ML20072E142

From kanterella
Jump to navigation Jump to search
Regulatory Licensing Status Summary Report.Data as of May 31,1983.(Blue Book)
ML20072E142
Person / Time
Issue date: 06/30/1983
From:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
To:
References
NUREG-0580, NUREG-0580-V12-N05, NUREG-580, NUREG-580-V12-N5, NUDOCS 8306240048
Download: ML20072E142 (67)


Text

_ -___

sets 8"E"jj NUREG-0580

[

Vol.12, No. 5 5

i REGULATORY LICENSING i

STATUS

SUMMARY

REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS I; BLUE BOOK?

MAY 1 - MAY 31,1983 UNITED STATES NUCLEAR REGULATORY COMMISSION gkB HECg Nhf 1

l AVAILABLE FROM' NRC/GPO SALES PROGRAM-SUPERINTENDENT OF DOCUMENTS

-GOVERNMENT PRINTING OFFICE WASHINGTON, D. C. 20402 A YEARS SU3SCRIPTION CONSISTS OF 12 ISSUES FOR THIS PUBLICATION I-4

~ MICROFICHE OF SINGLE COPIES ARE AVAILABLE FROM HRC/GPO SALES PROGRAM

. WASHINGTON, D. C. 20555 i

I i

l

NUREG-0580 Vol.12, No. 5 REGULATORY LICENSING STATUS

SUMMARY

REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS (BLUE BOOK) l MAY 1 - MAY_31,_1983_

l

rttar:3 er"8 l

Prepared for. OFFICE OF NUCLEAR REACTOR REGULATION

. NUC GU TORY C M SiON WASHINGTON, D.C. 20555 f

~%,,,

Y s.

I l

l 1

F0REW0RD IS DESIGHED TO PROVIDE THE HECESSARY THIS MANAGEMENT REPORT, REGULATORY LICENSING STATUS

SUMMARY

REPORT, INFORMATION FOR CONTROLLING THE PROGRESS OF REVIEW PROCESSES FOR CENTRAL STATION HU EXECUTIVE LEGAL DIRECTOR, OFFICE OF INSPECTION & ENFORCEMENT, AHD THE HATIONAL APPLICATIONS.

SYSTEM.

SECTIDH I 0F THIS EDITIDH CONSISTS OF THE THREE

SUMMARY

OF ACCOMPLISHMENTS, THE HEW APPLICATION FORECAST FOR OL'S AND CP'S, AND AH ABBREVIATION KEY.

ALL OL'S ARE SECTIDH II REPRESEHIS THE MAIN BODY OF THE REPORT AND CONSISTS OF THE FACILITY INFORMATION.

A H0H-POWER REACTOR LISTED FIRST, FOLLOWED BY CP'S, STANDARD DESIGN REVIEWS, OTHER REVIEWS, AND FINALLY, CURRENT STATUS FOR ALL PHASES OF T EACH PROJECT CONSISTS OF GENERAL FACILITY DATA, TARGETED AND ACTUAL COMPLETION DATES FOR ALL KEY MILESTONES IH THE REVIEW.

SUMMARY

LICEN5ING 0F MUCLEAR R E.A C T 0 R S THE U.S. NUCLEAR REGULATORY COMMISSION REQUIRES TWO SEPARATE LICENSES - ONE TO BUILD THE TO OPERATE IT.

LISTED BELOW ARE THE STEPS IN THE PROCESS OF OBTAINING A CONSTRUCTION PERMIT AND OPERAT LICENSE.

THE UTILITY SUBMITS A FORMAL APPLICATION DESCRIBING THE DESIGM, LOCATION, AND ENVIRONMENTAL IMPACT OF THE PROPOSED PLANT AND THE SAFEGUARDS TO BE PROVIDED. THE APPLICATION ALSO COVERS THE UTILITY'S FINAN QUALIFICATIONS.

THE NRC MAKES COPIES OF THE APPLICATION AVAILABLE TO THE ACRS AND TO THE PUBLIC DOCUMENT ROOM.

EXPERTS ANALYSE THE APPLICATION, TECHNICAL DOCUMENTS ARE ALSO MADE AVAILABLE IN THE PUBLIC DOCUMENT ROOM.AND PREPARE A SAFETY EVALUATION THESE THE STAFF'S ANALYSIS IS SUBMITTED TO THE MRC'S STATUTORY ADVISORY COMMITTEE ON REACTOR SAFEGUARDS, A L

COMMITTEE OF INDEPENDENT EXPERTS.

APPLICANT, THE LICENSING STAFF AND OTHERS.ACRS STUDIES THE APPLICATION IN DETAIL AND HOLDS CONFERENCES WITH THE THE ACRS FINDINGS ARE REPORTED TO THE HRC AND MADE PUBLIC.

A PUBLIC HEARING IS HELD, USUALLY NEAR THE PROPOSED SITE, BY AN NRC APPOINTED ATOMIC SAFETY & LICENSING BOARD.

PRIVATE CITIZEMS, STATE AND LOCAL OFFICIALS, AND COMMUNITY GROUPS MAY PARTICIPATE.

AFTER REVIEWING THE HEARING RECORD INCLUDING THE NRC STAFF AND ACRS FINDINGS, THE BOARD DECIDES F3R OR AGAINST GRANTING A CONSTRUCTION PERMIT.

THE BOARD'S DECISION IS REVIEWED BY THE ATOMIC SAFETY AND LICENSING APPEAL BOARD, AND IS SUBJECT TO REVIEW BY THE FIVE-MEMBER kJCLEAR REGULATORY COMMISSION.

IF THE LICENSING BOARD AUTHORIZES THE ISSUANCE OF'A CONSTRUCTION PERMIT, THE DIRECTOR OF THE DIVISION OF LICENSING WILL ISSUE A CONSTRUCTION PERMIT.

AN EARLIER LIMITED WORK AUTHORIZATION TO DO PRELIMINARY SITE CONSTRUCTION MAY HAVE BEEN GRANTED IF THE SITE HAD BEEN DETERMINED TO BE SUITABLE BY THE NRC STAFF AND THE i

BOARD HAD RULED FAVORABLY ON THE ENVIRONMENTAL IMPACT ANALYSIS. CONSTRUCTION IS SUBJECT TO INSPECTION BY THE OFFICE OF INSPECTION AND ENFORCEMENT.

AS CONSTRUCTION PROGRESSES, ADDITIONAL INFORMATION IS DEVELOPED AND THE UTILITY APPLIES TO THE NRC FOR AN OPERATING LICENSE.

THE SAME CAREFUL ANALYSIS AS IS MADE AT THE CONSTRUCTION PERMIT STAGE IS MADE BY THE NRC IN DECIDING WHETHER OR NOT TO ISSUE THE OPERATING LICENSE.

IN THE OPERATING LICENSE REVIEW PROCESS, OPPORTUNITY FOR HEARING IS PROVIDED. CONTRASTED WITH THE CONSTRUCTION PERMIT REVIEW PHASE, A HEARING IS HELD ONLY IF INTERVENTION IS GRANTED. FINAL ISSUANCE OF AN OPERATING PERMIT IS SUSJECT TO THE APPROVAL OF BOTH THE DIRECTOR OF THE DIVISION OF LICENSING AND OF THE l

COMMISSION.

i I

TABLE OF C0NTENTS PRINTED IN THE ORDER LISTED 5ECTION I

SUMMARY

OF ACCOMPLISNMENTS DL

SUMMARY

OF ACCOMPLISNMENTS CP

SUMMARY

OF ACCOMPLISNMENTS COMBINED NUMERICAL

SUMMARY

OF ACCOMPLISHMENTS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING OPERATING LICENSES IN THE HEXT FIVE YEARS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING CONSTRUCTION PERMITS IN THE MEXT FIVE YEARS NEW APPLICATION FORECAST:

OPERATING LICENSE REVIEWS SPECIAL REVIEWS CCMMON ABBREVIATIONS USED WITHIM THE PUBLICATION SECTION II PROJECT INDEX OPERATING LICENSE REVIEWS CONSTRUCTIDH PERMIT REVIEWS

/

STANDARD DESIGN REVIEWS OTHER REVIEWS HON-POWER REACTORS SECTION III EXAMPLE REVIEW

O i

a I

a i

2 O

P4 O

W i

e I

I i

(

0L

SUMMARY

0F ACC0MPLISHMENTS AS OF MAY 31, 1983 HAI FISCAL YEAR TO DATE FACILITY SCHEDULED ACTUAL FACILITY SCHEDULED ACTUAL SER'S SER ' S HONE CATAWBA 182 02/06/83 02/09/83C SEABROOK 1 8 2 01/12/83 03/07/83C SSER ' S SSER'S CATAWBA 182 05/02/83 05/02/83C BYROM 1 8 2 12/10/82 01/31/83C CLINTON 182 05/27/83 05/27/83C CATAWBA 1 82 05/02/83 05/02/83C WASHINGTON NUCLEAR 2 05/20/83 05/20/83C CLINTON 1 8 2 05/20/83 05/27/83C WOLF CREEK 1 05/27/83 COMANCHE PEAK 182 03/11/83C ENRICO FERMI 2 02/04/83C MCGUIRE 2 02/14/83 02/28/83C MIDLAND 1 82 10/06/82 10/06/82C PALO VERDE 1,2,3 03/15/83 03/15/83C PERRY 1 82 12/29/82 01/19/83C PERRY 1 82 04/22/83 04/25/83C SHOREHAM 01/15/83 02/04/83C ST LUCIE 2 04/06/83 04/06/83C SUSQUEHANNA 2 03/01/83 11/12/82C SUSQUEHANNA 2 03/31/83 03/29/83C WASHINGTON NUCLEAR 2 12/21/82 12/21/82C WASHINGTON NUCLEAR 2 05/20/83 05/20/83C WATERFORD 3 10/22/82 10/29/82C WOLF CREEK 1 05/27/83 DES ' S DES' S HONE HARRIS 1 8 2 04/00/83 04/00/83C FES 'S FES ' S NONE CATAWBA 1 8 2 01/07/83 01/07/83C SEABROOK 182 12/08/82 12/08/82C 0L ' S ISSUEDM 0L ' S I S S U E DW MCGUIRE 2 05/27/83 05/27/83C MCGUIRE 2 05/02/83 05/27/83C WATERFORD 3 05/00/83 WATERFORD 3 05/00/83 5 FULL POWER

C CC 3

32 L

8 88 A

/

/ /

U 1

20 1

03 TC

/

//

A 3

52 0

01 D

E E

3 32 T

L 8

88 A

U

/

/ /

D D

1 20 E

1 03 O

H

/

//

T C

3 51 S

0 01 R

A EY S

L A

T C

S H

I 2

F 8

E D

1 M

Y E

D T

R H

I U

L R

RO 5

I E

EF S

C V

VN I

A I

IA S

F R

RH

/

L I

H S

HT P 3 C

CI NG S

E S

E E

8 S

N M 9 I

IA N

N M

O O

S O

1 L

R LK C

CS H

N H

0 R

E S

S C

1 3

E S

E E

P Y

S S

D F

C C

A A M F

F O 0 S A C

3 Y

8 L

R A

/

U 2

A T

0 C

/

5 M

A 0

M U

S D

E 3

8 L

U

/

P D

2 E

0 C

H

/

C 5

S 0

g D

Y E

T I

U R

L E

I S

C V

I A

S F

R I

S H

C S

E N

S E

S E

E M

I M

M M

O R

L O

O S

O H

C H

H H

R E

S S

E S

E E

P S

S D

F C

llll

SUMMARY

0F ACC0MPLISHMENTS AS OF MAY 31, 1983 m

FISCAL YEAR TO DATE SCHEDULED ACTUAL SER'SCOL) 0 0

SER'SCOL) 2 2

SCHEDULED ACTUAL SER'S( CP) 0 0

$ E it ' S ( CP) 1 1

SSER'S( 0L) 4 3

$$ER'S( 0L) 16 17 55ER'S( CP) t 1

SSER'S( CP) 2 2

l DES'S( 0L) 0 0

DE$'S( 0L) 1 1

DES'S( CP) 0 0

DES'S( CP) 0 0

FES'S( 0L) 0 0

FES'S( 0L) 2 2

FES'SCCP) 0 0

FES'S( CP) 0 0

0L'S ISSUEDM 2

1 0L'S ISSUEDM 2

1 CP'S ISSUED 0

0 CP'S ISSUED 0

0 N FULL POWER

LICENSING SCHEDULES FDR ALL PENDING OL APPLICATIONS REPORT AS OF 05/31/83 (INCLUDES SCHEDULES FOR ADDITIDHAL UNITS WITH PROJECTED CONSTRUCTION COMPLETION IN CY 1983-1984)

(LISTED IN ORDER OF FACILITY NAME)

SER SSER EST.

STAFF TECH STAFF TECH ASLB COMMM APPL.

DELAY ISSUE IMPUT ISSUE ACRS ISSUE IMPUT ISSUE START IMITIAL DEC.

CONST.

PLANT (MONTHS) 211 TO DL 1ER HIG EE1 TO DL 11ER OF HRG DECISIDH 2 ALE COMPL.

BYROH 1 0

11/81C 01/82C 02/82C 03/82C 04/82C 08/82C 01/83C 03/83C 11/83 11/83 11/83 BYROM 2 0

11/81C 01/82C 02/82C 03/82C 04/82C 08/82C 02/84 03/83C 11/83 03/84 04/84 CALLAWAY 1 0

09/81C 09/81C 10/81C 11/81C 01/82C 01/82C 06/83 11/81C 10/83 03/84 04/84 CATAWBA 1 0

08/82C 01/83C 02/83C 03/83C 01/83C 04/83C 05/83C 10/83 05/84 05/84 05/84 CLINTON 1 0

12/81C 12/81C 02/82C 03/82C 05/82C 06/82C 05/83C 08/83 12/83 12/83 01/84 COMANCHE PEAK 1 2

05/81C 07/81C 07/81C 11/81C 09/81C 06/83 11/85 12/81C 11/83 11/83 39/83 COMANCHE PEAK 2 0

05/8tC 07/81C 07/8tC 11/81C 09/81C 06/83 11/84 12/81C 11/83 11/84 12/84 DIABLO CANYOH.1 0

12/72C 01/75C 10/74C 07/76C 05/76C 02/83C 06/83 12/76C 07e81C DIABLO CANYOH 2 0

12/72C 01/75C 10/74C 07/76C 05/76C 02/83C N/S 12/76C 07/81C EHRICO FERMI 2 0

04/81C 05/77C 09/77C 08/81C 09/81C 01/83C 02/83C 03/82C 10/82C 07/83 08/83 GRAND GULF 1 0

05/81C 08/81C 09/81C 10/8tc 10/8tC 03/83C 06/83 N/A N/A 07/83 06/82C LASALLE 2 0

03/78C 02/81C 03/81C 04/81C 11/78C 05/83C 06/83 N/A N/A 07/83 08/83 MCGUIRE 2 0

10/75C Ot/78C 03/78C 04/78C 04/76C 02/83C 02/83C 03/77C 06/81C 05/83C 03/83C MIDLAND 2 0

02/82C 04/82C 05/82C 06/82C 07/82C 08/82C 11/83 11/82C 10/83 09/84 10/84 PALD VERDE 1 0

10/81C 10/81C 11/81C 12/81C 03/82C 02/83C 03/83C 04/82C 12/82C 07/83 08/53 PALO VERDE 2 0

10/81C 10/81C 11/81C 12/81C 03/82C 02/83C 10/83 04/82C 12/82C 07/84 08/84 PERRY 1 0

02/82C 05/82C 05/82C 07/82C 08/82C N/S N/S 05/83C 03/84 11/84 12/84 SAN OH0FRE 3 0

01/81C 01/81C 02/81C 02/81C 04/81C 04/83 06/82C 06/81C 05/82C 11/82C SEABROOK 1 0

05/82C 12/82C 03/83C 04/83C 12/82C 05/83 06/83 08/83 06/84 08/84 09/84 SHOREHAM 0

03/77C 03/81C 04/81C 10/81C 10/77C H/S 07/83 05/82C 07/83 08/83 ST LUCIE 2 0

10/81C 09/81C 10/81C 11/81C 04/82C 03/83C 04/83C M/A N/A 06/83 03/83C SUSQUEHANNA 2 0

03/81C 03/81C 04/81C 08/81C 07/8tC 02/83C 11/83 10/81C 04/82C 12/83 01/84 WASHINGTOM HUCLEAR 2 0

07/81C 05/82C 03/82C 10/82C 12/81C 11/82C 05/83C N/A N/A 08/83 09/83 WATERFORD 3 0

05/81C 05/81C 07/8tC 08/81C 09/81C 05/83C 06/83 03/82C 04/83C 06/83 05/83 WATTS BAR 1 0

06/78C 06/82C 07/82C 08/82C 12/78C 09/82C 11/83 H/A N/A 12/83 01/84 0

06/78C 06/82C 07/82C 08/82C 12/78C 09/82C 06/84 N/A N/A 12/84 01/85 WATTS BAR 2 0

01/82C 03/82C 04/82C 05/82C 06/82C 08/82C 05/83 09/83 03/84 07/84 08/84 ZIMMER 1 0

10/76C 12/77C 01/79C 03/79C 06/77C 08/82C 08/82C 02/82C M/S 08/85 09/83 WOLF CREEK 1 KLICENSING SCHEDULES AND DECISION DATES DO NOT REFLECT POTENTIAL DELAY FROM EMERGENCY PREP

LICENSING SCHEDULES FOR ALL TEhDERED OL UNITS TO BE ISSUED AFTER CY 1984 ISSUE APPL. CONST.

PLANT 11EE COMPLETE BEAVER VALLEY 2 02/85 12/85 BELLEFONTE 1 12/84 05/85 BELLEFONTE 2 N/S 05/86 BRAIDWOOD 1 05/84 04/85 BRAIDWOOD 2 N/S 04/86 CATAWBA 2 N/S 10/86 CLINTON 2 N/S FERMI 2 (FSAR RESUB)

GRAND GULF 2 N/S N/S HARRIS 1 04/84 06/85 HARRIS 2 N/S 06/89 HOPE CREEK 1 01/86 LIMERICK 1 10/83 08/84 LIMERICK 2 N/S 04/88 MARBLE HILL 1 04/85 06/86 MARBLE HILL 2 N/S 12/87 MIDLAND 1 10/82C 02/85 MILLSTONE 3 11/84 11/85 NINE MILE POINT 2 N/S 42/86 PALO VERDE 3 09/85 11/85 PERRY 2 N/S 05/87 RIVER BEND 1 05/84 94/85 RIVER BEND 2 N/S SEABROOK 2 N/S 12/86 SOUTH TEXAS 1 01/86 12/86 SOUTH TEXAS 2 N/S 12/88 WASHINGTON NUCLEAR 1 N/S M/S WASHINGTON NUCLEAR 3 12/84 12/85

LICENSING SCHEDULES FOR ALL PENDING CP APPLICATIONS REPORT AS OF 05/31/83 (LISTED IN ORDER OF FACILITY MAME)

SER SSER STAFF TECH STAFF TECH ASLB COMM ISSUE IMPUT ISSUE ACRS ISSUE INPUT ISSUE START IMITIAL DEC.

PLANT RE1 TO DL 1ER 519 fl1 TO DL 11ER OF HRG DECISION RAI.E CLINCH RIVER 82/76C 02/83C 03/83C 04/83C 02/77C 04/83C 05/83C 08/82C 04/84 06/84 SKAGIT/HANFORD 182 05/82C 07/77C 08/77C 02/83C 06/83 11/82C 12/82C M/S N/S M/S G

h

NEW APPLICATION F 0 R E C A S T --- 0 P E R A T I N G LICENSE REVIEW 5 (ANTICIPATED TENDER DATES FOR ALL UNITS WITH CONSTRUCTION PERMITS)

AS OF WEEK ENDING: 05/31/83 DOCKET LICENSING APPL.

APPL.

tST UNIT PROJECT SUBMITS SUBMITS CONST.

