E,s i

bi NUREG-0580 Vol.11, No.8 i

l REGULATORY LICENSING l

STATUS SUldMARY REPORT l

l i

NUCLEAR POWER PLANTS DATA FOR DECISIONS l

(BLUE BOOK?

JULY 11-AUGUST 16,1982 i

f l

UNITED STATES NUCLEAR REGULATORY COMMISSION l

k l

[g I'sl 5, 's,y',

l

%;;;;,/

1

Available from NRC/GPO Sales Program Superintendent of Documents Government Printing Of fice Washington, D. C. 20402 l

A year's subscription consists of 12 issues for this publication.

Microfiche of single copies are available from NRC/GPO Sales Program Washington, D. C 20555

NUREG-0580 Vol.11, No.8 REGULATORY LICENSING STATUS

SUMMARY

REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS (BLUE BOOK)

JULY 11, ' AUGUST 16, 1982 l

Manuscript Completed: August 1982 Date Published: August 1982 Prepared for: 0FFICE OF NUCLEAR REACTOR REGULATION Prepared by: OFFICE OF RESOURCE MANAGEMENT l

U.S. NUCLEAR REGULATORY COMMISSION l

WASHINGTON, D.C. 20555

,. ~..,

4

's j

~

'g

  • 7 ~,

5 h

F0REW0RD THIS MANAGEMENT REPORT, REGULATORY LICENSING STATUS

SUMMARY

REPORT, IS DESIGNED TO PROVIDE THE NECESSARY INFORMATION FOR CONTROLLING THE PROGRESS OF REVILW PROCESSES FOR CENTRAL STATION NUCLEAR REACTOR APPLICATIONS.

IT UTILIZES DATA COLLECTED FROM THE OFFICE OF NUCLEAR REACTOR REGULATION. OFFICE OF THE EXECUTIVE LEGAL DIRECTOR. OFFICE OF INSPECTION & ENFORCEMENT, AND THE NATIONAL LABORATORIES. AND ANALYZED BY THE OFFICE OF RESOURCE MANAGEMENT IN THE IMPLEMENTATION OF THE REGULATORY INFORMATION SYSTEM.

SECTION I 0F THIS EDITION CONSISTS OF THE THREE

SUMMARY

OF ACCOMPLISHMENTS. THE NEW APPLICATION FORECAST FOR OL'S AND CP'S, AND AN ABBREVIATION KEY.

SECTION II REPRESENTS THE MAIN BODY OF THE REPORT AND CONSISTS OF THE FACILITY INFORMATION. ALL OL'S ARE LISTED FIRST, FOLLOWED BY CP'S, STANDARD DESIGN REVIEWS, OTHER REVIENS, AND FINALLY, A NON-POWER REACTOR

SUMMARY

EACH PROJECT CONSISTS OF GENERAL FACILITY DATA. CURRENT STATUS FOR ALL PHASES OF THE REVIEW, AND TARGETED AND ACTUAL COMPLETION DATES FOR ALL KEY MILESTOFES IN THE REVIEW.

l l

l l

l N

LICENSING 0F NUCLEAR REACT 0RS NUCLEAR REGULATORY COMMISSION REQUIRES TWO SEPARATE LICENSES - ONE TO BUILD THE FACILITY AND ANOTHER THE U.S.

LISTED BELOW ARE THE STEPS IN THE PROCESS OF OBTAINING A CONSTRUCTION PERMIT AND OPERATING TO OPERATE IT.

LICENSE.

AND ENVIRONMENTAL IMPACT 05 THE THE UTILITY SUBMITS A FORMAL APPLICATION DESCRIBING THE DESIGN LOCATION.THE APPLICATION ALSO COVERS THE U PROPOSED PLANT AND THE SAFEGUARDS TO DE PROVIDED.

QUALIFICATIONS.

THE ACRS AND TO THE PUBLIC DOCUMENT ROOM.

TECHNICAL THE NRC MAKES COPIES OF THE APPLICATION AVAILABLE TOSAFETY EVA*"ATION AND AN ENVIRONMENTAL IMPACT STATEMENT. THES EXPERTS ANALYSE THE APPLICATION, AND PREPARE A DOCUMENTS ARE ALSO MADE AVAILABLE IN THE PUBLIC DOCUMENT ROOM.

THE STAFF'S ANALYSIS IS SUBMITTED TO THE HRC'S STATUTORY ADVISORY COMMITTEE ON REACTOR SAFEGUARDS. A COMMITTEE OF INDEPENDENT EXPERTS. ACRS STUDIES THE APPLICATION IN DETAIL AND HOLDS CONFERENCES WITH THE APPLICANT. THE LICLHSING STAFF AND OIHERS. THE ACRS FINDINGS ARE REPORTED TO THE NRC AND MADE PUBLIC.

USUALLY HEAR THE PROPOSED SITE. BY AN NRC APPOINTED ATOMIC SAFETY & LICENSING A PUBLIC HEARING IS HELD.

BOARD.

PRIVATE CITIZENS. STATE AND LOCAL OFFICIALS. AND COMMUNITY GROUPS MAY PARTICIPATE.

AFTER REVIEWING THE HEARING RECORD INCLUDING THE NRC ST AFF AND ACRS FINDINGS. THE BOARD DECIDES FOR OR AGAIN GRANTING A CONSTRUCTIDH PERMIT.

IS REVIEWED BY THE ATOMIC SAFETY AND LICENSING APPEAL BOARD, AND IS SUBJECT TO REVIEW BY THE BOARD'S DECISION THE FIVE-MEMBER NUCLEAR REGULATORY COMMISSION.

THE DIRECTOR OF THE DIVISION OF IF THE LICENSING BOARD AUTHORIZES THE ISSUANCE OF A CONSTRUCTION PERMIT.

LICENSING WILL ISSUE A CONSTRUCTION PERMIT. AN EARLIER LIMITED WORK AUTHORIZATION TO DO PRELIMINARY SITE CONSTRUCTION MAY HAVE BEEN GRANTED IF THE SITE HAD BEEN DETERMINED TO BE SUITABLE BY THE NRC STAFF AND THE BOARD HAD RULED FAVORABLY ON THE ENVIRONMENTAL IMPACT ANALYSIS. CONSTRUCTION IS SUBJECT TO INSPECTION BY TH OFFICE OF INSPECTION AND ENFORCEMENT.

ADDITIONAL INFORMATION IS DEVELOPED AND THE UTILITY APPLIES TO THE NRC FOR AN AS CONSTRUCTION PROGRESSES.

THE SAME CAREFUL ANALYSIS AS IS MADE AT THE CONSTRUCTION PERMIT STAGE IS MADE BY THE HRC OPERATING LICENSE.

IN DECIDING WHETHER OR NOT TO ISSUE THE OPERATING LICENSE.

IN THE OPERATING LICENSE REVIEW PROCESS. OPPORTUNITY FOR HEARING IS PROVIDED. CONTRASTED WITH THE FINAL ISSUANCE OF AN CONSTRUCTION PERMIT REVIEW PHASE. A HEARING IS HELD ONLY IF INTERVENTION IS GRANTED.

I I

IS SUBJECT TO THE APPROVAL OF BOTH THE DIRECTOR OF THE DIVISION OF LICENSING AND OF THE

)

OPERATING PERMIT COMMISSION.

T ABL E OF C0NT ENTS PRINTED IN THE CRDER LISTED SECT I ON I

SUMMARY

OF ACCOMPLISHMENTS OL SUttMARY OF ACC0!PLISHMENTS CP

SUMMARY

OF ACCOMPLISHMENTS COMBINED NUMERICAL

SUMMARY

OF ACCOMPLISHMENTS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING OPERATING LICENSES IN THE NEXT FIVE YEARS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING CONSTRUCTIDH PERMITS IN THE HEXT FIVE YEARS NEW APPLICATI0H FORECAST:

OPERATING LICENSE REVIEWS CONSIRUCTION PERMIT REVIEWS SPECIAL REVIEWS COMMON ABBREVIATIONS USED WITHIN THE PUBLICATION SECTION I I PROJECT INDEX i

OPERATING LICENSE REVIEWS l

CONSTRIJCTIDH PERMIT REVIEWS STANDARD DESIGN REVIEWS OletER REVIEWS HDH-POWER REACTORS l

l SECT ION I I I EXAMPLE REVIEW

4 4

Z O

w U

LJ d

OL

SUMMARY

0F ACC0MPLISHMENTS AS OF AUGUST 16, 1982 FISCAL YEAD TO DATE AUGUST FACILITY SCHEr.ULED ACTUAL FACILITY SCHEDULED' ACTUAL SER 'S

?_F ?

' S BYRON 1 12 02/07/82 02/07/82C i:DHE CALLAWAY 1 10/07/S1 10/07/81C CLINT0H 1 32 01/05/82 02/17/82C MIDLAND 1 12 05/11/82 05/11/82C FALO VERDE 1,2,3 11/11/81 11/11/31C FERRY 1 12 05/10/82 05/24/82C ST LUCIE 2 10/09/81 10/09/81C MASHINGTON NUCLEAR 2 03/31/52 03/31/82C UT.TTS BAR 1 12 07/01/82 07/01/32C WJLF CREEK 1 04/07/82 04/07/82C SSER

'S

' s SSER DIA2LO-CA:00N 1 12 08/00/82 DYRON 1 32 03/30/82 03/30/82C PERRY 1 & 2 08/09/820 CALLAMAY 1 01/15/82 01/15/82C SUMMER 1 C0/06/82C CLINTON 1 12 C3/31/82 07/22/82C W ASHI!:GTON NUCLEAR 2 08/11/82 OS/11/E2C CDMANCHE PEAK 1 32 10/16/81 10/16/81C CCl1M;CHE PEAK 1 &2 01/20/82 01/20/32C DIABLO-CANYOH 1 3 2 10/02/81C DIASLO-CANYOU 1 &2 08/00/02 ENRICO FERfiI 2 01/26/82 01/29/82C GRAND GULF 1 &2 12/10/81C

(

GRAND GULF 1 1 2 05/14/82 06/16/82C i

G2AND CULF 1 32 07/09/32 07/21/82C i

LASALLE 1 8 2 02/12/82 02/12/82C LASALLE 1 & 2 04/t6/02 C 4/16 /820 LASALLE 1 12 C6/29/82 C6/29/82C l

LASALLE 1 12 07/14/82 07/14/C2C MIDLAND 1 12 06/30/82 C6/33/32C PALO VERDE 1,2,3 C2/05/02 02/05/02C l

PALG VERDE 1,2,3 05/17/32 05/17/82C PERRY 1 a2 07/29/02 03/09/82C SAN ONOFRE 2 2 3 C1/22/02 01/22/32C SAN 0;iOFRE 2 8 3 C2/16/02 02/16/32C SAN O!:0FRE 2 1 3 C6/30/82 06/30/82C SHCREHtli 03/12/82C ST LUCIE 2 12/30/81 12/30/81C SU"MER 1 01/08/82 Ot/CO/82C SUMTER 1 07/16/82 08/06/02C SUSQUEHAMMA 1 22 07/00/82 07/17/02C MASHIt:GTON NUCLEAR 2 07/15/82 UASHINGTON NUCLEAR 2 08/11/32 03/11/82C MATERFC2D 3 10/09/81 10/13/81C WATERFCRD 3 01/22/82 01/13/82C WATERFORD 3 04/30/32 04/30/32C ZIV.MER 1 10/C0/81 10/C0/o1C

OL

SUMMARY

0 F A CC0MPL ISHMEN T S AS OF AUGUST 16, 1932 1

AUQyST FISCAL YFAR TO DATE FACILITY SCHEDULED ACTUf,L FACILITY SCHEDULFD ACTUA1 DES ' S DES ' S CATAWBA 1 1 2 08/11/82 08/11/ 8 2 C BYRON 1 1 2 11/05/81 11/05/81C CATAUBA 1 8 2 03/05/02 08/11/o2C CLINTON 1 & 2 12/ 18/81 12/23/31C t1IDL At;D 1 & 2 02/05/82 02/05/82C PALO VERDE 1,2,3 10/26/81 13/26/31C PERRY 1 & 2 02/26/82 02/26/02C SEAER00K 1 & 2 05/14/82 05/14/32C ST LUCIE 2 10/16/81 10/16/81C WCLF CREEK 1 01/05/82 01/05/82C FES ' S FES ' S PERRY 1 &2 08/13/82 08/13/82C BYRON 1 &2 04/05/82 04/05/82C CALLARAY 1 01/29/82 01/29/82C CLINTON 1 12 05/23/82 05/20/C2C GRAND GULF 1 1 2 10/CS/81C tilDL AND 1 12 07/23/82 07/23/82C PALO VERDE 1,2,3 03/1'./32 03/11/82C PERRY 1 & 2 03/13/02 08/13/02C ST LUCIE 2 04/23/82 04/23/82C WASHINGTON NUCLEAR 2 12/31/81 12/31/010 l

WOLF CREEK 1 06/11/82 06/11/02C l

0L ' S ISSUEDw 0L ' S I SSUED*

LASALLE 1 &2 08/13/82 08/13/82C LASALLE 1 &2 08/13/82 08/13/82C 1

W FULL PCWER l

l l

1

=

ll}l CC C

11 2

L 88 8

A

/ /

/

U 00 4

T 30 0

C

/ /

/

A 00 5

11 0

D E

E 11 2

T L

88 8

A U

/ /

/

D D

50 4

E 10 0

O H

/ /

/

00 5

T C

11 0

S R

A E

Y S

L A

T C

S N

I F

2 2

E 1

8 D

1 1

M Y

D D

E T

1 H

I R

R L

KO O

U S

I EF F

C EN N

S I

A RA A

F CH H

S L

/

/

S ST T

I P 2 NI I

EG S

G S

E E

8 S

E M

9 N

LA A

H H

1 O

R LK K

D S

0 0

H AS S

H N

R E

S S

C 6

1 E

S E

E P

C T

S S

D F

C A

S U

G U

F A

0 F O

S Y

A L

R A

U A

T C

M A

M U

S D

E L

U P

D E

C H

C T

S S

U G

U A

D Y

T E

I L

U I

C S

A F

S S

I S

E E

S E

s E

E H

N N

N N

C P

O O

O S

O N

N H

N N

P E

S S

E S

E E

P S

5 D

F C

l l

1 1ll 1il 1ll 1

SUMMARY

0F A CC0MPL ISHMENTS AS OF AUGUST 16, 1982 AUQVST FISCAt YEAR TO DATE SCHEDULED ACTUA(

SCHEDULED ACTUAL

' S ( 0L )

0 0

$ER ' S( 0L )

to 10 5ER SER ' S ( CP) 0 0

SER ' S( CP )

0 0

SSER ' S ( 0L )

2 3

5SER' S ( 0L )

30 31 S( CP) 2 2

SSER ' S( CP) 0 0

SSER DE5' S( 0L )

1 1

DES' S( 0L )

9 9

DES'S ( CP) 0 0

DES ' S( CP )

1 1

FES'S( 0L )

1 1

FES'S ( 0L )

9 10 FES' S( CP )

0 0

FES'S( CP) 0 0

i 0L

'S ISSUEDM 1

1 0L ' S ISSUED

  • 1 1

CP'S ISSUED 0

0 CP'S ISSUED 0

0 W FULL POWER

LICENSING SCHEDULES FOR ALL PENDING OL APPLICATIONS REPORT AS OF 08/16/82 (INCLUDES SCHEDULES FOR ADDITIDHAL UNITS WITH PROJECTED CONSTRUCTION COMPLETI0H IN CY 1982-1983)

(LISTED IN ORDER OF FACILITY HAME)

SER SSER EST.

STAFF TECH STAFF TECH ASLB COMMu APPL.

DELAY ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.

CUNST.

PLANT (MONTHS) Dil TO DL SIR DIS Eli TO DL 11ER OF HRG DECISIDH DilE COMPL.

BYP0H 1 0

11/8tC Of/82C 02/82C 03/82C 04/82C 08/82 09/82 11/82 04/83 07/83 08/83 CALLAWAY 1 0

09/81C 09/81C 10/81C 11/81C 01/82C 01/82C 01/82C 11/81C 01/83 05/83 06/83 CLINTON 1 0

12/8tc 09/80C 02/82C 03/82C 05/82C 06/82C 07/82C 11/82 09/83 12/83 01/84 COMANCHE PEAK 1 0

05/81C 07/81C 07/81C 11/81C 09/81C 09/82 09/82 12/81C 01/83 05/83 06/83 DIABLO CANYON 1 0

12/72C 01/75C 10/74C 07/76C 05/76C 08/82 08/82 12/76C 08/82 DIABLO CANYON 2 0

12/72C Ot/75C 10/74C 07/76C 05/76C 08/82 H/S 12/76C 08/82 ENRICO FERMI 2 0

04/81C 05/77C 09/77C 08/81C 09/81C 09/82 09/82 03/82C 10/82 05/83 06/83 GRAND GULF 1 0

05/8tC 08/8tC 09/8tC 10/8tC 10/81C 08/82 09/82 N/A N/A 09/82 06/82C LASALLE 1 0

03/78C 02/81C 03/81C 04/81C 11/78C 06/82C 07/82C N/A N/A 08/82C 04/82C LASALLE 2 0

03/78C 02/81C 03/81C 04/81C 11/78C 06/82C 11/82 N/A N/A 03/83 04/83 MCGUIRE 2 0

10/75C Of/78C 03/78C 04/78C 04/76C 12/82 01/83 03/77C 06/81C 03/83 04/83 MIDLAND 1 0

02/82C 04/82C 05/82C 06/82C 07/82C 06/82C 06/82C 11/83 06/83 11/83 12/83 MIDLAND 2 0

02/82C 04/82C 05/82C 06/82C 07/82C 06/82C 06/82C 11/82 06/83 07/83 07/83 PALO VERDE 1 0

10/8tC 10/81C 11/81C 12/81C 03/82C 08/82C 08/82 04/82C 10/82 07/83 08/83 PERRY 1 0

02/82C 05/82C 05/82C 07/82C 08/82C 07/82C 09/82 11/82 04/83 10/83 11/83 SAN OHOFRE 2 0

01/81C 01/81C 02/81C 02/81C 04/81C 08/82 10/82 06/81C 05/82C 07/82C 02/82C SAN OHOFRE 3 0

Ot/8tC Ot/8tC 02/8tC 02/8tC 04/8tC 08/82 10/82 06/81C 05/82C 10/82 11/82 SHOREHAM 5

03/77C 03/81C 04/81C 10/81C 10/77C H/S 09/82 05/82C 04/83 05/83 09/82 ST LUCIE 2 0

10/81C 09/8tC 10/8tC ff/81C 04/82C 08/82 08/82 N/A N/A 09/82 10/82 SUMMER 1 0

06/79C 12/80C 02/81C 03/81C 05/81C 07/82C 08/82C 06/81C 08/82C 09/82 08/82C SUSQUEHAHHA 1 0

03/81C 03/81C 04/81C 08/81C 07/81C 07/82C 07/82C 10/81C 04/82C 09/82 07/82C SUSQUEHANNA 2 0

03/8tC 03/8tC 04/8tC 08/81C 07/8tC 07/82C 03/83 10/81C 04/82C 12/83 01/84 WASHINGTON HUCLEAR 2 0

07/81C 05/82C 03/82C 10/82 12/81C 10/82 11/82 N/A N/A 08/83 09/83 WATERFORD 3 0

05/81C 05/81C 07/8tC 08/81C 69/81C 09/82 10/82 03/82C 09/82 12/82 01/83 WATTS BAR 1 0

06/78C 06/82C 07/82C 08/82C 12/78C 08/82 09/82 N/A N/A 07/85 08/83 WOLF CREEK 1 0

Ot/82C 03/82C 04/82C 05/82C 06/82C 08/82C 08/82 10/82 03/83 11/83 12/83 ZIMMER 1 0

10/76C 12/77C 01/79C 03/79C 06/77C 08/82C 08/82 02/82C 06/82C 11/82 12/82 ulICENSING SCHEDULES AND DECISIDH DATES DO NOT REFLECT POTENTIAL DELAY FROM EMERGENCY PREPAREDNESS REVIEW.

LICENSING SCHEDULES FOR ALL TENDERED OL UNITS TO BE ISSUED AFTER CY 1983 ISSUE APPL. CONST.

PLANT 1S13 COMPLETE BELLEF0HTE 1 09/84 05/85 BELLEFONTE 2 N/S 05/86 BRAIDWOOD 1 05/84 04/85 BRAIDWOOD 2 04/86 BYROH 2 N/S 12/84 CATAWBA 1 04/83 11/84 CATAWBA 2 N/S 03/87 CLINTON 2 N/S COMANCHE PEAK 2 11/83 12/84 FERMI 2 (FSAR RESUB) l GRAND GULF 2 N/S H/S HARRIS 1 01/84 12/84 HARRIS 2 N/S 06/88 l

LIMERICK 1 10/83 10/84 LIMERICK 2 10/86 PALO VERDE 2 10/83 08/84 PALO VERDE 3 H/S 11/85 PERRY 2 N/S 05/87 RIVER BEND 1 05/84 04/85 RIVER BEND 2 N/S SEABROOK 1 12/82 05/84 SEABROOK 2 02/86 SOUTH TEXAS 1 01/86 12/86 SOUTH TEXAS 2 H/S 12/88 WASHINGTON HUCLEAR 1 H/S 12/85 WASHINGTON HUCLEAR 3 06/84 06/85 WATTS BAR 2 06/84 08/84

REPORT AS OF: 08/f6/82 LICEHSING SCHEDULES FOR ALL PENDING CP APPLICATIONS (LISTED IN ORDER OF FACILITY HAME)

SER SSER STAFF TECH STAFF TECH ASL8 COMM ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.

