NUREG-0580 l[
Vol.11, No.12
=
REGULATORY LICENSING STATUS
SUMMARY
REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS 1; BLUE BOOK?
DECEMBER 1 - DECEMBER 31,1982 UNITED STATES NUCLEAR REGULATORY COMMISSION
(* *%,,
r l
AVAILABLE FROM NRC/GPO SALES PROGRAM SUPERINTENDENT OF DOCUMENTS GOVERNMENT PRINTING OFFICE
. WASHINGTON, D. C. 20402 A-YEARS SUBSCRIPTION CONSISTS OF 12 ISSUES
'FOR-THIS PUBLICATION MICROFICHE OF SINGLE COPIES ARE
'AVAILABLE FROM NRC/GPO SALES PROGRAM
. WASI'TNGTON, D. C. 20555 4
1 i
NUREG-0580 Vol.11, No.12 REGULATORY LICENSING STATUS
SUMMARY
REPORT l
NUCLEAR POWER PLANTS DATA FOR DECISIONS (BLUE BOOK)
DECEMBER 1 - DECEMBER 31,1982
$ ate Pu is e anuary 19 Prepared for: OFFICE OF NUCLEAR REACTOR REGULATION S. NU L EGU TORY MM SION WASHINGTON, D.C. 20555 d"%,,,
j f
s.
F0REWDRD THIS MANAGEMENT REPORT, REGULATORY LICENSING STATU3
SUMMARY
REPORT, IS DESIGHED TO PROVIDE THE HECESSARY INFORMATI0H FOR CONTROLLING THE PROGRESS OF REVIEW PROCESSES FOR CENTRAL STATIDH HUCLEAR REACTOR APPLICATIONS.
IT UTILIZES DATA COLLECTED FROM THE OFFICE OF HUCLEAR REACTOR REGULATION, OFFICE OF THE EXECUTIVE LEGAL DIRECTOR, OFFICE OF INSPECTION 8 ENFORCEMENT, AND THE NATIDHAL LABORATORIES, AND ANALYZED BY THE OFFICE OF RESOURCE MANAGEMENT IN THE IMPLEMENTATIDH OF THE REGULATORY INFORMATION SYSTEM.
SECTION I 0F THIS EDITION CONSISTS OF THE THREE
SUMMARY
OF ACCOMPLISHMENTS, THE NEW APPLICATION FORECAST FOR OL'S AND CP'S, AND AN ABBREVIATION KEY.
SECTICH II REPRESENTS THE MAIN BODY OF THE REPORT AND CONSISTS OF THE FACILITY INFORMATION. ALL GL'S ARE LISTED FIRST, FOLLOWED BY CP'S, STANDARD DESIGH REVIEWS, OTHER REVIEWS, AND FINALLY, A HON-POWER REACTOR
SUMMARY
EACH PROJECT CONSISTS OF GENERAL FACILITY DATA, CURRENT STATUS FOR ALL PHASES OF THE REVIEW, AND TARGETED AND ACTUAL COMPLETION DATES FOR ALL KEY MILESTONES IN THE REVIEW.
e 1
LICENSING 0F NUCLEAR REACT 0RS l
THE U.S. NUCLEAR REGULATORY COMMISSION REQUIRES TWO SEPARATE LICENSES - ONE TO BUILD THE FACILITY AND ANOTHER l
TO OPERATE IT.
LISTED BELOW ARE THE STEPS IN THE PROCESS OF OBTAINING A CONSTRUCTION PERMIT AND OPERATING LICENSE.
THE UTILITY SUBMITS A FORMAL APPLICATION DESCRIBING THE DESIGN, LOCATION, AND ENVIRONMENTkL IMPACT OF THE PRGPOSED PLANT AND THE SAFEGUARDS TO BE PROVIDED.
THE APPLICATION ALSO COVERS THE UTILITY'S FINANCIAL QUALIFICATIONS.
THE HRC MAKES COPIES OF THE APPLICATION AVAILABLE TO THE ACRS AND TO THE PUBLIC DOCUMENT ROOM. TECHNICAL j
EXPERTS ANALYSE THE APPLICATION, AND PREPARE A SAFETY EVALUATION AND AN ENVIRONMENTAL IMPACT STATEMENT.
THESE l
DOCUMENTS ARE ALSO MADE AVAILABLE IN THE PUBLIC DOCUMENT ROOM.
THE STAFF'S ANALYSIS IS SUBMITTED TO THE HRC'S STATUTORY ADVISORY COMMITTEE ON REACTOR SAFEGUARDS, A i
COMMITTEE OF INDEPENDENT EXPERTS. ACRS STUDIES THE APPLICATION IN DETAIL AND HOLDS CONFERENCES WITH THE APPLICANT, THE LICENSING STAFF AND OTHERS.
THE ACRS FINDINGS ARE REPORTED TO THE HRC AND MADE PUBLIC.
A PUBLIC HEARING IS HELD, USUALLY NEAR THE PROPOSED SITE, BY AN NRC APPOINTED AT6MIC SAFETY & LICENSING L
BOARD.
PRIVATE CITIZENS, STATE AND LOCAL OFFICIALS, AND COMMUNITY GROUPS MAY PARTICIPATE.
AFTER REVIEWING THE HEARING RECORD INCLUDING IHE NRC STAFF AND ACRS FINDINGS, THE BOARD DECIDES FOR OR AGAINST l
GRANTING A CONSTRUCTION PERMIT.
THE BOARD'S DECISION IS REVIEWED BY THE ATOMIC SAFETY AND LICENSING APPEAL BOARD, AND IS SUBJECT TO REVIEW BY THE FIVE-MEMBFR NUCLEAR REGULATORY COMMISSION.
IF THE LICENSING BOARD AUTHORIZES THE ISSUANCE OF A CONSTRUCTION PERMIT,'THE DIRECTOR OF THE DIVISION OF LICENSING WILL ISSUE A CONSTRUCTION PERMIT.
AN EARLIER LIMITED WORK AUTHORIZATION TO DO PRELIMINARY SITE CONSTRUCTION MAY HAVE BEEN GRANTED IF THE SITE HAD BEEN DETERMINED TO BE SUITABLE BY THE NRC STAFF AND THE BOARD HAD RULED FAVORABLY ON THE ENVIRONMENTAL IMPACT ANALYSIS, CONSTRUCTION IS SUBJECT TO INSPECTION BY THE OFFICE OF INSPECTION AND ENFORCEMENT.
AS CONSTRUCTION PROGRESSES, ADDITIONAL INFORMATION IS DEVELOPED AND THE UTILITY APPLIES TO THE HRC FOR AN OPERATING LICENSE.
THE SAME CAREFUL ANALYSIS AS IS MADE AT THE CCHSTRUCTION PERNIT STAGE IS MADE BY THE NRC IN DECIDING WHETHER OR NOT TO ISSUE THE OPERATING LICENSE.
IN THE OPERATING LICENSE REVIEW PROCESS, OPPORTUNITY FOR HEARING IS PROVIDED.
CONTRASTED WITH THE CONSTRUCTION PERMIT REVIEW PHASE, A HEARING IS HELD ONLY IF INTERVENTION IS GRANTED.
FINAL ISSUANCE OF AN OPERATING PERMIT IS SUBJECT TO THE APPROVAL OF BOTH THE DIRECTOR OF THE DIVISION OF LICENSING AND OF THE COMMISSILh.
p I
TABLE OF C0NTENTS PRINTED IN THE ORDER LISTED i
i SECTION I
1
SUMMARY
OF ACCOMPLISHMENTS l
SUMMARY
OF ACCOMPLISHMENTS CP SUMI.ARY OF ACCOMPLISHMENTS COMBINED NUMERICAL
SUMMARY
OF ACCOMPLISHMENTS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING OPERATING LICENSES IN THE NEXT FIVE YEARS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING CONSTRUCTION PERMITS IN THE NEXT FIVE YEARS j
NEW APPLICATION FORECAST OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS SPECIAL REVIEWS COMMON ABBREVIATIONS USED WITHIN THE PUBLICATION SECTION II l
PROJECT INDEX OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS NON-POWER REACTORS SECTION III EXAMPLE REVIEW e
)
l t
l M
E D
M U
kJ 44 f
l i
l l
l l
l I
l l
_m.m__________________
T 0L
SUMMARY
0F ACC0MPLI$HMENTS AS OF DECEMBER 31, 1982 NOVEMBER EUcAL YEAR TO DATE l
FACILITY SCHEDULED ACTUAL FACILITY SCHEDULED ACTUAL SER ' S SER
'S HONE HOME SSER ' S SSER ' S BYROH 1 &2 12/30/82 BYROM 1 82 12/30/82 WASHINGTON HUCLEAR 2 12/15/82 12/15/82C MIDLAND 1 82 10/06/82 10/06/82C SUMMER 1 11/12/82 11/12/82C WASHINGTDH HUCLEAR 2 12/15/82 12/15/82C SUMMER 1 11/12/82 11/12/82C WATERFORD 3 10/22/82 10/29/82C DES ' S DES ' S N0HE BELLEFONTE 1 82 11/22/82 FES ' S FES '
- SEABROOK 1 &2 12/08/82 12/08/82C SEABROOK 1 &2 12/C8/82 12/08/82C 0L
'S ISSUEDM 0L ' S ISSUEDM SUMMER 1 11/12/82 11/12/82C SUMMER 1 11/12/82 11/12/82C SUSQUEHANNA 1 11/12/82C SUSQUEHANNA 1 11/12/82C D FULL POWER
k J
L A
U T
C A
g F.
i 2
T I,
8 A
U
/
D D
0 E
3 O
H
/
T C
2 S
1 R
A E
Y S
L A
T C
S H
I F
2 E
8 1
D M
Y T
D E
H I
R L
O U
S I
F C
N S
I A
A F
H S
L
/
S T
I P 2 I
8 S
E G
S E
S E
E M 9 N
A M
N M
1 O
R K
O O
S O
0 H
S H
H H
R E
S S
C 1
3 E
S E
E P
C R
S S
D F
C A
E B
M E
F C E
0 D F
O Y
S L
R A A
U A
T C
M A
M U
S D
E 2
L 8
U
/
P D
0 E
3 C
H
/
R C
2 E
S 1
B M
E C
E D
2 4
1 D
Y T
D E
I R
L O
U I
F C
N S
A A
F H
S
/
S T
I I
S E
G S
E S
E E
M A
M M
M O
R K
O O
S O
H S
H H
H R
E S
S E
S E
E P
S S
D F
C llllll
$UMMARY 0F ACC0MPLISHMENTS AS OF DECEMBER 31, 1982 DECEMBER FISCAL YEAR TO DATE SCHEDULED ACTUAL SCHEDULED ACTUAL 5ER'SC0L )
0 0
SER'S( 0L) 0 0
5ER'S( CP) 0 0
5SER'S( 0L) 3 2
SSER'SL0L) 5 4
5SER'S( CP) 1 0
55ER'S( CP) 1 0
DES'S( 0L) 0 0
DES'S( 0L) 1 6
bES'3( CP) 0 0
DES'S( CP) 0 0
FES ' S( 0L3 1
1 FE5'S( 0L) 1 1
FES'S( CP) 0 0
FES'S( CP) 0 0
0L'S ISSUEDM 1
2 0L ' S ISSUEDM 1
2 CP'S ISSUED 0
0 CP'S I3 SUED 0
0 0 FULL POWER
LICENSING SCHEDULES FOR ALL PENDING OL APPLICATIONS REPORT AS OF: 12/31/82 (INCLUDES SCHEDULES FOR ADDITIONAL UNITS WITH PROJECTED CONSTRUCTION COMPLETION IN CY 1982-1983)
(LISTED IN ORDER OF FACILITY HAME)
SER SSER EST.
STAFF TECH STAFF TECH ASLB COMMM APPL.
DELAY ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.
CONST.
PLANT (MONTHS) El TO DL Sfa 11IS ffd IQ_D.L 11 5 0F HRG DECISI0H MIE CQMP(.
BYROH 1 0
11/81C 01/82C 02/82C 03/82C 04/82C 08/82C 12/82 03/83 07/83 08/83 08/83 CLZHTON 1 0
12/81C 12/81C 02/82C 03/82C 05/82C 06/32C 07/82C 08/83 12/83 12/83 01/84 COMANCHE PEAK 1 0
G5/81C 07/81C 07/81C 11/81C 09/81C 01/83 06/d3 12/81C 04/83 05/83 06/83 DIABLO CANYOH 1 0
12/72C 01/75C 10/74C 07/76C 05/76C 01/83 02/83 12/76C 07/81C DIABLO CANYOH 2 0
12/72C 01/75C 10/74C 07/76C 05/76C 01/83 N/S 12/76C 07/81C ENRICO FERMI 2 0
04/81C 05/77C 09/77C 08/81C 39/81C 01/83 01/83 03/82C 10/82C 05/83 08/83 CRAND GULF 1 0
05/81C 08/81C 09/81C 10/81C 10/81C Ct/83 01/83 H/A N/A 03/83 06/82C LASALLE 2 0
03/78C 02/81C 03/81C 04/81C 11/78C 01/83 02/83 N/A N/A 03/83 04/83 MCGUIRE 2 0
10/75C 01/78C 03/78C 04/78C 04/76C 01/83 02/83 03/77C 06/81C 03/83 04/83 MIDLAND 1 0
02/82C 04/82C 05/820 06/82C 07/82C 08/82C 11/83 11/82C 10/83 11/83 12/83 MIDLAND 2 0
02/82C 04/82C 05/82C 06/82C 07/82C 08/82C 10/82C 11/82C 10/83 10/83 07/83 PALO VERDE 1 0
10/81C 10/81C 11/81C 12/81C 03/82C 08/820 09/82C 04/82C 12/82 07/83 08/83 PERRY I O
02/82C 05/82C 05/82C 07/82C 08/82C 01/83 01/83 02/83 08/83 10/83 11/83 SAN OHOFRE 3 0
01/81C 01/81C 02/81C 02/81C 04/81C 01/83 01/83 06/81C 05/82C 02/83 11/82C SHOREHAM 3
03/77C 03/81C 04/81C 10/81C 10/77C N/S 01/83 05/82C 05/83 06/83 03/83 ST LUCIE 2 0
10/81C 09/81C 10/81C 11/81C 04/82C 12/82 01/83 H/A N/A 01/83 01/83 SUSQUEHANNA 2 0
03/81C 03/81C 04/81C 08/81C 07/81C 02/83 03/83 10/81C 04/82C 12/83 01/84 WASHINGTOH HUCLEAR 2 0
07/81C 05/82C 03/82C 10/82C 12/81C 11/82C 12/82C H/A H/A 08/83 09/83 WATERFORD 3 0
05/81C 05/81C 07/81C 08/81C C3/81C 09/82C 10/82C 03/82C 03/83 04/83 05/83 WATTS BAR 1 0
06/78C 06/82C 07/82C 08/82C 12/78C 09/82C N/S N/A N/A 07/83 08/83 ZIMMER 1 0
10/76C 12/77C 01/79C 03/79C 06/77C 08/82C 08/82C 02/82C 06/82C
'08/83 09/83 CLICENSING SCHEDULES AND DECISIGH DAfES DO NOT REFLECT POTENTIAL DELAY FROM EMERGENCY PREPAREDNESS REVIEW.
LICENSING SCHEDULES FOR ALL TENDERED OL UNITS TO BE ISSUED AFTER CY 1985 ISSUE APPL. CONST.
PLANT 11ER COMPLETE BELLEFONTE 1 06/83 05/85 BELLEF0HTE 2 N/S 05/86 BRAIDWOOD 1 05/84 04/85 BRAIDWOOD 2 04/86 BYRON 2 N/S 04/84 CALLAWAY 1 02/83 04/84 CATAWPA 1 04/83 11/84 CATAWBA 2 N/S 03/87 CLINTON 2 N/S COMANCHE PEAK 2 11/83 12/84 FERMI 2 (FSAR RESilB)
GRAND GULF 2 N/S N/S HARRIS 1 04/84 06/85 HARRIS 2 N/S N/S LIMERICK 1 10/83 10/84 LIMERICK 2 N/S MARBLE HILL 1 05/85 06/86 MARBLE HILL 2 12/87 MILLSTONE 3 12/84 11/85 PALO VERDE 2 '
10/83 08/84 PALO VERDE 3 09/85 11/85 PERRY 2 N/S 03/87 RIVER BEND 1 05/84 04/85 RIVER BEND 2 N/S SEABROOK 1 05/83 09/84 SEABROOK 2 12/86 SOUTH TEXAS 1 01/86 12/86 SOUTH TEXAS 2 N/S 12/88 WASHINGTON NUCLEAR 1 N/S N/S WASHINGTON NUCLEAR 3 12/84 12/85 WATTS BAR 2 06/84 08/84 WOLF CREEK 1 08/82C 10/84
- u. _.. _ -
.m LICENSING SCHEDULES FOR ALL PENDING CP APPLICATI0HS REPORT AS OF8 12/31/82 (LISTED IN ORDER OF iACILITY NAME)
I j
SER SSER STAFF TECH STAFF TECH ASLB COMM ISSUE IHPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.
PLANT Dfi TO DL 1XE 519 Eli TO DL SSER OF HRG DECISION DAIE (SP)FHP 1-8 (MANUF.)
07/74C 08/75C 09/75C 04/76C 10/75C 03/76C 09/81C 06/76C 06/82C 12/82C CLINCH RIVER 02/76C 01/83 03/83 05/83 02/77C 56/83 07/83 08/82C 04/84 06/84 PEBBLE SPRINGS 1&2 01/75C 12/75C 01/76C 02/76C 04/75C 12/77C N/S N/S N/S N/S SKAGIT/HANFORD 182 05/82C 07/77C 08/77C 02/83 02/83 11/82C 12/82 07/75C 04/83 07/83 i
l i
i 5
t 1
i l
NEW APPLICATION F 0 R E C A S T --- O P E R A T I N G LICENSE REVIEWS (ANTICIPATED TENDER DATEL FOR ALL UNITS WITH CONSTRUCTION PERMITS)
AS OF WEEK ENDING: 12/31/82
...------=_ _
_ _ =. - - - - - - - - - - - - - - - - - - - - - - -... - -........ - -.. - - - - - - -... - - - - - - -. - - - - - _. -
LICENSING APPL.
APPL.
IST UNIT DOCKET PROJECT SUBMITS SUBMITS CONST.
FACILITY NUMBER UTILITY MANAGER FSAR ENV. RPT. COMPLETE COUNSEL
_=__------ ----------------..--
FY83 MILLSTONE 3 050-00423 NORTHEAST NUCLEAR ENERGY
. UNASSIGNED 10/29/82C 10/29/82C 11/ 00/85 M.ROTHSCHILD MARBLE HILL 1 82 054680547 PUBLIC SERVICE OF INDIANA E.DOOLITTLE 11/23/82C 11/23/82C 06/00/86 R.LESSY BEAVER VALLEY 2 050-00412 DUQUESHE LIGHT E.DOOLITTLE 12/31/82 12/31/82 12/31/85 J.GUTEIRREZ HINE MILE POINT 2 050-00410 HIAGARA MOHAWK POWER D. LYNCH 01/a'/83 01/00/83 03/00/86 B.BORDENICK HOPE CREEK 1 050-00354 PUBLIC SERVICE ELECTRIC 8 GAS
.UHASSIGNED 03/00/83 03/00/83 06/00/86 R. BLACK V0GTLE 1 82 0424-0425 GEORGIA POWER E.DOOLITTLE 07/00/83 09/00/83 09/00/86 B.BORDENICK
-. _ _ - - --------------. ------------------------....-------_.-----.....----....-----...-- --------..-----......=_
1 NEW APPLICATION F 0 R E C A S T -- C 0 N 5 T R U C T I O N PERMITS AS OF WEEK ENDING:
12/31/82
=-_===__
_----------------------------------------------------------------.e---------------------
FACILITY PROJECT PROJECT APPL. ER APPL. PSAR NAME UTILITY NUMBER MANAGER SUB. DATE SUB. DATE
_==---__-----------------_------------------------------_--__--------_-_-____
,___=== ------
--===.
.=--=.
