MONTHYEARML20210P5931999-08-11011 August 1999 Amend Application Number 189 for License NPF-10 & Amend Application Number 174 for License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Calculation E4C-098 ML20195E5061999-06-0808 June 1999 Application for Amends to Licenses NPF-10 & NPF-15, Consisting of Proposed Change Number 495,which Revises TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 ML20205T2841999-04-24024 April 1999 Amend Application 187 to License NPF-10,consisting of Proposed Change Number 504,requesting NRC Approval to Repair Degraded But Operable Shutdown Cooling Sys Check Valves at Unit 2 in Normal Operation (Mode 1) ML20204B9731999-03-12012 March 1999 Application for Amends to Licenses DPR-13,NPF-1 & NPF-15, Revising SONGS Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan for Defending Site Against Safeguards Emergencies.Details of Amend Withheld ML20199D0331999-01-13013 January 1999 Suppl 1 to Amend Applications 157 & 141 to Licenses NPF-10 & NPF-15,respectively,restricting Required Action Completion Time to Close All Containment Penetrations Providing Direct Access from Containment Atmosphere to Outside Atmosphere ML20206R2761999-01-11011 January 1999 Amends Applications 185 & 171 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change Number 499,requesting Rev to TS 3.7.6 & Associated Bases to Increase Required Water Volume in CST T-120 from 280,000 to 360,000 Gallons ML20198L6131998-12-31031 December 1998 Amend Applications 184 & 170 to Licenses NPF-10 & NPF-15, Consisting of Proposed Change 501,requesting Rev of TS 3.3.5, ESFAS Instrumentation ML20198G3741998-12-22022 December 1998 Proposed TS Change Number 489 to Amend Applications 176 & 162 to Licenses NPF-10 & NPF-15,changing TS 5.5.2.11, SG Tube Surveillance Program ML20196J1681998-12-0808 December 1998 PCN-493 to Amends 183 & 169 to Licenses NPF-10 & NPF-15, Revising Units 2 & 3 Tech Specs 3.4.10, Pressurizer Safety Valves, Consistent with Certain UFSAR Chapter 15 Events Recently Reanalyzed ML20195J9461998-11-23023 November 1998 Amends 178 & 164 to Licenses NPF-10 & NPF-15,consisting of Proposed Tech Specs Change Number (PCN-494),revising UFSAR Pages Necessary to Identify Programs Which Govern Test Intervals for Turbine ML20195J8961998-11-23023 November 1998 Amends 182 & 168 to Licenses NPF-10 & NPF-15,consisting of Proposed Tech Spec Change Number 498,revising TS 3.3.1, RPS Instrumentation - Operating ML20155B8631998-10-20020 October 1998 Application for Amends to Licenses NPF-10 & NPF-15, Respectively.Proposed Change Number 485 Adds SR to TS 3.3.9, CR Isolation Signal ML20153G7471998-09-22022 September 1998 Amends 181 & 167 to Licenses NPF-10 & NPF-15,respectively, Revising TS 3.3.1, RPS Instrumentation - Operating, Re Rt Operating Bypass Removal Process Variable ML20151W6751998-09-10010 September 1998 Application for Amends 180 & 166 to Licenses NPF-10 & NPF-15,eliminating Requirements for Hydrogen Control Sys from Low Power Plant License Condition 2.C(19)i & from TSs 3.3.11 & 3.6.7 ML20151T6521998-09-0404 September 1998 Application for Amends to Licenses NPF-10 & NPF-15,revising TS 3.4.10 by Increasing as-found Psv Setpoint Tolerances ML20236S6221998-07-22022 July 1998 Suppl 2 to Applications for Amend to Licenses NPF-10 & NPF-15,revising TS 3.8.1 by Extending Offsite Circuit Completion Time from 72 Hr & 6 Days from Discovery of Failure to Meet LCO ML20249B4271998-06-19019 June 1998 Application for Amends to Licenses NPF-10 & NPF-15,reducing Minimum Primary RCS Cold Leg Temp from 544 F to 535 F Between 70% & 100% Rated Thermal Power Levels & Eliminating Max RCS Flow Rate Limit ML20249A6511998-06-12012 June 1998 Application for Amends 178 & 164 to Licenses DPR-10 & DPR-15,revising Turbine Missile Protection Calculation Methodology,Per UFSAR Section,3.5, Missile Protection. Rev 1 to GEC-Alsthom Analysis Rept Encl.Subj Rept Withheld ML20216B6051998-05-11011 May 1998 Suppl 1 to Application for Amends 161 & 145 to Licenses