Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20217K8901999-10-18018 October 1999 TS Change Request NPF-38-224 for License NPF-38,modifying TS 3.6.2.2 LCO to Allow Plant to Operate with Two Independent Trains of Containment Cooling,Consisting of One Fan Cooler Per Train,Operable During Modes 1,2,3 & 4 ML20210M9761999-08-0404 August 1999 Application for Amend to License NPF-38,to Modify TS 3.5.2 to Extend Allowed Outage Time to Seven Days for One HPSI Train Inoperable & TS 3.5.3 to Change end-state to Hot Shutdown with at Least One Operable Shutdown in Operation ML20210M9601999-08-0404 August 1999 Application for Amend to License NPF-38,to Modify TS 3.5.2 to Extend Allowed Outage Time to Seven Days for One LPSI Train Inoperable & Allowed Outage Time of 72 Hours Imposed for Other Conditions ML20210H1401999-07-29029 July 1999 TS Change Request NPF-38-220 to License NPF-38,modifying TS 3.8.1.1 & Associated Bases by Extending EDG Allowed AOT from 72 H to Ten Days ML20210H2091999-07-29029 July 1999 TS Change Request NPF-38-221 to License NPF-38,modifying TS 3.6.2.1 to Extend Allowable Outage Time to Seven Days for One Containment Spray Sys Train Inoperable ML20210B3181999-07-19019 July 1999 TS Change Request NPF-38-219 for License NPF-38,modifying TS 4.5.2.f.2 by Increasing Performance Requirement for LPSI Pumps ML20210D0831999-07-15015 July 1999 TS Change Request NPF-38-216 to License NPF-38,adding TS Bases Control Program to TS Administrative Controls Section & Correcting Editorial Error Identified in TS Following Issuance of Amend 146,dtd 981019 ML20210D0341999-07-15015 July 1999 TS Change Request NPF-38-217 to License NPF-38,creating New TS for Feedwater Isolation Valves to Ts.Unreviewed Safety Question Re Crediting of Rt Override Feature & AFW Pump High Discharge Pressure Trip,Provided ML20209H3051999-07-15015 July 1999 Application for Amend to License NPF-38 to Modify TS 3/4.4.8.1,Figures 3.4-2 & 3.4-3 to Extend RCS Pressure Temperature Curves to 20 Efpy.Proprietary Rept 51-1234900-00 Encl.Proprietary Encl Withheld,Per 10CFR2.790 ML20195B1771999-05-20020 May 1999 Application for Amend to License NPF-38 to Change TS Bases B 3/4.3.1 & 3/4.3.2,B 3/4.6.3,B 3/4.7.1.2 & B 3/4.7.12 ML20198G2311998-12-23023 December 1998 Application for Amend to License NPF-38,modifying LCO for TS 3.3.3.7.1 for Chlorine Detection Sys by Changing Alarm/Trip Setpoint from 3 Ppm to 2 Ppm ML20154E1011998-10-0101 October 1998 Tech Spec Change Request NPF-38-211 to License NPF-38, Modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Detection Sys ML20153D5571998-09-23023 September 1998 Emergency TS Change Request NPF-38-210 to License NPF-38, Addressing Functional Requirements of 10-4% Bistable of Rps. TS Change Request NPF-38-21 Replaces 980918 Request Entirely ML20153B4381998-09-18018 September 1998 Emergency Application for Amend to License NPF-38,modifying Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints & Table 3.3-1 Re Reactor Protective Instrumentation.Application Supersedes 980911 Submittal ML20151W5791998-09-11011 September 1998 TS Change Request NPF-38-210 to License NPF-38,modifying Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints Limits & Table 3.3-1 Re Reactor Protective Instrumentation ML20237A7901998-08-12012 August 1998 Application for Amend to License NPF-38,increasing Max Boron Concentration in SITs & Rwsp from 2300 Ppm to 2900 Ppm ML20236U7281998-07-29029 July 1998 Application for Amend to License NPF-38 to Revise TS 6.9.1.11.1 to Replace Ref to Abb Combustion Engineering SBLOCA ECCS Performance Evaluation Model.Request Associated W/Methodology Used to Obtain SBLOCA Results ML20249C7861998-06-29029 June 1998 TS Change Request NPF-38-205 to License NPF-38,modifying TS 3.3.3.7.1, Chlorine Detection Sys & TS 3.3.3.7.3, Broad Range Gas Detection & Associated Bases ML20249C8301998-06-29029 June 1998 Application for Amend to License NPF-38,revising