=-------------en-----------.---mm-es---meen--e.----ame--------an---------------an==--------------------
l CARROLL 1&2 COMMONWEALTH EDISON 559 D.MORAN 10/00/84 10/00/84 l
...--=
C0MM0N ABBREVIATION 5 USED WITHIN THE PUBLICATION 1
ACRS: ADVISORY COMMITTEE ON REACTOR SAFEGUARDS L.A.:
LICENSING ASSISTANT AE:
ARCHITECT / ENGINEER LESR LIMITED EARLY SITE REVIEW (ALSO ABBREVIATED LES) i AEB:
ACCIDENT EVALUATION BRANCH LGR:
LICENSING GUIDANCE BRANCH ASB:
AUXILIARY SYSTEMS BRANCH LNFBR: LIQUID METAL FAST BREEDER REACTud ASLB ATOMIC SAFETY LICENSING BOARD LQB:
LICENSEE QUALIFICATIONS BRANCH B8R:
BURNS & ROE MEB:
MECHANICAL ENGINEERING BRANCH 88V BLACK 8 VEACH MPA:
MANAGEMENT AND PROGRAM ANALYSIS B8W:
BABCOCK & WILCOX MTEB: MATERIALS ENGINEERING BRANCH BECH: BECHTEL MWE MEGAWATTS ELECTRIC BRRT: BROWN & ROOT MWT:
MEGAWATTS THERMAL BWR:
BOILING WATER REACTOR NSSS: HUCLEAR STEAM SYSTEMS SUPPLIER CEB CHEMICAL ENGINEERING BRANCH OL:
OPERATING LICENSE COMB COMBUSTION ENGINEERING OLB:
OPERATOR LICENSING BRANCH l
CP:
CONSTRUCTION PERMIT OPS:
OFFSHORE POWER SYSTEMS I'
CPB:
CORE PERFORMANCE BRANCH CSB:
CONTAIHMENT SYSTEMS BRANCH CWE COMMONWEALTH EDISON PDA:
PRELIMINARY DESIGN APPROVAL PG4E PACIFIC GAS 8 ELECTRIC DES:
DRAFT ENVIRONMENTAL STATEMENT PID:
PARTIAL INITIAL DECISION PM:
PROJECT MANAGER PS:
POWER SYSTEMS BRANCH EEB:
ENVIRONMENTAL ENGINEERING BRANCH PSAR: PRELIMINARY SAFETY ANALYSIS REPORT EPA:
ENVIRONMENTAL PROTECTION AGENCY PTRBs PROCEDURES AND TEST REVIEW BRANCH EPLB EMERGENCY PREPAREDNESS LICENSING BRANCH PWR:
PRESSURIZED WATER REACTOR ER:
ENVIRONMENTAL REPORT EQB EQUIPMENT QUALIFICATION BRANCH ESR EARLY SITE REVIEW QAB QUALITY ASSURANCE BRANCH ETSB EFFLUENT TREAIMENT SYSTEMS BRANCH RAB:
RADIOLOGICAL ASSESSMENT BRANCH F.R.:
FEDERAL REGISTAR RSB:
REACTOR SYSTEMS BRANCH FDA:
FINAL DESIGN APPROVAL FES:
FINAL ENVIRONMENTAL STATEMENT FSAR: FINAL SAFETY ANALYSIS REPORT
$8La SARGENT 4 LUNDY S8W:
STONE & WEBSTER SAB:
SITING ANALYSIS BRANCH G8H:
GIBBS & HILL SAR:
SAFETY ANALYSIS REPORT GHDR: GIBBS & HILL SDA:
STANDARD DESIGN APPROVAL GIL:
GILBERT COMMONWEALTH SEB:
STRUCTURAL ENGINEERING BRANCH GSB:
GEOSCIENCES BRANCH SER:
SAFETY EVALUATION REPORT SIB:
SYSTEMS INTERACTION BRANCH SP SPECIAL PROJECT HGB:
HYDROLOGIC AND GEOTECHNICAL BRANCH SSC:
SOUTHERN SERVICES COMPANY HTGR: HIGH TEMPERATURE GAS COOLED REACTOR SSER: SUFPLEMENT TO SAFETY EVALUATION TVA:
TENNESSEE VALLEY AUTHORITY i
ICB:
INSTRUMENTATION AND CONTROL BRANCH UEC:
UNITED ENG. S' CONSTRUCTORS UFB:
UTILITY FINANCE BRANCH WEST: WESTINGHOUSE
H H
E O
M H
U DJ to i
l I
i l
l l
I i
l i
i i
I i
I
1 PR0 JECT IHDEX l
SECTIDH II OPERATING LICENSE REVIEW CONSTRUCTION PERMIT REVIEWS STANDARD DESIGH REVIEWS OTHER REVIEWS 2-1 BELLEFONTE 1 82 2-35 CLINCH RIVER 2-38 (BOP)BOPSSAR/BSAR-205 2-48 (SP)FHP 1-8 (MANUF.)
2-2 BRAIDWOOD 1 8 2 2-36 PEBBLE SPRINGS 182 2-39 (BOP)ESSAR/BSAR-205 2-49 CARROLL SITE 2-3 BYRON 1 82 2-37 SKAGIT/HANFORD 182 2-40 (BOP)ESSAR/CESSAR-80 2-4 CALLAWAY 1 2-41 (BOP)ESSAR/RESAR-414 2-5 CATAWBA 1 82 2-42 (BOP)GAISSAR 2-6 CLINTON 1 82 2-43 (BOP)GIBBSSAR (W) 2-7 COMANCHE PEAK 182 2-44 (BOP)SWESSAR/BSAR-205 2-8 DIABLO-CANYOH 1 82 2-45 (HSS)CESSAR SYSTEM 80 2-9 ENRICO FERMI 2 2-46 (HSS)GESSAR SEVERE ACC 2-10 FERMI 2 (FSAR RESUB) 2-47 (HSS)GESSAR-238 NI 2-11 GRAND GULF 1 82 2-12 HARRIS 1 8 2 2-13 LASALLE 2 2-14 LIMERICK 1 82 2-15 MARBLE HILL 1 82 2-16 MCGUIRE 2 2-17 MIDLAND 1 82 2-18 MILLSTONE 3 2-19 PALO VERDE 1,2,3 2-20 PERRY 1 82 2-21 RIVER BEND 1 &2 2-22 SAN OHOFRE 3 2-23 SEABROOK 1 82 2-24 SHOREHAM 2-25 SOUTH TEXAS 1 &2 2-26 ST LUCIE 2 2-27 SUSQUEHANNA 2 2-28 WASHINGTON HUCLEAR 1 2-29 WASHINGTON HUCLEAR 2 2-30 WASHINGTON HUCLEAR 3 2-31 WATERFORD 3 2-32 WATTS BAR 1 82 2-33 WOLF CREEK 1 2-34 ZIMMER 1 i,
7
~
i NRR LICENSING SYSTEM PAGE NO: 2-1 BCLLEFONTE 1 82 0L CURRENT STATUS REPORT REPORT AS OF 12/31/82 PLANT C H A R A C T E R I S T I C S:
KEY PERS0NNELa DOCKET NO:
043880439 LIC. PM:
R. HERNAN ASLB CHAIR: N/A APPLICANT:
TENNESSEE VALLEY AUTHORITY LIC. BC:
E. ADENSAM MEMBER 18 N/A LOCATION:
6 MI NE OF SCOTTSBORD. ALA LIC. LA.:
M.
DUNCAN MEMBER 2:
N/A REGION:
2 AE:
TVA LOUNSEL:
B. PATON CONST. INSP R. CRLENJAK REAC. TYPE: PWR NSSS: B8W ANTITRUST:
J. RUTBERG RESID. INSP J. WILCOX DESIGN PWR: 3760 MWT/1235 MWE CONST: TVA RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE As a result of applicant's construction delay, the review schedule bas been delayed.
The applicant has ER DOCKETED:
06/12/78 06/12/78C announced a delay in loading fuel to 05/85.
The ER SITE VISIT COMPLETE:
02/20/82 06/17/82C staff is currentiv evaluating tFa impacts of this IMPUT TO DES TO PM:
09/30/82 delay on the safets review schedule.
ISSUE DES:
11/22/82 RESPONSE TO COMMENTS ON DES:
04/22/83 ISSUE FES:
05/20/83 CURRENT ENV. STATUSr As a result of applicant's construction delay, the review schedule was delayed, and is being re evaluated.
SAFETY / HEARING MILESTONES:
The environmental site visit was completed on 6/17/82.
APPLICATION TENDERED:
02/03/78 02/03/78C SAR DOCKETED:
06/12/78C SAR Q'S RECEIVED BY PM:
07/03/80 11/01/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 06/25/82 CURRENT HRG. STATUS' INPUT TO DRAFT SER TO PM:
08/13/82 No hearing i s anticipated.
ISSUE DRAFT SER:
11/09/82 INPUT TO SER:
02/22/83 ISSUE SER:
03/10/83 ACRS FULL COMMITTEE MEETING:
04/15/83 INPUTS TO SE SUPPLEMENT 1:
05/27/83 ISSUE SE SUPPLEMENT 18 06/24/83 FEMA LETTER RECEIVED:
CURREMT ANTITRUST:
Pencing determination NEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A COMMISSION EFFECTIVENESS DECISION: N/A TECH SPECS COMPLETED:
03/08/85 COMMISSION DECISION:
04/00/85-ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
05/08/85 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
On 07/06/82 TVA revised fuel load date to 5/85.
Staff is CONSTRUCTION COMPLETION - APPL.:
V5/08/85 07/06/82 evaluating impact on safety and environmental review schedules.
HRR LICENSING SYSTEM PAGE NO: 2-2 BRAIDWOOD 182 0L CURRENT STATUS REPORT REPORT AS OF 12/31/82 PLANT CHARACTERISTIC 5:
KEY PERS0NNELa DOCKET NO:
045680457 LIC. PM:
J. STEVENS ASLB CHAIR M. MILLER APPLICANT:
COMMONWEALTH EDISON LIC. BC:
J. YDLNGBLOOD MEMBER 1:
R. COLE L OC A T I0ri:
24 MI SSW OF JOLIET. ILL LIC. LA.:
M. RUSHBROOK MEMBER 2:
D. CALLIHAN REGION:
3 AE:
S8L COUNSEL:
D. HASSELL CONST. INSP: J. NEISLER REAC. TYPE: PWR HSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP: L. MCGREGOR DESIGN PWR 3425 MWT/1120 MWE CONST: CWE RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Several portions are under contract review.
ER DOCKETED:
11/30/70C ER SITE VISIT COMPLETE:
04/15/83 INPUT TO DES TO PM:
tt/01/83 ISSUE DES:
01/00/84 RESPONSE TO COMMENTS ON DES:
04/01/84 ISSUE FES:
06/00/84 CURRENT ENV. STATUS:
Inactive.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/26/78 06/26/78C SAR DOCKETED:
11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:
12/31/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 03/01/83 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
05/01/83 Opportunity for hearing was published in the Federal ISSUE DRAFT SER:
09/20/83 Register on 06/13/79. There will be a contested hearing.
INPUT TO SER:
11/01/83 ISSUE SER:
12/01/83 ACRS FULL COMMITTEE MEETING:
01/00/84 INPUTS TO SE SUPPLEMENT 18 04/01/84 ISSUE SE SUPPLEMENT 18 05/00/84 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Applicant has submitted antitrust information pursuant to HEARING STARTED:
10/00/84 Req. Guide 9.3.
ASLB INITIAL DECISION:
03/00/85 COMMISSION EFFECTIVENESS DECISIDH: 04/00/85 TECH SPECS COMPLETED:
04/00/85 COMMISSION DECISION:
04/00/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
04/00/85 FSAR Amendment No. 38 SCHFD. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
04/00/85 04/14/82
l I
NRR LICENSING SYSTEM PAGE NO: 2-3 BYRON 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF 12/31/82 PLANT C H A R A C T E R I S T I C 5:
KEY E R S 0 N N E L:
DOCKET NO:
045480455 LIC., M:
L. OLSHAN ASLB CHAIR:
I. SMITH APPLICANT:
COMMONWEALTH EDISON LIC. BC:
J. YOUNGBLOOD MEMBER 1:
R. COLE LOCATION:
17 MI SW OF ROCKFORs. ILL LIC. LA.:
M. RUSHBROOL MEMBER 2:
D. CALLIHAN REGION:
3 AE:
S8L COUNSEL:
S. GOLDBERG CONST. INSP: M. RIPG REAC. TYPE: PWR HSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP W. FORNEY DESIGN PWR: 3425 MWT/1120 MWE CONST: CWE RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER and Supplement 1 have been issued. Several outstanding and confirmatory issues remain to be ER DOCKETED:
11/30/78C resolved prior to licensing.
ER SITE VISIT COMPLETE:
05/31/81 05/31/81C INPUT TO DES TO PM:
08/15/81 08/15/81C ISSUE DES:
11/05/81 11/05/81C RESPONSE TO COMMENTS ON DES:
03/01/82 03/01/82C ISSUE FES:
04/05/82 04/05/82C CURRENT ENV. STATUS:
Environmental review completed and FES (NUREG-0848) published in April 1982.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/26/78 06/26/78C SAR DOCKETED:
11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:
08/15/81 08/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/15/81 10/15/8tC CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
11/07/81 11/07/81C In discovery. Hearing scheduled to commence in ISSUE DRAFT SER:
March 1983.
INPUT TO SER:
01/07/82 Ot/07/82C ISSUE SER:
02/07/82 02/07/82C ACRS LETTER RECEIVED:
03/10/82 03/10/82C INPUTS TO SE SUPPLEMENT 28 08/20/82 08/20/82C ISSUE SE SUPPLEMENT 2:
12/30/82 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
Applicant has submitted antitrust information pursuant HEARING STARTED:
03/00/83 to Reg. Guide 9.3.
ASLS INITIAL DECISION:
07/00/83 COMMISSION EFFECTIVENESS DECISION: 08/00/83 TECH SPECS COMPLETED:
06/30/83 COMMISSION DECISION:
08/00/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
08/00/83 FSAR - Amendment 40 ER - Amendment 3 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
08/31/83 07/14/82
NRR LICENSING SYSTEM PAGE HO 2-4 CALLAWAY 1 0L CURRENT STATUS REP 0RT REPORT AS OF 12/31/82 PLANT CHARACTERI5TICSt KEY P E R S 0 N N E L:
DOCKET HO:
05000483 LIC. PM:
G. EDISON ASLB CHAIR:
J. GLEASON APPLICANT:
UNION ELECTRIC LIC. BC:
B. YOUNGBLOOD MEMBER 1:
G.
BRIGHT LOCATION:
10 MI SE OF FULTON, M0 LIC. LA.:
M. RUSHBROOK MEMBER 28 J. KLINE REGION:
3 AE:
BECH COUNSEL:
R. LES$Y CONST. INSP J. KONKLIN REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP J. NEISLER DESIGN PWR 3425 MWT/1188 MWE CONST DANIEL RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SAR was docketed 08/08/80. The SER was issued by HRC on 10/07/81 and the SER Supplement No. I was issued on ER DOCKETED:
12/12/80 12/12/80C 01/15/82. SSER 2 is scheduled for 2/83.
ER SITE VISIT COMPLETE:
12/00/81 12/00/81C INPUT TO DES TO PM:
08/01/81 08/01/81C ISSUE DES:
09/29/81 09/29/81C RESPONSE TO COMMENTS ON DES:
12/01/81 12/01/81C ISSUE FES:
01/29/82 01/29/82C CURRENT ENV. STATUS:
ER was docketed 12/12/80. The DES was issued by HRC on 09/29/81 and the FES was issued on 01/29/82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/25/79 10/25/79C SAR DOCKETED:
08/08/80 08/08/80C SAR Q'S RECEIVED BY PM:
12/18/80 12/18/80C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/81 10/01/81C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Hearings were held on limited issues during Hovember 1981.
ISSUE DRAFT SER:
N/A The hearing on the one remaining contention, emergency INPUT TO SER:
09/11/81 09/11/81C preparedness, is scheduled for May, 1983.
ISSUE SER:
10/07/81 10/07/81C ACRS LETTER RECCIVED:
11/19/81 11/19/81C INPUTS TO SE SUPPLEMENT 28 01/01/82 01/01/82C ISSUE SE SUPPLEMENT 28 02/08/83 FEMA LETTER RECEIVED:
03/00/83 CURRENT ANTITRUST:
OL review is in progress.
HEARING STARTED:
11/17/81 11/17/81C ASLB INITIAL DECISION:
10/08/83 COMMISSION EFFECTIVEMESS DECISION:
11/00/83 TECH SPECS COMPLETED:
N/S COMMISSION DECISIDH 03/00/84 ISSUE LIC. WITH POWER RESTRICTION: 04/00/84 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
07/09/84 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
The Caseload Forecast Panel is reviewing construction CONSTRUCTION COMPLETION - APPL.:
04/00/84 08/23/82 progress in order to make a new construction completion schedule estimate. An April 1984 estimate is based on the anolicant's recentiv revised fuel load date.
i
MRR LICEN$ING SYSTEM PAGE NO: 2-5 CATAWBA 1 8 2 0L CURRENT STATUS REPORT REPORT AS OF 12/31/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:
DOCKET NO:
041380414 LIC. PM:
K. JABBOUR ASLB CHAIR:
J. KELLEY APPLICANT:
DUKE POWER LIC. BC:
E. ADENSAM MEMBER 1:
D. CALLINAN LOCATIDH 6 MI NNW OF ROCK HILL, SC LIC. LA.:
M. DUNCAN MEMBER 2:
R. FOSTER REGIDH:
2 AE DUKE COUNSEL:
G. JOHNSON CONST. INSP P. VAND00RN REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP: K. VAN DOORN DESIGN PWR: 3582 MWT/1145 MWE CONST DUKE RM ANALYST:
L. LANIER CURRENT SAF. STATUS:'
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER is scheduled to be completed 02/06/83.
ER DOCKETED:
06/11/81 06/11/81C ER SITE VISIT COMPLETE:
10/15/81 10/15/81C INPUT TO DES TO PM:
06/25/82 07/29/82C ISSUE DES:
08/05/82 08/11/82C RESPONSE TO COMMENTS ON DES:
11/30/82 11/30/82C ISSUE FES:
01/05/83 CURRENT ENV. STATUS:
DES was issued en 08/11/82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
04/07/81 04/07/8tc SAR DOCKETED:
06/11/81 06/11/8tC SAR Q'S RECEIVED BY PM:
12/15/81 12/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/10/82 12/10/82C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
12/30/82 Combined hearing anticipated to start 09/83.
ISSUE DR4FT SER:
11/19/8.
11/19/82C i
INPUT TO SER:
01/09/83 ISSUE SER:
02/06/83 ALRS FULL COMMITTEE MEETING:
03/10/83 INPUTS TO SE SUPPLEMENT 18 04/12/83 ISSUE SE SUPPLEMENT 18 04/30/83 FEMA LETTER RECEIVED:
03/30/83 CURRENT ANTITRUST:
Operating Ilcense antitrust review is in progress 4 HEARING STARTED:
09/28/83 ASLB INITIAL DECISIDH:
03/00/84 COMMISSION EFFECTIVENESS DECISION: 04/00/84 TECH SPECS COMPLETED:
09/00/84 COMMISSION DECISION:
09/00/84 ISSUF LIC. WITN POWER RESTRICTIDH LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
11/00/84 Revision 6 dated 10/25/82.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CP Amend. Issued 12/23/80 indicating change in ownership.
CONSTRUCTION COMPLETION - APPL.:
11/00/84 05/08/82 Staff is reassessing standard assumptions for projecting hearing schedules for plants with const completion dates bevond '82.
This re-assess. may result in a new schedule.
I 1
1 MRR LICEN$ING SY$ TEM PAGE NO: 2-6 i
CLINTON 182 0L CURRENT STATUS REPORT REPORT AS OF* 12/31/82 I
l PLANT C H A R A C T E R i S T I C 5:
KEY PERS0NNELa i
DOCKET NO:
046180462 LIC. PM:
M. ABELSON ASLB CHAIR:
M. CLARK APPLICANT:
ILLINDIS POWER LIC. BC:
A.
SCHWENCER MEMBER 1:
G. FERGUSON LOCATION:
6 MI E OF CLINTON, ILL LIC. LA.:
E. HYLTON MENBER 2:
D. PARIS REGION:
3 AE Sal COUNSEL:
R. GODDARD CONST. INSP F. JABLONSKI REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP M. LIVERMORE l
DESIGN PWR 2894 MWT/0950 MWE CONST: BALDWIN RM ANALYST:
M. KING l
l CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE i
FSAR was docketed 09/08/80. SER was issued 02/17/82.
I Supplement No. I was issued 37/22/82.
ER DOCKETFDs 03/01/81 09/08/80C l
ER SITE VISIT COMPLETE:
i IMPUT TO DES TO PM:
12/08/81 12/08/81C i
ISSUE DES:
12/18/81 12/28/81C RESPONSE TO COMMENTS ON DES:
02/22/82 03/25/82C l
ISSUE FES:
05/2G/82 05/20/82C CURRENT ENV. STATUS:
l The draft environmental statement was completed December 1981 The FES was comoleted May 1982.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
12/01/79 12/01/79C l
SAR DOCKETED:
09/08/80 09/08/80C SAR 9'S RECEIVED BY PM:
SAR APPL. RESPONSE TO 9'S RECEIVED:
CURRENT HRG. STATUS INPUT TO DRAFT SER TO PM:
Two petitions for leave to intervene were filed. The ISSUE DRAFT SER:
State of Illinois filed under le CFR 2.715(c).