NPF-10 & NPF-15,respectively,requesting Changes to Surveillance Requirements (Srs) 3.6.1.1,3.6.2.1 & 3.6.3.6 & Creating New TS 5.5.2.14 ML20216B4031998-05-0707 May 1998 Applications for Amend to Licenses NPF-10 & NPF-15,revising TS Section 1.1, Definitions, to Change Reference Used for Obtaining Dose Conversion Factors for Calculating Dose Equivalent I-131 ML20217P8391998-04-0606 April 1998 Application for Amends to Licenses NPF-10 & NPF-15,revising Containment Isolation Valves Completion Times ML20216B9991998-03-0606 March 1998 Application for Amends 175 & 161 to Licenses NPF-10 & Proposed Change 490,eliminating Ref to Inverters in TS 3.4.12.1 ML20198H6651998-01-0909 January 1998 Suppl 1 to Application to Amends 152 & 136 to Licenses NPF-10 & NPF-15,revising TS 3.5.1, Safety Injection Tanks, to Extend,In General,Completion Time for Single Inoperable Safety Injection Tank from 1 H to 24 H ML20199K6371998-01-0909 January 1998 Corrected Suppl 1 to Application for Amends 152 & 136 to Licenses NPF-10 & NPF-15,respectively ML20198H7441998-01-0909 January 1998 Suppl 1 to Application for Amends 150 & 134 to Licenses NPF-10 & NPF-15,revising TS 3.8.1, AC Sources - Operating, to Extend Offsite Circuit Completion Time from 72 H & 6 Days from Discovery of Failure to Meet LCO to 72 H & 17 Days ML20198H8381998-01-0909 January 1998 Suppl 1 to Application for Amends 151 & 135 to Licenses NPF-10 & NPF-15,revising TS 3.5.2, ECCS-Operating, to Extend Allowed Outage Time from 72 H to 7 Days for Single Low Pressure Safety Injection Train ML20198E5941998-01-0505 January 1998 Proposed Change Number 482 to Application for Amends 174 & 160 to Licenses NPF-10 & NPF-15.Amends Revise TS 3.7.5, AFW Sys & Bases to Indicate Turbine Driven AFW Pump Is Operable When Running in Manual Mode to Shutdowns & Testing ML20197C7001997-12-19019 December 1997 Application for Amends to Licenses NPF-10 & NPF-15,reducing Pressurizer Water Level Required for Operability to Be Consistent W/Certain Updated FSAR Chapter 15 Events Which Were Recently Reanalyzed ML20199H9441997-11-25025 November 1997 Supplemental Application for Amend to Licenses NPF-10 & NPF-15,respectively,revising License Condition 2G to Replace Region V W/Region IV ML20199C6191997-11-14014 November 1997 Suppl 1 to Application for Amends 138 & 122 to Licenses NPF-10 & NPF-15,revising Ufsar,Section 3.5 to Allow Use of Probability of Damage to Critical Components in Evaluating tornado-generated Missile Protection Barriers ML20217J9491997-10-17017 October 1997 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Permission of Radiation Monitoring Sys Upgrade ML20148R3751997-06-30030 June 1997 Applications 165 & 149 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change NPF-10/15-475 (PCN-475),to Delete SONGS Unit 2 License Condition 2.C.(19)b & Revise SONGS Units 2 & 3 TS ML20141B4421997-06-18018 June 1997 Applications 168 & 154 for Amends to Licenses NPF-10 & NPF-15,respectively,requesting Revision to TS 3.8.1, AC Sources - Operating & Applicable Bases ML20137V2251997-04-15015 April 1997 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Rev of SR 3.8.1.8 & Applicable Bases to TS 3.8.1, AC Sources - Operating. Proposed Change Allows Credit Overlap Testing ML20134P9841997-02-21021 February 1997 Application for Amend to License NPF-15,which Would Clarify in Note Which Relays Will Not Be Response Time Tested Until Next Songs,Unit 3 Refueling Outage to Satisfy SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation ML20138L1011997-02-18018 February 1997 Application for Amend to License NPF-15,to Defer Implementation of SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation, for 30 Subgroup Relays Until Next Refueling Outage on Songs,Unit 3 ML20134J6921997-02-0707 February 1997 Application for Amend to License NPF-15,consisting of PCN-479,revising TS SR 3.1.5.4, CEA Alignment ML20134A9861997-01-24024 January 1997 Application for Amends to Licenses NPF-10 & NPF-15,to Revise SR 3.8.1.9 to TS 