FACILITY HUMBER UTIL

_______________________________________=ITY MANAGER FSAR ENV. RPT. COMPLETE COUNSEL

= - _ _ _ _ _ = - - -

FY83 MILLSTONE 3 050-00425 NORTHEAST NUCLEAR ENERGY E.DOOLITTLE 10/29/82C 10/29/82C 11/01/85 M.ROTNSCHILD

.=_______.==- -_ _ _ = - _ - - _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _.... _ _ _ _ _ _. - - _ ___

MARBLE HILL 1 82 054680547 PuBLIC SERVICE OF INDIANA P.0 CONNOR tt/23/82C 11/23/82C 06/00/86 E.CHEN BEAVER VALLEY 2 050-00412 DUQUESNE LIGHT L.LAZO 01/26/83C 01/26/83C 12/31/85 J.GUTEIRREZ HINE MILE POINT 2 050-00410 NIAGARA MOHAWK POWER M.NAUGHEY 01/31/83C OS/31/83C 02/00/86 B.BORDENICK HOPE CREEK 1 050-00354 PUBLIC SERVICE ELECTRIC & GAS D. WAGNER V0GTLE 1 82 0424 0425 GEORGIA POWER 03/02/83C 03/02/83C 01/14/86 R. GODDARD

______________________________________M.MILLER 07/09/83 09/00/83 09/00/86 B.BORDENICK

==____--_==--

d

MEW APPLICATION F0.RECA5T-SPECIAL REVIEW AS OF WEEK ENDING: 05/31/83 5TANDARDIZATION REVIEW 5 PROJ PROJECT TENDER PROJECT

_,tHL.

APPLICANT MANAGER BAIE (MSS)WAPWR 668 WESTINGHOUSE G.MEYER 07/08/83 s

COMMON ABBREVIATIONS USED WITHIN THE PUBLICATION ACRS: ADVISORY COMMITTEE ON REACTOR SAFEGUARDS AE:

ARCHITECT / ENGINEER L.A.:

LICENSING ASSISTAhT AEB ACCIDENT EVALUATION BRANCH LESR LIMITED EARLY SITE REVIEW (ALSO ABBREVIATED LES)

ASB AUXILIARY SYSTEMS BRANCH LGR LICENSING GUIDANCE BRANCH ASLB ATOMIC SAFETY LICENSING BOARD LMFBR LIQUID METAL FAST BREEDER REACTOR L98 LICENSEE QUALIFICATIONS BRANCH 88R BURNS 8 ROE 58V:

BLACK 8 VEACH MEB:

MECHANICAL ENGINEERING BRANCH B4W:

BABCOCK & WILCOX MPA:

MANAGEMENT AND PROGRAM ANALYSIS BECH: BECHTEL MTEB MATERIALS ENGINEERING BRANCH BRRT: BROWN 8 ROOT MWE MEGAWATTS ELECTRIC MWT MEGAWATTS THERMAL BWR BOILING WATER REACTOR CEB:

CHEMICAL ENGINEERING BRANCH OL:

OPERATING LICENSE COMB COMBUSTION ENGINEERING OLB OPERATOR LICENSING BRANCH CP:

CONSTRUCTION PERMIT OPS:

OFFSHORE POWER SYSTEMS CPS:

CORE PERFORMANCE BRANCH CSB CONTAINMENT SYSTEMS BRANCH 1

CWE:

COMMONWEALTH EDISON PDA:

PRELIMINARY DESIGN APPROVAL PG8E8 PACIFIC GAS 8 ELECTRIC DES:

DRAFT ENVIRONMENTAL STATEMENT PID:

PARTIAL INITIAL DECISION PM:

PROJECT MANAGER PS:

POWER SYSTEMS BRANCH 1

EEB ENVIRONMENTAL ENGINEERING BRANCH PSAR: PRELIMINARY SAFETY ANALYSIS REPORT EPA:

ENVIRONMENTAL PROTECTION AGENCY PTRBs PROCEDURES AND TEST REVIEW BRANCH EPLB: EMERGENCY PREPAREDNESS LICENSING BRANCH PWR PRESSURIZED WATER REACTOR ER:

ENVIRONMENTAL REPORT EQB EQUIPMENT QUALIFICATION BRANCH ESR EARLY SITE REVIEW QAB QUALITY ASSURANCE BRANCH l

ETSB: EFFLUENT TREATMENT SYSTEMS BRANCH RAB RADIOLOGICAL ASSESSMENT BRANCH i

F.R.:

FEDERAL REGISTAR RSB REACTOR SYSTEMS BRANCH FDA FINAL DESIGN APPROVAL FES:

FINAL ENVIRONMENTAL STATEMENT FSAR: FINAL SAFETY ANALYSIS REPORT SSL SARGENT 4 LUNDY

$8W STONE 8 WEBSTER SAB SITING ANALYSIS BRANCH G8H GIBBS & HILL i

SAR SAFETY ANALYSIS REPORT i

GHDR: GIBBS & HILL SDA:

STANDARD DESIGN APPROVAL GIL:

GILBERT COMMONWEALTH SEB STRUCTURAL ENGINEERING BRANCH GSB:

GEOSCIENCES BRANCH SER:

SAFETY EVALUATION REPORT SIB:

SYSTEMS INTERACTION BRANCH SP SPECIAL PROJECT HGB:

HYDROLOGIC AND GE0 TECHNICAL BRANCH SSC SOUTHERN SERVICES COMPANY HTGR HIGH TEMPERATURE GAS COOLED REACTOR SSER: SUPPLEMENT TO SAFETY EVALUATION TVA:

TENNESSEE VALLEY AUTHORITY ICB INSTRUMENTATION AND CONTROL BRANCH UEC UNITED ENG. 8 CONSTRUCTORS UFB UTILITY FINANCE BRANCH WEST: WESTINGHOUSE

s_

A T

I l

1 t

l M

M Z

O M

t U

W (A

k I

i t

1

~r-PR0 JECT INDEX SECTIDH II OPERATING LICENSE REVIEW CONSTRUCTION PERMIT REVIEWS STANDARD DESIGH REVIEWS OTHER REVIEWS 2-1 BEAVER VALLEY 2 2-38 CLINCH RIVER 2-40 (HSS)CESSAR SYSTEM 80 2-2 BELLEFONTE 1 82 2-39 SKAGIT/HANFORD 182 2-41 (HSS)GESSAR SEVERE ACC 2-3 BRAIDWOOD 1 82 2-42 (HSS)GESSAR-238 HI 2-4 BYROH 1 82 2-5 CALLAWAY 1 2-6 CATAWBA 1 82 2-7 CLINTON 182 2-8 COMANCHE PEAK 1 82 2-9 DIABLO-CANYOH 1 82 2-10 ENRICO FERMI 2 2-11 FERMI 2 (FSAR RESUB) 2-12 GRAND GULF 1 82 2-13 HARRIS 1 82 2-14 HOPE CREEK 1 2-15 LASALLE 2 2-16 LIMERICK 1 82 2-17 MARBLE HILL 1 82 2-18 MCGUIRE 2 2-19 MIDLAND 1 82 2-20 MILLSTONE 3 2-21 HINE MILE POINT 2 2-22 PALO VERDE 1,2,3 2-23 PERRY 1 82 2-24. RIVER BEND 1 &2 2-25 SAN ONOFRE 3 2-26 SEABROOK 1 82 2-27 SHOREHAM 2-28 SOUTH TEXAS 1 &2 2-29 ST LUCIE 2 2-30 SUSQUEHANNA 2 2-31 WASHINGTON HUCLEAR 1 2-32 WASHINGTON HUCLEAR 2 2-33 WASHINGTOH HUCLEAR 3 2-34 WATERFORD 3 2-35 WATTS BAR 1 82 2-36 WOLF CREEK 1 3-37 ZIMMER 1 l

HRR LICEH$IHG SYSTEM PAGE HO 2-1 BEAVER VALLEY 2 0L CURRENT STATUS REP 0RT REPORT AS OF 05/31/83 PLANT CHARACTERISTICSt KEY P E R S 0 H H E L:

DOCKET HO 05000412 LIC. PM:

L. LAZO ASLB CHAIR N/A APPLICANT:

DUQUESHE LIGHT LIC. BC:

G. KNIGHTON MEMBER 1:

LOCATION:

5 MI E OF E. LIVERPOOL, OH LIC. LA.:

E. HYLTON MEMBER 2:

REGION:

1 AE 58W COUNSEL:

J. GUTEIRREZ CONST. INSP S. FOLSON REAC. TYPE: PWR HSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP:

DESIGH PWR: 2774 MWT/0852 MWE CONST $8W RM ANALYST S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The FSAR was tendered on 01-26-83.

The SAR was docketed on 05/18/83.

ER DOCKETED:

05/18/83 05/18/83C ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

05/31/84 ISSUE DES:

07/31/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

12/31/84 CURRENT ENV. STATUS:

The ER was tendered on 01-26-83.

The ER was docketed SAFETY / HEARING MILESTOMES:

on 05/18/83.

APPLICATI0H TENDERED:

01/26/83 01/26/83C SAR DOCKETED:

05/18/83 05/18/83C SAR Q'S RECEIVED BY PM:

07/31/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 10/31/83 INPUT TO DRAFT SER TO PM:

01/31/84 CURRENT HRG. STATUS:

ISSUE DRAFT SER:

02/28/84 Opportunity for Hearing will be published in the Federal IMPUT TO SER:

08/31/84 Register.

ISSUE SER:

10/31/84 ACRS FULL COMMITTEE MEETING:

12/31/84 IHPUTS TO SE SUPPLEMENT 18 ISSUE SE SUPPLEMENT.18 02/28/85 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

HEARING STARTED:

04/30/85 The information for antitrust review of operating license application was tendered 12/15/82.

ASLB INITIAL DECISIDH:

11/30/85 COMMISSIGH EFFECTIVEMESS DECISIGHz TECH SPECS COMPLETED:

COMMISSIDH DECISION:

02/28/86 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:

CONSTRUCTION COMPLETI0H - APPL.:

12/31/85 07/30/82

NRR LICENSING SYSTEM PAGE NO: 2-2 BELLEFONTE 1 8 2 0L CURRENT STATUS REP 0RT REPORT AS OF.05/31/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:

043880439 LIC. PM:

M. THADANI ASLB CHAIR: N/A APPLICANT:

TENNESSEE VALLEY AUTHORITY LIC. BC:

E. ADENSAM MEMBER 1 N/A LOCATION:

6 MI NE OF SCOTTSBORD, ALA LIC. LA.:

M. DUNCAN MEMBER 2 N/A REGION:

2 AE:

TVA COUNSEL:

B. PATON CONST. INSP R. CRLENJAK REAC. TYPE: PWR HSSS: 88W ANTITRUST:

J. RUTBERG RESID. INSP J. WILCOX DESIGN PWR 3760 MWT/1235 MWE CONST: TVA RM ANALYST:

B. ST MARY CURRENT SAF STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE As a result of applicant's construction delay, the review schedule has been delayed.

The applicant has ER DOCKETED:

06/12/78 06/12/78C announced a delay in loading fuel to 05/85.

The ER SITE VISIT COMPLETE:

02/20/82 06/17/82C staff has evaluated the impacts of this delay on the INPUT TO DES TO PM:

11/04/83 safety and environmental review schedules and issued ISSUE DES:

12/16/83 new schedule on 01/25/83.

RESPONSE TO COMMENTS ON DES:

03/05/84 ISSUE FES:

05/18/84 CURRENT ENV. STATUS:

As a result of applicant's construction delay, the review schedule was delayed, and has been re evaluated.

SAFETY / NEARING MILESTONES:

The environmental site visit was completed on 6/17/82.

APPLICATION TENDERED:

02/03/78 02/03/78C SAR DOCKETED:

06/12/78C SAR 9'S RECEIVED BY PM:

07/03/80 11/01/82C SAR APPL. RESPONSE 10 9'S RECEIVED: 12/02/83 CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/20/84 No hearing is anticipated.

ISSUE DRAFT SER:

03/16/84 INPUT TO SER:

06/15/84 ISSUE SER:

08/17/84 ACRS FULL COMMITTEE MEETING:

09/28/84 INPUTS TO SE SUPPLEMENT 13 10/05/84 ISSUE SE SUPPLEMENT 18 12/14/84 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

Pending determination NEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSION EFFECTIVENESS DECISION: N/A TECH SPECS COMPLETED:

02/01/85 COMMISSION DECISION:

04/15/85 ISSUE LIC. WITN POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

05/00/85 No. 23 (12/17/82).

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

On 07/06/82 TVA revised fuel load date to 5/85.

Staff has CONSTRUCTION COMPLETION - APPL.:

05/00/85 07/06/82 evaluated impact on safety and environmental review schedules and issued new schedule on 01/25/83.

t

. _ =.

HRR LICEN5ING SY$ TEM PAGE N0 2-3 BRAIDWOOD 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF 05/31/83 PLANT CHARACTERISTICSt KEY PERS0NNEL DOCKET HO:

045680457 LIC. PM:

J. STEVENS ASLB CHAIR '

M. MILLER APPLICANT:

COMM0HWEALTH EDISON LIC. BC:

J. YOUNGBLOOD MEMBER 1 R. COLE LOCATION:

24 MI SSW OF JOLIET, ILL LIC. LA.:

M. RUSHBROOK MEMBER 28' D. CALLIHAN REGION:

3 AE 58L COUNSEL:

D. HASSELL CONST. INSP J. HEISLER REAC. TYPE: PWR HSSS: WEST ANTITRUST B. V0GLER RESID. INSP L. MCGREGOR DESIGH PWR 3425 MWT/1120 MWE CONST: CWE RM ANALYST S. HEDLUND ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

Draft SER will be issued during July, 1983.

ER DOCKETED:

11/30/78C ER SITE VISIT COMPLETE:

05/31/83 05/05/83C INPUT TO DES TO PM:

11/01/83 ISSUE DES:

01/01/84 RESPONSE TO COMMENTS OH DES:

04/15/E4 ISSUE FES:

06/00/84 CURRENT ENV. STATUS:

Site visit was conducted during May, 1983.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/26/78 06/26/78C SAR DOCKETED:

11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:

12/31/82 12/31/82C SAP. APPL. RESPONSE TO Q'S RECEIVED: 03/01/83 05/06/83C INPUT TO D" AFT SER TO PM:

06/15/83 CURRENT HRG. STATUS:

ISSUE DRAFT SER:

07/15/83 Opportunity for Hearing was published in the Federal Register on 06/13/79. 1here will be a contested hearing.

IMPUT TO SER:

11/01/83 ISSUE SER:

12/01/83 ACRS FULL COMMITTEE MEETING:

01/00/84 INPUTS TO SE SUPPLEMENT 12 04/01/84 ISSUE SE SUPPLEMENT 1:

05/00/84 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST HEARING STARTED:

10/06/84 Applicant has submitted antitrust information pursuant to ASLB INITIAL DECISIGHz 03/00/85 Reg. Guide 9.3.

COMMISSIDH EFFECTIVENESS DECISIDH 04/00/85 TECH SPECS COMPLETED:

04/00/85 COMMISSIDH DECISI0H:

C1/09/85 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

04/09/85 LATEST AMENDMENT:

FSAR Amendment No. 41 SCHED. DATE RECEIPT DATE HEW SLIPS / MOTES:

CONSTRUCTION COMPLETION - APPL.:

04/00/85 04/14/82

1

\\

l NRR LICEN5ING SYSTEM PAGE NO: 2-4 BYRON 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF 05/31/83 PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:

045480455 LIC PM:

L. OLSHAN ASLB CHAIR:

I. SMITH APPLICANT:

COMMONWEALTH EDISON LIC. BC:

J. YOUNGBLOOD MEMBER 1 R. COLE LOCATION:

17 MI SW OF ROCKFORD, ILL LIC. LA.:

M. RUSHBROOK MEMBER 2:

D. CALLIHAN REGION:

3 AE S8L COUNSEL:

S. GOLDBERG CONST. INSP: M. RIf 1 REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP W. FG EY DESIGN PWR: 3425 MWT/1120 MWE CONST: CWE RM ANALYST S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER and Supplements 1 and 2 have been issued. Several outstanding and confirmatory issues remain to be ER DOCKETED:

11/30/78C resolved prior to licensing.

ER SITE VISIT COMPLETE:

05/31/81 05/31/81C INPUT TO DES TO PM:

08/15/81 08/15/81C ISSUE DES:

11/05/81 11/05/81C RESPONSE TO COMMENTS ON DES:

03/01/82 03/01/82C ISSUE FES:

04/05/82 04/05/82C CURRENT ENV. STATUS:

Environmental review completed and FES (NUREG-0848) published in April 1982.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/26/78 06/26/78C SAR DOCKETED 11/09/78 11/30/78C SAR Q'S RECEIVED BY PM:

08/15/81 08/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/15/81 10/15/81C CURRENT HRG. STATUS:

INPUT To DRAFT SER TO PM:

11/07/41 11/07/81C Hearing began March 1,

1983.

ISSUE DRAFT SER:

INPUT TO SER:

01/07/82 01/07/82C ISSUE SER:

02/07/82 02/07/82C 1

ACRS LETTER RECEIVED:

03/10/82 03/10/82C INPUTS TO SE SUPPLEMENT 28 08/20/82 08/20/82C ISSUE SE SUPPLEMENT 2 12/10/82 01/31/83C FEMA LETTER RECEIVED:

I CURRENT ANTITRUST Applicant has submitted antitrust information pursuant HEARING STARTED:

03/00/83 03/01/83C to Reg. Guide 9.3.

ASLB INITIAL DECISIGHz 11/00/83 COMMISSION EFFECTIVENESS DECISION: 11/00/83 TECH SPECS COMPLETED:

11/00/83 COMMISSION DECISION:

11/00/83 ISSUE LIC. WITH POWER RESTRICTIDH LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

11/00/83 FSAR - Amendment 41 ER - Amendment 3 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTIDH COMPLETI0H - APPL.

11/00/83 04/18/83

HRR LICENSING SYSTEM PAGE HO: 2-5 CALLAWAY 1 0L CURRENT STATUS REPORT REPORT AS OF 05/31/83 PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET HO:

05000483 LIC. PM:

G. EDISON ASLB CHAIR:

J. GLEASON APPLICANT:

UNIDH ELECTRIC LIC. BC:

B. YOUNGBLOOD MEMBER 1:

G. BRIGHT LOCATION:

to MI SE OF FULTON, MD LIC. LA.:

M. RUSHBROOK MEMBER 2:

J. KLIHE REGION:

3 AE BECH COUNSEL:

B. PERLESS CONST. INSP: J. KOHKLIN REAC. TYPE: PWR HSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP: J. HEISLER DESIGN PWR: 3425 MWT/1188 MWE CONST DANIEL RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SAR was docketed 08/08/80. The SER was issued by HRC on 10/07/81 and the SER Supplement No. 1 was issued on ER DOCKETED:

12/12/80 12/12/80C 01/15/82. SSER 2 is scheduled for 5/83.

ER SITE VISIT COMPLETE:

12/00/81 12/00/81C INPUT T0 sES TO PM:

06/01/81 08/01/81C ISSUE DES:

09/29/81 09/29/81C RESPONSE TO COMMENTS OH DES:

12/01/81 12/01/81C ISSUE FES:

01/29/82 01/29/82C CURRENT ENV. STATUS:

ER was docketed 12/12/80. The DES was issued by HRC on 09/29/81 and the FES was issued on 01/29/82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/25/79 10/25/79C SAR DOCKETED:

08/08/80 08/08/80C SAR Q'S RECEIVED BY PM:

12/18/80 12/18/80C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/81 10/01/81C INPUT TO DRAFT SER TO PM:

CURRENT HRG. STATUS:

Hearings were held on limitad issues during Hovember 1981.

ISSUE DRAFT SER:

N/A A decision on these limited issues was rendered by the INPUT TO SER:

09/11/81 09/11/81C licensing board on 12/13/82. Joint intervenors have ISSUE SER:

10/07/81 10/07/81C appealed the initial decision. Oral arguments on the appeal are scheduled for 6/14/83.

