?:+- 7 +
3
. Wisconsin Electnc POWER COMPANY 231 W Michgon. Po. Box 2046 Milwaukee. WI 53201-2046 (414)221-2345 VPNPD 0 0 8 NRC-94-005 January 20, 1994 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlemen:
DOCKETS 50-266 AND 50-301 ASME SICTION XI PRESSURE TEST PROGRAM i
POINT BEACH NUQLEAR PLANT, UNITS 1 AND 2 Enclosed is an updated copy of our Third Interval ASME Section XI Picssure Test ?togram.
Please note that one of the two program relief requests in Appendix C (Relief Request No. PTP-3-02) is new.
Sheuld you have any questions or require any additional information regarding this matter, please do not hesitate to contact us.
Sincerely,-
'~2 1
,, ~f
,)
/
L~
Bob Link Vice President Nuclear Power DEK/jg Enclosure cc:
NRC Resident Inspector (w/o/e)
NRC Regional Administrator, Region III 24"201
- 9401200011931214^oocn o m gss y
a,,,n,e.auw,,,,,,n a.,,.n.,,
ay
POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRh ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 THIRD INTERVAL
.W~
.('N INDEX PROCEDURE REVISION EFFECTIVE NUMBER PROCEDURE TITLE NUMBER DATE THIRD INTERVAL..
.1 12/14/93
1.0 INTRODUCTION
2.0 SCOPE 3.0 DEFINITIONS 3.1 System leakage Test 3.2 System Functional Pressure Test 3.3 System Inservice Pressure Test 3.4 System Hydrostatic Pressure Test 3.5 System Pneumatic Pressure Test 4.0 APPLICABLE RULES 4.1 Scheduling 4.2 Requirements O
4.3 Boundaries 4.4 Documentation 5.0 PRE-TEST REVIEW AND TEST PREPARATION 6.0 SCHEDULE f
7.0 RELIEF REQUESTS 8.0 ACCEL 7TANCE CRITERIA
9.0 REFERENCES
i APPENDICES I
12/14/93 i
A.
Unit I and Common Program Schedule B
Unit 2 Program Schedule
..I 12/14/93 C.
Relief Requests I
12/14/93 0
I
o POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 4
THIRD INTERVAL PROGRAM DISCUSSION i
1.0 -
INTRODUCTION This document summarizes the applicable rules and requirements for periodic system -
I pressure testing at Point Beach Nuclear Plant (PBNP) in accordance with the American 1
Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI,
'i
" Rules for Inservice Inspection of Nuclear Power Plant Components," 1986 Edition. This document also outlines the proposed schedule for the implementation of the program, and lists the technical basis for each individual pressure test.
2.0 SCOPE This document is limited to periodic system pressure testing performed to sausfy the requirements of ASME Section XI, Tables IWB-2500-1 (Class 1 Piping /Compcaents), IWC-i 2500-1 (Class 2 Piping / Components), and 'IWD-2500-1 (Class 3 Piping / Components). It k not the intent of this document to include or cover the requirements for post-maintenance
/ post-modification pressure testing. Requirements for post-maintenance / post-modification
'j pressure testing are covered in Administrative Procedure PBNP 3.2.5, " Pressure Test Procedure."
Maintenance of this document is the responsibility of the Plant Performance Engineering 1
(PPE) Group - Inservice Engineering (ISE). An individual currently assigned to this group shall serve as the Pressure Testing Program Coordinator / Engineer. The PPE Group Senior Project Engineer shall be the approval authority for revision of the program document.
3.0 DEFINITIONS d
I The following periodic pressure tests are covered by this program document:
1)
System leakage tests.
2)
System functional pressure tests.
3)
System inservice pressure tests.
4)
System hydrostatic pressure tests.
5)
System pneumatic pressure tests.
3.1 System Leakace Test
- i i
Purpose:
Ensure primary system pressure retaining integrity.