PLANT Dil TO DL 1EE tLTji EE1 TO DL 1}ig 0F HRG DECISION DALE (SP)FHP 1-8 (MANUF.)

07/74C 08/75C 09/75C 04/76C 10/75C 03/760 09/81C 06/76C 06/82C 09/82 ALLENS CREEK 1 07/74C 11/74C 11/74C 12/74C 11/74C 03/75C 10/8tC 03/75C 11/82 11/82 CLINCH RIVER 02/76C 0t/83 03/83 05/83 02/77C 06/83 07/83 08/82 05/84 06/84 PEBBLE SPRINGS 1 82 01/75C 12/75C 01/76C 02/76C 04/75C 12/77C N/S N/S N/S N/S SKAGIT/HANFORD 182 05/82C 07/77C 08/77C 01/83 12/82 09/B2 11/82 07/75C 04/83 07/83 l

N EW APP L ICA T ION F 0 R E C A S T --- 0 P E R A T ING L ICENSE REV I EWS (ANTICIPATED TENDER DATES FOR ALL UNITS WITH CONSTRUCTION PERMITS)

AS OF WEEK ENDING: 08/15/82 LICENSING APPL.

APPL.

1ST UNIT DOCKET PROJECT SUBMITS SUBMITS CONST.

FACILITY NUMBER UTILITY MANAGER FSAR ENV. RPT. COMPLETE COUNSEL FY82l WASHINGTON NUCLEAR 1 050-00460 WASHINGTON PUBLIC POWER SUPPLY

. UNASSIGNED 12/00/81C 12/00/81C 12/00/85 M. YOUNG l

l WASHINGTON NUCLEAR 3 050-00508 WASHINGTOH PUBLIC POWER SUPPLY

. UNASSIGNED 06/02/82C 06/00/82C 06/00/85 D.SWANSON l

FY83 MILLSTONE 3 050-00423 NORTHEAST NUCLEAR ENERGY J. GRANT 11/00/82 12/00/82 12/00/85 M.ROTHSCHILD MARBLE HILL 1 4 2 054680547 PUBLIC SERVICE OF INDIANA E.DOOLITTLE 12/00/82 12/00/82 06/00/86 R.LESSY BEAVER VALLEY 2 050-00412 DUQUESNE LIGHT E.DOOLITTLE 12/31/82 12/31/82 12/00/85 J.GUTEIRREZ NINE MILE POINT 2 050-00410 NIAGARA MOHAWK POWER D. LYNCH 01/00/83 01/00/83 03/00/86 B.BORDENICK HOPE CREEK 1 050-00354 PUBLIC SERVICE ELECTRIC 8 GAS

. UNASSIGNED 06/00/83 06/00/83 06/00/86 R. BLACK V0GTLE 1 8 2 0424-0425 GEORGIA POWER J. GRANT 09/00/83 09/00/83 09/00/86 B.BORDENICK FY86l NORTH ANNA 3 050-00404 VIRGINIA ELECTRIC & POWER

. UNASSIGNED 04/00/86 04/00/86 04/00/89 M.WILCOVER l

.1 HEW APPL I CAT IOH F 0 R E C A S T -- C 0 N S T RUCT ION P E R f1 I TS AS OF WEEK ENDING:

03/15/82 l

FACILITY rROJECT PROJECT APPL. ER APPL. PSAR l

NAME UTILITY N UT13 E R fiANAGER SUD. DATE SUB. DATE l

CARROLL 1 8 2 COMMONWEALTH EDISON 559 J.tJI L S O N 10/00/84 10/00/84 l

l i

1 l

l l

l i

C0MM0N A BBR EV IA T IOH S USED WITH IH THE PUBL ICA T ION ACRS: ADVISORY CCMMITTEE ON REACTOR SAFEGUARDS L.A.

LICENSING ASSISTANT AE:

ARCHITECT / ENGINEER LESR: LIMITED EARLY SITE REVIEW (ALSO ABBREVIATED LES)

AEB:

ACCIDENT EVALUATICH BRANCH LGR:

LICENSING GUIDANCE BRANCH ASB:

AUXILIARY SYSTEMS BRANCH LMFBR: LIQUID METAL FAST BREEDER REACTOR ASLB: ATOMIC SAFETY LICENSING BOARD LQB:

LICENSEE QUALIFICATIONS BRANCH B8R:

BURHS 8 ROE MEB:

MECHANICAL ENGINEERING BRANCH l

B8V:

BLACK & VEACH MPA:

MANAGEMENT AND PROGRAM ANALYSIS I

B&W:

BABCOCK 8 WILCOX MTEB: MATERIALS ENGINEERING BRANCH BECH: BECHTEL MEW:

MEGAWATTS ELECTRIC BRRT: BROWN 3 ROOT MWT:

MEGAWATTS THERMAL BWR BOILING WATER REACTOR NSSS: HUCLEAR STEAM SYSTEMS SUPPLIER CEB:

CHEMICAL ENGINEERING BRANCH OL:

OPERATING LICENSE COMB: COMBUSTIDH ENGINEERING OLB:

OPERATOR LICEHSING BRANCH CP:

CONSTRUCTIDH PERMIT DPS:

OFFSHORE POWER SYSTEMS CPB:

CORE PERFORMANCE BRANCH CSB:

CONTAIHMENT SYSTEMS BRANCH CWE:

COMMONWEALTH EDISON PDA:

PRELIMINARY DESIGN APPROVAL PGLE: PACIFIC GAS & ELECTRIC DES:

DRAFT EHVIRONMENTAL STATEMENT PID:

PARTIAL IHITIAL DECISION PM:

PROJECT MANAGER PS:

POWER SYSTEMS BRANCH EEB:

ENVIRONMENTAL ENGINEERING BRANCH PSAR: PRELIMINARY SAFETY ANALYSIS REPORT EPA:

ENVIRONMENTAL PROTECTION AGENCY PTRB: PROCEDURES AND TEST REVIEW BRANCH EPLB: EMERGENCY PREPAREDHESS LICENSING BRANCH PWR:

PRESSURIZED WATER REACTOR ER:

ENVIRONMENTAL REPORT EQB:

EQUIPMENT QUALIFICATION BRANCH ESR:

EARLY SITE REVIEW QAB:

QUALITY ASSURANCE BRANCH ETSB: EFFLUENT TREATMENT SYSTEMS BRANCH RAB:

RADIOLOGICAL ASSESSMENT BRANCH F.R.

FEDERAL REGISTAR RSB:

REACTOR SYSTEMS BRANCH FDA:

FINAL DESIGH APPROVAL FES:

FINAL ENVIRONMENTAL STATEMENT FSAR: FINAL SAFETY ANALYSIS REPORT 58L:

SARGENT 3 LUNDY S!W:

STONE 8 WEBSTER SAB:

SITING ANALYSIS BRANCH G8H:

GIBBS 4 HIL*L SAR:

SAFETY ANALYSIS REPORT GHDR: GIBBS & HILL SDA:

STANDARD DESIGN APPROVAL GIL:

GILBERT COMMONWEALTH SED:

STRUCTURAL ENGINEERING BRANCH GSB:

GEOSCIENCES BRANCH SER:

SAFETY EVALUATION REPORT SID:

SYSTEMS INTERACTION BRANCH SP:

SPECIAL PROJECT HGB:

HYDROLOGIC AND GEOTECHNICAL BRANCH SSC:

SOUTHERN SERVICES COMPANY HTGR: HIGH TEMPERATURE GAS COOLED REACTOR SSER: SUPPLEMENT TO SAFETY EVALUATION TVA:

TENNESSEE VALLEY AUTHORITY ICP:

INSTRUMENTATION AND CONTROL BRANCH UEC:

UNITED EHG. & CONSTRUCTORS UFB:

UTILITY FINANCE BRANCH WEST: WESTINGHOUSE

4 J

M P4 Z

C M

O Ld to m.__

PR0J ECT IN DEX SECTION II OPERATING LICENSE REVIEW CONSTRUCTION PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS 2-1 BELLEFONTE 1 &2 2-34 ALLENS CREEK 1 2-38 (BOP)BCPSSAR/BSAR-205 2-48 (SP)FNP 1-8 (MANUF.)

2-2 BRAICWOOD f & 2 2-3S CLINCH RIVER 2-39 (BOP)ESSAR/BSAR-205 2 49 CARROL SITE 2-3 BYROM 1 & 2 2-36 PEBBLE SPRINGS 1 12 2-40 (BOP)ESSAR/CESSAR-80 2-4 CALLAWAY 1 2-37 SKAGIT/HANFORD 112 2-41 (BOP)ESSAR/RESAR-414 2-42 (BOP)GAISSAR 2-S CATAWBA 1 8 2 2-43 (BOP)GIBBSSAR (W) 2-6 CLINTON 1 4 2 2-7 COMANCHE PEAK 1 8 2 2-44 (30P)SWESSAR/BSAR-205 2-8 DIABLO-CANYON 1 &2 2-45 (NSS)CESSAR SYSTEM 80 2-46 (HSS)GESSAR SEVERE ACC 2-9 ENRICO FERMI 2 2-10 FERMI 2 (FSAR RESUB) 2-47 (HSS)GESSAR-238 HI 2-11 GRAND GULF 1 &2 2-12 HARRIS 1 8 2 2-13 LASALLE 1 8 2 2-14 LIMERICK 1 & 2 2-15 MCGUIRE 2 2-16 MIDLAND 1 8 2 2-17 PALO VERDE 1,2,3 2-18 PERRY 1 & 2 2-19 RIVER BEND 1 3 2 2-20 SAH ONOFRE 2 8 3 2-21 SEABROOK 1 & 2 2-22 SHOREHAM 2-23 SOUTH TEXAS 1 82 2-24 ST LUCIE 2 2-25 SUMMER 1 2-26 SUSQUEHANNA 1 8 2 2-27 WASHINGTON NUCLEAR 1 2-28 WASHINGTON NUCLEAR 2 2-29 UASHINGTCH NUCLEAR 3 2-30 WATERFORD 3 2-31 WATTS BAR 1 &2 2-32 WOLF CREEK 1 2-33 ZIMMER 1

HRR L ICENS ING SYST EM PAGE NO:

2-1 BELLEFONTE 1 &2 0L CURREhT STA TUS REPORT REPORT AS OF: 08/16/82 PLANT C H A R A C T E R I 5 T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

043880439 LIC. PM:

D.

SCALETTI ASLB CHAIR:

N/A APPLICANT:

TENNESSEE VALLEY AUTHORITY LIC. BC:

E. ADENSAM MEMBER 1:

N/A LOCATION:

6 MI HE OF SCOTTSBORD, ALA LIC. LA.

M.

DUNCAN MEMBER 2:

N/A REGION:

2 AE:

TVA COUNSEL:

B.

PATON CONST. INSP:

R.

CRLENJAK REAC. TYPE: PWR HSSS: B8W ANTITRUST:

J.

RUTBLRG RESID. INSP:

J. WILCOX DESIGH PWR: 3760 MWT/1235 MWE CONST: TVA RM ANALYST:

M.

KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE l

As a result of applicant's construction delay, the review schedule has been delayed.

The applicant has ER DOCKETED:

06/12/78 06/12/78C announced a delay in loading fuel to 05/85.

The ER SITE VISIT COMPLETE:

02/20/82 06/17/82C staf f i s currently evaluating the impacts of this INPUT TO DES TO PM:

10/31/82 delay on the safety review schedule.

ISSUE DES:

Of/f5/83 RESPONSE TO COMMENTS ON DES:

05/22/83 ISSUE FES:

06/20/83 CURRENT ENV. STATUS:

As a result of applicant's construction delay, the review schedule was delayed, and is being re evaluated.

SAFETY / HEARING MILESTONES:

The er vironmental site visit was completed on 6/17/82.

APPLICATION TENDERED:

02/03/78 02/03/78C SAR DOCKETED:

06/12/7EC SAR Q'S RECEIVED BY PM:

07/03/80 04/02/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/28/83 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

05/15/83 No hearing i s anticipated.

ISSUE DRAFT SER:

INPUT TO SER:

03/15/84 ISSUE SER:

05/15/84 ACRS FULL COMMITTEE MEETING:

07/08/84 INPUTS TO SE SUPPLEMENT 1:

07/29/84 ISSUE SE SUPPLEMENT 1:

09/15/84 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

Pending determination HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A ASLB FINAL DECISI0H:

N/A TECH SPECS COMPLETED:

03/00/85 COMMISSION DECISIDH:

04/00/85 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

05/00/85 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

On 07/06/82 TVA revised fuel load date to 5/85.

Staff is CONSTRUCTION COMPLETION - APPL.

05/00/85 07/06/82 evaluating impact on safety and environmental review schedules.

i NRR LICENS ING SY$T EM PAGE NO:

2-2 BRAIDWOOD 1 & 2 0L CURR ENT STA TUS REPORT REPORT AS OF: 08/16/82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

045640457 LIC. PM:

K.

KIPER ASL3 CHAIR:

M. MILLER APPLICANT:

COMMONWEALTH EDISON LIC. BC:

J. YOUNGBLOOD MEMBER 1:

R.

COLE LOCATION:

24 MI SSW OF JOLIET, ILL LIC. LA.

M.

RUSHBROOK MEMBER 2:

D.

CALLIHAN REGION:

3 AE:

S&L COUNSEL:

D.

HASSELL CONST. INSP:

J.

HEISLER REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP:

L.

MCGREGOR DESIGN PWR: 3425 MWT/1120 MWE CGNST: CWE RM ANALYST:

M.

KING ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

Several portions are under contract review.

ER DOCKETED:

11/30/78C ER SITE VISIT COMPLETE:

04/15/83 INPUT TO DES TO PM:

11/01/83 ISSUE DES:

01/00/84 RESPCHSE TO COMMENTS ON DES:

04/01/84 ISSUE FES:

06/00/84 CURRENT ENV. STATUS:

Inactive.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/26/78 06/26/78C SAR DOCKETED:

11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:

12/01/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 03/01/83 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

05/01/83 There will be a contested hearing.

ISSUE DRAFT SER:

09/20/83 INPUT TO SER:

11/01/83 ISSUE SER:

12/01/83 ACRS FULL COMMITTEE MEETING:

01/00/84 INPUTS TO SE SUPPLEMENT 1:

04/01/84 ISSUE SE SUPPLEMENT 1:

05/00/84 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Applicant has submitted antitrust information pursuant to HEARING STARTED:

10/00/84 Reg. Guide 9.3.

ASLB INITIAL DECISION:

03/00/85 ASLB FINAL DECISION:

04/00/85 TECH SPECS COMPLETED:

09/00/C4 COMMISSICH DECISION:

04/00/85 ISSUE LIC. !!ITH PCWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

04/00/85 FSAR Amendment No. 37 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.

04/00/85 04/14/82 l

NRR L ICENS IN G SYST EM PAGE ND: 2-3 BYRON 1 1 2 0 L CURREN T ST A TUS R EPQRT REPORT AS OF: 08/16/82 PLA N T CHARACTERIST I C S:

KEY PERS0NN E L:

DOCKET NO:

045480455 LIC. PM:

S.

CHESNUT ASLB CHAIR:

M. MARGULIES APPLICANT:

CCMMONWEALTH EDISON LIC. BC:

J.

YOUNCBLCOD MEMBER 1:

R.

COLE LOCATION:

17 MI SW OF ROCKFORD, ILL LIC. LA.

M.

RUSHBROOK MEMBER 2:

D.

CALLIHAN REGION:

3 AE:

S&L COUNSEL:

S.

GOLDBERG CCNST. INSP: M.

RING REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B.

V0GLER RESID. INSP: W.

FORNEY DESIGN PWR: 342S MWT/1120 MWE CONST: CWE RM ANALYST:

M.

KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTCHES:

SCHED. DATE ACTUAL DATE SER and Supplement 1 have been issued.

Several outstanding and confirmatory issues remain to be ER DOCKETED:

11/30/78C resolved prior to licensing.

ER SITE VISIT COMPLETE:

05/31/81 0 5/ 31/81 C INPUT TO DES TO PM:

08/15/81 08/15/31C ISSUE DES:

11/05/81 11/05/81C RESPONSE TO COMMENTS ON DES:

03/01/82 03/01/82C ISSUE FES:

04/05/82 04/05/82C CURRENT ENV. STATUS:

Environmental review completed and FES (NUREG-0848) published in April 1982.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/26/78 06/26/78C SAR DOCKETED:

11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:

08/15/81 08/15/81C SAR APPL. RESPCHSE TO Q'S RECEIVED: 10/15/81 10/15/81C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

11/07/81 11/07/81C In discovery.

Hearing scheduled to commence in ISSUE DRAFT SER:

November 1982.

INPUT TO SER:

01/07/82 01/07/82C ISSUE SER:

02/07/82 02/07/82C ACRS LETTER RECEIVED:

03/10/82 03/10/82C INPUTS TO SE SUPPLEMENT 2:

08/20/82 ISSUE SE SUPPLEMENT 2:

09/18/82 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

Applicant has submitted antitrust information pursuant HEARING STARTED:

11/00/82 to Reg. Guide 9.3.

ASLB INITIAL DECISION:

04/0C/83 ASLB FINAL DECISION:

04/00/83 TECH SPECS CCMPLETED:

06/30/83 CCMMISSION DECISION:

07/00/83 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENCMENT:

ISSUE FULL POWER LICENSE AMEND:

08/00/83 FSAR - Amendment 37 ER - Amendment 3 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.

08/31/83 07/14/82

HRR LICENSING SYSTEM PAGE NO: 2-4 CALLAWAY 1 0L CURRENT STATUS R EP0RT REPORT AS OF: 08/16/82 P L ANT CHA RACTERIST I C S:

KEY P E R S 0 N N E L:

DOCKET ND:

05000483 LIC. PM:

G.

EDISDN ASLB CHAIR:

J. GLEASON

/PPLICANT:

UNION ELECTRIC LIC. BC:

B.

YOUNGBLOOD MEMBER 1:

G.

BRIGHT LCCATION:

10 MI SE OF FULTON, MO LIC. LA.

M.

RUSHLROOK MEMBER 2:

J.

KLINE REGION:

3 AE:

BECH COUNSEL:

R.

LESSY CCNST. INSP:

J.

KONKLIN REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B.

V0GLER RESID. INSP:

J.

HEISLER DESIGN PWR: 3425 MWT/1188 MWE CONST: DANIEL RM ANALYST:

S. HEDLUND CURRENT St.F. ST ATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SAR was docketed 08/08/80.

The SER was issued by NRC on 10/07/81 and the SER Supplement No. 1 was i ssued on ER DOCKETED:

12/12/80 12/12/80C 01/15/82.

ER SITE VISIT COMPLETE:

12/00/81 12/00/81C INPUT TO DES TO PM:

08/01/81 08/01/81C ISSUE DES:

09/29/81 09/29/81C RESPONSE TO COMMENTS CH DES:

12/01/81 12/01/81C ISSUE FES:

01/29/82 01/29/82C CURRENT ENV. STATUS:

ER was docketed 12/12/80.

The DES was issued by HRC on 09/29/81 and the FES was issued on 01/29/82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/25/79 10/25/79C SAR DOCKETED:

08/08/80 08/08/80C SAR Q'S RECEIVED BY PM:

12/18/80 12/18/80C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/81 10/01/81C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Hearings wero held on limited issues during November 1981 ISSUE DRAFT SER:

N/A The hearing on the one remaining contention, emergency INPUT TO SER:

09/11/81 09/11/81C preparedness, is expected to begin October 12, 1982.

A ISSUE SER:

10/07/81 10/07/81C prehearing is scheduled for September 2-9, 1982.

ACRS LETTER RECEIVED:

11/19/81 11/19/81 C INPUTS TO SE SUPPLEMENT 1:

01/01/82 01/ 01/82C ISSUE SE SUPPLEMENT 1:

01/15/82 01/15/82C FEMA LETTER RECEIVED:

09/01/82 CURRENT ANTITRUST:

OL review is in progress.

HEARING STARTED:

11/17/81 11/17/81C ASLB INITIAL DECISION:

01/00/83 ASLB FINAL DECISIGH:

02/00/83 TECN SPECS COMPLETED:

N/S COMMISSION DECISION:

05/00/83 ISSUE LIC. WITH POWER RESTRICTION: 06/00/83 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

10/00/83 SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:

The Caseload Forecast Panel has revised construction CONSTRUCTION COMPLETION - APPL.

06/00/83 04/14/81 completion frca February 1983 to June 1983.

The June 1983 estimate is based on the applicant's revised fuel load dnto.