3.8.1, AC Sources - Operating, Which Will More Accurately Reflect Safety Analysis Conditions ML20133G9061997-01-14014 January 1997 Application for Amends to License NPF-15,requesting Rev to TSs 3.8.1.14 & 3.8.1.15, AC Sources - Operating, Surveillance Requirements ML20128P3441996-10-11011 October 1996 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Change to Reinstate Provisions of SONGS Unit 2 & 3 TS Revised as Part of NRC Amendment 127 & 116 ML20117K9851996-08-30030 August 1996 Application for Amends 153 & 137 to Licenses NPF-10 & NPF-15,respectively,clarifying Figures 3.7.18-1 & 3.7.18-2 by Adding Line at 4.8 Weight % Initial U-235 Enrichment to Show Acceptable Zone of Operation Ends Maximum 4.8 W/O ML20116C6741996-07-29029 July 1996 Application for Amends 146 & 130 to Licenses NPF-10 & NPF-15 Consisting of Change Request 443,permitting Increase in Licensed Storage Capacity of Spent Fuel Pools,By Allowing Fuel to Be Consolidated After Required Time in SFP ML20113C2541996-06-25025 June 1996 Application for Amends 159 & 143 to Licenses NPF-10 & NPF-15 Revising TS 3.3.11, Pami, & TS 5.5.2.13, Diesel Fuel Oil Testing Program ML20112D4511996-06-0303 June 1996 Applications 159 & 143 for Amend to Licenses NPF-10 & NPF-15,consisting of Change Number 466,reinstating Provisions of Current SONGS TS Revised as Part of NRC Amends 127 & 116 ML20117J8371996-05-30030 May 1996 Applications for Amends 161 & 145 to Licenses NPF-10 & NPF-15,consisting of Change Number 468,requesting Changes to SR 3.6.1.1,SR 3.6.2.1 & SR 3.6.3.6 Which Allows Implementation of Option B to 10CFR50,App J ML20117J4431996-05-29029 May 1996 Amends 162 & 146 to Licenses NPF-10 & NPF-15,respectively, Consisting of Proposed Change Number 465,changing Unit 2 Amend 127 & Unit 3 Amend 116 Approved TS 3.5.1, Safety Injection Tanks ML20112D0231996-05-29029 May 1996 Application for Amends to Licenses NPF-10 & NPF-15, Consisting of PCN-454,revising Acceptance Criteria for Agastat Time Delay Relays Used in ESF Load Sequencer in TS 3.8.1.18, A.C. Sources - Operating ML20117D7991996-05-0909 May 1996 Amend Applications 160 & 144 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change Number 467,adding Section 5.5.2.14, Barrier Control Program ML20108E3251996-05-0808 May 1996 Application for Amends to Licenses NPF-10 & NPF-15, Consisting of Change Number 458,revising Unit 2 Amend 127 & Unit 3 Amend 116 Changing TS 3.9.4 & 3.9.5 ML20107B9781996-04-11011 April 1996 Application for Amends 158 & 142 to Licenses NPF-10 & NPF-15,respectively,revising TS 3.6.3, Containment Isolation Valves, to Resolve Inconsistency in TSs 1999-08-11
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20210P5931999-08-11011 August 1999 Amend Application Number 189 for License NPF-10 & Amend Application Number 174 for License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Calculation E4C-098 ML20195E5061999-06-0808 June 1999 Application for Amends to Licenses NPF-10 & NPF-15, Consisting of Proposed Change Number 495,which Revises TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 ML20205T2841999-04-24024 April 1999 Amend Application 187 to License NPF-10,consisting of Proposed Change Number 504,requesting NRC Approval to Repair Degraded But Operable Shutdown Cooling Sys Check Valves at Unit 2 in Normal Operation (Mode 1) ML20204B9731999-03-12012 March 1999 Application for Amends to Licenses DPR-13,NPF-1 & NPF-15, Revising SONGS Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan for Defending Site Against Safeguards Emergencies.Details of Amend Withheld ML20199D0331999-01-13013 January 1999 Suppl 1 to Amend Applications 157 & 141 to Licenses NPF-10 & NPF-15,respectively,restricting Required Action Completion Time to Close All Containment Penetrations Providing Direct Access from Containment Atmosphere to Outside Atmosphere ML20206R2761999-01-11011 January 1999 Amends Applications 185 & 171 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change Number 499,requesting Rev