Advises of Plans for Const of New 230 Kv Transmission Line to Connect North Anna Power Station to Louisa Substation. No Tech Spec or ETS Change Required
ML20065G875
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/27/1982
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20065G878 List:
References
538, NUDOCS 8210040277
Download: ML20065G875 (2)


Text

_ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _

1 VIHOINIA Er,ecTnic Ann Powen COMl'ANY H icu >t oxu, Vi no r n:A 20061 n.n.r.unnuno September 27, 1982 Vice Puessaant Normaan opsmations Mr. Harold R. Denten Director Serial No. 538 Office of Nuclear Reactor Regulation T&D/MP,RJG Attn: Mr. Robert A. Clark, Chief N0/ERS,Jr.:acm Operating Reactors Branch No. 3 Docket Nos. 50-338 Division of Licensing 50-339 U. S. Nuclear Regulatory Commission License Nos. NPF-4 Washington, D. C. 20555 NPF-7 Gentlemen:

NEW 230 KV LINE TO NORTH ANNA 1 AND 2 By various letters in 1974 and 1976 Virginia Electric and Power Company (Vepco) advised the NRC of the possibility that Vepco might someday wish to bt.ild a new 230 kV transmission line to connect clie North Anna Power Station to the Louisa Substation. The NRC advised us, in the attached letter dated November 26, 1976 from Mr. B. J. Youngblood, that Vepco would have to " provide written notification to and obtain approval from the Director, Office of Nuclear Reactor Regulation, prior to construction of the line."

This letter is to inform you that Vepco now wishes to const uct the 230 kV line. The Virginia State Corporation Commission (SCC) has already given its approval in an Order Amending Certificate of March 23, 1982, a copy of which is attached for your information. Under Virginia law, Va. Code Ann. $56-46.1 (1961 Rep 1. Vol.), before the SCC may approve such a transmission line, it must consider the environmental impact and " establish such conditions as may be desirable or necessary to minimize adverse environmental impact." A copy of 56-46.1 is also attached. As the order indicates, no one objected to Vepco's request for permission from the SCC to build the line.

In 1974 and 1976, the NRC was furnished considerable information about the planned 230 kV line. Copies of :at correspondence are enclosed. The information supplied should be sufficient for your purposes. The proposed line is needed to serve a local need for power and to serve as an integral part of Vepco's transmission network. The line will not affect operation of the North Anna Power Station.

We are notifying you regarding this transmission line because of Mr.

Youngblood's 1976 letter. No statute or regulation, however, requires the NRC to review or approve this 230 kV line. The NRC regulation 10 CFR 550.59 allows a licensee to make changes in a facility as described in the safety analysis report without prior Commission approval if the change does not involve a change in the technical specifications or an unreviewed safety question. Vepco's Station Nuclear Safety and Operating Committee (SNSOC) and Safety Evaluation and Control group have reviewed the 230 kV line and determined that it does not require a Technical Specifications or Environmental Technical Specifications change. These groups also determined that the line does not involve an unreviewed safety or environmental question.

8210040277 820927 .

60) . N t' )

gDRADOCKOS000g

. e Vinoix 4 Ex.ECTRIC AMD Powra Cowraxy to Harold R. Denton Furthermore, no approval is required under the National Environmental Policy Act of 1969, as amended, 42 U.S.C. $4321-69. Section 102(2)(C) of NEPA applies only to " major Federal actions," like the licensing of a nuclear power plant. It is true that the NRC reviews the environmental impact of transmis: ion lines as part of the rc.,iew of construction permit applications.

See Detroit Edison Co. v. NRC, 630 F.2d 450 (6th Cir. 1980); Public Service Co. v. NRC, 582 F.2d 77 (1st Cir. 1978); Detroit Edison Co. (Greenwood Energy Center, Units 2 and 3), ALAB-247, 8 AEC 936 (1974); Virginia Electric and Power Co. (North Anna Power Station. Units 1 and 2), LBP-76-1, 3 NRC 37 (1976); Kansas Gas and Electric Co. (Wolf Creek Nuclear Generating Station, Unit 1), 5 NRC 1 (1977). In the case of North Anna, however, the station already has an operating license, and no further " Federal action" is required for the 230 kV line. NEPA does not expand the organic jurisdiction of any federal agency. Cage v. U. S. Atomic Energy Commission, 479 F 2d 1214, 1220 n.19 (D. C. Cir. 1973); Kitchen v. Federal Communications Commission, 464 F.

2d 801, 802-3 (D. C. Cir. 1972).

The existing facilities in the area, particularly in Charlottesville and along the existing Chsrlottesville to Remington 115 kV transmission line, will soon be inadequate to meet the growing electrical needs of the area. Therefore, in light of the findings of the SNSOC and the Safety Evaluation and Control group cited above and the apparent absence of NRC authority over the 230 kV line, Vepco plans to begin engineering and construction of the line during October 1982. If the NRC has any objection, please advise uc as soon as possible.

Very trulv yours,

// /

. H. Leasburg Enclosures cc: Mr. James P. O'Reilly Regional Administrator Region II e - - -