Frequency:
Following opening and closing of a component within the ISI class 1 pressure retaining boundary. Typically this is at the end of each refueling outage.
1 Page 1 of 15
}
POINT BEACH' NUCLEAR PLANT '
PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC -
Revision 1 l
PRESSURE TEST PROGRAM December 14,1993 l
r THIRD INTERVAL' PROGRAM DISCUSSION Boundtries: Extend to 'the pressure retaining components within the system l
boundary containing pressurized reactor coolant under normal startup conditions.
Rules:
Test pressure is 2085 psig. The test pressure is dictated by the operation pressure of 2000 psia as stated in Technical Specification j
15.4.3.a.2.
No hold time required after attaining test pressure and temperature.
l 3.2 System Functional Pressure Test
Purpose:
Verify pressure retaining integrity of a system or component that is not.
required to operate during normal plant operation.
Frequency:
Once each period (periods defined by IWB-2412, IWC 2412, and l
IWD-2412).
l Boundaries: Include only those pressure retaining components within the system l
boundary pressurized under the test mode defined by the valve alignment checklist and procedures associated with system tests.
Rules:
Test pressure shall be the test mode pressure or other parameters defined by the test procedure.
A ten minute hold time is required after attaining test pressure.
3.3 System Inservice Pressure Test
{
j Purpcse:
Verify the pressure retaining integrity of a system while the system is in service and at normal operating pressure.
I Frequency:
Once each period (periods defined by IWB-2412, IWC-2412, and IWD-2412).
~
Boundaries: Extend to these pressure retaining components under operating pressures during normal system service defined by valve alignment checklists associated with normal heatup, power, or cooldown activities.
Page 2 of 15
y POINT BEACH NUCLEAR PLANT.
PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1 -
PRESSURE TEST PROGRAM December 14, 1993
' THIRD INTERVAL i
p.
G PROGRAM DISCUSSION Rules:
Test pressure shall be the normal operating pressure.
Normal operating pressures are defined by:
.i
- 1) Operating Instructions (OIs)
- 2) Other written operating procedures
- 3) Isometric Drawings such as the "P" drawings
- 4) NRC IE Bulletin 79-14 Final Report No holding time is required, provided the system has been in operation for at least four hours. The test procedure will document that the system has been in operation for four hours prior to examination.
3.4 System Hydrostatic Pressure Test
Purpose:
Verify pressure retaining boundary integrity. This test is typically __
conducted during a plant shutdown at a pressure above nominal operating pressure or above the system pressure for which overpressure protection is provided.
Frequency:
Once each interval, near the end of the interval (intervals defined by IWB-2412, IWC-2412, and IWD-2412).
Boundaries: Defined by the ISI classification boundary.
Rules:
Hy'drostatic testing shall be performed in accordance with the following:
- 1) ISI Class 1 pressure retaining components will be tested at system i
leakage test pressures as allowed by ASME Code Case N-498. -
- 2) ISI Class 2 pressure retaining components will be tested at system functional or inservice test pressures as allowed by ASME Code Case N-498.
- 3) ISI Class 3 pressure retaining components will be tested at 110
- i percent of the design pressure for those components having a '
design temperature s200*F, and 125 percent of the design pressure for those components having a design temperature
> 200*F.
i Page 3 of 15
POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM '
ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14,'1993 THIRD INTERVAL
~
PROGRAM DISCUSSION After attaining the test pressure, the hold time is four hours for insulated systems or ten minutes for non-insulated systems.
3.5 System Pneumatic Pressure Test
Purpose:
Verify pressure retaining boundary integrity. This test is typically conducted during a plant shutdown at a pressure above nominal i
operating pressure or above the system pressure for which overpressure protection is provided.
t Frequency:
Once each interval in lieu of a hydrostatic test (intervals defined by IWB-2412, IWC-2412, and IWD-2412).
1 Boundaries: Defined by the ISI classification boundary.
t Rules:
This test shall be performed at 110 percent of the design pressure for those components having a design temperature s200*F, and 125 percent of the design pressure for those components having a design temperatures >200*F.
