Other: 05000348/LER-1980-076, Forwards LER 80-076/01T-0, 05000348/LER-1980-076-01, /01T-0:on 801209,wall Sampling Tests Revealed Omission of Vertical Reinforcing &/Or Accompanying Grout. Caused by Const Activities Not Performed in Accordance W/Design Drawings.Block Walls to Be Tested, 05000364/LER-1980-003-01, /01T-0:on 801209,concrete Block Walls Found Not to Meet Seismic Operational Requirements.Caused by Omission of Portions of Vertical Reinforcing &/Or Accompanying Grout Per Original Drawing.Corrections to Be Approved, ML19341A625, ML19341A989, ML19345E188, ML19347F481, ML19347F483, ML20028B316, ML20028B321, ML20055A745, ML20063J535, ML20069P068, ML20070D992, ML20070E002, ML20261F164, ML20261F169, ML20261F174, ML20261F177, ML20261F182, ML20261F187, ML20261F191, ML20261F194, ML20261F199, ML20261F204, ML20261F207, ML20261F212, ML20261F215, ML20261F220, ML20261F226, ML20261F230, ML20261F234, ML20261F239, ML20261F243, ML20261F246, ML20261F250
|
MONTHYEARML20261F1991980-10-30030 October 1980 Unit 2 Aux Bldg:Conc Blk Wall 25 El 135 Ft. Sheet 1 of 5 Project stage: Other ML20261F2071980-10-30030 October 1980 Unit 2 Aux Bldg:Conc Blk Wall 25 & 26 El 139 Ft. Sheet 2 of 5 Project stage: Other ML20261F2121980-10-30030 October 1980 Unit 2 Aux Bldg:Concrete Block Wall 25 El 139 Ft. Sheet 3 of 5 Project stage: Other ML20261F2461980-10-30030 October 1980 Unit 2 Aux Bldg:Concrete Blk Wall 1 El 83 Ft. Sheet 2 of 3 Project stage: Other ML20261F2431980-10-30030 October 1980 Unit 2 Aux Bldg:Concrete Blk Wall 1 & 41 El 83 Ft. Sheet 1 of 3 Project stage: Other ML20261F2391980-10-30030 October 1980 Unit 2 Aux Bldg:Conc Blk Wall 21 El 121 Ft. Sheet 4 of 4 Project stage: Other ML20261F2341980-10-30030 October 1980 Unit 2 Aux Bldg:Conc Blk Wall 21 El 121 Ft. Sheet 3 of 4 Project stage: Other ML20261F2301980-10-30030 October 1980 Unit 2 Aux Bldg:Conc Blk Wall 21 El 121 Ft. Sheet 2 of 4 Project stage: Other ML20261F2261980-10-30030 October 1980 Unit 2 Aux Bldg:Conc Blk Wall 21 El 121 Ft. Sheet 1 of 4 Project stage: Other ML20261F2201980-10-30030 October 1980 Unit 2 Aux Bldg:Concrete Block Wall 25 & 26 El 139 Ft. Sheet 5 of 5 Project stage: Other ML20261F2151980-10-30030 October 1980 Unit 2 Aux Bldg:Conc Blk Wall 25 Elev 139 Ft. Sheet 4 of 5 Project stage: Other ML19345E1881980-12-12012 December 1980 Responds to Varga Re Masonry Walls in Category 1 Structures.Util Commits to re-evalaution of Walls by 801215 to Determine Significance of Design Deviations Project stage: Other 05000348/LER-1980-076, Forwards LER 80-076/01T-01980-12-23023 December 1980 Forwards LER 80-076/01T-0 Project stage: Other 05000348/LER-1980-076-01, /01T-0:on 801209,wall Sampling Tests Revealed Omission of Vertical Reinforcing &/Or Accompanying Grout. Caused by Const Activities Not Performed in Accordance W/Design Drawings.Block Walls to Be Tested1980-12-23023 December 1980 /01T-0:on 801209,wall Sampling Tests Revealed Omission of Vertical Reinforcing &/Or Accompanying Grout. Caused by Const Activities Not Performed in Accordance W/Design Drawings.Block Walls to Be Tested Project stage: Other 05000364/LER-1980-003-01, /01T-0:on 801209,concrete Block Walls Found Not to Meet Seismic Operational Requirements.Caused by Omission of Portions of Vertical Reinforcing &/Or Accompanying Grout Per Original Drawing.Corrections to Be Approved1980-12-23023 December 1980 /01T-0:on 801209,concrete Block Walls Found Not to Meet Seismic Operational Requirements.Caused by Omission of Portions of Vertical Reinforcing &/Or Accompanying Grout Per Original Drawing.Corrections to Be Approved Project stage: Other ML19341A6251981-01-13013 January 1981 Summarizes 810109 Conference Call Re Licensee Evaluation of IE Bulletin 80-11, Masonry Wall Design. Licensee Should Be Requested to Provide Description of Deficiencies,Bechtel Wall Evaluation & Commitment to Modify Walls Project stage: Other ML19341A9891981-01-15015 January 1981 Responds to IE Bulletin 80-11, Masonry Wall Design. Required Vertical Reinforcing Missing from Both Unit Walls. Wall w/safety-related Equipment Should Conform W/Requirements Before Criticality Project stage: Other ML20261F1911981-01-22022 January 1981 Unit 1 Aux Bldg:Conc Block Wall 