to TS 3.7.6 & Associated Bases to Increase Required Water Volume in CST T-120 from 280,000 to 360,000 Gallons ML20198L6131998-12-31031 December 1998 Amend Applications 184 & 170 to Licenses NPF-10 & NPF-15, Consisting of Proposed Change 501,requesting Rev of TS 3.3.5, ESFAS Instrumentation ML20198G3741998-12-22022 December 1998 Proposed TS Change Number 489 to Amend Applications 176 & 162 to Licenses NPF-10 & NPF-15,changing TS 5.5.2.11, SG Tube Surveillance Program ML20196J1681998-12-0808 December 1998 PCN-493 to Amends 183 & 169 to Licenses NPF-10 & NPF-15, Revising Units 2 & 3 Tech Specs 3.4.10, Pressurizer Safety Valves, Consistent with Certain UFSAR Chapter 15 Events Recently Reanalyzed ML20195J8961998-11-23023 November 1998 Amends 182 & 168 to Licenses NPF-10 & NPF-15,consisting of Proposed Tech Spec Change Number 498,revising TS 3.3.1, RPS Instrumentation - Operating ML20195J9461998-11-23023 November 1998 Amends 178 & 164 to Licenses NPF-10 & NPF-15,consisting of Proposed Tech Specs Change Number (PCN-494),revising UFSAR Pages Necessary to Identify Programs Which Govern Test Intervals for Turbine ML20155B8631998-10-20020 October 1998 Application for Amends to Licenses NPF-10 & NPF-15, Respectively.Proposed Change Number 485 Adds SR to TS 3.3.9, CR Isolation Signal ML20153G7471998-09-22022 September 1998 Amends 181 & 167 to Licenses NPF-10 & NPF-15,respectively, Revising TS 3.3.1, RPS Instrumentation - Operating, Re Rt Operating Bypass Removal Process Variable ML20151W6751998-09-10010 September 1998 Application for Amends 180 & 166 to Licenses NPF-10 & NPF-15,eliminating Requirements for Hydrogen Control Sys from Low Power Plant License Condition 2.C(19)i & from TSs 3.3.11 & 3.6.7 ML20151T6521998-09-0404 September 1998 Application for Amends to Licenses NPF-10 & NPF-15,revising TS 3.4.10 by Increasing as-found Psv Setpoint Tolerances ML20236S6221998-07-22022 July 1998 Suppl 2 to Applications for Amend to Licenses NPF-10 & NPF-15,revising TS 3.8.1 by Extending Offsite Circuit Completion Time from 72 Hr & 6 Days from Discovery of Failure to Meet LCO ML20249B4271998-06-19019 June 1998 Application for Amends to Licenses NPF-10 & NPF-15,reducing Minimum Primary RCS Cold Leg Temp from 544 F to 535 F Between 70% & 100% Rated Thermal Power Levels & Eliminating Max RCS Flow Rate Limit ML20249A6511998-06-12012 June 1998 Application for Amends 178 & 164 to Licenses DPR-10 & DPR-15,revising Turbine Missile Protection Calculation Methodology,Per UFSAR Section,3.5, Missile Protection. Rev 1 to GEC-Alsthom Analysis Rept Encl.Subj Rept Withheld ML20216B6051998-05-11011 May 1998 Suppl 1 to Application for Amends 161 & 145 to Licenses NPF-10 & NPF-15,respectively,requesting Changes to Surveillance Requirements (Srs) 3.6.1.1,3.6.2.1 & 3.6.3.6 & Creating New TS 5.5.2.14 ML20216B4031998-05-0707 May 1998 Applications for Amend to Licenses NPF-10 & NPF-15,revising TS Section 1.1, Definitions, to Change Reference Used for Obtaining Dose Conversion Factors for Calculating Dose Equivalent I-131 ML20217P8391998-04-0606 April 1998 Application for Amends to Licenses NPF-10 & NPF-15,revising Containment Isolation Valves Completion Times ML20216B9991998-03-0606 March 1998 Application for Amends 175 & 161 to Licenses NPF-10 & Proposed Change 490,eliminating Ref to Inverters in TS 3.4.12.1 ML20199K6371998-01-0909 January 1998 Corrected Suppl 1 to Application for Amends 152 & 136 to Licenses NPF-10 & NPF-15,respectively ML20198H8381998-01-0909 January 1998 Suppl 1 to Application for Amends 151 & 135 to Licenses NPF-10 & NPF-15,revising TS 3.5.2, ECCS-Operating, to Extend Allowed Outage Time from 72 H to 7 Days for Single Low Pressure Safety Injection Train ML20198H6651998-01-0909 January 1998 Suppl 1 to Application to Amends 152 & 136 to Licenses NPF-10 & NPF-15,revising TS 3.5.1, Safety Injection Tanks, to Extend,In General,Completion Time for Single Inoperable Safety Injection Tank from 1 H to 24 H ML20198H7441998-01-0909 January 1998 Suppl 1 