NRR L ICEN5 ING SYST EN PAGE NO:

2-5 CATAWBA 1 8 2 0L CURRENT STATUS R EPORT REPORT AS OF: 08/16/82 KEY P E R S 0 N N E L:

PLANT C H A R A C T E R I S T I C S:

LIC, PM:

K.

JABBOUR ASLB CHAIR:

J. KELLEY DOCKET NO:

041380414 LIC. BC:

E.

AGENSAM MEMOER 1:

D.

CALLIHAN APPLICANT:

DUKE PCWER LIC. LA.

M.

DUNCAN MEMBER 2:

R.

FOSTER LOCATION:

6 MI NNW OF ROCK HILL, SC REGION:

2 AE:

DUKE COUNSEL:

G.

JOHNSON CONST. INSP:

P.

VANDCORN REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP:

K.

VAN DOGRN DESIGN PWR: 3582 MWT/1145 MWE CONST: DUKE RM ANALYST:

L.

LANIER l

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SER is scheduled to be ccmpleted 02/06/83.

06/11/31 06/11/ SIC ER DOCKETED:

ER SITE VISIT COMPLETE:

10/15/81 10/15/81C INPUT TO DES TO PM:

06/25/82 07/29/82C ISSUE DES:

08/05/82 08/11/82C RESPONSE TO COMMENTS ON DES:

11/01/82 ISSUE FES:

01/05/83 CURRENT ENV. STATUS:

DES was issued on 08/11/82.

SAFETY /HFARING MILESTONES:

APPLICATION TENDERED:

04/07/81 04/07/81C SAR DOCKETED:

06/11/8 f 06/11/81C SAR Q'S RECEIVED BY PM:

12/15/81 12/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/t6/32 INPUT TO DRAFT SER TO FM:

08/31/82 CURRENT HRG. STATUS:

Combined hearing anticipated to start 09/83.

ISSUE DRAFT SER:

INPUT TO SER:

01/09/83 ISSUE SER:

02/06/83 ACRS FULL COMMITTEE MEETING:

03/10/83 INPUTS TO SE SUPPLEMENT 1:

04/12/83 ISSUE SE SUPPLEMENT 1:

04/30/83 FEMA LETTER RECEIVED:

03/30/83 CURRENT ANTITRUST:

HEARING STARTED:

09/28/83 Complete.

ASLB INITIAL DECISION:

03/00/84 ASLB FINAL DECISION:

04/00/84 TECH SPECS COMPLETED:

CCM:11SSION DECISION:

09/00/84 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL PCUER LICENSE AMEND:

11/00/84 LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CP Amend. issued 12/23/80 indicating change in ownership.

CONSTRUCTION COMPLETION - APPL.

11/00/84 05/00/82 Staff is reassessing standard assumptions for projecting hearing schedules for plants with const, completion dates bovend '82.

This re-assess. nav result in a neu s c h e du l.,.

NRR LICENSING SYSTEM PAGE NO: 2-6 CLINTON 1 82 0L CURRENT STATUS REPQRT REPORT AS OF: C8/16/32 PLANT CHA RACTERI$T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

046110462 LIC. PM:

H. WILLIAMS ASLB CHAIR:

H.

CLARK APPLICANT:

ILLINDIS PCWER LIC. BC:

J. MILLER MEM2ER 1:

G.

FERCUSCN LOCATION:

6 MI E OF CLINTCN, ILL LIC.

LA..

P.

ANDERSON MEM3ER 2:

C. PARIS REGION:

3 AE:

S8L COUNSEL:

R. GODDARD CCNST. INSP:

H.

WESCOTT REAC. TYPE: BWR NSSS: GE ANTITRUST:

B.

V0GLER RESID. INSP:

H.

LIVEEMORE DESIGN PWR: 2894 MWT/0950 MWE CONST: BALDWIN RM ANALYST:

M.

KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE FSAR was docketed 09/08/80.

SER was issued 02/17/82.

Supplement No. I was i ssued 07/22/82.

ER COCKETED:

03/01/81 09/08/80C ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

12/08/81 12/08/81C ISSUE DES:

12/1C/81 12/23/81C l

RESPONSE TO COMMENTS ON DES:

02/22/82 03/23/82C ISSUE FES:

05/20/82 05/20/82C CURRENT ENV. STATUS:

The draft environmental statement was completed December 1981.

The FES was completed May 1982.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

12/01/79 12/01/79C SAR DOCKETED:

09/08/80 09/08/00C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Two petitions for leave to intervene were filed.

The ISSUE DRAFT SER:

State of Illinoi s filed under 10 CFR 2.715(c).

INPUT TO SER:

12/05/81 09/08/80C A prehearing was held on 04/14/81 A second ISSUE SER:

01/05/32 02/17/32C prehearing was held 05/04/82.

ACRS LETTER RECEIVED:

02/12/82 03/09/82C INPUTS TO SE SUPPLEMENT 1:

06/11/82 06/11/820 ISSUE SE SUPPLEMENT 1:

03/31/82 07/22/32C FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Operating license antitrust review completed HEARING STARTED:

11/00/82 March 18, 1982 (SECY-82-120).

ASLB INITIAL DECISION:

09/00/83 ASLE FINAL DECISIGH:

10/00/83 TECH SPECS COMPLETED:

CGMMISSICN DECISICN:

12/00/83 ISSUE LIC. WITH PCWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

01/00/84 FSAR Amendment #17, 07/82.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

IPC announced fuel load date of 1/84 by letter dated CONSTRUCTION COMPLETICN - APPL.

01/00/84 04/21/82 04/21/82.

Stop work orders associated with construction QA are expected to impact fuel load date.

HRR LICENS ING SVSTEM PAGE NO: 2-7-

CDMANCHE PEAK 1 & 2 0L CURRENT STATUS REP 0RT REPORT AS OF: 08/16/82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

LIC. PM:

S. BURWELL ASLB CHAIR:

M. MILLER DOCKET ND:

044580446 APPLICANT:

TEXAS UTILITIES GENERATING LIC. BC:

B. YOUNGBLOOD MEMBER 1:

R. COLE LOCATION:

4 MI N OF GLEN ROSE, TEX LIC. LA.

M.

RUSHBROOK MEMBER 2:

K. MCCOLLCM REGION:

4 AE:

G8H COUNSEL:

M. ROTHSCHILD CONST. INSP: R.

TAYLOR REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP: D. KELLY DESIGN PWR: 3411 MWT/1150 MWE CONST: BRRT RM ANALYST:

M.

ANDERSON ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

The SER was issued 07/14/81. The staff deferred scheduling the Comanche Peak review by the ACRS until sufficient ER DOCKETED:

01/19/79 01/19/79C information was provided to resolve a large number of open ER SITE VISIT COMPLETE:

06/20/80 08/07/80C issues. SSER 81 was issued 10/16/81.

Application was INPUT TO DES TO PM:

08/15/80 04/27/81C reviewed by the ACRS on 11/13/81 SSER #2 responding to ISSUE DES:

04/30/81 05/22/81C the ACRS was issued on 01/20/82. SSER 83 is scheduled RESPONSE TO COMMENTS ON DES:

07/19/81 08/28/81C ISSUE FES:

09/18/81 09/24/81C to be issued 09/30/82.

CURRENT ENV. STATUS:

The DES was i ssued on 05/22/81 The EPA Federal Register Hotice was printed on 05/29/81 and the comment period SAFETY / HEARING MILESTONES:

ended 07/13/81. The FES was issued on 09/24/81.

APPLICATION TENDERED:

03/01/78 03/01/78C SAR DOCKETED:

05/12/78 05/12/78C SAR Q'S RECEIVED BY PM:

12/30/78 02/22/79C SAR APPL. RESP 0 HSE TO Q'S RECEIVED: 05/08/79 01/31/80C i

INPUT TO DRAFT SER TO PM:

04/13/79 03/11/81C CURRENT HRG. STATUS:

The first hearing session was held 12/02/81 in Fort Worth.

ISSUE DRAFT SER:

03/31/81 03/31/81C i

Issues heard were financial qualifications and the INPUT TO SER:

05/22/81 07/08/81C l

operating QA program.

A second and third hearing session ISSUE SER:

07/14/81 07/14/81C on QA/QC during construction were held 06/07-11/82 and 07/26-30/82.

A fourth hearing session is scheduled to be ACRS LETTER RECEIVED:

11/17/81 11/17/81C held 09/13-24/82.

The fourth hearing session is expected INPUTS TO SE SUPPLEMENT 3:

09/21/82 to complete QA/QC during construction and the remaining ISSUE SE SUPPLEMENT 3:

09/30/82 FEMA LETTER RECEIVED:

10/01/82 contention, emergency plans.

CURRENT ANTITRUST:

ALJ appointed on 02/23/82 to replace ASLB. Prehrq HEARING STARTED:

12/02/81 12/02/81C conference held 04/13/82 to determine status of parties.

ASLB INITIAL DECISION:

01/00/83 Briefs filed 05/04/82 request immediate imposition of ASLB FINAL DECISION:

02/00/83 settlement license conditions. A Memorandum and Order TECH SPECS COMPLETED:

05/00/83 approving settlement agreements 8 proposed license COMMISSION DECISION:

05/00/83 conditions 8 dismissing pro =cedings was issued 05/06/82.

ISSUE LIC. WITH POWER RESTRICTION: N/S ISSUE FULL POWER LICENSE AMEND:

06/00/83 LATEST AMENDMENT:

33 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES

  • CONSTRUCTION COMPLETION - APPL.'

06/00/83 10/29/81

NRR L ICENSING SYST EM PAGE NO: 2-8 DIABLO-CANYOH 1 &2 0L CURRENT STA TUS REPORT REPORT AS OF: 08/16/82 PLANT CHARACTER I S T I C S:

KEY P E R S 0 N N E L:

DOCKET ND:

027580323 LIC. PM:

B. BUCKLEY ASLB CHAIR:

J. WOLF APPLICANT:

PACIFIC GAS 8 ELECTRIC LIC. BC:

F. MIRAGLIA MEMBER 1:

J. XLINE LOCATION:

12 MI WSW OF SAN LUIS OBISPD LIC. LA.

J.

LEE MEMBER 2:

G.

BRIGHT REGION:

5 AE:

PG8E COUNSEL:

B. JONES CCNSTl INSP: D. KIRSCH REAC. TYPE: PWR NSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP:

J. CARLSON DESIGN PWR: 3333 MWT/1084 MWE CONST: PG8E RM ANALYST:

E. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SSER 15 (Equip. Qualification) was issued on 10-02-81 SSER 16 (Emergency Prep.) is estimated for 08/82 (indicated ER DOCKETED:

11/09/71 11/ 0 9/ 71C as SSER9 cn schedule).

ASLB decision on a full power ER SITE VISIT COMPLETE:

license is projected for August 1982.

Low power license INPUT TO DES TO PM:

10/09/72 10/09/72C was issued on 09-22-81 and suspended on November 19, 1981 ISSUE DES:

12/12/72 12/12/72C RESPONSE TO COMMENTS ON DES:

04/27/73 04/27/73C ISSUE FES:

09/15/75 05/28/76C CURRENT ENV. STATUS:

Complete SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

07/10/73 07/10/73C SAR 00CKETED:

10/02/73 10/02/73C SAR Q'S RECEIVED BY PM:

01/04/74 01/04/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/01/74 11/ 01/ 74 C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/24/75 01/24/75C LP hearings were held 05-19-81 through 05-22-81 A

ISSUE DRAFT SER:

favorable PID on low power operation was issued July INPUT TO SER:

01/24/75 01/24/75C 17, 1981.

A full power hearing was completed on January ISSUE SER:

10/04/74 10/16/74C 26, 1982.

ACRS LETTER RECEIVED:

05/00/78 07/18/78C INPUTS TO SE SUPPLEMENT 9:

08/00/82 ISSUE SE SUPPLEMENT 9:

08/00/82 FEMA LETTER RECEIVED:

08/00/82 CURRENT ANTITRUST:

HEARING STARTED:

10/29/75 12/07/76C Not required ASLB INITIAL DECISI0H:

08/00/82 ASLB FINAL DECISION:

09/00/82 TECH SPECS COMPLETED:

09/15/31 09/15/81C COMMISSION DECISION:

09/00/82 ISSUE LIC. WITH POWER RESTRICTION: 09/22/81 09/22/81C LATEST AMENCMENT:

ISSUE FULL POWER LICENSE AMEND:

N/S SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Est. of dates from end of LP hrq to lic. complete CONSTRUCTION CCMPLETION - APPL.

dependent upon dev./ approval of Stato and local Emergency Plans.

Cngoing Design Verif. Program likely to identify nlant modifications.

Const, comolotion denendent on mods.

3 NRR LICENSING SYST EM PAGE NO: 2-9 ENRICO FERMI 2 0L CURRENT STA TUS REP 0RT REPORT AS OF: 08/16/82 PLANT C H A R A C T E R I S T I C 5:

KEY P E R S O N N E L:

DOCKET NO:

05000341 LIC, PM:

L.

KINTHER ASLB CHAIR:

G. MILLHOLLIN I

APPLICANT:

DETROIT EDISON LIC. BC:

J. YOUNGBLOOD MEMBER 1:

P. MORRIS LOCATION:

LAGUNA BEACH, MICH LIC.

LA.'

M.

RUSHBROOK MEMBER 2:

D. SCHINK REGI0H 3

AE:

SSL COUNSEL:

C. WOODHEAD CONST. INSP:

REAC. TYPE: BWR NSSS: GE ANTITRUST:

A.

HODGDON RESID. INSP: B. LITTLE DESIGN PWR: 3292 MWT/1093 MWE CONST: DANIEL RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE An interim SER was issued on 09-29-77 and a final SER was issued on 07-10-81 (See second page for milestone ER DOCKETED:

04/04/75 04/04/75C sun mary. )

SSER Ho. I was issued 09-25-81 SSER No. 2 was ER SITE VISIT COMPLETE:

09/27/78 10/31/78C issued 01-29-82 with 7 prelicensing issues outstanding.

INPUT TO DES TO PM:

07/31/81 04/24/81C SSER No. 3 is scheduled for issuance on 09-30-82.

ISSUE DES:

05/01/31 04/30/8tC RESPONSE TO COMMENTS OH DES:

07/31/31 06/29/81C ISSUE FES:

08/31/81 09/04/81C CURRENT ENV. STATUS:

Addendum No. 1 to the FES was issued 03-03-82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/22/74 10/22/74C SAR DOCKETED:

04/05/75 04/05/75C SAR Q'S RECEIVED BY PM:

06/13/75 08/11/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/29/75 01/12/76 C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/24/75 03/08/76C A hearing on two issues began on 03-31-82 and ended on ISSUE DRAFT SER:

04-02-82.

The two contentions were: (1) QA/QC during INPUT TO SER:

03/05/76 05/20/77C construction and (2) adequacy of evacuation plans for ISSUE SER:

08/01/77 09/29/77C the local community. Proposed findings completed by by applicant and staff.

ACRS LETTER RECEIVED:

08/20/81 08/11/81C INPUTS TO SE SUPPLEMENT 3:

09/03/82 ISSUE SE SUPPLEMENT 3:

09/30/82 FEMA LETTER RECEIVED:

05/01/83 CURRENT ANTITRUST:

An ASLB decision on antitrust matters was issued on HEARING STARTED:

12/02/81 03/31/82C 04-25-78.

ASLB INITIAL DECISION:

10/00/82 ASLB FINAL DECISION!

11/00/82 TECH SPECS CCMPLETED:

04/01/83 COMMISSION DECISION:

05/01/83 ISSUE LIC. WITH POWER RESTRICTION: N/A LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

06/01/83 The latest final Safety Analysis Report Amendment is number 43.

SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:

Issuance of SE Supplement 3 slippes. month due to later CONSTRUCTION COMPLETION - APPL.'

06/01/83 03/29/82 responses from applicant and later aE input.

There is no impact on OL issuance.

NRR LICENSING SYSYEM PAGE NO: 2-10 FERMI 2 (FSAR RESUB)

OL CURRENT STATUS REP 0RT REPORT AS OF: 08/16/22 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:

DOCKET NO:

00007341 LIC. PM:

L. KINTNER ASLB CHAIR:

G. MILLHOLLIN APPLICANT:

DETROIT EDISON LIC. BC:

J. YOUNG 3LOOD MEMBER 1:

P. MORRIS LOCATION:

LAGUNA BEACH, MICH LIC. LA.:

M. RUSHBROOK MEMBER 2:

D. SCHINK REGION:

3 AE:

SIL COUNSEL:

C. WOOCHEAD CONST. INSP:

REAC. TYPE: BWR NSSS: GE ANTITRUST:

A.

HODGDON RESID. INSP B. LITTLE

{

DESIGN PWR 3292 MWT/1093 MWE CONST: DANIEL RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

SCHED. DATE ACTUAL DATE i

I l

All information on this page reflects the FSAR resubmittal. The SAR resubmittal was docketed on 06-01-78 and the safety review was completed. A final SER was issued on 07-10-81 Summary of later milestones is on previous page.

l CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

f APPLICATION TENDERED:

10/22/74 10/22/74C SAR DOCKETED:

06/01/78 06/01/78C SAR Q'S RECEIVED BY PM:

07/01/78 08/02/7CC SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/78 10/02/7EC INFUT TO DRAFT SER TO PM:

09/08/78 03/27/81C CURRENT HRG. STATUS:

i ISiUE DRAFT SER:

If.PUT TO SER:

06/10/81 06/23/81C ISSUE SER:

06/30/81 07/10/81C

)

i CURRENT ANTITRUST:

j LATEST AMENDMENT:

1 NEW SLIPS / NOTES:

All information on this page reflects the FSAR i

i resubmittal. The schedule for input to the SER slipped due to slippage in the fuel load date because of TMI cause.

i

N NR2 LICEN5ZHG SVSVEM PAGE NO: 3-11 GRAND CULF 1 & 2 LIC CURRENT STATUS REP 0RT REPORT AS OF: 08/16/82 PLAdT CHARACTERISTICSt KEY PERS0NNEL DOCKET NO:

041680417 LIC. PM:

D. HOUSTON ASLB CHAIR: N/A APPLICANT:

MISSISSIPPI POWER 8 LIGHT COMPANY LIC. BC:

A.

SCHWENCER MEMBER 1:

N/A LOCATION:

25 MI S OF VICKSBURG, MISS LIC. LA.:

E. HYLTON MEMBER 2:

N/A REGION:

2 AE:

BECH COUNSEL:

M. WAGNER CONST. INSP: R. VANDORN REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP A. WAGNER DESIGN PWR: 3333 MWT/1250 MWE CONST: BECH RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was issued on September 10, 1981.

An initial ACRS meeting was held Oct. 15, 1981.

SSERs were issued in ER DOCKETED:

06/05/78 06/30/78C December 1981 and in June and July 1982.

A second ACRS ER SITE VISIT COMPLETE:

12/14/79C meeting was held on August 12, 1982 on Hydrogen, HCU INPUT TO DES TO PM:

04/30/81 04/30/81C floor loads, and management staffing and capability.

ISSUE DES:

05/31/81 05/31/8tC RESPONSE TO COMMENTS CH DES:

08/15/81 08/15/81C ISSUE FES:

09/15/81 10/09/81C l

CURRENT ENV. STATUS:

DES was issued in May 1981 FES was issued October 9, 1981 SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

04/28/78 04/28/78C SAR DOCKETED:

06/05/78 06/30/78C SAR Q'S RECEIVED BY PM:

04/24/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/01/80 09/30/80C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S No hearing i s scheduled.

ISSUE DRAFT SER:

09/18/8tC INPUT TO SER:

04/01/81 08/14/81C ISSUE SER:

06/00/81 09/10/81C ACRS LETTER RECEIVED:

08/20/82 INPUTS TO SE SUPPLEMENT 4:

08/30/82 ISSUE SE SUPPLEMENT 4:

09/10/82 FEMA LETTER RECEIVED:

09/30/82 CURRENT AMTITRUST:

OL review is in progress. No significant changes have HEARING STARTED:

N/A occurred since the CP.

ASLB INITIAL DECISIGH:

N/A ASLB FINAL DECISION:

TECH SPECS COMPLETED:

09/01/81 06/16/82C COMMISSION DECISION:

09/00/82 ISSUE LIC. WITH POWER RESTRICTIDH: 04/23/82 06/16/82C LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

09/00/82 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

An operating license for Unit 1 authorizing fuel load CONSTRUCTION COMPLETION - APPL.

06/16/82C and up to 5% power operation was issued 06/16/82.

t

HRR LICENSING SVST EM PAGE NO: 2-12 HARRIS 1 82 0L CURRENT STATdS REPORT REPORT AS OF 08/16/82 PLANT C H A R A C T E R I 5 T I C S:

KEY P E R S 0 N N E L:

DOCKEi NO:

0400-0401 LIC. PM:

E. LICITRA ASLB CHAIR:

J. KELLEY APPLICANT:

CAROLINA PCWER 3 LIGHT LIC. BC:

F. MIRAGLIA MEMBER 1:

G.