INPUT TO SER:
12/05/81 12/05/81C A prehearing was held on 04/14/81. A second ISSUE SER:
01/05/82 02/17/82C prehearing was held 05/04/82. ASLB issued Memorandum and Order 11/10/82 ruling on proposed supplemental contentions, ACRS LETTER RECEIVED:
02/12/82 03/09/82C proposed issues, motion for summary disposition, and INPUTS TO SE SUPPLEMENT 18 06/30/82 e6/30/82C dismissing a previously admitted contention.
ISSUE SE SUPPLEMENT 1 06/30/82 07/22/82C FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Operating license antitrust review completed HEARING STARTED:
08/08/83 March 18, 1982 (SECY-82-120).
ASLB INITIAL DECISION:
12/00/83 COMMISSION EFFECTIVENESS DECISION: 12/00/83 T
TECH SPECS COMPLETED:
12/08/83 COMMISSION DECISION:
12/08/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
01/09/84 j
FSAR Amendment 020, 10/82.
SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
IPC announced fuel load date of 1/84 by letter dated CONSTRUCTION COMPLETION - APPL.:
81/09/84 04/21/82 i
1 04/21/82. Stop work orders associated with construction QA may impact fuel load date.
I l
l
NRR LICENSING SYSTEM PAGE NO: 2-7 COMANCHE PEAK 1 8 2 0L CURRENT STATUS REPORT REPORT AS OF 12/31/82 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:
044580446 LIC. PM:
S. BURWELL AS!? JHAIR:
M. MILLER APPLICANT:
TEXAS UTILITIES GENERATING LIC. BC:
B. YOUNGBLOOD MEMBER 12 R. COLE LOCATION:
4 MI N OF GLEN ROSE, TEX LIC-LA.:
M. RUSHBROOK MEMBER 24 K. MCCOLLOM REGION:
4 AE:
G8H COUNSEL:
M. ROTHSCHILD CONST. INSP: R. TAYLOR REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID INSP: D. KELLY DESIGN PWR: 3411 MWT/1150 MWE CONST: BRRT RM ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The SER was issued 07/14/81 The staff deferred scheduling the Comanche Peak review by the ACRS until sufficient ER DOCKETED:
01/19/79 01/19/79C information was provided to resolve a large number of open ER SITE VISIT COMPLETE:
06/20/80 04/07/80C issues.
SSER 81 was issued 10/16/81. Application was INPUT TO DES TO PM:
08/15/80 f'/27/81C reviewed by the ACRS on 11/13/81 SSER 82 responding to ISSUE DES:
04/30/81
.2/22/81C the ACRS was issued on 01/20/82. SSER 03 is scheduled RESPONSE TO COMMENTS ON DES:
07/19/81 08/28/81C to be issued 01/28/83.
ISSUE FES:
09/18/81 09/24/81C CURRENT ENV. STATUS:
The DES was issued on 05/22/81 The EPA Federal Register Notice was printed on 05/29/81 and the comment period SAFETY / HEARING MILESTONES:
ended 07/13/81.
The FES was issued on 09/24/81.
APPLICATION TENDERED:
03/01/78 03/01/78C SAR DOCKETED:
05/12/78 05/12/78C SAR Q'S RECEIVED BY PM:
12/30/78 02/22/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/08/79 01/31/80C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
04/13/79 03/11/81C The first hearing session was held 12/02/81 in Fort Gorth.
ISSUE DRAFT SER:
03/31/81 03/31/81C Issues heard were financial qualifications and the INPUT TO SER:
05/22/81 07/08/81C operating QA program.
A second, third, and fourth hearing ISSUE SER:
07/14/81 07/14/81C sessions on QA/QC during construction were held 06/07-11/82, 07/26-30/82, and 09/13-17/82.
The fourth hearing session ACRS LETTER RECEIVED:
11/17/81 11/17/81C completed the remaining contention, emergency plans.
INPUTS TO SE SUPPLEMENT 3:
01/14/83 The ASLB is awaiting staff rebuttal testimony to allegation ISSUE SE SUPPLEMENT 32 01/28/83 concerning pipe hangers.
The fifth hearing session is N/S.
FEMA LETTER RECEIVED:
06/0G/83 CURRENT ANTITRUST:
ALJ appointed on 02/23/82 to replace ASLB. Prehearing HEARING STARTED:
12/02/81 12/02/81C conference held 04/13/82 to determine status of parties.
ASLB INITIAL DECISION:
04/00/83 Briefs filed 05/04/82 request immediate imposition of COMMISSION EFFECTIVENESS DECISION: 04/00/83 settlement license conditions. A Memorandum and Order TECH SPECS COMPLETED:
05/00/83 approving settlement agreements & proposed license COMMISSION DECISI0H:
05/09/83 conditions 8 dismissing proceedings was issued 05/06/82.
ISSUE LIC. WITH POWER RESTRICTION: N/S LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
C6/00/83 34 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
SSER 83 has been delayed an additional eight weeks due to CONSTRUCTION COMPLETION - APPL.:
06/00/83 10/29/81 staff resources. The delay will not impact the hearing schedule.
e
NRR LIC( NSING SYSTEM PAGE NO: 2-8 DIABLO-CANYON 1 8 2 01 CURRENT STATUS REPORT REPORT AS OF: 12/31/82 PLANT C H A R A C T E R I S T I C S:
KEY
'l E R S 0 N N E L:
DOCKET NO:
027580323 LIC. PM:
B. BUCKLEY ASLB CHAIR:
J. WOLF APPLICANT:
PACIFIC GAS 8 ELECTRIC LIC. BC:
G. KNIGHTON MEMSER 1:
J. KLINE L9 CATION:
12 MI WSW OF SAN LUIS 081SPb LIC. LA.:
J. LEE MEMBER 2:
G. ERIGHT REGION:
5 AE:
PG8E COUNSEL:
B. JONES CONST. INSP: D. KIRSCH REAC. TYPE: PWR HSSS: WEST ANTITRUST:
J. RUTBERG RESID. INSP J. CARLSON DE$IGN PWR: 3336 MWT/1084 MWE CONST: PC8E RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONE?:
SCHED. DATE ACTUAL DATE SSER 15 (Equip. Qualification) was issued on 10-02-81 SSER 16 is estimated for 02/07/83 (indicated as SSER9 ER DOCKETED:
11/09/71 It/09/71C on schedule).
Favorable ASLB Initial Decision on a ER SITE VISIT COMPLETE:
full-power license was issued on August 31 1982.
Low INPUT TO DES TO PM:
10/09/72 10/09/72C Power license was issued on 09-22-81 and suspended on ISSUE DES:
12/12/72 12/?2/12C November 19, 1981 RESPONSE TO COMMENTS ON DES:
04/27/73 04/27/73C ISSUE FES:
09/15/75 65/28/76C CURRENT ENV. STATUS:
Complete SAFETY / HEARING MILESTONES:
APPLICAT.ON TENDERED:
07/10/73 07/10/73C SAR DOCKETED:
10/02/73 10/02/73C SAR Q'S RECEIVED BY PM:
01/04/74 01/04/74C SAR APPL. RESPGNSE TO Q'S RECEIVED: 11/01/74 11/01/74C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
01/24/75 Ot/24/75C LP hearings were held 05-19-81 through 05-22-81.
A ISSUE DRAFT SER:
favorable PID on Icw power operation was issued July INPUT TO SER:
01/24/75 01/24/75C 17, 1981.
A full power hearing was completed on January ISSUE SER:
10/04/74 10/16/74 C 26, 1982.
In August an Initial Decision was issued authorizing issuance of a full power operating license.
ACRS LETTER RECEIVED:
05/09/78 07/18/78C INPUTS TO SE SUPPLEMENT 9:
01/25/83 ISSUE SE SUPPLEMENT 9:
02/07/83 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Not required HEARING STARTED:
10/29/75 12/07/76C ASLB INITIAL DECISION:
07/17/88 07/17/8tC COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
09/15/81 09/IS/81C COMMISSION DECISION:
ISSUE LIC. WITH POWER RESTRICTION: 09/22/81 69/22/8tC LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
N/S SCHED. DATE PECEIPT DATE NEW SLIPS / NOTES:
Est. of dates from end of LP hrq to lic. complete CONSTRUCTION COMPLETION - APPL.:
dependent upon dev./ approval of State and local Emercancy Plans.
Ongoing Design Verif. Program likely to identify olant modifications.
Const. comotetion deoendent on mode.
HRR LICENSING SYSTEM PAGE dO: 2-9 ENRICO FERMI 2 0L CURRENT STATUS REPORT REPORT AS OF: 12/31/82 PLANT C H A R A C T E R I 5 T I C S:
KEY P'E R S 0 N N E L:
DOCKET NO:
05000348 LIC. PM:
D. LYNCH ASLB CHAIRt G. MILLHOLLIN APPLICANT:
DETROIT EDISON LIC. BC:
J. YOUNGBLOOD MEMBER 1?
P. MORRIS LOCATION:
LAGUNA BEACH. MICH LIC. LA.:
F RUSHBROOK MEMBER 2:
D. SCHINK REGICH:
3 AE:
S8L COUNSEL:
C. WOODHEAD CONST. INSP P. PELKE REAC. TYPE: BWR NSSS: GE ANTITRUST:
A. HODGDON RESID. INSP: B. LITTLE DESIGN PWR 3292 MWT/1093 MWE CONST: DANIEL RM ANALYST S. HEDLUND CURREN1 SAF. STATUS
- ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE An interim SER was issued on 09-29-77 and a final SER was issued on 07-10-81.
(See second page for milestone ER DOCKETED:
04/04/75 04/04/75C summary.) SSER Ho. I was issued 09-25-81 SSER Ho. 2 was ER SITE VISIT COMPLETE:
09/27/78 10/31/78C issued 01-29-82 with 7 prelicensing issues outstanding.
INPUT TO DES TO PM:
07/31/81 04/24/81C SSER No. 3 is scheduled for issuance on 01-05-83.
ISSUE DES:
05/01/81 04/30/81C RESPONSE TO COMMENTS ON DES:
07/31/81 06/29/81C ISSUE FES:
08/31/81 09/04/81C CURRENT ENV. STATUS:
Addendum No. 1 to the FES was issued 03-03-82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/22/74 10/22/74C SAR DOCXETED:
04/05/75 04/05/75C SAR Q'S RECEIVED BY PM:
06/13/75 08/11/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/29/75 01/12/76C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/24/75 03/08/76C A hearing on two issues began on 03-31-82 and ended on ISSUE DRAFT SER:
04-02-82.
The two co.itentions were (t) QA/QC durinq INPUT TO SER:
03/05/76 05/20/77C construction and (2) adequacy of evacuation plans for ISSUE SER:
08/01/77 09/29/77C the local community. Proposed findings completed by by applicant and staff. Monroe County. Michigan ACRS LETTER RECEIVED:
08/20/81 08/11/81C petitioned for leave to reopen hearings on the INPUTS TO SE SUPPLEMENT 38 01/05/83 evacuation issue.
ASLB issued initial decision on ISSUE SE 1UPPLEMENT 38 01/05/83 10/29/82 authorizing operating license issuance.
FEMA LETTER RECEIVED:
05/01/83 CURRENT ANTITRUST:
An ASLB decision on antitrust matters was issued on HEARING STARTED:
12/02/81 03/31/82C 04-25-78.
ASLB INITIAL DECISION:
10/00/82 10/29/82C COMMISSION EFFECTIVENESS DECISIGHz TECH SPECS COMPLETED:
04/01/83 COMMISSION DECISION:
05/01/83 ISSUE LIC. WITH POWER RESTRICTION: N/A LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
08/01/83 The latest final Safety Analysis Report Amendment is number 43.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
SSER 3 slipped 2 months. It has been slipped an additional CONSTRUCTION COMPLETION - APPL.:
08/01/83 10/01/82 few weeks to reflect the resolution of some pool dynamic leads issues. There is no impact on OL issuance.
NRR LICENSING SYSTEM PAGE NO: 2-10 FERMI 2 (FSAR RESUB)
OL CURRENT STATUS REP 0RT REPORT AS OF 12/31/82 PLANT CHARACTERISTICSt KEY PERS0NNEL l
DOCKET NO:
00007341 LIC.. PM:
L. KINTHER ASLB CHAIR G. MILLHOLLIN APPLICANT:
DETROIT EDISON LIC. "C:
J. YOUNGBLOOD MEMBER 1:
P. MORRIS i
l LOCATION:
LAGUNA BEACH, MICH LIC. LA.:
M. RUSHDROOK MEMBER 2:
D. SCHINK REGION:
3 AE:
S8L COUNSEL:
C. WOODHEAD CONST. INSP P. PELKE t
REAC. TYPE: BWR NSSS: GE ANTITRUST:
A. HODGDON RESID. INSPa B. LITTLE l
DESIGN PWR: 3292 MWT/1093 MWE CONST DANIEL RM ANALYST:
S. HEDLUND
{
CURRENT SAF. STATUS:
SCHED. DATE ACTUAL DATE All information on this page reflects the FSAR resubmittal. The SAR resubmittal was docketed on 06-01-78 and the safety review was completed. A final SER was issued on 07-10-81.
Summary of later milestones is on previous page.
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/22/74 10/22/74C SAR DOCKETED:
06/01/78 06/01/78C SAR Q'S RECEIVED BY PM:
07/01/78 08/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/78 10/02/78C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
09/08/78 03/27/81C ISSUE DRAFT SER:
INPUT TO SER:
06/10/81 06/23/81C ISSUL SER:
06/30/81 07/10/81C CURRENT ANTITRUST:
LATEST AMENDMENT:
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
All information on this page reflects the FSAR CONSTRUCTION COMPLETION - APPL.:
resubmittal. The schedule for input to the SER slipped due to slippage in the fuel load date because of TMI cause.
HRR LICEN5ING SYSTEM PAGE NO: 2-11 GRAND GULF 82 LIC CURRENT STATUS REPORT REPORT AS OF 12/31/82 PLANT CHARACIERISTICSt KEY PERS0NNEL DOCKET NO:
04168007 LIC. PM:
D. HOUSTON ASLB CHAIR:
J. LAURENSON APPLICANT:
MISSISSIPPI POWER S LIGHT COMPANY LIC. BC:
A. SCHWENCER MEMBER 1 G. BRIGHT LOCATION:
25 MI S OF VICKSBURG. MISS LIC. LA.:
E. HYLTON MEMBER 2 J. HARBOUR REGION:
2 AE:
BECH COUNSEL:
M. WAGNER CONST. INSP R. VANDORN REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP A. WAGNER DESIGN PWR: 3833 MWT/1250 MWE CONST BECH RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER was issued on September 10, 1981 An initial ACRS meeting was held Oct. 15, 1981.
SSERs were issued in ER DOCKETED:
06/05/78 06/30/78C December 1981 and in June and July 1982.
A second ACRS ER SITE VISIT COMPLETE:
12/14/79C u HCU INPUT TO DES TO PM:
04/30/81 04/30/81C meeting was held on August 12. 1982 on Hydrogev floor loads, and management staffinq and capability.
ISSUE DES:
05/31/81 05/31/81C The ACRS report or full power operation was issued RESPONSE TO COMMENTS ON DES:
08/15/81 08/15/81C August 18, 1982.
ISSUE FES:
09/15/81 10/09/81C CURRENT ENV. STATUS:
DES was issued in May 1981.
FES was issued October 9, 1981.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
04/28/76 04/28/78C SAR DOCKETED:
06/05/78 06/30/78C SAR Q'S RECEIVED BY PM:
04/24/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/01/80 09/30/80C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S No hearing. Petition was filed by the State ISSUE DRAFT SER:
09/18/81C of Louisiana on basis of Court of Appeals. District of INPUT TO SER:
04/01/81 08/14/81C Columbia, opinion on S-3 Table issue.
Board denied petition ISSUE SER:
06/00/81 09/10/81C for intervention on October 20. 1982.
The State of Louisiana filed an appeal to the Board's denial. Appeal ACRS LETTER RECEIVED:
07/00/81 08/18/82C Board upheld the denial for intervention in a decision INPUTS TO SE SUPPLEMENT 4:
01/15/83 issued December 8, 1982.
ISSUE SE SUPPLEMENT 4:
01/31/83 FEMA LETTER RECEIVED:
12/15/82 CURRENT ANTITRUST:
OL review is in progress. No significant changes have HEARING STARTED:
N/A occurred since the CP.
ASLB INITIAL DECISION:
N/A COMMISSION EFFECTIVENESS DECISI0H: N/A TECH SPECS COMPLETED:
09/01/81 06/16/82C COMMISSION DECISI0H2 03/00/83 ISSUE LIC. WITH POWER RESTRICTION: 04/23/82 06/16/82C LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
04/15/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Unit 1 OL authori ing fuel load up to 5% power was issued CONSTRUCTION COMPLETI0H - APPL.:
06/16/82C 06/16/82.
Full power date delayed due to licensee's desire to complete number of outstanding items and accomolish maintenance 8 mods for first refuelina outaae.
NRR LICEN5ING SYSTEM PAGE ND* 2-12 HARRIS 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF 12/31/82 PLANT C H A R A C T E R I S T I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
0400-0401 LIC. PM:
P. KADAMBI ASLB CHAIR:
J. KELLEY APPLICANT:
CAROLINA POWER 8 LIGHT LIC. BC:
G. KNIGHTON MEMBLR 1:
G. BRIGHT LOCATION:
20 MI SW OF PALEIGH. NC LIC. LA.:
J.
LEE NEMBER 2 J. CARPENTER REGION:
2 AE:
ERASCO COUNSEL:
C. BARTH CONST. INSP REAC. TYPE: PWR NSSS: WEST ANTITRUST:
J. RUTBERG RESID. INSP: G. MAXWELL DESIGN PWR 2775 MWT/0915 MWE CONST: DANIEL RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE FSAR was docketed on 12/22/81. Review has started.
Questions were sent to the applicant between 4/26/82 ER DOCKETED:
12/22/81 12/22/8tC and 7/30/82. Most of applicant's responses were ER SITE VISIT COMPLETE:
04/08/82 04/08/82C received by 08/31/82.
INPUT 10 DES TO PM:
01/14/83 ISSUE DES:
02/21/83 RESPONSE TO COMMENTS ON DES:
06/10/83 ISSUE FES:
08/15/83 CURRENT 'NV. STATUS:
ER was Locketed on 12/22/81. The site visit was complete on 04/08/82 and questions were sent to applicant on SAFETY / HEARING MILESTONES:
04/28/82. Most of the applicant's responses were received by October 15, 1982.
APPLICATION TENDERED:
06/26/80 06/26/80C SAR DOCKETED:
12/22/81 12/22/81C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE 10 Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
12/31/82 Notice for Opportunity for Hearing was published in the ISSUE DRAFT SER:
01/10/83 Federal Register on January 27. 1982.
Several petitions INPUT TO SER:
09/01/83 to intervene were filed. Prehearing conference on petitions ISSUE SER:
11/01/83 was held on July 13-14, 1982.
Board decision on contentions issued September 23, 1982.
ACRS FULL COMMITTEE MEETING:
01/02/84 INPUTS TO SE SUPPLEMENT 12 03/01/84 ISSUE SE SUPPLEMENT 18 04/02/84 FEMA LETTER RECEIVED:
04/00/84 CURRENT ANTITRUST:
Status to be determined.
HEARING STARTED:
09/03/84 ASLB INITIAL DECISION:
05/01/85 COMMISSION EFFECTIVENESS DECISIDH: 05/00/8S TECH SPECS COMPLETED:
05/01/85 COMMISSION DECISION:
05/00/85 ISSUE LIC. WITH POWER RESTRICTION: 12/01/84 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
06/03/85 FSAR No. 4 ER No. 4 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Staff schedule based on fuel load date of 06/03/85.
CONSTRUCTION COMPLETION - APPL.:
06/03/85 10/06/82
f I
I NRR LICENSING SYSTEM PAGE NO: 2-13' LASALLE 2 0L CURRENT STATUS REPORT REPORT AS OF 12/31/82 PLANT C H A R A C T E R I 5 T I C S:
KEY PERS0NNEL DOCKET NO:
05030374 LIC. PM:
A. BOURNIA ASLB CHAIR:
M. MILLER APPLICANT:
COMMONWEALTH EDISON LIC. BC:
A. SCHWENCER MEMBER 1:
F. SHON LOCATION:
11 MI SE OF OTTAWA, ILL LIC. LA.:
E. HYLTON MEMBER 2:
O. PARIS REGION:
3 AE SIL COUNSEL:
C, WOODHEAD CONST. INSP: H. WESCOTT REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP W. GULDEMOND DESIGN PWR: 3293 MWT/1078 MWE CONST: CWE RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SSER-1 was issued in June 1981.
SSER-2 was issued in February 1982.
SSER-3 was issued on April 16, 1982.
ER DOCKETED:
01/17/77 05/12/77C SSER-4 was issued on July 14, 1982.