to Application for Amends 150 & 134 to Licenses NPF-10 & NPF-15,revising TS 3.8.1, AC Sources - Operating, to Extend Offsite Circuit Completion Time from 72 H & 6 Days from Discovery of Failure to Meet LCO to 72 H & 17 Days ML20198E5941998-01-0505 January 1998 Proposed Change Number 482 to Application for Amends 174 & 160 to Licenses NPF-10 & NPF-15.Amends Revise TS 3.7.5, AFW Sys & Bases to Indicate Turbine Driven AFW Pump Is Operable When Running in Manual Mode to Shutdowns & Testing ML20197C7001997-12-19019 December 1997 Application for Amends to Licenses NPF-10 & NPF-15,reducing Pressurizer Water Level Required for Operability to Be Consistent W/Certain Updated FSAR Chapter 15 Events Which Were Recently Reanalyzed ML20199H9441997-11-25025 November 1997 Supplemental Application for Amend to Licenses NPF-10 & NPF-15,respectively,revising License Condition 2G to Replace Region V W/Region IV ML20199C6191997-11-14014 November 1997 Suppl 1 to Application for Amends 138 & 122 to Licenses NPF-10 & NPF-15,revising Ufsar,Section 3.5 to Allow Use of Probability of Damage to Critical Components in Evaluating tornado-generated Missile Protection Barriers ML20217J9491997-10-17017 October 1997 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Permission of Radiation Monitoring Sys Upgrade ML20148R3751997-06-30030 June 1997 Applications 165 & 149 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change NPF-10/15-475 (PCN-475),to Delete SONGS Unit 2 License Condition 2.C.(19)b & Revise SONGS Units 2 & 3 TS ML20141B4421997-06-18018 June 1997 Applications 168 & 154 for Amends to Licenses NPF-10 & NPF-15,respectively,requesting Revision to TS 3.8.1, AC Sources - Operating & Applicable Bases ML20137V2251997-04-15015 April 1997 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Rev of SR 3.8.1.8 & Applicable Bases to TS 3.8.1, AC Sources - Operating. Proposed Change Allows Credit Overlap Testing ML20134P9841997-02-21021 February 1997 Application for Amend to License NPF-15,which Would Clarify in Note Which Relays Will Not Be Response Time Tested Until Next Songs,Unit 3 Refueling Outage to Satisfy SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation ML20138L1011997-02-18018 February 1997 Application for Amend to License NPF-15,to Defer Implementation of SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation, for 30 Subgroup Relays Until Next Refueling Outage on Songs,Unit 3 ML20134J6921997-02-0707 February 1997 Application for Amend to License NPF-15,consisting of PCN-479,revising TS SR 3.1.5.4, CEA Alignment ML20134A9861997-01-24024 January 1997 Application for Amends to Licenses NPF-10 & NPF-15,to Revise SR 3.8.1.9 to TS 3.8.1, AC Sources - Operating, Which Will More Accurately Reflect Safety Analysis Conditions ML20133G9061997-01-14014 January 1997 Application for Amends to License NPF-15,requesting Rev to TSs 3.8.1.14 & 3.8.1.15, AC Sources - Operating, Surveillance Requirements ML20132B9051996-12-13013 December 1996 Revised TS Pages D6.1-1,D6.2-1 & D6.5-4 for Amend 158 to License DPR-13 ML20128P3441996-10-11011 October 1996 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Change to Reinstate Provisions of SONGS Unit 2 & 3 TS Revised as Part of NRC Amendment 127 & 116 ML20128L7141996-10-0303 October 1996 Amend 158 to License DPR-13,revising Section 2.D of Plant, Unit 1 Operating License to Remove Reporting Requirement Redundant to Reporting Requirements in 10CFR50.72 & 50.73 ML20117K9851996-08-30030 August 1996 Application for Amends 153 & 137 to Licenses NPF-10 & NPF-15,respectively,clarifying Figures 3.7.18-1 & 3.7.18-2 by Adding Line at 4.8 Weight % Initial U-235 Enrichment to Show Acceptable Zone of Operation Ends Maximum 4.8 W/O ML20116C6741996-07-29029 July 1996 Application for Amends 146 & 130 to Licenses NPF-10 & NPF-15 Consisting of Change Request 443,permitting Increase in Licensed Storage Capacity of Spent Fuel Pools,By Allowing Fuel to Be Consolidated After Required Time in SFP ML20113C2541996-06-25025 