BRIGHT LOCATION:

20 MI SW OF RALEIGH, NC LIC.

LA.*

J. LEE MEMBER 2:

J. CARPENTER REGION:

2 AE:

EBASCO COUNSEL:

C. BARTH CONST. INSP:

REAC. TYPE: PWR NSSS: WEST ANTITRUSI:

J. RUTBERG RESID. INSP: G. MAXWELL DESIGN PWR: 2775 MRT/0915 MWE CONST: DANIEL RM ANALYST:

M. ANDERSON CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

50HED. DATE ACTUAL DATE FS*R was docketed on 12/22/81.

Review has started.

Q0astions were sent to the applicant between 4/26/82 ER DOCKETED:

12e22/81 12/22/81C and 7/30/82. Most of applicant's responses were ER SITE VISIT COMPLETE:

04/08/82 04/08/82Cv received by 08/02/82.

INPUT TO DES TO PM:

31/15/82 ISSUE DES:

f0/25/82

/

RESPON3E TO CCMMENTS ON DES:

02/03/83

{

ISSUE FES:

03/31/83 s

NT i'

CURRENT ENV. STATUS:

ER was dockq6ed on 12/22/51. The situ visit was complate e

on C4/08/82 ated queshfons'were cent to applicant on '*

SAFETY /HEA3ING MILESTONES: '

8.3

~N 04/28/82.

Partist response'was received in e

g-amendment No. 5 da'e June 30, 1982.

APPLICATICH TENDERrD:'

06/26/80 06/26/80C

~

SAR DOCXETED:

f 12/22/81 12/22/81C e

SAR Q'S RECEIVE 3 BY PM:

N/S g

,i N

l SAR APPL. RESP 0r4SE TO Q'S RECEIVED: N/S

,jl 1,

4 1

INPUT TO DRAFT SER TO PM

,!' =

10/15/82 f

)(

CURRENT HRC.,%'ATUS:

Hotice for' 6pportuni ty for Heaeing wa= published in the ISSUE DRAFT GER:

12/01/82

, Federal REqfster op J>nuary 27, 1582.

Scverag,netitians INPUT TO SEma 06/01/83

\\were filed.

Prehdaring confwrer cc on petitions was held ISSUE SER:

C7/08/83 ca July 13-14, 1982.

" r I

ACRS FULL COMMITTEE MEETING:

08/11/83 l'iPU'S. TO SE SUPPL EMENT 1:

1 12/01/83 ISSUE SE SUPPLEMENT 3:

01/09/84 i

FIMA b T}:N RE,C?' SED:

f4/00/84 CURRENT ANTITRUST:

s s

Status to be determined.

HEARING STARTEt:'

06/O f/84

(, ' %

ASLB INL7IAL DECISIONe d(

11/57,34 ASLB F2AAL DECISION:

11/00/84-

~

TECH SPECS CONPLETED:

11/01/04.s\\;'-

COMMISSIrH DECISION:

11/00/24 ISSUE LIL. WITH POWER RESTRICTION:

12/04/84

'3 LATEST AMENDMENT:

I550E FULL POWER LICENSE AMEtC s 12/41/84 FSAR No. 3 ER No. 3 s

+

4 SCHE 2 DATE RECEIPT DATE NEW SLIPS / NOTES:

N s ~\\

s.,

CONSTRUCTION CCMPLETION - APPL..

12/01/84 04/14/82 y

s 9

_ \\'i.'

7

~,

~

m A

h

.,},,

e t

NRR LICEN$ING SY$T EM PAGE ND: 2-13 LASALLE 1 82 LIC CURRENT STATUS REPORT REPORT AS OF: 08/16/32 PLANT C H A R A C T E R I 5 T I C S:

KEY PERS0NN E L:

DCCKET NO:

037310374 LIC. PM:

A.

BOURNIA ASLB CHAIR:

M. MILLER APPLICANT:

COMMONWEALTH EDISON LIC. BC:

A.

SCHWEMCER MEMBER 1:

F. SHON LOCATION:

11 MI SE OF OTTAWA, ILL LIC. LA.

E. HYLTON MEti3ER 2:

O. PARIS REGION:

3 AE:

58L CCUNSEL:

C. WOOCHEAD CCNST. INSP:

H. WESCOTT REAC. TYPE: BWR NSSS: GE ANTITRUST:

B.

V0GLER RESID. INSP: W. CULLEMOND DESIGN PWR: 3293 MMT/1078 MWE CONST: CWE RM ANALYST:

5. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SSER-1 was issued in June 1981 SSER-2 was issued in February 1982.

SSER-3 was issued on April 16, 1982.

ER COCKETED:

01/17/77 05/12/77C SSER-4 was issued on July 14, 1982.

A lew power ER SITE VISIT COMPLETE:

01/12/77 C6/1S/77C license to permit fuel load and low power testing was INPUT TO DES TO PM:

02/17/78 02/17/78C issued on April 17, 1982.

A Full-Power License was ISSUE DES:

03/22/73 C3/29/78C issued on August 13, 1982.

RESPONSE TO COMMENTS ON DES:

07/14/78 0 7/14/.'8C ISSUE FES:

09/22/78 11/03/78C CURRENT ENV. STATUS:

Environmental Protection Plan has been issued.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

09/01/76 0 9/ 01/7 6 C SAR DOCKETED:

04/08/77 0 5/12/ 77 C SAR C'S RECEIVED BY PM:

07/C8/77 07/27/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/20/77 C8/t8/78C CURRENT HRG. STATUS:

INPUT TO CRAFT SER TO PM:

10/06/78 11/ 08/78 C No hearing.

ISSUE CRAFT SER:

INPUT TO SER:

12/29/78 C2/27/81C ISSUE SER:

09/0*/80 03/05/81C ACRS LETTER RECEIVED:

04/C9/81 C4/16/81C INPUTS TO SE SUPPLEMENT 4:

06/29/82 C6/29/32C ISSUE SE SUPPLEMENT 4:

07/14/82 07/14/82C FEMA LETTER RECEIVEDt N/S CURRENT ANTITRUST:

Complete.

HEARING STARTED:

N/A L

ASLB INITIAL DECISICN:

N/A ASLB FINAL DECISION:

N/A TECH SPECS CC!PLETED:

C4/12/82 04/12/82C COMMISSION DECISION:

C8/05/82 C8/05/82C ISSUE LIC. WITH POWER RESTRICTION: 04/17/82 04/17/82C LATEST AMENDMENT:

ISSUE FULL PCMER LICEN5E AMEND:

08/13/82 C8/13/82C SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Plant criticality was achieved on June 21, 1982.

CONSTRUCTION COMPLETION - APPL.:

C4/17/82C 04/17/82

~ _ - -

NRR LICEN5ING SYSTFM PAGE NO: 2-14 LIMERICK 1 82 0L CURRENT STA TUS REP 0RT REPORT AS OF: 08/16/02 I

PLANT CHARACTERI$ TICS:

KEY PERS0NNEL 4

I DOCKET NO:

03S2803S3 LIC. FM:

H. ABELSCN ASLB CHAIR:

L. BRENNER I

APPLICANT:

PHILADELPHIA ELECTRIC LIC. BC:

A.

SCHWENCER MEMBER 1:

R. COLE LOCATION:

3S MI NW OF PHILADELPHIA, PA LIC.

LA.*

E. HYLTCN MEM3ER 2:

P. MORRIS REGION:

1 AE:

BECH COUNSEL:

S. LEWIS CCNST. INSP:

REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP: S. CHAUNCHARY DESIGN PWR: 3440 MWT/106S MWE CONST: BECH RM ANALYST:

M. ANDERSON CURRENT SAF. STATUS:

ENVIRON *! ENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Applicant submitted Probabilistic Risk Assessment with FSAR on March 17, 1931.

SAR was docketed on 07/27/81 ER COCKETED:

07/27/81 07/27/81C PRA under review by Brookhaven National Laboratory; ER SITE VISIT COMPLETE:

08/17/02 NUREG/CR on PRA scheduled for issuanco 11/30/82.

INPUT TO DES TO FM:

03/2S/G3 ISSUE DES:

DS/06/83 RESPONSE TO COMMENTS ON DES:

09/06/33 ISSUE FES:

10/31/83 CURRENT ENV. STATUS:

ER was tendered with the FSAR on March 17, 1981 and was docketed on 07/27/81 ER site visit is scheduled to SAFETY / HEARING MILESTONES:

take place on 8/17/82.

APPLICATION TENDERED:

01/03/81 03/17/81C SAR DOCKETED:

07/27/81 07/27/81C SAR Q'S RECEIVED BY PM:

C3/20/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 10/07/32 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/07/83 Notice of Opportunity of Hearing was published in the ISSUE CRAFT SER:

02/04/83 Federal Registor on August 21, 1981 Pro-hearing INPUT TO SER:

07/01/83 conference held January 6-8, 1982.

A special pre-hearing ISSUE SER:

08/08/03 conference order was issued on June 1,

1982.

ACRS FULL COMMITTEE MEETING:

09/C8/83 INPUTS TO SE SUPPLEMENT 12 10/07/83 ISSUE SE SUPPLEt1ENT 1:

10/30/83 FEMA LETTER RECEIVED:

10/07/03 CURRENT ANTITRUST:

Status to be determined.

HEARING STARTED:

04/00/84 ASLB INITIAL CECISION:

09/00/84 ASLB FINAL CECISION:

10/0C/64 TECH SPECS Cui.PLETED:

N/S CD1 MISSION DECISION:

10/00/84 ISSUE LIC. WITH POMER RESTRICTION: 10/00/34 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

N/S Rev. 4. July 27, 1982 (ER OL)

Rev. 8. July 27, 1982 (FSAR)

SCHED. DATE RECEIPT CA'E NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

10/03/84 04/27/82

.... _. _ = - -.. _ _ _ _ _ _

... ~ -. - - _ - _ _ _ _

b NRR LICENS ING SY$ TEM PAGE NO: 2-15 MCCUIRE 2 0L CURRENT STATUS REP 0RT REFORT AS OF: 08/16/82 PLANT CHARACTERIST I C S:

KEY P E R S 0 N N E L:

j DOCKET NO:

05000370 LIC. PM:

R. BIRKEL ASLE CHAIR:

R. LA20 APPLICANT:

DUKE PCMER LIC. RC:

E. ADENSAM MEMBER 1:

X. HAND LOCATION:

17 MI N OF CHARLOTTE, NC LIC. LA.

M.

DUNCAN MEM3ER 2:

E. LUEBKE REGION:

2 AE:

DUKE COUNSEL:

J. CUTCHIN CONST. INSP: M.

HUNT REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP: P. B Et1IS DESIGN PWR: 3411 MWT/1180 MWE CONST: DUKE RM ANALYST:

3. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Input for SSER 6 (SSER for unit 2) is due to DL on 12/01/82, with issuance of the supplement scheduled ER DOCKETED:

05/31/74 05/31/74C for 01/01/83.

ER SITE VISIT COMPLETE:

01/30/75 01/30/75C INPUT TO DES TO PM:

08/29/75 08/29/75C ISSUE DES:

11/07/75 10/29/75C RESPONSE TO COMMENTS ON DES:

ISSUE FES:

05/07/76 04/20/76C t

CURRENT ENV. STATUS:

Complete.

SAFETY / HEARING MILESTONES:

I APPLICATION TENDERED:

04/05/74 04/05/74C SAR DOCKETED:

04/29/75 05/05/75C SAR C'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED!

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Complete.

ISSUE DRAFT SER:

INPUT TO SER:

06/01/77 01/16/78C ISSUE SER:

02/21/78 03/01/78C ACRS LETTER RECEIVED:

04/14/78 04/14/78C INPUTS TO SE SUPPLEMENT 6:

12/01/82 ISSUE SE SUPPLEMENT 6:

01/01/83 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

Complete.

HEARING STARTED:

03/15/77 03/28/77C

. ASLB INITIAL DECISION:

06/00/81 06/08/81C ASLB FINAL DECISION:

l TECH SPECS COMPLETED:

12/01/82 COMMISSION DECISION:

03/01/83 ISSUE LIC. WITH PCMER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

04/01/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

04/01/83 05/20/82 l

4 NRR LICENSING SYSTEM PAGE NO: 2-14 I

MIDLAND 1 82 0L 00RRENT STATUS REPQRT REPORT AS CF: 08/16/32 i

PLANT CHARACTERIST I C 5:

KEY P E R S 0 N N E L:

DOCKET NO:

0330A0321 LIC. PM:

R. HERMAN CHOCD ASLB. CHAIR:

C.

BECHHOEFER APPLICANT:

CONSUMERS PCWER LIC. BC:

E. ADENSAM MEMBER 1:

F. CCMAN LOCATICN:

SW EDUNDARY OF MIDLAND. MICH.

LIC.

LA.-

M.

DUNCAN MEMBER 2:

J. HAREOUR REGION:

3 AE:

BECH COUSSEL:

W. PATCN CONST. INSP: R.

LANDSMAN REAC. TYPE: PWR NSSS: 92U ANTITRUST:

B. VCGLER RESID. INSP: R. CC0K DESIGN PWR: 2452 MWT/0818 MME CONST: EECH RM ANALYST:

M. ANDERSON CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Utilization of National Laboratories or other agencies to complete sema revicu areas is currently ER DOCKETED:

04/01/78 04/14/78C in prcqress.

CP cxtension was issued 12/28/81.

ACRS ER SITE VISIT COMPLETE:

09/08/78 09/08/78C Full Committec Meeting was hcid 05/3-5/82.

SSER #1 INPUT TO DES TO PM:

02/03/82 02/03/82C responding to ACRS Ictter was issued 6/30/82.

ISSUE DES:

02/05/82 02/05/82C RESPONSE TO CCMMENTS ON DES:

07/03/82 07/08/82C ISSUE FES:

07/23/82 07/23/32C CURRENT ENV. STATUS:

The DES was issued 02/05/82. The FES was issued on July 23, 1982.

SAFETY / HEARING MILESTONES:

APPLICATICN TENDERED:

08/31/77 08/31/77C SAR DOCKETED:

09/30/77 11/18/77C SAR Q'S RECEIVED EY PM:

03/20/78 10/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/03/78 12/08/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

11/01/78 12/01/78C Three prehearings ending 04/27-28/81 were held for a ISSUE DnAFT SER:

N/A separate hearing on soils settlement. Hearing on soils INPUT TO SER:

04/23/82 04/23/82C settlement began July 7.

1981 and is continuing.

ISSUE SER:

05/11/82 05/11/82C Discovery phase for OL hearing is in progress.

ACRS LETTER RECEIVED:

06/15/82 06/08/82C INPUTS TO SE SL'PPLEMENT 1:

06/10/82 06/10/82C ISSUE SE SUPPLEMENT 1:

06/30/82 06/30/82C FEMA LETTER RECEIVED:

08/00/82 CURRENT ANTITRUST:

Proceeding completed. License was amended 10/20/80.

HEfRING STARTED:

11/16/82 ASLB INITIAL DECISION:

06/30/83 ASLB FINAL DECISION:

07/00/83 TECH SPECS CCMFLETED:

10/25/82 COMMISSION DECISION:

07/00/83 ISSUE LIC. WITH PC2ER RESTRICTION: 07/31/83 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

N/S 103 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CGNSTRUCTION COMPLETION - APPL.:

07/31/83 12/31/81

N R.?

LICENSING SVSTEM PAGE NO: 2-17 i

PALO VERDE 1,2,3 0L CURRENT STATUS REPQRT REPORT AS OF: 08/16/82 PLANT C H A R A C T E R I S T I C 5:

KEY PERS0NNEL DOCKET NO 0528-0530 LIC. PM:

E. LICITRA ASLB CHAIR:

R.

LAZO APPLICANT:

ARIZONA PUBLIC SERVICE LIC. BC:

F. MIRAGLIA MEMBER 1:

R. COLE LOCATION:

36 MI W OF PHOENIX, AZ LIC. LA.:

J. LEE MEMBER 2:

D. CALLIHAN l

REGION:

S AE:

BECH COUNSEL:

L. DEWEY CONST. INSP:

L. VBRUEGGEN REAC. TYPE: PWR NSSS: COMB ANTITRUST:

B. V0GLER RESID. INSP: G. FIORELLI DESIGN PWR: 3817 MWT/1304 MWE CONST: BECH RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The safety OL review is in progress. Several " Independent Design Review" meetings have been completed. The SER ER DOCKETED:

07/01/80 06/20/80C was issued on November 11, 1981.

The SER supplement ER SITE VISIT COMPLETE:

01/30/81 01/30/81C Nos. 1 and 2 were issued on February 5, 1982 and May 17, INPUT TO DES TO PM:

10/05/81 10/05/81C 1982.- respectively. SSER-3 is scheduled to be issued on ISSUE DES:

10/26/81 10/26/8tC August 30, 1982.

RESPONSE TO COMMENTS ON DES:

02/25/82 02/25/82C ISSUE FES:

03/11/82 03/11/82C CURRENT ENV. STATUS:

The ER (OL) review is complete. A site visit was completed on January 30, 1981 The DES was issued on SAFETY / HEARING MILESTONES:

October 26, 1981 and the FES was issued on March 11, 1982.

APPLICATION TENDERED:

10/05/79 10/05/79C SAR DGCKETED:

06/20/80 06/20/80C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Five contentions were initially admitted. Two contentions ISSUE BRAFT SER:

have been subsequently dropped by the intervenor and two INPUT TO SER:

10/30/81 10/30/81C others were summarily disposed of by the Board.

The ISSUE SER:

11/11/81 ft/11/8tC remaining contention deals with water availability.

The hearing started April 27-30, 1982, resumed on May ACRS LETTER RECEIVED:

12/18/81 12/t3/8tC 25-28, 1982 and again on June 22, 1982.

Hearing record INPUTS TO SE SUPPLEf1ENT 32 08/02/82 08/02/82C was closed on June 25, 1982.

ISSUE SE SUPPLEMENT 3:

08/30/82 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Antitrust OL review is in progress.

HEAR 1!1G ST ARTED:

04/27/82 04/27/82C ASIB INITIAL DECISION:

10/30/82 ASLB FINAL DECISION:

11/00/82 TECH SPECS COMPLETED:

08/01/83 COMMISSION DECISION:

07/00/83 ISSUE LIC. WITH POWER RESTRICTION: 08/01/83 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

08/20/83 FSAR Amendment No. 8 ER Supplement No. 4 SCHED. DATE RECEIPT DATE i

HEW SLIPS / NOTES:

Caseload Forecast Panel estimates for construction CONSTRUCTION CCMPLETION - APPL.:

08/00/83 07/13/82 completion on Units 1,

2, and 3 are being re evaluated as a result of a March 1982 site visit.

NRR LICENSING SYSTEM PAGE NO: 2-18 PERRY 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF: 08/16/32 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

044080441 LIC. PM:

J. STEFAND ASLB CHAIR:

P. ELOCH APPLICANT:

CLEVELAND ELECTRIC ILLUMINATING LIC. BC:

A. SCHWENCER MEMSER 17 J. KLINE LOCATION:

7 MI NE OF PAINESVILLE, OHIO LIC. LA.-

E. HYLTON MEMBER 2:

F. SHON REGION:

3 AE:

GIL COUNSEL:

B. V0GLER CONST. INSF:

REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP: M. GILDNER DESIGN PWR: 3759 MWT/1205 MWE CONST: GIL RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The Safety Evaluation Report was issued in May 1982.

An ACRS subcommittee meeting was held on June 28-29, 1982.

ER DOCKETED:

06/26/81 06/19/81C The ACRS full committee meeting was held on July 8, 1982.

ER SITE VISIT COMPLETE:

SSER No. I was issued on August 9, 1982.

INPUT TO DES TO PM:

01/01/82 01/01/82C SSER No. 2 to be issued prior to start of ASLB ISSUE DES:

02/26/82 02/26/32C bearings (on/or about September 30, 1982).

RESPONSE TO COMMENTS ON DES:

06/30/82 Co/30/C2C ISSUE FES:

08/13/82 08/13/82C CURRENT ENV. STATUS:

Environmental acceptance review was completed on June 9,

1981 The ER was docketod June 19, 1981 FES SAFETY / HEARING MILESTONES:

issued on August 13, 1982.

APPLICATION TENDERED:

06/26/80 06/26/80C SAR COCKETED:

01/09/81 01/30/81C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO CRAFT SER TO PM:

02/24/82 02/24/82C A prehearing conference was held June 2-3, 1981 in ISSUE CRAFT SER:

02/26/82 02/26/8EC Painesville, Ohio.

By Board Orders dated July 28, 1981, INPUT TO SER:

04/10/82 OS/10/82C October 2, 1981, March 3, 1982, and July 19, 1982, ISSUE SER:

05/10/82 05/24/82C ten contentions including financial qualifications were admitted as hearing issues.

ACRS LETTER RECEIVED:

07/16/82 07/16/82C INPUTS TO SE SUPPLEMENT 22 07/15/82 07/16/F2C ISSUE SE SUPPLEMENT 2:

09/30/82 FEMA LETTER RECEIVED:

12/00/C2 CURRENT ANTITRUST:

CP antitrust review has been completed. OL antitrust HEARING STARTED:

11/03/82 status is under review.

ASLB INITIAL DECISION:

04/00/83 ASLB FINAL DECISION:

05/00/83 TECH SPECS COMPLETED:

06/00/83 COM;1ISSION DECISIONr 10/03/83 ISSUE LIC. WITH POWER RESTRICTION: N/S LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

11/00/83 Number 7 (5-27-82).

