total battery terminal voltage is greater than or equal to 130.2 volts on float charge.

6 INSERT 6

3) The specified busses shall be determined energized in the required manner by verifying correct breaker alignment and indicated voltage on the busses.

CALLAWAY - UNIT 1 3/4 8-9

.a  ;

i ELECTRICAL POWER SYSTEMS p.C. SOURCES SHU_T_DOWN LIMITING CONDITION FOR OPERATION a 125- volt D C. flusses NK01 and NK03 3.8.2.2 As a minimum, {one of} the following D.C. electrical sources shall be OPERABLE: energized trorn actieries NKil and NKi 3 c- and associated Full-CapacityChargers

a. 125 Voit Battery Bank NK and NK43,-and-itc ascociOted NK21. NK23 or installa! swing Charger Fu!! Ccpacity-Ghargef 3 NK21 and NK22, Or NK25 powered frorn NG01, or b.125- volt D.C. liusses NK02 and NK04
h. 126-WNt-BattefpBafik-NK42-and NK1 A, Ond itc 0000cIOted energized frorn liatteries NK12 and NKI4 F(f4-Gapaeity-Ghargers-NK22 and NK2^. .

<=< and associated Full- Capacity Chargers m2, NNnstaM mng aarga APPLICABILITY: MODES 5 and 6.

NK26 powered frorn 1:304.

ACTION:

With the required hattery-banks and/or full capeeftyehafger C D.C. electrical source inoperable, immediately suspend all operations involving CORE ALTERATIONS, positive reactivity changes or movement of irradiated fuel; initiate corrective action to restore the required battsW.k-endAx fu!! capaeitwehafger to OPERABLE status as c D.C. electrical source soon as possible.

SURVEILLANCE REQUIREMENTS i

4.8.2.2 The above required 125 sc!: battery banks and acccciated o D.C. electrical source  !

ehargefs shall be demonstrated OPERABLE in accordance with l Specification 4.8.2.1.

),

i l

i i

I l

l I

CALLAWAY - UNIT 1 3/4 8-12

ELECTRICAL POWER SYSTEMS 3/4.8 3 ONSITE POWER DISTRIBUTION QPERATING LIMITING CONDITION FOR OPERATION 3.8.3.1 The following 120 Volt A.C. Vital electrical busses shall be energized in the specified manner:-with tic breakerc Open between redundcrt bucccc withn+-the-uM+

c. Div:cion #1 A.C. Ernergency Bucccc concicting of:
1) 60-Volt-Emergency Buc #NB01. and
2) '80 Volt-Emergency Bucccc #NG01, NG03 and NG05E.
b. Div;cica 12 A.C. Emergency Buccca-eens+stife-ef+

') '160 Volt Emergency Bus #NB02, and

2) '80 Ve!! Emenymcy Bucccc #NG02, NGO' and NGOSE.

{a} er 4-20-Velt A.C. Vitel Bus . NN01 energized from its associated inverter connected to D.C. Busk 01,

{b} d1 120 Ve!! ^.C. Vitel Bus'KNN02 energized from its associated inverter connected to D.C. Bus (NK02,

{c} or 120 Vo!! A.C. Vitel BusDNO3 energized from its associated inverter connected to D.C. Bus '#{JK03,

{d}fr 440 Vc!: ^..C. V!!c! Bus DN04 energized from its associated inverter connected to D.C. Bus 'ABlK04,

g. 125 Vo!! D.C. Buc #NK01 cncrgized from Battery "N".' ' and Charger w..en,

.m .,

h 125 Vc!: D.C. Bus ?NK02 cncrgized .'ron Battery 1NK12 and Charger

  1. NK22, 125 Vo! D.C. Bus #NK03 energized from Battery #NK13 and Charger
  1. NK23, cad J. 125 Volt D.C. Bus #NKO' cncrgized from Battery-#NK1' and Charger
  1. NK44, i

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

ar--With-ene-of-the-requked division cf A.C. cmcrgency-bucccc not fu!!y energized, recncrgize the division-within S heurc or bc in at !ccct HOT STANDBV-wnhin-the-fmxt S hours-and in COLD SHUTDOWN .tithin the feHowmg 30 hour3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />st i