June 1996 Application for Amends 159 & 143 to Licenses NPF-10 & NPF-15 Revising TS 3.3.11, Pami, & TS 5.5.2.13, Diesel Fuel Oil Testing Program ML20112D4511996-06-0303 June 1996 Applications 159 & 143 for Amend to Licenses NPF-10 & NPF-15,consisting of Change Number 466,reinstating Provisions of Current SONGS TS Revised as Part of NRC Amends 127 & 116 ML20117J8371996-05-30030 May 1996 Applications for Amends 161 & 145 to Licenses NPF-10 & NPF-15,consisting of Change Number 468,requesting Changes to SR 3.6.1.1,SR 3.6.2.1 & SR 3.6.3.6 Which Allows Implementation of Option B to 10CFR50,App J ML20117J4431996-05-29029 May 1996 Amends 162 & 146 to Licenses NPF-10 & NPF-15,respectively, Consisting of Proposed Change Number 465,changing Unit 2 Amend 127 & Unit 3 Amend 116 Approved TS 3.5.1, Safety Injection Tanks ML20112D0231996-05-29029 May 1996 Application for Amends to Licenses NPF-10 & NPF-15, Consisting of PCN-454,revising Acceptance Criteria for Agastat Time Delay Relays Used in ESF Load Sequencer in TS 3.8.1.18, A.C. Sources - Operating ML20117D7991996-05-0909 May 1996 Amend Applications 160 & 144 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change Number 467,adding Section 5.5.2.14, Barrier Control Program 1999-08-11
[Table view] |
Text
.. _ _ - .
i UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION :
Application of SOUTHERN CALIFORNIA ) Docket No. 50-361 EDISON COMPANY, et al . for a Class )
103 License to Acquire, Possess, and ) Amendment Use a Utilization Facility as Part of ) Application No. 138 Unit No. 2 of the San Onofre Nuclear )
Generating Station. )
)
SOUTHERN CALIFORNIA EDISON COMPANY, et al. pursuant to 10CFR50.90, hereby submit ,
Amendment Application No. 138. This amendment application consists of Proposed Change No. NPF-10-433 to Facility Operating License No. NPF-10. ?roposed Change L
No. NPF-10-433 is a request to revise the Updated Final Safety Analysis Report (UFSAR) to allow the use of probabilistic risk assessment in evaluating the need for tornado-generated missile protection barriers.
Subscribed on the /" day of kBMAf ,199 .
Respectfully submitted, i SOUTHERN CALIFORNIA EDISON Ci.?ANY By: / '
er #W Richard M. Rosenblum Vice President ,
state of California County on c2 lofOrange ll9'l before me, Bussen A. ficeAcrM/$s*o'na/qgt./c 11y appearedM'kpo M. ROJEva t.4M , personally known to me to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his ,
authorized capacity, and that by his signature on the instrument the pers,on, or the ;
entity upon behelf of which the person acted, executed the instrument.
WITNESS my hand and official seal.
OFFICIAL SEAL j
Notory PWIc-Confornio 9 BARIARA A.ORANGE COUNN Signature M b W O - March 1 i
_ y ----- -- - _ _
94020B0098 940201 i PDR. ADOCK 05000361 ? !
P PDR y
e UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Application of SOUTHERN CALIFORNIA ) Docket No. 50-362 -
EDIS0N COMPANY, et al. for a Class )
103 License to Acquire, Possess, and Amendment Use a Utilization Facility as Part of Application No. 122 Unit No. 3 of the San Onofre Nuclear Generating Station.
SOUTHERN CALIFORNIA EDISON COMPANY, et al. pursuant to 10CFR50.90, hereby submit Amendment Application No. 122. This amendment application consists of Proposed j Change No. NPF-15-433 to Facility Operating License No. NPF-15. Proposed Change No. NPF-15-433 is a request to revise the Updated Final Safety Analysis Report (UFSAR) to allow the use of probabilistic risk assessment in evaluating the need +
for tornado-generated missile protection barriers.
Subscribed on the day of FE6MV,19 .
Respectfully submitted, ,
SOUTHERN CALIFORNIA EDISON COMPANY h
By: m) Le I Ri~ chard M. Ros'enblum ..
Vice President State of California . '
Countyof07ange On A/// 9Y before me,JMdMA A. MMUgpfty /ugu G
/ , personally !
appeared %huMO M. 05&#L4M personally known to me to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the j entity upon behalf of which the person acted, executed the instrument.
