Amends 103 & 103 to Licenses NPF-72 & NPF-77,respectively, Changing Max Allowable Temp of UHS in TSs from 98 Degrees F to 100 Degrees F
ML20212A812
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/08/1999
From: Anthony Mendiola
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20212A815 List:
References
NUDOCS 9909170133
Download: ML20212A812 (6)


Text

Fi o car

+

0 1

t UNITED STATES i

g' f

,j NUCLEAR REGULATORY COMMISSION

' 1" WASHINGTON, D.C. 20666-0001 e

s*****/

i 4

j COMMONWEALTH EDISON COMPANY DOCKET NO. STN 50-456 ERAIDWOOD STATION. UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.103 License No. NPF-72 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Commonwealth Edison Company (the licensee) dated July 30,1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's i

rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-72 is hereby amended to redd as follows:

9909170133 990908 PDR ADOCK 05000456 P

PDR

2 (2)

Technical Soecifications The Technical Specifications contained in Appendix A as revised through Amendment No. 103 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION

{

/*

\\

b a/

,/,/

/

d ony J. Mendiola, Chief, Section 2 roject Directorate til

} Office of Nuclear Reactor Regulation Division of Licensing Project Management f

Attachment:

Changes to the Technical Specifications Date of Issuance:

September 8, 1999 4

fit

[-

4 UNITED STATES

,g NUCLEAR REGULATORY COMMISSION

'2 WASHINGTON, D.C. 20066 4 001

\\...../

COMMONWEALTH EDISON COMPANY DOCKET NO. STN 50-457 BRAIDWOOD STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.103 License No. NPF-77 l

1.

The Nuclear Regulatory Commission (the Commission) hc:: found that:

A.

The application for amendment by Commonwealth Edison Company (the l

licensee) dated July 30,1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I;

]

i B.

The facility will operate in conformity with the application, the provisions of the Act, and the ruit;s ::nd regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance w;th 10 Cra Pari 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, ahd paragraph 2.C.(2) of Facility Operating License No. NPF-77 is hereby amended to road as follows:

. (2)

Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No.103 and the Environmental Protection Plan contained in Appendix B, both of which were attached to License No. NPF-72, dated July 2, 1987, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date if its issuance and shall be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION f

'cy,, < /

O 7

nthony J. Mendiola, Chief, Section 2

. Project Directorate ill Division of Licensing Project Management

' Office of Nuclear Reactor Regulation

/

Attachment:

Changes to the Technical Specifications Date of Issuance: September 8, 1999

ATTACHMENT TO LICENSE AMENDMENT NOS.103 AND 103 FACILITY OPERATING LICENSE NOS NPF-72 AND NPF-77 DOCKET NOS. STN 50-456 AND STN 50-457 Replace the following page of the Appendix "A" Technical Specifications with the attached page. The revised page is identified by the amendment number and contains verticallines indicating the area of change.

Remove Paae insert Pace 3.7.9-1 3.7.9-1

UHS 3.7.9 3.7 PLANT SYSTEMS 3.7.9 Ultimate Heat Sink (UHS) i LC0 3.7.9 The UHS shall be OPERABLE.

APPLICABILITY:

MODES 1. 2. 3. and 4 ACTIONS i

CONDITION REQUIRED ACTION COMPLETION TIME A.

UHS inoperable.

A.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> AND A.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.9.1 Verify water level of UHS is a 590 ft Mean 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Sea Level (MSL).

SR 3.7.9.2 Verify average water temperature of UHS is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> s 98 F after September 30. 1999 (s 100 F through September 30, 1999).

SR 3.7.9.3 Verify bottom level of UHS is s 584 ft MSL.

18 months BRAIDWOOD - UNITS 1 & 2

3. 7. 9 - 1 Amendment 103 & 103