6 With one A.C. vital bus either not energized from its associated inverter, or l with the inverter not connected to its associated D.C. bus: (1) reenergize the A.C. vital bus within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, and (2) reenergize the A.C. vital bus from its associated inverter connected to its associated D.C. bus within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

CALLAWAY - UNIT 1 3/4 8-13

ELECTRICAL POWER SYSTEMS LIMITING CONDITION FOR OPERATION ACTION (Continued)

c. With one O.C. bus net-eregized from its acccciated battery ban': cr eherger. :cenc:gize-the-D-GAn:c frorn its acccciated bat cry bar'; and sharger-within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at ! cast HOT ST^NDBY within the next S hou:0 and in COLD SHUTDOWN /sithin the fc!!cwing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.8.3.1 The specified busses shall be determined energized in the required manner at least once per 7 days by verifying correct breaker alignment and i indicated voltage on the busses.

CALLAWAY - UNIT 1 3/4 8-14

ELECTRICAL POWER SYSTEMS ONSITE POWER DISTRIBUTION i

. SHUTDOWN LIMITING CONDITION FOR OPERATION .

3.8.3.2 As a minimum, one of the following divisions of electrical busses c 120 VAC Vital shall be energized in the specified manner:

a. Division 1, consisting of:
1) '160 volt Emergency Buc "NB01, and  ;
2) '80 vc!: Emergency Bucccc "NG01, NG03, and NGO5E, and
3) 120 vc!t ^.C. Vita! Busses %N01 and NNO3 energized from their associated inverter connected to D.C. BussesKNK01 and NK03, and (or}  !

') 125 vc!: D.C. Bucccc "NK01 and NK03 cncrgized from Betteric: "NK11 and NK13 and Charger: "NK21 and NK23, er

b. Division 2, consisting of: 4
1) '160 vc!! Emergency Buc "NB02, and  ;
2) '80 vc!! Emergency Busccc "NG02, NGO' and NGOSErend '
3) 120 vc!! .^.C. Vitel Busses %N02 and NN04 energized from their associated inverter connected to D.C. Busses %K02 and NK04 rend {.}

A) 125-velt-0.C. Bucccc "NK02 and NKO' cncrgi cd from -

Bettefic ."NK12 and NK1' and Charger: "NK22 and NK2'.

APPLICABILITY: MODES 5 and 6. >

ACTION:  ;

i Without one of the above required divicienc of electrical busses energized c 120 Volt A.C.

in the required manner, immediately suspend all operations involving - Vital

' CORE ALTERATIONS, positive reactivity changes, or movement of irradiated fuel; initiate corrective action to energize at least one division of the required 120 Volt A.C. Vital busses in the specified manner.  :

. SURVEILLANCE REQUIREMENTS 1

i i

'4.8.3.2 The specified busses shall be determined energized in the required manner at least once per 7 days by verifying correct breaker alignment and indicated voltage on the busses.

CALLAWAY - UNIT 1 3/4 8-15

'l i

l

3/4.8 ELECTRICAL POWER SYSTEMS BASES 3/4.8.1, 3/4.8.2. AND 3/4.8.3 A_uC. SOURCES D.C. SOURCES. AND ONSITE POWER DISTRIBUTION The OPERABILITY of the A.C. and D.C. power sources and associated distribution systems during operation ensures that sufficient power will be available to supply the safety-related equipment required for: (1) the safe shutdown of the facility, and (2) the mituation and control of accident conditions within the facility. The minimum e specified independent and redundant A.C. and D.C. power sources and distribution systems satisfy the requirements of General Design Criterion 17 of Appendix A to 10 CFR Part 50.

