ML20062C472

From kanterella
Jump to navigation Jump to search
Amend 40 to Facil Oper Lic DPR-31,changing Tech Spec to Reduce Pressurizer Heatup Rate
ML20062C472
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/25/1978
From: Schwencer A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20062C454 List:
References
NUDOCS 7811090018
Download: ML20062C472 (2)


Text

'

  • d f L*EU

'g UNITED STATES y g NUCLEAR REGULATORY COMMISSION 3 j WASHINGTON. D. C. 20555 s.; /

FLORIDA POWER AND LIGHT COMPANY '

DOCKET NO. 50-250 TURKEY POINT NUCLEAR GENERATING UNIT NO. 3 AMEN 0 MENT TO FACILITY OPERATING LICENSE Amendment No. 40 .

License No. OPR-31 Q 1.

The Nuclear Regulatory Commission (the Commission) has found that: -

A.

The application for amendment by the Florida Power and Light Company (the licensee) dated December 15, 1977, complies wi th the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations >

set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the regulations, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) ,

that such activities will be conducted in compliance with Q

the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense the public; and and security or to the health and safety of l

E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

i 78 WW'8 '

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B of Facility License No. DPR-31 is hereby amended to read as follows:

(B) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 40 , are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

()

3. This license amendment is effective as of the date of its issuance.  ;

FOR THE N LEAR REGULATORY COMMISSION

/

,l' / ,

l

, . .  !(JHWt'8'V A. Schwencer, Chief Operating Reactors Branch el Division of Operating Reactors

Attachment:

Changes to the Technical Specifications ,

() Date of Issuance: October 25, 1978 i

a i

t l