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTIDH COMPLETION - APPL.*

11/00/83 02/22/82

NRR L ICENSING SYSTEM PAGE N3: 2-19 RIVER BEND 1 32 0L CURRENT STATUS REPORT REPORT AS Or: 08/16/82 PLANT CHARACTERI5T I C S:

K EY PERS0NN E L:

DOCKET NO:

045880459 LIC. PM:

UNASSIGNED ASLB CHAIR:

B. COTTER APPLICANT:

GULF STATES UTILITIES LIC. BC:

A.

SCHWENCER MEMBER 1:

F. REMICK LOCATION:

24 MI NNW OF BATON ROUGE, LA LIC. LA.

E. HYLTON MEM3ER 2:

R. COLE REGION:

4 AE:

S8W COUNSEL:

L. DEWEY CONST. INSP:

. UNASSIGNED REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP: R.

BRCWN DESIGN PWR: 3015 MWT/0934 MWE CONST: S&W RM ANALYST:

M.

KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Applicant tendered FSAR for docketing on 04/24/81 FSAR was docketed on 08/25/81 Draft SER targeted for ER DCCKETED:

08/25/81 08/25/81C 03/83.

ER SITE VISIT COMPLETE:

01/22/82 01/22/82C INPUT TO DES TO PM:

12/09/83 ISSUE DES:

01/09/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

06/08/84 CURRENT ENV. STATUS:

Applicant tendered ER for docketino on 04/24/81.

ER was docketed on 08/25/81 DES targeted for 01/09/84.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

04/24/81 04/24/81C SAR DOCKETED:

08/25/81 08/25/81C SAR Q'S RECEIVED BY PM:

12/07/81 12/16/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 09/01/82 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

03/04/83 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

03/00/83 Federal Register on 09/04/81 INPUT TO SER:

11/04/83 ISSUE SER:

12/02/83 ACRS FULL COMMITTEE MEETING:

01/13/84 INPUTS TO SE SUPPLEMENT 1:

04/00/84 ISSUE SE SUPPLEMENT 1:

05/00/84 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Status to be determined.

HEARING STARTED:

10/00/84 ASLB INITIAL DECISION:

03/00/85 ASLB FINAL DECISICH:

04/00/85 TECH SPECS COMPLETED:

COMMISSICN DECISION:

04/00/85 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENCMENT:

ISSUE FULL POWER LICENSE AMEND:

04/00/85 Number 3.

SCHED. DATE RECEIPT DATE l

NEW SLIPS / NOTES:

NRR/CL revised tho priority of the review on this caso due CONSTRUCTION COMPLETION - APPL.:

04/00/85 04/15/82 to 18-month slip in construction schedule.

. _ _ _ _ _ _ - _ ~ _ _ _ _ _ _ _.

NRR L ICENSING SYSTEM PAGE NO: 2-20 SAN ONOFRE 2 8 3 L IC CURREN T STATUS REPQRT REPORT AS OF: 08/16/82 1

i I

PLANT C H A R A C T E R I $ T I C S:

KEY P E R S 0 N N E L:

00CKET NO:

036130362 LIC, PM:

H. ROOD ASLB CHAIR:

J. KELLEY APPLICANT:

SOUTHERN CALIFORNIA EDISON LIC. BC:

F. MIRAGLIA MEMBER 1:

C. HAND LOCATION:

S MI S CF SAN CLEMENTE, CA LIC.

LA..

J. LEE MEMBER 2:

E. JOHNSON REGION:

5 AE BECH COUNSEL:

L. CHANDLER CONST. INSP: D. KIRSCH REAC. TYPE: PWR NSSS: COMS ANTITRUST:

B. V0GLER RESID. INSP:

A.

CHAFFEE DESIGN PWR: 3410 MWT/1100 MWE CONST: BECH RM ANALYST:

M.

ANDERSON CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER on geolocical and seismological matters was issued on 12/31/80.

ACRS subcommittee meetings were held 01/30/81 and ER DOCKETED:

03/01/77 03/23/77C 03/11/81 and full committee meetings were held 02/5/81 and ER SITE VISIT COMPLETE:

05/20/77 05/20/77C 03/12/81.

SER (Non-TMI matters), was issued on 02/06/81.

INPUT TO DES TO PM:

10/01/77 12/01/80C i

SER supplement on TMI issues was issued on 02/25/81.

SER ISSUE DES:

01/27/78 01/20/81C supplenent No. 2, 3.

4, 5 and 6 addressing open i tems were RESPONSE TO COMMENTS ON DES:

04/06/81 04/06/81C issued 05/08/81, 09/16/81, 01/22/82, 02/16/82, and 06/30/82.

ISSUE FES:

04/00/81 04/29/81C An ASLB partial initial decision was rendered on 01/11/82 and an ASLB initial decision was issued on 05/14/82.

Low power OL issued 02/16/82; full power issued 08/17/82.

CURPENT ENV. STATUS:

DES addressing class 9 accidents was issued 01-20-81, j

FES was isrued 04-29-81.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

11/29/76 11/29/76C SAR DOCKETED:

03/01/77 03/23/77C SAR Q'S RECEIVED BY PM:

08/15/77 09/29/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/18/77 12/08/77C 1

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

02/10/78 08/11/78C Motions for summary disposition were granted by ASLB.

ISSUE CRAFT SER:

01/15/81 01/15/81C Hearing started 06/22/31 and ended 09/31/81.

A INPUT TO SER:

06/23/78 Ot/15/81C decision on low power operation was issued on 01/tt/82.

ISSUE SER:

08/01/80 02/06/81C An ASLB initial decision on full power operation was issued on 05/14/82.

ACRS LETTER RECEIVED:

03/17/81 03/17/81C INPUTS TO SE SUPPLEMENT 7:

08/30/82 ISSUE SE SUPPLEMENT 7:

10/01/82 FEMA LETTER RECEIVED:

12/01/81 12/01/81C CURRENT ANTITRUST:

The Staff is reviewing the OL antitrust information.

HEARING STARTED:

06/22/81 06/22/8tC ASLB INITIAL DECISIGN:

05/14/82 05/14/82C ASLB FINAL DECISION:

07/00/82 07/C0/82C TECH SPECS COMPLETED:

02/16/82 02/16/82C CGM:1ISSION DECISION:

07/28/82 07/28/82C ISSUE LIC. WITH POWER RESTRICTION: 02/16/82 0 2/16 /82C LATEST AMENDMENT:

ISSUE FULL PCWER LICENSE AMEND:

08/17/82 08/17/82C SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL..

02/16/82C I

3

NRR LICEN$ING SYSTEM PAGE NO: 2-21 SEABROCK 1 8 2 0L CURRENT STATUS REPQRT REPORT AS OF: 08/16/32 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNELi DOCKET NO:

044380444 LIC. PM:

L. MHEELER ASLB CHAIR:

H. H0YT APPLICANT:

PUBLIC SERVICE OF NEW HAMPSHIRE LIC. BC:

F. MIRAGLIA MEMBER 1:

E. LUEBKE LOCATION:

10 MI S OF PORTSMOUTH, NH LIC. LA.

J.

LEE MEMBER 2:

D. PARIS REGIDH:

1 AE:

UEC COUNSEL:

R. LESSY CONST. INSP:

A.

TOTH REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP: A. CERHE DESIGN PWR: 3411 MWT/1198 MWE CONST: UEC RM ANALYST:

B.

ST MARY l

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE l

l The FSAR acceptance review was completed in September 1981.

The FSAR was docketed October 5, 1981 Applicant has ER DOCKETED:

10/05/81 10/05/81C responded to round 1 Q's.

SER issuance has moved from ER SITE VISIT COMPLETE:

09/07/82 to 11/08/82. Partial input to draft SER INPUT TO DES TO PM:

03/01/82 03/01/82C has been forwarded to DL and prepared for issuance.

ISSUE DES:

05/14/82 05/14/82C Human Factors and Operator Licensing input is outstanding.

RESPONSE TO COMMENTS ON DES:

08/18/82 ISSUE FES:

10/05/32 CURRENT ENV. STATUS:

ER was tendered June 1981.

ER acceptance review was completed September 1981.

The ER was docketed SAFETY / HEARING MILESTONES:

October 5, 1981 DES was i ssued May, 1982.

Comments APPLICATION TENDERED:

06/29/81 06/29/81C are being evaluated.

SAR DOCKETED:

10/05/81 10/05/81C SAR Q'S RECEIVED BY PM:

01/20/82 03/05/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/12/82 04/13/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

08/30/82 Notice for Opportunity for Hearing was published in ISSUE DRAFT SER:

08/20/82 the Federal Register en October 19, 1981.

First prehearing INPUT TO SER:

10/08/82 conference was held May 6-7, 1982. Second prehearing ISSUE SER:

11/08/82 conference was held July 15-16, 1982.

ACRS FULL COMMITTEE MEETING:

12/10/82 INPUTS TO SE SUPPLEMENT 1:

12/10/82 ISSUE SE SUPPLEMENT 1:

12/30/82 FEMA LETTER RECEIVED:

12/20/82 CURRENT ANTITRUST:

Status to be determined.

HEARING STARTED:

06/00/83 ASLB INITIAL DECISION:

04/00/84 ASLB FINAL DECISIDH:

05/03/84 TECH SPECS COMPLETED:

COMMISSION DECISICH:

05/00/84 ISSUE LIC. WITH PCWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

05/00/84 45 SCHED. DATE RECEIPT DATE HEM SLIPS / NOTES:

Applicant critical path construction progress is behind CONSTRUCTION COMPLETION - APPL.:

05/31/84 06/23/82 schedule. Licensing schedule has been expanded six months.

NQR LICENSING SYSTEM PAGE ND: 2-22 SHOREHAM 0L CURRENT STATUS REPORT REPORT AS CF: 08/16/32 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05000322 LIC. PM:

R. GILBERT ASLB CHAIR:

L. BRENNER APPLICANT:

LONG ISLAND LIGHTING CD.

LIC. EC:

A.

SCEWENCER MEMSER 1:

P. MORRIS LOCATION:

BROOKHAVEN, NY (LI)

LIC. LA.:

E. HYLTON MEM3ER 2:

J.

CARPENIER REGION:

1 AE:

S&W COUNSEL:

B. BORDENICK CONST. INSP:

L. NARROW REAC. TYPE: BWR NSSS: GE ANTITRUST:

J. RUTEERG RESID. INSP J. HIGGINS DESIGN PWR: 2436 MWT/0854 MWE CONST: $3W RM ANALYST:

L.

LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The ACRS meeting was held in October 1981 SER Supplement 2 was issued in March 1982.

An additional ER COCKETED:

01/26/76 01/26/76C SER Supplement is scheduled for Sept. 1982 or earlier ER SITE VISIT COMPLETE:

08/06/76 08/03/76C to address resolution of outstanding matters.

INPUT TO DES TO PM:

11/22/76 11/'9/76C ISSUE DES:

03/11/77 03/24/77C RESPONSE TO COMMENTS ON DES:

07/22/77 07/22/77C ISSUE FES:

10/21/77 10/18/77C CURRENT ENV. STATUS:

The environmental review is complete.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

09/00/7S 09/04/75C SAR DOCKETED:

12/15/77 01/26/76C SAR Q'S RECEIVED BY PM:

06/04/76 07/09/76C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/23/76 07/23/76C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/15/77 08/01/77C Hearing sessions are scheduled for August 24-27, 1982.

ISSUE CRAFT SER:

INPUT TO SER:

03/10/81 03/10/81C ISSUE SER:

04/10/81 04/10/81C ACRS LETTER RECEIVED:

09/18/81 10/19/8tC INPUTS TO SE SUPPLEMENT 3:

N/S ISSUE SE SUPPLEMENT 3:

09/03/82 FEMA LETIER RECEIVED:

10/01/82 CURRENT ANIITRUST:

Not required.

HEARING STARTED:

05/04/82 05/04/82C ASLB INITIAL DECISION:

04/00/83 ASLB FINAL DECISION:

TECH SPECS COMPLETED:

COM:1ISSION DECISION:

05/00/83 ISSUE LIC. WITH POWER RESTRICTION: 03/00/83 LATEST AMENDMENT:

ISSUE FULL PCWER LICENSE AMEND:

05/03/83 FSAR Amendment 26 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

The current estimate for a partial initial ASLB decision.

CONSTRUCTION CCMPLETION - APPL.:

09/20/82 04/30/82 un all matters except offsite emergency planning is the end of December, 1982.

A corplete initial decision may not be available crior to March, 1983.

N22 L ICEN5ING SYSVEM PAGE NO: 2-23 SOUTH TEXAS 1 12 0L CURRENT STATUS REP 0RT REPORT AS OF: 08/16/82 PLANT C H A R A C T E R I $ T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

049880499 LIC. PM:

D. SELLS ASLB CHAIR:

C. BECHHOEFER APPLICANT:

HOUSTON LIGHTING AND POWER COMPANY LIC. BC:

F. MIRAGLIA MEMBER 18 J. LAMB LOCATION:

12 MI SSW OF BAY CITY, TEX LIC. LA.

J. LEE MEMBER.2:

E. HILL REGION:

4 AE:

BECH COUNSEL:

J. GUTIERREZ CONST. INSP:

REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP: W. HILL DESIGN PWR: 3800 MWT/1250 MWE CONST: EBASCO RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Limited work being performed due to highor priorities.

BRRT has been replaced by Bechtel as the A/E.

BRRT ER DOCKETED:

07/17/78C has been replaced by Ebasco as the constructor.

ER SITE VISIT COMPLETE:

09/26/78 09/26/78C Non-safety related construction restarted on June 15, 1982.

IMPUT TO DES TO PM:

08/00/85 Restart of safety related construction scheduled about ISSUE DES:

09/00/85 i

August 15, 1982.

Current FLD is 12/86.

Milestones new RESPONSE TO COMMENTS ON DES:

01/00/86 reflect a 12/86 FLD.

ISSUE FES:

02/00/86 i

i CURRENT ENV. STATUS:

Schedule revised to reflect new 12/86 FLD.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

05/10/78 05/10/78C SAR DOCKETED:

07/17/78C SAR Q'S RECEIVED BY PM:

01/22/79 02/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

03/00/85 As provided in a Commission Order of 9/22/80, an ISSUE DRAFT SER:

03/00/85 expedited hearing on QA programs and management was INPUT TO SER:

11/00/85 held.

The record of this phase of the hearing ISSUE SER:

12/00/85 was closed on June 17, 1982. Phase II of hearing will consider all aspects of Quadrex Report.

ACRS FULL COMMITTEE MEETING:

01/00/86 Phase II is expected to begin in late '82 or early '83.

INPUTS TO SE SUPPLEMENT 1:

01/00/86 ISSUE SE SUPPLEMENT 1:

01/00/86 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Memo and Order issued May 6, 1982 approving setticments and HEARING STARTED:

06/00/86 proposed license conditions and dismissin0 proceeding.

ASLB INITIAL DECISION:

11/00/86 ASLB FINAL DECISION:

12/00/86 TECH SPECS COMPLETED:

01/00/86 COMMISSION DECISION:

12/00/86 ISSUE LIC. WITH PCWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/00/86 Amendment 025 was issuod 03/15/82.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

All schedules now reflect new official FLD of 12/86.

CONSTRUCTIDH CCMPLETION - APPL.:

12/00/86 03/00/82

NRR LICENSING SYSTEM PAGE NO: 2-24 ST LUCIE 2 0L CURRENT STATUS REPQRT REPORT AS OF: 08/16/82 PLANT CHARACTERI5 TICS:

KEY P E R S 0 N N E L:

DOCKET NO:

05000389 LIC. PM:

V. NERSES ASLB CHAIR:

E. BOWERS APPLICANT:

FLORIDA POWER & LIGHT LIC. BC:

F. MIRAGLIA MEMBER 1:

P. MORRIS LOCATION:

12 MI SE OF FT. PIERCE. FLA LIC.

LA.'

J. LEE MEMBER 2:

D. PARIS REGION:

2 AE2 EBASCO COUNSEL:

W. PATTON CONST. INSP: R. WRIGHT REAC. TYPE: PWR NSSS: COMB ANTITRUST:

B. V0GLER RESID. INSP: S. ELROD DESIGN PWR: 2700 MWT/0842 MWE CONST: EBASCO Rf1 ANALYST:

M. ANDERSON CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Status of Q-1 and Q-2 review is complete. The SER was issued on 10/09/81. SE Supplement No. I was issued ER DOCKETED:

02/17/81C on 12/30/81. SE Supplement No. 2 is scheduled to be ER SITE VISIT COMPLETE:

02/18/81 0 2/18/8 t C issued on 8/27/82.

INPUT TO DE5 TO PM:

08/07/81 08/07/81C ISSUE DES:

10/16/81 10/16/8tC RESP 0 HSE TO COMMENTS ON DES:

02/08/82 02/C8/82C ISSUE FES:

04/23/82 04/23/82C CURRENT ENV. STATUS:

The DES was issued on 10/16/8 1 and the FR Notice was published 10/30/81. The FES was issued on 04/23/82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/31/80 03/31/80C SAR DOCKETED:

02/17/81C SAR Q'S RECEIVED BY PM:

06/1S/81 06/tS/81C SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

08/03/81 08/03/81C There have been no politioners on matters dealing with ISSUE DRAFT SER:

08/10/81 08/10/81C health, safety and environment.

INPUT TO SER:

09/11/81 09/11/81C ISSUE SER:

10/09/81 10/09/81C ACRS FULL COMMITTEE MEETING:

11/12/81 11/12/81C INPUTS TO SE SUPPLEMENT 2:

08/20/82 ISSUE SE SUFPLEMENT 2:

08/27/82 FEf1A LETTER RECEIVED:

08/20/82 CURRENT ANTITRUST:

Settlement among the Department of Justice, the NRC Staff HEARING STARTED:

N/A and the licensee has been agreed upon.

Case dismissed ASLB INITIAL DECISION:

N/A 3/82 following summary disposition and settlement agreement.

ASLB FINAL DECISION:

N/A TECH SPECS COMPLETED:

09/30/82 COMMISSION DECISION:

09/30/82 ISSUE LIC. WITH POWER RESTRICTION: N/A LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

10/31/82 No. 12 (FSAR); No. 5 (ER)

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Caseload Forecast Panel estimate for constru: tion CONSTRUCTION COMPLETION - APPL.:

10/28/82 12/31/81 ccmpletion on Unit 2 is being reevaluated as a result of the June, 1982 site visit.

NRR LICENSING SYSTEM PAGE NO: 2-25 SUMMER 1 LIC CURRENT STATUS R EPORT REPORT AS OF: 08/16/32 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05000395 LIC. PM:

W. KANE ASLB CHAIR:

H. CROSSMAN APPLICANT:

SOUTH CAROLINA ELECTRIC 8 GAS CO.

LIC. BC2 B. YOUNGBLOOD MEMBER 1:

G.

LINENBERGER LOCATION:

26 MI NW OF COLUMBIA, SC LIC. LA.

M.

RUSHBROOK MEMBER 2:

F. HOOPER REGION:

2 AE:

GIL COUNSEL:

S. GOLDBERG CONST. INSP:

REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP: J. SK0LDS DESIGN PWR: 2785 MWT/0900 MWE CONST DANIEL RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER Supplement No. 1 was issued 04/28/81 Supplement No. 2 to the SER was issued on 05/28/81. Supplement No.

ER DOCKETED:

01/21/77 02/24/77C 3 was issued in January 1982.

Supplement No. 4 was ER SITE VISIT COMPLETE:

06/30/78 06/07/78C issued on August 6, 1982.

An operating license with INPUT TO DES TO PM:

09/21/78 05/29/79C a 5% power restriction was issued on August 6, 1982.

ISSUE DES:

10/30/78 06/22/79C RESPONSE TO COMMENTS ON DES:

07/01/80 07/24/80C ISSUE FES:

05/15/81 05/21/81C CURRENT ENV. STATUS:

DES supplement on Class 9 accidents was issued in November 1980.

The FES was issued in May, 1981.

SAFETY / HEARING MILESTONES:

APPLICATICN TENDERED:

12/10/76 12/10/76C SAR DOCKETED:

01/21/77 02/24/77C SAR Q'S RECEIVED BY PM:

02/03/78 03/08/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 04/21/78 09/18/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

06/16/78 02/21/79C On 04/31/81 the ASLB by order granted the FUA intervention ISSUE DRAFT SER:

N/A on 10 contentions. The ASLAB on 06/01/81 reversed the ASLB INPUT TO SER:

06/02/80 12/15/80C decision to admit FUA as an intervenor. The contested ISSUE SERE 08/01/80 02/06/81C hearing began 06/81 and was completed in January 1982.

ASLB Partial initial decision on seismic issues was ACRS LETTER RECEIVED:

03/18/81 03/18/81C issued on July 20, 1982.

The rcmainder of the decision INPUTS TO SE SUPPLEMENT 4 07/14/82 07/14/32C was issued on August 4, 1982.

ISSUE SE SUPPLEMENT 4:

07/16/82 08/06/82C FEMA LETTER RECEIVED:

11/13/81 11/13/81C CURRENT ANTITRUST:

The Attorney general sent his advice on significant HEARING STARTED:

06/22/21 06/22/81C changes to the Commission on 10/10/80.