The ACTION requirements specified for the levels of degradation of the power sources provide restriction upon continued facility operation commensurate with the level of degradation. The OPERABILITY of the power sources are consistent with the initial condition assumptions of the safety analyses and are based upon maintaining at least one redundant set of onsite A.C. and D.C. power sources and associated distribution systems OPERABLE during accident conditions coincident with an assumed loss-of-offsite power and single failure of the other onsite A.C. source. The A.C. and D.C. source allowable out-of-service times are based on Regulatory Guide )

1.93, " Availability of Electrical Power Sources," December 1974. When one diesel generator is inoperable, there is an additional ACTION requirement to verify that all required systems, subsystems, trains, components and devices, that depend on the remaining OPERABLE diesel generator as a source of emergency power, are also OPERABLE, and that the steam-driven auxiliary feedwater pump is OPERABLE. This requirement is intended to provide assurance that a loss-of-offsite power event will not

]

result in a complete loss of safety function of critical systems during the period one of )

the diesel generators is inoperable. The term verify as used in this context means to administratively check by examining logs or other information to determine if certain components are out-of-service for maintenance or other reasons. It does not mean to perform the Surveillance Requirements needed to demonstrate the OPERABILITY of the component.

The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that: (1) the facility can be maintained in the shutdown or refueling condition for extended time periods, and (2) sufficien: Mstrumentation and control capbility are available for monitoring and maintaining the unit status.

4 INSERT #1'- ATTACHED The Surveillance Requirements for demonstrating the OPERABILITY of the diesel generators are in accordance with the recommendations of Regulatory Guides 1.9,

" Selection of Diesel Generator Set Capacity for Standby Power Supplies," Revision 1, November 1978; 1.108, " Periodic Testing of Diesel Generator Units Used as Onsite Electric Power Systems at Nuclear Power Plants," Revision 1, August 1977 as modified by Amendment No. 21, issued May 1,1987; and 1.137, " Fuel-Oil Systems for Standby Diesel Generators," Revision 1, October 1979. Each diesel generator (DG) is provided with an CALLAWAY - UNIT 1 B 3/4 8-1 Amendment No. 2A , 65

', l . : - .

f. ,

INSERT #1 --

A D.C. electrical source consists of the battery banks, associated full capacity chargers and the D.C. busses. The associated fullz capacity chargers may be the charger designated for that bus or the installed swing charger.

. TABLE 3.3-3 (continued)

ACTION STATEMENTS (continued)

ACTION 18 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

ACTION 19 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a. The inoperable channel is placad in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and
b. The Minimum Channels JPERABLE requirement is met; however, the inoperable channel riay be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing of ot 'er channels per Specification 4.3.2.1.

For Functional Unit 8.b. (Loss of Power - grid degraded voltage) tie breaker 52 NG0116 between busses NG01 and NG03 or the tie breaker 52 NG0216 between busses NG02 and NG04 may be closed for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. Closing an NG bus tie breaker makes the 4 bus degraded voltage channels for the respective NB bus inoperable. When the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> time is exceeded apply Specification 3.0.3.

ACTION 20 - With less than the Minimum Channels OPERABLE, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> determine N' observation of the associated permissive annunciator window (s) r< . the interlock is in its required state for the existing plant condition, or apply Specification 3.0.3.

ACTION 21 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2.1 provided the other channel is OPERABLE.

ACTION 22 - With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

ACTION 23 - With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or declare the associated valve inoperable and take the ACTION required by Specification 3.7.1.5.

ACTION 24 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, declare the affected auxiliary feedwater pump inoperable and take the ACTION required by Specification 3.7.1.2.

CALLAWAY - UNIT 1 3/4 3-20a Amendment No. 64, 85 Correction letter of 1/6/94

TABLE 4.3-2 (Continued)

ENGINEERED SAFETY FEATRES ACTUATION SYSTENI INSTRUNTENTATION SUIn LILLANCE REOUIREh1ENTS TRIP A10 DES ANALOG ACTUATING FOR WHICH CHANNEL DEVICE hlASTER SLAVE SURVEILLANCE CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION RELAY RELAY IS FUNCTIONAL UNIT CHECK CALIBRA*IlON TEST TEST LOGIC TEST TEST _TFSI REOUIRED

