ML18043B143

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-395/78-30
ML18043B143
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/16/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clay Johnson
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML18043B144 List:
References
NUDOCS 7903280108
Download: ML18043B143 (1)


See also: IR 05000395/1978030

Text

consumers

Power

company

General Offices: 212 West Michigan Avenue, .Jackson, Michigan 49201 * Area Code 517 788-0550

March 26, 1979

Director, Nuclear Reactor Regulation

Att:

Mr Dennis L Ziemann, Chief

Operating Reactors Branch No 2

US Nuclear Regulatory Connnission

Washington, DC

20555

DOCKET 50-255 - LICENSE DPR-20 -

PALISADES PLANT - LONG-TERM COOLING

EQUIPMENT MODIFICATION BIMONTHLY STATUS

REPORT

©lPW

Bechtel Corporation is preparing final design details for the Long Term

Cooling Modifications.

These modifications are still scheduled for the

1981 refueling outage.

This serves as the bimonthly status report for January - February, 1979,

as required by Technical Specification 6.9.3.3.b.

,

David P Hoffman (Signed)

David P Hoffman

Assistant Nuclear Licensing Administrator

CC:

JGKeppler, USNRC

'190328 O/cJ $