Control Room Ventilation TS to Be More Consistent w/NUREG-1432 ML20248B7441998-05-28028 May 1998 Application for Amend to License NPF-38 to Change TS 3.7.1.2,surveillance Requirement 4.7.1.2 & Bases Change for Emergency Feedwater Sys ML20217D4921998-03-25025 March 1998 Rev 1 to 960718 TS Change Request NPF-38-177 to License NPF-38,correcting Discrepancy in Original Submittal & Incorporating Addl Changes to Improve Clarity of TS 3.9.8.1 & TS 3.9.8.2 ML20199A1031997-11-13013 November 1997 TS Change Request NPF-38-202 to License NPF-38,modifying TS 6.8.4.a, Primary Coolant Sources Outside Containment, to Add Portions of Containment Vacuum Relief Sys & Primary Sampling Sys to Program ML20217G2351997-10-0707 October 1997 Application for Amend to License NPF-38,modifying TS 3.3.3.7.3 & Surveillance Requirement 4.3.3.7.3 for Broad Range Gas Detection Sys ML20211F8091997-09-25025 September 1997 Application for Amend to License NPF-38,modifying LCO 3.6.1.2, Containment Leakage, Associated Action & SR 4.6.1.2 ML20141G6951997-07-0707 July 1997 Application for Amend to License NPF-38,supplementing TS Change Request NPF-38-179 by Modifying Value Previously Submitted to Prevent Vortexing & Value for Short Term Requirements of CCW Makeup Sys & Expand Applicability of TS ML20141D8471997-06-26026 June 1997 Application for Amend to License NPF-38,revising TS Tables 3.7-1 & 3.7-2 by Changing MSSVs Orifice Size from 26 Inches to 28.27 Inches & Relocating Orifice Size from TS to TS Bases ML20148G6221997-06-0303 June 1997 Suppl to 960717 TS Change Request NPF-38-179,providing Updated Info Based on Min Required Level in Condensate Storage Pool.Attachment a Contains Original Vortexing Calculation & Attachment B Contains Revised Calculation ML20140B1591997-06-0303 June 1997 Application for Amend to License NPF-38,consisting of TS Change Request NPF-38-108,revising Action Requirements for TS 3/4.3.2 for Safety Injection Sys Sump RAS ML20141K1911997-05-24024 May 1997 TS Change Request NPF-38-197 to License NPF-38,modifying TS 3/4.7.4 Re Ultimate Heat Sink,Table 3.7-3 by Incorporating More Restrictive Dry Cooling Tower Fan Requirements & Changes Wet Cooling Tower Water Consumption in TS Bases ML20141K1611997-05-24024 May 1997 TS Change Request NPF-38-196 to License NPF-38,modifying Specifications 3.1.1.1,3.1.1.2,3.10.1 & Figure 3.1-1 by Removing Cycle Dependent Boron Concentration & Boration Flow Rate from Action Statements ML20137T4251997-04-11011 April 1997 Application for Amend to License NPF-38,deleting TS 3.7.1.3, Action (B) & Associated Surveillance Requirement ML20137T4451997-04-11011 April 1997 Application for Amend to License NPF-38,making TS 3.6.2.2 & Surveillance Requirement 4.6.2.2 Consistent W/Containment Cooling Assumptions in Waterford 3 Containment Analysis ML20137T3971997-04-11011 April 1997 Application for Amend to License NPF-38-195,modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Detection Sys ML20137P2561997-04-0707 April 1997 Application for Amend to License NPF-38,deleting TS 4.8.1.1.2a.7 & Incorporating 184 Day Fast Start Test Requirement as 4.8.1.1.2d,renumber Subsequent Requirements & Adding Footnote as Indicated ML20137G4711997-03-27027 March 1997 TS Change Request NPF-38-192 to License NPF-38,modifing TS 3/4.5.2, ECCS Subsystems Modes 1,2 & 3 ML20137F9201997-03-27027 March 1997 TS Change Request NPF-38-191 to License NPF-38,modifying TS Surveillance Requirements 4.5.2.d.3 & 4.5.2.d.4 Re Granular Trisodium Phosphate Dodecahydrate ML20137G2021997-03-27027 March 1997 Application for Amend to License NPF-38,increasing SFP Storage Capacity & Increasing Maximum Fuel Enrichment from 4.9 W/O to 5.0 W/O U-235.Proprietary & Nonproprietary Repts HI-971628 Encl.Proprietary Rept Withheld ML20134F7091997-02-0505 February 1997 Application for Amend to License NPF-38,requesting to Increase Minimum Boron Concentration in Safety Injection Tanks & Refueling Water Storage