The hearing on the ACRS LETTER RECEIVED:

11/19/81 11/19/81C one remaining contention, emergency preparedness, is INPUTS TO SE SUPPLEMENT 2:

01/01/82 01/01/82C ISSUE SE SUPPLEMENT 2:

06/00/83 scheduled for 8/31/83.

FEMA LETTER RECEIVED:

11/00/83 CURRENT ANTITRUST:

HEARING STARTED:

11/17/81 11/17/81C OL review is in progress.

ASLB IHITIAL DECISIDH:

10/00/83 COMMISSION EFFECTIVEHESS DECISIDH 11/00/83 TECH SPECS COMPLETED:

02/00/84 COMMISSIDH DECISIDH:

03/00/84 ISSUE LIC. WITH POWER RESTRICTIDH 04/00/84 ISSUE FULL POWER LICENSE AMEND:

07/00/84 LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

04/00/84 08/23/82 The Caseload Forecast Panel is reviewing construction progress in order to make a new construction completion schedule estimate. An April 1984 estimate is based on the aoolicant's recentiv revised fuel load date.

^ - -

NRR LICENSING SYSTEM PAGE NO: 2-6 CATAWBA 1&2 0L CURRENT STATUS REPORT REPORT AS OF8 05/31/83 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNEL:

DOCKET NO:

041380414 LIC. PM:

K. JABBOUR ASLB CHAIR:

J. KELLEY APPLICANT:

DUKE POWER LIC. BC:

E. ADENSAM MEMBER 18 D. CALLINAN LOCATION:

6 MI NNW OF ROCK HILL, SC LIC. LA.:

M. DUNCAN MEMBER 2:

R. FOSTER REGION:

2 AE DUKE COUNSEL:

G. JOHNSON CONST. INSP P. VAND00RN REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP P. VAND00RN DESIGN PWR 3582 MWT/1145 MWE CONST DUKE RM ANALYST L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was issued on February 9, 1983.

SSER 01 was issued on May 2, 1983.-

ER DOCKETED:

06/11/81 06/11/81C ER SITE VISIT COMPLETE:

10/15/81 10/15/81C INPUT TO DES TO PM:

06/25/82 07/29/82C ISSUE DES:

08/05/82 08/11/82C RESPONSE TO COMMENTS ON DES:

11/30/82 11/30/82C l

4 ISSUE FES:

01/07/83 Ot/07/83C CURRENT ENV. STATUS:

s I

DES was issued on 08/11/82. FES was issued on 1/7/83.

SAFETY / HEARING MILESTONES:

APPLICATI0H TENDERED:

03/26/79 03/26/79C SAR DOCKETED:

06/11/81 06/11/8tC SAR Q'S RECEIVED BY PM:

12/15/81 12/15/81C i

SAR APPL. RESPONSE TO Q'S RECEIVED: 12/10/82 12/10/82C l

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/02/82 12/30/82C Combined hearing anticipated to start 10/83.

ISSUE DRAFT SER:

11/19/82 11/19/82C INPUT TO SER:

01/09/83 01/19/83C ISSUE SER:

02/06/83 02/09/83C I

ACRS LETTER RECEIVED:

03/18/83 03/18/83C l

INPUTS TO SE SUPPLEMENT 18 04/12/83 04/12/83C ISSUE SE SUPPLEMENT 1:

05/02/83 05/02/83C j

FEMA LETTER RECEIVED:

04/30/83 04/30/83C CURRENT ANTITRUST:

Operating license antitrust review is in progress.

HEARING STARTED:

10/00/83 ASLB INITIAL DECISION:

05/00/84 COMMISSION EFFECTIVENESS DECISIDH 05/00/84 i

TECH SPECS COMPLETED:

05/00/84 COMMISSION DECISION:

05/00/84 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

05/00/84 Revision 7 dated 02/22/83.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CP Amend. issued 12/23/80 indicating change in ownership.

CONSTRUCTION COMPLETION - APPL.:

05/00/84 05/08/82 i

i i

l NRR LICENSING SYSTEM PAGE N0: 2-7 CLINTON 182 0L CURRENT STATUS REPORT REPORT AS OF 05/31/83 i

PLANT CHARACTERISTICS:

KEY P E R S 0 N N E La DOCKET NO:

046180462 LIC. PM:

H. ABELSON ASLB CHAIR:

H. CLARK APPLICANT:

ILLINOIS POWER LIC. BC:

A. SCHWENCER MEMBER 1 G. FERGUSON LOCATIDH:

6 MI E OF CLINTON, ILL LIC. LA.:

E. HYLTON MEMBER 2:

0. PARIS REGION:

3 AE S8L COUNSEL:

R. GODDARD CONST. INSP: F. JABLONSKI REAC. TYPE: BWR HSSS: GE ANTITRUST:

B. V0GLER RESID. INSP: H. LIVERMORE DESIGN PWR 2894 MWT/0950 MWE CONST: BALDWIN RM ANALYST:

B. ST MARY ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

FSAR was docketed 09/08/80. SER was issued 02/17/82.

Supplement No. I was issued 07/22/82. SSER No. 2 was ER DOCKETED:

03/01/81 09/08/80C ER SITE VISIT COMPLETE:

issued in May 1983.

IMPUT TO DES TO PM:

12/08/81 12/08/81C ISSUE DES:

12/18/81 12/28/81C RESPONSE TO COMMENTS OH DES:

02/22/82 03/25/82C ISSUE FES:

05/20/82 05/20/82C CURRENT ENV. STATUS:

The draft environmental statement was completed December 1981 The FES was completed May 1982, SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

12/01/79 12/01/79C SAR DOCKETED:

09/08/80 09/08/A0C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

IMPUT TO DRAFT SER TO PM:

CURRENT HRG. STATUS:

Prehearing conferences were held 4/14/81 and 5/4/82.

ISSUE DRAFT SER:

ASLB Memorandum and Order was issued 11/12/82. Six INPUT TO SER:

12/05/81 12/05/81C contentions have been admitted. Hearing start currently ISSUE SER:

01/05/82 02/17/82C estimated for 08/83 at the earliest. Prehearing conference ACRS LETTER RECEIVED:

02/12/82 03/09/82C is scheduled for June 2, 1983.

IMPUTS TO SE SUPPLEMENT 2:

06/30/82 06/30/82C ISSUE SE SUPPLEMENT 28 05/27/83 05/27/83C FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

HEARING STARTED:

08/09/83 Operating license antitrust review completed ASLB INITIAL DECISIGH:

12/00/83 March 18, 1982 (SECY-82-120).

COMMISSIDH EFFECTIVENESS DECISI0H:

12/00/83 TECH SPECS COMPLETED:

11/00/83 COMMISSIGH DECISI0Hz 12/00/83 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

01/00/84 LATEST AMENDMENT:

FSAR Amendment 024, 03/83.

SCHED. DATE RECEIPT DATE CONSTRUCTION COMPLETION - APPL.:

01/00/84 01/24/83 NEW SLIPS / MOTES:

Stop work orders associated with construction QA expected to delay fuel load by at least one year from current IPC date of 1/84.

IPC will provide revised fuel load date in 6/83.

\\

HRR LICENSIHG SYSTEM PAGE HO: 2-8 COMANCHE PEAK 1 82 0L CURRENT STATUS REPORT REPORT AS OF 05/31/83 PLAHT CHARACTERISTICS:

KEY PERSONHEL:

DOCKET NO:

044580446 LIC, PM:

S. BURWELL ASLB CHAIR P. BLOCH APPLICANT:

TEXAS UTILITIES GENERATING LIC. BC:

B. YOUNGBLOOD MEMBER 1:

W. JORDAN LOCATION:

4 MI N OF GLEN ROSE TEX LIC. LA.:

M. RUSHBROOK MEMBER 2 K. MCCOLLOM REGION:

4 AE:

G8H COUNSEL:

M. ROTHSCHILD CONST. INSP R. TAYLOR REAC. TYPE: PWR HSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP D. KELLEY DESIGH PWR: 3411 MWT/1150 MWE CONST BRRT RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The SER was issued 07/14/81 The staff deferred scheduling the Comanche Peak review by the ACRS until sufficient ER DOCKETED:

01/19/79 01/19/79C information was provided to resolve a large number of open ER SITE VISIT COMPLETE:

06/20/80 08/07/80C i

issues.

SSER Of was issued 10/16/81.

Application was INPUT TO DES TO PM:

08/15/80 04/27/81C reviewed by the ACRS on 11/13/81 SSER 82 responding to ISSUE DES:

04/30/81 05/22/81C the ACRS was issued on 01/20/82.

SSER 03 containing RESPONSE TO COMMENTS ON DES:

07/19/81 08/28/81C emergency preparedness was issued 03/11/83.

ISSUE FES:

09/18/81 09/24/81C l

CURRENT ENV. STATUS:

The DES was i ssued on 05/22/81 The EPA Federal Register l

Hotice was printed on 05/29/81 and the comment period SAFETY / HEARING MILESTONES:

l ended 07/13/81.

The FES was issued on 09/24/81 APPLICATION TENDERED:

03/01/78 03/01/78C SAR DOCKETED:

05/12/78 05/12/78C I

SAR Q'S RECEIVED BY PM 12/30/78 02/22/79C

{

SAR APPL. RESPONSE TO 9'S RECEIVED: 05/08/79 01/31/80C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

04/13/79 03/11/81C Hearing began 12/02/81 Issues heard were financial ISSUE DRAFT SER:

03/31/81 03/31/81C qualifications and operating QA program.

Further hearing INPUT TO SER:

05/22/81 07/08/81C I,

sessions on QA/QC during construction were held 06/07-11/82, ISSUE SER:

07/14/81 07/14/81C 07/26-30/82, and 09/13-17/82.

The fifth hearing session continuing testimony on QA/QC during construction and ACRS LETTER RECEIVED:

11/17/81 11/17/81C emergency preparedness was held 5/16-20/83.

The sixth INPUTS TO SE SUPPLEMENT 4 06/00/83 hearing session continuing testimony on QA/QC during ISSUE SE SUPPLEMENT 48 07/29/83 construction is scheduled for 06/13-17/83.

FEMA LETTER RECEIVED:

11/00/83 CURRENT ANTITRUST:

ALJ appointed on 02/23/82 to replace ASLB. Prehearing HEARING STARTED:

12/02/81 12/02/81C conference held 04/13/82 to determine status of parties.

ASLB INITIAL DECISIDH 11/00/83 Briefs filed 05/04/82 request immediate imposition of COMMISSION EFFECTIVENESS DECISION:

11/00/83 settlement license conditions. A Memorandum and Order TECH SPECS COMPLETED:

09/00/83 approving settlement agreements 8 proposed license COMMISSIDH DECISION:

11/00/83 conditions & dismissing proceedings was issued 05/06/82.

ISSUE LIC. WITH POWER RESTRICTICH:

12/00/83 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/00/83 39 SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:

SSER-4 is slipped 2 months due to applicant delays in sub-CONSTRUCTION COMPLETI0H - APPL.:

09/00/83 03/03/83 mittal of information. The fifth hearing session scheduled for 4/4-8/83 was cancelled and has now been rescheduled for 5/16-20/83.

No imoact on fuel load date is oroiected.

I 1

NRR LICENSING SYSTEM PAGE N08 2-9 DIABLO-CANYON 1 &2 0L CURRENT STATUS REPORT REPORT AS oft 05/31/83 j

PLANT CHARACTERISTICS

  • KEY PERSONHEL:

DOCKET HO:

027540323 LIC. PM:

B. BUCKLEY ASLB CHAIRt J. WOLF APPLICANT:

PACIFIC GAS & ELECTRIC LIC. BC:

G. KNIGHTON MEMBER 18 J. KLINE LOCATIDH*

12 MI WSW OF SAN LUIS OSISPO LIC. LA.:

J. LEE MEMBER 2:

G. BRIGHT REGION:

5 AE PGSE COUNSEL:

L. CHANDLER CONST. INSP: D. KIRSCH REAC. TYPE: PWR HSSS: WEST ANTITRUST:

J. RUTLERG RESID. INSPt J. CARLSON DESIGN PWR: 3338 MWT/1084 MWE CONST PG8E RM ANALYST B. ST MARY i

ENVIRONMENTAL MILESTONES 8 SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SSER 15 (Equip. Qualification) was issued on 10-02-81.

l SSER 16 is estimated for 06/10/83 (indicated as SSER9 ER DOCKETED 11/09/71 11/09/71C on schedule). Favorable ASLB Initial Decision on a ER SITE VISIT COMPLETE:

i full-power license was issued on August 31, 1982.

Low IMPUT TO DES TO PM:

10/09/72 10/09/72C i

Power license was issued on 09-22-81 and suspended on ISSUE DES:

12/12/72 12/12/72C RESPONSE TO COMMENTS DH DES:

04/27/73 04/27/73C ISSUE FES:

09/15/75 05/28/76C j

Hovember 19, 1981 CURRENT ENV. STATUS:

Complete SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

07/10/73 07/10/73C SAR DOCKETED:

10/02/73 10/02/73C SAR Q'S RECEIVED BY PM 01/04/74 01/ 04/74C SAR APPL. RESPONSE TO 4'S RECEIVED: 11/01/74 11/01/74C IMPUT TO DRAFT SER TO PM:

01/24/75 01/24/75C CURRENT HRG. STATUS:

LP hearings were held 05-19-81 through 05-22-81.

A ISSUE DRAFT SER:

INPUT TO SER:

01/24/75 01/24/75C favorable PID on low power operation was issued July ISSUE SER:

10/04/74 10/16/74C 17, 1981 A full power hearing was completed on January 26, 1982.

In August 1982 an Initial Decision was issued ACRS LETTER RECEIVED

  • 05/00/78 07/18/78C authorizing issuance of a full power operating license.

INPUTS TO SE SUPPLEMENT 98 02/18/83 02/18/83C The ASLAB decided to reopen the record on design quality ISSUE SE SUPPLEMENT 98 06/10/83 assurance.

FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST HEARING STARTED:

10/29/75 12/07/76C Not required ASLB INITIAL DECISIDH 07/17/81 07/17/81C COMMISSION EFFECTIVENESS DECISION: 06/00/83 TECH SPECS COMPLETED:

09/15/81 09/15/81C COMMISSIDH DECISIDH:

ISSUE LIC. WITH POWER RESTRICTIDH 09/22/81 09/22/81C ISSUE FULL F0WER LICENSE AMEND:

08/30/83 LATEST AMENDMENT SCHED. DATE RECEIPT DATE CONSTRUCTION COMPLETION - APPL.:

HEW SLIPS /HOTES:

Estimate of dates from end of LP hrq to lic, complete dependent upon dev./ approval of State and local Emergency Ongoing Design Verif. Program likely to identify Plans.

olant modifications.

Const. comoletion dec ndent on mods.

4 i

4 i

4

NRR LICEN5ING SYSTEM PAGE NO: 2-10 ENRICO FERMI 2 0L CURRENT STATUS REPORT REPORT AS OF 05/31/83 1

\\

i PLANT C H A R A C T E R I S T I C S:

KEY PERSONNEL:

DOCKET NO:

05000341 LIC, PM:

D. LYNCH ASLB CHAIR:

G. MILLHOLLIN APPLICANT:

DETROIT EDISON LIC. BC:

J. YOUNGBLOOD MEMBER 1:

P. MORRIS i

LOCATIDH LAGUNA BEACH, MICM LIC. LA.:

M. RUSNBROOK MEMBER 28 D. SCHINK REGION:

3 AE:

S8L COUNSEL:

C. WOODNEAD CONST. INSP P. PELKE REAC. TYPE: BWR HSSS: GE ANTITRUST:

A. NODGDON RESID. INSP B. LITTLE i

DESIGN PWR 3292 MWT/1093 MWE CONST DANIEL RM ANALYST S. HEDLUND i

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE An interim SER was issued on 09-29-77 and a final SER was issued on 07-10-81 (See s4cond page for milestone ER DOCKETED:

04/04/75 04/04/75C summary.)

SSER No. 1 was issued 09-25-81 SSER No. 2 was ER SITE VISIT COMPLETE:

09/27/78 10/31/78C issued 01-29-82 with 7 prelicensing issues outstanding.

INPUT TO DES TO PM:

07/31/81 04/24/81C SSER Ho. 3 was issued on 02-04-83.

The design criteria ISSUE DES:

05/01/81 04/30/81C j

for the standby liquid control system is being evaluated.

RESPONSE TO COMMENTS ON DES:

07/31/81 06/29/81C ISSUE FES:

08/31/81 09/04/81C i

CURRENT ENV. STATUS:

Addendum No. I to the FES was issued 03-03-82.

SAFETY / NEARING MILESTONES:

APPLICATION TENDERED:

10/22/74 10/22/74C l

SAR DOCKETED:

04/05/75 04/05/750 SAR Q'S RECEIVED BY PM:

06/13/75 08/11/75C SAR APPL. RESPONSE TO 9'S RECEIVED: 08/29/75 01/12/76C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/24/75 03/08/76C A hearing on two issues began on 03-31-82 and ended on ISSUE DRAFT SER:

04-02-82.

Monroe County, Michigan petitioned for INPUT TO SER:

03/05/76 05/20/77C leave to reopen hearings on the evacuation issue of ISSUE SER:

08/01/77 09/29/77C Emergency Prepardness; the Board denied this petition.

ASLB issued initial decision on 10/29/82 authorizing ACRS LETTER RECEIVED:

08/20/81 08/11/81C operating license issuance. The Commission affirmed the INPUTS TO SE SUPPLEMENT 38 08/22/82 01/05/83C initial ASLB's decision on 12/22/82. A section 2.206 ISSUE SE SUPPLEMENT 38 09/01/82 02/04/83C petition on emergency preparedness is pending.

FEMA LETTER RECEIVED:

07/01/83 CURRENT ANTITRUST An ASLB decision on antitrust matters was issued on NEARING STARTED:

12/02/81 03/31/82C 04-25-78.

ASLB INITIAL DECISION:

10/00/82 10/29/82C l

COMMISSION EFFECTIVENESS DECISION:

12/22/82C TECM SPECS COMPLETED:

06/07/83 COMMISSION DECISION:

07/00/83 ISSUE LIC. WITH POWER RESTRICTION: N/A LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

08/01/83 i

The latest final Safety Analysis Report Amendment is number 46.

SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:

i l

CONSTRUCTION COMPLETI0H - APPL.:

08/01/83 10/01/82

~

..... -.. _n ~ _-

-~ -

- - -. ~.

e l

NRR LICEN5ING SYSTEM PAGE NO: 2-11 FERMI 2 (FSAR RESUB)

OL CURRENT STATUS REPORT REPORT AS OF: 05/31/83 i

PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNEL DOCKET NO:

00007341 LIC. PM:

D. LYNCH ASLB CHAIR:

G. MILLHOLLIN i

APPLICANT:

DETROIT EDISON LIC. BC:

J. YOUNGBLOOD MEMBER 1:

P. MORRIS LOCATIDH LAGUHA BEACH, MICH LIC. LA.:

M. RUSHBROOK MEMBER 2:

D. SCHINK REGION:

3 AE2 58L COUNSEL:

C. WOODHEAD CONST. INSP P. PELKE REAC. TYPE: BWR HSSS: GE ANTITRUST:

A. HODGDON RESID. INSP: B. LITTLE 4

DESIGH PWR: 3292 MWT/1993 MWE CONST DANIEL RM ANALYST:

S. HEDLUND s.

SCHED. DATE ACTUAL DATE a

f CURRENT SAF. STATUS:

All information on this page reflects the FSAR I

resubmittal. The SAR resubmittal was docketed on 06-01-78 and the safety review was completed. A final SER was Issued on 07-10-81 Summary of later. milestones is on previous page.

l l

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

I APPLICATION TENDERED:

10/22/74 10/22/74C SAR DOCKETED:

06/01/78 06/0t/78C i

SAR Q'S RECEIVED BY PM:

07/01/78 08/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/78 10/02/78C IMPUT TO DRAFT SER TO PM:

09/08/78 03/27/81C CURRENT HRG. STATUS:

ISSUE DRAFT SER:

INPUT TO SER:

06/10/81 06/23/81C ISSUE SER:

06/30/81 07/10/81C 1

CURRENT ANTITRUST:

i i

LATEST AMENDMENT:

i NEW SLIPS / NOTES:

All information on this page reflects the FSAR resubmittal. The schedule for input to the SER slipped due to slippage-in the fuel load date because of TMI i

cause.

t MRR LICEN5ING SY' STEM PAGE NO: 2-12 GRAND GULF 1 8 2 LIC CURRENT

$TATUS REPORT REPORT AS OF 05/51/85 PLANT C H A R A C T E R I S T.I C St KEY PERS0NNEL DOCKET NO:

041680417 LIC. PM:

D. HCUSTON ASLB CHAIR:

J. LAURENSON APPLICANT:

MISSISSIPPI POWER 8 LIGHT COMPANY LIC. BC:

A.