1 After attaining the test pressure, hold time is ten minutes.
A pneumatic pressure test may be conducted in lieu of a system hydrostatic pressure test for those components within the scope of
-i Articles IWC and IWD,
- 4.0 APPLICABLE RULES The applicable rules governing periodic system pressure testing as applicable to this program can be found in ASME Section XI, Articles IWA,B,C,D-5000, Tables IWB,C,D-2500-1;-
ASME Section III, Articles Nx-2300, Appendix R; and ASME Code Case N-498.
4.1 SCHEDULING The proposed schedule for the completion of the Code requirements is shown in the Appendices to this program, as discussed in Section 6.0.
4
)
Page 4 of 15
- - = -.
POINT BEACH NUCLEAR PLANT -
PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14,1993 THIRD INTERVAL O
PROGRAM DISCUSSION j
4.1.1 ISI Class 1
~
I Table IWB-2500-1, Examination Category B-P, requires that a system leakage test be performed on ASME Code Class 1 pressure retaining components following each refueling outage. A system hydrostatic pressure test must be performed at or near the end of the 10-year inspection interval. The hydrostatic pressure test may be performed in lieu -
of the system leakage test.
4.1.2 ISI Class 2 Table IWC-2500-1, Examination Category C-H, requires that a system functional pressure test or a system inservice pressure test be performed on ASME Code Class 2 pressure retaining components each 40 month inspection period. A system hydrostatic \\ pneumatic pressure test must be performed at or near the end of the inspection interval. The hydrostatic \\ pneumatic pressure test may be performed in lieu of the system functional pressure test or an inservice pressure test.
4.1.3 ISI Class 3 Table IWD-2500-1, Examination Categories D-A, D-B, and D-C require that a system functional pressure test or a system inservice pressure test be performed on ASME Code Class 3 pressure retaining components each 40 month inspection period. A system hydrostatic \\ pneumatic pressure test
'l must be performed at or near the end of the inspection interval. The hydrostatic \\ pneumatic pressure test may be performed in lieu of the system functional or inservice pressure test.
l 1
4.2 REOUIREMENTS ASME Section XI, Articles IWA-2000 and IWA-5000 identify the general i
requirements for pressure testing. ASME Section XI, Articles IWB-5000, IWC-5000, and IWD-5000 define the requirements that are specific to ISI Class 1, 2, and 3 respectively.
i i
i I
s Page 5 of 15
POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14,1993 i
g j
THIRD INTERVAL J
PROGRAM DISCUSSION i
4.2.1 Examination Item Number
~
The Pressure Testing Program does not reference the examination item number determination as described by ASME Section XI, Table IWx-2500-1 for the purpose of tracking pressure tests. However, examination i
categories have been assigned in' the Unit I and 2 Program Schedules I
(Appendices A and B) that link the pressure test procedures to the applicable paragraphs of Section XI. All of the pressure test procedures that comprise the pressure test program meet all of the requirements of f
ASME Section XI, including the requirements of individual item numbers.
l 4.2.2 ASME Code Case N-498 i
ASME Code Case N-498, " Alternative Rules for 10-Year Hydrostatic Pressure Testing for Class I and 2 Systems" allows ISI Class 1 and 2 l
hydrostatic pressure tests to be conducted at the normal system operating j
pressure.
i 4.2.3 Authorized Inspection Agency O
PBNP has retained the services of an authorized inspection agency to provide inspection services in accordance with IWA-1400(f). The Authorized Nuclear Inservice Inspector (ANU) shall witness or otherwise verify the performance of system pressure tests within the scope of this i
program. In addition, the ANII shall review every completed pressure test / test document package. The ANII review shall be documented and retained with the pressure test / test document package.
The ANII shall be notified in advance of all upcoming pressure tests in accordance with IWA-2130. Such notification should be not less than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the performance of any test.
