ML20063C393
| ML20063C393 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 08/19/1982 |
| From: | Mills L TENNESSEE VALLEY AUTHORITY |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8208270245 | |
| Download: ML20063C393 (2) | |
Text
,
d A
1
)
s' l.'*
+3 TENNESSEE VALLEY AUTHORITY 1
s CH ATTANOOG A. TENNESSEE 37401 400 Chestnut Street Towdr IQ August 19,k982' BLRD-50-438/81-75 i
/
BLRD-L*3-43?/81-74 tji l 'I,
, 'l L 1
i I
U.S. Nuclear Regulatory Commisrion Region II Is I~
Attn:
Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, Suits 3100
)
Atlanta, Gsorg i 30,?01 *
[
Dear Mr. O' Red.ly:
l 4 / BELLEFONTE NUCLEAir, plint UNITS 1 AND 2 - OVERPRESSURE PROTECTION IN THE DECAY HEAT REMOR. SYJ;EK - BLRD-50-438/81-75, BLRD-50-439/81 FINAL REPORT i
The subject defjciency was initially reported to NRC-0IE idspeator C. Julian on November 27, 1931 in accordance with 10 CFR 50.5R M as NCR BLN BLP 8127. This was followed by our interim reports ' dated December 21, 198,1 and ApriE 14, 1982. Enclosed is our final edpirt.
If you have any questions concerning this matter, please get in touch with R. H. Shell at FIS 859-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY i
L. M. Mills, Manager Nuclear Licensing V
/
,. 9 Enclosure
!'t cc:
Mr. Richard C. DeYoung, Director, (Enclosurv)
~ ;
s Office oPibspection and Enforc'iment r
f' U. C Nuclear':legelatory Commis; ion 5
Wae.jington, DC 20555 m;
y r9 y
q N
c, cc i
4i
)
/
@FFICIAL COPh. -
3 8208270245 820819 M ' JL PDR ADOCK 05C00438 6O S
PDR An Equal Opportunity Employer
ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 OVERPRESSURE PROTECTION IN THE DECAY HEAT REMOVAL SYSTEM NCR BLN BLP 8127 i
BLRD-50-438/81-75, BLRD-50-439/81-74 l
FINAL REPORT Description of Deficiency The decay heat removal (DHR) cooler inlet relief valve discharge and the cooler outlet relief valve discharge have been combined into a single discharge header. The line size of the common header is the same as the relief valve discharge lines. This is in violation of
(
ASME Section III, NC3677.3(d) which states that, "... in no case shall the area of such comon lines be less than the combined area of all lines discharging into it." This condition exists on both trains A and B for both units. This situation arose because TVA design engineers were not aware, at the time design changes were being made to complete item 2.1.6a of NUREG-0578, that NC3677.3(d) applied to the thermal relief valves. The 2-inch relief valve discharges were combined into a single line and connected to a 2-inch embedded drain line. This problem was discovered during a checking of the system drawings for other changes.
Safety Implications With the present design, if both pressure relief valves relieve at the same time, the rated flow would be achieved and there would be no adverse effect on the safe operations of the plant, c
Corrective Action TVA has qualified the present piping design using ASME Section III NB3677.2 as a basis. The qualification method involved a review against NB3677.2 requirements and calculations to show that, with the two relief valve discharges combined, sufficient discharge area exists and undue back pressure does not develop in accordance with NB3677.2(d).
3 Because of code violations for the installation of relief valves and as a means to prevent recurrence, TVA design personnel were instructed about this design deficiency and instructed to review all relief valve designs for compliance with appropriate codes. The investigation identified one additional significant item on the Component Cooling Water System which has been documented under NCR BLN BLP 8210.
No other TVA nuclear plants are affected.