ML20062C473

From kanterella
Jump to navigation Jump to search
Amend 32 to Facil Oper Lic DPR-41,changing Tech Spec to Reduce Pressurizer Heatup Rate
ML20062C473
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/25/1978
From: Schwencer A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20062C454 List:
References
NUDOCS 7811090021
Download: ML20062C473 (4)


Text

-

-[

UNITED STATES y

NUCLEAR REGULATORY COMMISSION 3

WASHINGTON, D. C. 20555 a

%, '*....f FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-251 TURKEY POINT NUCLEAR GENERATING UNIT NO. 4 AMENDMENT TO FACILITY OPERATING LICENSE Anendment No. 32 License No. OPR-41 1.

The Nuclear Regulatory Commission (the Commission) has ~found that:

A.

The application for amendment by the Florida Power and Light Company (the licensee) dated December 15, 1977, complies wi th the stanoards and requirements of the Atomic Energy Act of 1954, as amended (tha Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the regulations, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii)

O that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the conmon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

ff

I q i i

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.8 of Facility License No. DPR-41 is hereby amended to read as follows:

(B) Technical Specifications The Technical Specifications contained in Appendices j

A and B, as revised through Amendment No.32, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the i

({},

Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUC AR REGULATORY C0f1 MISSION I

,f7,

}hgg/G-V

/

A. Schwencer, Chief Operating Reactors Sranch di Division of Operating Reactors

Attachment:

Changes to the Technical Specifications Ci Date of Issuance:

October 25, 1978 U

t I

ATTACHMENT TO LICENSE AMENDMENT il0. 40

[

TO THE TECHNICAL SPECIFICATIONS FACILITY OPERATING LICENSE NO. OPR-31 DOCKET NO. 50-250 i

Replace the folicwing page of the Appendix "A" Technical Specifications CJ.

with the enclosed page. The revised page is identified by amendment number and contains vertical lines indicating the area of change.

l Remove Replace 3.1-2 3.1-2

[

I l

l r

r r

ATTACHMENT TO LICENSE AMENDMENT NO. 32 TO THE TECHNICAL SPECIFICATIONS FACILITY OPERATING LICENSE H0. OPR-41 DOCKET NO. 50-251 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page.

The revised page is identified by amendment Cs,,

number and contains vertical lines indicati.1g the area of change.

Remove Replace 3.1-2 3.1-2 O

2.

PWISSURE-TEMPERATURE LIMITS The Reactor Coolant System (except for the pressurl=er) pressure and te=perature shall be limited during heatup, cooldewn, criticality (except for low power physics tests), and inservice leak and hydrostatic testing in accordance with the linit lines shown on Figures 3.1-la through 3.1-lb.

Allowable pressure-temperature combinations are BELOW AND TO THE RIGHT of the lines on the Figures.

Heatup and cooldown rate limits are:

A maximum heatup rate of 100 *F in any one hour.

a.

b.

A maximum cocidown rate of 100-*F in any one hour.

([')

A maximum temperature dnange of 1 5 *F in any one c.

hour during hydrostatic testing operation above system design pressure.

The pressurizer pressure and temperature shall be li=ited in accordance with the following:

d.

The pressurizer shall be limited to a maximum heatup rate of 100 *F in any one hour, and a maximum cooldown rate of 200 *F in any one hour. I The pressurizer shall be limited to a maximum ~

i e.

Reactor Coolant System spray water temperature i

differential of 320 *F.

()

With any of the above limits exceeded, restore the temperature and/or prassure within the limits within 30 minutes; determine that the RCS or pressurizer remains acceptable for continued operations or, if at pcwer, be in at least Hot Shutdown within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Cold Shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

The reactor shall not be made critical unless the moderator temperature coefficient is tero or negative.

When the coefficient is greater than zero, the reactor l

shall be suberitical by an amount equal to er greater than the potential reactivity insertion due to depressurization.

These moderator temperature coefficient conditions do not apply to low power physics tests.

l l

3.1-2 Amendment Nos. 40 and 32

-. -