Advises That Proposed 230 Kv Transmission Line Between North Anna & Louisa Need Not Be Evaluated in Amend to Environ Rept for North Anna 1 & 2.Line Is Not Part of North Anna Utilization Facility
ML20065G973
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 01/02/1974
From: Ragone S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Muller D
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20065G878 List:
References
20473, NUDOCS 8210040325
Download: ML20065G973 (2)


Text

. .

.w . ., .

~

( {

f' ,

January 2, 1974 fir. Dcntel R. Iuller Serial t!o. 20473 Assiste.nt Director for LCA/ CAD:cjd Environ.r.cntal Projects Docket !!os: 50-333 Directorate of Licensing 50-339 U. S. Ato ilc Energy Cc:uission 50-404 Vashington, D. C. 20545 50-405 Dear fir. Hullers -

In th license applications for the four r.uclear units at our

!! orth Anr.a Power Station wo described the 500 kv trensmission system that will bc Installed as part of this project. These lines constitute the transmission system rcquired for the dellvory of power generated at the station into our systen c.,rld and for cceting the Commission's safety relcted requirements ulth resp:ct to off-site power. As such, these lines have been reviewed by the Staff in connection with its safety evaluation and essess:d with regard to their environ.nental effects.

., in Figuro 8.2-1 of the Final Safety Analysis Report for Units 1 and 2, we designated a future 230 kv transmission line which wauld ultinately connect in the switchyard near the florth Anna Power Station. At the time the FSAR was filed, our nanagement had not reached a final decision as to when to go ahead ulth this lino, it has now decided to proceed so that the line will be avsflable in 1976.-

Cur preferred line route extends In a southwesterly direction, passing north of Hineral, Virginia and south of Louisa Virginia, fourteen miles to a connection with en existing lino at the Louisa substation near Gordensville, Virginie. This line's purpose will be to reinforce our electric service to cur custo:crs in southside

. Virginia and to serve as an alternate source of supply should wa ex-perience an Interruption to the existing lino.

We plan to re. cot in the very near future with the appropriato State and County agencies when our refined route selection efforts, which include consideration of environmental effects, are cc.T.pletc.

~

Va.cxpect to r.ccura the necessary State and local approvals In timo to ensure that the lins can Lo operational by 1976.

a 8210040325 820927 DR ADOCK 05000338 PDR

.. . ..~

h .g. J f , .

(

fir. Daniel R.1: aller 2 in our judcenent, this lino does not constituto a part of the

orth Anna ** utilization fac'llity." It is not necessary, as are the 50] kv Ilc.cs, eithcr to carry pcwcr miay frc.7 the stetton or to provide the off-sita pc.tcr required under the /.EC's safety critoria. In short, the Station is not dc.condent on it in any way. The line is desir,ncd te provide b.ndly needed reir. forcer.ent to sout'iside Virginia, a need that is entlrcly Independent of the enlutence of the 1.' orth Anna Power Station.

tis have cencluded, therefore, that the pre;;oacd line need not lee cvaluatcd in an c.un.'. ent to the jgpl! cent _'s_inviro.-- ental Ikoc.rt, Operatini Licesite St-~s for t nrth Anno l'rits i en:t 2.

~

t o f ci t it :.ppr:; riate, h:n:ver, to Inf orra you of this proposed extension to our trans:ilssion network,.

Very truly yours, s ,.

Stanley Rag .1e Senl @ a Presidsnt cc: Hessrs. L. D. Johnson E. A. Cau n ' '

D. L'sasworth Dugg, Jr.

H. bl. Itaupin e