Responds to 820826 Telcon Re Status of Listed TMI Items Contained in Generic Ltr 82-05 to Be Completed After Current Refueling Outage
ML20065C106
Person / Time
Site: Davis Besse 
Issue date: 09/17/1982
From: Crouse R
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.1, TASK-2.B.3, TASK-2.E.1.2, TASK-2.F.1, TASK-2.F.2, TASK-2.K.2.10, TASK-TM 858, GL-82-05, GL-82-5, TAC-49582, TAC-49583, NUDOCS 8209230213
Download: ML20065C106 (8)


Text

,

O Docket No. 50-346 7gtggg License No. NPF-3 "C""* " C"""#

Serial No. 858 vo n,-ww PMIRW September 17, 1982

'd'S 259 $221 Director of Nuclear Reactor Regulation Attention:

Mr. John F. Stolz Operating Reactors Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Stolz:

This letter is in response to a telephone conversation between Mr. L. D.

Young et al of Toledo Edison's Nuclear Licensing Department and yourself on August 26, 1982. The attachment contains the current status of TMI Items (NUREC 0737) of Generic Letter 82-05 after the current refueling outage for Davis-Besse Nuclear Power Station Unit 1.

Toledo Edison has just completed a refueling outage, which had several unforeseen problems. The turbine blade repair work and Auxiliary Feedwater Header replacement were the main work items which created a drain on the resources available for planned outage work load. During the outage there was a total manhour construction work force of 482,915 manhours on NRC required and equipment repair items, of that, 370,225 manhours were expended on NRC related work. These manhours do not include normal refueling related work, AFW header work nor turbine blade work.

Toledo Edison completed the following items of NUREG 0737:

ITEM TITLE II.B.1 Reactor Coolant System Hot Leg Vents II.E.1.2 Auxiliary Feedwater Initiation and Flow Indication II.F.1.3 In-Containment Radiation - Level Monitors II.F.1.4 Containment Pressure ce II.F.1.6 Hydrogen Concentration in Containment II.K.2.10 Anticipatory Reactor Trips System (ARTS)

O THE TOLEOO EDISON COMPANY EDISON PLAZA 300 MAOISON AVENUE TOLEOO, OHIO 43652 8209230213 820917 PDR ADOCK 05000346 P

PDR

f i

Docket No.'50-346 s

" License Non NPF-3 Serial No. 858,

September 17, 1982 Page 2 The following items of NUREG 0737 uere installed and are awaiting docu-mentation or they have all outage related work completed and a schedule for final completion is supplied.

ITEM TITLE REMARKS II.B.3 Post Accident Sampling All outage work is com-pleted and final work is scheduled to be completed by June 30, 1983.

II.F.2 Instrumentation for Deteat-During the 1982 refueling ing of Inadequate Core outage Toledo Edison Cooling enhanced its detecting cf inadequate core 1

cooling by adding core exit thermo-couples, new RTD's to the primary coolant Hot Legs and safety grade inouts to the T-sat meter. The system is operable, but the documentation of the environmental and seismic qualification of the Hot Leg RTD's is expected by the end of the year. Upon receipt of qualification docu-mentation of the RTD's Toledo Edison will meet the intent of Item II.F.2.

II.F.1.2 Iodine / Particulate Sampling All outage work is com-pleted and final work is scheduled to be completed by June 30, 1983.

II.F.1.5 Containment Vater Level During the 1982 refuel-ing outage Toledo Edison installed a containment vater level syatem to meet NUREG 0737 require-ments. The system s

Docket No. 50-346 License No. NPF-3 Serial No. 858 September 17, 1982 Page 3 ITEM TITLE REMARKS included a narrow and wide range level range.

The system is operable and meets the original license requirements for this type of instrumenta-tion, but the documenta-tion of the environmental and seismic qualifica-tion to meet NUREG 0737 requirements on the trans-mitters has not been received. The documenta-tion is expected by the end of the year.

The attachment reflects our current schedule on the listed NUREG 0737 items. We will keep you apprised of any major changes to the attached schedule.

Very truly yours, RPC: GAB: lab Attachment ks e/6 cc:

DB-1 NRC Resident Inspector l

l l

NUREG-0737 ITEMS LICENSEE RESPONSE Toledo Toledo NUREG-0737 Edison Edison Item Title Description Schedule Letters Schedule I.A.3.1 Simulator Exams Include simulator exams in 10/1/81 8/4/80, #641 licensing examinations 9/14/81, #741 II.B.2 Plant Shielding Modify facility to provide 1/1/82 3/21/80, #601 access to vital areas under accident conditions.