SSER-S is scheduled ER SITE VISIT COMPLETE:
for 02/83.
IMPUT 10 DES TO PM:
02/17/78 02/17/78C l
ISSUE DES:
03/22/78 03/29/78C I
TESPONSE TO COMMENTS ON DES:
07/14/78 07/14/78C l
ISSUE FES:
09/22/78 11/03/78C i
CURRENT ENV. STATUS:
Environmental Protection Plan has been issued with Unit 1 license.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
09/01/76 09/01/76C SAR DOCKETED:
04/08,77 05/12/77C SAR 9'S RECEIVED BY PM:
07/22/77 07/27/77C SAR APPL. RESPONSE TO Q'S RECEIVEDE 12/15/77 98418/78C CURRENT HRG. STATUS:
IMPUT TO DRAFT SER TO PM:
10/06/78 11/08/78C No hearing.
ISSUE DRAFT SER:
l INPUT TO SER:
12/29/78 02/27/81C ISSUE SER:
09/05/80 03/05/81C ACRS LETTER RECEIVED:
04/09/81 04/16/81C IMPUTS TO SE SUPPLEMENT S 01/00/83 ISSUE SE SUPPLEMENT S 02/00/83 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
Complete.
NEARING STARTED:
N/A ASLB IMITIAL DECISION:
N/A COMMISSION EFFECTIVENESS DECISION: N/A TECH SPECS COMPLETED:
04/12/82 04/12/82C COMMISSION DECISION:
03/08/83 ISSUE LIC. WITN POWER RESTRICTION: N/S LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
04/00/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Lasalle Unit 1 criticality was achieved on June 21, 1982.
CONSTRUCTION COMPLETION - APPL.:
04/09/83 07/10/82 4
NRR LICEN$ING SYSTEM PAGE MO: 2-14 LIMERICK 1 & 2 0L CURRENT STATUS REPORT REPORT AS OF 12/31/82 PLANT C H A R A C T E R I 5 T I C S:
KEY PERS0NNEL DOCKET NO:
035280353 LIC. PM:
R. MARTIN ASLB CHAIR:
L. BRENNER APPLICANT:
PHILADELPHIA ELECTRIC LIC. BC:
A. SCHWENCER MEMBER 1 R. COLE LOCATION:
35 MI HW OF PHILADELPHIA. PA LIC. LA.:
E. HYLTON MEMBER 2:
P. MORRIS REGIDH:
1 AE:
BECH COUNSEL:
A.
HODGDON CONST. INSP REAC. TYPE: BWR NSSS GE ANTITRUST:
B. V0GLER RESID. INSP S. CHAUDHARY l
DESIGN PWR 3440 MWT/1065 MWE CONST: BECH RM ANALYST:
L. LANIER l
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Applicant submitted Probabilistic Risk Assessment with 1
FSAR on March 17, 1981 SAR was docketed on 07/27/81.
ER DOCKETED:
07/27/81 07/27/81C PRA under review by Brookhaven National Laboratory; draft ER SITE VISIT COMPLETE:
08/20/82 08/20/82C NUREG/CR on PRA scheduled for issoance 01/28/83.
INPUT TO DES TO PM:
03/25/83 ISSUE DES:
05/06/83 RESPONSE TO COMMENTS ON DES:
09/06/83 ISSUE FES:
10/31/83 CURRENT ENV. STATUS:
ER was tendered with the FSAR on March 17, 1981 and was docketed on 07/27/81 ER site visit was completed SAFETY / HEARING MILESTONES:
on 8/20/82.
APPLICATION TENDERED:
01/00/81 03/17/81C SAR DOCKETED:
07/27/81 07/27/81C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
01/07/83 Notice of Opportunity of Hearing was published in the ISSUE DRAFT SER:
02/04/83 Federal Register on August 21, 1981.
Pre-hearing INPUT TO SER:
07/01/83 conference held January 6-8, 1982.
A special pre-hearing ISSUE SER:
08/08/83 conference order was issued on J ne 1,
1982.
Early hearings on three contentions related to Point Pleasant diversion ACRS FULL COMMITTEE MEETING:
09/08/83 were held beginning October 4, 1962, and ended on October INPUTS TO SE SUPPLEMENT 1 10/07/83 26, 1982.
ISSUE SE SUPPLEMENT 1:
10/30/83 FEMA LETTER RECEIVED:
10/07/83 CURRENT ANTITRUST Status to be determined.
HEARING STARTED:
04/00/84 ASLB INITIAL DECISIDH 09/00/8v COMMISSION EFFECTIVENESS DECISION: 10/00/84 TECH SPECS COMPLETED:
N/S COMMISSIDH DECISION:
10/00/84 ISSUE LIC. WITH POWER RESTRICTION: 10/00/84 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
10/00/84 Rev. 7. October 29, 1982 (ER OL)
Rev. 13, November 30, 1982 (FSAR)
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
10/00/84 04/27/82
NRR LICEN$ING SYSTEM PAGE NO: 2-15 MARBLE HILL 182 PCP CURRENT STATUS REPORT REPORT AS OF: 12/31/82 PLANT CHARACTERISTICSt KEY PERS0NNEL DOCKET NO:
054680547 LIC. PM:
P. OCONNER ASLB CHAIR:
E. BOWERS APPLICANT:
PUBLIC SERVICE OF INDIANA LIC. BC:
J. YOUNGBLOOD MEMBER 1:
M. MANN LOCATION:
10 MI S OF MADISON, IN LIC. LA.:
M. SERVICE MEMBER 2
- 0. STOBER REGION:
3 AE:
$8L COUNSEL:
R. LESSY CONST. INSP: E. SCHWEIBINZ REAC. TYPE: PWR NSSS WEST ANTITRUST:
J. RuTBERG RESID. INSP:
DESIGN PWR: 3415 MWT/1130 MWE CONST: PSI RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENT 3L MILESTONES:
SCHED. DATE ACTUAL DATE Application was tendered on 11/23/82.
ER DOCKETED:
03/01/83 ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
02/01/84 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
08/01/84 CURRENT ENV. STATUS:
Application was tendered on 11/23/82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/01/82 11/23/82C SAR DOCKETED:
03/01/83 SAR O'S RECEIVED Bf PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Opportunity fsr hearing will be published in the Federal ISSUE DRAFT SER:
05/01/F4 Register.
INPUT TO SER:
ISSUE SER:
01/01/85 ACRS FULL COMMITTEE MEETING:
02/01/85 INPUTS TO SE SUPPLEMENT 1:
ISSOE SE SUPPLEMENT 18 05/01/85 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
HEARING STARTED:
12/01/85 ASLB INITIAL DECISION:
06/01/86 COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISION:
06/08/86 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
06/08/86 12/31/81 l
__.m_
1 NRR LICEN$ING SYSTEM PAGE NO: 2-16 MCGUIRE 2 0L CURRENT STATUS REPORT REPORT AS OF 12/31/82 PLANT C H A R A C T E R I S T I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05000370 LIC. PM:
R. BIRKEL ASLB CHAIR:
R. LAZO APPLICANT:
DUKE POWER LIC. BC:
E. ADENSAM MEMBER 1:
X. HAND l
LOCATION:
17 MI N OF CHARLOTTE, NC LIC. LA.:
M. DUNCAN MEMBER 2:
E. LUEBKE REGION:
2 AE:
DUKE COUNSEL:
J. CUTCHIN CD:<ST. INSP: M. HUNT REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP* W. ORDERS i
DESIGN PWR: 3411 MWT/1180 MWE CONST: DUKE RM ANALYST:
B. ST MARY i
i CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Input for SSER 6 (SSER for unit 2) is due to DL on i
12/01/82, with issuance of the supplement scheduled ER DOCKETED:
05/31/74 05/31/74C for 01/01/83.
ER SITE VISIT COMPLETE:
01/30/75 01/30/71C INPUT TO DES TO PM:
08/29/75 08/29/75C ISSUE DES:
11/07/75 10/29/75C RESPONSE TO COMMENTS ON DES:
ISSUE FES:
05/07/76 04/20/76C CURRENT ENV. STATUS:
Complete.
SAFETY / HEARING MILESTONES:
i APPLICATION TENDERED:
04/05/74 04/05/74C SAR DOCKETED 3 04/29/75 05/05/75C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
1 Complete.
ISSUE DRAFT SER:
i INPUT TO SER:
06/01/77 01/16/78C ISSUE SER:
02/21/78 d3/01/78C ACRS LETTER RECEIVED:
04/14/78 04/14/78C L
INPUTS TO SE SUPPLEMENT 6:
01/21/83 ISSUE SE SUPPLEMENT 6:
02/14/83 CURRENT ANTITRUST Complete.
NEARING STARTED:
03/15/77 03/28/77C ASLB INITIAL DECISION:
06/00/81 06/08/81C COMMISSION EFFECTIVENESS DECISION: N/A i
TECH SPECS C0f:PLETED:
01/07/83 COMMISSION DECISION:
03/00/83 L
4 ISSUE LIC. WITH POWER RESTRICTION:
{
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
05/02/83 i
No. 19 (October 1, 1982)
-SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
04/01/83 05/20/82
NRR LICEN5IN SYSTEM PAGE NO: 2-17 MIDLAND 1 82 0L CURRENT STATUS REPORT REPORT AS OF 12/31/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:
DOCKET NO:
033020329 LIC. PM:
D. HOOD ASLB CHAIR:
C. BECHHOEFER APPLICANT:
CONSUMERS POWER LIC. BC:
E. ADENSAM MEMBER 1:
F. COWAN LOCATION:
SW BOUNDARY OF MIDLAND. MICH.
LIC. LA.:
M.
DUNCAN MEMBER 2:
J. HARBOUR REGION:
3 AE:
BECH COUNSEL:
W.
PATON CONST. INSP R.
LANDSMAN REAC. TYPE: PWR NSSS: B8W ANTITRUST:
B. V0GLER RESID. INSP:
R. COOK DESIGN PWR: 2452 MWT/0818 MWE CONST: BECH RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATc.
Utilization of National Laboratories or other agencies to complete some review areas i s currently ER DOCKETED:
04/01/78 04/14/78C in progress.
CP extension was issued 12/28/81. ACRS ER SITE VISIT COMFLETE:
09/08/78 09/08/78C Full Committee Meeting was held 06/04/82. SSER #1 INPUT TO DES TO PM:
02/03/82 02/03/82C responding to ACRS letter was issued 6/30/82.
S'e E? 82 ISSUE DES:
02/05/82 02/05/82C on soils settlement problems was issued 10/06/82.
RESPONSE TO COMMENTS ON DES:
07/08/82 07/08/82C ISSUE FES:
07/30/82 07/30/82C CURRENT ENV. STA1US:
The DES was i ssued 02/05/82. The FES was issued on July 30, 1982.
SAFETY /HEARI:4G MILESTONES:
APPLICATION TENDERED:
08/31/77 08/31/77C SAR DOCKETED:
09/30/77 11/18/77C SAR Q'S RECEIVED BY PM:
03/20/78 10/02/78C SAR APPL. RESPONSE TO Q'S RECETVED: 12/08/78 1 '48/78C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
11/01/78 12/01/78C Three prehearings ending 04/27-28/81 were held for a ISSUE DRAFT SER:
N/A separate hearing on soils settlement. Hearing on soils INPUT TO SER:
04/23/82 04/23/82C settlement began July 7.
1981 and is continuing. Combined ISSUE SER:
05/11/82 05/11/82C hearinos for soils issues ces OL issues commenced on l
11/15/82 and are continuing.
ACRS LETTER RECEIVED:
06/15/82 06/08/82C INPUTS TO SE SUPPLEMENT 2:
08/tt/82 08/16/82C ISSUE SE SUPPLEMENT 2:
10/06/32 10/06/82C FEMA LETTER RECEIVED:
01/01/83 CURRENT ANTITRUST:
Proceeding completed. License was amended 10/20/80.
HEARING STARTED:
11/15/82 11/15/82C ASLB INITIAL DECISION:
10/00/83 COMMISSION EFFECTIVENESS DECISION: 10/00/83 TECH SPECS COMPLETED:
05/00/83 COMMISSION DECISION:
10/00/83 ISSUE LIC. WITH POWER RESTRICTIDH 09/00/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
11/00/83 109 S CH EP.. DATE RECEIPT DATE NEW SLIPS / NOTES:
Applicant announced on 11/16/82 that July 1983 completion CONSTRUCTION COMPLETION - APPL.:
07/00/83 03/31/82 date has slipped by "some months".
Applicant will develop i
revised schedule in first calendar quarter of 1983.
l
HRR LICENSING SYSTEM PAGE HO: 2-18 MILLSTONE 3 0L CURRENT STATUS REP 0RT REPORT AS OF: 12/31/82 PLAHT C H A R A C T E R I S T I C S:
KEY P E R S 0 N N E La DOCKET NO:
05000423 LIC. PM:
E. DOOLITTLE ASLB CHAIR:
APPLICANT:
NORTHEAST NUCLEAR ENERGY LIC. BC:
B. YOUNGBLOOD MEMBER 1:
LOCATION:
3.2 MI WSW OF HEW LONDON CT.
LIC. LA.:
M.
RUSHBROOK MEMBER 2:
REGION:
1 AE2 S8W COUNSEL:
M. ROTHSCHILD CONST. INSP: A. TOTH REAC. TYPE: PWR HSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP: J. MATTIA DESIGH PWR: 3565 MWT/1156 MWE CONST: S&W RM ANALYST:
L. LAHIER CURRENT SAF. STATUSt ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE AppIrcation was tendered on 10/29/82, and will be docketed in February, 1983.
ER DOCKETED:
02/01/83 ER SITE VISIT COMPLETE:
03/21/83 INPUT TO DES TO PM:
ISSUE DES:
10/01/83 RESPONSE TO COMMENTS OH DES:
ISSUE FES:
04/01/84 CURRENT ENV. STATUS:
ER to be docketed in February, 1983.
SAFETY / HEARING MILESTONES:
APPLICATI0H TENDERED:
11/01/82 10/29/82C SAR DOCKETED:
02/01/83 SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Hotice of Opportunity for Hearing will be published in the ISSUE DRAFT SER:
12/01/83 Federal Register.
INPUT TO SER:
ISSUE SER:
08/01/84 ACRS FULL COMMITTEE MEETING:
09/01/84 INPUTS TO SE SUPPLEMENT 1:
ISSUE SE SUPPLEMENT 1 12/01/84 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
HEARING STARTED:
05/01/85 ASLB INITIAL DECISIDH:
11/01/85 COMMISSIDH EFFECTIVENESS DECISIDH:
TECH SPECS COMPLETED:
COMMISSION DECISIDH:
11/01/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:
CONSTRUCTIDH COMPLETION - APPL.:
11/01/85 09/30/82 I
NRR LICEN$ING SY$ TEM PAGE NO: 2-19 PALO VERDE 1,2,3 0L CURRENT STATUS REPORT REPORT AS OF 12/31/82 PLANT CHARACTERI5TICSt KEY PERS0NNEL DOCKET NO:
0528-0530 LIC. PM E. LICITRA ASLB CHAIR:
R. LAZO APPLICANT!
ARIZONA PUBLIC SERVICE LIC. BC:
G. KNIGHTON MEMBER 1:
R. COLE LOCATION:
36 MI W 0F PHOENIX, AZ LIC. LA.:
J. LEE MEMBER 2:
D. CALLIHAN REGION:
5 AE*
BECH COUNSEL:
L. DEWEY CON 5T. INSP: L. VBRUEGGEN HEAC. TYPE PWR NSSS: COMB ANTITRUST B. V0GLER RESID. INSP: G. FIORELLI DESIGN PWR 3817 MWT/1304 MWE CONST BECH RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Several " Independent Design Review" meetings have been completed.
The SER was issued on November 11, 1981.
SER ER DOCKETED:
07/01/80 06/20/80C supplement Mos.
1,2, and 3 were issued on February 5, 1982 ER SITE VISIT COMPLETE:
01/30/81 Ol/30/81C and May 17, 1982, and September 23, 1982 respectively.
INPUT TO DES TO PM:
10/05/81 10/05/81C ISSUE DES:
10/26/81 10/26/81C RESPONSE TO COMMENTS ON DES:
02/25/82 02/25/82C ISSUE FES:
03/11/82 03/11/82C CURRENT ENV. STATUS:
The ER (OL) review is complete. A site visit was completed on January 30, 1981.
The DES was issued on SAFETY / HEARING MILESTONES:
October 26, 1981 and the F ES was issued on March 11, 1982.
APPLICATION TENDERED:
10/05/79 10/05/79C SAR DOCKETED:
06/20/80 06/20/80C SAR Q'S RECEIVED BY PMt SAR APML. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
IMPUT TO DRAFT SER TO PMt Five contentions were initially admitted. Two contentions ISSUE DRAFT SER:
were dropped by the intervenor and two others were summarily INPUT TO SER:
10/30/81 10/30/81C disposed of by the Board.
The remaining content *.on deals ISSUE SER:
14/11/81 II/11/81C with water availability. The hearing started 4/27-30, 1982, resumed on 5/25-28 and again on 6-22.
Hearing record was ACRS LETTER RECEIVED:
12/18/81 12/18/81C closed on 6-25-82.
Findings by all parties have been filed.
INPUTS TO SE SUPPLEMENT 32 08/02/82 08/02/82C A late petition, dated 10-13-82 dealing with salt drift on ISSUE SE SUPPLEMENT 3 09/23/82 09/23/82C farm crops, was filed by W. Valley Agri. Protection Council.
FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST Antitrust OL review is in progress.
HEARING STARTED:
04/27/82 04/27/82C ASLB INITIAL DECISION:
12/00/82 COMMISSION EFFECTIVENESS DECISION: 01/00/83 TECH SPECS COMPLETED:
08/01/83 COMMISSION DECISION:
07/00/83 ISSUE LIC. WITH POWER RESTRICTION: 08/01/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
08/20/83 FSAR I.mendment No. 9 ER Supplomont No. 4 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
08/00/83 07/13/82 n
NRR LICENSING SYSTEM PAGE NO: 2-20 PERRY 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF 12'31/82 PLANT C H A R A C T E R I S T I C S:
KEY PERSONNELa DOCKET NO:
044080441 LIC. PM:
J. STEFAND ASLB CHAIR:
P. BLOCH APPLICANT:
CLEVELAND ELECTRIC ILLUMINATING LIC. BC:
J. YOUNGBLOOD MEMBER 18 J. KLINE LOCATION:
7 MI NE OF PAINESVILLE. OHIO LIC. LA.:
M. RUSHBROOK MEMBER 2:
F. SHON REGION:
3 AE GIL COUNSEL:
J. CUTCHIN CONST. INSP: P. PELKE REAC. TYPE: BWR NSSS: GE ANTITRUST:
J. CUTCHIN RESID. INSP: M. GILDNER DESIGN PWR: 3759 MWT/1205 MWE CONST: KAISER RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL CATE The Safety Evaluation Report was issued in May 1982.
The ACRS Report was issued on July 16. 1982.
SSER Ho. 1 ER DOCKETED:
06/26/81 06/19/81C was issued on August 9, 1982.
SSER Ho. 2 to be issued ER SITE VISIT COMPLETE:
prior to start of ASLB hearings.
INPUT TO DES TO PM:
01/01/82 Ot/Ot/82C ISSUE DES:
02/26/82 02/26/82C RESPO?lSE TO COMMENTS ON DES:
06/30/82 06/30/82C ISSUE FES:
08/13/82 08/13/820 CURRENT ENV. STATUS:
Environmental acceptance review was completed on June 9,
1981.
The ER was docketed June 19. 1981 FES SAFETY / HEARING MILESTONES:
issued on August IT. 1982.
APPLICATION TENDERED:
06/26/80 06/26/80C SAR DOCKETED:
01/09/81 01/30/81C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
02/24/82 02/24/82C Board Order dated September 16. 1982. targets start ISSUE DRAFT SER:
02/26/82 02/26/82C of hearing on February 15. 1983.
INPUT TO SER:
04/10/82 05/10/82C ISSUE SER:
05/1G/82 05/24/82C ACRS LETTER RECEIVED:
07/16/82 07/16/82C INPUTS TO SE SUPPLEMENT 22 01/15/83 ISSUE SE SUPPLEMENT 22 01/07/83 FEMA LETTER P'.CEIVED:
04/00/83 CURRENT ANTITRUST:
CP antitrust review has been completed. OL antitrust HEARING STARTED:
02/15/83 status is under review.
ASLB INITIAL DECISION:
08/00/83 COMMISSION EFFECTIVENESS DECISION: 09/00/83 TECH SPECS COMPLETED:
06/00/83 COMMISSION DECISION:
10/00/83 ISSUE LIC. WITH POWER RESTRICTION: N/S LATEST AMENOMENT:
ISSUE FutL POWER LICENSE AMEND:
11/00/83 Number 10 (11-23-82).