SCHWENCER MEMBER 1:

G. BRIGHT LOCATION:

25 MI S OF VICKSBURG, MISS LIC. LA.:

E. HYLTON MEMBER 28 J. HARBOUR REGIDH 2

AE:

BECH COUNSEL:

M. WAGNER CONST. INSP R. VANDORN REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP: A. WAGNER DESIGN PWR 3833 MWT/1250 MWE CONST: BECH RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was issued on September 10, 1981 SSERs were issued in December 1981 and in June and July 1982.

The ACRS ER DOCKETED:

06/05/78 06/30/78C report on full power operation for Unit 1 was issued ER SITE VISIT COMPLETE:

August 18, 1982.

Interim FEMA letter was received INPUT TO DES TO PM:

04/30/81 04/30/81C 12/14/79C 12/ 17/82.

ISSUE DES:

05/31/81 05/31/8tC l

RESPONSE TO COMMENTS ON DES:

08/15/81 08/15/81C

- ISSUE FES:

09/15/81 10/09/81C CURRENT ENV. STATUS:

DES was issued in May 1981 FES was issued October 9, 1981.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

04/28/78 04/28/78C SAR DOCKETED:

06/05/78 06/30/78C SAR 9'S RECEIVED BY PM:

04/24/79C SAR APPL. RESPONSE TO 9'S RECEIVED: 07/01/80 09/30/80C CURRENT HRG. STATUS:

t INPUT TO DRAFT SER TO PM:

N/$

i No hearing. Petition was filed by the State ISSUE DRAFT SER:

09/18/81C l

of Louisiana on basis of Court of Appeals, District of INPUT TO SER:

04/01/81 08/14/81C Columbia, opinion on S-3 Table issue.

Board denied petition ISSUE SER:

06/00/81 09/10/81C for intervention on October 20, 1982.

The State of Louisiana filed an appeal to the Board's denial. Appeal ACRS LETTER RECEIVED:

07/0t/81 08/18/82C l

Board upheld the denial for intervention in a decision INPUTS TO SE SUPPLEMENT 48 04/01/82 03/15/83C j

issued December 8, 1982.

ISSUE SE SUPPLEMENT 48 06/10/83 FEMA LETTER RECEIVED:

04/08/83 CURRENT ANTITRUST:

i OL review is in progress. No significant changes have HEARING STARTED:

N/A occurred since the CP.

ASLB INITIAL DECISION:

N/A i

COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

09/01/81 06/16/82C COMMISSIDH DECISION:

07/90/83 ISSUE LIC. WITH POWER RESTRICTION: 04/23/82 06/16/82C j

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

07/15/83

)

l NEW SLIPS / NOTES:

SCHED. DATE RECEIPT DATE Unit 1 OL for fuel load to 5% power issued 06/16/82. FP de-CONSTRUCTION COMPLETION - APPL.

06/16/82C OL IS5UED layed by Region II CDA on TS surveillance procedure defic-i iencies 8 outstanding items, maint. A mods for 1st refueling outaae.

Apol. not ready to ao above 5% until 7 or 8/83.

a

b l

HRR LICEH$IHG SY$ TEM PAGE HO: 2-13 HARRIS 1 &2 0L CURRENT STATUS REP 0RT REPORT AS OF 05/31/83 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NHEL DOCKET HO:

0400-0401 LIC, PM:

P. KADAMBI ASLB CHAIR:

J. KELLEY APPLICANT:

CAROLIHA POWER & LIGHT LIC. BC:

G. KHIGHTON MEMBER 1:

G. BRIGHT LOCATION:

20 MI SW OF RALEIGH, NC LIC. LA.:

J.

LEE MEMBER 2:

J. CARPENTER REGION:

2 AE EBASCO COUNSEL:

C. BARTH CONST. INSP REAC. TYPE: PWR HSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP G. MAXWELL DESIGH PWR 2775 MWT/0915 MWE CONST: DANIEL RM ANALYST:

B. ST MARY ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

FSAR was docketed on 12/22/81. Questions were sent to the applicant between 4/26/82 and 7/30/82. Most of ER DOCKETED:

12/22/81 12/22/81C applicant's responses were received by 08/31/82. Draft ER SITE VISIT COMPLETE:

04/08/82 04/08/82C INPUT TO DES TO PM:

01/14/83 02/08/83C SER issued 2/1/83.

ISSUE DES:

04/00/83 04/00/83C RESPONSE TO COMMENTS OH DES:

05/10/83 ISSUE FES:

08/15/83 CURRENT ENV. STATUS:

ER was docketed on 12/22/81. The site visit was complete on 04/08/82 and questions were sent to applicant on SAFETY / HEARING MILESTONES:

04/28/82. Most of the applicant's responses were received by October 15, 1982. Draft Environmental Statement APPLICATION TENDERED:

06/26/80 06/26/80C SAR DOCKETED:

12/22/t1 12/22/81C was issued in April 1983.

SAR O'S RECEIVED BY PM:

07/09/82 07/09/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/08/82 11/08/82C IHPUT TO DRAFT SER TO PM:

09/01/83 ISSUE DRAFT SER:

01/03/83 02/01/83C CURRENT HRG. STATUS:

Notice for Opportunity for Hearing was published in the Federal Register on January 27, 1982.

Several petitions INPUT TO SER:

09/01/83 to intervene were flied.

Prehearing conference on petitions ISSUE sed:

11/01/83 was held on July 13-14, 1982.

Board decision on contentions issued September 23, 1982.

Further clarification issued ACRS FULL COMMITTEE MEE!ING:

01/02/84 January 11, 1983.

A pre-hearing conference was held on INPUTS TO SE SUPPLEMENT 1 03/01/84 ISSUE SE SUPPLEMENT 1:

04/02/84 February 24, 1983 on discovery and scheduling.

FEMA LETTER RECEIVED:

04/00/84 CURRENT ANTITRUST:

HEARING STARTED:

01/04/84 Status to be determined.

ASLB INITIAL DECISION:

05/01/85 COMMISSION EFFECTIVENESS DECISION: 05/00/85 TECH SPECS COMPLETED:

05/01/85 COMMISSIDH DECISIDH 05/00/85 ISSUE LIC. WITH POWER RESTRICTION: 06/00/85 ISSUE FULL POWER LICENSE AMEND:

06/03/85 LATEST AMENDMENT:

FSAR Ho. 4 ER Ho. 5 SCHED. DATE RECEIPT DATE Staff schedule based on fuel load date of 06/03/85.

CONSTRUCTION COMPLETION - APPL.:

06/03/85 10/06/82 NEW SLIPS / NOTES:

v

NRR LICEN5ING SYSTEM PAGE NO: 2-14 NOPE CREEK 1 0L CURRENT STATUS REPORT REPORT AS OF 05/31/83 PLANT CHARACTERISTICS:

KEY PERSONNEL:

DOCKET NO 050003S4 LIC. PM:

D. WAGNER ASLB.CNAIR: N/A APPLICANT:

PUBLIC SERVICE ELECTRIC 8 GAS LIC. BC:

A. SCHWLHCER MEMBER 1:

LOCATION:

18 MI SE OF WILMINGTON, DEL LIC. LA.:

J. LEE MEMBER 2 REGION:

1 REAC. TYPE:

BWR.

AE:

BECH COUNSEL:

R. GODDARD CONST. INSP S. FOLSDM NSSS: GE ANTITRUST:

RESID. INSP:

DESIGN PWR 3440 MWT/1067 MWE CONST BECH RN ANALYST B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE FSAR was tendered cn March 2, 1983.

ER DOCKETED:

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

ER was tendered on March 2, 1983.

SAFETY / NEARING MILESTONES:

APPLICATION TENDERED:

03/31/83 03/02/83C SAR DOCKETED:

SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Hotice of Opportunity for Hearing is to be published in ISSUE DRAFT SER:

the Federal Register.

INPUT TO SER:

ISSUE SER:

ACRS FULL COMMITTEE MEETING:

INPUTS TO SE SUPPLEMENT

  • ISSUE SE SUPPLEMENT :

FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

Status to be determined.

NEARING STARTED:

ASLB INITIAL DECISION:

COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

COMMISSION DECISION:

01/00/86 ISSUE LIC. WITN POWER RESTRICTICH:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.

01/14/86 06/30/82

NRR LICEN$ING SY$ TEM PAGE N0

'2-15 LASALLE 2 0L CURRENT STATUS REP 0RT REPORT AS OF 05/31/83 i

PLAHT CHARACTERISTICSt KEY PERS0NNEL j

DOCKET HO:

05000374 LIC. PM:

A. BOURHIA ASLB CHAIR:

M. MILLER APPLICANT:

COMM0HWEALTH EDISON LIC. BC:

A. SCHWENCER MEMBER 1:

F. SHON I

LOCATION:

11 MI SE OF OTTAWA, ILL LIC. LA.:

E. HYLTON MEMBER 2:

O. PARIS REGION:

3 AE

$8L COUNSEL:

C. WOODHEAD CONST. INSP: H. WESCOTT REAC. TYPE: BWR HSSS GE ANTITRUST B. V0GLER RESID. INSP W. GULDEMOND DESIGH PWR 3293 MWT/1078 MWE CONST: CWE RM ANALYST:

S. HEDLUND t

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SSER-1 was issued in June 1981.

SSER-2 was issued in February 1982.

SSER-3 was issued on April 16, 1982.

ER DOCKETED:

01/17/77 05/12/77C SSER-4 was issued on July 14, 1982.

SSER-5 is scheduled ER SITE VISIT COMPLETE:

for 06/83.

INPUT TO DES TO PM:

02/17/78 02/17/78C ISSUE DES:

03/22/78 03/29/78C RESPONSE TO COMhENTS ON DES:

07/14/78 07/14/78C ISSUE FES:

09/22/78 11/03/78C j

CURRENT ENV. STATUS:

Environmental Protection Plan has been issued with SAFETY / HEARING MILESTOMES:

Unit 1 license.

I APPLICATI0H TENDERED:

09/01/76 09/01/76C I

SAR DOCKETED:

04/08/77 05/12/77C SAR Q'S RECEIVED BY PM:

07/22/77 07/27/77C i

SAR APPL. RESPONSE To t'S RECEIVED: 12/15/77 08/18/78C j

INPUT TO DRAFT SER TO PM:

10/06/78 11/08/78C 1

CURRENT HRG. STATUS:

IS$tE DRAFT SER:

I Ho hearing.

IMPUT TO SER:

12/29/78 02/27/81C ISSUE SER:

09/05/80 03/05/81C ACRS LETTER RECEIVED:

04/09/81 04/16/81C i

INPUTS TO SE SUPPLEMENT 5:

05/00/83 ISSUE SE SUPPLEMENT 58 06/00/83 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

HEARING STARTED:

N/A Complete.

ASLB INITIAL DECISIDH:

N/A COMMISSIDH EFFECTIVFHESS DECISION:

i TECH SPECS COMPLETED:

04/12/82 04/12/82C COMMISSIDH DECISIDH:

07/00/83 t

ISSUE LIC. WITH POWER RESTRICTION: N/S ISSUE FULL POWER LICENSE AMEND:

07/00/83 L ATEST AMENDMENT:

i SCHED. DATE RECEIPT DATE i

HEW SLIPS / MOTES:

Lasalle Unit 1 criticality was achieved on June 21, 1982.

CONSTRUCTION COMPLETI0H - APPL.:

08/00/83 02/01/83 Construction completion date for Unit 2 has been reassessed by applicant and has slipped to 08/83.

MRR LICEN$ING SYSTEM PAGE NO: 2-16 LIMERICK 1 8 2 0L CURRENT STATUS REPORT REPORT AS OF 05/31/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:

035280353 LIC. PM:

R. MARTIN ASLB CHAIR L. BRENNER APPLICANT:

PHILADELPHIA ELECTRIC LIC. BC:

A.

SCHWENCER MEMBER 1 R. COLE LOCATION:

35 MI NW OF PHILADELPHIA. PA LIC. LA.:

E. HYLTON MEMBER 2:

P. MORRIS REGION:

1 AE BECH COUNSEL:

A. H0DGDON CONST. INSP REAC. TYPE: BWR NSSS: GE ANTITRUST B. V0GLER RESID. INSP S. CHAUDHARY DESIGN PWR 3440 MWT/1065 MWE CONST: BECH RM ANALYST:

L. LANIER I

CURRENT SAF. STATUS:

Applicant submitted Probabilistic Risk Assessment with ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE t

FSAR on March 17, 1981.

SAR was docketed on 07/27/81.

ER DOCKETED:

07/27/81 07/27/81C j

HUREG/CR on PRA issued by Board Notification on 03/04/83.

ER SITE VISIT COMPLETE:

08/20/82 08/20/82C SER inputs scheduled for July 1,

1983.

INPUT TO DES TO PM:

06/10/83 ISSUE DES:

06/13/83 RESPONSE TO COMMENTS ON DES:

09/06/83 ISSUE FES:

10/31/83 CURRENT ENV. STATUS:

ER was docketed on 07/27/81. DES will be issued in two parts (June 8 Oct.

'83).

The second part will address SAFETY / HEARING MILESTONES:

impacts by severe accidents and will be based on applicants severe accidents and submitted April 21, 1983.

APPLICATION TENDERED:

01/00/81 03/17/31C 1

SAR DOCKETED:

07/27/81 07/27/81C SAR Q'S RECEIVED BY PM:

07/08/82 02/01/83C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S Notice of Opportunity of Hearing was published in the ISSUE DRAFT SER:

N/S Federal Register on August 21, 1981 A special prehearing INPUT TO SER:

07/01/83 conference addressing conditionally admitted contentions ISSUE SER:

08/08/83 was held 05/09/83. Actions we,re specified by the Board for all parties.

ACRS FULL COMMITTEE MEETING:

09/08/83 INPUTS TO SE SUPPLEMENT 13 10/07/83 i

ISSUE SE SUPPLEMENT 1:

10/30/83 l

FEMA LETTER RECEIVED:

10/07/83 CURRENT ANTITRUST:

Status to be determined.

HEARING STARTED:

01/00/84 ASLB INITIAL DECISION:

03/00/85 COMMISSION EFFECTIVENESS DECISION: 03/00/85 TECH SPECS COMPLETED:

03/00/85 COMMISSIDH DECISION:

03/00/85 ISSUE LIC. WITH POWER RESTRICTION: 03/00/85 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

03/00/85 Rev. 12, April 30, 1983 (ER OL); Rev. 19, April 30, 1983 (FSAR); Rev. 5, March 31, 1983 (EP), Rev 3, April 30, 1983 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

)

Several inputs to Draft SER have been delayed. Applicant CONSTRUCTION COMPLETION - APPL.:

08/00/84 12/27/82 estimates 2 month improvement in cor.struction completion schedule. ASLB estimates that 17 months are necessary for hearino.

1

a-l NRR LICEHSING SYSTEN PAGE NO: 2-17 MARBLE HILL 1 & 2 0L CURREHT STATUS REPORT REPORT AS OF: 05/31/83 PLAHT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

054680547 LIC. PM:

P. O CONNOR ASLB CHAIR:

I. SMITH APPLICANT:

PUBLIC SERVICE OF INDIANA.

LIC. BC:

J. YOUNGBLOOD MEMBER 1:

G. LINENBERGER LOCATIDH2 to MI 5 0F MADISON, IN LIC.

LA.'

M. RUSHBROOK MEMBER 2:

O.

PARIS REGION:

3 AE S8L COUNSEL:

E. CHEN CONST. INSP: P. PELKE REAC. TYPE: PWR HSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP: J. SCHAPKER DESIGH PWR: 3415 MWT/1130 MWE CONST: PSI RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Application was docketed on 02/25/83.

ER DOCKETED:

03/01/83 02/25/83C ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

05/30/84 1

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

11/30/84 CURRENT ENV. STATUS:

Application was docketed on 02/25/83.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

12/01/82 11/23/82C SAR DOCKETED:

03/01/83 02/25/83C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

An Atomic Safety and Licensing Board was established on ISSUE DRAFT SER:

04/06/84 4/26/83. Three petitions for a hearing have been INPUT TO SER:

10/05/84 received.

ISSUE SER:

12/07/84 i

ACRS FULL COMMITTEE MEETING:

01/10/85 INPUTS TO SE SUPPLEMENT 18 03/01/85 ISSUE SE SUPPLEMENT 1:

04/15/85 FEMA LETTER RECEIVED:

i CURRENT ANTITRUST Notice of a receipt of antitrust information at OL HEARING STARTED:

09/15/85 stage published 4/6/83.

ASLB INITIAL DECISIDH:

05/15/86 COMMISSION EFFECTIVENESS DECISION: N/S TECH SPECS COMPLETED:

COMMISSION DECISION:

06/00/86 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

Amendment 24 (04/21/83)

SCHED. DATE RECEIPT DATE CONSTRUCTION COMPLETION - APPL.

06/00/86 12/15/82

NRR LICENSING SYSTEM PAGE NO: 2-18 MCGUIRE 2 LIC CURRENT STATUS REPORT REPORT AS OF 05/31/83 PLANT C H A R A C T E R I S T I C 5:

KEY PERS0NNELa DOCKET NO:

05000370 LIC. PM:

R. BIRKEL ASLB CHAIR R. LAZO APPLICANT:

DUKE POWER LIC, BC:

E. ADENSAM MEMBER 1:

X. HAND LOCATION:

17 MI N OF CHARLOTTE, NC LIC. LA.:

M. DUNCAN MEMBER 2:

E. LUEBKE REGIDH:

2 AE:

DUKE COUNSEL:

J. CUTCHIN CONST. INSP M. HUNT REAC. TYPE: PWR HSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP: W. ORDERS DESIGN PWR 3411 MWT/1180 MWE CONST DUKE RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SSER Ho. 6 was issued 02/28/83.

HPF-17 was issued on 03/03/83 restricted to 5% pending Commission final ER DOCKETED:

05/31/74 05/31/74C approval. On 05/27/83 the operating license was amended to ER SITE VISIT COMPLETE:

01/30/75 01/30/75C authorize full power operation of Unit 2.

INPUT TO DES TO PM:

08/29/75 08/29/75C ISSUE DES:

11/07/75 10/29/75C RESPONSE TO COMMENTS ON DES:

ISSUE FES:

05/07/76 04/20/76C CURRENT ENV. STATUS:

Complete.

SAFETY / NEARING MILESTONES:

APPLICATION TENDERED:

04/05/74 04/05/74C SAR DOCKETED:

04/29/75 05/05/75C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Complete.

ISSUE DRAFT SER:

INPUT TO SER:

~

06/01/77 01/16/78C ISSUE SER:

02/21/78 03/01/78C ACRS LETTER RECEIVED:

04/14/78 04/14/78C INPUTS TO SE SUPPLEMENT 6 12/01/82 02/28/83C ISSUE SE SUPPLEMENT 68 02/14/83 02/28/03C FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

Complete.