6. Auxiliary Feedwater (Continued)
f. - less-of-Offsite Power N.A. R N.A. N1 N.A. N.A. N.A. 1, 2, 3
g. Trip of All h1ain Feedwater N.A. N.A. N.A. R N.A. N.A. N.A. 1, 2 Pumps v h. Auxiliary Feedwater Pump S R h1 N.A. N.A. N.A. N.A. 1, 2, 3
  • - Suction Pressure-lmw Y

g 7. Automatic Switchover to p

v Containment Sump

a. Automatic Actuation logic ~ N.A. N.A. N.A. N.A. h1(1) h1(1) Q(3) 1, 2, 3, 4 and Actuation Relays (SSPS)
b. RWST Level - low-lew S R Q N.A. N.A. N.A. N.A. 1, 2, 3, 4 Coincident With Safety Injection See Item I above for all Safety Injection Surveillance Requirements.
8. loss of Power
a. 4 kV Undervoltage-loss of N.A. R N.A. Al N.A. N.A. N.A. 1, 2, 3, 4, Voltage 5++,6++
b. 4 kV Undervoltage-Grid W(4) R N.A. hl N.A. N.A. N.A. 1, 2, 3, 4, Degraded Voltage 5++,6++

y = = = . - . - ' ' --Tmeam+r + *' >'WP ' ' - E -----------2------_----<--i------_--_---m&1 '

TABLE 4.3-2 (Continued)

ENGINEERED SAFETY FEATURES ACTUATION SYSTEh!INSTRUN1ENTAT ON SURVEILLANCE REOUIREN1ENTS TRIP N10 DES .

ANALOG ACTUATING FOR WHICH CHANNEL DEVICE MASTER SLAVE SURVEILLANCE CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION RELAY RELAY IS FUNCTIONAL UNIT CHECK CALIBRAllON TEST TEST LOGIC TEST TEST TEST REOUIRED

9. Control Room Isolation
a. hianual Initiation N.A. N.A. N.A. R N.A. N.A. N.A. All
b. Automatic Actuation Logic N.A. N.A. N.A. N.A. Al(l) h1(1) Q(3) 1, 2. 3, 4 and Actuation Relays (SSPS)
c. Automatic Actuation bgic N.A. N.A. N.A. N.A. M(1)(2) N.A. N.A. All and Actuation Relays u (BOP ESFAS)

N u d. Phase " A" Isolation See Item 3.a. above for all Phase "A" Isolation Surveillance Requirements.

b

10. Load Shedder Emergency N.A. N.A. N.A. N.A. M(1)(2) N.A. N.A. 1, 2, 3, 4, 5 + ,

bad Sequencer 6+

11. Engineered Safety Features Actuation System Interlocks
a. Pressurizer Pressure P-11 N.A. R Q N.A. N.A. N.A. N.A. 1, 2, 3
b. Reactor Trip, P-4 N.A. N.A. N.A. R N.A. N.A. N.A. 1, 2. 3 TABLE NOTATIONS (1) Each train shall be tested at least every 62 days on a STAGGERED TEST BASIS.

(2) Continuity check may be excluded from the ACTUATION LOGIC TEST.

(3) Except Relays K602, 'K620, K622, K624, K630, K740, and K741, which shall be tested at least once per 18 months during refueling and during each COLD SHUTDOWN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless they have been tested within the previous 90 days.

(4) Tie breakers 52 NG0116 and 52 NG0216 shall be verified open.

  1. The specified 18 month frequency may be waived for Cycle 1 provided the surveillance is performed prior to restart following the first refueling outage or June 1,1986, whichever occurs tirst. The provisions of Specification 4.0.2 are rest from performance of this surveillance.

+ Only the shutdown portion of one sequencer is required to be OPERABLE in Modes 5 and 6 which corresponds to the OPERABLE Emergency Diesel Generator.

+ + Operability is only required for associated OPERABLE bus in Modes 5 and 6.