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Start of hearing has slipped to February 1983.
CONSTRUCTION COMPLETION - APPL.:
11/00/83 02/22/82 FEMA letter has slipped to April 1983 due to incomplete offsite plans.
HRR LICEN5ING SYSTEM PAGE N0: 2-21 RIVER BEND 1 82 0L CURRENT STATUS REPORT REPORT AS OF 12/31/82 PLANT C H A R A C T E R I S T I C S:
KEY PEk
- O N N E L:
DOCKET NO:
045880459 LIC. PM:
E. WtINKAM ASLB CHAIR:
B. COTTER APPLICANT:
GULF STATES UTILITIES LIC. BC:
A. SCHWENCER MEMBER 1:
G. LINENBERGER LOCATION:
24 MI HNW OF BATON ROUGE, LA LIC. LA.:
E. HYLTON MEMBER 2:
R. COLE REGION:
4 AE:
S8W COUNSEL:
J. GUTIERREZ CONST. INSP
. UNASSIGNED REAC. TYPE: BWR NSSS: GE ANTITRUST B. V0GLER RESID. INSP: R. BROWN DESIGN PWR: 3015 MWT/09:4 MWE CONST: 58W RM ANALYST:
M. KING CURRENT SAF. STATUS
- ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Applicant tendered FSAR for docketing on 04/24/81.
FSAR was docketed on 08/25/61. Draft SER targeted for ER DOCKETED:
08/25/81 08/25/81C 03/83.
Construction permit extension requested ER SITE VISIT COMPLETE:
01/22/82 01/22/82C from 03/83 to 12/85.
INPUT TO DES TO PM:
12/09/83 ISSUE DES:
01/09/84 RESPONSE TO COMMENTS ON DES:
ISSUE FESr 06/08/84 CURRENT ENV. STATUS:
Applicant tendered ER for docketing on 04/24/81.
ER was docketed on 08/25/81. DES targeted for 01/09/84.
SAFETY / HEARING MILL 3 TONES:
APPLICATION TENDERED:
04/04/81 04/24/81C SAR DOCKETED:
08/25/81 08/25/81C SAR Q'S RECEIVED BY PM:
12/07/81 06/01/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 01/03/83 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
03/04/83 Notice of Opportunity for hearing was published in the ISSUE DRAFT SER:
03/00/83 Federal Register on 09/04/81. Prehearing conference INPUT TO SER:
11/04/83 scheduled for 02/08/83.
ISSUE SER:
12/02/03 ACRS FULL COMMITTEE MEETING:
31/13/84 INPUTS TO SE SUPPLEMENT 1:
04/00/84 ISSUE SE SUPPLEMENT 1:
05/00/84 FEMA LETTER RECEIVED:
05/01/84 CURRENT ANTITRUST Status to be determined.
HEARING STARTED:
10/00/84 ASLB INITIAL DECISION:
03/00/85 COMMISSION EFFECTIVENESS DECISION: 04/07/85 TECH SPECS COMPLETED:
10/00/84 COMMISSIDH DECISION:
04/00/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
04/00/85 Humber 6.
SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
NRR/DL revised the priority of the review on this case due CONSTRUCTIDH COMPLETION - APPL.:
04/08/85 04/15/82 to 18-month slip in construction schedule.
HRR LICEN5ING SYSTEM PAGE HO: 2-22 SAN ONOFRE 3 LIC CURRENT STATUS REP 0RT REPORT AS OF: 12/3f/82
- LANT CHARACTERIST I C S:
KEY P E R S O N N E La DOCKET HO:
05000362 LIC. PM:
H. ROOD ASLB CHAIR:
J. KELLEY APPLICANT:
SOUTHERN CALIFORNIA EDISOM LIC. BC:
G. KNIGHTON MEMBER 1:
C. HAND LOCATION:
5 MI 5 0F SAN CLEMENTE. CA LIC. LA.:
J. LEE MEMBER 2 E. JOHHSON REGIDH:
5 AE:
BECH COUNSEL:
L. CHANDLER CONST. INSP: D. KIRSCH REAC. TYPE PWR NSSS: COMB ANTITRUST J. GOLDBERG RESID. INSP: A. CHAFFEE DESIGH PWR: 3410 MWT/tt00 MWE CONST BECH RM ANALYST:
L. LAHIER ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DaTE CURRENT SAF. STATUS:
SER on geological and seismological matters was issued on 12/31/80. ACRS subcommittee meetings were held 01/30/81 and ER DOCKETED:
03/01/77 03/23/77C 03/11/81 and full committee enetings were held 02/5/81 and ER SITE VISIT COMPLETE:
05/20/77 05/20/77C 03/12/21. SER (Hon-TMI matters), wat issued on 02/06/88.
INPUT TO DES 70 PM:
10/01/77 12/01/80C SER supplement on TMI issues was issued on 02/25/81 SER ISSUE DES:
01/27/78 01/20/81C supplement No. 2, 3. *, 5. and 6 addressing open items were RESPONSE TO COMMENTS ON DES:
issued 05/08/L:. 09/16/81 01/22/82, 02/16/82, and 06/30/82.
ISSUE FES:
04/00/81 04/29/81C ASLB PID was rendered on 01/11/82 and ID on 05/14/82.
Supplement Ho, 7 is scheduled for 1/15/83.
CURRENT FNV. STATUS:
DES addressing class 9 accidents was issued 01-20-81, FES was issued 04 29-81 SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/29/76C SAR DOCKETED:
03/01/77 03/23/77C SAR Q'S RECEIVED BY PM:
08/15/77 09/21/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/18/77 12/08/77C INPUT TO DRAFT SER TO PM:
02/10/78 08/11/78C CURRENT HRG. STATUS:
Motions for summary disposition were granted by ASLB.
ISSUE DRAFT SER:
01/15/81 01/15/81C Hearing started 06/22/81 and ended 09/31/88.
INPUT TO SER:
06/23/78 01/15/81C ISSUE SER:
08/01/80 02/06/8'C ACRS LETTER RECEIVED:
03/17/81 03/17/81C INPUTS TO SE SUPPLEMENT 72 01/01/83 ISSUE SE SUPPLEMENT 7:
01/15/83 FEMA LETTER RECEIVED:
12/01/81 12/01/81C CURRENT ANTITRUST:
The antitrust review is complate.
HEARING STARTED:
06/22/81 06/22/8tc ASLB Ih::IAL DECISION:
05/14/82 05/14/82C COMMISSIDH EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
11/15/82 11/15/82C COMMISSION DECISION:
02/00/83 ISSUE LIC. WITH POWER RESTRICTION: 11/15/82 11/15/82C ISSUE FULL POWER LICENSE AMEND:
04/04/83 LATEST AMENDMENT:
SchZD. DATE RECEIPT DATE HEW SLIPS /HOTES:
CONSTRUCTION COMPLETION - APPL.:
11/15/82C 09/27/82
NRR LICEH$IN0 5YSTEM PAGE NO: 2-23 SEABROOK 1 8 2 GL CURRENT
$TATUS REPQRT REPORT AS oft 12/31/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:
DOCKET NO:
044340444 LIC. PM:
L. WHEELER ASLB CHAIR H. H0YT APPLICANT:
PU3LIC SERVICE OF NEW HAMPSHIRE LIC. BC:
G. KNIGHTON MEMBER 1:
E. LUEBKE LOCATION:
10 MI S OF PORTSMOUTH, NH LIC. LA.:
J. LEE MEMBER 2:
J. HARBOUR REGION:
1 AE UEC COUNSEL:
R. LESSY CONST. INSP A. TOTH REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP A. CERNE DESIGN PWR: 3411 MWT/1198 MWE CONST: UEC RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMiNTAL MILESTONES:
SCHED. DATE ACTUAL DATE The FSAR acceptance review was completed in September 1981.
i The FSAR was docketed October 5.
1981.
Applicant has ER DUCKETED:
10/05/81 10/05/8tC responded to round 1 9's.
SER issuance has moved from ER SITE VISIT COMPLETE:
12/02/81 12/02/81C 11/08/82 to 01/12/83. Partial draft SER has been issued.
INPUT TO DES TO PM:
03/01/82 03/01/82C ISSUE DES:
05/14/82 05/14/82C RESPONSE TO COMMENTS ON DES:
08/18/82 09/15/82C ISSUE FES:
12/08/82 12/08/82C CURRENT ENV. STATUS:
ER was tendered June 1981 ER acceptance review was completed September 1981 The ER was docketed SAFETY / HEARING MILESTONES:
October 5, 1981 DES was issued in May, 1982.
FES was issued in December 1982.
APPLICATION TENDERED:
06/29/81 06/29/8tc SAR DOCKETED:
10/05/88 10/05/8tC SAR Q'S RECEIVED BY PM:
01/20/82 03/OS/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/12/82 04/13/82C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
05/07/82 10/08/82C Notice for Opportunity for Hearing was published in ISSUE DRAFT SER:
07/30/82 08/13/82C the Federal Register on October 19. 1981.
Firet prehearing INPUT TO SER:
11/30/82 12/29/82C conference was held May 6-7, 1982.
Second prehearing ISSUE SER:
02/dO/83 conference was held July 15-16, 1982.
ASLB Order identifying parties, contentions and prehearing schedule ACRS FULL COMMITTEE MEETING:
03/00/83 was i ssued September 13, 1982.
Discovery is in progress.
IhPUTS TO SE SUPPLEMENT 1:
04/00/83 ISSUE SE SUPPLEMENT 18 05/00/83 CURRENT ANTITRUST:
FEMA LETTER RECEIVED:
04/00/83 Status to be determined.
L HEARING STARTED:
08/00/83 ASLB INITIAL DECISION:
06/00/84 COMMISSION EFFECTIVENESS DECISIDH: 07/00/84 TECH SPECS COMPLETED:
COMMISSION DECISION:
08/00/84 LATEST AMENDMENT:
ISSUE LIC. WITH POWER RESTRICTION:
47 ISSUE FULL POWER LICENSE AMEND:
07/00/84 NEW SLIPS / NOTES:
SCHED. DATE RECEIPT DATE Fuel Ioad slipped to 9/84 per applicant letter of 12/02/82.
CONSTRUCTION COMPLETION - APPL.:
09/30/84 12/02/82 ACRS schedule is being reevaluated.
NRR LICEN5ING SY$ TEM F' AGE NO: 2-24 SHOREHAM 0L CURRENT STATUS REPORT REPORT AS OF 12/31'82 PLANT C H A R A C T E R I S T I C S:
KEY PERS0NNEL:
DOCKET NO:
05000322 LIC PM:
R. CARUSO ASLB CHAIR:
L. BRENNER APPLICANT:
LONG ISLAND LIGHTING CO.
LIC. BC:
A.
SCHWENCER MEMBER 1:
P. MORRIS LOCATION:
BROOKHAVEN, NY (LI)
LIC. LA.:
E. HYLTON MEMBER 2:
J. CARPENTER REGION:
1 AE:
S8W COUNSEL:
B. BORDENICK CONST. INSP:
L. HARROW REAC. TYPE: BWR NSSS: GE ANTITRUST:
J. RUTBERG RESID. INSP: J. HIGGINS DESIGN PWR: 2436 MWT/0820 MWE CONST: SIW RM ANALYST:
L. LAHIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The ACRS meeting was held in October 1981.
SER Supplement 2 was issued in March 1982.
An additional ER DOCKETED:
01/26/76 Ot/26/76C SER Suppicment is scheduled for Jan. 1583 to address ER SITE VISIT COMPLETE:
08/06/76 08/03/76C resolu& ion of additional outstanding matters.
INPUT TO DES TO PM:
11/22/76 11/29/76C ISSUE DES:
03/11/77 03/24/77C RESPONSE TO COMMENTS ON DES:
07/22/77 07/22/77C ISSUE FES:
10/21/77 10/18/77C CURRENT ENV. STATUS:
The environmental review is complete.
SAFETY /dEARING MILESTONES:
APPLICATION TENDERED:
09/00/75 09/04/75C SAR LOCKETED:
12/15/77 Ot/26/76C SAR Q'S RECEIVED BY PM:
06/04/76 07/09/76C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/23/76 07/23/76C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
07/15/77 08/01/77C After a brief recess, hearings resumed in Bethesda on ISSUE DRAFT SER:
October 12. 1982.
They will remain in Bethesda until INPUT TO SER:
03/10/81 03/10/81C the end of the year.
ISSUE SER:
04/10/81 04/10/81C ACRS LETTER RECEIVED:
09/18/81 10/19/81C INPUTS TO SE SUPPLER 1ENT 3:
N/S ISSUE SE SUPPLEMENT 3:
01/15/83 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
HEARING STARTED:
05/04/82 05/04/82C Not required.
ASLB INITIAL DECISION:
05/00/83 COMMISSION EFFECTIVENESS DECISION: 06/00/83 TECH SPECS COMPLETED:
03/00/83 COMMISSION DECISION:
06/00/83 ISSUE LIC. WITH POWER RESTRICTION: 03/30/83 ISSUE FULL POWER LICENSE AMEND:
06/00/83 LATEST AMENDMENT:
FSAR Amendment 27 SCHED DATE RECEIPT DATE NEW SLIPS / NOTES:
The current estimate for a partial initial ASLB decision CONSTRUCTIDH COMPLETION - APPL.:
03/00/83 04/30/82 on all matters except uffsitt emergency planning is the end of April, 1983.
A complete initial decision may not be available prior to Mav. 1983.
l
NRR LICEN5ING SYSTEM PAGE No: 2-25 SOUTH TEXAS 1 8 2 0L CURRENT STATUS REP 0RT REPORT AS OF 12/31/82 PLANT CHARACTERISTICSt KEY P E R S O N N E L:
DOCKET NO:
049880499 LIC. PM:
H. SCHIERLING ASLB CHAIR:
C. BECHH0EFER APPLICANT:
HOUSTON LIGHTING 8 POWER COMPANY LIC. BC:
G. KNIGHTON MEMBER 1:
J. LAMB LOCATION:
12 MI SSW OF BAY CITY, TEX LIC. LA.:
J. LEE MEMBER 2:
E. HILL REGION:
4 AE:
BECH COUNSEL:
J. GUTIERREZ CONST. INSP:
REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP: W. HILL DESIGN PWR: 3800 MWT/1250 MWE CONST EBASCO RM ANALYST:
L. LANIER I
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Limited work being performed due to higher priorities.
BRRT has been replaced by Bechtel as the A/E.
BRRT ER DOCKETED:
07/17/78C has been replaced by Ebasco as the constructor.
ER SITE VISIT COMPLETE:
09/26/78 09/26/78C Hon safety related construction restarted on June 15, 1982.
INPUT TO DES TO PM:
08/00/85 Safety related construction restarted on August 15, 1982.
ISSUE DES:
09/08/85 Current FLD is 12/86. Milestones now reflect a 12/86 FLD.
RESPONSE TO COMMENTS ON DES:
01/00/86 ISSUE FES:
02/00/86 CURRENT ENV. STATUS:
Schedule revised to reflect new 12/86 FLD.
SAFETY / HEARING MILESTONES:
APPLICATI0H TENDERED:
05/10/78 05/10/78C SAR DOCKETED:
07/17/78C SAR Q'S RECEIVED BY PM:
01/22/79 02/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
03/00/85 As provided in a Commission Order of 9/22/80, an ISSUE DRAFT SER:
03/00/85 expedited hearing on QA programs and management was INPUT TO SER:
11/00/85 held.
The record of this phase of the hearing ISSUE SER:
12/00/85 was closed on June 17, 1982. Phase II of hearing will consider all aspects of Quadrex Report.
ACRS FULL COMMITTEE MEETING:
01/08/86 Phase II is expected to begin in the Spring of '83.
INPUTS TO SE SUPPLEMENT 1:
01/00/86 3
4 i
ISSUE SE SUPPLEMENT 18 01/09/86 CURRENT ANTITRUST:
FEMA LETTER RECEIVED:
N/S Memo and Order issued May 6, 1982 approving settlements and HEARING STARTED:
06/00/86 i
proposed license conditions and dismissing proceeding.
ASLB INITIAL DECISION:
11/00/86 COMMISSION EFFECTIVENESS DECISION: 12/00/86 TECH SPECS COMPLETED:
12/00/86 4'
COMMISSION DECISION:
12/00/86 LATEST AMENDMENT:
ISSUE LIC. WITH POWER RESTRICTION:
ISSUE FULL POWER LICENSE AMEND:
12/00/86 FSAR amendment 028 was issued 12/06/82.
ER amendment 85 was issued 08/31/82.
NEW SLIPS / NOTES:
SCHED. DATE RECEIPT DATE All schedules now reflect new official FLD of 12/86.
CONSTRUCTION COMPLETION - APPL.:
12/08/86 03/08/82
HRR LICENSING SYSTEM PAGE ND: 2-26 ST LUCIE 2 0L CURRENT STATUS REPORT REPORT AS OF: 12/31/82 I PLANT CHARAC7ERISTICSt KEY P E R S 0 N N E L:
DOCKET NO:
OS000389 LIC. PM:
V. HERSES ASLB CHAIR E. BOWERS APPLICANT:
FLORIDA POWER & LIGHT LIC. BC:
G. KNIGHTON MEMBER 1:
P. MORRIS LOCATION:
12 MI SE OF FT. PIERCE, FLA LIC. LA.:
J. LEE MEMBER 2:
D. PARIS REGIDH 2
AE2 EBASCO COUNSEL:
W. PATTON CONST. INSP R. WRIGHT REAC. TYPE: PWR NSSS: COMB ANTITRUST:
B. V0GLER RESID. INSP S. ELROD DESIGN PWR 2700 MWT/0842 MWE CONST EBASCO RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Status of Q-1 and Q-2 review is complete. The SER was issued on 10/09/81.
SE Supplement No. 1 was issued ER DOCKETED:
02/17/81C on 12/30/81.
SE Supplement No. 2 was issued on 09/30/82.
ER SITE VISIT COMPLETE:
02/18/81 02/18/81C INPUT TO DES TO PM:
08/07/81 08/07/8tc ISSUE DES:
10/16/81 10/16/8tC RESPONSE TO COMMENTS ON DES:
02/08/82 02/08/82C ISSUE FES:
04/23/82 04/23/82C CURRENT ENV. STATUS:
The DES was issuud on 10/16/81 and the FR Hotice was published 10/30/81 The FES was issued on 04/23/82.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
03/31/80 03/31/80C SAR DOCKETED:
02/t7/8tC SAR Q'S RECEIVED BY PM 06/15/81 06/15/8tc SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
08/03/81 08/03/81C There have been no petitioners on matters dealing with ISSUE CRAFT SER:
08/10/88 08/10/81C INPUT TO SER:
09/11/81 09/ll/8tC health, safety and environment.
ISSUE SER 10/09/81 lO/09/81C ACRS FULL COMMITTEE MEETING 11/12/81 II/12/81C INPUTS TO SE SUPPLEMENT 3 12/23/82 ISSUE SE SUPPLEMENT 32 01/14/83 FEMA LETTER RECEIVED:
08/20/82 08/20/82C CURRENT ANTITRUST:
Settlement among the Department of Justice, the NRC Staff HEARING STARTED:
N/A and the licensee has been agreed upon.
Case dismissed ASLB INITIAL DECISION:
N/A 3/82 following summary disposition and settlement ager rment.
COMMISSION EFFECTIVENESS DECISION: N/A TECH SPECS COMPLETED:
Ct/14/83 COMMISSION DECISION:
01/00/83 ISSUE LIC. WITH POWER RESTRICTION: N/A ISSUE FULL POWER LICENSE AMEND:
01/21/83 LATEST AMENDMENT:
No. 12 (FSAR); No. 5 (ER)
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Caseload Forecast Panel estimates 08/83 core load date.
CONSTRUCTIDH COMPLETION - APPL.
01/08/83 Applicant, in meeting with NRC on 09/30/82 astimates 01/83 core load date.
NRR LICEN$ING SYSTEM PAGE NO: 2-27 SUSQUEHANNA 2 0L CURRENT STATUS REPORT REPORT AS OF: 12/31/82 PLANT CHARACTER 1STICSt KEY PERS0NNELa DOCKET NO:
05000.'88 LIC. PM:
R. PERCH ASLB CHAIR:
J. GLEASON APPLICANT:
PENNS'fLVANIA POWER 8 LIGHT LIC. BC:
A.
SCHWENCER MEMBER 1:
10CATIDH:
7 MI ME OF BERWICK. PA LIC. LA.:
E. HYLTON MEMBER 2:
P. PURDOM REGION:
1 AE:
BECN COUNSEL:
J. CUTCHIN CONST. INSP L. HARROW REAC. TYPE: BWR NSSS: GE ANTITRUST:
A. HODGDON RESID. INSP: G. RNOADS DESIGN PWR: 3440 MWT/1052 MWE CONST: BECH RM ANALYST L. LANIER CURRENT SAF. STATU4:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER was issued 9/06/81 SSER 01 was issued 07/07/81.