HEARING STARTED:

03/15/77 03/28/77C ASLB INITIAL DECISION:

06/00/81 06/08/81C COMMISSION EFFECTIVENESS DECISI0H:

TECH SPECS COMPLETED:

03/03/83 03/03/83C COMMISSION DECISION:

05/00/83 05/27/83C ISSUE LIC. WITH POWER RESTRICTION: 03/03/83 03/03/83C LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

05/02/83 05/27/83C No. 70 (December 15, 1982)

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

03/03/83C 05/20/82 1

HRR LICENSING SYSTEM PAGE HO: 2-19 MIDLAND 1 &2 0L CURRENT STATUS REPORT REPORT AS OF 05/31/83 PLAHT CHARACTERISTICS:

KEY P E R S 0 N H E La DOCKET HO 033080329 LIC. PM:

D. HOOD ASLB CHAIR:

C. BECHHOEFER APPLICANT:

CONSUMERS POWER LIC. BC:

E. ADENSAM MEMBER 1:

F. COWAN LOCATION:

SW BOUNDARY OF MIDLAND, MICH.

LIC. LA.:

M. DUNCAN MEMBER 28 J. HARBOUR REGION:

3 AE:

BECH COUNSEL:

W. PATON CONST. INSP: R. LANDSMAN REAC. TYPE: PWR HSSS: B8W ANTITRUST:

B. V0GLER RESID. INSP: R. COOK DESIGH PWR: 2452 MWT/0818 MWE CONST: BECH RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Utilization of National Laboratories or other agencies to complete some review areas is currently ER DOCKETED:

04/01/78 04/14/78C in progress. CP extension was issued 12/28/81 ACRS ER SITE VISIT COMPLETE:

09/08/78 09/08/78C Full Committee Meeting was held 06/04/82.

SSER 81 INPUT TO DES TO PM:

02/03/82 02/03/82C responding to ACRS letter was issued 6/30/82.

SSER 82 ISSUE DES:

02/05/82 02/05/82C on soils settlement problems was issued 10/06/82.

RESPONSE TO COMMENTS ON DES:

07/08/82 07/08/82C ISSUE FES:

07/30/82 07/30/82C CURRENT ENV. STATUS:

The DES was issued 02/05/82. The FES was issued on July 30, 1982.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

08/31/77 08/31/77C SAR DOCKETED:

09/30/77 11/18/77C SAR Q'S RECEIVED BY PM:

03/20/78 10/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/08/78 12/08/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

11/01/78 12/01/78C Three prehearings ending 04/27-28/81 were held for a ISSUE DRAFT SER:

N/A separate hearing on soils settlement. Hearinc on soils INPUT TO SER:

04/23/82 04/23/82C settlement began July 7, 1981 and is continuing. Combined ISSUE SER:

05/11/82 05/11/82C hearings for soils issues and OL issues commenced on 11/15/82 and are continuing.

ACRS LETTER RECEIVED:

06/15/82 06/08/82C INPUTS TO SE SUPPLEMENT 28 08/16/82 08/16/82C ISSUE SE SUPPLEMENT 2 10/06/82 10/06/82C FEMA LETTER RECEIVED:

01/14/83 01/14/83C CURRENT ANTITRUST:

Proceeding completed. License was amended 10/20/80.

HEARING STARTED:

11/15/82 11/15/82C ASLB IHITIAL DECISION:

10/00/83 COMMISSIDH EFFECTIVENESS DECISION:

10/00/83 TECH SPECS COMPLETED:

08/00/83 COMMISSION DECISI0H:

09/00/84 ISSUE LIC. WITH POWER RESTRICTION: 09/00/83 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

10/00/84 l

SCHED. DATE RECEIPT DATE HEW SLIPS /NCTES:

1 Appilcant announced revised completion schedule on 4/12/83.

CONSTRUCTIDH COMPLETION - APPL.:

10/00/84 04/12/83 l

Unit 2 slipped 14 mos. to.10/84, and unit 1 slipped 13 mos.

l to February 1985.

HRC caseload visit conducted April l

19-21. 1983.

l

NRR LICEN5ING SY$ TEM PAGE NO: 2-20 MILLSTONE 3 0L CURRENT STATUS REP 0RT REPORT AS OF 05/31/83 PLANT CHARACTERISTICS:

KEY PERS0NNELa DOCKET NO:

05000423 LIC. PM:

E. DOOLITTLE ASLB CHAIR APPLICANT:

NORTHEAST HUCLEAR ENERGY LIC. BC:

B. YOUNGBLOOD MEMBER 18 l

LOCATION:

3.2 MI WSW OF HEW LONDON CT.

LIC. LA.:

M. RUSHBROOK MEMBER 2 REGION:

1 AE:

58W COUNSEL:

M. ROTHSCHILD CONST. INSP REAC. TYPE: PWR HSSS: WEST ANTITRUST B. V0GLER RESID. INSP DESIGN PWR: 3565 MWT/1156 MWE CONST: S8W RM ANALYST:

L. LAHIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Safety review questions sent to applicant on 05/03/83.

ER DOCKETED:

02/01/83 02/03/83C Ek SITE VISIT COMPLETE:

07/00/83 INPUT TO DES TO PM ISSUE DES:

04/17/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

11/16/84 CURRENT ENV. STATUS:

Environmental site visit planned for week-of 07/18/83.

SAFETY / HEARING MILESTONES:

APPLICATI0H TENDERED:

11/01/82 10/29/82C SAR DOCKETED:

02/01/83 02/03/83C SAR Q'S RECEIVED BY PM:

04/15/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 08/01/83 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

11/01/83 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

12/01/83 Federal Register on March 4, 1983.

No requests for INPUT TO SER:

05/15/84 hearing or petitions for leave to intervene were received.

ISSUE SER:

07/15/84 ACRS FULL COMMITTEE MEETING:

08/15/84 INPUTS TO SE SUPPLEMENT 1:

10/15/84 ISSUE SE SUPPLEMENT 1:

11/15/84 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSION EFFECTIVENESS DECISIGHz 11/00/85 TECH SPECS COMPLETED:

COMMISSION DECISIDH:

11/01/85 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

Amendment 2 to FSAR received 04/21/B3. Amendment 2 to ER received 04/21/83.

SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:

CONSTRUCTION COMPLETION - APPL.:

11/01/85 09/30/82

l NRR LICENSIHG SY$ TEM PAGE HO: 2-21 NINE MILE POINT 2 0L CURRENT STATU5 REPORT REPORT AS OF 05/31/83 PLANT CHARACTERISTIC $8 KEY PERS0NNELa DOCKET NO:

050004fD LIC. PM M. HAUGHEY ASLB CHAIR APPLICANT:

HIAGARA MOHAWK POWER LIC. BC:

A. SCHWENCER MEMBER t:

LOCATIDH:

8 MI NE OF OSWEGO. NY LIC. LA.:

E. HYLTON MEMBER 2:

REGION:

1 AE2 SAW COUNSEL:

B. BORDENICK CONST. INSP L. HARROW REAC. TYPE: BWR HSSS: GE ANTITRUST:

L. DEWEY RESID. INSP:

DESIGN PWR: 3489 MWT/1080 MWE CONST: S&W RM ANALYST B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The FSAR was tendered on 01-31-83 and docketed on 04/12/83.

ER DOCKETED:

03/31/83 04/12/83C ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

12/15/83 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

06/15/84 CURRENT ENV. STATUS:

The ER was tendered on 01-31-83 and docketed on 04/12/83.

SAFETY / HEARING MILESTONES:

APPLICATI0H TENDERED:

01/31/83 01/31/83C SAR DOCKETED:

03/31/83 04/12/83C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

02/16/84 Federal Register on 05/13/83.

INPUT TO SER:

ISSUE SER:

10/05/84 ACR$ FULL COMMITTEE MEETING 11/08/84 INPUTS TO SE SUPPLEMENT 1 ISSUE SE SUPPLEMENT 1 N/S FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

HEARING STARTED:

06/17/85 ASLB IHITIAL DECISIDH:

02/14/86 COMMISSIDH EFFECTIVENESS DECISION: N/S TECH SPECS COMPLETED:

COMMISSIDH DECISI0H:

02/28/86 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:

A tentative schedule has been established. Dates wi!I CONSTRUCTIDH COMPLETION - APPL.:

02/00/86 01/31/83 be revised to reflect the approved schedule dates when the schedule is approved.

s

NRR LICEN$IQG SY$TER PAGE NO: 2-22 PALO VERDE 1,2,3 0L CURRENT STATUS REPORT REPORT AS OF 05/31/83 PLANT CHARACTERI5 TIC 5:

KEY P E R S O N N E L:

DOCKET NO:

0528-0530 LIC. PM:

E. LICITRA ASLB CHAIR" R. LAZO APPLICANT:

ARIZONA PUBLIC SERVICE LIC. BC:

G. KNIGHTON MEMBER 1 R. COLE LOCATION:

36 MI W OF PHOEMIX, AZ LIC. LA.:

J. LEE MEMBER 2:

D. CALLINAM REGION:

5 AE:

BECM COUNSEL:

L. DEWEY CONST. INSP L. VBRUEGGEN REAC. TYPE PWR NSSS COMB ANTITPUST:

B. V0GLER RESID. INSP G. FIORELLI DESIGN PWR 3817 MWT/1304 MWE CONST: BECH RM ANALYST:

S. NEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Several " Independent Design Review" meetings have been completed. The SER was issued on November 11, 1981.

SER ER DOCKETED:

07/01/80 06/20/80C supplement Nos.

1,2, and 3 were issued on February 5, 1982 ER SITE VISIT COMPLETE:

01/30/81 01/30/81C and May 17, 1982, and September 23, 1982 respectively.

INPUT TO DES TO PM:

10/05/81 10/05/81C Supplement No. 4 was issued on March 15, 1983.

ISSUE DES:

10/26/81 10/26/81C RESPONSE TO COMMENTS ON DES:

02/25/82 02/25/82C ISSUE FES:

03/11/82 03/11/82C CURRENT ENV. STATUS:

The ER (OL) review is complete. A site visit was completed on January 30, 1981.

The DES was issued on SAFETY / NEARING MILESTONES:

October 26, 1981 and the FES was issued on March 11, 1982.

APPLICATION TENDERED:

10/05/79 10/05/79C SAR DOCKETED:

06/20/80 06/20/80C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

The hearing started 4/27-30, 1982, resumed on 5/25-28 and ISSUE DRAFT SER:

on 6-22.

Hearing record was closed on 6-25-82.

A late INPUT TO SER:

10/30/81 10/30/81C petition, dated 10-13-82 dealing with salt drift on ISSUE SER:

11/11/31 11/11/81C farm crops, was filed by W. Valley Agri. Protection Council. On 12-30-82, the Board issued a favorable ID ACRS LETTER RECEIVED:

12/18/81 12/18/81C but reopened the hearing on Units 2 and 3 to consider INPUTS TO SE SUPPLEMENT 4 02/14/83 02/14/83C late petition by W. Valley. Board's decision authorizes ISSUE SE SUPPLEMENT 48 03/15/83 03/15/83C full power license for Unit 1 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Antitrust OL review has resulted in a finding of no NEARING STARTED:

04/27/82 04/27/82C significant antitrust changes since CP review.

A ASLB INITIAL DECISION:

12/30/82 12/30/82C Federal Register of the finding was published 2-9-83.

COMMISSION EFFECTIVENESS DECISION: 05/00/84 TECH SPECS COMPLETED:

08/01/83 COMMISSION DECISION:

07/00/83 ISSUE LIC. WITN POWER RESTRICTION: 08/01/83 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

08/20/83 FSAR Amendment No. 11 SCHED. DATE RECEIPT DATE ER Supplement No. 4 NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

08/08/83 07/13/82

- ~, -

HRR LICEHSING SYSTEM PAGE H0: 2-23 PERRY 1 82 0L CURREHT STATUS REPORT REPORT AS OF: 05/31/83 PLANT C H A R A C T E R I 5 T I C S:

KEY P E R S O N H E La DOCKET NO 044080441 LIC. PM:

J. STEFAHO ASLB CHAIR:

P. BLOCH APPLICANT:

CLEVELAND ELECTRIC ILLUMINATING LIC. BC:

J. YOUNGBLOOD MEMBER 18 J. KLINE LOCATION:

7 MI HE OF PAINESVILLE, OHIO LIC. LA.:

M. RUSHBROOK MEMBER 2:

G. BRIGHT REGION:

3 AE:

GIL COUNSEL:

J. CUTCHIH CONST. INSP: P. PELKE

)

REAC. TYPE: BWR HSSS: GE ANTITRUST:

J. CUTCHIH RESID. INSP M. GILDHER t

DESIGN PWR: 3759 MWT/1205 MWE CONST: KAISER RM ANALYST S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The Safety Evaluation Report was issued in May 1982.

The ACRS Report was issued on July 13, 1982.

SSER Ho. 1 ER DOCKETED:

06/26/81 06/19/81C was issued in August 1982.

SSER Ho. 2 was issued in ER SITE VISIT COMPLETE:

Jan. 1983.

SSER Ho. 3 was issued in 4/83.

SSER Ho. 4 INPUT TO DES TO PM:

01/01/82 01/01/82C not yet scheduled.

ISSUE DES:

02/26/82 02/26/82C RESPONSE TO COMMENTS ON DES:

06/30/82 06/30/82C

(

l ISSUE FES:

08/13/82 08/13/82C CURRENT ENV. STATUS:

Environmental acceptance review was completed on June 1

9, 1981.

The ER was docketed June 19, 1981.

FES SAFETY / HEARING MILESTONES:

issued in August 1982.

APPLICATION TENDERED:

06/26/80 06/26/80C SAR DOCKETED:

01/09/81 01/30/81C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

02/24/82 02/24/82C Conference call between Board, intervenor, applicant, and ISSUE DRAFT SER:

02/26/82 02/26/82C staff attorneys on 1/5/83 targeted start of hearing for INPUT TO SER:

04/10/82 05/10/82C 5/23/83 on Issue 3 (QA Const. prog.).

Issues 1 ISSUE SER:

05/10/82 05/24/82C (Emergency Plan), 13 (Turbine Missiles), 14 (In-core T/C's),

and 15 (Steam Erosion) not scheduled.

Issue 6 (ATWS-auto ACRS LETTER RECEIVED:

07/13/82 07/13/82C SLCS) and 8 (H2 control for degraded core accident) deferred INPUTS TO SE SUPPLEMENT 4 N/S pending Commission rulings. All other issues deleted by ISSUE SE SUPPLEMENT 4:

N/S FEMA LETTER RECEIVED:

12/00/83 summary disposition.

CURRENT ANTITRUST:

CP antitrust review has been completed. OL antitrust HEARING STARTED:

05/23/83 05/23/83C status is under review.

ASLB INITIAL DECISI0H:

03/00/84 COMMISSIDH EFFECTIVENESS DECISIONI 04/00/84 TECH SPECS COMPLETED:

10/00/84 COMMISSIDH DECISIDH:

11/00/84 ISSUE LIC. WITH POWER RESTRICTION: 12/00/84 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/00/84 Humber 11 (2-15-83).

SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:

Start of hearing has slipped to 5/83.

FEMA letter has CONSTRUCTIDH COMPLETI0H - APPL.

12/00/84 03/08/83 I

alipped to 12/83 due to incomplete offsite plans.

l 1

HRR LECEH$2HG SY3 TEM PAGE NO: 2-20 REVER BEND 1 &2 OL CURREHT STATUS REPORT REPORT AS OF 05/31/83 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E La DOCKET NO:

045880459 LIC. PM:

E. WEINKAM ASLB CHAIR B. COTTER APPLICANT:

GULF STATES UTILITIES LIC. BC A. SCHWENCER MEMBER 1:

G. LIHENBERGER LOCATIDH:

24 MI NNW OF BATON ROUGE, LA LIC. LA.:

E. HYLTON MEMBER 2:

R. COLE REGIDH2 4

AE 58W COUNSEL:

D. REPKA CONST. INSP:. UNASSIGNED REAC. TYPE: BWR HSSS: GE ANTITRUST B. V0GLER RESID. INSP R. BROWN DESIGN PWR: '3015 MWT/0934 MWE CONST: 58W RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Applicant tendered FSAR for docketing on 04/24/81.

FSAR was docketed on 08/25/81. Draft SER issued for ER DOCKETED:

08/25/81 08/25/81C review 05/83.

Construction permit extension requested and ER SITE VISIT COMPLETE:

01/22/82 01/22/82C granted from 03/83 to 12/85.

INPUT TO DES TO PM:

12/09/83 ISSUE DES:

01/09/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

06/08/84 CURRENT ENV. STATUS:

Applicant tandered ER for docketing on 04/24/81.

ER was docketed on 08/25/81 DES targeted for 01/09/84.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

04/24/81 04/24/81C SAR DOCKETED:

08/25/81 08/25/81C SAR Q'S RECEIVED BY PM:

12/07/81 06/01/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/14/82 12/01/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM 05/30/83 Hotice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

04/30/83 05/02/83C Federal Register on 09/04/81. Prehearing conference INPUT TO SER:

11/04/83 rescheduled for 06/14/83 per Board order dated 04/29/83.

ISSUE SER:

12/02/83 ACRS FULL COMMITTEE MEETING:

01/13/84 INPUTS TO SE SUPPLEMENT 12 04/00/84 ISSUE SE SUPPLEMENT 18 05/05/84 FEMA LETTER RECEIVED:

05/01/84 CURRENT ANTITRUST Status to be determined.

HEARING STARTED:

10/00/84 ASLB INITIAL DECISION:

03/00/85 COMMISSION EFFECTIVENESS DECISIDH: 04/00/85 TECH SPECS COMPLETED:

10/00/84 COMMISSIDH DECISION:

04/00/85 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

04/00/85 Humber 7.

SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:

Amendment 8 to FSAR due in June 1983.

CONSTRUCTION COMPLETION - APPL.:

04/00/85 01/14/83

1 HRR LICEH$ING SYSTEM PAGE HO: 2-25 SAN ONOFRE 3 LIC CURREHT STATUS REPORT REPORT AS OF 05/31/83 0 LAHT C H A R A C T E R I S T I C 5:

KEY P E R S 0 N N E Le DOCKET NO:

05000362 LIC. PM:

H. ROOD ASLB CHAIR:

J. KELLEY APPLICANT:

SOUTHERN CALIFORNIA EDISON LIC. BC:

G. KNIGHTON MEMBER 1:

C. HAND LOCATION:

5 MI S OF SAH CLEMENTE, CA LIC.

LA.'

J. LEE MEMBER 2:

E. JOHNSON REGION:

5 AE:

BECH COUNSEL:

L. CHANDLER CONST. INSP: D. KIRSCH REAC. TYPE: PWR NSSS: COMB ANTITRUST:

J. GOLDBERG RESID. INSP: A. CHAFFEE DESIGH PWR 3410 MWT/1100 MWE CONST: BECH RM ANALYST L. LANIER l

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER on geological and seismological matters was issued on 12/31/80.

ACRS subcommittee meetings were held 01/30/81 and ER DOCKETED:

03/01/77 03/23/77C 03/11/81 and full committee meetings were held 02/5/81 and ER SITE VISIT COMPLETE:

05/20/77 05/20/77C I

03/12/81. SER (Hon-TMI matters), was issued on 02/06/81.

INPUT TO DES TO PM:

10/01/77 12/01/80C

~

SER supplement on TMI issues was issued on 02/25/81. SER ISSUE DES:

01/27/78 01/20/81C supplement No. 2, 3, 4,

5, and 6 addressing open items were RESPONSE TO COMMENTS ON DES:

issued 05/08/81, 09/16/81, 01/22/82, 02/16/82, and 06/30/82.

ISSUE FES:

04/00/81 04/29/81C CURRENT ENV. STATUS:

DES addressing class 9 accidents was issued 01-20-81, FES was issued 04-29-81 SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

11/29/76C SAR DOCKETED:

03/01/77 03/23/77C SAR Q'S RECEIVED BY PM:

08/15/77 09/29/77C SAR APPL. RESPCHSE TO Q'S RECEIVED 11/18/77 12/08/77C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM 02/10/78 08/11/78C Motions for summary disposition were granted by ASLB.