E_LECTRICAL POWER SYSTEMS 3/4.8.2 D.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.1 As a minimum, the following D.C. electrical sources shall be OPERABLE:

a. 125 Volt D.C. Busses NKO1 and NK03 energized from Batteries NK11 and NK13 and associated Full-Capacity Chargers NK21, NK23 or installed swing Charger NK25 powered from NG01, and
b. 125-Volt D.C. Busses NKO2 and NK04 energized from Batteries NK12 and NK14 and associated Full-Capacity Chargers NK22, NK24 or installed swing Charger NK26 powered from NG04.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

With one of the required D.C. electrical sources inoperable, restore the inoperable D.C.

electrical source to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.8.2.1 Each required D.C. electrical source shall be demonstrated OPERABLE:  ;

a. At least once per 7 days by verifying that:
1) The parameters in Table 4.8-2 meet the Category A limits, and ,

l

2) The total battery terminal voltage is greater than or equal to 130.2 volts i on float charge.
3) The specified busses shall be determined energized in the required manner l by verifying correct breaker alignment and indicated voltage on the l busses.  !

CALLAWAY - UNIT 1 3/4 8-9

i ,, : t :...

.i ELECTRICAL POWER SYSTEMS .

D.C. SOURCES SHUTDOWN LIMITING CONDITION FOR OPERATION .

' 3.8.2.2 As a minimum, one of the following D.C. electrical sources shall be -

OPERABLE: I

a. 125-Volt D.C. Busses NK01 and NK03 energized from Batteries NK11'and. l NK13 and associated Full-Capacity Chargers NK21, NK23 or installed swing j Charger NK25 powered from NG01, or
p
b. 125-Volt D.C. Busses NK02 and NK04 energized from Batteries NK12 and NK14 and associated Full-Capacity Chargers NK22, NK24 or installed swing Charger NK26 powered from NG04.

APPLICABILITY: MODES 5 and 6.

  • ACTION:

.With the required D.C. electrical source inoperable, immediately suspend all operations  !'

involving CORE ALTERATIONS, positive reactivity changes or movement of irradiated fuel; initiate corrective action to restore the required D.C. electrical source to .

OPERABLE status as soon as possible. l l

-e SURVEILLANCE REQUIREMENTS -4.8.2.2 The above required D.C. electrical source shall be demonstrated OPERABLE in i accordance with Specification 4.8.2.1. i; 1

9 h

4 .

k CALLAWAY - UNIT 1 3/4 8-12 '

, . - _. _ _ __ _ ___ _ _ ..____ _ _ _._ ____ _ _ _ _ _ _ _ 1_ _ _ _ _

, n .

L, .

ELECTRICAL POWER SYSTEMS i

3/4.8.3 ONSITE POWER DISTRIBUTION OPERATING LIMITING CONDITION FOR OPERATION 3.8.3.1 The following 120 Volt A.C. Vital electrical busses shall be energized in the specified manner:

a. Bus NN01 energized from its associated inverter connected to D.C. Bus NK01,
b. Bus NNO2 energized from its associated inverter connected to D.C. Bus NK02,
c. Bus NNO3 energized from its associated inverter connected to D.C. Bus NK03,
d. Bus NN04 energized from its associated inverter connected to D.C. Bus NK04, APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

With one A.C. vital bus either not energized from its associated inverter, or with the inverter not connected to its associated D.C. bus: (1) reenergize the A.C. vital bus within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, and (2) reenergize the A.C. vital bus from its associated inverter connected to its associated D.C. bus within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

i h

l l

t 4

CALLAWAY - UNIT 1 3/4 8-13

ELECTRICAL POWER SYSTEMS LIMITING CONDITION FOR OPERATION

. I ACTION (Continued) .

1 SURVEILLANCE REQUIREMENTS i i

4.8.3.1 The specified busses shall be determined energized in the required manner at least once per 7 days by verifying correct breaker alignment and indicated voltage on the busses.

  • t.

l l

f h

l t

i

{

i t

i I

l I

i CALLAWAY - UNIT-1 3/4 8-14 i

B-o 3 ..

ELECTRICAL POWER SYSTEMS ONSITE POWER DISTRIBUTION SHUTDOWN '

LIMITING CONDITION FOR OPERATION 3.8.3.2 As a minimum, one of the following 120 VAC Vital electrical busses shall be -

energized in the specified manner:

a. Division 1, consisting of: .

Busses NN01 and NNO3 energized from their associated inverter connected to D.C. Busses NKO1 and NKO3, or j

b. Division 2, consisting of: i Busses NNO2 and NN04 energized from their associated inverter connected to l D.C. Busses NK02 and NK04.

l APPLICABILITY: MODES 5 and 6.

l ACTION:  !