1 El 83 Ft. Sheet 2 of 3 Project stage: Other ML20261F1941981-01-22022 January 1981 Diesel Generator Bldg:Conc Block Wall 1 in Diesel Generator Building. Sheet 1 of 1 Project stage: Other ML20261F2041981-01-22022 January 1981 Service Water Intake Struct:Conc Block Wall 1 & 2 Service Water Structure El 188 Ft. Sheet 1 of 1 Project stage: Other ML19347F4831981-05-12012 May 1981 Re-evaluation of Concrete Masonry Walls Project stage: Other ML19347F4811981-05-12012 May 1981 Forwards Re-evaluation of Concrete Masonry Walls, in Response to IE Bulletin 80-11, Masonry Wall Design Project stage: Other ML20261F2501981-11-18018 November 1981 Unit 2 Aux Bldg:Conc Block Wall 41 El 83 Ft. Sheet 3 of 3 Project stage: Other ML20041E8921982-03-0404 March 1982 Forwards Request for Addl Info on IE Bulletin 80-11 Re Masonry Walls.Response Requested within 45 Days Project stage: RAI ML20261F1871982-04-22022 April 1982 Unit 1 Aux Bldg:Conc Block Wall 1.7 El 83 Ft. Sheet 1 of 3.No Revision Date Project stage: Other ML20261F1821982-04-22022 April 1982 Unit 1 Aux Bldg:Conc Block Wall 8 El 121 Ft. Sheet 3 of 4 Project stage: Other ML20261F1771982-04-22022 April 1982 Unit 1 Aux Bldg:Conc Block Wall 8 El 121 Ft. Sheet 2 of 4 Project stage: Other ML20261F1741982-04-22022 April 1982 Unit 1 Aux Bldg:Conc Block Wall 8 El 121 Ft. Sheet 1 of 4 Project stage: Other ML20261F1691982-04-22022 April 1982 Unit 1 Aux Bldg:Conc Block Wall 11.14 El 121 Ft. Sheet 7 of 11 Project stage: Other ML20261F1641982-04-22022 April 1982 Unit 1 Aux Bldg:Conc Block Wall 11.14 El 121 Ft. Sheet 6 of 11.Date Illegible Project stage: Other ML20055A7451982-07-0808 July 1982 Forwards Addl Clarification of Util 820422 Response to IE Bulletin 80-11,based on 820610 Telephone Conference Between Util,Nrc,Franklin Research Inst & Bechtel Power Corp Project stage: Other ML20063J5351982-08-26026 August 1982 Forwards Addl Info Re Structural Integrity of safety-related Masonry Walls,In Response to IE Bulletin 80-11.Info & Previous Submittals Fully Document Structural Integrity of All Masonry Walls & Satisfy License Condition Project stage: Other ML20028B3161982-11-19019 November 1982 Forwards Suppl to Rept on Re-Evaluation of Concrete Masonry Walls in Response to Us NRC IE Bulletin 80-11. Requests That Seeking Deletion of License Condition 2.C(16) Be Modified to Request Extension Project stage: Other ML20028B3211982-11-30030 November 1982 Suppl to Rept on Re-Evaluation of Concrete Masonry Walls in Response to Us NRC IE Bulletin 80-11 Project stage: Other ML20069P0681982-12-0101 December 1982 Submits Info Per IE Bulletin 80-11, Masonry Walls, Re Concrete Block Wall 2CBW-34.Motor Control Ctr Can Be Supplied by Power Feed from Unit 1 within 2-h,if Seismic Event Occurred & Power Supply Lost Project stage: Other ML20070E0021982-12-0202 December 1982 Notice of Issuance & Availability of Amend 21 to License NPF-8 Project stage: Other ML20070D9981982-12-0202 December 1982 Safety Evaluation Supporting Amend 21 to License NPF-8 Project stage: Approval ML20070D9921982-12-0202 December 1982 Amend 21 to License NPF-8,extending Time Scheduled to Complete Mod to safety-related Masonry Wall Until Second Refueling Outage or Until NRC Accepts Energy Balance Technique Showing No Mod Needed Project stage: Other ML20081C8781984-03-0505 March 1984 Responds to 840209 Request for Addl Info Re IE Bulletin 80-11 Concerning Masonry Walls.Block Walls Qualified by Energy Balance Methods Listed Project stage: Request 1982-11-19
[Table View] |
Text
--
3 M:lling Addriss Alabama Power Company
%0 North 18th Street i
Y Post Office Box 2641 Dirrningham. Alabama 35291 Telephone 205 783-6081 b
F. L. Clayton, Jr.
C'";'C*:7"'
Alabama Power im soumem accmc s wm August 26, 1982 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 I.E.Bulletin 80-11 Masonry Walls Gentlemen:
Based upon a telephone conference August 6, 1982 between Alabama Power Company, and members of the Nuclear Regulatory Commission staff, Franklin Research Institute, and Bechtel Power Corporation, the attached information is sumbitted as additional clarification of our April 22, 1982 and July 8,1982 responses to your letter of March 9, 1982 on I. E.Bulletin 80-11.