Pool to 2050 Ppm ML20135A7661996-12-0202 December 1996 Application for Amend to License NPF-38,permitting Use of 10CFR50,App J,Option B Re performance-based Containment Leakage Testing for Type A,B & C Leak Rate Testing ML20134L6771996-11-18018 November 1996 Application for Amend to License NPF-38,requesting Rev to Change Testing Requirement for Shutdown Cooling Sys Suction Line Relief Valves to Test in Accordance W/Ts 4.0.5 ML20134L1901996-11-15015 November 1996 Application for Amend to License NPF-38,requesting Revision to Scope of Limiting Condition for Operation 3.6.3 Re Containment Isolation ML20128Q1661996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 185,expanding Applicability for CPC Operability & Allowing for Application of Cycle Independent Shape Annealing Matrix ML20128Q2221996-10-16016 October 1996 Application for Amend to License NPF-38,requesting That Change Request 182,permit Use of 10CFR50,App J,Option B, Performance-Based Containment Leakage Testing ML20128Q1871996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 183,extending Allowable Time for Core Operating Limit Supervisory Sys OOS by Monitoring for Adverse Trends ML20128Q2091996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 186,relocating Certain Adminstrative Controls to QA Program Manual & Changing Shift Coverage from 8 H day,40 H Wks to Option of 8 or 12 H Days & Nominal 40 H Wks ML20116B0461996-07-25025 July 1996 Application for Amend to License NPF-38,modifying TS 3/4.7.4 Ultimate Heat Sink by Incorporating More Restrictive Fan Operability Requirements & Lower Basin Temp ML20115G5071996-07-18018 July 1996 Application for Amend to License NPF-38,revising TS 3.9.8.1, Shutdown Cooling & Coolant Circulation High Water Level & TS 3.9.8.2, Shutdown Coolant Circulation Low Water Level ML20116D0071996-07-17017 July 1996 Application for Amend to License NPF-38,consisting of Change Request 174,extending Surveillance Interval for Rtbs from Monthly to Quarterly & Increasing AOT for Operation W/Inoperable Rtb from One H to Two H ML20115G2811996-07-17017 July 1996 Application for Amend to License NPF-38,reflecting That Name La Power & Light Co Has Been Changed to Entergy Louisiana,Inc ML20115G4901996-07-17017 July 1996 Application for Amend to License NPF-38,modifying Spec 3/4.7.1.3 Condensate Storage Pool by Increasing Minimum Required Contained Water Vol from 82% to 91% Indicated Level 1999-08-04
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217K8901999-10-18018 October 1999 TS Change Request NPF-38-224 for License NPF-38,modifying TS 3.6.2.2 LCO to Allow Plant to Operate with Two Independent Trains of Containment Cooling,Consisting of One Fan Cooler Per Train,Operable During Modes 1,2,3 & 4 ML20210M9761999-08-0404 August 1999 Application for Amend to License NPF-38,to Modify TS 3.5.2 to Extend Allowed Outage Time to Seven Days for One HPSI Train Inoperable & TS 3.5.3 to Change end-state to Hot Shutdown with at Least One Operable Shutdown in Operation ML20210M9601999-08-0404 August 1999 Application for Amend to License NPF-38,to Modify TS 3.5.2 to Extend Allowed Outage Time to Seven Days for One LPSI Train Inoperable & Allowed Outage Time of 72 Hours Imposed for Other Conditions ML20210H1401999-07-29029 July 1999 TS Change Request NPF-38-220 to License NPF-38,modifying TS 3.8.1.1 & Associated Bases by Extending EDG Allowed AOT from 72 H to Ten Days ML20210H2091999-07-29029 July 1999 TS Change Request NPF-38-221 to License NPF-38,modifying TS 3.6.2.1 to Extend Allowable Outage Time to Seven Days for One Containment Spray Sys Train Inoperable ML20210B3181999-07-19019 July 1999 TS Change Request NPF-38-219 for License NPF-38,modifying TS 4.5.2.f.2 by Increasing Performance Requirement for LPSI Pumps ML20210D0831999-07-15015 July 1999 TS Change Request NPF-38-216 to License NPF-38,adding TS Bases Control Program to TS Administrative Controls Section & Correcting Editorial