The Commission ASLB INITIAL DECISION:

07/00/82 08/04/82C on 06/26/81 denied Central Electric Power Coop., Inc.

ASLB FINAL DECISION:

09/00/82 petition for antitrust review.

TECH SPECS COMPLETED:

07/00/82 08/06/82C CCMMISSION DECISION:

09/00/82 ISSUE LIC. WITH POWER RESTRICTION: 07/00/82 08/06/82C LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

09/00/82 Number 33.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.*

08/10/82C

NR2 L ICENSING SY$ TEM PAGE NO: 2-26 SUSQUEHANNA 1 &2 LIC CURRENT STATUS REPQRT REPORT AS OF: 08/16/82 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNEL:

DOCKET NO:

038780388 LIC. PM:

R. PERCH ASLB CHAIR:

J. GLEASON APPLICANT:

PENNSYLVANIA PCWER 8 LIGHT LIC. BC:

A.

SCHWENCER MEf1BER 1:

G. BRIGHT LOCATION:

7 MI NE OF BERWICK, PA LIC. LA.*

E. HYLTON MEMBER 2:

P. PUR DC:1 REGION:

1 AE:

BECH COUNSEL:

J. CUTCHIN CCNST. INSP: L. NARROW REAC. TYPE: BWR HSSS: GE ANTITRUST:

A.

H0DGDON RESID. INSP:

G.

RHOADS DESIGN PWR: 3440 MWT/1052 MWE CONST: BECH RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was issued 04/06/81.

SSER 41 was issued 07/07/81 Post ACRS SSER 82 was issued 09/10/81. SSER 83 was ER DOCKETED:

06/10/780 issued 07/17/82. Full power license with a fuel load ER SITE VISIT CCMPLETE:

10/20/78 10/20/78C and low power testing restriction was issued on 07/17/82.

INPUT TO DES TO FM:

03/30/81 03/30/31C ISSUE DES:

03/30/81 03/30/81C RESPONSE TO COMMENTS ON DES:

05/21/81 05/21/81C ISSUE FES:

06/15/81 07/02/31C CURRENT ENV. STATUS:

DES was issued on 03-30-81.

FES was issued 07-02-81.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/05/78 04/10/78C SAR DOCKETED:

07/31/78 0 7/31/78 C SAR Q'S RECEIVED BY PM:

11/17/78 05/15/79C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

04/07/80 04/07/80C The OL hearing is complete; Initial Decision issued on ISSUE DRAFT SER:

04-12-82.

INPUT TO SER:

03/23/81 03/23/81C ISSUE SER:

04/06/81 04/06/81C ACRS LETTER RECEIVED:

08/1S/81C INPUTS TO SE SUPPLER 1ENT 3:

07/16/82 07/16/32C ISSUE SE SUPPLE 1ENT 3:

07/00/82 07/17/82C FEr1A LETTER RECEIVED:

06/00/82 06/00/32C CURRENT ANTITRUST:

Complete.

HEARING STARTED:

10/06/81 10/06/81C ASLB INITIAL DECISION:

04/12/82 04/12/82C ASLB FINAL DECISICN:

TECN SPECS CGMPLETED:

CCM?1ISSICN DECISION:

09/00/82 ISSUE LIC. WITH POWER RESTRICTION: 07/01/82 07/17/82C LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

09/00/82 FSAR:

No. 30; ER:

No. 5 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION CCMPLETION - APPL.:

07/17/82C 05/11/82

. ~. -- -

. -... -.~

-._ - -- ~ ~ - --

l NRR LICENSENG SYSTEM PAGE NO: 2-37 WASHINGTON NUCLEAR 1 0L CURRENT STATUS REPQRT REPORT AS OF: 08/16/82 e

PLANT CHARACTERIST I C St KEY P E R S 0 N N E L:

t DOCKET NO:

05000460 LIC. PM:

. UNASSIGNED ASLB CHAIR:

0 APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:

E. ADENSAM MEMBER 1:

l LOCATION:

10 MI N OF RICHLAND, WA LIC. LA.:

M. DUNCAN MEMBER 2:

i REGION:

5 AE:

UEC COUNSEL:

M. YOUNG CONST. INSP P. HARBUT REAC. TYPE: PWR HSSS: B&W ANTITRUST:

RESID. INSP: A.

TOTH DESICH PWR: 3760 MWT/1266 MWE CONST: BECH RM ANALYST L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONE 3:

SCHED. DATE ACTUAL DATE

?

Application was tendered on 11-25-81.

This schedule is being reconsidered in light of a notice of deferral from ER DOCKETED:

07/00/82 07/16/82C the applicant. A review schedule will be established ER SITE VISIT COMPLETE:

1 following construction resumption. Application was INPUT TO DES T3 PM

)

docketed on July 16, 1982.

ISSUE DES:

N/S 1

2ESPONSE TO COMMENTS ON DES:

)

'iSUE FES:

N/S t

1 CURRENT ENV. STATUS:

i l

DES issuance will be scheduled following resumption of

[

j construction.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

11/25/81 11/25/81C SAR DOCKETED:

07/00/82 07/16/82C SAR Q'S RECEIVED BY PM SAR APPL. RESPONSE TO Q'S RECEIVED:

i CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

l Notice of Opportunity for Hearing was published ISSUE DRAFT SER:

in the Federal Register on August 16, 1982.

INPUT TO SER:

ISSUE SER:

N/S 5

ACRS FULL COMMITTEE MEETING:

N/S

}

INPUTS TO SE SUPPLEMENT 1 i

ISSUE SE SUPPLEMENT 1:

N/S FEMA LETTER RECEIVED:

i CURRENT ANTITRUST:

i HEARING STARTED:

N/S ASLB INITIAL DECISION:

N/S ASLB FINAL DECISION:

TECH SPECS COMPLETED:

COMMISSION DECISION:

ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

N/S r

l None I

i SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Construction delay of from 2 to 5 years was announced CONSTRUCTION COMPLETION - APPL.:

12/00/85 05/07/82 i

on 4/29/82.

I l'

'l

N2R LICENSING SYSTEM PAGE NO: 2-28 WASHINGTON NUCLEAR 2 0L CURRENT STATUS REPQRT REPORT AS OF 08/16/82 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNEL:

DOCKET NO:

05000397 LIC. PM:

R. AULUCK ASLB CHAIR:

E. BOWERS APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:

A.

SCHWENCER MEMBER 1:

R. COLE LOCATION:

30 MI NW OF RICHLAND, WASH LIC. LA.:

E. HYLTON MEMBER 2:

E. HILL REGION:

5 AE2 B2R COUNSEL:

W. PATON CONST. INSP:

A.

TOTH REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP R. FEIL DESIGN PWR: 3323 MMT/1103 MWE CONST: BECH RM ANALYST:

L. LANIER CURRENT SAR. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was issued 3/31/82.

Geology / Seismology reviews is included in SSER No. 1 issued August 11, 1982.

ACRS ER DOCKETED:

12/28/77 04/20/77C meeting targot date is October 1982.

ER SITE VISIT COMPLETE:

J7/13/77 07/14/77C INPUT TO DES TO PM:

06/30/81 06/30/81C ISSUE DES:

07/31/31 07/31/81C RESPONSE TO COMMENTS ON DES:

09/28/81 09/28/81C ISSUE FES:

12/31/31 12/31/81C CURRENT ENV. STATUS:

FES was issued 12-31-81.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

12/30/76 12/30/76C SAR DOCKETED:

04/01/78 06/22/78C SAR Q'S RECEIVED BY PM:

01/0S/79 03/07/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/11/79 07/26/79C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/12/81 10/12/31C Not required ISSUE DRAFT SER:

11/17/81 11/17/81C INPUT TO SER:

0S/30/82 05/30/82C ISSUE SER:

03/31/82 03/31/82C ACRS FULL COMMITTEE MEETING:

10/07/82 INPUTS TO SE SUPPLEMENT 2:

10/22/82 ISSUE SE SUPPLEMENT 2:

11/22/82 FEMA LETTER RECEIVED:

10/01/82 CURRENT ANTITRUST:

Not required HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A ASLB FINAL-DiCISION:

N/A 1

TECH SPECS COMPLETED:

08/30/82 i

COMMISSICH DECISION:

08/00/83 l

ISSUE LIC. WITH POWER RESTRICTION:

l LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

09/00/83 l

SCHED. DATE - RECEIPT DATE l

NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

09/00/83 0S/07/82

NRR LICEN5KNG SYSVEM PAGE NO: 2-29 WASHINGTON NUCLEAR 3 0L CURRENT

$TATUS REPQRT REPORT AS OF: 08/16/82 PLANT CHARACTERISTICSt KEY PERS0NNEL DOCKET NO:

05000508 LIC. PM:

. UNASSIGNED ASLB CHAIR:

R. LAZO APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:

F. MIRAGLIA MEMBER 1:

E. LUEEKE LOCATION:

26 MI W OF OLYMPIA, WA LIC. LA.:

J. LEE MEMBER 2:

D. SCHINK REGION:

5 AE2 EBASCO COUNSEL:

D. SWANSON CONST. INSP: D. KIRSCH REAC. TYPE: PWR NSSS: COMB ANTITRUST:

B. V0GLER RESID. INSP: W. AL3ERT DESIGN PWR 3800 MWT/1242 MWE CONST: EBASCO RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Application was tendered on June 2, 1982, and is estimated to be docketed on 08/82.

ER DOCKETED:

08/00/82 ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

05/00/83 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

10/00/83 CURRENT ENV. STATUS:

Application was tendered on June 2, 1952, and i s estimated to be docketed on 08/82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/02/82 06/02/82C SAR DOCKETED:

08/00/82 SAR Q'S RECEIVED BY PM:

i SAR APFL. RESPONSE TO Q'S RECEIVED:

l CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Notice of Opportunity for Hearing is to be published ISSUE DRAFT SER:

in the Federal Register.

INPUT TO SER:

ISSUE SER:

04/00/84 ACRS FULL COMMITTEE MEETING:

05/00/84 INPUTS TO SE SUPPLEMENT 1:

ISSUE SE SUPPLEMENT 1:

06/00/84 FEMA LETTER RECEIVED:

CURRENT ANTITRUST HEARING STARTED:

10/00/84 ASLB INITIAL DECISION:

05/00/85 ASLB FINAL DECISION:

TECH SPECS COMPLETED:

COMMISSION DECISION:

06/00/85 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

06/00/85 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Tenative milestone schedule assumes favorable results CONSTRUCTION COMPLETION - APPL.:

06/00/85 06/07/82 of acceptance review (to be completed August, 1982).

Schedule will be completed after docketing and management acoroval.

. ~

~-

N3R LICENSING SVSVEM PAGE NO: 2-30 WATERFORD 3 0L CURRENT STATUS REP 0RT REPORT AS OF: C8/15/82 PLANT C H A R A C T E R I S T I C 5:

KEY PERS0NNELa DOCKET NO:

05000382 LIC. PM:

S. BLACK ASLB CHAIR:

S. WOLFE APPLICANT:

LOUISIANA POWER 8 LIGHT LIC. BC:

F. MIRAGLIA MEMBER 1:

W. JORDAN LOCATION:

20 MI W OF NEW ORLEANS, LA LIC. LA.:

J. LEE 11 EMBER 2:

H.

FOREMAN REGION:

4 AE2 EBASCO COUNSEL:

S. TURK CONST. INSP:. UNASSIGNED REAC. TYPE: PWR NSSS: COMB ANTITRUST B. V0GLER RESID. INSP: L. CO.iSTAELE DESIGN PWR: 3560 MWT/1151 MWE CONST: EBASCO RM ANALYST:

M. KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The safety review was expedited. The SER was issued July 9, 1981.

Fuel load date delayed until 01/83 by ER DOCKETED:

12/09/78 12/00/78C applicant from 10/82.

ER SITE VISIT COMPLETE:

12/05/80 12/05/80C INPUT TO DES TO PM:

04/06/81 04/06/81C ISSUE DES:

05/01/81 05/01/31C RESPONSE TO COMMENTS ON DES:

07/24/81 08/19/81C ISSUE FES:

09/30/81 09/30/8tC CUR 2ENT ENV. STATUS:

The DES was completed on May 1981 FES was completed September 1981.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

09/28/78 09/28/78C SAR DOCKETED:

12/18/7EC SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE TD Q'S RECEIVED: 08/08/80 12/15/80C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/03/80 OS/15/81C Contested hearing started 03/82. Discovery among the ISSUE DRAFT SER:

parties has been held.

Hearing record closed 5/12/82.

INPUT TO SER:

05/08/81 05/15/81C ISSUE SER:

07/09/81 07/09/8tC ACRS LETTER RECEIVED:

08/08/81 08/08/81C INPUTS TO SE SUPPLEMENT 4:

09/1S/82 ISSUE SE SUPPLEMENT 4:

10/15/82 FEMA LETTER RECEI'!ED:

11/30/82 CURRENT ANTITRUST:

. Staff is reviewing OL Antitrust information.

HEARING STARTED:

03/03/82 03/23/82C ASLB INITIAL DECISION:

09/09/82 ASLB FINAL DECISION:

10/00/82 TECH SPECS COMPLETED:

12/30/82 COMMISSION DECISION:

12/30/82 ISSUE LIC. WITH PCWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

ER 83 - 8/81 FSAR 828 - 7/82.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

To date State of Louisiana does not have an approved CONSTRUCTION COMPLETION - APPL.:

01/16/83 04/12/82 emergency plan.

.m_.

_____m_

l l

i NRR LECEN$ING SYSYEM PAGE NO: 3-31 j

I l

WATTS BAR 1 12 0L CURRENT STATUS REPORT REPORT AS OF 08/16/82 f

l PLANT CHARACTERISTICSt KEY PERS0NNELe f

I DOCKET ND:

039080391 LIC. PM:

T. KENYON ASLB CHAIR: N/A APPLICANT:

TENNESSEE VALLEY AUTHORITY LIC. BC:

E. ADENSAM MEMBER 18 N/A LOCATION:

to MI S OF SPRING CITY. TENN LIC. LA.:

M. DUNCAN MEMBER 2 N/A REGION:

2 AE:

TVA COUNSEL:

M. YOUNG CONST. INSP R. CRLENJAK REAC. TYPE: PWR HSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP: T. HEATHERLY DESIGN PWR: 3411 MWT/1165 MWE CONST: TVA RM ANALYST M. KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CFP predicted earliest Unit 1 completion date at 08/83.

[

SER published 07/82.

ACRS subcommittee meetings held ER DOCKETED:

01/05/77 11/23/76C i

04/30/82 and 08/10/82. ACRS full committee meeting ER SITE VISIT COMPLETE:

03/18/77 02/25/77C l

l held 08/13/82.

INPUT TO DES TO PM:

07/06/77 08/18/77C ISSUE DES:

11/29/77 06/02/78C l

)

RESPONSE TO COMMENTS ON DES:

N/A ISSUE FES:

11/24/78 12/29/78C I

l CURRENT ENV. STATUS:

j Complete except for environmental toch specs.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/30/76 06/30/76C t

f SAR DOCKETED:

10/04/76 10/04/76C i

SAR Q'S RECEIVED BY PM:

12/15/76 05/20/77C E

SAR APPL. RESPONSE TO Q'S RECEIVED: 03/23/77 02/10/78C 4

i j

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

06/18/80 12/18/81C No hearings are assumed.

ISSUE DRAFT SER:

12/30/81 12/30/81C l

INPUT TO SER:

06/04/82 06/04/82C j

ISSUE SER:

07/01/82 07/01/82C l

ACRS LETTER RECEIVED:

09/00/82 INPUTS TO SE SUPPLEMENT 18 08/27/82 ISSUE SE SUPPLEMENT 1:

09/10/82 FEMA LETTER RECEIVED:

04/00/83 CURRENT ANTITRUST:

Complete HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A ASLB FINAL DECISIGH:

N/A 1

TECH SPECS COMPLETED:

11/00/82 CCMMISSION DECISION:

07/00/83 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

08/00/83

?

FSAR No. 46 j

SCHED. DATE RECEIPT DATE i

NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

08/00/83 04/09/82 i

I i

4

__ _=_

N2R LICEN$ING SYSTEM PAGE NO: 2-32 WOLF CREEK 1 0L CURRENT STATUS REP 0RT REPORT AS OF: 08/16/82 PLANT C H A R A C T E R I 5 T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05000482 LIC. PM:

J. HOPKINS ASLB CHAIR:

J. GLEASON APPLICANT:

KANSAS GAS 8 ELECTRIC LIC. BC:

B. YOUNG 3LOOD MEM3ER 1:

G. ANOERSON LOCATION:

3.5 MI NE OF EURLINGTON, KAN LIC. LA.:

M.

RUSHER 00K MEMBER 2:

H. PAXTGH REGICH:

4 AE2 BECH COUNSEL:

M. KARMAN CCNST. INSP:

REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP: T. VANDEL DESIGN PWR: 3425 MMT/1150 MWE CONST: DANIEL RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The SER was issued in April 1982.

SSER-1 is expected to be issued on August 30, 1982.

ER DOCKETED:

11/25/80 11/25/80C ER SITE VISIT COMPLETE:

07/28/81 04/21/81C INPUT TO DES TO PM:

10/01/81 10/01/81C ISSUE DES:

01/05/82 01/05/82C RESPONSE TO COMMENTS ON DES:

05/14/82 05/14/82C ISSUE FES:

06/11/82 06/11/82C CURRENT ENV. STATUS:

The DES was issued in January 1982.

The FES was issued in June 1982.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

02/21/80 02/21/80C SAR DOCKETED:

08/07/80 08/07/80C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

03/12/82 03/12/82C Notice of Opportunity for Hearing was published in the' ISSUE DRAFT SER:

Federal Register on 12/18/80.

Two petitions for INPUT TO SER:

03/19/82 03/19/82C leave to intervene were filed.

A special combined ISSUE SER:

04/07/82 04/07/82C prehearing conference was held on 4/15/81 ACRS LETTER RECEIVED:

05/11/82 0 5/11/82 C t

INPUTS TO SE SUPPLEMENT 1:

C8/10/82 08/10/82C ISSUE SE SUPPLEMENT 1:

08/30/82 FEMA LETTER RECEIVED:

04/01/83 CURRENT ANTITRUST:

OL antitrust review is in progress.

HEARING STARTE9:

10/00/82 ASLB INITIAL DECISION:

03/03/83 ASLB FINAL DECISION:

04/00/83 TECH SPECS COMPLETED:

N/S CCMMISSION DECISION:

11/00/83 ISSUE LIC. WITH PCWER RESTRICTICN: N/S LATEST AMENDMENT 2 ISSUE FULL POWER LICENSE AMEND:

12/00/83 SNUPPS FSAR - No. 9; Wolf Creek Site Addendum - No. 9; ER - No.

3.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Caseload Forecast Panel estimates construction CONSTRUCTION COMPLETION - APPL.:

12/00/83 03/00/82 completion on 6/84.

. = _.

NR3 LICENSING SYSTEM PAGE NO: 2-33 ZIMMER 1 0L CURRENT STATUS REPORT REPORT AS OF: 08/16/82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05000358 LIC. PM:

G. EDISDN ASLB CHAIR:

J. FRYE APPLICANT:

CINCINNATI GAS 8 ELECTRIC LIC. BC:

B. YOUNGBLOOD MEM3ER 1:

F.

H03PER LOCATION:

24 MI SE OF CINCINNATI. OH LIC.

LA.-

M, RUSHER 00K MEM3ER 2:

M.

LIVINGSTON REGION:

3 AE:

$1L COUNSEL:

C. BARTH CONST. INSP: D. HUNTER REAC. TYPE: BWR NSSS: GE ANTITRUST:

5. LEWIS RESID. INSP: F. CHRISTIANSON DESIGN PWR: 2436 MWT/0810 MWE CONST: KAISER RM ANALYST:

M. ANDERSON CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONESt SCHED. DATE ACTUAL DATE SE Supplement was issued on 06/04/81. SE Supplement 32 was issued 10/81.

SE Supplement 83 i s scheduled to be issued ER DOCKETED:

09/10/75 09/10/75C 08/19/82.

ER SITE VISIT COMPLETE:

10/09/75 10/09/75C INPUT TO DES TO PM:

08/20/76 08/19/76C ISSUE DES:

10/15/76 10/15/76C RESPONSE TO COMMENTS ON DES:

03/25/77 04/01/77C ISSUE FES:

06/10/77 06/10/77C CURRENT ENV. STATUS:

Complete 1

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

08/15/75 05/09/75C SAR DOCKETED:

09/15/75 09/10/75C SAR Q'S RECEIVED BY PM:

10/29/76 01/ 06 /77 C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/31/76 07/29/77C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/28/77 08/11/77C Hearing was completed March 5, 1982.

Board decision was ISSUE DRAFT SER:

N/A l

rendered in June, 1982.

The Board exercised its sua INPUT TO SER:

05/20/77 12/07/77C sponte authority to admit as Board i ssues eight new ISSUE SER:

07/29/77 Ot/31/79C 4

contentions. The Commission reviewed the action and directed the Board to issue an appropriate ordor ACRS LETTER RECEIVED:

09/16/77 03/13/790 dismissing the eight contentions from the proceeding.