Post ACRS SSER 82 was issued 09/10/81 SSER 83 was ER DOCKETED:
06/lO/78C issued 07/17/82.
ER SITE VISIT COMPLETE:
10/20/78 10/20/78C INPUT TO DES TO PM:
ISSUE DES:
03/30/81 03/30/81C RESPONSE TO COMMENTS ON DES:
05/21/88 05/21/81C ISSUE FES:
06/15/81 07/02/81C CURRENT ENV. STATUS:
DES was issued on 03-30-81.
FES was issued 07-02-81.
SAFETY / HEARING MILESTONES:
APPLICATICH TENDERED:
06/05/78 04/10/78C SAR DOCKETED:
07/31/78 07/31/78C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO 4'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
04/07/80 04/07/80C The OL hearing is complete; Initial Decision issued on ISSUE DRAFT SER:
l 04-12-82.
INPUT TO SER:
03/23/81 03/23/81C ISSUE SER:
04/06/81 04/06/81C I
ACRS LETTER RECEIVED:
08/15/81C INPUTS TO SE SUPPLEMENT 4:
02/01/83 ISSUE SE SUPPLEMENT 4:
03/01/83 FEMA LETTER RECEIVED:
06/00/82 06/00/82C CURRENT ANTITRUST:
Complete.
HEARING STARTED:
10/06/81 10/06/81C ASLB INITIAL DECISION:
04/12/82 04/12/82C COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISION:
12/00/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
01/00/84 FSAR:
No. 30; ER:
No. 5 NEW SLIPS / NOTES:
SCHED. DATE RECEIPT DATE CONSTRUCTION COMPLETI0H - APPL.:
01/00/84
HRR LICEHSIHG SY$ TEM PAGE HO 2-28 WASHINGTON HUCLEAR 1 0L CURREHT STATUS REP 0RT REPORT AS OF 12/31/82 PLAHT C H A R A C T E R I S T I C 5:
KEY PERS0HHEL DOCKET NO:
05000460 LIC. PM:
M. THADANI ASLB CHAIR H. GROSSMAN APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:
E. ADENSAM MEMBER 12 G. BRIGHT LOCATION:
10 MI H OF RICHLAND, WA LIC. LA.:
M.
DUNCAN MEMBER 2' J. HARBOUR REGIDH:
5 AE:
UEC COUNSEL:
M. YOUNG CONST. INSP: J. OLIN REAC. TYPE: PWR HSSS: B&W ANTITRUST:
RESID. INSP A.
TOTH DESIGN PWR 3760 MWT/1266 MWE CONST: BECH RM ANALYST:
L. LANIER l
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTCHES:
SCHED. DATE ACTUAL DATE l
Application was tendered on 11-25-81.
This schedule is being reconsidered in light of a notice of deferral from ER DOCKETED:
07/00/82 07/16/82C the applicant. A review schedule will be established ER SITE VISIT COMPLETE:
following construction resumption.
Application was INPUT TO DES TO PM:
docketed on July 16, 1982.
ISSUE DES:
N/S RESPONSE TO COMMEN1" ON DES:
4 ISSUE FES:
N/S j
l CURRENT ENV. STATUS:
DES issuance will be scheduled following resumption of construction.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/25/81 11/25/81C SAR DOCKETED:
07/00/82 07/16/82C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Hotice of Opportunity for Hearing was published ISSUE DRAFT SER:
in the Federal Register on August 16, 1982.
INPUT TO SER:
1 A petition to intertene has been received from ISSUE SER:
N/S l
the Coalition for Safe Power.
Planning for a ACRS FULL COMMITTEE MEETING:
N/S prehearing conference is in progress.
INPUTS TO SE SUPPLEMENT 1:
ISSUE SE SUPPLEMENT 1 N/S FEMA LETTER RECEIVED:
CURRENT ANTITRIIST HEARING STARTED:
N/S ASLB INITIAL DECISICH N/S COMMISSIGH EFFECTIVENESS DECISI0H:
TECH SPECS COMPLETED:
COMMISSION DECISION:
ISSUE LIC. WITH POWER RESTRICTICH:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
N/S Amendment 1,
dated October 18, 1282 received in document SCHED. DATE RECEIPT DATE Control System Hov.
1, 1982.
NEW SLIPS / NOTES:
Construction delay of from 2 to 5 years was announced CONSTRUCTIDH COMPLETION - APPL.*
N/S 04/29/82 l
on 4/29/82.
l 1
NRR LICENSING SYSTEM PAGE NO: 2-29 WASHINGTON NUCLEAR 2 0L CURRENT STATUS REPORT REPORT AS OF 12/31/82 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:
05000397 LIC. PM:
R. AULUCK ASLB CHAIR E. BOWERS APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:
A. SCHWENCER MEMBER 1 R. COLE LOCATION:
30 MI NW OF RICHLAND, WASH LIL. LA.:
E. HYLTON MEMBER 2:
E. HILL REGION:
5 AE:
BIR COUNSEL:
W. PATON CONST. INSP A. TOTH REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP: R. FEIL DESIGN PWR: 3323 MWT/ttC3 MWE CONST: BECH RM ANALYST:
L. LANIER 1
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER was issued 3/31/82. Geology / Seismology reviews were included in SSER No. 1 issued August it, 1982.
ACRS ER DOCKETED:
02/28/77 04/20/77C meeting was held on October 7, 1982.
SSER No. 2 was ER SITE VISIT COMPLETF:
07/13/77 07/14/77C issued 12/15/82.
INPUT 10 DES TO PM:
06/30/81 06/30/8tC ISSUE DES:
07/31/81 07/31/8tC RESPONSE TO COMMENTS ON DES:
09/28/81 09/28/81C ISSUE FES:
12/31/81 12/31/81C CURRENT ENV. STATUS:
FES was issued 12-31-81 SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/30/76 12/SO/76C SAR DOCKETED:
04/01/78 06/22/78C SAR Q'S RECEIVED BY PM:
01/05/79 03/07/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/11/79 07/26/7,9C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/12/81 10/12/81C Prehearing conference is scheduled for Jan. 19, 1983 ISSUE DRAFT SER:
11/17/88 11/17/81C in Richland, Wa.
INPUT TO SER:
05/30/82 05/30/82C ISSUE SER:
03/31/82 03/31/82C ACRS LETTER RECEIVED:
11/13/82 11/13/82C INPUTS TO SE SUPPLEMENT 2:
11/22/82 11/22/82C ISSUE SE SUPPLEMENT 2 12/15/82 12/15/82C FEMA LETTER RECEIVED:
05/01/83 CL'RRENT ANTITRUST:
Not required HEARING STARTED:
N/A ASLB INITIAL DECISIDH N/A COMMISSION EFFECTIVENESS DECISION: N/A TECH SPECS COMPLETED:
07/00/83 CGMMISSION DECISION:
08/08/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
09/09/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
09/09/83 05/07/82 l
NRR LICENSING SYSTEM PAGE HO: 2-30 WASHINGTON HUCLEAR 3 0L CURRENT STATUS REPORT RL/ ORT AS OF: 82/31/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:
DOCKET HO:
05000508 LIC. PM:
A. VIETTI ASLB CHAIR:
R. LAZO APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:
G. KHIGHTON MEMBER 1 E. LUEBKE LOCATION:
26 MI W OF OLYMPIA, WA LIC. LA.:
J. LEE MEMBER 2 D. SCHINK REGION:
5 AE:
EBASCO COUNSEL:
D. SWANSON CONST. INSP: D. KIRSCH REAC. TYPE: PWR NSSS: COMB ANTITRUST:
B. V0GLER RESID. INSP W. ALBERT DESIGH PWR: 3800 MWT/1242 MWE CONST: EBASCO RM ANALYST:
L. LAHIER ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
Application was tendered on June 2, 1982, and was docketed on 08/27/82.
ER DOCKETED:
08/27/82 08/27/82C ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
07/08/83 ISSUE DES:
09/07/83 RESPONSE TO COMMENTS CH DES:
ISSUE FES:
04/06/84 CURRENT ENV. STATUS:
Application was tendered on June 2, 1982, and was SAFETY / HEARING MILESTONES:
docketed on 08/27/82.
APPLICATION TENDERED:
06/02/82 06/02/82C SAR DOCKETED:
08/27/82 OE/27/E?C SAR Q'S RECEIVED BY PM:
04/05/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 07/13/83 INPUT TO DRAFT SER TO PM:
10/28/83 CURRENT HRG. STATUS:
Hotice of Opportunity for Hearing was published in the ISSUE DRAFT SER:
12/01/83 Federal Register on 09/15/82.
INPUT TO SER:
06/05/84 ISSUE SER:
08/09/84 ACRS FULL COMMITTEE hEETING:
09/00/84 IHPUTS TO SE SUPPLEMENT 1:
11/06/84 ISSUE SE SUPPLEMENT 1 12/13/84 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
Notice oF Opportunity for hearing was published in the HEARING STARTED:
05/00/85 Federal register on October 15, 1982.
ASLB IHITIAL DECISIDH 11/00/85 COMMISSIGH EFFECTIVENESS DECISIGHz 12/00/85 TECH SPECS COMPLETED:
COMMISSIDH DECISIGH:
12/00/85 ISSUE LIC. WITH POWER RESTRICTIDH ISSUE FULL POWER LICENSE AMEND:
N/S LATEST AMENDMENT:
SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:
CONSTRUCTIDH COMPLETION - APPL.:
12/00/85 10/01/82 Detailed review schedule has bcan approved.
I
NRR LICENSING SYSTEM PAGE NO: 2-31 WATERFORD 3 0L CURRENT STATUS REP 0RT REPORT AS OF: 12/31/82 i
PLANT CHARACTEAISTICSt KEY PERS0NNELa DOCKET NO:
05Gt0382 LIC. PM:
J. sILSON ASLB CHAIR S. WOLFE APPLICANT:
LOUISIANA POWER 8 LIGHT LIC. BC:
G. KNIGHTON MEMBER 1 W. JORDAN LOCATION:
20 MI W OF HEW ORLEANS, LA LIC. LA.:
J. LEE MEMBER 2 H. FOREMAN REGION:
4 AE ERASCO COUNSEL:
S. TURK CONST. INSP
, UNASSIGNED REAC. TYPE: PWR NSSS: COMB ANTITRUST:
- 8. V0GLER RESID. INSP L. CONSTABLE DESIGN PWR 3560 MWT/tt51 MWE CONST EBASCO RM ANALYST M. KING CURRENT SAF. STATUS' ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE l
The safety review was expedited. Fuel load date l
delayud until 05/83 by applicant. SSER 84 issued ER DOCKETED:
12/09/78 12/09/78C 10/29/82.
ER SITE VISIT COMPLETE:
12/05/80 12/05/80C INPUT TO DES TO PM:
44/06/81 04/06/8tC l
ISSUE DES:
05/01/81 05/01/8tC l
RESPONSE TO COMMENTS ON DES:
07/24/88 08/19/8tC ISSUE FES:
09/30/81 09/30/ SIC CURRENT ENV. STATUS:
The DES was completed in May 1981.
FES was completed September 1981.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
09/28/78 09/28/78C SAR DOCKETED:
12/18/78C SAR O'S RECEIVED BY PM:
N/S I
SAR APPL. RESPONSE To t'S RECEIVED: 08/08/89 12/15/80C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/03/80 05/15/81C Contested hearing started 03/82.
Discovery among the ISSUE DRAFT SER:
parties has been held.
Partial initial decision issued INPUT TO SER:
05/08/81 05/tS/8tC 11/03/82. Nearing for remaining item (emergency ISSUE SER:
07/09/81 07/09/8tC preparedness) scheduled for January 11-14, 1983.
l ACRS LETTER RECEIVED:
08/08/81 68/08/8tC 1
INPUTS TO SE SUPPLEMENT 48 09/15/82C ISSUE SE SUPPLEMENT 4:
10/22/82 10/29/82C l
FEMA LETTER RECEIVED:
12/31/82 l
CURRENT ANTITRUST l
Staff is reviewing OL antitrust information.
HEARING STARTED:
03/00/82 03/23/82C ASLB INITIAL DECISION:
03/09/83 l
COMMISSION EFFECTIVENESS DECISION: 04/00/83 l
TECH SPECS COMPLETED:
02/28/83 COMMISSION DECISION:
04/30/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POW 2R LICENSE AMEND:
05/09/83 ER 93 - 8/81 FSAR 829 - 10/82.
SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
To date State of Loulslana does not have an approved CONSTRUCTION COMPLETION - APPL.:
05/08/83 08/24/82
I
HRR LICENSING SYSTEN PAGE HO: 2-32 WATTS BAR 182 0L CURRENT STATUS REPQRT REPORT AS OF 12/31/82 PLANT C H A R A C T E R I S T 1 C S:
KEY P E R S 0 N N E L:
DOCKET NO:
039020391 LIC, PM:
T. KENYON ASLB CHAIR: N/A APPLICANT:
TENNESSEE VALLEY AUTHORITY LIC. L; E. ADENSAM MEMBER 1 N/A LOCATION:
10 MI S OF SPRING CITY. TENN LIC. LA.:
M. DUNCAN MEMBER 2 N/A REGION:
2 AE2 TVA COUNSEL:
M. YOUNG CONST. INSP R. CRLENJAK REAC. TYPE: PWR HSSS: WEST ANTITRUST:
J. RUTBERG RESID. INSP: T. HEATHERLY DESIGN PWR: 3411 MWT/116S MWE CONST TVA RM ANALYST:
M.
KING ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
CFP predicted earliest Unit 1 completion date at 08/83.
SER published 07/82.
ACRS subcommittee meetings held ER DOCKETED:
01/0S/77 11/23/76C 04/30/82 and 08/10/82. ACRS full committee meeting ER SITE VISIT COMPLETE:
03/18/77 02/25/77C held 08/13/82.
ACRS letter received 08/16/82.
Supplement INPUT TO DES TO PM:
07/06/77 08/18/77C 81 to SER published 09/22/82. Supplement #2 to SER not ISSUE DES:
11/29/77 06/02/78C RESPONSE TO COMMENTS ON DES:
N/A scheduled yet.
ISSUE FES:
11/24/78 12/29/78C CURRENT ENV. STATUS:
Complete except for environmental tech specs.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/30/76 06/30/76C SAR DOCKETED:
10/04/76 10/04/76C SAR Q'S RECEIVED BY PM:
!2/1S/76 05/20/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 04/23/77 02/10/78C IHPUT TO DRAFT SER TO PM:
06/18/80 12/18/81C CURRENT HRG. STATUS:
ISSUE DRAFT SER:
12/30/81 12/30/81C No hearings are assumed.
INPUT TD SER:
06/04/82 06/04/82C ISSUE SER:
07/01/82 07/01/82C ACRS LETTER RECEIVED:
09/00/82 08/16/82C INPUTS TO SE SUPPLEMENT 2:
08/27/82 09/03/82C ISSUE SE SUPPLEMENT 2:
N/S FEMA LETTER RECEIVED:
04/00/83 CURRENT ANTITRUST:
HEARING STARTED:
N/A Complete ASLB INITIAL DECISION:
N/A COMMISSION EFFECTIVENESS DECISION: N/A TECH SPECS COMPLETED:
02/00/83 C0tV11SSION DECISION:
07/00/83 ISSUE LIC. WITH POWER RESTRICTION:
ISSUE FULL POWER LICENSE AMEND:
08/00/83 LATEST AMENDMENT:
FSAR Ho. 46 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.
08/00/83 04/09/82
l NRR LICENSING SYSTEM PAGE ND: 2-33 WOLF CREEK 1 0L CURRENT STATUS REP 0RT REPORT AS OF 12/31/82 PLANT C H A R A C T E R I S T I C S:
KEY PERS0NNEL:
DOCKET NO:
05000482 LIC. PM:
J. HOLONICH ASLB CHAIR:
J. LAURENSON I
APPLICANT:
KANSAS GAS 8 ELECTRIC LIC. BC:
B. YOUNGBLOOD MEMBER 1:
G. ANDERSON l
LOCATION:
3.5 MI NE OF BURLINGiuH. KAN LIC. LA.:
M. RUSHBROOK MEMBER 2:
H. PAXTON REGION:
4 AE:
BECH COUNSEL:
M. KARMAN CONST. INSP:
REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP: T. VANDCL DESIGN PWR: 3425 MWT/1150 MWE CONST: DANIEL RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The SER was issued in April 1982.
SSER-1 was issued in August 1982.
ER DOCKETED:
11/25/80 11/25/80C ER SITE VISIT COMPLETE:
07/28/81 04/21/81C INPUT TO DES TO PM:
10/01/81 10/01/81C l
ISSUE DES:
01/05/82 01/05/82C l
RESPONSE TO COMMENTS ON DES:
05/14/82 05/14/82C j
ISSUE FES:
06/11/82 06/11/82C l
l l
CURRENT ENV. STATUS:
i The DES was issued in January 1982.
The FES was issued in June 1982.
SAFETY / HEARING MILESTONES:
l APPLICATION TENDERED:
02/21/80 02/21/80C l
SAR DOCKETED:
08/07/80 08/07/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
1 CU2 RENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
03/12/82 03/12/82C l
Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:
Federal Register on 12/18/80.
Two petitions for INPUT TO SER:
03/19/82 03/19/82C leave go intervene were filed.
A special combined ISSUE SER:
04/07/82 04/07/82C prehearing conference was held on 4/15/81 ACRS LETTER RECEIVED:
05/11/82 05/11/82C INPUTS TO SE SUPPLEMENT 18 08/10/82 08/10/82C ISSUE SE SUPPLEMENT 1:
08/26/82 08/26/82C FEMA LETTER RECEIVED:
04/01/83 CURRENT ANTITRUST:
OL antitrust review is in progress.
HEARING STARTED:
06/00/83 ASLB INITIAL DECISIDH:
11/00/83 COMMISSION EFFECTIVENESS DECISION:
12/00/83 TECH SPECS COMPLETED:
N/S COMMISSIDH DECISION:
09/00/84 ISSUE LIC. WITH POWER RESTRICTION: N/S LATEST AMENDMENT:
9; ISSUE FULL POWER LICENSE AMEND:
10/00/84 SNUPPS FSAR - No. 10; Wolf Creek Site Addendum - No.
ER - No. 4.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
10/00/84 08/24/82
HRR LICEHSIHG SYSTEM PAGE NO: 2-34 ZIMMER 1 0L CURRENT STATUS RE? ORT REPORT AS OF 12/31/82 PLAHT C H A R A C T E R I S T I C S:
KEY P E R S 0 N H E L:
LIC. PM:
L. KIHTHER ASLB CHAIR:
J. FRYE DOCKET HG 05000358 APPLICANT:
CIHCINNATI GAS & ELECTRIC LIC. BC:
B. YOUNGBLOOD.
MEMBER 1:
F. HOOPER LOCATION:
24 MI SE OF CIHCINNATI. OH LIC. LA.:
M. RUSHER 00K MEMBER 2:
M. LIVINGSTON REGION:
3 AE:
S8L COUNSEL:
C.
BARIH CONST. INSP: D. HUNTER REAC. TYPE: BWR HSSS: GE ANTITRUST:
S. LEWIS RESID. INSP F. CHRISTIANSON DESIGN PWR 2436 MWT/0810 MWE CONST: KAISER RM ANALYST:
B. ST MARY ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
SE Supplement was issued on 06/04/81 SE Supplement 82 was issued 10/81.
SE Supplement 83 was issued on 08/23/82.
ER DOCKETED:
09/19/75 09/10/75C NRR is assisting Region IV in its vendor inspection of the ER SITE VISIT COMPLETE:
10/09/75 10/09/75C main steam line and its supporting structures in the INPUT TO DES TO PM:
08/20/76 08/19/76C ISSUE DES:
10/15/76 10/15/76C turbine building.
RESPONSE TO COMMENTS ON DES:
G3/25/77 04/01/77C ISSUE FES:
06/10/77 06/f3/77C CURRENT ENV. STATUS:
Complete SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
08/15/75 05/09/75C SAR DOCKETED:
09/15/75 09/10/75C SAR Q'S RECEIVED BY PM:
10/29/76 Ot/06/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/31/76 07/29/77C IHPUT TO DRAFT SER TD PM:
01/28/77 08/ft/77C CURRENT HRG. STATUS:
Hearing completed 3/5/82. Board decision was rendered in ISSUE DRAFT SER:
N/A June, 1982.
The Board exercised sua eponte author:ty to INPUT TO SER:
05/20/77 12/07/77C admit as Board issues 8 new contentions. The Commission ISSUE SER:
07/29/77 01/31/79C reviewed the action and directed the Board to issue an appropriate order dismissing the 8 contentions from the ACRS LETTER RECEIVED:
09/16/77 03/13/79C proceeding. On 11/12/82 the Commission issued an order to INPUTS TO SE SUPPLEMENT 38 06/17/82 08/02/82C Show Cause and Order Immediately Suspending Construction.