Error Identified in TS Following Issuance of Amend 146,dtd 981019 ML20210D0341999-07-15015 July 1999 TS Change Request NPF-38-217 to License NPF-38,creating New TS for Feedwater Isolation Valves to Ts.Unreviewed Safety Question Re Crediting of Rt Override Feature & AFW Pump High Discharge Pressure Trip,Provided ML20209H3051999-07-15015 July 1999 Application for Amend to License NPF-38 to Modify TS 3/4.4.8.1,Figures 3.4-2 & 3.4-3 to Extend RCS Pressure Temperature Curves to 20 Efpy.Proprietary Rept 51-1234900-00 Encl.Proprietary Encl Withheld,Per 10CFR2.790 ML20195B1771999-05-20020 May 1999 Application for Amend to License NPF-38 to Change TS Bases B 3/4.3.1 & 3/4.3.2,B 3/4.6.3,B 3/4.7.1.2 & B 3/4.7.12 ML20198G2311998-12-23023 December 1998 Application for Amend to License NPF-38,modifying LCO for TS 3.3.3.7.1 for Chlorine Detection Sys by Changing Alarm/Trip Setpoint from 3 Ppm to 2 Ppm ML20154E1011998-10-0101 October 1998 Tech Spec Change Request NPF-38-211 to License NPF-38, Modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Detection Sys ML20153D5571998-09-23023 September 1998 Emergency TS Change Request NPF-38-210 to License NPF-38, Addressing Functional Requirements of 10-4% Bistable of Rps. TS Change Request NPF-38-21 Replaces 980918 Request Entirely ML20153B4381998-09-18018 September 1998 Emergency Application for Amend to License NPF-38,modifying Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints & Table 3.3-1 Re Reactor Protective Instrumentation.Application Supersedes 980911 Submittal ML20151W5791998-09-11011 September 1998 TS Change Request NPF-38-210 to License NPF-38,modifying Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints Limits & Table 3.3-1 Re Reactor Protective Instrumentation ML20237A7901998-08-12012 August 1998 Application for Amend to License NPF-38,increasing Max Boron Concentration in SITs & Rwsp from 2300 Ppm to 2900 Ppm ML20236U7281998-07-29029 July 1998 Application for Amend to License NPF-38 to Revise TS 6.9.1.11.1 to Replace Ref to Abb Combustion Engineering SBLOCA ECCS Performance Evaluation Model.Request Associated W/Methodology Used to Obtain SBLOCA Results ML20249C8301998-06-29029 June 1998 Application for Amend to License NPF-38,revising Control Room Ventilation TS to Be More Consistent w/NUREG-1432 ML20249C7861998-06-29029 June 1998 TS Change Request NPF-38-205 to License NPF-38,modifying TS 3.3.3.7.1, Chlorine Detection Sys & TS 3.3.3.7.3, Broad Range Gas Detection & Associated Bases ML20248B7441998-05-28028 May 1998 Application for Amend to License NPF-38 to Change TS 3.7.1.2,surveillance Requirement 4.7.1.2 & Bases Change for Emergency Feedwater Sys ML20217D4921998-03-25025 March 1998 Rev 1 to 960718 TS Change Request NPF-38-177 to License NPF-38,correcting Discrepancy in Original Submittal & Incorporating Addl Changes to Improve Clarity of TS 3.9.8.1 & TS 3.9.8.2 ML20199A1031997-11-13013 November 1997 TS Change Request NPF-38-202 to License NPF-38,modifying TS 6.8.4.a, Primary Coolant Sources Outside Containment, to Add Portions of Containment Vacuum Relief Sys & Primary Sampling Sys to Program ML20217G2351997-10-0707 October 1997 Application for Amend to License NPF-38,modifying TS 3.3.3.7.3 & Surveillance Requirement 4.3.3.7.3 for Broad Range Gas Detection Sys ML20211F8091997-09-25025 September 1997 Application for Amend to License NPF-38,modifying LCO 3.6.1.2, Containment Leakage, Associated Action & SR 4.6.1.2 ML20141G6951997-07-0707 July 1997 Application for Amend to License NPF-38,supplementing TS Change Request NPF-38-179 by Modifying Value Previously Submitted to Prevent Vortexing & Value for Short Term Requirements of CCW Makeup Sys & Expand Applicability of TS ML20141D8471997-06-26026 June 1997 Application for Amend to License NPF-38,revising TS Tables 3.7-1 & 3.7-2 by Changing MSSVs Orifice Size from 26 Inches to 28.27 Inches & Relocating Orifice Size from TS to TS Bases ML20148G6221997-06-0303 