ISSUE DRAFT SER:

01/15/81 01/15/81C Hearing started 06/22/81 and ended 09/31/81 ASLB PID INPUT TO SER:

06/23/78 01/15/81C was rendered on 01/11/82 and ID on 05/14/82. ASLAB ISSUE SER:

08/01/80 02/06/81C Decision (ALAB-717) was issued on 03/04/83.

ACRS LETTER RECEIVED:

03/17/81 03/17/81C l

INPUTS TO SE SUPPLEMENT 6:

04/21/83 ISSUE SE SUPPLEMENT 6:

06/30/82 06/30/82C l

FEMA LETTER RECEIVED:

12/01/81 12/01/81C i

j CURRENT ANTITRUST:

The antitrust review is complete.

HEARING STARTED:

06/22/81 06/22/81C ASLB INITIAL DECISIDH:

05/14/82 05/14/82C COMMISSION EFFECTIVENESS DECISIDH: 05/14/82 05/14/82C TECH SPECS COMPLETED:

11/15/82 11/15/82C COMMISSION DECISI0H:

ISSUE LIC. WITH POWER RESTRICTION:

11/15/82 11/15/82C ISSUE FULL POWER LICENSE AMEND:

06/00/83 LATEST AMENDMENT:

l SCHED. DATE RECEIPT DATE HEW SLIPS /HOTES:

CONSTRUCTION COMPLETION - APPL.:

11/15/82C 09/27/82

(

I

NRR LICEN5ING SY$ TEM PAGE NO: 2-26 SEABROOK 1 8 2 0L CURRENT STATUS REP 0RT REPORT AS OF 05/31/83 PLANT CHARACTERISTIC 5:

KEY PERS0NNELa DOCKET NO:

844380444 LIC. PM:

L. WHEELER ASLB CHAIR H. H0YT APPLICANT:

PUBLIC SERVICE OF NEW HAMPSHIRE LIC. BC:

G. KNIGHTON MEMBER 18 E. LUESKE LOCATION:

13 MI $ OR PORTSMOUTH, NH LIC. LA.:

J. LEE MEMBER 28 J. HARBOUR REGION:

1 AE UEC COUNSEL:

R. LESSY CONST. INSP: A. TOTH REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP A. CERNE DESIGN PWR 3411 MWT/1198 MWE CONST: UEC RM ANALYST B. ST MARY lENVIRONMENTALMILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

The FSAR acceptance review was completed in September 1981.

The FSAR was docketed October 5, 1981 Applicant has ER DOCTETED:

10/05/81 10/05/81C responded to round 1 9's.

SER was i ssued 03/07/83. ACR$

ER SITE VISIT COMPLETE:

12/02/81 12/02/81C subcommittee meeting was held Apell 1-2, 1983.

ACRS INPUT TO DES TO PM:

03/01/82 03/01/82C full committee meeting was held on April 15, 1983.

ISSUE DES:

05/14/82 05/14/82C RESPONSE TO COMMENTS ON DES:

08/18/82 09/15/82C ISSUE FES:

12/08/82 12/08/82C I

l CURRENT ENV. STATUS:

ER was tendered June 1981.

ER acceptance review was completed September 1981.

The ER was docketed SAFETY / HEARING MILESTONES:

October 5, 1981.

DES was issued in May, 1982.

FES was issued in December 1982.

APPLICATION TENDERED:

06/29/81 06/29/81C SAR DOCKETED:

10/05/81 10/05/81C SAR 9'S RECEIVED BY PM:

01/20/82 03/05/82C SAR A/PL. RESPONSE TO 9'S' RECEIVED: 03/12/82 04/13/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

05/07/82 10/08/82C Notice for Opportunity for Hearing was published in ISSUE DRAFT SER:

07/30/82 08/13/82C the Federal Register on October 19, 1981.

Prehearing IMPUT TO SER:

11/30/82 12/29/82C conferences were held May 6-7, 1982. July 15-16, 1982 ISSUE SER:

01/12/83 03/07/83C and April 7-8, 1983.

ASLB Order identifying parties, contentions and prehearing schedule was issued September ACRS LETTER RECEIVED:

02/17/83 04/19/83C 13, 1982.

Discovery is in progress.

INPUTS TO SE SUPPLEMENT 12 05/08/83 ISSUE SE SUPPLEMENT 18 06/08/83 FEMA LETTER RECEIVED:

09/08/83 CURRENT ANTITRUST:

Status to be determined.

HEARING STARTED:

08/08/83 ASLB INITIAL DECISION:

06/08/84

. COMMISSION EFFECTIVENESS DECISION: 07/84 TECH SPECS COMPLETED:

07/08/84 COMMISSION DECISION:

08/09/84 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

09/08/84 48 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:

Fuel load slipped to 9/84 per applicant letter of 12/02/82.

CONSTRUCTION COMPLETION - APPL.

09/30/84 12/02/82

l NRR LICEH$IHG SYSTEM PAGE NO: 2-27 SHOREHAM 0L CURREHT

$TATUS REPORT REPORT AS OF 05/31/83 PLAHT CHARACTERISTICSt KEY PERS0NNEL DOCKET HO:

05000322 LIC. PM:

R. CARUSO ASLB CHAIR:

L. BRENNER APPLICANT:

LONG ISLAND LIGHTING CO.

LIC. BC:

A. SCHWENCER MEMBER 1 P. MORRIS LOCATION:

BROOKHAVEN, NY (LI)

LIC. LA.:

E. HYLTON MEMBER 23 J. CARPENTER REGION:

1 AE:

58W COUNSEL:

B. BORDEHICK CONST. INSP L. HARROW REAC. TYPE: BWR HSSS: GE ANTITRUST:

J. RUTBERG RESID. INSP: J. HIGGINS DESIGH PWR: 2436 MWT/0320 MWE CONST: 58W RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The ACRS meeting was held in October 1981.

SER Supplement 2 was issued in March 1982.

SER 83 was ER DOCKETED:

01/26/76 01/26/76C issued 02/04/83.

ER SITE VISIT COMPLETE:

08/06/76 08/03/76C INPUT TO DES TO PM:

11/22/76 11/29/76C ISSUE DES:

03/11/77 03/24/77C i

RESPONSE TO COMMENTS OH DES:

07/22/77 07/22/77C l

ISSUE FES:

10/21/77 10/18/77C CURRENT ENV. STATUS:

The environmental review is complete.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

09/00/75 09/04/75C SAR DOCKETED:

12/15/77 01/26/76C SAR Q'S RECEIVED BY PM:

06/04/76 07/09/76C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/23/76 07/23/76C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/15/77 08/01/77C The Board concluded hearings regarding all issues ISSUE DRAFT SER:

except emergency planning on April 8, 1983.

Draft emergency INPUT TO SER:

03/10/81 03/10/81C planning contentions are due by 06/13 and final contentions ISSUE SER:

04/10/81 04/10/81C are due to the Board by 06/27.

A new Board was constituted on 05/12/83 to hear the emergency planning contentions.

ACRS LETTER RECEIVED:

09/18/81 10/19/81C INPUTS TO SE SUPPLEMENT 4:

N/S ISSUE SE SUPPLEMENT 48 07/01/83 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Not required.

HEARING STARTED:

05/04/82 05/04/82C ASLB INITIAL DECISION:

07/00/83 COMMISSIDH EFFECTIVENESS DECISI0H:

10/00/83 TECH SPECS COMPLETED:

08/00/83 COMMISSIGH DECISIGHz ISSUE LIC. WITH POWER RESTRICTION: 08/00/83 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

10/00/83 FSAR Amendment 27 SCHED. DATE RECEIPT DATE HEW SLIPS /HOTES:

l The current estimate for a partial initial ASLB decision CONSTRUCTION COMPLETI0H - APPL.:

08/00/83 03/31/83 t

on all matters except offsite emergency planning is July, 1983.

A complete initial decision may not be available orlor to October, 1983.

I

MRR LICEN$INO

$Y$ TEM PAGE NO: 2-23 SOUTH TEXAS 1 8 2 0L CURRENT STATUS REPORT REPORT AS OF 05/31/83 PLANT C H A R A C T E R I S T I C 5:

KEY PERSONNELa DOCKET NO:

049880499 LIC. PM:

H. SCHIERLING ASLB CHAIR:

C. BECHH0EFER APPLICANT:

HOUSTON LIGHTING 8 POWER COMPANY LIC. BC:

G. KNIGHTON MEMBER 18 J. LAMB LOCATION:

12 MI SSW OF BAY CITY, TEX LIC. LA.:

J. LEE MEMBER 2:

E. HILL REGIDH:

4 AE BECH COUNSEL:

R. PERLIS CONST. INSP REAC. TYPE: PWR HSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP W. HILL DESIGH PWR 3800 MWT/1250 MWE CONST: EBASCO RM ANALYST L. LAMIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE BRRT has been replaced by Bect.cel as the A/E.

BRRT has been replaced by Ebasco as the constructor.

ER DOCKETED:

07/17/78C Hon safety related construction restarted on June 15, 1982.

ER SITE VISIT COMPLETE:

09/26/78 09/26/78C Safety related construction restarted on August 15, 1982.

INPUT TO DES TO PM:

08/00/85 Current FLD is 12/86. Milestones now reflect a 12/86 FLD.

ISSUE DES:

09/00/85 RESPONSE TO COMMENTS ON DES:

01/08/86 l

ISSUE FES:

02/00/86

}

l CURRENT ENV. STATUS:

l Schedule revised to reflect new 12/86 FLD.

l SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

05/10/78 05/10/78C SAR DOCKETED:

07/17/78C SAR Q'S RECEIVED BY PM:

01/22/79 02/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

02/01/85 As provided in a Commission Order of 9/22/80, an ISSUE DRAFT SER:

02/01/85 expedited hearing on QA programs and management was INPUT TO SER:

11/01/85 held.

The record of this phase of the hearing ISSUE SER:

12/01/85 was closed on June 17, 1982.

Phase II of hearing will consider all aspects of Quadrex Report.

ACRS FULL COMMITTEE MEETING:

01/00/86 Phase II is expected to begin in the Summer of '83.

INPUTS TO SE SUPPLEMENT 18 01/00/86 ISSUE SE SUPPLEMENT 18 01/00/86 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Memo and Order issued May 6, 1982 approving settlements and HEARING STARTED:

06/00/86 proposed license conditions and dismissing proceeding.

ASLB INITIAL DECISION:

11/00/86 COMMISSICH EFFECTIVENESS DECISION: 12/00/86 TECH SPECS COMPLETED:

12/00/86 COMMISSION DECISION:

12/00/86 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/08/86 FSAR amendment 030 was issued 03/11/83.

ER amendment 06 was issued 12/01/82.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

All schedules now reflect new official FLD of 12/86.

CONSTRUCTION COMPLETION - APPL.:

12/00/86 03/00/82

1 HRR LICEHSIHG SYSTEM PAGE HO 2-29 ST LUCIE 2 0L CURREHT STATUS REPORT REPORT AS OF 05/31/83 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 H H E L:

DOCKET HO:

0S000389 LIC. PM:

V. HERSES ASLB CHAIR:

E. BOWERS APPLICANT:

FLORIDA POWER & LIGHT LIC. BC:

G.

KNIGHTON NEMBER 1 P. MORRIS LOCATION:

12 MI SE OF FT. PIERCE. FLA LIC.

LA.'

J. LEE MEMBER 2:

O. PARIS REGIDH:

2 AE:

EBASCO COUNSEL:

W. PATTON CONST. INSP R. WRIGHT REAC. TYPE: PWR HSSS: COMB ANTITRUST:

B. V0GLER RESID. INSP: S. ELROD DESIGN PWR: 2700 MWT/0842 MWE CONST: EBASCO RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

fMVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Status of Q-1 and Q-2 review is complete. The SER was issued on 10/09/81 SE Supplement No. I was issued ER DOCKETED:

02/17/81C on 12/30/81.

SE Supplement No. 2 was issued on 09/30/82.

ER SITE VISIT COMPLETE:

02/18/81 02/18/81C SE Supplement No. 3 was issued in 4/83.

On 04/06/83 INPUT TO DES TO PM:

08/07/81 08/07/81C licensee was issued a full power license limited to low ISSUE DES:

10/16/81 10/16/81C 1

power testing.

RESPONSE TO COMMENTS ON DES:

02/08/82 02/08/82C l

ISSUE FES:

04/23/82 04/23/82C l

CURRENT ENV. STATUS:

l The DES was issued on 10/16/81 and the FR Hotice was published 10/30/81. The FES was issued on 04/23/82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/31/80 03/31/80C SAR DOCKETED:

02/17/81C SAR Q'S RECEIVED BY PM:

06/15/81 06/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

08/03/81 08/03/81C There have been no petitioners on matters dealing with ISSUE DRAFT SER:

08/10/81 08/10/81C health, safety and environment.

INPUT TO SER:

09/11/81 09/11/81C ISSUE SER:

10/09/81 10/09/81C ACRS FULL COMMITTEE MEETING:

11/12/81 11/12/81C INPUTS TO SE SUPPLEMENT 3 03/31/83 03/31/83C ISSUE SE SUPPLEMENT 3 04/06/83 04/06/83C FEMA LETTER RECEIVED:

08/20/82 08/20/82C CURRENT ANTITRUST:

Settlement among the Department of Justice, the HRC Staff HEARING STARTED:

N/A and the licensee has been agreed upon.

Case dismissed ASLB IHITIAL DECISIDH N/A

'3/82 follswing summary disposition and settlement agreement.

COMMISSIDH EFFECTIVENESS DECISIDH:

TECH SPECS COMPLETED:

03/31/83 03/31/83C COMMISSIDH DECISI0Hz 06/13/83 ISSUE LIC. WITH POWER RESTRICTIDH: 04/06/83 04/06/83C LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

06/13/83 Ho. 13 (FSAR); Ho. 5 (ER)

SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:

CONSTRUCTIDH COMPLETIDH - APPL.:

03/31/83C

NRR LICENSING SY$ TEM PA!E NO: 2-30 SUSQUEHANNA 2 0L CURRENT STATUS REPORT REPORT AS OF 05/31/83 PLANT CHARACTERISTICSt KEY P E R S 0 N N E Le DOCKET NO:

05000388 LIC. PM R. PERCH ASLB CHAIR:

J. GLEASON APPLICANT:

PENNSYLVANIA POWER & LIGHT LIC. BC A. SCHWENCER MEMBER 1:

LOCATION:

7 MI NE OF BERWICK, PA LIC. LA.:

E. HYLTON MEMBER 2:

P. PURDOM REGION:

1 AE:

BECH COUNSEL:

J. CUTCHIN CONST. INSP L. HARROW REAC. TYPE: BWR NSSS: GE ANTITRUST:

A. HODGDON RESID. INSP J. MCCANN DESIGN PWR 3440 MWT/1052 MWE CONST: BECH RM ANALYST L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SSER 85 is scheduled for 03/01/83.

SER was issued 04/06/81.

SSER 81 was issued 07/07/81.

ER DOCKETED:

06/10/78C Post ACRS SSER 82 was issued 09/10/81. SSER 83 was ER SITE VISIT COMPLETE:

10/20/78 10/20/78C issued 07/17/82. SSER 84 was issued 11/12/82.

SSER 85 INPUT TO DES TO PM:

was issued 3/29/83. SSER 86 is scheduled for 11/83.

ISSUE DES:

03/30/81 03/30/81C RESPONSE TO COMMENTS ON DES:

05/21/81 05/21/81C ISSUE FES:

06/15/81 07/02/81C CURRENT ENV. STATUS:

DES was issued on 03-30-81.

FES was i ssued 07-02-81.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/05/78 04/10/78C SAR DOCKETED:

07/31/78 07/31/78C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

04/07/80 04/07/80C The OL hearing is complete; Initial Decision issued on ISSUE DRAFT SER:

INPUT TO SER:

03/23/81 03/23/81C 04-12-82.

ISSUE SER:

04/06/81 04/06/81C ACRS LETTER RECEIVED:

08/15/81C IMPUTS TO SE SUPPLEMENT 6 02/01/83 02/03/83C ISSUE SE SUPPLEMENT 6 11/00/83 FEMA LETTER RECEIVED:

06/00/82 06/00/82C CURRENT ANTITRUST:

HEARING STARTED:

10/06/81 10/06/81C Complete.

ASLB INITIAL DECISION:

04/12/82 04/12/82C COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

12/00/83 COMMISSION DECISION:

12/00/83 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

01/00/84 FSAR:

No. 30; ER:

No. 5 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTIDM COMPLETI0H - APPL.

01/00/84

HRR LICEHSING SYSTEM PAGE HO 2-31 WASHINGTON NUCLEAR 1 0L CURREHT STATUS REPORT REPORT AS OF 05/31/83 PLANT C H A R A C T E R I S T I C S:

KEY P E R S O N N E L:

DOCKET NO:

05000460 LIC. PM:

M.

THADANI ASLB CHAIR:

H. GROSSMAN APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:

E. ADENSAM MEMBER 1:

G.

BRIGHT LOCATION:

10 MI H OF RICHLAND, WA LIC. LA.:

M. DUNCAN MEMBER 2:

J. HARBOUR REGIDH:

5 AE:

UEC COUNSEL:

M. YOUNG CONST. INSP: J. OLIN REAC. TYPE: FWR NSSS: B8W ANTITRUST:

J.

RUTBERG RESID. INSP:

A.

TOTH DESIGN PWR: 3760 MWT/1266 MWE CONST: BECH RM ANALYST:

L.

LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Application was tendered on 11-25-81 Application was docketed on July 16, 1982.

The staff reviews will be ER DOCKETED:

07/00/82 07/16/82C performed on " manpower available" basi s.

Applicant ER SITE VISIT COMPLETE:

has requested an amendment to construction permit INPUT TO DES TO PM:

extending the construction completion date from 01/01/82 ISSUE DES:

N/S to 06/01/91 Staff is reviewing the applicant's basi s RESPONSE TO COMMENTS ON DES:

l for requested amendments.

ISSUE FES:

N/S CURRENT ENV. STATUS:

The staff reviews will be performed on " Manpower available" basis.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

11/25/81 11/25/81C SAR DOCKETED:

07/00/82 07/16/82C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

Federal Register on August 16, 1982.

A petition to INPUT TO SER:

intervene has been received from the Coalition for ISSUE SER:

N/S Safe Power.

A prehearing conference was held in Richland, Wa.,

on January 26 and 27, 1983.

ASLB ACRS FULL COMMITTEE MEETING:

N/S denied CP amended hearing contention 81, and admitted INPUTS TO SE SUPPLEMENT 1:

l CP contention 82.

ISSUE SE SUPPLEMENT 1:

N/S i

FEMA LETTER RECEIVED:

l CURRENT ANTITRUST:

HEARING STARTED:

N/S

(

ASLB INITIAL DECISI0H:

N/S l

COMMISSIDH EFFECTIVENESS DECISIDH: N/S

[

TECH SPECS COMPLETED:

i COMMISSION DECISIDH ISSUE LIC. WITH POWER RESTRICTIDH:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

N/S ER amend. I dated 02/11/83, received 03/04/83.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Construction delay of from 2 to 5 years was announced CONSTRUCTIDH COMPLETION - APPL.:

N/S 04/29/82 on 4/29/82.

l 1

l

NRR LICENSING SYSTEM PAGE NO: 2-32 WASHINGTON NUCLEAR 2 0L CURRENT STATUS REP 0RT REPORT AS OF 05/31/83 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:

DOCKET NO:

05000397 LIC. PM:

R. AULUCK ASLB CHAIR E. BOWERS APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:

A. SCHWENCER MEMBER 1 R. COLE LOCATION:

30 MI HW OF RICHLAND, WASH LIC. LA.:

E. HYLTON MEMBER 2:

E. HILL REGION:

5 AE B8R COUNSEL:

W. PATON CONST. INSP A. TOTH REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP: R. FEIL DESIGN PWR: 3323 MWT/1103 MWE CONST BECH RM ANALYST L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was issued 3/31/82. Geology /Sei smology reviews were included in SSER No. 1 issued August 11, 1982.