ISSUE SE SUPPLEMENT 3:
08/23/82 P8/23/82C On 12/8/82 applicant consented to the Order.
FEMA LETTER RECEIVED:
04/15/82 04/15/82C CURRENT ANTITRUST:
Antitrust review is now closed. Federal Register Hotice HEARING STARTED:
02/26/82 02/26/82C Sargent 8 Lundy seismic analyses of the main steam line ASLB INITIAL DECISION:
06/21/82 06/21/82C COMMISSIGH EFFECTIVEMESS DECISI0Hz N/S was published 04/09/82.
TECH SPECS COMPLETED:
05/00/83 COMMISSION DECISION:
08/00/83 ISSUE LIC. WITH POWER RESTRICTIDH ISSUE FULL POWER LICENSE AMEND:
09/00/83 LATEST AMENDMENT:
SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:
Applicant by letter of 09/24/82 has revised the construction CONSTRUCTIDH COMPLETI0H - APPL.:
09/00/83 09/24/82 completion target date to the third quarter of 1983.
NRR LICENSING SYSTEM PAGE NO: 2-35 CLINCH RIVER CP CURRENT STATUS REP 0RT REPORT AS OF 12/31/82 i
PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:
05000537 LIC. PM:
STARK LEECH ASLB CHAIR:
M. MILLER APPLICANT:
PROJECT MANAGEMENT CORP.; DOE;TVA LIC. BC:
P. CHECK MEMBER 1:
G. LINENBERGER LOCATION:
25 MI W OF KNOXVILLE, TN LIC. LA.:
P. SHUTTLEWORTH MEMBER 2:
C. HAND REGION:
2 AE:
B8R COUNSEL:
S. TREBY CONST. INSP REAC. TYPE: LMFBR NSSS: WEST ANTITRUST:
J. RUTBERG RESID. I NT.P DESIGN PWR: 0975 MWT/0350 MWE CONST S&W RM ANALYST:
- 3. ST NARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Safety review was reinitiated in October 1981 A revision to the Site Suitability Report was issued June 11, 1982.
ER DOCKETED:
04/11/75 04/11/75C Cn August 17, 1982, NRC issued an order granting Clinch ER SITE VISIT COMPLETE:
River's request to begin site preparation activities.
INPUT TO DES TO PM:
The Site Suitability Report hearing sessions were held ISSUE DES:
02/12/76C in Oak Ridge during the week of August 23, 1982.
RESPC:iSE T0 COMMENTS ON DES:
s ISSUE FES:
02/07/77 02/07/77C CURRENT ENV. STATUS:
The FES was issued in February 1977.
A draft supplement to the 7ES was issued on July 19, 1982.
A final supplement SAFETY / NEARING MILESTONES:
was issued on October 29, 1982.
APPLICATION TENDERED:
10/15/74 10/15/74C SAR DOCKETED:
06/13/75 06/13/75C SAR Q'S RECEIVED BY PM:
04/09/82 04/09/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/15/82 05/15/82C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
07/16/82 07/16/82C Hearing sessions on the SSR took place on August 23-27.
ISSUE DRAFT SER:
09/27/82 09/27/82C 1982.
The FES hearings were held November 15-19, 1982.
A INPUT TO SER:
01/14/83 second week of FES hearings is scheduled for the week of ISSUE SER:
03/04/83 Decem0er 13, 1982.
ACRS FULL COMMITTEE MEETING:
05/06/83 i
INPUTS TO SE SUPPLEMENT 18 06/10/83 ISSUE SE SUPPLEMENT 18 07/01/83 CURRENT ANTITRUST:
HEARING STARTED:
08/23/82 08/23/82C ASLB INITIAL DECISION:
04/01/84 COMMISSION EFFECTIVENESS DECISIDH: N/S TECH SPECS COMPLETED:
COMMISSION DECISION:
06/01/84 CP ISSUED:
06/01/84 LATEST AMENDMENT:
HEW SLIPS / NOTES:
HRR LICEHSIHG SYSTEM PAGE NO: 2-36 PEBBLE SPRINGS 1 82 CP CURRENT STATUS REPORT REPORT AS OF 12/31/82 PLANT C H A R A C T E R I S T I C 5:
KEY P E R S 0 H H E L:
DOCKET NO:
051420515 LIC. PM:
D. SCALETTI ASLB CHAIP.
I. SMITH APPLICANT:
PORTLAND GENERAL ELECTRIC LIC. BC:
E. ADENSAM MEMBER 12
- 0. PARIS LOCATIO!4:
3 NI NW OF ARLINGTON, ORE LIC.
LA..
M.
DUNCAN MEMBER 2:
W. JORDAN REGION:
5 AE:
BECH COUNSEL:
B. BORDENICK C0t;S T. INSP:
REAC. TYPE: PWR HSSS: B1W ANTITRUST:
B. V0GLER RESID. INSP:
DESIGH PWR: 3760 MWT/1260 MWE CONST: BECH RM ANALYS1:
L. LANIER CURRENT SAF STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Amendment 13 to the PSAR in respanse to 10CFR50.34(f)
(CP/ML rule) was filed 1/29/82.
The staff's review of ER DOCKETED:
08/06/74 08/06/74C the TMI-2 issues is presently in a hold status awaiting ER SITE VISIT COMPLETE:
a decision by PGE whether or not to continuo their INPUT TO DES TO PM:
10/11/74 12/ff/74C application at a different site (see Environmental Status).
ISSUE DES:
11/15/74 01/06/75C PGE has indicated a desire to cancel.
The applicant filed RESPONSE TO COMMENTS ON DES:
03/07/75 03/22/75C an application dated Nov. 12, 1982 proposing to withdraw ISSUE FES:
04/07/75 04/16/75C the application for construction permits.
CURRENT ENV. STATUS:
On 4/9/82, PGE withdrew their application, before the tregon Enorgy facility siting council, for the Pebble SAFETY / HEARING MILESTONES:
Springs site.
The alternative sites hearing before the ASLB scheduled for 4/20/82 was cancelled. The applicant APPLICATION TENDERED:
06/07/76 06/07/74C filed an application dated Nov. 12, 1982 proposing to SAR DOCKETED:
10/18/74 10/18/74C withdraw the application for construction permits.
SAR Q'S RECEIVED BY PM:
12/13/74 Of/13/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/14/75 02/04/75C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
04/11/75 05/23/75C A prehearing conference on alternative sites was held ISSUE DRAFT SER:
on December 1,
1981 The applicant filed an application INPUT TO SER:
09/01/75 12/08/75C dated Hovember 12, 1982 proposing to withdraw the ISSUE SER:
Of/05/76 01/12/76C
.pplication for construction permits.
ACRS LETTER RECEIVED:
11/12/76 02/12/76C INPUTS TO SE SUPPLEMENT 68 09/09/76 12/14/77C ISSUE SE SUPPLEMENT 6:
N/S CURRENT ANTITRUST:
Antitrust review is complete.
HEARING STARTED:
ASLB INITIAL DECISIDH:
N/S COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISIDH:
N/S CP ISSUED:
N/S LATEST AMENDMENT:
Amer.dment 13 to the PSAR in response to 10CFR50.34(f).
NEW SLIPS /HOTES:
MRR LICENSING SYSTEM PAGE N0: 2-37 SKAGIT/HANFORD 182 CP CURRENT STATUS F EPORT REPORT AS OF: 12/31/82 PLAHT CHARACTERISTICSt KEY P E R S 0 N N E L:
DOCKET NO:
052280523 LIC. PM:
C. MOON ASLB CHAIR:
J. WOLF i
APPLICANT:
PUGE1 SOUND POWER 8 LIGHT LIC. BC:
E. ADENSAM MEMBER 18 F. HOOPER l
LOCATION:
30 MI. NW OF RICHLAND. WA.
LIC. LA.:
M. DUNCAN MEMBER 2 G. LINENBERGER REGIDH 5
AE:
BECH COUNSEL:
L. DEWEY CONST. INSP REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP:
DESIGN PWR: 3833 MWT/1277 MWE CONST: BECH RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Supplement No. 2 to the SER was issued 10/81 on TMI-related action items.
Site relocation ER amendment and PSAR ER DOCKETED:
09/30/74 09/30/74C amendment were submitted on 12/31/St.
The applicant is ER SITE VISIT COMPLETE:
02/05/82 02/05/82C relocating the site to the Hanford Peservation.
INPUT TO DES TO PM:
04/09/82 04/09/82C It is expected that Supplement 3 to the SER will be ISSUE DES 2 05/04/82 05/04/82C issued in 12/82.
The staff recommends additional RESPONSE TO COMMENTS ON DES:
08/06/82 09/30/82C investigations of The May Junction Monocline. An ACRS ISSUE FES:
02/00/83 subcommittee site visit and meeting is scheduled for 01/13-14/83.
CURRENT ENV. STATUS:
Site relocation (to Hanford) DES was issued on May 4, 1982.
The FES was expected to be issued 12/82.
SAFETY / HEARING MILESTONES:
A dela/ to 02/83 is now expected in order that FES issuance follow i ssuance of the draf t report on need APPLICATI0H TENDERED:
08/06/74 08/06/74C for power by the Regional Power Council in 01/83.
SAR DOCKETED:
01/15/75 01/15/75C l
SAR Q'S RECEIVED BY PM:
02/10/82 02/10/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/82 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
A special prehearing conference was held on May 5, 1982.
ISSUE DRAFT SER:
Safety hearings are expected to begin in 02/83.
INPUT TO SER:
07/11/77 0"/11/ 7 7 C Environmental hearings, except for need-for power, are ISSUE SER:
08/31/77 08/31/77C expected to begin in 04/83.
Need-for power hearing is expected to begin in 05/83 after the Regional Power ACRS FULL COMMITTEE MEETING:
02/00/83 Council publishes a regional conservation and electric INPUTS TO SE SUPPLEMENT 3 11/30/82 11/30/82C power plan in 04/83.
A prehearing conference was held ISSUE SE SUPPLEMENT 3:
12/50/82 on 12/02/82.
CURRENT ANTITRUST l
Complate HEARING STARTED:
07/15/75 07/15/75C ASLB INITIAL DECISION:
04/00/83 COMMISSION EFFECTIVENESS DECISIDH: N/A TECH SPECS COMPLETED:
N/A COMMISSIDH DECISIDH:
01/00/83 CP ISSUED:
C7/00/83 LATEST AMENDMENT:
HEW SLIPS / NOTES:
)
NRR LICENSING SYSTEM PAGE N08 2-38 (BOP)BOPSSAR/BSAR-205 PDA CURRENT STAYUS REP 0RT REPORT AS OF 12/31/82 PLANT CHARACTERTSTICSt KEY P E R S 0 N N E La DOCKET N0:
05000560 LIC. PM:
. UNASSIGNED ASLB Cl: AIR:
APPLICANT:
FLUDR POWER SERVICES LIC. BC:
C. THOMAS MEMBER 1:
LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
REGION:
1 AE FLUOR COUNSEL:
N/A CONST. INSP REAC. TYPE: BOP HSSS:
ANTITRUST
'ESID. INSP:
DESIGN PWR: 0000 MWT/0000 MWE CONST:
RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the futere of standardization.
ER DOCKETED:
ER SITE VISIT COMPLETE:
IMPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS CH DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/31/77 10/31/77C SAR D6CKETED:
10/31/77 10/31/77C SAR Q'S RECEIVED BY PM:
04/14/78 06/20/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 06/02/78 07/31/78C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
65/25/78 07/07/78C ISSUE DRAFT SER:
INPUT TO SER:
08/21/78 10/17/78C ISSUE SER:
10/02/78 12/29/78C ACRS LETTER RECEIVED:
11/17/78 02/16/79C IMPUTS TO SE SUPPLEMENT 18 12/08/78 03/21/79C JSSUE SE SUPPLEMENT 1 N/S CURRENT ANTITRUST:
HEARING STARTED:
ASL8 IMITIAL DECISIGHz COMMISSIGH DECIS10Hz SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMEHft HEW SLIPS / MOTES:
I
MRR LICENSING SY$ TEM PAGE NO: 2-39 (BOP)ESSAR/BSAR-205 PDA CURRENT
$TATUS EEPORT REPORT AS OF 12/31/82 PLANT CHARACTERISTICS:
KEY PERS0NNELa DOCKET NO:
00002591 LIC. PM:
. UNASSIGNED ASLB CHAIR APPLICANT:
EBASCO SERVICES LIC. BC:
C. THOMAS MEMBER 1 LOCATIDH N/A LIC. LA.:
P. ANDERSON MEMBER 2 REGION:
0 AE2 EBASCO COUNSFL
. UNASSIGNED CONST. INSP REAC. TYPE: BOP HSSS:
ANTITRUST:
RESID. INSP DESIGN PWR 0000 MWT/0000 MWE CONST:
RM ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization, and resources to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
l ISSUE DES:
l RESPONSE TO COMMENTS ON DES:
ISSUE TES:
l CURRENT ENV. STATUS:
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
11/23/77
'11/23/77C SAR DOCKETED:
02/02/78 02/02/78C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO 4'S RECEIVED: N/S CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER:
INPUT TO SER:
N/S ISSUE SER:
N/S l
l ACRS FULL COMMITTEE MEETING:
N/S i
INPUTS TO SE SUPPLEMENT 18 N/S l
ISSUE SE SUPPLEMENT 18 N/S CURRENT ANTITRUST l
NEARING STARTED:
1 ASLB INITIAL DECISION:
COMMISSION DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
HRR LICENSING SYSTEM PAGE H0t 2-40 (BOP)ESSAR/CESSAR-80 PDA CURRENT STATUS REPORT REPORT AS OF8 12/31/82 PLAHT CHARACTERISTICSt KEY PERS0NHELt DOCKET HO 65000591 LIC. PM8
. UNASSIGHED ASLB CHAIR APPLICANT:
EBASCO SERVICES LIC. BC C. THOMAS MEMBER 1 LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2 REGION:
0 AE2 EBASCO COUNSEL:
. UNASSIGNED CONST. INSP8 REAC. TYPE: BOP HSSS8 ANTITRUST:
RESID. INSPs DESIGH PWR8 3800 MWT/0000 MWE CONST:
RM ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization, and resources to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM ISSUE DESs RESPONSE TO COMMENTS OH DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/23/77 11/23/77C SAR DOCKETED:
02/02/78 02/02/78C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER IMPUT TO SER:
N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S IMPUTS TO SE SUPPLEMENT 18 H/S ISSUE SE SUPPLEMENT It H/S CURRENT ANTITRUST HEARING STARTED:
ASLB INITIAL DECISIDH COMMISSIDH DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT 8 NEW SLIPS / NOTES:
r NRR LICENSING SYSTEM PAGE NO: 2-41 I
(BOP)ESSAR/RESAR-414 PDA CURRENT STATUS REP 0RT REPORT AS OF 12/31/82 PLANT CHARACTERI5 TIC 5:
KEY PERS0NNELa DOCKET NO:
00007591 LIC. PM:
. UNASSIGNED ASLB CNAIR APPLICANT:
EBASCO SERVICES LIC. BC:
C. THOMAS MEMBER 1:
LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
REGIDH 0
AE EBASCO COUNSEL:
. UNASSIGNED CONST. INSP REAC. TYPE: BOP HSSS:
ANTITRUST:
RESID. INSP i
DESIGN PWR 0000 MWT/0000 MWE CONST:
RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in ateyance pending the future of standardization, and resources to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
REP.PONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/23/77 11/23/77C l
SAR DOCKETED:
02/02/78 02/02/78C l
SAR Q'S RECEIVED BY PM:
N/S l
SAR APPL. RESPONSE TO Q'S RECEIVED: N/S l
CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER:
INPUT TO SER:
N/S ISSUE SER:
N/S j
ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 12 N/S ISSUE SE SUPPLEMENT 1 N/S CURRENT ANTITRUST:
NEARING STARTED:
l ASLB INITIAL DECISION:
1 COMMISSION DECISION:
l SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
j
HRR LICENSING SYSTEM PAGE HO 2-42 (BOP)GAISSAR PDA CURREHT STATUS REF0RT REPORT AS OF 12/31/82 PLAHT C H A R t. C T E R I S T I C St KEY PERSONNELa DOCKET HO:
0S00059S LIC. PM:
. UNASSIGHED ASLB CHAIR:
APPLICANT:
GILBERT COMMONWEALTH LIC. BC:
C. THOMAS MEMBER 1 LIC. LA.:
P. ANDERSON MEMBER 2 LOCATION:
N/A REGIDH 4
AE WEST COUNSEL:
M. KARMAN CONST. INSP REAC. TYPE: 80P HSSS:
ANTITRUST:
RESID. INSP DESIGH PWR 0000 MWT/0000 MWE CONST:
RM ANALYST B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardizatien and resources to conduct review.
ER DOCKETED:
ER SITE VISIT C61PLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
02/24/78 02/24/78C SAR DOCKETED:
08/21/78C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER 10 PM:
N/S ISSUE DRAFT SER:
N/S INPUT TO SER:
N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 1 N/S ISSUE SE SUPPLEMENT 1:
N/S CURRENT ANTITRUST:
HEARING STARTED:
ASLB INITIAL DECISIDH COMMISSION DECISIDH SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
HEW SLIPS / NOTES:
l
HRR LICENSING SYSTEM PAGE NO: 2-43 (BOP)GIBBSSAR (W)
PDA CURRENT STATUS REPORT REPORT AS OF 12/31/82 PLANT C H A R A C T E R I S T I C S:
KEY PERSONNEL DOCKET NO:
05000584 LIC. PM:
UNASSIGNED ASLB CHAIR APPLICANT:
GIBBS S HILL LIC. BC:
C. THOMAS MEMBER 1:
LOCATION:
N/A LIC. LA.
P. ANDERSON MEMBER 28 s
REGIDH 0
AEt GMDR COUNSEL:
M. WAGNER CONST. INSPs REAC. TYPE: BOP HSSS ANTITRUST:
RESID. INSP DESIGN PWR 0000 MWT/0000 MWE CONST:
RM ANALYST S. MEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization and resources to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS SACETY/ NEARING MILESTONES:
APPLICATION TENDERED:
10/15/76 10/15/76C SAR DOCKETED:
04/08/77 05/10/77C SAR 4'S RECEIVED BY PM:
02/03/78 03/16/79C SAR APPL. RESPONSE TO 4'S RECEIVED: N/S CURRENT NRG. STATUS
- INPUT TO DRAFT SER TD PM:
N/S ISSUE DRAFT SER:
INPUT TO SER:
N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 18 N/S ISSUE SE SUPPLEMENT 18 H/S CURRENT ANTITRUST:
HEARING STARTED:
ASLB INITIAL DECISION:
COMMISSION DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / MOTES
- 4 i
NRR LICEN5ING 3YSTEM PAGE NO: 2-44 (BOP)SWESSAR/BSAR-205 PDA CUR REMT STATU3 REPORT REPORT AS OF 12/31/82 l
PLAMT CHARACTER ISTICSt KEY PERSONNEL t
DOCKET N0 00000595 LIC. PM:
. UNASSIGNED ASLB CHAIR:
APPLICANT:
STONE & WEBSTER LIC. BC:
C. THOMAS MEMBER 1:
LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
l REGION:
0 AE 58W COUNSEL:
. UNASSIGNED CONST. INSP REAC. TYPE: 90P HSS$8 ANTITRUST:
RESID. INSP i
DESIGH PWR 0000 MWT/0000 MWE CONST: N/A RM ANALYST; M. KING j
l CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE j
Review in abeyance pending the future of standardization, and resources to conduct review.
ER DOCKETED:
N/A j
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
I ISSUE DES:
l RESPONSE TO COMMENTS OH DES:
i ISSUE FES:
1 CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
I APPLICATION TENDERED:
12/15/75 12/22/75C
)
SAR DOCKETED:
12/22/75 12/22/75C j
SAR Q'S RECEIVED BY PM:
11/12/76 04/04/77C SAR APPL. RESPONSE TO 4'S RECEIVED: 01/14/77 05/20/77C CURRENT HRG. STATUS:
IMPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER:
INPUT TO SER:
09/09/77 10/13/77C ISSUE SER:
10/19/77 12/02/77C ACRS LETTER RECEIVED:
01/15/78 01/13/78C A
INPUTS TO SE SUPPLEMENT 1 N/S ISSUE SE SUPPLEMENT 1 N/S CURRENT ANTITRUST HEARING STARTED:
ASLB INITIAL DECISIDH COMMISSIDH DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
HEW SLIPS / MOTES:
I
..J
HRR LICEN5IHG SYSTEM PAGE HO: 2-45 (H35)CESSAR SYSTEM 80 FDA CURRENT STATUS REPORT REPORT AS OF 12/31/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:
DOCKET HO:
05000470 LIC. PM:
G. MEYER ASLB CHAIR APPLICANT:
COMBUSTIDH ENGINEERING LIC. BC C. THOMAS MEMBER 1:
LIC. LA.:
P. ANDERSON MEMBER 2:
LOCATION:
N/A REGION:
0 AE:
COUNSEL:
M. WAGHER CONST. INSP REAC. TYPE: PWR HSSS: COMB ANTITRUST:
RESID. INSP DESIGH PWR 3800 MWT/1295 MWE CONST:
RM ANALYST:
M. KING ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
SER (NUREG-0852) issued 11/81.
