Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,requesting Grant Emergency Amend to TS Section 3/4.7.1, Turbine Cycle Safety Valves
ML20065A063
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 03/21/1994
From: Saccomondo D
COMMONWEALTH EDISON CO.
To: Russell W
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20065A065 List:
References
NUDOCS 9403310016
Download: ML20065A063 (5)


Text

%

w Os Comm:nwrith Edb:n '

2 T

o a/.e )

.~1400 Opus Place -

N-

-A YO'

'. Downers Grove, Illinois 60515 March-21,1994

~

Mr. William Russell, Director Office of Nuclear Reactor Regulation

~ U.S. Nuclear Regulatory Commission

~ Washington, D.C. 20555 Attn: Document Control Desk

Subject:

Byron Units 1 and 2 Braidwood Units 1 and 2 v

Request for EMERGENCY TECHNICAL SPECIFICATION AMENDMENT.

i Facility Operation Licenses: NPF-37, NPF-66, NPF-72 and NPF R Technical Specification Section 3/4.7.1 NRC Docket Nos.~50-454. 50-455 50-456 and 50-457 i

,h

Reference:

D. Saccomando Letter to J. Zwolinski dated March 11,1994, transmitting Notice of. Enforcement Discretion Pertaining to-Byron and Braidwood Station Main Steam Safety Valve

Dear Mr. Russell:

Pursuant to 10 CFR 50.91(a)(5), Commonwealth Edison _ Company'(CECO) proposes -

to amend Appendix A, Technical Specifications of Facility. Operating License ~s.-

NPF-37, NPF-66, NPF-72 and NPF-77, ~ and requests that the Nuclear Regulatory

-. Commission (NRC)~ grant an.. EMERGENCY amendment to Technical Specification' Section 3/4.7.1 " Turbine Cycle Safety Valves" Consistent with NRC guidance, a-request for an NRR Notice of Enforcement Discretion (NOED) for the ~ period until this q

amendment can be granted was provided in the reference letter, l

Technical Specification 3.7.1.1 states that," Ali main steam line code safety valves -

associated with each steam generator shall be OPERABLE with lift settings as specified in Table 3.7-2." The proposed amendment will allow the' current as-left.

setpoints to be acceptable until they can be reset within the time frame described in

. the amendment.

- At the time of issuance of the Notice of Enforcement Discretion (NOED) Braidwood

Unit 2 and Byron Units 1 and 2 were operating in Mode 1. The proposed' amendment-i would add a footnote to Table 3.7-2 which states / Main steam line code. safety valve

. lift settings'may have a ~+/-3% tolerance;until May 9,' 1994, by which time' the lift.,

. settings will be reset to +/-1%."

300057 9403310016 940321 4

kinla:brwd:mssvts:1-PDR ADOCK:05000454 p-P' PDR g'

]l1; i

y

.W. Russell March 21,1994 in addition, at the time of issuance of the NOED, Braidwood Unit 1 was in a refuel outage. An amendment to Braidwood Technical Specification 4.7.1.1 will be necessary to facilitate resetting of the setpoints. The proposed amendment adds the statement: "The provisions of Specification 4.0.4 are not applicable for Braidwood Unit 1 Cycle -5 until the initial entry into Mode 2."

The attached safety analysis shows that this proposal will have minimal impact on safety. Amending Section 3/4.7.1 to allow for the Main Steam Safety Valve setpoint to be greater than the allowed maximum of +/-1% would not impact the safety margin,

.j because the Main Steam Safety Valves had been previously analyzed for as-found setpoints of up +/.3%. All valves for the four units fall within +/-3% of the nominal setpoint for the individual valve.

This emergency change could not be avoided because CECO only recently became informed of the need to reset the setpoints by the vendor.

The situation was not created by a failure to make a timely application of the Technical I

Specification Amendment because prior to notification from the vendor, CECO was unaware that an improper value for mean seat areas was used in calculations the Main Steam Safety Valve setpoints.

In support of this request, the following information is attached:

Attachment A:

Detailed Description Of The Proposed Changes Attachment B:

' Revised Technical Specification Pages.

. Attachment C:

Evaluation of Significant Hazards Considerations Attachment D:

Environmental Assessment Pursuant to 10CFR50.91(b)(1) a copy of this request has been forwarded to the designated State of Illinois Official.

To the best of my knowledge and belief, the statements contained in this document are true and correct. In some respects these statements are not based on my personal knowledge, but on information furnished by other CECO employees, contractor employees, and/or consultants. Such information has been reviewed in accordance with company practice, and I believe it to be reliable.

4 1

k:nla t brwd mssvts : 2

~.-

.~..

I JW. Russell March 21,1994 -

Please address any comments or questions regarding this matter to this office.

Respectfully, 1j

.4 e

lnd ne,~fo Denise W Saccomando Nuclear Licensing Administrator Attachments 1

cc:

R. Assa, Braidwood Project Manager - NRR G. Dick, Byron Project Manager - NRR S. Dupont, Senior Resident inspector - Braidwood H. Peterson, Senior Resident inspector - Byron B. Clayton, Branch Chief - Region Ill Office of Nuclear Facility Safety - IDNS 1W LW h./

3bs/9'/

v:::::::::::::::::::::::::::4 OFFICIAL SEAL l!