4.2.4 Qualified Personnel All system pressure tests referred to in this document will have a VT-2 visual examination, as discussed in IWA-5240, performed by qualified personnel having a certification of Ievel II or level III. ' The Quality Technical Services (QTS) Group of Wisconsin Electric's Nuclear Power i
Department maintains qualified personnel on staff and/or arranges for the services of qualified personnel under contract.
i i
i I
Page 6 of 15
?
i POINT BEACH NUCLEAR PLANT.
PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1' PRESSURE TEST PROGRAM December 14, 1993
-i 1
THIRD INTERVAL t
PROGRAM DISCUSSION i
4.2.5 Test Equipment Calibration All pressure gauges used for system hydrostatic pressure tests and system pneumatic pressure tests, shall.
- a. Be accurate to within 0.5 percent of full scale.
- b. Be calibrated within 14 days of the test.
l
- c. Have an indicating range of at least one and one half (1.5) times, but not more than four times the maximum test pressure,
- d. Be recalibrated upon completion of the hydrostatic test to verify data i
obtained is accurate.
System leakage tests, system functional pressure tests, and system inservice pressure tests do not have test gauge calibration requirements.
Normally installed system instrumentation may be used in the performance of these tests.
4.2.6 Test Pressures
-l The maximum test pressure at any point within the system or portion of a i
system being tested during a hydrostatic pmssure test (i.e., the low point pressure due to hydrostatic head) shall not exceed 106 percent of the test j
pressure unless the appropriate engineering evaluation has been completed prior to the performance of the test. Overpressurization may be prevented by subdividing the system. If it is impractical to subdivide the system to prevent overpressurization, the piping and components at the lowest part of' the area being tested will be reviewed by the Pressure Testing Program Coordinator / Engineer to determine if the test pressure is acceptable.
i l
l
\\
i 1
Page 7 of 15 1
.]
POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM i
ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 p
THIRD INTERVAL i
PROGRAM DISCUSSION l
4.2.7 Test Temperature The hydrostatic pressure test temperature for systems constructed of ferritic steel shall satisfy the requirements of fracture prevention crite-ia.
Components constructed entirely of austenitic steel or ferritic steel and have a nominal wall thickness s 0.625" are not required to satisfy -
fracture prevention criteria. The temperature-pressure criteria for the reactor coolant system and the steam generators are addressed in the PBNP Technical Specifications and vendor literature. For carbon steel piping with a nominal wall thickness 2 0.625", (piping classification DB 2 10" nominal pipe size, EB 2 16" nominal pipe size, and 2503 2 5" nominal pipe size), the test temperature shall be 2 70*F. For other components such as tanks, heat exchangers, and pump casings, refer to the applicable vendor manuals for the minimum hydrostatic pressure test temperatures.
Additional information on the lowest service metal temperature may be found in ASME Section III, Nx-2300 and Appendix R.
-l The test fluid shall be warm enough to prevent the component from sweating so that leakage can be identified. If no guidance is available, the I
minimum test fluid temperature shall be 70*F.
4.2.8 Buried Components In nonredundant systems where the buried components are isolable by -
means of valves, the visual examination shall consist of a leakage test that determines the rate of pressure loss. Alternatively, the test may determine the change in flow between the ends of the buried components. In both cases, the acceptable rate of pressure loss or flow shall be established b'y the Pressure Testing Program Coordinator / Engineer, or a designated alternate, and documented in the pressure test basis prior to the performance of the test. In nonredundant systems where the buried components are nonisolable, such as return lines to the heat sink, the visual examination shall consist only of a verification that the flow lduring operation is not impaired. In redundant systems where the buried components are nonisolable, the visual examination shall consist of a test I
that determines the change in flow between the ends of buried components, j
In cases where an annulus surrounds the components, the areas at each end of the annulus shall be visually examined for evidence of leakage.