INPUTS TO SE SUPPLEMENT 3:

06/17/82 08/02/82C ISSUE SE SUFPLEMENT 3:

08/19/82 FEMA LETTER RECEIVED:

04/15/82 04/15/82C i

CURRENT ANTITRUST:

?

Antitrust review is now closed. Federal Register Notice HEARING STARTED:

02/26/32 02/26/820 was published 04/09/82.

ASLB INITIAL DECISION:

06/21/82 06/21/82C ASL3 FINAL DECISION:

11/20/82 TECH SPECS CCMPLETED:

08/20/82 CCMMISSION DECISION:

11/00/82 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/00/82 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Applicant has slipped construction completion to 12/82.

CONSTRUCTION COMPLETION - APPL.:

12/00/82 04/19/82 Therefore, Zimmer is no longer an impacted plant.

NRR L ICENSING SYSTEM PAGE NO: 2-34 ALLENS CREEK 1 CP CURRENT STATUS REPQRT REPORT AS OF: 08/16/32 PLANT C H A R A C T E R I 5 T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05000466 LIC. FM:

C. MOON ASLB CHAIR:

S. WOLFE I

APPLICANT:

HOUSTCH LIGHTING AND PCMER CCMPANY LIC. EC:

E. ADEllS AM MEMBER 1:

E. CHEATUM LOCATION:

45 M1 W OF HOUSTCN, TX LIC. LA.

M. DUNCAN MEMSER 2:

G. LINENBERGER REGION:

4 AE:

EBASCO COUNSEL:

R.

BLACK CCNST. INSP:

REAC. TY?E: BWR NSSS: CE ANTITRUST:

A.

H0DGCON RESID. INSP:

DESIGN PWR 3758 MWT/1150 MWE CCNST: EBASCO RM ANALYST:

B. ST MARY l

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SSER3 on TMI issues, was issued August 6, 1981.

The ACRS does not plan to review TMI issues ER DCCKETED:

12/07/7?.

12/07/73C for Allens Creek.

SSER4 on non-TMI issues including ER SITE VISIT CCMPLETE:

03/05/74 03/02/74C emergency planning, financial capability; unresolved safety INPUT TO DES TO PM:

06/07/74 C6/07/74C issue; containment, ultimate heat sink, and fuel designs ISSUE DES:

07/05/74 07/05/74C was issued Cetober 30, 1981.

RESPONSE TO COMMENTS ON DES:

09/23/74 10/01/74C ISSUE FES:

11/18/74 11/18/74 C CURRENT ENV. STATUS:

A draft second FES supplement was issued in December, 1980.

The final second supplement was issued March 13, 1981.

SAFETY /HEARIMG MILESTONES:

APPLICATION TENDERED:

08/24/73 08/24/73C SAR COCKETED:

12/07/73 12/07/73C SAR Q'S RECEIVED BY PM:

03/22/74 03/22/74C SAR APPL. RESPCNSE TO Q'S RECEIVED: C6/C3/74 07/C3/74C CURRENT HRG. STATUS:

INPUT TO CRAFT SER TO PM:

08/09/74 09/20/74C Env. hearing commenced 01/12/81 and was completed on ISSUE DRAFT SER:

05/15/81 Safety sessions were held May 18-22 and June INPUT TO SER:

10/11/74 11/01/74C 1-12.

Further sessiens were held on 10/5-9/81 ISSUE SER:

11/07/74 11/15/74C 10/26-30/81, 11/16-20/81, 12/7-11/81, 12/14-16/81 and 04/12-14/82.

ACRS LETTER RECEIVED:

12/20/74 12/13/74C 1

INPUTS TO SE SUPPLEMENT 4:

01/10/75 03/28/75C ISSUE SE SUFFLEMENT 4:

10/15/81 10/30/81C CURRENT ANTITRUST:

A set of preposed license conditions was submitted to the HEARING STARTED:

03/11/75 03/11/75C i

Licensing Board in the South Texas antitrust proceeding.

ASLB INITIAL DECISION:

11/00/82 The South Texas antitrust review was completed in May of ASLB FINAL DECISION:

N/A 1932.

License conditions will be attached to the South TECH SPECS COMPLETED:

N/A Texas and Allens Creek licenses upon issuance.

CCFL'1ISSICN DECISICN:

11/00/82 i

CP ISSUED:

11/00/82 LATEST AMENUMENT:

NEW SLIPS / NOTES:

NRR LICENSING SY$VEM PAGE NO: 2-35 CLINCH RIVER CP CURRENT

$TATUS REPQRT REPORT AS OF 08/16/82 PL ANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05000537 LIC. PM:

STARK LEECH ASLB CHAIR:

M. MILLER APPLICANT:

PROJECT MANAGEMENT CORP.; DOE;TVA LIC. BC:

C. THOMAS MEMBER 1:

G. LINENBERGER LOCATION:

25 MI W OF KNOXVILLE. TN LIC. LA.:

P. SHUTTLEWORTH MEMBER 2 C. HAND REGION:

2 AE2 BER COUNSEL:

S. TREBY CONST. INSP:

REAC. TYPE: LMFBR NSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP:

DESIGN PWR: 0975 MWT/0350 MWE CONST: S&W RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Safety review was reinitiated in October 1981 A revision to the Site Suitability Report was issued June 11, 1982.

ER DOCKETED:

04/11/75 04/11/75C ER SITE VISIT COMPLETE:

IhPUT TO DES TO PM:

ISSUE DES:

02/12/76C RESPONSE TO COMMENTS ON DES:

ISSUE FES:

02/07/77 02/07/77C CURRENT ENV. STATUS:

The FES was issued in February 1977.

A document updating the FES was issued on July 19, 1982.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/15/74 10/15/74C SAR DOCKETED:

06/13/75 06/13/75C SAR Q'S RECEIVED BY PM:

04/09/82 04/09/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/15/82 05/15/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/16/82 07/16/82C The ASLB heId a prehearing conference on 2/9-10/82, and ISSUE DRAFT SER:

08/27/82 on April 6-7, 1982.

Hearing sessions are scheduled for INPUT TO SER:

01/14/83 August 23-27, 1982.

ISSUE SER:

03/04/83 ACRS FULL COMMITTEE MEETING:

05/06/83 INPUTS TO SE SUPPLEMENT 1:

06/10/83 ISSUE SE SUPPLEMENT 1:

07/01/83 CURRENT ANTITRUST:

HEARING STARTED:

08/23/82 ASLB INITIAL DECISION:

05/01/84 ASLB FINAL DECISION:

TECH SPECS COMPLETED:

COM1ISSION DECISION:

06/01/84 CP ISSUED:

06/01/84 LATEST AMENDMENT:

HEW SLIPS / NOTES:

NRR LICEN5ING SYSTEM PAGE NO: 2-36 PEBBLE SPRINGS 1 82 CP CURRENT STATUS REP 0RT REPORT AS OF: 08/16/82 PLANT C H A R A C ! E R I S T I C S:

KEY P E R S O N N E La DOCKET NO:

051410515 LIC. PM:

D. SCALETTI ASLB CHAIR I. SMITH APPLICANT:

PORTLAND GENERAL ELECTRIC LIC. BC:

E. ADENSAM MEMBER 1:

O. PARIS LOCATION:

3 MI NW OF ARLINGTON, ORE LIC. LA.:

M. DUNCAN MEMBER 2:

W. JORDAN REGION:

5 AE:

BECH COUNSEL:

B.

BORDENICK CONST. INSP:

REAC. TYPE: PWR NSSS: B&W ANTITRUST:

B. V0GLER RESID. INSP:

DESIGN PUR: 3760 MWT/1260 MWE CONST: BECH RM ANALYST:

L.

LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED..DATE ACTUAL DATE Amendment 13 to the P3AR in response to 10CFR50.34(f)

(CP/ML rule) was filed 1/29/82.

The staff's review of ER DOCKETED:

08/06/74 08/06/74C the TMI-2 issues is presently in a hold status awaiting ER SITE VISIT COMPLETE:

a decision by PGE uhether or not to continue their INPUT TO DES TO PM:

10/11/74 12/11/ 74 C application at a different site (see Environmental Status).

ISSUE DES:

11/15/74 01/06/75C A decision is expected within 2 months.

RESPONSE TO COMMENTS ON DES:

03/07/75 03/22/75C ISSUE FES:

04/07/75 04/16/75C CURRENT ENV. STATUS:

On 4/9/82, PGE withdrew their application, before the Oregon Energy facility siting council, for the Pebble SAFETY / HEARING MILESTONES:

Springs site.

The alternative sites hearing before the ASLB scheduled for 4/20/82 was cancelled.

APPLICATION TENDERED:

06/07/74 06/07/74C SAR DOCKETED:

10/18/74 10/18/74C SAR Q'S RECEIVED BY PM:

12/13/74 01/13/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/14/75 02/04/75C CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

04/11/75 05/23/75C A prehearing conference on afternative sites was held ISSUE DRAFT SER:

on December 1,

1981.

INPUT TO SER:

09/01/75 12/08/75C ISSUE SER:

01/0S/76 01/12/76C ACRS LETTER RECEIVED:

11/12/76 02/12/76C INPUTS TO SE SUPPLEMENT 6:

09/09/76 12/14/77C ISSUE SE SUPPLEMENT 6:

N/S CURRENT ANTITRUST:

Antitrust review is complete.

HEARING STARTED:

ASLB INITIAL DECISION:

N/S ASLB FINAL DECISION:

TECil SPECS COMPLETED:

COM 11SSION DECISION:

N/S CP ISSUED:

N/S LATEST AMENDMENT:

Amendment 13 to the PSAR in response to 10CFR50.34Cf).

NEW SLIPS / NOTES:

f N3R LICENSING SVSTEM PAGE NO: 2-37 SKAGIT/HANFORD 182 CP CURREN T STATUS REPORT REPCRT AS OF: 08/16/82 PLANT C H A R A C T E R I S T I C S:

KEY PERSONNEL:

I DOCKET NO:

052240523 LIC. PM:

C. MOON ASLB CHAIR:

J. WOLF l

APPLICANT:

PUGET SOUND POWER 8 LIGHT LIC. BC:

E. ADENSAM MEMBER 1:

F. HOOPER LOCATION:

30 MI. NW OF RICNLAND, WA.

LIC. LA.:

M. DUNCAN MEMBER 2:

G. LINENBERGER l

REGIDH 5

AE:

BECH COUNSEL:

R. BLACK CONST. INSP:

REAC. TYPE BWR NSSS: GE ANTITRUST B. V0GLER RESID. INSP:

DESIGN FWR: 3833 MWT/1277 MWE CONST: BECH RM ANALYST S. HEDLUND CURRENT SAF. STATUse ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Supplement No. 2 to the SER was issued 10/81 on TMI-related I

action items.

Site relocation ER amendment and PSAR ER DOCKETED:

09/30/74 09/30/74C amendment were submitted on 12/31/81.

The applicant is ER SITE VISIT COMPLETE:

02/05/82 02/05/82C L

relocating the site to the Hanford Reservation.

INPUT TO DES TO FN:

04/09/82 04/09/82C i

On 7/16/82, the staff requested additional geological ISSUE DES:

05/04/82 05/04/82C I

field data.

Submittal and review of this data will RESPONSE TO COMMENTS ON DES:

09/06/82 l,

require a delay in issuance of supplement No. 3 to ISSUE FES:

12/00/82 i

SER to 11/82.

CURRENT ENV. STATUS:

L Site relocation (to Hanford) DES was issued on May 4, 1982.

The FES is expected to be issued 12/82.

SAFETY / HEARING MILESTONES:

f APPLICATION TENDERED:

08/06/74 08/06/74C I

SAR DOCKETED:

01/15/75 01/15/75C I

SAR Q'S RECEIVED BY PM:

02/10/82 02/10/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 09/01/82 L

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

A special prehearing conference was held on May 5, 1982.

ISSUE DRAFT SER:

Safety hearings are expected to begin in 02/83.

INPUT TO SER:

07/11/77 07/11/77C l

Environmental hearings, except for need-for power, are ISSUE SER:

08/31/77 08/31/77C expected to begin in 04/83.

Need-for-power hearing i s expected to begin in 05/83 after the Regional Power ACRS FULL COMMITTEE MEETING:

01/00/83 Council publishes a regional conservation and electric INPUTS TO SE SUPPLEMENT 3:

09/10/82 i

power plan in 04/83.

ISSUE SE SUPPLEMENT 3 11/15/82 CURRENT ANTITRUST Complete HEARING STARTED:

07/15/75 07/15/75C ASLB INITIAL DECISION:

04/00/83 1

ASLB FINAL DECISION:

N/S TECN SPECS COT 1PLETED:

N/A 3

COMMISSION DECISION:

07/00/83 CP ISSUED:

07/00/83

(

LATEST AMENDMENT:

i L

i NEW SLIPS / NOTES:

t i

-nn

NRR LICEN5ING SYSTEM PAGE NO: 2-3G (BOP)BOPSSAR/BSAR-205 PDA CURRENT STATUS REPQRT REPORT AS CF: 08/16/82 i

PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05000550 LIC. PM:

. UNASSIGNED ASLB CHAIR:

APPLICANT:

FLUOR PCWER SERVICES LIC. BC:

J. MILLER MEMSER 1:

LOCATION:

N/A LIC. LA.:

P.

ANDERSON MEMBER 2:

REGION:

1 AE:

FLUOR COUNSEL:

N/A CCNST. INSP:

REAC. TYPE: BOP HSSS:

ANTITRUST:

RESID. INSP:

DESIGN PWRa 0000 MWT/0000 MWE CONST:

RM ANALYST:

S. NEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Review :n abeyance pending the future of standardization.

ER COCKETED:

ER SITE VISIT CCMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO CCMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / NEARING MILESTONES:

APPLICATION TENDERED ~

10/31/77 10/31/77C SAR DOCKETED:

10/31//7 10/31/77C SAR Q'S RECEIVED BY PM:

04/14/78 06/20/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 06/02/78 07/31/ 7E C CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

05/25/78 07/07/78C ISSUE DRAFT SER:

INPUT TO SER:

08/21/78 10/17/72C ISSUE SER:

10/02/78 12/29/78C ACRS LETTER RECEIVED:

11/17/78 02/16/75C INPUTS TO SE SUPPLEMENT 1:

12/08/78 03/21/79C ISSUE SE SUPPLEMENT 1:

N/S CURRENT ANTITRUST:

HE<. RING STARTED:

AT LB INITIAL DECISION:

CfMMISSION DECISIGH:

!>ECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

NEW StIPS/ NOTES:

HRR LICEN$fMG SVSTEM PQGE NO: 3-39 (BOP)ESSAR/BSAR-20$

PDA CURRENT STATUS REP 0kT REPORT AS OF: 08/16/82 PLANT C H A R A C T E R I S T I C 5:

KEY P E R S 0 N N E L:

DOCKET HQ:

00002591 LIC PM:

. UNASSIGNED ASLB CHAIR:

APPLICANT:

EBASCO SERVICES LIC. BC:

J. MILLER MEMBER 1:

LOCATIDH:

N/A LIC. LA.:

P. ANDERSON MEMBER 2:

REGION:

0 AE:

EBASCO COUNSEL:

. UNASSIGNED CCHST. INSP:

REAC. TYPE: BOP NSSS ANTITRUST:

RESID. INSP:

DESIGN PWR: 0000 MWT/0000 MWE CONST:

RM ANALYST:

M.

KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONESt SCNED. DATE ACTUAL DATE Review in abeyance pending the future of standardization, and resources to conduct review.

ER DOCKETED:

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

i APPLICATION TENDERED:

11/23/77 11/23/77C SAR DOCKETED:

02/02/78 02/02/78C SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S ISSUE DRAFT SER:

INPUT TO SER:

N/S ISSUE SER:

N/S ACRS FULL CCMMITTEE MEETING:

N/S INPUTS TO SE SUPPLEMENT 1:

N/S ISSUE SE SUPPLEMENT 1:

N/S CURRENT ANTITRUST:

HEARING STARTED:

ASLB INITIAL DECISION:

CurJ1ISSION DECISION:

SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

NEW SLIPS / NOTES:

n hus.

+

e N 3 R.

LICENSING SYSTEM.

PAGE NO: 2-40 r

s (BOP)ESSAR/CESSAR-80 PDA CURRENT STATUS REPQRT REPORT AS OF 08/16/32 PLAN 7

-C N A'R A C T E R I S T I'C S:

K EY P E R S 0 N'N E~Le DOCKET NO: -05000591 LIC. PM:

. UNASSIGNED ASLB CHAIR:

APPLICANT:

EBASCO SERVICES LIC. BC:

J. MILLER MEMB'ER :

LOCATION:

N/A LIC. LA.a P. ANDERSON MEMBER 2:

REGION:

0 AE:

EBASCO COUNSEL:

UNASSIGNED CONST. INSP:

REAC. TYPE: BOP NSSS:

ANTITRUST:

RESID. INSP:

DESIGN PWR: 3800 MWT/0000 MWE CONST:

RM ANALYST:

M. KING 4

s 4

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

  • SCHED, DATE ACTUAL f/ATEA' A Review in abeyance pending the future of standardization.

and resources to conduct review.

ER DOCY.ETEDr

< b N

ER SITE VISIT COMPLETE:

3 4

.TO SES.TO FM:

INPU) 4 ISSUE DES:

  • ISSUE FES:

-['

RESPONSE TO COMMENTS ON DES:

s' s

~

?!

i s.

CURRENT ENV. STATUS:

.. N 5

,t w

t w;-

SAFETY / HEARING MILESTONES:

.0,l a-s APPLICATION TENDERED:

11/23/77 11/23/77C C

SAR DOCKETED:J O2/02/78 02/02/78C

+

,s' SAR Q(S RECEIuED BY PM:

N/S SAR AWK?,93PONSE TO QpRECEIVED:

_ l N/S s

s

_~

INPUT?!![ DiMFT SER TO P.Mt N/S CURRENT NRG. STATUS:

~

.. "s'.

ISSUE IRJFT TER:

f

\\

INPUT TO SER,

N/S I

,A* '

?,

ISSUE SEU ^ Q N/S ACRS Fulf. COMNUTEE MEETING:

N/S

~

, u

~

h IMPUTS.TO SE SUPPLEMENT 1:

N/S

._ t

.a e

' ISSUE SE SUPPLEMENI 1 N/S

. v, CURRENT ANTITRUST'r.,

e l

" ASLB INITIAL DECISION: g N

NEARING STARTED:N

~

s I,

^

j COMMISSION DECISION:

W SPECIAL PROJECT COMPLETE:

N/S i

A I

L ATEST AMENDM' MT t c

.c

./'

NEW SLIPS / NOTES:

f,i v $

?

g f,

s w

L.

L c.

{

s l

(.

l t

HRR LICENSING SYSTEM PAGE NO: 2-41 (80P)ESSAR/RESAR-414 PDA CURRENT STATUS REP 0RT REPORT AS OF: 08/16/82 PLANT CHARACTERISTICS:

KEY P E R S 0 N N E L:

DOCKET ND:

00007591 LIC. PM:

. UNASSIGNED ASLB CHAIR:

APPLICANT:

EBASCO SERVICES LIC. BC:

J. MILLER MEMBER 1:

LOCATION:

N/A LIC. LA.:

P. ANDERSON MEM3ER 2:

REGION:

0 AE:

EBASCO COUNSEL:

UNASSIGNED CONST. INSP:

REAC. TYPE: BOP HSSS:

ANTITRUST:

RESID. INSP:

DESIGN PWR 0000 MWT/0000 MWE CONST:

RM ANALYST:

M. KING l

l CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE I

Review in abeyance pending the future of standardization, and resources to conduct review.

ER DOCKETED:

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

?

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

I CURRENT ENV STATUS:

SAFETY / HEARING MILESTONES:

1 APPLICATION TENDERED:

11/23/77 11/23/77C SAR DOCKETED:

02/02/78 02/02/78C SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S ISSUE DRAFT SER:

INPUT TO SER:

N/S ISSUE SER:

N/S ACRS FULL COMMITTEE MEETING:

N/S INPUTS TO SE SUPPLEMENT 1 N/S ISSUE SE SUPPLEMENT 1:

N/S CURRENT ANTITRUST:

i HEARING STARTED:

l ASLB INITIAL DECISION:

COMMISSION DECISION:

SPECIAL PROJECT COMPLETE:

N/S i

LATEST AMENDMENT:

NEW SLIPS / NOTES:

l

NRR LZCEN$ING SYSVEM PAGE NO: 2-42 (B0P)GAISSAR PDA CURRENT STATUS REPORT REPORT AS OF: 08/16/82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05000595 LIC. PM:

. UNASSIGNED ASLB CHAIR:

APPLICANT:

GILBERT COMMONWEALTH LIC. BC:

J. MILLER MEMBER 1:

LOCATION:

N/A LIC. LA.:

P.

ANDERSON f1EM3ER 2:

REGION:

4 AE:

WEST COUNSEL:

M. KARMAN CONST. INSP:

REAC. TYPE: BOP NSSS:

ANTITRUST:

RESID. INSP:

DESIGN PWR: 0000 MWT/0000 MWE CONST:

RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization and resources to conduct review.