I Without one of the above required 120 Volt A.C. Vital electrical busses energized in the required manner, immediately suspend all operations involving CORE ALTERATIONS, positive reactivity changes, or movement of irradiated fuel; initiate .-

corrective action to energize at least one division of the required 120 Volt A.C. Vital busses in the specified manner.

.l l'

SURVEILLANCE REQUIREMENTS - 4.8.3.2 The specified busses shall be determined energized in the required manner at l least once per 7 days by verifying correct breaker alignment and indicated voltage on i

.the busses. l

.i l

CALLAWAY UNIT-1 3/4 8-15

3/4.8 ELECTRICAL POWER SYSTEMS BASES 3/4.8.1, 3/4,8.2, AND 3/4.8.3 A.C. SOURCES, D.C. SOURCES, AND ONSITE POWER DISTRIBUTION The OPERABILITY of the A.C. and D.C. power sources and associated distribution systems during operation ensures that sufficient power will be available to supply the safety-related equipment required for: (1) the safe shutdown of the facility, and (2) the mitigation and control of accident conditions within the facility. The minimum specified independent and redundant A.C. and D.C. power sources and distribution -

systems satisfy the requirements of General Design Criterion 17 of Appendix A to 10 CFR Part 50.

The ACTION requirements specified for the levels of degradation of the power sources provide restriction upon continued facility operation commensurate with the level of degradation. The OPERABILITY of the power sources are consistent with the initial condition assumptions of the safety analyses and are based upon maintaining at least one redundant set of onsite A.C. and D.C. power sources and associated distribution systems OPERABLE during accident conditions coincident with an assumed loss-of-offsite power and single failure of the other onsite A.C. source. The A.C. and D.C. source allowable ,

out-of-service times are based on Regulatory Guide 1.93, " Availability of Electrical Power Sources," December 1974. When one diesel generator is inoperable, there is an additional ACTION requirement to verify that all required systems, subsystems, trains, -

components and devices, that depend on the remaining OPERABLE diesel generator as a source of emergency power, are also OPERABLE, and that the steam-driven auxiliary '

feedwater pump is OPERABLE. This requirement is intended to provide assurance that a loss-of-offsite power event will not result in a complete loss of safety function of critical systems during the period one of the diesel generators is inoperable. The term verify as used in this context means to administratively check by examining logs or other information to determine if certain components are out-of-service for maintenance or other reasons. It does not mean to perform the Surveillance Requirements needed to demonstrate the OPERABILITY of the component.

The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that: (1) the facility can be maintained in the shutdown or refueling condition for extended time ,

-periods, and (2) sufficient instrumentation and control capability are available for j monitoring and maintaining the unit status. A D.C. electrical source consists of the i battery banks, associated full capacity chargers and the D.C. busses. The associated full capacity chargers may be the charger designated for that bus or the installed swing  !

charger.

The Surveillance Requirements for demonstrating the OPERABILITY of the diesel l generators are in accordance with the recommendations of Regulatory Guides 1.9,  ;

" Selection of Diesel Generator Set Capacity for Standby Power Supplies," Revision 1, November 1978: 1.108, " Periodic Testing of Diesel Generator Units Used as Onsite Electric Power Systems at Nuclear Power Plants," Revision 1, August 1977 as modified by Amendment No. 21, issued May 1,1987: and 1.137, " Fuel-Oil Systems for Standby Diesel Generators," Revision 1, October 1979. Each diesel generator (DG) is provided with an CALLAWAY - UNIT 1 B 3/4 8-1 Amendment No. 2A,65

1 s

bec: D. Shafer/A160.761

/QA Record (CA-758)

Nuclear Date E210.01 DFS/ Chrono D. F. Schnell J. E. Birk J. V. Laux R. D. Affolter G. L. Randolph R. J. Irwin P. M. Barrett r C. D. Naslund J. D. Blosser A. C. Passwater D. E. Shafer W. E. Kahl S. Wideman (WCNOC)

M. D. Archdeacon (Bechtel)

H. D. Bono NSRB (Sandra Dale)

)

4 i