June 1997 Suppl to 960717 TS Change Request NPF-38-179,providing Updated Info Based on Min Required Level in Condensate Storage Pool.Attachment a Contains Original Vortexing Calculation & Attachment B Contains Revised Calculation ML20140B1591997-06-0303 June 1997 Application for Amend to License NPF-38,consisting of TS Change Request NPF-38-108,revising Action Requirements for TS 3/4.3.2 for Safety Injection Sys Sump RAS ML20141K1911997-05-24024 May 1997 TS Change Request NPF-38-197 to License NPF-38,modifying TS 3/4.7.4 Re Ultimate Heat Sink,Table 3.7-3 by Incorporating More Restrictive Dry Cooling Tower Fan Requirements & Changes Wet Cooling Tower Water Consumption in TS Bases ML20141K1611997-05-24024 May 1997 TS Change Request NPF-38-196 to License NPF-38,modifying Specifications 3.1.1.1,3.1.1.2,3.10.1 & Figure 3.1-1 by Removing Cycle Dependent Boron Concentration & Boration Flow Rate from Action Statements ML20137T4251997-04-11011 April 1997 Application for Amend to License NPF-38,deleting TS 3.7.1.3, Action (B) & Associated Surveillance Requirement ML20137T3971997-04-11011 April 1997 Application for Amend to License NPF-38-195,modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Detection Sys ML20137T4451997-04-11011 April 1997 Application for Amend to License NPF-38,making TS 3.6.2.2 & Surveillance Requirement 4.6.2.2 Consistent W/Containment Cooling Assumptions in Waterford 3 Containment Analysis ML20137P2561997-04-0707 April 1997 Application for Amend to License NPF-38,deleting TS 4.8.1.1.2a.7 & Incorporating 184 Day Fast Start Test Requirement as 4.8.1.1.2d,renumber Subsequent Requirements & Adding Footnote as Indicated ML20137G4711997-03-27027 March 1997 TS Change Request NPF-38-192 to License NPF-38,modifing TS 3/4.5.2, ECCS Subsystems Modes 1,2 & 3 ML20137F9201997-03-27027 March 1997 TS Change Request NPF-38-191 to License NPF-38,modifying TS Surveillance Requirements 4.5.2.d.3 & 4.5.2.d.4 Re Granular Trisodium Phosphate Dodecahydrate ML20137G2021997-03-27027 March 1997 Application for Amend to License NPF-38,increasing SFP Storage Capacity & Increasing Maximum Fuel Enrichment from 4.9 W/O to 5.0 W/O U-235.Proprietary & Nonproprietary Repts HI-971628 Encl.Proprietary Rept Withheld ML20134F7091997-02-0505 February 1997 Application for Amend to License NPF-38,requesting to Increase Minimum Boron Concentration in Safety Injection Tanks & Refueling Water Storage Pool to 2050 Ppm ML20135A7661996-12-0202 December 1996 Application for Amend to License NPF-38,permitting Use of 10CFR50,App J,Option B Re performance-based Containment Leakage Testing for Type A,B & C Leak Rate Testing ML20134L6771996-11-18018 November 1996 Application for Amend to License NPF-38,requesting Rev to Change Testing Requirement for Shutdown Cooling Sys Suction Line Relief Valves to Test in Accordance W/Ts 4.0.5 ML20134L1901996-11-15015 November 1996 Application for Amend to License NPF-38,requesting Revision to Scope of Limiting Condition for Operation 3.6.3 Re Containment Isolation ML20128Q2091996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 186,relocating Certain Adminstrative Controls to QA Program Manual & Changing Shift Coverage from 8 H day,40 H Wks to Option of 8 or 12 H Days & Nominal 40 H Wks ML20128Q2221996-10-16016 October 1996 Application for Amend to License NPF-38,requesting That Change Request 182,permit Use of 10CFR50,App J,Option B, Performance-Based Containment Leakage Testing ML20128Q1871996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 183,extending Allowable Time for Core Operating Limit Supervisory Sys OOS by Monitoring for Adverse Trends ML20128Q1661996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 185,expanding Applicability for CPC Operability & Allowing for Application of Cycle Independent Shape Annealing Matrix ML20116B0461996-07-25025 July 1996 Application for Amend to License NPF-38,modifying TS 3/4.7.4 Ultimate Heat