ER DOCKETED:

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / NEARING MILESTONES:

APPLICATION TENDERED:

02/24/78 02/24/7EC StR DOCKETED:

08/21/78C SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S ISSUE DRAFT SER:

N/S INPUT TO SER:

N/S ISSUE SER:

N/S ACRS FULL COMMITTEE r.EETING:

N/S INPUTS TO SE SUPPLEMENT 1:

N/S ISSUE SE SUPPLEMENT 1:

N/S CURRENT ANTITRUST:

HEARING STARTED:

ASLB INITIAL DECISION:

COMMISSION DECISION:

SPECIAL PROJECT CCMPLETE:

N/S LATEST AMENDMENT:

NEW SLIPS / NOTES:

~.

__.____m m

i NRR L8CEN5ING SYSVEM PAGE NO: 3-43 (BOP)GIBBSSAR (W)

PDA CURRENT STATUS REP 0RT REPORT AS OF 08/16/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:

DOCKET NO 05000584 LIC. PM:

UNASSIGNED ASLB CHAIR APPLICANT:

GIBBS 3 HILL LIC. BC:

J. MILLER MEMBER 1:

LOCATION:

N/A LIC. LA.:

P. ANDERSON MEMBER 2:

REGION:

0 AE:

GHDR COUNSEL:

M. WAGNER CONST. INSP:

REAC. TYPE: BOP NSSS:

ANTITRUST:

RESID. INSP DESIGN PWR 0000 MWT/0000 MWE CONST:

RM ANALYST:

M. ANDERSON CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization and resources to conduct review.

ER DOCKETED:

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

I RESPONSE TO COMMENTS ON DES:

d ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

i APPLICATION TENDERED:

10/15/76 10/1S/76C SAR DOCKETED:

04/08/77 05/10/77C SAR Q'S RECEIVED BY PM:

02/03/78 03/16/79C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S ISSUE DRAFT SER:

INPUT TO SER:

N/S ISSUE SER:

N/S 1

ACRS FULL COMMITTEE MEETING:

N/S l

INPUTS TO SE SUPPLEMENT 1:

N/S ISSUE SE SUPPLEMENT 1:

N/S CURRENT ANTITRUST:

HEARING STARTED:

ASLB INITIAL DECISIGH:

COMMISSION DECISION:

SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

HEW SLIPS /HOTES:

l.

i

NRR L ICENSING SYST EM PAGE NO: 2-44 (BOP)SWESSAR/BSAR-205 PDA CURRENT STATUS REPQRT REPORT AS OF: 08/16/82 PLANT CHARACTERIST I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

00000595 LIC. PM:

. UNASSIGNED ASLB CHAIR:

APPLICANT:

STONE a WEBSTER LIC. BC:

J. MILLER MEMBER 1:

LOCATION:

N/A LIC. LA.6 P. ANDERSON MEf1BER 2:

REGION:

0 AE:

58W COUNSEL:

. UNASSIGNED CON 5T. INSP:

REAC. TYPE: BOP NSSS:

ANTITRUST:

RESID. INSP:

DESIGN FWR: 0000 MWT/0000 MWE CONST: N/A RM ANALYST:

M. KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED.'DATE ACTUAL DATE Review in abeyance pending the future of standardization, and resources to conduct review.

ER DOCKETED:

N/A ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

12/15/75 12/22/75C SAR DOCKETED:

12/22/75 12/22/75C SAR Q'S RECEIVED BY PM:

11/12/76 04/C4/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 01/14/77 05/20/77C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S ISSUE DRAFT SER:

INPUT TO SER:

09/09/77 10/13/77C ISSUE SER:

10/19/77 12/02/77C ACRS LETTER RECEIVED:

01/15/78 01/13/78C INPUTS TO SE SUPPLEMENT 1:

N/S ISSUE SE SUPPLEMENT 1:

N/S CURRENT ANTITRUST:

HEARING STARTED ASLB INITIAL DECISION:

COMMISSION DECISION:

SPECIAL PROJECT COMPLETE:

N/S LATEST AMENCMENT:

HEW SLIPS /NCTES:

NRR LICENS2NG SYSTEM PAGE NO: 3-45 (NSS)CESSAR SYSTEM 80 FDA CURRENT STATUS REP 0RT REPORT AS OF: 08/1G/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:

DOCKET NO:

05000470 LIC. PM:

C. GRIMES ASLB CHAIR:

APPLICANT:

COMBUSTION ENGINEERING LIC. BC:

H.

BERNARD MEMBER 1:

LOCATION:

N/A LIC. LA.:

P.

ANDERSON MEMBER 22 4

i REGION:

0 AE:

COUNSEL:

M. WAGNER CONST. INSP:

REAC. TYPE: PWR NSSS: COMB ANTITRUST:

RESID. INSP DESIGN PWR 3800 MWT/1295 MWE CONST:

RM ANALYST:

M. KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER (NUREG-0852) issued 11/81.

Awaiting documentation to resolve ACRS, open, and confirmatory issues.

ER DOCKETED:

ER SITE VISIT COMPLETE:

{

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

N/A.

l SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/27/78 10/27/78C SAR DOCKETED:

12/21/79 12/21/79C 2

SAR Q'S RECEIVED BY PM:

09/01/80 09/01/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 01/01/81 07/15/81C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S N/A.

ISSUE DRAFT SER:

N/S INPUT TO SER:

11/01/81 11/13/81C ISSUE SER:

05/01/82 11/10/81C ACRS LETTER RECEIVED:

06/21/82 12/15/81C INPUTS TO SE SUPPLEMENT 1:

02/28/83 ISSUE SE SUPPLEMENT 1 03/30/83 CURRENT ANTITRUST:

HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A j

COMMISSION DECISION:

07/00/83 SPECIAL PROJECT COMPLETE:

07/29/83 i

LATEST AMENDMENT:

NEW SLIPS / NOTES:

t I

NRR LICENSING

$YSTEM PAGE NO: 2-46 (NSS)GESSAR SEVERE ACC FDA CURRENT STATUS REPQRT REPORT AS OF: 08/16/82 PLANT C H A R A C T E R I S T I C 5:

KEY P E R S 0 N N E L:

DOCKET NO:

00007447 LIC. PM:

D. LYNCH ASLB CHAIR: N/A APPLICANT:

GENERAL ELECTRIC COMPANY LIC. BC:

J. MILLER MEMBER 1:

N/A LOCATION:

N/A LIC.

LA.-

P. ANDERSON MEMBER 2:

N/A REGIDH:

0 AE:

BRAUN COUNSEL:

B. BORDENIK C 0 tt S T. INSP:

REAC. TYPE: BWR NSSS: GE ANTITRUST:

RESID. INSP:

DESIGN PWR: 3S79 MWT/1220 MME CONST:

RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82; review is in progress.

Some generic issues are being identified / resolved in ER DOCKETED:

conjunction with LRG-II.

Dates shown reflect review ER SITE VISIT COMPLETE:

for the severe accident design.

PRA for severe accident INPUT TO DES TO PM:

design was submitted 4/82.

Severe accident design ISSUE DES:

modifications were submitted 6/82 in Amendment RESPONSE TO CCMMENTS ON DES:

No. 4.

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/31/80 33/31/80C SAR DOCKETED:

02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:

09/01/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 02/01/83 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

ISSUE DRAFT SER:

INPUT TO SER:

02/01/84 ISSUE SER:

03/01/84 ACRS FULL COMMITTEE MEETING:

04/06/84 INPUTS TO SE SUPPLEMENT 1:

04/21/84 ISSUE SE SUPPLEMENT 1:

OS/25/84 CURRENT ANTITRUST:

FDA antitrust review is in progress.

HEARING STARTED:

N/A ASLB INITIAL DECISIDH:

N/A COM;1ISSION DECISIGH:

05/00/84 SPECIAL PROJECT COMPLETE:

OS/00/84 LATEST AMENDMENT:

FDA Amendment No. 4 was received in June, 1982.

NEW SLIPS / NOTES:

l

NRR L ICENSING SYST EM PAGE NO: 3-47 (NSS)GESSAR-238 NI FDA CURRENT STA TUS REPORT REP RT AS OF: 08/16/32 PLANT CHARACTERIST I C S:

KEY PERS0NNEL:

DOCKET NO:

05000447 LIC. PM:

D. LYNCH ASLB CHAIR: N/A APPLICANT:

GENERAL ELECTRIC CCMPANY LIC. BC:

J. MILLER NEMBER 1:

N/A LOCATION:

N/A LIC.

LA.'

P.

ANDERSON MEMBER 2:

N/A REGION:

0 AE:

BRAUN COUNSEL:

B. BORDENICK CONST. INSP:

REAC. TYPE: BUR NSSS: GE ANTITRUST:

RESID. INSP:

DESIGN PWR: 3579 MWT/1220 MWE CONST:

RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82; review is in progress.

Some generic issues are being identified / resolved in ER DOCKETED:

conjunction with LRG-II.

Dates shown reflect review ER SITE VISIT CCMPLETE:

for the 238 Nuclear Island.

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO CGMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUt I

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/31/80 03/31/80C SAR DOCKETED:

02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:

07/16/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 11/26/82 CURRENT NRG. STATUS:

INPUT TO CRAFT SER TO PM:

ISSUE DRAFT SER:

INPUT TO SER:

02/01/83 ISSUE SER:

03/02/83 ACRS FULL COMMITTEE MEETING:

04/08/83 INPUTS TO SE SUPPLEMENT 1:

04/15/83 ISSUE SE SUPPLEMENT 1 05/12/83 CURRENT ANTITRUST:

FDA antitrust review is in progress.

HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSICH DECISION:

05/00/83 4

SPECIAL PROJECT COMPLETE:

05/00/83 LATEST AMENDMENT:

FDA Amendment No. 4 was received in June, 1982.

NEW SLIPS / NOTES:

HRR LYCENSING SY$7EM PAGE NO 2-48 4

REP 0RT REPORT AS OF: 08/16/82 (SP)FNP 1-8 (MANUF.)

SPC CURRENT S T A T U'S i

l PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:.05000437 LIC. PM:

. UNASSIGNED ASLB CHAIR:

S. WOLFE APPLICANT:

OFFSHORE PCWER SYSTEMS LIC. BC:

E. ADENSAM MEMBER 1:

D. SCHINK LOCATION:

JACKSONVILLE, FLA.

LIC. LA.:

M.

DUNCAN MEMBER 2:

G. BRIGHT REGION:

2 AE:

OPS COUNSEL:

D. GODDARD CONST. INSP:

REAC. TYPE: PWR NSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP:

DESIGN PWR: 3411 MWT/1150 MWE CONST: OPS RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE I

ML matters have been addressed by applicant. SSER 4.

covering TMI requirements and other previous unresolved ER DOCKETED:

07/05/73 07/05/73C i

issues, was issued 09-29-81.

An ACRS subcommittee ER SITE VISIT COMPLETE:

08/16/73 08/16/73C i

i meeting was held on 10-15-81.

The ACRS sent a favorable INPUT TO DES TO PM:

07/01/74C j

letter on 10-19-81 Commission Decision is projected ISSUE DES:

04/12/74 07/24/74C for 09-82.

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

10/06/75 10/06/75C 4

CURRENT ENV. STATUS:

l 4

All environmental statements have been issued.

4 SAFETY / HEARING MILESTONES:

1 APPLICATION TENDERED:

05/07/73 05/07/73C SAR DOCKETED:

07/05/73 07/05/73C SAR Q'S RECEIVED BY PM:

02/15/74 02/15/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 04/08/74 04/08/74C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/25/75 07/25/75C Suppl. 4 to the SER was entered into the record on 12-4-81.

ISSUE DRAFT SER:

l Hearing reopened and closed on 12-4-81.

Licensing Board INPUT TO SER:

08/22/75 08/22/75C 1

issued an Initial Decision on 6-30-82, authorizing the ISSUE SER:

09/30/75 09/30/75C Director of NRR to issue a manufacturing license, subject to a condition, to CPS for the manufacturing by the end ACRS LETTER RECEIVED:

10/19/81 10/19/8tC of 1999 of eight standardized floating nuclear plants at INPUTS TO SE SUPPLEMENT 4:

02/20/76 03/05/76C l

Blount Island, Jacksonville, Florida.

ISSUE SE SUPPLEMENT 42 09/00/81

'09/29/81C CURRENT ANTITRUST:

l HEARING STARTED:

06/17/76 06/15/76C ASLB INITIAL DECISION:

06/30/82 06/30/82C COMMISSION DECISION:

09/00/82 j

SPECIAL PROJECT COMPLETE:

09/00/82 LATEST AMENDMENT:

NEW SLIPS / NOTES:

I F

NRR L ICEN$ING SYSVEM PAGE NO: 2-49 CARROLL SITE ESR CURRENT STATUS REP 0RT REPORT AS OF: 08/16/82 PLAN T C H A R A C T E R I S T I C S:

KEY PERS0NN E L:

DOCKET NO:

05000599 LIC. PM:

J. WILSON ASLB CHAIR:

J. WOLF APPLICANT:

C01:MONWEALTH EDISDN LIC. BC:

J. MILLER MEMBER 1:

G.

BRIGHT LOCATION:

CARROLL COUNTY, IL.

LIC. LA.

P.

ANDERSON MEM3ER 2:

R. HOLTON REGION:

3 AE:

COUNSEL:

R.

LESSY CONST. INSP:

REAC. TYPE:

NSSS: WEST ANTITRUST:

A.

HDDGDON RESID. INSP:

DESIGN PWR: 0000 MWT/1120 MWE CONST:

RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRCNMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The cccmercial operation date has been postponed until 1999 - 2000.

This license ER DOCKETED:

04/07/79 04/07/79C is not under active review.

ER SITE VISIT COMPLETE:

N/S INPUT TO DES TO PM:

N/S ISSUE DES:

N/S RESPONSE TO COMMENTS ON DES:

N/S ISSUE FES:

N/S CURRENT ENV. STATUS:

Portions of the alternate site study are under review SAFETY / HEARING MILESTONES:

by DOE.

APPLICATICH TENDERED:

12/20/78 12/20/78C SAR DOCKETED:

SAR C'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Fivo intervenors have been admitted.

ISSUE DRAFT SER:

INPUT TO SER:

ISSUE SER:

ACRS FULL CCMMITTEE MEETING:

INPUTS TO SE SUPPLEMENT ISSUE SE SUPPLEMENT CURRENT ANTITRUST:

Awaiting updated antitrust information from applicant.

HEARING STARTED:

N/S ASLB INITIAL DECISION:

N/S SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

NEW SLIPS / NOTES:

HRR LICENSING SYST EM AS OF:0G/15/82 H0N-POWER REACVORS INPUT ISSUE EARLIEST ISSUE

  • TO SER ISSUE FES OR START ISSUE NON-POWER FACILITY DOCKET DE1 TO PM

$13 EIA HEARING El COMMENTS AFRRI, TRIGA 1000.0000W TANK ESTIMATED DATE: 10/80 N/A 01/82 N/S 09/81 N/S CONTESTED CASE ACTUAL DATE:

10/80C 01/82C NBSR 10.0000W T ESTIMATED DATE: 12/80 02/82 11/82 08/82 10/C2 POWER INCREASE TO 20 MW ACTUAL DATE:

12/80C 02/82C INCLUDED IN RENEWAL TEXAS A8M, TRIGA 1030.0000W POOL ESTIMATED DATE: 07/79 N/A 10/82 11/82 11/82 ACTUAL DATE:

07/79C U. OF FLA., ARGONAUT 100.0000W GRAPH ESTIMATED DATE: 01/81 N/A 06/82 N/S N/A 07/82 ACTUAL DATE:

01/81C 06/82C U. OF VA.

2000.0000W POOL ESTIMATED DATE: 03/77 N/A 10/82 10/82 N/A 08/82 ACTUAL DATE:

03/77C WORCHESTER POLY TECH 10.0000W ESTIMATED DATE: 07/79 H/A 10/82 N/S N/A 10/82 ACTUAL DATE:

07/79C u FOR TEST REACTORS ONLY

~._

n-u.~.-

-~_ _

-. _. _~-~

1 1

o 1

1 4

?

i E

1 1

i.

h-M M

M Z

O M

>=

O kJ th I

1 i

L i

1

' r W w wt r' FYFe-Nm v ein e -wwwew*

  • -r-

+y-

,w w

we ee

...wemm-en----memwcw--m----"

e m ew e m-e wae-u

l NRR LICEN$8NG SYSTEM PAGE NO: 3-0L CURRENY SYATUS REP 0RT REPORT AS OF PLANT CHARACTERISTICSt KEY PERS0> HEL DOCKET NO:

Docket No. or Project No.,if not docketed LIC. PM:

Licensing Project Maneger ASL B CH AIR: ASLB Chairman APPLICANT:

Utility

.LIC. BC:

Licensing Branch Chief MEMBER 18 on panel LOCATJON:

Miles and direction from nearest maior towr LIC. LA.:

Licensing Assistant MEMBER 2 on panel REGION:

1 through 5 AE:

Architect / Engineer COUNSEL:

Attorney assigned to case CONST. INSP : Construction inspector ANTITRUST:

Antitrust Attorney RESID INSP: Resident inspector REAC. TYPE:

PWR, BWR, HTGR or LMFBR NSSS Nuclear Steam Systems Supplier DESIGN PWR: Megawatts electric & thermal CONST: Constructor MP A AN A LYST MPA analyst assigned to track proj,ect CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Safety status for this reporting period only. It consists of accomplishments and schedule ER DOCKETED:

Environmental Feeport changes occurring since the last issue of Blue Book. Outstanding issues and late input from review branches should be indicated. along with indication of the critical path.

P O

T Project Manager ISSUE DES

  • Draft Environmental Statement RESPONSE TO COMMENTS ON DES:

ISSUE FES:

Final Environmental Statement CURRENT ENV. STATUS:

Environmental status for this reporting period only. It consists of accomplishments and schedule changes occurring since the last issue of Blue Book. Outstanding issues and late SAFETY / HEARING MILESTONES:

input from review branches should be indicated.

APPLICATION TENDERED:

SAR DOCKETED:

Safety Analysis Report SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Changes in the hearing dates since the last issue of Blue Book. Changes in intervention and ISSUE DRAFT SER:

Safety Evaluation Report INPUT TO SER:

contentions should be indicated.

ISSUE SER:

ACRS LETTER RECEIVED:

Advisory Committee INPUTS TO SE SUPPLEMEr(T 3 on Reactor Safeguards ISSUE SE SUPPLEMENT 3:

FEMA LETTER RECEIVED:

Safety Evaluation Supplement CURRENT ANTITRUSTr Changes in the antitrust status since the last issue of Blue Book.

HEARING STARTED:

ASLB INITIAL DECISION:

Atomic Safety & Licensing Board ASLB FINAL DECISION:

TECH SPECS COMPLETED:

C07:11ISSION DECISION:

ISSUE PARTIAL F0WER LICENSE:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE:

The latest amendment submitted by the applicant.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTIDH COMPLETION - APPL.

,T,,*,*,"[f Slips or potential problems that should be brought to management's attention.

n t ce o construction in construction completion compiction

%+ no 33s U $ NUCLE AR RE GUL ATORY COMMISSION BIBLIOGR APHIC DAT A SHEET fiUREG-0580 Vol.11 tio. 8 LIT L E AN D SUBliT LE (Add Volarne No, st apprope stel 2 (L eave b!s,hl Regulatory Licensing Status Suamary Report 3 HE CIPibi S ACCESSION NO (Blue Book) 5 D A T E H F POH T C O*.*PL E T E D AU T HO R tSi l YE AH MONTH August 1982 PE H6 OHMING ORG ANIZATION Pg AME AND M AILING ADDHE SS (/nctuar 2 0 Coac)

DATE GE PORT ISSUE D Of fice of Resource Management A"u g"u s"t l "1982

^a Management Information Branch 6"'d' * ' * " >

U. S. Nuclear Regulatory Conraission Washington, D.C.

20555 8 (Leo.e b anh1 Spot:SOHING OHG ANIZ AllON N AME AND M AILING ADORE SS (incluae I,p Co.fel Office of Resource Management n CONI s ACT NO Management InforTnation Branch U. S. Nuclear Regulatory Connission Washington, D.C.

20555 8'E RIOD C OV E RE D (loclume carrs/

5 T ) F'E Of HEPORT July 11 - August 15, 1982 14 (L' *e n d'h/

SUPPt F ME N T AHY NOTE S AHSTHACT '700 a ords or / css)

Provide a review of the status of the progress of the licensing reviews for all construction permits, operating license, special project and non-power reactor renewals under review, as reported to Congress.

17a DE SC hip T O RS 7 A E Y nOH DS AND DOCUME NT AN ALYSIS J

?n IDE N TIF IE RS Orf N EN DE D T E AMS 19 SE CURI T Y C L ASS e Tr uro ri 21 ' O 0; P A,15 f AV Af L ASI L t i s 51 A T E ',*E NT Unclassified

DC RIT4 Ct : % t7' or u s
W in L t Unlimited UncTassi fied