ACRS ER DOCKETED:

02/28/77 04/20/77C meeting was held on October 7, 1982.

SSER No. 2 was ER SITE VISIT COMPLETE:

07/13/77 07/14/77C issued 12/21/82. SSER 93 issued on 05/20/83.

INPUT TO DES TO PM:

06/30/81 06/30/81C ISSUE DES:

07/31/81 07/31/81C RESPONSE TO COMMENTS ON DES:

09/28/81 09/28/81C ISSUE FES:

12/31/81 12/31/81C e

CURRENT ENV. STATUS:

FES was issued 12-31-81.

SAFETY / HEARING MILESTONES:

APPLICATION s t'NDERED:

12/30/76 12/30/76C SAR DOCKETED:

04/01/78 06/22/78C SAR Q'S RECEIVED BY PM:

01/05/79 03/07/79C SAR APPL. RESPONSE TO 9'S RECEIVED: 05/11/79 07/26/79C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/12/81 10/12/81C A prehearing conference on CP extension order was held ISSUE DRAFT SER:

11/17/81 11/17/81C l

on January 26, 1983, in Richland, Wa.

On February 22, INPUT TO SER:

05/30/82 05/30/82C 1983, the ASLB denied the request for hearing filed by ISSUE SER:

03/31/82 03/31/82C the Coalition for Safer Power and dismissed the proceeding.

No OL hearings scheduled.

ACRS LETTER RECEIVED:

11/13/82 11/13/82C INPUTS TO SE SUPPLEMENT 38 11/22/82 11/22/82C ISSUE SE SUPPLEMENT 3 05/20/83 05/20/83C FEMA LETTER RECEIVED:

05/01/83 CURRENT ANTITRUST:

HEARING STARTED:

N/A Not required ASLB INITIAL DECISION:

N/A COMMISSIDH EFFECTIVENESS DECISION: N/A TECH SPECS COMPLETED:

07/08/83 COMMISSION DECISION:

08/08/83 ISSUE LIC. WITN POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

09/08/83 SCHED. DATE RECEIPT DATE l

l NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

09/08/83 05/07/82 j

l PAGE NO: 2-33 HRR LICEHSIHG SYSTEM WASHINGTON NUCLEAR 3 0L CURRENT STATUS REP 0RT REPORT AS OF: 05/31/83 KEY P E R S 0 N N E L:

PLANT C H A R A C T E R I 5 T I C S:

LIC. PM:

A. VIETTI ASLB CHAIR:

M. MARQULIES KNIGHTON MEMBER 1:

G. BRIGHT DOCKET NO:

05000508 G

APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC-BC-J LEE MEMBER 2:

J.

CARPENTER LOCATION:

26 MI W OF OLYMPIA WA COUNSEL $

D. HASSELL CONST. IHSP:

D. KIRSCH REGION:

5 AE.

EBA CD ANTITRUST:

B. V0GLER RESID. INSP: W. ALBERT ES GH PW 0 MWT/1242 MWE ONST: EBASCO RM ANALYST:

L.

LAHIER I

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE l

CURRENT SAF. STATUS:

Application was tendered on June 2, 1982, and was docketed on 08/27/82. Review effort from FSAR docket ER DOCKETED:

08/27/82 08/27/82C ER SITE VISIT COMPLETE:

thru applicant responses to Q's.

INPUT TO DES TO PM:

07/08/83 ISSUE DES:

09/07/83 RESPONSE TO COMMENTS OH DES:

ISSUE FES:

04/06/84 CURRENT ENV. ST t.T US :

Application was tendered on June 2, 1982, and was docketed on 08/27/82. Review effort from ER docket SAFETY / HEARING MILESTONES:

thru preparation and issuance of the DES.

APPLICATION TENDERED:

06/02/82 06/02/82C i

SAR DOCKETED:

08/27/82 08/27/82C SAR Q'S RECEIVED BY PM:

07/00/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 07/13/83

{

IHPUT TO DRAFT SER TO PM:

10/28/83 f

ISSUE DRAFT SER:

12/01/83 CURRENT HRG. STATUS:

Notice of Opportunity for Hearing was published in the INPUT TO SER:

06/05/84 Federal Register on 09/15/82. On February 25, 1983, a 08/09/84 ISSUE SER:

request for a hearing and petition for leave to intervene was received from coalition for Safe Power of Portland, ACRS FULL COMMITTEE MEETING:

09/00/84 Oregon. On April 21, 1983 the Licensing Board handed down an order to accept its date filed petition. Prehearing INPUTS TO SE SUPPLEMENT 1 11/06/84 is currently scheduled for August 3-4, 1983.

ISSUE SE SUPPLEMENT 1:

12/13/84 FEMA LETTER RECEIVED:

HEARING STARTED:

05/00/85 CURRENT ANTITRUST:

Notice of receipt of Antitrust Information was published ASLB INITIAL DECISI0H:

11/00/85 in the Federal Register on October 27, 1983.

COMMISSION EFFECTIVENESS DECISION:

12/00/85 TECH SPECS COMPLETED:

12/00/85 COMMISSIDH DECISION:

12/00/85 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

N/S LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION CGMPLETION - APPL.:

12/00/85 10/01/82 Detailed review schedule has been approved.

l

HRR LICENSING SYSTEM PAGE NO 2-34 WATERFORD 3 0L CURRENT STATUS REP 0RT REPORT AS OF 05/31/83 PLANT CHARACTERI$TICSt KEY PERS0NNEL DOCKET NO:

05000382 LIC. PM:

J. WILSON ASLB CHAIR S. WOLFE APPLICANT:

LOUISIANA POWER 8 LIGHT LIC. BC:

G. KNIGNTON MEMBER 1 W. JORDAN LOCATION:

20 MI W OF NEW ORLEANS, LA LIC. LA.:

J. LEE MEMBER 28 N. FOREMAN REGION:

4 AE EBASCO COUNSEL:

S. TURX CONST. INSP

. UNASSIGNED REAC. TYPE: PWR HSSS: COMB ANTITRUST B. V0GLER RESID. INSP L. CONSTABLE DESIGN PWR: 3560 MWT/1151 MWE CONST: EBASCO RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The safety review was expedited. Fuel load date dela*/ed until 05/83 by applicant. SSER 84 issued ER DOCKETED:

12/00/78 12/00/78C 10/29/82.

ER SITE VISIT COMPLETE:

12/05/80 12/05/80C INPUT TO DES TO PM:

04/06/81 04/06/81C ISSUE DES:

05/01/81 05/01/81C RESPONSE TO COMMENTS ON DES:

07/24/81 08/19/81C ISSUE FES:

09/30/81 09/30/81C CURRENT ENV. STATUS:

The DES was completed in May 1981.

FES was completed September 1981 SAFETY / HEARING MILESTONES:

APPLICATI0H TENDERED:

09/28/78 09/28/78C SAR DOCKETED:

12/18/78C SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/80 12/15/80C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/03/80 05/15/81C Contested hearing started 03/82. Partial initial ISSUE DRAFT SER:

decision issued 11/03/82. Hearing for remaining item INPUT TO SER:

05/08/81 05/15/81C (emergency preparedness) was held February 7-11, 1983.

ISSUE SER:

07/09/81 07/09/81C Record closed Fcbruary 11, 1983.

Appeal Board hearino was held April 19, 1983 to hear rebuttal of 11/03/82 PID.

ACRS LETTER RECEIVED:

08/08/81 08/08/81C INPUTS TO SE SUPPLEMENT 5:

05/18/83 05/18/83C ISSUE SE SUPPLEMENT 58 06/15/83 FEMA LETTER RECEIVED:

03/31/83 CURRENT ANTITRUST:

Staff is reviewing OL antitrust information.

HEARING STARTED:

03/00/82 03/23/82C ASLB INITIAL DECISIDH 10/00/82 04/00/83C COMMISSION EFFECTIVENESS DECISION: 06/00/83 TECH SPECS COMPLETED:

06/00/83 COMMISSION DECISION:

06/00/83 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

05/00/83 ER 03 - 8/81 FSAR 031 - 3/83.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

To date State of Louisiana does not have an approved CONSTRUCTION COMPLETION - APPL.:

05/00/83 08/24/82 emergency plan.

v l

l NRR LICENSIHG SYSTEN PAGE HO: 2-35 WATTS BAR 1 82 0L CURREHT STATUS REPORT REPORT AS OF: 05/31/83 PL ANT CHARACTERIST I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

039080391 LIC. PM:

T. KENYOH ASLB CHAIR: N/A APPLICANT:

TENNESSEE VALLEY AUTHORITY LIC. BC:

E. ADENSAM MEMBER 1 N/A i

LOCATION:

10 MI S OF SPRING CITY, TENH LIC. LA..

M. DUNCAN MEMBER 2:

N/A REGION:

2 AE:

TVA COUNSEL:

M. YOUNG CONST. INSP: W. SWtN REAC. TYPE PWR HS$$: WEST ANTITRUST:

J. RUTBERG RESID. INSP:

T. HEATHERLY DESIGN PWR: 3411 MWT/1165 MWE CONST: TVA RM ANALYST:

L.

LANIER l

1 l

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CFP predicted earliest Unit 1 completion date at 06/84.

SER published 07/82.

ACRS subcommittee meetings held ER DOCKETED:

01/05/77 11/23/76C l

04/30/82 and 08/10/82. ACRS full committee meeting ER SITE VISIT COMPLETE:

03/18/77 02/25/77C held 08/13/82. ACRS letter received 08/16/82. Supplement INPUT TO DES TO PM:

07/06/77 08/18/77C 01 to SER published 09/22/82. Supplement 02 to SER ISSUE DES:

11/29/77 06/02/78C scheduled 11/83.

RESPONSE TO COMMENTS ON DES:

N/A ISSUE FES:

11/24/78 12/29/78C CURRENT ENV. STATUS:

Complete except for environmental tech specs.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/30/76 06/30/76C SAR DOCKETED:

10/04/76 10/04/76C SAR Q'S RECEIVED BY PM:

12/15/76 05/20/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/23/77 02/10/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

06/18/80 12/18/81C ISSUE DRAFT SER:

12/30/81 12/30/81C Ho hearings are assumed.

INPUT TO SER:

06/04/82 06/04/82C ISSUE SER:

07/01/82 07/01/82C ACRS LETTER RECEIVED:

09/00/82 08/16/82C INPUTS TO SE SUPPLEMENT 22 08/27/82 09/03/82C ISSUE SE SUPPLEMENT 2:

11/00/83 FEMA LETTER RECEIVED:

04/00/83 CURRENT ANTITRUST:

HEARING STARTED:

N/A Complete ASLB IHITIAL DECISIDH:

H/A COMMISSIDH EFFECTIVENESS DECISIDH: N/A TECH SPECS COMPLETED:

07/00/83 COMMISSION DECISI0H:

12/00/83 ISSUE LIC. WITH POWER RESTRICTION: 01/00/84 ISSUE FULL POWER LICENSE AMEND:

03/00/84 LATEST AMENDMENT:

FSAR Ho. 46 SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

01/00/84 02/25/83 l

NRR LICENSING SYSTEM PAGE NO: 2-36 WOLF CREEK 1 0L CURRENT STATUS REP 0RT REPORT AS OF 05/31/83 PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:

05000482 LIC. PM:

J. HOLONICH ASLB CHAIR:

J. LAURENSON APPLICANT:

KANSAS GAS 8 ELECTRIC LIC. BC:

B. YOUNGBLOOD MEMBER 1:

G. ANDERSON LOCATION:

3.5 MI NE OF BURLINGTON, KAN LIC. LA.:

M. RUSHBROOK MEMBER 2:

H. PAXTON REGION:

4 AE:

BECH COUNSEL:

M. KARMAN CONST. INSP: H. ROBERDS REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP: S. SCHUM DESIGN PWR: 3425 MWT/1150 MWE CONST: DANIEL RM ANALYST S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The SER was issued in April 1982.

SSER-1 was issued in August 1982.

ER DOCKETED:

11/25/80 11/25/80C ER SITE VISIT COMPLETE:

07/28/81 04/21/81C INPUT TO DES TO PM:

10/01/81 10/01/81C l

ISSUE DES:

01/05/82 01/05/82C l

RESPONSE TO COMMENTS ON DES:

05/14/82 05/14/82C ISSUE FES:

06/11/82 06/11/82C CURRENT ENV. STATUS:

The DES was issued in January 1982.

The FES was issued in June 1982.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

02/21/80 02/21/80C SAR DOCKETED:

08/07/80 08/07/80C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO 0'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

03/12/82 03/12/82C Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

Federal Register on 12/18/80.

Two petitions for INPUT TO SER:

03/19/82 03/19/82C leave to intervene were filed.

A special combined ISSUE SER:

04/07/82 04/07/82C prehearing conference was held on 4/15/81.

A second prehearing conference was held on March 10, 1983.

ACRS LETTER RECEIVED:

05/11/82 05/11/82C Hearing is tentatively scheduled for Sept. 20-29, 1983 INPUTS TO SE SUPPLEMENT 2:

08/10/82 08/10/82C and Oct. 18-27, 1983.

ISSUE SE SUPPLEMENT 28 05/27/83 FEMA LETTER RECEIVED:

07/15/83 CURRENT ANTITRUST:

OL antitrust review is in progress.

HEARING STARTED:

09/20/83 ASLB INITIAL DECISION:

03/00/84 COMMISSION EFFECTIVENESS DECISIDH 04/00/84 TECH SPECS COMPLETED:

09/00/84 COMMISSION DECISIGHz 07/00/84 ISSUE LIC. WITH POWER RESTRICTION: N/S LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

10/00/84 SNUPPS FSAR - No. 11; Wolf Creek Site Addendum - No. 10; ER - No. 4.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

08/00/84 08/24/82

l HRR LICEHSIHG SY$ TEM PAGE PD: 2-37 ZIMMER 1 0L CURREHT STATUS REPORT REPORT AS OF: 05/31/83 l

PLAHT C H A k A C T E R I S T I C S:

KEY P E R S 0 H H E L:

DOCKET NO:

05000358 LIC. PM:

L. KINTHER ASLB CHAIR:

J. FRYE APPLICANT:

CINCINNATI GAS 8 ELECTRIC LIC. BC:

B. YOUNGBLOOD MEMBER 1:

F. HOOPER LOCATION:

24 MI SE OF CINCINNATI, OH LIC. LA.:

M. RUSHBROOK MEMBER 2:

M. LIVINGSTON i

REGION:

3 AE:

SSL COUNSEL:

C. BARTH CONST. INSP: D. HUNTER REAC. TYPE: BWR NSSS: GE ANTITRUST:

S.

LEWIS RESID. INSP:

F. CHRISTIANSON DESIGH PWR: 2436 MWT/0810 MWE CONST: KAISER RM ANALYST:

B. ST MARY

)

l CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SE Supplement #1 was issued on 06/04/81. SE Supplement 82 was issued 10/81 SE Supplement #3 issued on 08/23/82.

ER DOCKETED:

09/10/75 09/10/75C HRR is assisting Region IV in its vendor inspection of the ER SITE VISIT COMPLETE:

10/09/75 10/09/75C main steam line and its supporting structures in the INPUT TO DES TO PM:

08/20/76 08/19/76C turbine building. Resolution of open items in the safety ISSUE DES:

10/15/76 10/15/76C review is continuing.

RESPONSE TO COMMENTS OH DES:

03/25/77 04/01/77C ISSUE FES:

06/10/77 06/10/77C l

CURRENT ENV. STATUS:

i Complete SAFETY / HEARING MILESTONES:

l l

APPLICATI0H TENDERED:

08/15/75 05/09/75C l

SAR DOCKETED:

09/15/75 09/10/75C l'

SAR Q'S RECEIVED BY PM:

10/29/76 01/06/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/31/76 07/29/77C CURRENT HRG. STATUS:

IMPUT TO DRAFT SER TO PM:

01/28/77 08/11/77C Hearing completed 3/5/82.

Licensing Board decision rendered ISSUE DRAFT SER:

N/A 6/82, which precludes the NRC staff from issuing a full-INPUT TO SER:

05/20/77 12/07/77C power license and orders additional hearings after FEMA ISSUE SER:

07/29/77 01/31/79C assessment of emergency plans.

On 11/12/82 the Commission issued an order to Show Cause 8 Order Immediately Suspending ACRS LETTER RECEIVED:

09/16/77 03/13/79C Construction because of quality assurance concerns.

INPUTS TO SE SUPPLEMENT 33 06/17/82 08/02/82C l

On 12/8/82, applicant consented to the Order. On 5/2/83, ISSUE SE SUPPLEMENT 32 08/23/82 08/23/82C Appeal Board affirmed Licensing Board's decision with mods.

FEMA LETTER RECEIVED:

04/15/82 04/15/82C CURRENT ANTITRUST:

Antitrust review is now closed.

HEARING STARTED:

02/26/82 02/26/82C ASLB INITIAL DECISION:

N/S COMMISSION EFFECTIVENESS DECISION: N/S TECH SPECS COMPLETED:

08/00/83 COMMISSIDH DECISIDH:

08/00/83 l

ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

09/00/83 LATEST AMENDMENT:

Application amendment 148, FSAR Revision 94 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Applicant letter of 09/24/82 revised estimated construction CONSTRUCTION COMPLETION - APPL.:

09/00/83 09/24/82 completion date to the third quarter of 1983.

Applicant letter of 01/24/82 requested latest construction completion date of 12/31/84.

NRR LICENSING SYSTEM PAGE NO: 2-38 CLINCH RIVER CP CURRENT STATUS REP 0RT REPORT AS OF 05/31/83

(

PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:

05000537 LIC. PM:

R. STARK ASLB CHAIR:

M. MILLER l

APPLICANT:

PROJECT MANAGEMENT CORP.; DOE;TVA LIC. BC:

H. GRACE MEMBER 1:

G.

LINENBERGER LOCATION:

25 MI W OF KNOXVILLE, TH LIC. LA.:

P. SHUTTLEWORTH MEMBER 2:

C. HAND REGION:

2 AE B&R COUNSEL:

S. TREBY CONST. INSP:

REAC. TYPE: LMFBR NSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP:

DESIGN PWR: 0975 MWT/0350 MWE CONST: S&W RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Safety review was reinitiated in October 1981 A revision to the Site Suitability Report was issued June 11, 1982.

ER DOCKETED:

04/11/75 04/11/75C On August 17, 1982. HRC issued an order granting Clinch ER SITE VISIT COMPLETE:

River's request to begin site preparation activities.

INPUT TO DES TO PM:

The Site Suitability Report hearing sessions were held ISSUE DES:

02/12/76C in Oak Ridge during the week of August 23, 1982.

SER was RESPONSE TO COMMENTS ON DES:

i ssued 3/11/83.

The ACRS meeting was held 4/14/83.

LWA-2 ISSUE FES:

02/07/77 02/07/77C will not be requested. Safety hearing is to commence July 18, 1983.

Supplement No. I was issued on 5/2/83 and Supplement No. 2 was issued on 5/20/83.

CURRENT ENV. STATUS:

The FES was issued in February 1977.

A draft supplement to the FES was issued on July 19, 1982.

A final supplement SAFETY / NEARING MILESTONES:

was issued on October 29, 1982.

APPLICATION TENDERED:

10/15/74 10/15/74C SAR DOCKETED:

06/13/75 06/13/75C SAR Q'S RECEIVED BY PM:

04/09/82 04/09/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/15/82 05/15/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/16/82 07/16/82C Hearing sessions on the SSR took place on August 23-27, ISSUE DRAFT SER:

09/27/82 09/27/82C 1982.

The FES hearings were held November 15-19, 1982.

INPUT TO SER:

01/14/83 02/04/83C December 13-17, 1982, and on January 4-5, 1983.

The safety ISSUE SER:

03/11/83 03/11/83C hearings are forecasted for July 18, 1983.

