ML20062H020

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Rept 50-395/78-30.Corrective Actions:Contractors Log Checked for Tool Status;Tools Re Calibr
ML20062H020
Person / Time
Site: Summer 
Issue date: 02/01/1979
From: Mary Johnson
SOUTH CAROLINA ELECTRIC & GAS CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18043B144 List:
References
NUDOCS 7903280112
Download: ML20062H020 (2)


Text

'

.~.

i SOUTH CAROLINA ELECTRIC a gas COMPANY t

f i f.,C.alcluson' n. Q Cotune:A.Sovin Camoun4 seria n

V'

..u.,u..... n e.m.

February 1, 1979

.nc u.ca..

=.a.

United States Nuclear Regulatory Commission ATTN:

Mr. James P. O'Reilly Director Marietta Building, 31st Floor 101 Marietta Street, NW Atlanta, Georgia 30303

Subject:

V. C. Summer Nuclear Station Unit #1 l

()

Response to NRC Audit Report j

50-395/78-30 dated January 12, i

1979 j

1 Centlemen:

I l

In response to the above captioned report, we have reviewed the informa-i tion contained there-in and find that it contains no proprietary information.

In addition, w: have evaluated the circumstances relating to the item identified as 78-30-01 in report 78-395/78-30, which dealt with a deficiency in the QC verification of calibration of termination tools. Our evaluation has produced the following results:

5 1.

Cause i

Two inspectors were charged with inspections on the termination Cl tools. Due to confusion and lack of coordination between them, no inspections were made on the NRC noted weeks.

2.

Immediate Corrective Steps Taken and Results 1

The Contractor's Log was checked to determine the status of the

i tools for the subject weeks. The records showed that all j

termination tools were calibrated. Also, all tools were re-j, turned within calibration in weeks subsequent to the subject weeks.

]

From this investigation, it was concluded that lack of inspection far the subject weeks had no effect on the cable terminations.

t i

l 7 9 0 3 2 8 01 t'2-a 1

1 19oo A.9

..... x. m s.@

l

~,Mr. J:mes P. O'R: illy Paga 2 Tsbruary 1, 1979

's 3.

Corrective Steps Taken to Avoid Future Noncompliance The inspectors have been reindoctrinated to the requirements of the procedure. A program has been established to insure that inspections are carried out at prescribed intervals. This program consist of a chart posted at the entrance of the QC field office with type of inspections, frequency and inspector's initials.

4.

Full Compliance Date g

It has been determined there was no effect on the quality of cable terminations due to our lack of inspections and corrective action has been accomplished as of this date.

()

We trust that you will find our actions to resolve this item appropriate as and satisfactory. Please feel free to contact us if we can provide additional information in relation to this item or the captioned report.

Very truly yours, DAN /MCJ/jls i

cc:

C. J. fritz G. C. Meetze

.i 4