II.B.3 Post-accident Install upgrade post-accident 1/1/82 2/19/82, #779 June 1.

1983 Sampling sampling capability.

June 2.1 1983 1

1 i

1 t

y j

1 l

Remarks

=1 l

Completed i

_s No modifications proposed from the l

study of II.B.2.1.

E Reactor Coolint 4ar, O. stem:

All outage reined

>rk

.as been comple ted aurine the current re-tueling 'utage tbe ra t o r s ' panel will be installed after outace with on er it ion b '. Tune 1083, 5

-s my 7.2

=s&

Containment Air "onitoring:

Althoueh an extended range Containment 4

Air Monitorin, oestem has been replaced urr mt outace, to insure m.- durin A,

sample o.ilvsi-ibilit-it r the full rance et N R( source terms ot N 'J R E t ' -(, ' 37, 25,

a grab, ample system is Seing provided to meet this i tem.

Due to representative sample problems in L aign, this vill not

~ <

be operable until 1983.

Interim Measures:

k

?

All interim systems are operational and will remain so until the upgraded svstems are operational.

Additionallv, the new Conta in aent Air Monitoring will be operationa1.

A M

s A

W

NUREG-0737 ITEMS LICENSEE RESPONSE Toledo Toledo KUREG-0737 Edison Edison Iten Title Description Schedule Letters Schedule II.B.4 Training for Complete training program.

10/1/81 7/31/81, #740 3/16/82, #796 Mitigating Core Damage l

I I. E. '1. 2 Aux. Feedwater Modify instrumentation to 7/1/81 3/21/80, #601 Initiation & Flow level of safety grade 9/16/81, #742 Indicator II.E.4.2 Containment Iso-Part 5 - lower containment 7/1/18 1/30/81, #685 lation Dependability pressure setpoint to level compatible with normal operation Part 7 - isolate purge and 7/1/81 vent valves on radiation signal.

2

_r e-s

e e

Remarks lCampleted Ctmpleted Cor:pleted.

NRC letter dated 4/14/82

'(Log No. 961) Contained Safety Evalu-ation Report for Item II.E.4.2.

Comp 1cted.

Part of original design.

)

~

c NUREG-0737 ITEMS LICENSEE RESPONSE Toledo Toledo NUREG-0737 Edisco Edison Item Title Description Schedule Letters Schedule II.F.1 Accident Monitoring (1) install noble gas 1/1/82 4/20/82, #1-261 6/30/83 effluent monitors.

i (2) provide capabritty for 1/1/82 1/25/82, #779 6/30/83 effluent monitoring of 4/20/82, #1-261 r

iodine.

P l

6 7

3

-9 w*

Remarks Station Vent Monitor:

All outage related work is completed.

Extensive work is still required and schedule to be completed by 6/30/82.

Compensatorv Measure:

l'n t i l the effluent monitors are insta11ed and operational, the interim effluent monitors will remain funetiona1.

Also, the capability for grab sampling is

, available Station Vent Monitor:

All outage work is completed and

,L final work is scheduled to be

[ - c omple t ed by h /30/83.

I Compensatorv Measure:

I'nt il the erfluent monitors are installed ani operational, the interim ef fluent monitors wil1 remain functional.

Also, the capability for grab sampling is available m

~

-e -

s.,

NUREG-0737 ITEMS LICENSEE RESPONSE Toledo Toledo NUREG-0737 Edison Edison Iten Title Description Schedule Letters Schedule (3) install in-containment 1/1/82 1/25/82, #773 radiation-level monitors.

(4) provide continuous indica-1/1/82 tion of containment pressure (5) provide continuous indica-1/1/82 12/31/82 tion of containment water level.

(6) provide continuous 1/1/82 indication of hydrogen concentration in contain-ment.

4 i

Remarks completed Completed The Narrow and wide range level indication has been installed during the refueling outage and the system is operable.

Environ-mental and Seismic Qualification to meet NUREG - 0737 requirements for the transmitters is not ex-pected until the end of the year.

t Completed I

e 4

.= _ _ l

e-NUREG-0737 ITEMS LICENSEE RESPONSE Toledo Toledo NUREG-0737 Edison Edison Itest Title Description Schedule Letters Schedule II.K.2.10 Safety Grade Trip Install anticipatory reactor 7/1/81 7/24/81, #735 trips.

9/8/81, #744 1/5/82, #765 4/14/82, #808 S

D 5

(.

w

O

'4 e

I i

)

r

.3d 6.s M

Eo C4 5

0 I

4.J l

Q Mn.

HO u

.