License condition 2.C.(16) for Alabama Power Company's Farley Unit 2 requires Alabama Power Company to complete any modifications needed to assure the structural integrity of the safety-related masonry walls.
Alabama Power Company believes the supplemental information supplied with this letter, the above referenced letters, and our original submittals of May 12, 1981 (Unit 2) and May 22, 1981 (Unit
- 1) fully document the structural integrity of all masonry walls at the Farley Nuclear Plant, and that the requirements of the Unit 2 license condition 2.C.(16) have been satisified.
If you have any questions, please advise.
Yours very truly,
. Clay %{1, t
J r.
FLCJr/CLB:jc-D27 Attachment f[p) cc:
Mr. R. A. Thomas p
Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. E. A. Reeves 8209020452 820026 PDR ADOCK 05000348 G
PDR
r J
ATTACHMENT The first step performed in the energy balance technique is to calculate the moment capacity of the beam model based on convential ultimate strength design theory.
When the moment capacity of the beam model is governed by the tension capacity of the reinforcing steel, this conven-tional elastic analysis may be used to compute moment capacity.
The moment capacity of the beam is assumed to be that which causes reinforcing steel stress equal to the yield strength of the steel.
If the applied moment of the beam model, due to externally applied loads and the seismic inertia forces, does not exceed the capacity of the beam based on conventional ultimate strength analysis, the so-called energy balance reduces to this conventional analysis.
Therefore, the additional load capacity of the section after the steel yields need not be relied on to demonstrate the adequacy of the beam.
Table A. below summarizes the calculated stress in the reinforcing steel due to the above defined applied moment.
According to certified mill test reports the actual yield strength of the reinforcing steel exceeds 64.5 KSI.
Based on the actual yield, maximum reinforcing steel stresses in the nine walls most highly stressed do not exceed 93 percent of the yield strength.
Note:
All of the walls at Farley in both units are non-structural elements.
TABLE A Stresses in Farley Nuclear Plant Masonry Wall Steel Wall Seismic Tension Steel Percent of Number Stress (KSI)
Yield Strength OBE SSE 2CBW-8 X
60 93 2CBW-9 X
35 54 2CBW-10 X
40 62 2CBW-11 X
35 54 2CBW-12 X
13 20 2CBW-13 X
16 25 2CBW-14 X
19 29 2CBW-15 X
41 64 2CBW-16 X
41 64
r a
TABLE A Page 2 Stresses in Farley Nuclear Plant Masonry Wall Steel Wall Seismic Tension Steel Percent of Number Stress (KSI)
Yield Strength OBE SSE 2C8W-17 X
41 64 2CBW-18 X
31 48 2CBW-19 X
41 64 2CBW-21 X
46 71 2CBW-23 X
31 48 2CBW-24 X
32 50 2CBW-25 X
26 40 2CBW-26*
X X
30 47 2CBW-27 X
22 34 2CBW-28 X
60 93 2CBW-30*
X X
26 40 2CBW-34*
X X
60 93 1CBW-9 X
60 93 1CBW-12 X
19 29 1CBW-13 X
20 31 1CBW-14 X
20 31 1CBW-15 X
19 29 1CBW-16 X
19 29 1CBW-19 X
60 93 1CBW-21 X
49 76 1CBW-23 X
46 71 1CBW-25 X
60 93
e e
TABLE A Page 3 Stresses in Farley Nuclear Plant Masonry Wall Steel Wall Seismic Tension Steel Percent of Number Stress (KSI)
Yield Strength OBE SSE 1CBW-26 X
27 42 1CBW-28 X
60 93 1CBW-32 X
39 60 1CBW-33 X
21 33 1CBW-34 X
60 93 1CBW-62 X
60 93 1CBW-69 X
60 93 Notes:
1.
All stresses listed result from dead load plus attachment load (if any) plus seismic. loading.
Seismic loading based on 7% damping.
2.
Only the walls analyzed using ultimate strength theory are included in this table.
The remainder of the 75 walls have been analyzed using working stress theory.
Stresses in these walls do not exceed working stress allowables.
3.
For seismic loading in the north-south direction OBE accelerations are used (N-S OBE accelerations are greater than N-S SSE accelerations for equal damping).
{
4.
For seismic loading in the east-west direction SSE accelerations are used.
(E-W SSE accelerations are greater than E-W OBE accelerations for 9 qual damping).
5.
Walls analyzed for both OBE and SSE are "L" shaped in plan view.
At least one beam strip with a north-south orientation and at least one beam strip with a east-west orientation have been analyzed.
I