Sink by Incorporating More Restrictive Fan Operability Requirements & Lower Basin Temp ML20115G5071996-07-18018 July 1996 Application for Amend to License NPF-38,revising TS 3.9.8.1, Shutdown Cooling & Coolant Circulation High Water Level & TS 3.9.8.2, Shutdown Coolant Circulation Low Water Level ML20116D0071996-07-17017 July 1996 Application for Amend to License NPF-38,consisting of Change Request 174,extending Surveillance Interval for Rtbs from Monthly to Quarterly & Increasing AOT for Operation W/Inoperable Rtb from One H to Two H ML20115G2811996-07-17017 July 1996 Application for Amend to License NPF-38,reflecting That Name La Power & Light Co Has Been Changed to Entergy Louisiana,Inc ML20115G4901996-07-17017 July 1996 Application for Amend to License NPF-38,modifying Spec 3/4.7.1.3 Condensate Storage Pool by Increasing Minimum Required Contained Water Vol from 82% to 91% Indicated Level 1999-08-04
[Table view] |
Text
m
.m i
& - ENTERGY c I"US """ " '"*'
elivru LA 70%60517 Te! 504 739 6061 1
Ross P. Barkhurst v< e Rovym Qvut n v.ww 3 W3F1-94-0121 A4.05 PR June 22, 1994 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Technical Specification Change Request NPF-38-152 Gentlemen:
The attached description and safety analysis supports a change to the Waterford 3 Technical Specifications (TS). The proposed change will modify the TS by adjusting 3 Plant Protection System (PPS) trip setpoints and allowable values. The change adjusts the affected TS values in a more conservative direction such that they will be consistent with the current setpoint/ uncertainty methodology being implemented at Waterford 3.
The new setpoints and allowable values are based on a revised PPS Setpoint .
Analys i s . The new analysis will become effective as Waterford 3 restarts following the current refueling outage. Therefore, Waterford 3 will adhere to the revised conservative values during startup and operation following Refuel 6.
.. a5 G
4 I I 9406270210 940622 PDR ADOCK 05000382
.t
. I Technical Specification Change Request NPF-38-152 !
W3F1-94-0121 Page 2 June 22, 1994 Should you have any questions or comments concerning this request, please
> contact Paul Caropino at (504)739-6692.
Very truly yours, t
( JoJ N AJJ d)
R.P. Barkhurst Vice President, Operations Waterford 3 RPB/PLC/ssf
Attachment:
Affidavit NPF-38-152 Reference List Figure 1 cc: L.J. Callan, NRC Region IV D.L. Wigginton, NRC-NRR R.B. McGehee N.S. Reynolds NRC Resident Inspectors Office Administrator Radiation Protection Division (State of Louisiana)
American Nun. ear Insurers
.i 1
i
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the matter of )
)
Entergy Operations, Incorporated ) Docket No. 50-382 Waterford 3 Steam Electric Station )
AFFIDAVIT R.P. Barkhurst, being duly sworn, hereby deposes and says that he is Vice President Operations - Waterford 3 of Entergy Operations, Incorporated; that '
he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached Technical Specification Change Request NPF-38-152; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.
JJD N R.P. Barkhurst Vice President Operations - Waterford 3 STATE OF LOUISIANA )
) sr PARISH OF ST. CHARLES )
Subscribed and sworn to before me, a Notary Public in and for the Parish and State above named this 22*" day of /oNa , 1994.
Tk C7 Notary Public k k l
My Commission expires W s rn u rc. .
I
4 t
DESCRIPTION AND SAFETY ANALYSIS OF PROPOSED CHANGE NPF-38-152 The proposed change affects Technical Specification (TS) Table 2.2-1 REACTOR PROTECTIVE INSTRUMENTATION TRIP SETPOINT LIMITS, Table 3.3-4 ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION TRIP VALUES and associated Bases by modifying three parameter setpoints as follows: ,
- 1. Table 2.2-1 Item 2) Linear Power Level-High: the TRIP SETPOINT of s 110% of RATED THERMAL POWER and the ALLOWABLE VALUE of s 110.7% RATED THERMAL POWER are changed to reflect s 108% and s 108.76% respectively.