PID was issued on 02/28/83 on the FES hearing.

ACRS LETTER RECEIVED:

04/19/83 04/19/83C INPUTS TO SE SUPPLEMENT 18 04/22/83 04/22/83C ISSUE SE SUPPLEMENT 1:

95/02/83 05/02/83C CURRENT ANTITRUST:

HEARING STARTED:

08/23/82 08/23/82C ASLB INITIAL DECISI0Hz 04/01/84 COMMISSION EFFECTIVENESS DECISION: 06/00/84 TECH SPECS COMPLETED:

COMMISSION DECISION:

06/00/84 CP ISSUED:

06/00/84 LATEST AMENDMENT:

NEW SLIPS / NOTES:

HRR LICENSING SYSTEM PAGE HO: 2-39 SKAGIT/HANFORD 182 CP CURREHT STATUS REPORT REPORT AS OF 05/31/83 PLANT CHARACTERIST ICS XEY PERS0NNELa DOCKET NO:

0522A0523 LIC. PM:

C. M90N ASLB CHAIR:

J. WOLF APPLICANT:

PUGET SOUND POWER 8 LIGHT LIC. BC:

E.

ADENSAM MEMBER 1:

F. HOOPER LOCATION:

12 MI. NW OF RICHLAND, WA.

LIC. LA.:

M. DUNCAN MEMBER 2:

G. LINENBERGER REGION:

5 AE:

BECH COUNSEL:

L. DEWEY CONST. INSP REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP:

DESIGN PWR: 3833 MWT/1277 MWE CONST: BECH RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Supplement No. 2 to the SER was issued 10/81 on TMI-related action items.

Site relocation ER amendment and PSAR ER DOCKETED:

09/30/74 09/30/74C amendment were submitted on 12/31/81. The applicant is ER SITE VISIT COMPLETE:

02/05/82 02/05/82C relocating the site to the Hanford Reservation.

INPUT TO DES TO PM:

04/09/82 04/09/82C Supplement 3 to the SER was issued in 12/82.

The staff ISSUE DES:

05/04/82 05/04/82C recommends additional investigations of the May Junction RESPONSE TO COMMENTS ON DES:

08/06/82 09/30/82C Monocline. An ACRS subcommittee site visit and meeting ISSUE FES:

06/30/83 was complete on 01/24-25/83.

The ACRS completed its review in a meeting on 02/10/83 and reported the results of its review in a letter to the chairman on 02/16/83.

CURRENT ENV. STATUS:

Site relocation (to Hanford) DES was issued on 5/4/82.

In response to the applicant's request of 2/4/83, issuance of SAFETY / HEARING MILESTONES:

the FES had been defered until 6/30/83 following scheduled issuance of the Northwest Conservation and Electric Power APPLICATION TENDERED:

08/06/74 08/06/74C Plan by the Northwest Power Council. On 4/27/83 Council SAR DOCKETED:

01/15/75 01/15/75C adopted its first plan.

The proposed portfolio of SAR Q'S RECEIVED BY PM:

02/10/82 02/10/82C electrical resources for the next 20 years did not include SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/82 10/01/82C l

S/ HHP.

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

A prehearing schedule on safety matters was established on ISSUE DRAFT SER:

I 1/ 18/83 including a tentative date of 5/17/83 for beginning INPUT TO SER:

07/11/77 07/11/77C of hearing.

Applicants on 2/4/83 and the intervenors on ISSUE SER:

08/31/77 08/31/77C 2/10/83 submitted motions to suspend the safety prehearing schedule. On 2/18/83 the Board suspended the prehearing ACRS LETTER RECEIVED:

01/00/83

'02/16/83C schedule (Safety) including the filing of new contentions INPUTS TO SE SUPPLEMENT 38 11/30/82 11/30/82C pending adoption of the Final Regional Power Plan and until ISSUE SE SUPPLEMENT 3:

11/30/82 12/30/82C the conclusion of hearings on " Heed for Power".

CURRENT ANTITRUST:

HEARING STARTED:

07/15/75 07/15/75C Complete ASL3 INITIAL DECISI0H:

N/S COMMISSION EFFECTIVENESS DECISIDH N/S TECH SPECS COMPLETED:

N/A COMMISSIDH DECISION:

N/S CP ISSUED:

N/S LATEST AMENDMENT:

f HEW SLIPS /HOTES:

I l

HRR LICEH$ING SYSTEM PAGE HO: 2-40.

(HSS)CESSAR SYSTEM 80 FDA CURREHT STATUS REPORT REPORT AS OF 05/31/83 PLAHT CHARACTERI5TICSt KEY PERS0HHELa DOCKET NO:

05000470 LIC. PM:

G. MEYER ASLB CHAIR:

APPLICANT:

COMBUSTIDH ENGINEERING LIC. BC:

C. THOMAS MEMBER 1:

LOCATIDH N/A LIC. LA.:

P. ANDERSON MEMBER 2:

REGIDH 0

AE:

COUNSEL:

M. WAGNER CONST. INSP:

REAC. TYPE: PWR HSSS: COMB ANTITRUST:

RESID. INSP:

DESIGH PWR 3800 MWT/1295 MWE CONST:

RM ANALYST S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER (HUREG-0852) issued 11/81. Awaiting documentation to resolve ACRS, open, and confirmatory issues. SSERI was ER DOCKETED:

Issued 03/30/83. A revision to the supplement is ER SITE VISIT COMPLETE:

scheduled for May 31, 1983.

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

l l

l I

CURRENT ENV. STATUS:

N/A.

SAFETY / HEARING MILESTONES:

APPLICATI0H TENDERED:

10/27/78 10/27/78C

)

SAR DOCKETED:

12/21/79 12/21/79C SAR Q'S RECEIVED BY PM:

09/01/80 09/01/81C l

SAR APPL. RESPONSE TO Q'S RECEIVED: 01/01/81 07/15/81C l

l CURRENT HRG. STATUS:

IMPUT TO DRAFT SER TO PM:

N/$

H/A.

ISSUE DRAFT SER:

N/S INPUT TO SER:

11/01/81 11/13/81C ISSUE SER:

05/01/82 11/10/81C ACRS LETTER RECEIVED:

06/21/82 12/15/81C INPUTS TO SE SUPPLEMENT 28 06/03/83 ISSUE SE SUPPLEMENT 28 05/31/83 CURRENT ANTITRUST:

HEARING STARTED:

N/A ASLB INITIAL DECISIDH N/A COMMISSIDH DECISIDH j

SPECIAL PROJECT COMPLETE:

07/29/83 LATEST AMENDMENT:

HEW SLIPS / MOTES:

NRR LICEN5ING SYSTEM PA!E NO 2-41 (HSS)GESSAR SEVERE ACC FDA CURRENT STATUS REPORT REPORT AS OF 05/31/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:

00007447 LIC. PM:

D. SCALLETTI ASLB CHAIR: N/A APPLICANT:

GENERAL ELECTRIC COMPANY LIC. BC C. THOMAS MEMBER 1:

N/A LOCATION:

N/A LIC. LA.:

P. ANDERSON MEMBER 28 N/A REGION:

0 AE:

BRAUN COUNSEL:

B. BORDENICK CONST. INSP REAC. TYPE: BWR NSSS: GE ANTITRUST:

RESID. INSP I

DESIGN PWR: 3S79 MWT/1220 MWE CONST:

RM ANALYST:

B. ST MARY-CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82; review is in progress.

Dates shown reflect review for the severe accident ER DOCKETED:

ER SITE VISIT COMPLETE:

design.

INPUT TO DES 10 PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/31/80 03/31/80C SAR DOCKETED:

02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:

09/01/82 10/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/01/83 02/01/83C INPUT TO DRAFT SER TO PM:

CURRENT HRG. STATUS:

ISSUE DRAFT SER:

INPUT TO SER:

02/01/84 ISSUE SER:

03/01/84 ACRS FULL COMMITTEE MEETING:

04/06/84 INPUTS TO SE SUPPLEMENT 13 04/21/84 ISSUE SE SUPPLEMENT 1:

05/25/84 J

CURRENT ANTITRUST:

FDA antitrust review is in progress.

HEARING STARTED:

N/A ASLB INITIAL DECISIGHz N/A COMMISSION DECISION:

N/A SPECIAL PROJECT COMPLETE:

05/00/84 LATEST AMENDMENT:

FSAR Amendment No. 14 was received in April, 1953.

NEW SLIPS / NOTES:

-~ - --

l

HRR LICEHSING SYSTEM PAGE HO: 2-42 (HSS)GESSAR-238 HI FDA CURREHT STATUS REPORT REPORT AS OF 05/31/83 PLAHT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET HO:

05000447 LIC. PM:

D. SCALETTI ASLB CHAIR: N/A APPLICANT:

GENERAL ELECTRIC COMPANY LIC. BC:

C. THOMAS MEMBER 1:

N/A LOCATION:

N/A LIC. LA.:

P. ANDERSON MEMBER 2 N/A REGION:

0 AE BRAUH COUNSEL:

B. BORDEHICK CONST. INSP REAC. TYPE: BWR HSSS GE ANTITRUST:

RESID. INSP:

DESIGN PWR: 3579 MWT/1220 MWE CONST:

RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82.

The foundation analysis 1

issue will require special attention. PRA for severe ER DOCKETED:

accident design was submitted 4/82.

Severe accident ER SITE VISIT COMPLETE:

design modifications were submitted 6/82 in Amendment INPUT TO DES TO PM:

No. 4.

GE has requested the EDO to accelerate the ISSUE DES:

j PRA review schedule to coincide with the FDA.

RESPONSE TO COMMENTS OH DES:

ISSUE FES:

l CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/31/80 03/31/80C SAR DOCKETED:

02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:

10/15/82 10/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/12/82 02/11/83C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

ISSUE DRAFT SER:

INPUT TO SER:

03/25/83 03/25/83C ISSUE SER:

04/01/83 04/08/83C ACRS FULL COMMITTEE MEETING:

05/12/83 INPUTS TO SE SUPPLEMENT 1:

05/27/83 ISSUE SE SUPPLEMENT 1:

06/17/83 CURRENT ANTITRUST:

FDA antitrust review is in progress.

HEARING STARTED:

N/A ASLB IHITIAL DECISIDH N/A COMMISSIDH DECISI0H:

N/A SPECIAL PROJECT COMPLETE:

06/00/83 LATEST AMENDMENT:

FSAR Amendment No. 14 was received in April, 1983.

HEW SLIPS /H0TES:

l 1

NRR LICEN5ING SYSTEM AS OF8 05/31/83 NON-POWER RENEWAL 5 INPUT ISSUE DOCKET EARLIEST ISSUEM TER ISSUE FES OR START ISSUE MON-POWER FACILITY NUMBER DOCKET RE1 TO PM 111 11&

HEARINC RL COMMENTS AFRRI 05000170 10/80C N/A 09/81C 01/82C N/A 06/83 N/S CONTESTED CASE 1000.0000KW TRIGA CORNELL U.

05000157 05/80C N/A 02/83C 06/83 06/83 N/A 06/83 100.0000KW TRIGA CORNELL UNIVERSITY 05000097 10/78C N/A 02/83C 06/83 06/83 N/A 06/83 1000KW CRITI GE TEST REACTOR 05000070 07/77C N/S N/S N/S M/S N/S N/S ORDER TO SHOW CAUSE.

50.0000KW TANK ASLAB HEARINGS.

j GE, NTR 05000073 11/79C N/A 06/84 09/84 09/84 N/A 09/84 100.0000KW POOL IOWA STATE 05000116 09/79C N/A 09/83 12/83 12/83 N/A 12/83 10.0000KW ARGHT MANHATTAN COLLEGE 05000199 08/83 N/A 08/84 10/84 10/84 N/A 10/84

.0001KW CRITI MICHIGAN STATE 05000294 09/77C N/A 09/83 12/83 N/A N/A 12/83 250.0000KW TRIGA HBSR 05000184 12/80C 02/82C 09/82C 06/83 09/82C M/A 06/83 POWER INCREASE TO 20 MW 10.0000KW TANK INCLUDED IN RENEWAL RENSSELAER 05000225 05/79C N/A 05/83 09/83 09/83 N/A 09/83

.0000KW CRITI STATE U OF NEW YORK 05000057 06/79C N/A 12/82C 05/83 N/A N/A 05/83 2000.0000KW PULSR TEXAS A8M 05000128 07/79C N/A 07/82C 03/83C 03/83C N/A 04/83C 1000.0000KW TRIGA l

U. OF KANSAS 05000148 03/80C N/A 02/84 04/84 04/84 N/A 04/84 250.0000KW POOL U. OF MD.

05000166 05/80C N/A 10/83 12/83 N/A N/A 12/83.

250.0000KW TRIGA U. OF MO., ROLLA 05000123 10/79C N/A 04/84, 06/84 N/A N/A 06/84 200.0000KW P0OL U. OF OKLA.

05000112 10/78C N/A 05/83 08/83 08/83-N/A 08/83

.0150KW AGH

HRR LICEN5ING SYSTEM AS OF 05/31/83 H0H-POWER REHEWALS INPUT ISSUE DOCKET EARLIEST ISSUEM TER ISSUE FES OR START ISSUE NOH-POWER FACILITY NUMBER DOCKET RE1 TO PM 1EE EIA HEARING AL COMMENTS U. OF TEXAS 05000192 05/80C N/A 03/83C 08/83 08/83 H/A 08/83 250.0000KW TRIGA U. OF UTAH 05000407 05/83 N/A 11/83 02/84 H/A N/A 02/84 100.0000KW TRIGA U. OF VA., CAVALIER 05000396 06/84 H/A 07/84 09/84 H/A N/A 09/84

.1000KW POOL UCLA, ARG0HAUT 05000142 02/80C H/A 10/82C 06/81C 06/81C 09/80C H/S CONTESTED CASE 100.0000KW ARGHT UNIDH CARBIDE 05000054 05/80C N/A 10/82C 07/83 07/83 H/A 07/83 5000.0000KW POOL VA HOSPITAL 05000131 01/80C H/A 05/83 07/83 N/A H/A 07/83 18.0000KW POOL VA POLY. INSTITUTE 05000124 10/79C H/A 10/83 12/83 12/83 H/A 12/83 100.0000KW ARGHT WEST., TRAINING REACTOR 05000087 12/81C H/A 11/83 02/84 02/54 H/A 02/84 10.0000KW TANK l

0 FOR TEST REACTCRS ONLY l

M M

Z O

M H

U hJ M

i

HRR LICEHSING SYSTEM PAGE HO: 2-0L CURREHT STATUS REP 0RT REPORT AS OF:

PLAHT C H A R A C T E R I 5 T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

Docket No.or Project No'.,if not docketed LIC. PM:

Licensing Project Manager ASLB CH AIR: ASL9 Chairman APPLICANT:

Utility ~

LIC. BC:

Licensing Branch chief MEMBER 1:

on panel LOCATION:

Miles and direction from nearest major town LIC. LA.:

Licensing Assistant MEMBER 2:

on panel REGION:

1 through 5 AE:

Architect / Engineer COUNSEL:

Attorney assigned to case CONST. INSP : Construction Inspector REAC. TYPE: PWR, BWR, HTGR or LMFBR NSSS: Nuclear Steam Systems Supplier ANTITRUST:

Antitrust Attorney RESID INSP Resident inspector DESIGH PWR: Megawatts electric & ' hermal CONST: Constructor MP A AN ALYST : MPA analyst assigned to track proj,ect t

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Safety status for this reporting period only. It consists of accomplishments and schedule ER DOCKETED:

Environmental Report changes occurring since the last issue of Blue Book. Outstanding issues and late input from review branches should be indicated, along with indication of the critical path.

P O

T Project Manager ISSUE DES:

Draft Environmental Statement RESPONSE TO COMMENTS ON DES:

ISSUE FES:

Final Environmental Statement CURRENT ENV. STATUS:

Environmental status for this reporting period only. It consists of accomplishments and schedule changes occurring since the last issue of Blue Book. Outstanding issues and late SAFETY / HEARING MILESTONES:

input from review branches should be indicated.

APPLICATI0H TENDERED:

SAR DOCKETED:

Safety Analysis Report SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Changes in the hearing dates since the last issue of Blue Book. Changes in intervention and ISSUE DRAFT SER:

Safety Evaluation Repxt INPUT TO SER:

contentions should be indicated.

ISSUE SER:

ACRS LETTER RECEIVED:

Advisory Committee INPUTS TO SE SUPPLEMENT 3:

on fbector Safeguards ISSUE SE SUPPLEMENT 3:

I FEMA LETTER RECEIVED:

Safety Evaluation Supplement l

CURRENT ANTITRUST:

l Changes in the antitrust status since the last issue of Blue Book.

HEARING STARTED:

ASLB IHITIAL DECISIDH Atomic Safaty & Lice wing Board ASLB FINAL DECISIDH TECH SPECS COMPLETED:

COMMISSION DECISION:

ISSUE PARTIAL POWER LICENSE:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE:

The latest amendment submitted by the applicant.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Det '

Slips or potential problems that should M brought to management's attention.

CONSTRUCTIDH COMPLETIDH - APPL.*

%g h

,,tc o construction in construction completion completion e g,s. er,Mi PRII TING OFFICE: 1983-381-299:140

' ' "' " "I * # " "#'* * ####

N"f,'Rus3s u 5 NoctE AR Recut ATORY cOMMisSlow NUREG-0580 Vol.12 No. 5 BIBLIOGRAPHIC DATA SHEET 4 tit LE ANO SU61sTLE. (Add Volume No,,f appscorsatel 2 fleaveNMhl Regulatory Licensing Status Sumary Report (Bluebook) a RECIPIENT 1; Accession NO.

7 AUTHOR (S)

5. DATE RErORT COMPLETED MONTH lVEAR June 1983 9 PE RFORMING ORGANIZATION NAME AND M AltiNG ADDRESS (Jackdr le Codr#

DATE REPORT ISSUED Office of Resource Management

  • m ivEAR Management Information Branch June 1983 U. S. Nuclear Regulatory Commission
s. (te=e a>-hi Washington, D.C.

20555 8 fteave bomkl

12. SPONSORING ORCANIZATION NAME AND MAILING ADDRESS (Jac8 var le Comel 10 PROJECT /TASKIWORK UNIT NO.

Office of Resource Management Management Information Branch li. coNTR AcT NO.

U. S. Nuclear Regulatory Commission Washingtion, D.C.

02555 13 TYPE OF REPORT

,PE Riou COVE RE D flatfuswe asses)

May 1, 1983 - May 31.,1983 15 SUPPLEMENT ARY NOTES 14 fl eave 8'*a*

  • 16 ABST R ACT (200 wo,a, o, sess8 Provide a review cf the status of the progress of the licensing reviews for all construction permits, operating license, special project and non-power reactor g

renewals under review, as reported to Congress.

I 17 KE Y WORDS AND DOCUME NT AN ALYSIS 17a DESCRIPTORS 17r IDE NTif tE RS OPE N ENDE D TE RMS IS AV AIL ABILITY ST ATE ME NT 19 SE CURITY CL A?.S trea sesons 21 NO 08 P AGE S Unlimited Unclassified 20 SE CUR 4TY CL ASS #7e s ress 22 PRICE Unclassified s

UZlTED STATES s easi ct ass unit NUCLEAR REGULATORY COMMISSION postact a stes eoso WASHINGTON, D.C. 20555

,fg,"'3 c 5 C esn a n. i n OFFCAL SUSINESS PENALTY FOR PRIVATE USE. 4300 s

1 ( C '> b t C ( p u y 7 I LA%IAc U h A f- (.

.L*.: l v iF T '

PLH f! r - p e,

h 4 5 b l N(; 7 ( g

>1,,c st.

r h

e r

f f

r r

I d

W h

}YJ'

. fc n, '(

u 2

l*

-4 s

w, e

.'4 g

i '

'~

, l

~~

.2

.y e

1

/

~.

s

,0

\\

L :,a

. 3 N

' ' '4, \\'

x

~

1.

_..