Examples of annuli at PBNP are the North and South Service Water
[
Supply and Return Headers through the Switchgear Room located on the
\\
8' elevation of the turbine hall.
l
'l Page 8 of 15 q
_ _ ~.
POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14,~ 1993 r
THIRD INTERVAL PROGRAM DISCUSSION 4.2.9 Tanks Piping from a tank to the first isolation valve is considered to be an extension of the tank. In cases where a check valve in series with the first.
4 isolation valve prevents pressurization of that portion of piping between the valves, the tank boundary will'be extended to the first valve'that will i
allow pressurization of the connecting system classified for ISI without overpressurizing the tank. Open-ended portions of suction or drain lines from a storage tank are considered to be an extension of the tank.
When performing a hydrostatic pressure test of an atmospheric storage ~
tank, the pressure developed due to the static head when the tank is filled to its design capacity will ba acceptable as the test pressure. For a 0-15 psi storage tank (i.e., a tank that is not vented to atmosphere), the test pressure will be 1.10 times the design pressure of the vapor or gas space above the liquid level for which overpressure protection is provided by the relief valve. Tanks with a design pressure greater than 15 psi will be tested using the applicable system hydrostatic pressure test rules.'
4.2.10 Open ended piping Hydrostatic pressure tests on open ended portions of discharge lines beyond the last shutoff valve in non-closed systems (eg. containment spray 3
header) shall demonstrate an open flow path. Demonstration of an open flow path is not required during system functional pressure tests. ASME Section XI,- Article IWA-5222 requires the pressurization and examination of only those pressure retaining components that are pressurized in the test 1
mode. Therefore, these portions of ISI class systems will be tca:d only once, near the end of the inspection interval.
4.2.11 Insulated Components Pressure retaining bolted connections in systems borated for the purpose of-controlling reactivity shall have insulation removed for VT-2 examination.
Other components may be examined without removal of insulation by examining accessible and e.xposed surfaces and joints, as discussed in IWA-5242.
k Page 9 of 15
POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 n
THIRD INTERVAL PROGRAM DISCUSSION 4.2.12 Pumps and Valves For the purposes of hydrostatic pressure testing of centrifugal pumps, the low pressure piping boundary shall terminate at the first isolation valve on the discharge side of the pump. Likewise, the high pressure piping boundary shall begin at the first discharge isolation valve.
Where leakages from components are normally expected and collected (such as valve stems and pump seals), the visual examination shall be conducted by verifying that the leakage collection system is operable.
4.2.13 Containment Penetrations While all containment penetrations are included within the Pressure Test Program, not all are actually tested under the program. Containment penetrations which are not part of larger ISI classed systems are tested under the 10 CFR 50, Appendix J, testing program, as discussed in relie.
request PTP-3-02.
f~
4.3 BOUNDARIF3
- (
The ISI classification boundaries used to develop and implement this program are defined in the " Basis for ASME Section XI Classification Boundaries" for the Third Inspection Interval (Units 1 and 2). There are two types of boundaries that are used when describing a pressure test. These are the " pressure retaining boundary" and the 4
" examination boundary." The pressure retaining boundary is generally defined by the location of the ISI Class boundary valves within the system. These valves are then shut if needed to provide a pressure retaining barrier. The extent of the examination boundaries vary due to the ISI Classification and type of pressure test being performed.
Establishing appropriate pressure boundaries which conform exactly to examination boundaries cannot always be done while adhering to the principles of ALARA and maintaining safety. For these instances a request for relief will be prepared and submitted in accordance with 10 CFR 50.55a(g)(5).
r i
\\
Page 10 of 15
POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14,1993 THIRD INTERVAL PROGRAM DISCUSSION
-4.3.1 ISI Class 1
- a. System 12akage Test The boundary will extend to the pressure retaining components within 1
the system boundary containing pressurized reactor coolant under th'e plant mode of normal reactor startup. (i.e., No special valve line-up is required.)