Awaiting documentation to resolve ACRS, spen, and confirmatory issues.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
M/A.
SAFETY / HEARING MILESTONES:
APPLICATI0H TENDERED:
10/27/78 10/27/78C i
SAR DOCKETED:
12/21/79 12/21/79C SAR Q'S RECEIVED BY PM:
09/01/80 09/01/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 01/01/81 07/15/81C INPUT TO DRAFT SER TO PM:
N/S CURRENT HRG. STATUS:
ISSUE DRAFT SER:
N/S H/A.
INPUT TO SER:
11/01/81 11/13/81C ISSUE SER:
05/01/82 11/10/81C ACRS LETTER RECEIVED:
06/21/82 12/15/81C INPUTS TO SE SUPPLEMENT 18 02/28/83 ISSUE SE SUPPLEMENT 12 03/30/83 CURRENT ANTITRUST:
HEARING STARTED:
N/A ASLB INITIAL DECISIDH N/A COMMISSIDH DECISIDH:
07/00/83 SPECIAL PROJECT COMPLETE:
07/29/13 LATEST AMENDMENT:
HEW SLIPS /HOTES:
J
NRR LICENSING SYSTEM PAGE HO: 2-46 (NSS)GESSAR SEVERE ACC FDA CURRENT STATUS REP 0RT REPORT AS OF 12/31/82 PLANT CHARACTERISTICSt KEY PERS0HHEL DOCKET NO:
00007447 LIC. PM:
D. SCALLETTI ASLB CHAIR: N/A APPLICANT:
GENERAL ELECTRIC COMPANY LIC. BC:
C.
THOMAS MEMBER 13 H/A LOCATION:
N/A LIC. LA.:
P.
ANDERSOH MEMBER 2:
N/A REGION:
0 AE BRAUN COUNSEL:
B. BORDENICK CONST. INSP REAC. TYPE: BWR NSS$8 GE ANTITRUST:
RESID. INSP DESIGN PWR 3S79 MWT/1220 MWE CONST:
RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
EHVIRONMEHTAL MILESTONES:
SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/823 review is in progress.
Dates shown reflect review for the severe accident ER DOCKETED:
design.
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
03/31/80 03/31/80C SAR DOCKETED:
02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:
09/01/82 10/08/82C SAR A"PL. RESPONSE TG Q'S RECEIVED: 02/01/83 CURRENT HRG. STATUS:
INPUT TD DRAFT SER TO PM:
ISSUE DRAFT SER:
INPUT TC SER:
02/01/84 ISSUE SER:
03/01/84 ACRS FULL COMMITTEE MEETING:
04/06/84 INPUTS TO SE SUPPLEMENT 18 04/21/84 ISSUE SE SUPPLEMENT 12 05/25/84 CURRENT ANTITRUST:
FDA antitrust review is in progress.
HEARING STARTED:
N/A ASLB INITIAL DECISIDH N/A COMMISSION DECISION:
05/00/84 SPECIAL PROJECT COMPLETE:
05/00/84 LATEST AMENDMENT:
FDA Amendment No. 9 was received in November, 1982.
NEW SLIPS / NOTES:
HRk LICEHSING SYSTEM PAGE NO2 2-47 (NSS)GESSAR-238 HI FDA CURRENT STATU$
REPORT REPORT AS OF 12/31/82 PLANT CHARACTERISTICSt KEY PERS0NNELt DOCKET N08 05000447 LIC. PM:
D. SCALETTI ASLB CHAIR: N/A APPLICANT:
GENERAL ELECTRIC COMPANY LIC. BC:
C. THOMAS MEMBER 18 N/A LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2 N/A REGIDH 0
AEt BRAUN COUNSEL B. BORDENICK CONST. INSPs REAC. TYPE: BWR NSSS GE ANTITRUST RESID. INSP DESIGN PWRt 3579 MWT/1220 MWE CONST RM ANALYST B. ST MARY CURRENT SAF. STATUS ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82.
The foundation analysis issue will require special attention. PRA for severe ER DOCKETED:
accident design was submitted 4/82.
Severe accident ER SITE VISIT COMPLETE:
design modifications were submitted 6/82 in Amendment INPUT TO DES TO PM Ho. 4.
GE has requested the EDO to accelerate the ISSUE DES:
PRA review schedule to coincide with the FDA.
RESPONSE TO CCHMENTS ON DES:
ISSUE FFSt CURRENT ENV. 51ATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
03/31/80 03/31/80C SAR DOCKETED 02/22/82 02/22/82C SAR Q'S RECEIVED BY PMt 10/15/82 SAR APPL. RESPONSE TO Q'S RECEIVED 12/30/82 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
ISSUE DRAFT SERT INPUT TO SER 02/01/83 ISSUE SER 03/02/83 ACRS FULL COMMITTEE MEEVING:
04/08/83 INPUTS TO SE SUPPLEMENT 11 04/15/83 ISSUE SE SUPPLEMENT 12 05/12/83 CURRENT ANTITRUST:
FDA antitrust review is in progress.
HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A COMMISSION DECISIGH 05/00/83 SPECIAL PROJECT COMPLETE:
05/00/83 1
LATEST AMENDMENT:
i FDA Amendment No. 9 was received in Hovember, 1982.
NEW SLIPS / MOTES:
l
NRR LICENSING SYSTEM PAGE NO: 2-48 (SP)FNP 1-8 (MANUF.)
SPC CURRENT STATUS REPORT REPORT AS OF 12/31/82 PLANT CHARACTERI$TICSt KEY PERSONNELa DOCKET NO:
05000437 LIC. PM:
C. MOON ASLB CHAIR:
S. WOLFE APPLICANT:
OFFSHORE POWER SYSTEMS LIC. BC:
E. ADENSAM MEMBER 1 D. SCHINK LOCATION:
JACKSOHVILLE, FLA.
LIC. LA.:
M. DUNCAN MEMBER 2:
G. BRIGHT REGION:
2 AE OPS COUNSEL:
D. GODDARD CONST. INSP
{
REAC. TYPE: PWR HSSS: WEST ANTITRUST:
J. RUTBERG RESID, INSP DESIGN PWR 3411 MWT/1150 MWE CONST: OPS RM ANALYST B. ST MARY CURRENT SAF. STATUS:
ENVIRnHMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE ML matters have been addressed by applicant. SSER 4, covering TMI requirements and other previous unresolved ER DOCKETED:
07/05/73 07/05/73C issues, was issued 09-29-81.
An ACRS subcom.nittee ER SITE VISIT COMPLETE:
08/16/73 08/16/73C meeting was held on 10-15-81 The ACRS sent a favorable INPUT TO DES TO PM:
07/01/74C letter on 10-19-81.
Commi ssion Deci sion was issued ISSUE DES:
04/12/74 07/24/74C r
12-06-82, and a license was issued on 12-17-82.
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
10/06/75 10/06/75C I
CURRENT ENV. STATUS:
All environmental statements have been issued.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
05/07/73 05/07/73C SAR DOCKETED:
07/05/73 07/05/73C SAR Q'S RECEIVED BY PM:
02/15/74 02/15/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 04/08/74 04/08/74C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
07/25/75 07/25/75C Licensing Board issued an ID on 6-30-82, authorizing the ISSUE DRAFT SER:
Director, NRR to issue a manufacturing lic., subject to a INPUT TO SER:
08/22/75 08/22/75C condition for the manufacturing by 12/99 of 8 standardized ISSUE SER:
09/30/75 09/30/75C floating nuclear plants at Blount Island, Jacksonville, Fla.
By Memorandum 8 Order (CLI-82-37) on 12/6/82 the Commsssion ACRS LETTER RECEIVED:
10/19/88 10/19/8tC found that a manufacturing license can become effective INPUTS TO SE SUPPLEMENT 4:
02/20/76 03/05/76C before it becomes final and that neither the Appeal Board ISSUE SE SUPPLEMENT 4 09/00/81 09/29/81C nor the Commission need andertake an (CONT. UNDER ANTITRUST)
CURRENT ANTITRUST:
immediate effectiveness review of a Licensing Board Decision NEARING STARTED:
06/17/76 PS/15/76C authorizing the issuance of a manufacturing license.
ASLB INITIAL DECISIDH 06/30/82 06/30/82C COMMISSIDH DECISION:
11/00/82 12/06/82C SPECIAL PROJECT COMPLETE:
11/00/82 12/17/82C LATEST AMENDMENT:
4 NEW SLIPS / MOTES:
l l
HRR LICENSING SYSTEM PAGE HO 2-49 CARROLL SITE ESR CURREHT STATUS REP 0RT REPORT AS oft 12/31/82 PLANT CHARACTERISTICSt KEY PERS0HHELe DOCKET H08 05000599 LIC. PM D. MORAN ASLB CHAIR 4 J. WOLF APPLICANT COMM0HWEALTH EDISON LIC. BC:
C. THOMAS MEMBER tt G. BRIGHT LOCATIDH CARROLL COUNTY, IL.
LIC. LA.:
P.
ANDERS0?
MEMBER 2:
R. HOLTON REGION:
3 AEt COUNSEL:
R. LESSY CONST. INSP REAC. TYPE HSSS: WEST ANTITRUST A. HODGDON RESID. INSP DESIGH PWRt 0000 MWT/1120 MWE CONST:
RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The commercial operation date has been postponed until 1999 - 2000.
This license ER DOCKETED:
04/07/79 04/07/79C is not under active review.
ER SITE VISIT COMPLETE:
N/S INPUT TO DES TO PMt N/S ISSUE DEST N/S RESPONSE TO COMMENTS ON DES:
N/S ISSUE FES:
N/S CURRENT ENV. STATUS Portions of the alternate site study are under review by DOE.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/20/78 12/20/78C SAR DOCKETED:
SAR Q'S RECEIVED BY PMt SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM Five intervenors have been admitted.
ISSUE DRAFT SER INPUT TO SER:
ISSUE SER:
ACRS FULL COMMITTEE MEETING:
INPUTS TO SE SUPPLEMENT
- ISSUE SE SUPPLEMENT CURRENT ANTITRUSTt twaiting updated antitrust information from appilcant.
HEARING STARTED:
N/S ASLB INITIAL DECISIDH2 N/S SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT HEW SLIPS / MOTES:
3 NRR LICENSING SYSTEM AS oft 12/31/82 NON-POWER REACT 0RS INPUT ISSUE EARLIEST ISSUEN TER ISSUE FES 09 START ISSUE NON-POWER FACILITY DOCKET Rf}
TO PM lER I.la HEA?ING DL SD121ENT.1 AFRRI, TRIGA 1000.0000W TANK ESTIMATED DATE: 10/80 N/A 01/82 N/S 06/83 N/S CONTESTED CASE ACTUAL DATE:
10/80C 01/82C CORNEP.L U.,
TRIGA 100.0000W POOL ESTIMATED DATE: 05/80 N/A 12/82 04/83 06/83 N/A 06/33 ACTUAL DATE:
05/80C CORNELL U.,
ZPR
.1000W POOL ESTIMATED DATE: 10/78 N/A 12/82 06/83 06/83 N/A 06/83 ACTUAL DATE:
10/78C IOWA STATE, UTR-10 10.0000W ESTIMATED DATE: 09/79 N/A 10/83 02/84 02/*4 N/A 02/84 ACTUAL DATE:
09/79*
MANHATTAN COLLEGE
.0001W POOL ESTIMATED DATE: 08/83 N/A 08/84 10/84 10/84 N/A 10/84 ACTUAL DATE:
MICH. STATE, TRIGA MARK 250.0000W PROTO ESTIMATED DATE: 09/77 N/A 09/83 11/83 11/83 N/A 11/83 ACTUAL DATE:
09/77C NBSR 10.0000W T ESTIMATED DATE! 12/80 02/82 09/82C 11/82 09/82 H/A 03/83 POWER INCRE*SE TO 20 MW ACTUAL DATE:
12/80C 02/82C 09/82C INCLUDED IN RENEWAL REN3SELAER
.0000W CRITI ESTIMATED DATE8 05/79 N/A 09/83 11/83 11/83 N/A 11/8I ACTUAL DATEt 05/79C STATE U OF NY PULSTAR 2000.0000W POOL ESTIMATED DATE8 06/79 N/A 12/82 03/83 03/83 N/A 03/83 ACTUAL DATE:
06/79C TEXAS A8M, TRIGA 1000.0000W POOL ESTIMATED DATE: 07/79 N/A 07/82C 10/82 12/82 N/A 12/82 r
ACTUAL DATE:
07/79C 10/82C U. OF KANSAS 250.0000W POOL ESTINATED DATE: 03/80 N/A 06/83 09/83 09/83 N/A 09/83 ACTUAL DATE:
03/80C U. OF MD., TRIGA 250.0000W TRIGA ESTIMATED DATE: 05/79 N/A 02/83 06/83 06/83 N/A 06/83 i
ACTUAL DATE 05/79C
NRR LICENSING SYSTEM AS OF:12/31/82 NON-POWER REACT 0RS INPUT ISSUE EARLIEST ISSUEM TER ISSUE FES OR START ISSUE NON-POWER FACILITY DOCKET D11 TO PM IER EIA HEARING DL COMMENTS U. OF MO., ROLLA 200.0000W POOL ESTIMATED DATE: 10/79 N/A 11/83 03/84 03/84 N/A 03/84 ACTUAL DATE:
10/79C U. OF OKLA., AGN-211 10
.0150W HOMOG ESTIf1ATED DATE: 10/78 N/A 04/83 06/83 06/83 N/A 08/83 ACTUAL DATE:
10/78C U. OF TEXAS, TRIGA 250.0000W U-ZR ESTIMATED DATE: 05/80 N/A 05/83 08/83 N/A N/A 08/83 ACTUAL DATE:
05/80C U. OF UTAH, TRIGA MARK 100.0000W R ESTIMATED DATE: 03/83 N/A 02/84 04/84 04/84 N/A 04/84 ACTUAL DATE:
U. OF VA., CAVALIER 1000W R ESTIMATED DATE: 06/84 N/A 07/84 09/84 09/84 N/A 09/84 ACTUAL DATE:
UNION CARBIDE 5000.0000W POOL ESTIMATED DATE: 05/80 N/A 10/82C 03/83 04/83 N/A 03/83 ACTUAL DATE:
A5/80C VA HOSP., TRIGA 18.0000W 42150 ESTIMATED DATE: 01/80 N/A 04/83 07/83 07/83 N/A 07/83 ACTUAL DATE:
01/80C VA. POLY. INST., UTR-10 100.0000W GRAPH ESTIMATED DATE: 10/79 N/A 04/84 07/84 07/84 N/A 07/84 ACTUAL DATE:
10/79C WEST., TRAINING REACTOR 10.0000W R ESTIMATED DATE: 12/81 N/A 02/84 04/84 04/84 N/A 04/84 ACTUAL DATE:
12/81C WORCESTER POLY TECN 10.0000W ESTIMATED DATE: 07/79 N/A N/A 12/82 N/S N/A 12/82 ACTUAL DATE:
07/79C O FOR TEST REACTORS ONLY
F F
M M
M E
O M
>=
U W
m
Hp.R LICEN5ING SYSTEM PAGE NO: 2-1 REPORT AS OF:
0L CURRENT STATUS
,R E P 0 R T PLAHT CHARACTERISI I C $:
KEY P E R S O N N E La DOCKET NO:
Do+ket No. or Project No'.,if not docketed LIC. PM:
Licensing Project Manager ASLB CHAIR: ASLB Chairman APPLICANT:
Utahty
.LIC. BC:
Licensing Branch Chief MEMBER t:
on panel i
LOCATION:
Miles and direction from nearest major town LIC. LA.
Licensing Assistant MEMBER 22 on panel REGION:
1 through 5 AE:
Architect / Engineer COUNSEL:
Attorney assigned to case CONS T. INSP : Construction inspector ANTITRUST:
Antitrust Attorney RESID INSP: Resident inspector REAC. TYPE: PWR, BWR, HTGR or LMFBR NS SS: Nuclear Steam Systeins Supplier MPA AN ALYST : MPA analyst assigned to track proj,ect DESIGN PWR: Megawatts electric & thermal C0NST: Constructor ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
Safety status for this reporting period only, it consists of accomplishments and schedule ER DOCKETED:
Environmental Report changes occurring since the last issue of Blue Book. Outstanding issues and late input from
~
review branches should be indicated, along with indication of the critical path.
P O
T Project Menager ISSUE DES:
Draft Environmental Statement RESPONSE TO COMMENTS ON DES:
ISSUE FES:
Final Environmental Statement CURRENT ENV. STATUS:
Environmental status for this reporting period only. It consists of accomplishments and schedule changes occurring since the last issue of Blue Book. Outstanding issues and late SAFETY / NEARING MILESTONES:
input from review branches should be indicated.
APPLICATION TENDERED:
SAR DOCKETED:
Safety Analysis Report SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S REJEIVED:
l CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
ISSUE DRAFT SER:
Safety Evaluation Report Changes in the hearing dates since the last issue of blue Book, Changes in intervention and ER:
contentions should be indicated.
ACRS LETTER RECEIVED:
Advisory Committee INPUTS TO SE SUPPLEMENT 3:
on Reactor Safeguards ISSUE SE SUPPLEMENT 3:
FEMA LETTER RECEIVED:
Safety Evaluation Supplement CURRENT ANTITRUST:
HEARING ! TARTED:
Changes in the antitrust status since the last issue of Blue Book.
ASLB INITIAL DECISION:
Atomic Safety & Licensing Board ASLB FINAL DECISI0H:
TECH SPECS COMPLETED:
1 C0f tttISSION DECISION:
3 ISSUE PARTIAL POWER LICENSE:
LATEST ANENDMENT:
ISSUE FULL POWER LICENSE:
1he latest amendment submitted by the applicant.
SCHED. DATE RECEIPT DATE CONSTRUCTION COMPLETIDH - APPL.:
(;',,'I[
NEW SLIPS / NOTES:
Slips or potential problems that should be brought to management's attention.
construetion in construction
[
U.S. NUCLE AR REGUL ATORY COMMISSION
. EPORT NUMBE R (Ass,poed by DOC #
y BIBLIOGRAPHIC DATA SHEET NUREG-0580 Vol. 11 No.
- 4. TIT LE AND SUBTITLE (Add Volume No.,,t appscar,aref
- 2. (Leave 6/mk/
Regulatory Licensing Status SunTnary Report
- 3. REciPirNT S ACCESSION NO.
(Bluebook)
- 7. AUTHOR $1
- 5. DATE REPORT COMPLETED lVEAR MONTH December 1982 9 PE RF ORMING ORGANIZATION N AME AND M AILING ADDRESS (factude 2,p Code /
OATE REPORT ISSUED l^"
Office of Resource Management January 1983 Management Information Branch 8*"'6'***'
U. S. Nuclear Regulatory Comission Washington, D.C.
20555
- 8. (Leave blank)
- 12. SPONSORING ORGANIZ ATION N AME AND M AILING ADDRE SS (include I,p Codel
- 10. PROJE CT/T ASK/ WORK UNIT NO.
Office of Resource Management Management Information Branch it. CONT R ACT NO.
U. S. Nuclear Regulatory Comission Washington, D.C.
20555 PE RIOD COVE RE D //actus ve deres/
13 TYPE OF REPORT December 1,1982 - December 31, 1982 14 (Leave dim &J 15 SUPPLEMENTARY NOTES l
- 16. ABSTR ACT 1200 *ords or lessi a
Provide a review of the status of the progress of the licensing reviews for all construction permits, operating license, special project and non-power reactor renewals under review, as reported to Congress.
17 KE Y WORDS AND DOCUME NT AN ALYSIS 17a DESCRIPTORS 17h IDENTIFIE RS OPEN ENDE D TE RMS 19 SE CURIT Y CL ASS hs reports 21 NO Os PAGE S 1; AV AIL ABILITY S1 ATEf/E NT Unclassified Unlimited 20 C
iTY CL As iT* s cap) 22 PRICE
- U.S. COVERNMENT PRINTING OFFICE: 198 3-M i-302:lo2
UNITE *> STATES sissi ctass sait NUCLEAR RFGULATORY COMMISSION Postm a seis Psio ustac WASKINGTON, D.C. 20555
.as o c es suit n. itt OFFICIAL BU$tNESS PENALTY FOR PRIVATE USE. $300 e
I s
5
?
8 4
9 s
0 4
4
)
1 i
i e
6 g
l:
3 J
L
_ _ -. _ _