ML20072U187

From kanterella
Jump to navigation Jump to search
Ack Receipt of Change Request 2,dtd 620111,requesting Change in TS Re Mode of Operation of Chargin Pumps.Ts Will Be Revised to Read as Listed.Hazards Analysis Encl
ML20072U187
Person / Time
Site: Saxton File:GPU Nuclear icon.png
Issue date: 02/15/1962
From: Kirk R
US ATOMIC ENERGY COMMISSION (AEC)
To: Rees D
SAXTON NUCLEAR EXPERIMENTAL CORP.
Shared Package
ML20072T843 List: ... further results
References
FOIA-91-17 NUDOCS 9104190047
Download: ML20072U187 (1)


Text

.

l UNITED STATES i

ATOMIC ENERGY COMMISSION u

l d l'

I W ASHINGTON H. D. C.

%,, { p $'

FEB 151962 Docket No. 50-lh6 Change No. 2 Saxton Nuclear Erperimental Corporation P. O. Box 5h2 Reading, Pennsylvania Attention Mr. D. R. Rees General Manager Gentlement This refers to your Change Request No. 2 dated January 11, 1962 requesting AEC authorization to make a change in the Techrdeal Specifications in License No. DPR-b pursuant to paragraph 3.B.

of the license.

We have reviewed the proposed change in Section 12. of the Technical Specifications and have found that changing the mode of operation of the charging pumps in the manner proposed does not present significant hazards considerations not described or implicit in the Final Safeguards Report, as defined in License No. DPR-h, and that there is reasonable assurance that the health and safety of the public will not be endangered by operation of the reactor under the proposed Technical Specifi-cation change. A copy of our related hazards analysis is enclosed.

T'

  1. aregoing, Technical Speci*1-7 t, N tirety to read as foD y

.sns. 4.ing of tvo motor-driven

"'7 A chargint, system horizontal, tripler, reciprocating pumps, each having an adjustable capacity of 3 to 15 cpm at a total dynamic head of 2500 psig, is provided to charge degasified, demineralized make-up water, concentrated borated water, and water from the purification system back into the main coolant system. These pumps vill be in operational condition during power operation of the reactor and will operate intermittently as required for the purification system and for volume control of the main coolant system."

Sincerely yours, 1

Original signed by R.LKitt 9104190047 910314 PDR F01A Director DEKOK91 17 PDR m.....

..,e

_...,..