MARYELLEN D LONG !;

NOT ARY ftBLIC, ST ATE OF fLLINOISll MY COMMISSION EXPtRES:09/01/97 il v.v.v.v::f#####.vd k:nla:brwd:mssvtst3

i ATTACHMENT A DESCRIPTION AND SAFETY ANALYSIS OF PROPOSED' CHANGES TO APPENDIX A TECHNICAL SPECIFICATIONS OF FACILITY OPERATING LICENSES NPF-37, NPF-66, NPF-72, AND NPF-77 DESCRIPTION OF THE PROPOSED CHANGE Commonwealth Edison Company proposes a one time revision to Turbine Cycle Safety Valve Technical Specification 3.7.1.1 Surveillance Requirements and Technical Specification 3.7.1.1 Table 3.7-2.

The proposed Technical Specification Revisions include:

1.

Adding a statement to the Surveillance Requirements stating that the provisions of Specification 4.0.4 are not applicable for Braidwood Unit 1 Cycle 5 until the initial entry into MODE 2, 2.

Adding a provision to Table 3.7-2 allowing main steam line Code safety valve lift settings to have a 13% tolerance until May 9,1994, by which time the lift settings will be roset to 21%.

The revised Technical Specification pages indicating the proposed changes are provided in Attachment B. A discussion of the proposed changes follows.

Descdntion and Bases of the Current Rp_quigineJ11 The Main Steam Safety Valves (MSSV) are currently required to be set within a lift setting tolerance of 1%. Technical Specification 3.7.1.1 Action Statement "a" states that with one or more MSSVs inoperable, operation in MODES 1,2, and 3 may proceed provided the valve is restored to OPERABLE status or the Power Range High Flux trip setpoints are reduced within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. lf these requirements are not met, the plant is required to be in HOT STANDBY in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN in the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

The safety valves limits secondary pressure to within 110% of design pressure of 1200 psia during the most severe anticipated operating transient (Turbine Trip at 102%

Rated Thermal Power with no steam dumps available).

k:nla:brwd:mssvts:4

l l

' RenGEip.tipD_and3aSRS_of t!1e_Begunigd Revision At about 1730 hours0.02 days <br />0.481 hours <br />0.00286 weeks <br />6.58265e-4 months <br /> on March 9,1994, Braidwood System Engineering received a phone call from Furmanite Company indicating that an improper value for mean seat area was used in the Trevitest calculation for main steam safety valve setpoints.

i l

Additional phone calls on March 10,1994, and a letter from Furmanite revealed that l

the scope of the concern also included Byron Station. Calculations to determine the as-left condition of the MSSVs for each unit based on the revised mean seat area were completed at approximately 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> on March 10,1994. Results indicate that 16 valves for Byron Unit 1,19 valves for Byron Unit 2, and 17 valves each for Braidwood Units 1 and 2 fall outside of the Technical Specification requirement of i

1% All valves for the four Units fall within $3% of the nominal setpoint for the j

individual valves.

The proposed emergency Technical Specification amendment will allow the current as-i left setpoints for Braidwood Unit 2, and Byron Units 1 and 2 to be acceptable until they l

can be reset. It allows Braidwood Unit 1, currently in refueling outage, to reach MODE 3 to reset the valves. Based upon unit operating schedules and Furmanite availability, l

the safety valves for Braidwood Unit 2, and Byron Units 1 and 2 will be reset on or l

before May 9,1994. The valves for Braidwood Unit 1 will be reset prior to reaching 1

l MODE 2 following the current refueling outage.

impaclof the_Changejs l

The requested changes to Specification 3.'7.1.1 due to the as-left setpoints of the l

MSSVs being greater than the allowed maximum of 21% but within t 3% do not impact the safety margin. The MSSVs are analyzed for as-found setpoints of *3%,

which Commonwealth Edison Company will apply for in an upcoming amendment request.

The effects of increasing the as-found lift setpoint tolerance on the MSSV have been examined, and it has been determined that, with the exception of the Loss of Load / Turbine Trip, the current accident analyses as presented in the UFSAR remain I

valid. The loss of load / turbine trip event was analyzed in order to quantify the impact l

of the setpoint tolerance relaxation. All applicable acceptance criteria for this event l

remain satisfied and the conclusion presented in the UFSAR remains valid.

The conclusions presented in the Overpressure Protection Report remain valid.

No operating conditions or modes will be changed as a result of this evaluation. No new failure modes have been determined to exist as a result of this new analysis. The MSSVs will continue to relieve any unlikely system overpressure during all applicable l

operating modes. The increased as-found setpoint tolerance has no significant negative impact on any system, operating mode, or accident analysis.

l.

SCHEDULE REQUIREMENTS l

This amendment is needed for the startup of Braidwood Unit 1. Therefore, CECO requests that this amendment be approved prior to April 17,1994.

k:nla:brwd:mssvts:S