- 2. Table 2.2-1 Item 4) Pressurizer Pressure-High: the TRIP SETPOINT of i s 2365 psia and ALLOWABLE VALUE of s 2372 psia are changed to reflect s 2350 psia and s 2359 psia respectively.
- 3. Table 3.3-4 Item 7 c.& d.) Emergency Feedwater, Steam Generator AP-High:
the TRIP VALUE of s 127.6 psid and ALLOWABLE VALUE of s 136.6 psid are changed to s 123 psid and s 134 psid respectively.
The proposed changes are necessary to accommodate additional uncertainty and will have no effect on the original safety analysis setpoints (analytical limits).
Existina Specificatiqn See Attachment A Proposed Specification See Attachment B fLiLCEEoMnd The proposed change updates the TS consistent with the Waterford 3 revised PPS Setpoint Uncertainty Calculation (Reference 1). The revised calculation was i genera'ad using a new Waterford 3 Setpoint and Uncertainty Determination I guideline (Reference 2) that provides plant personnel with a description of the governing codes and standards, plant specific criteria, and concepts involved in instrument loop uncertainty analysis and setpoint determination.
The Setpoint and Uncertainty Determination guideline was generated to identify and define additional uncertainty factors that have evolved in the industry since the original Waterford 3 PPS Setpoint Analysis (Reference 3) was developed.
The use of improved guidelines i.s in+ ended to enhance plant safety and in no way invalidates the previous analysis which was also performed using approved methodology.
This proposed change is also driven by a change in plant components. Several transmitters that provide input to the PPS have been upgraded. This upgrade was completed during our recent refueling outage and the new PPS Setpoint Calculation incorporates the new transmitter performance data. An engineering calculation (Reference 4) has demonstrated that the specifications for the original transmitters bound those for the upgraded transmitters.
l De_scriotion
! The proposed change modifies the identified parameter TRIP SETPOINTS and ALLOWABLE VALUES to reflect the following. .
1 PARAMETER TRIP SETPOINT ALLOWABLE VALUES HI Linear Power s 108 % PWR s 108.76 % PWR HI Pressurizer Pressure s 2350 PSIA s 2359 PSIA ,
HI Steam Generator AP s 123 PSID s 134 PSID l The Reactor Protection System (RPS) Instrumentation Trip Setpoint Limits and the Engineered Safety feature Actuation System (ESFAS) Instrumentation Trip Values listed in the Technical Specification Tables 2.2-1 and 3.3-4 prescribe those settings for critical parameters that will avoid exceeding any j analytical limit for postulated Design Bases Accidents (DBAs) or Anticipated Operational Occurrences (A00s).
The Trip Setpoints and Allowable Values are based on analytical limits stated in the Final Safety Analysis Report (FSAR). The selection of these trip setpoints is such that adequate protection is provided when all sensor and processing time delays are taken into account. To allow for calibration tolerances, instrumentation uncertainties, instrumentation drift, and severe environment effects for those RPS and ESFAS channels that must function in harsh environments as defined by 10 CFR 50.49, Allowable Values specified in Tables 2.2-1 and 3.3-4 are conservatively adjusted with respect to the analytical limits. A detailed description of the methodology used to calculate the proposed trip setpoints, including their explicit uncertainties, is documented in Reference 1 and 2.
The specific safety analysis applicable to each protective function affected by the proposed change are identified below:
Linear Power Level-Hiah This function provides a reactor trip on high linear neutron flux level . This trip provides protection against core damage during the following:
. Uncontrolled CEA Withdrawal from Low Power (A00);
. Uncontrolled CEA Withdrawal at Power (A00); and
. CEA Ejection (Accident).
Pressurizer Pressure-Hiah This function provides a reactor trip on high pressurizer pressure. This trip provides protection for the high Reactor ,
Coolant System pressure Safety Limit. In conjunction with the pressurizer safety valves and the main steam safety valves, it provides protection against overpressurization of the Reactor Coolant Pressure Boundary during the l following events:
. Loss of Electrical Load Without a Reactor Trip Being Generated by the l Turbine Trip (A00); l
. loss of Condenser Vacuum (A00); ,
l . CEA Withdrawal From Low Power Conditions (A00); i j . Chemical and Volume Control System Malfunction (A00); and l l . Main Feedwater System Pipe Break (Accident). I Steam Generator Differential Pressure-Hiah This function of the Plant Protection System enables emergency feedwater flow only to the intact Steam Generator (SG) when the high SG differential pressure condition exist. ESFAS logic includes SG Differential Pressure-High (SG-1 > SG-2 or SG-2 > SG-1) to determine if a rupture in either generator has occurred. Rupture is assumed if the affected generator has a low pressure condition, unless that generator is significantly higher in pressure than the ether generator. This latter feature allows feeding the intact SG, even if both are below the Main Steam l Isolation Signal (MSIS) setpoint, while preventing the ruptured generator from j being fed. Not feeding a ruptured generator prevents containment !