- b. Hydrostatic Pressure Test The boundary will extend to the ISI classification boundary within the system. This means that when two valves are in series, the inner valve must be opened to pressurize piping and components to the extent of l
the ISI class boundary. (i.e., A special valve line-up is required.)
4.3.2 ISI Class 2
- a. Functional Pressure Test j
The boundary will include only those pressure retaining components within the system boundary pressurized under the test mode required during the performance of a periodic system (or component) functional test. (i.e., No special valve line-up is required.)
- b. Inservice Pressure Test The boundary will include those pressure retaining components within the system boundary that are pressurized under operating pressures during normal system service. (i.e., No special valve line-up is required.)
- c. Hydrostatic Pressure Test The boundary will extend to the ISI classification boundary valves within the system or each portion of the system within which the components have the same minimum classification and design pressure.
This means that all systems or portions of systems that are classified for ISI will be appropriately pressurized and examined. Therefore, valve positions may need to be altered in order to perform this pressure test.
Systems that are designed to operate at different pressures under several modes of plant operation or post accident conditions shall be Page 11 of 15
POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM i
ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 f
. THIRD INTERVAL
(
PROGRAM DISCUSSION 1
~
subject to a system pressure test within the test boundary defined by ;
the operating mode with the higher pressure.
4.3.3 ISI Class 3 c
- a. Inservice Pressure Test The boundary will include those pressure retaining components within the system boundary that are pressurized under operating pressures during normal system service. (i.e., No special valve line-up is required.)
- b. Hydrostatic Pressure Test The boundary will extend to the ISI classification boundary valves within the system or each portion of the system within,which the l
components have the same minimum classification and design pressure.
This means that all systems or. portions of systems that are classified
[
for ISI will be appropriately pressurized and examined. Therefore, valve positions may need to be altered in order to accomplish this l'
pressure test.
4.4 DOCUMENTATION Inservice Test procedures (ITs), Operating Refueling Tests (ORTS), and Tech Spec Tests (TS) are used to implement the system pressure test program at PBNP. They are also used to document the performance of the test. Other working documents, such as Maintenance Work Requests (MWRs), may be utilized to document test performance at the discretion of the Pressure Testing Program Coordinator / Engineer, i
A VT-2 visual examination data sheet must also accompany the completed implementing procedure as part of the permanent record.
Copies of completed periodic pressure tests, including the inspection results and dispositions, are retained by the Pressure Testing Program Coordinator / Engineer.
Page 12 of 15
POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM IASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993
'~
THIRD INTERVAL PROGRAM DISCUSSION 5.0 -
PRE-TEST REVIEW AND TEST PREPARATION Prior to conducting an ASME Section XI periodic pressure test, the test procedure shall be-reviewed by the Pressure Testing Program Coordinator / Engineer, or a designated alternate, to ensure compliance with ASME Section XI requirements. The Pressure Testing Program Coordinator / Engineer, or a designated alternate, shall review the test valve line-up to ensure that all portions required to be examined by the procedure will be pressurized as required.
i Development of actual testing procedures should be accomplished by Operations personnel knowledgeable in the operation of the subject system, with technical support provided by the Pressure Testing Program Coordinator / Engineer, or a designated alternate. The Pressure Testing Program Coordinator / Engineer, or a designated alternate, will forward a test package containing the reviewed test procedure with marked drawings indicating the piping / components to be inspected to the QTS Supervisor for use in the field. The QTS Supervisor shall have the responsibility of arranging for any necessary radiological support required for their inspections.
6.0 SCHEDULE System pressure tests at PBNP will follow Inspection Program B as defm' ed by ASME Section XI, Article IWA-2432. The system pressure tests to be performed at PBNP shall b
meet the planned schedule listed in Table 1..The dates shown in this table may be adjusted within the limits allowed by ASME Section XI, Article IWA-2430.
Table 1 - Third Inspection Interval Udt !