WITNESS my hand and official seal. _______ _
OFFCML SEAL "
Notory Amic CoWordo l Signature h d. p U @ BARIMRA A My ComMedon Eg*es MWeh 31,1996
4 DESCRIPTION AND SAFETY ANALYSIS PROPOSED LICENSE AMENDMENT TO USE NUREG-0800, " STANDARD REVIEW PLAN,"
METHODOLOGY TO EVALUATE THE NEED FOR TORNADO-GENERATED MISSILE HAZARDS 1 SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 This is a request to change the licensing basis of San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 to allow the use of probabilistic risk assessment techniques, consistent with NUREG-0800, " Standard Review Plan" (SRP), to evaluate the need for tornado-generated missile barriers.
DESCRIPTION OF CHANGES:
The Updated Final Safety Analysis Report (UFSAR) will be changed to allow the use of Probabilistic Risk Assessment (PRA) techniques in evaluating the need for tornado-generated missile barriers. The probability of core damage due to postulated tornado-generated missile strikes of less than 10 4 per year (P 7)-
will be used u a conservative threshold for evaluating the plant configuration. Existing plant conditions, as well as future changes to the facility, may be evaluated through the 10CFR50.59 process as long as the total probability of core damage due to postulated tornado-generated missile strikes is less than 10 4per year. The UFSAR will be updated on'the normal cycle with a listing of affected plant areas and their associated probability of core damage due to postulated tornado-generated missile strikes.
BACKGROUND:
The original SONGS 2&3 licensing basis assumed a tornado-generated missile strike to exposed critical components. Accordingly, barriers to protect certain critical components against these postulated missiles were designed and constructed. By letter dated November 24, 1980, from Mr. K. P. Baskin (SCE) to Mr. F. Miraglia (NRC), Edison committed to protect the SONGS 2&5 Auxiliary feedwater (AFW) system from postulated tornado-generated missiles as listed in UFSAR Table 3.5-6, consistent with the criteria used for tornado-generated missile protection for other plant safe shutdown components. During the resolution of calculation concerns raised during an Edison internal audit of the design of tornado-generated missile protection structures, Edison determined that the missile barriers for portions of the SONGS 2&3 AFW system do not fully satisfy this licensing commitment (Ref.: Voluntary Licensee Event Report 2-93-006, Docket No. 50-361).
A PRA was conducted to determine the risks associated with postulated tornado-generated missile strikes on exposed AFW and Condensate Transfer system piping. The PRA determined that the core damage frequency attributable to tornado-generated missile strikes on the subject piping is less than 10 4 per year (Attachment 1).
The PRA results were eval'uated in light of' Standard Review Plan (SRP) Section 3.5.1.4, Missiles Generated by Natural Phenomena, and SRP Rev.1, Section 3.5.1.5, Site Proximity Missiles (Except Aircraft). Table 1 provides a comparison of the SRP and the proposed licensing basis of SONGS 2&3.
Table 1 i SRP and SONGS 2&3 Proposed Licensing Basis-Acceptance Criteria Comparison SRP Section 3.5.1.4, Rev. O, Tornado-generated missile Missiles Generated by Natural protection is not required if the Phenomena aggregate probability 4of a missile '
strike is less than 10 per year.
SRP Section 3.5.1.4, Rev. 1, Tornado-generated missile Missiles Generated by Natural protection is not required if the Phenomena aggregate probability of a missile strike is less than 10 d per year.
SRP Section 3.5.1.4, Rev. 2, Allows probabilistic approach but Missiles Generated by Natural does not provide an explicit Phenomena acceptance criteria. 7 SRP Section 3.5.1.5, Rev.1, Si+'. Acceptance criteria is met if the Proximity Missiles (Except probability of site proximity Aircraft) missiles impacting the plant and causing radiological consequences greater than 10 CFR Part 100 ~
exposureguidelinesislessthan about 10' per year.
SONGS 2&3 proposed Licensing Basis Tornado-generated missile protection is not required-if the aggregate probability of4 core ;
damage is less than 10 per year.
r The SRP uses missile strikes and 10 CFR Part 100 exposure guidelines to '
establish acceptance criteria. This FSAR amendment will update the SONGS 2&3 licensing basis to be consistent with these two criteria by using the :
i probability of core damage to evaluate postulated tornado-generated missile strikes. This methodology is consistent with the work be'ing performed for the Individual Plant Examination of External Events (IPEEE).