nyerpressurization during analyzed events. The most limiting accident condition for the High Steam Generator Differential Pressure function is a ,
Steam Line Break event. {
The methodology used in the revised PPS Setpoint Calculation is generelly unchanged. However, several factors are now considered or clarified in the j revised analysis (e.g. cable insulation resistance degradation, steam generator elongation, containment conditions during specific accidents, and more precise definition of process measurement errors). Figure 1 is provided to illustrate the proposed setpoint change.
i SE ETY ANALYSIS l
- 1. Will operation of the facility in accordance with this proposed change involve a significant increase in the probability or consequences of any accident previously evaluated?
Response: No Implementing the proposed change will not affect any design basis accidert. The revised trip and actuation setpoints are based upon the same analytical limits that form the basis for the current trip and actuation setpoints. The design basis for each trip and actuation setpoint was verified to be consistent with the apprcpriate accident analyses as part of the process of revising the PPS setpoint analysis.
The proposed changes in trip and actuation setpoints are all in the conservative (away from the analytical limits) direction. Therefore, the proposed change will not involve a significant increase in the probability or consequences of any previously analyzed accident.
- 2. Will operation of the facility in accordance with this proposed change create the possibility of a new or uifferent kind of accident from any accident previously analyzed?
Response: No Plant operation and the manner in which the plant is operated will not be altered as a result of implementing the proposed change since no new system or design change is being implemented. Therefore, the proposed change will not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Will operation of the facility in accordance with this proposed change involve a significant reduction in margin of safety?
Response: No The current safety margins of the affected trip setpoints and allowable values is preserved by the proposed change. This is assured by retaining the current analytical limit for the affected parameters.
Since the analytical limits are not affected and the total channel uncertainty is increased the margin of safety for the affected trip setpoints and allowable values is preserved. Therefore, the proposed change will not involve a significant reduction in margin of safety.
l l
1
1 I
. \
Safety and Sionificant Hazards Determination Based on the above safety analysis, it is concluded that: (1) the proposed l change does not constitute a significant hazards consideration as defined by '
10 CFR 50.92; and (2) there is a reasonable assurance that the health and safety of the public will not be endangered by the proposed change; and (3) this action will not result in a condition which significantly alters the impact of the station on the environment as described in the NRC final environmental statement.
l
4 NPF-38-152 l 1
Figure 1 1 ORIGINAL CALCULATION REVISED CALCULATION Hich Pressurizer Pressure Tu &aw AN Alvi! CAL LIMIT (2t.22 Pst A ) g, Uncertainty Uncertainty 57 PS!A 0 3 PSIA setoonnt: 2365 setooint: 2350 Hich Linear Power ANALYTICAL LIMIT (115 %) g, Uncertainty uncertainty 4.9% setooint: 110.1 % 6.24%
letooint: 108 % Round of f Allowsnce Hich S/G D/P g, g, ANALYTICAL LIMlf (230 PSID) gg,g ,g Uncertainty Uncertainty 102.4 P51D setooint: 127.6 PSID 104.76 PSID setooint: 123 PSID Round off Allowance
P References
- 1. Plant Protection System Setpoint Uncertainty Calculation (EC-192-019 Rev.A) dated August 30,1993.
- 2. I&C Engineering Design Guide for Setpoint and Uncertainty Determination Rev. 1 dated February 26,1993
- 3. Combustion Engineering "LP&L WSES-3 PPS Setpoint Analysis" (9270-ICE-36182 Rev.2) dated August 16,1983.
- 4. Rosemount Transmitter Comparison Calculation (EC-192-030 Rev.1) dated 06/11/93 4
. . . ~ . . _ _ -. . .- . - _ . .. - - -- --
i -
i l
1 4
I i
I l
J i
1 4
i i
1 1
l 1
?
l 1
P NPF-38-152 I l
Attachment A l 1
i
~
i
.a