1
+
9 a
w
~ .. . . ~ . . . . -
PROPOSED CHANGES TO THE UFSAR: ,
r The following proposed changes are to be made to the SONGS 2&3 UFSAR:
Existing UFSAR ,
l 3.5.3 BARRIER DESIGN PROCEDURES c
Missile-resistant barriers and structures are designed to withstand and ,
absorb missile impact loads without being perforated in order to prevent '
damage to protected components. The procedures employed in design of sistant barriers for local effects are described in Section 2 of '
missile-rpl')
BC-TOP-9A and EPRI RP-399.03) The procedures used to predict the overall ,
response of the barrier and portions thereof to missile impact are described in Sections 3 and 4 of BC-TOP-9A.02)
The barriers provided for protection against tornado-generated missiles are typically the reinforced concrete walls (1-foot 6-inch thick minimum) and '
roof slabs (1-foot 2-inch thick minimum) of the safety-related' structures.
These thicknesses prevent perforation and sustain the impact without concrete spalling on the interior surfaces. In addition, steel grids or framed steel plates (3/4-inch minimum thickness) are provided as covers for safety-related openings. These covers prevent missile perforation and experience structural !
deflections which are restricted by design so as not to impair the intended ;
safety function of each opening. One of these covers is the set of front entry doors (AC201) to .the control room lobby. These doors are designed as missile barriers and are normally held in an open position. Uoon initiation of a severe weather warning, the station is notified by the SCE Energy '
Control Center and station personnel will then close these missile doors. ;
i f
J h
.i 1
l l
t 1
Proposed Addition to the UFSAR:
Hissile-resistant barriers are not required when the aggregate probability of core damage due to postulated tornado-generated missiles is less than 10 per year. Table 3.5-13 lists the equipment that has been analyzed as meeting this criteria.
Table 3.5-13 Core Damage Risk Assessment for Equipment Locations without 1 Tornado-generated Missile Resistant Barriers Probability of Core Number Description Location Damage per year 4
- 1. Piping and valves Exposed portions inside <10 associated with the the Refueling Water Units 2 arid 3 Auxiliary Storage Tank (T-005 and i Feed Water pump T-006) enclosures. -l suction, discharge and miniflow, and Exposed portions Condensate Transfer in and around the systems. Condensate Storage Tank :
T-120 enclosure. ;
4 TOTAL <10 i
+
)
f I
c r
i SAFETY ANALYSIS:
- The proposed change described above shall be deemed to involve a significant !
hazards consideration if there is a positive finding in any one of the !
following areas: ]
Does the proposed amendment: !
(1) Involve a significant increase in the probability or consequences of an ,
accident previously evaluated? ;
Response: No.
NUREG-0800, Standard Review Plan (SRP) Section 3.5.1.4 Revision 0 and Section 3.5.1.5 Revision 1 provide a conservatively acceptable ;
thresholdforsafetyduetodamagecausedbypostulatedmissile !
strikes. Section 3.5.1.4 Revision 0 uses 10- per year for a :
tornado-uses 10' generated missile per year for strike,10 exceeding and Section CFR 3.5.1.5 Part 100 Revision 1 limits.
The new criteria of 10 per year for core damage frequency is consistent with this guidance and is negligible when compared to i the overall probability for core damage of about 3x10'6 for the San Onofre Nuclear Generating Station, Units 2 and 3. !
This change does not involve a significant increase in the ,
probability of an accident previously evaluated because the probability of core damage due to a postulated missile strike is .
so small as to be negligible. The consequences of.an accident remain unchanged since this change only affects the probability of ,
the initiating event and not the consequences.
(2) Create the possibility of a new or different kind of accident from any l accident previously evaluated? :
i i
Response: No. 1 This amendment establishes a conservatively acceptable risk I criteria for evaluating postulated tornado-generated missile j damage consistent with the SRP guidance and will not create a new- 1 or different kind of accident from those that have been previously evaluated.
I (3) Involve a significant reduction in the margin of safety. -l Response: No.
This proposed change is consistent with the methodology and acceptance criteria of the SRP. There will be no significant
t reduction in the margin of safety since the acceptance criteria is !
negligible when compared to the overall core damage frequency of t SONGS 2&3.
SAFETY AND SIGNIFICANT HAZARDS DETERMINATION:
Based on the above Safety Analysis, it is concluded that: 1) the proposed change does noticonstitute a significant hazards consideration as defined by ,
10CFR50.92 and 2) there is reasonable assurance that the health and-safety of the public will not be endangered by the proposed change. Moreover, because. <
this action does not involve a significant hazards consideration, it will also j not result in a condition which significantly alters the impact.of the station .
on the environment as described in the NRC Final Environmental Statement. 1 e