UMt2 Ten Year Interval December 1,1990 - November 30, 2000 December 1,1992 - September 30, 2002 First 40 month Period December 1,1990 - March 31,1994 December 1,1992 - January 31,1996 Second 40 month Period April 1,1994 - July 31,1997 February 1,1996 - May 31,1999 Third 40 month Period August 1,1997 - November 30,2000 June 1,1999 - September 30,2002
.l 7.0 RELIEF REOUESTS U
.I Appendix C contains relief requests related to both Unit I and Unit 2 pressure tests.
Additional requests for relief may be added as necessary and shall be submitted to the NRC for review and approval as required by Federal Regulations. All Relief Requests are identified by the prefix, PTP-3, which indicates Pressure Testing Program - Third Interval O
l Page 13 of 15 i
lo
POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 e
THIRD INTERVAL
(\\
PROGRAM DISCUSSION 8.0 ACCEPTANCE CRITERIA Acceptance criteria for each pressure test shall be specified within the test procedure or test working document. The Pressure Testing Program Coordinator / Engineer, or a designated alternate, shall ensure that appropriate acceptance criteria is set forth for each test during his pre-test review. In general, acceptance criteria for each pressure test shall specify that the test is to be considered acceptable as long as the pressure retaining piping and components within the test boundary are able to withstand test pressure with no loss of structural integrity. Additionally, acceptance criteria will also generally specify that the test is to be considered acceptable as long as there is no leakage from the system other than controlled leakage or leakage through boundary valves.
The term " leakage" has been defined by the Point Beach Manager's Supervisory Staff (MSS) to be " wet, spraying, or steaming." The term " residue" is used to describe dry material deposits, such as boric acid, and may not have the same acceptance criteria that is specified for leakage.
Since the pressure tests accomplished under this program do not measure or record any numerical data, no numerical acceptance criteria need be specified.
The Pressure Testing Program Coordinator / Engineer, or a designated alternate, shall review the results of each pressure test within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> of completion. This review shall compare the test results obtained to the specified acceptance criteria, and note any corrective actions which may be required.
O Page 14 of 15 i
POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM -
4 1
ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 i
p-THIRD INTERVAL J
PROGRAM DISCUSSION
9.0 REFERENCES
9.1 American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, " Rules for Inservice Inspection of Nuclear Power Plant Components," 1986 Edition, with no Addenda.
9.2
" Basis for ASME Section XI Classification Boundaries" for the Third Inspection
'l Interval, Unit 1.
.i I
9.3
" Basis for ASME Section XI Classification Boundaries" for the Third Inspection Interval, Unit 2.
9.4 American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section III, " Rules for Construction of Nuclear Power Plant Components,"
1986 Edition, with no Addenda.
9.5 ASME Code Case N-498, " Alternative Rules for 10-Year Hydrostatic Pressure testing for Class 1 and 2 Systems."
9.6 Inservice Inspection Long Term Plan for the Third Inspection Interval, Unit 1.
9.7 Inservice Inspection Long Term Plan for the Third Inspection Interval, Unit 2.
9.8 PBNP 3.2.5, " Pressure Test Procedure".
1 l
l 1
Page 15 of 15
l POINT BEACH NUCLEAR PLANT '
PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC APPENDIX A PRESSURE TEST PROGRAM Revision 1 e
THIRD INTERVAL December 14, 1993 PROGRAM SCHEDULE UNIT 1 AND COMMON The database shown is a schedule for the implementation of the Pressure Testing Program for PBNP j
Unit 1 and common systems. Preceding the table is a brief description of the information that is provided in the Unit 1 and common program.
FIELD NAME DESCRIPTION TEST Description of the type of test to be performed and an explanation of what DESCRIPTION system / component the test pertains to.
SYSTEM A portion of the plant that performs a particular function and is usually identified by an acronym of the function performed.
- Auxiliary Feedwater RC
- Component Cooling Water RHR - Residual Heat Removal CVC - Chemical & Volume Control SC
- Sampling DA
- Diesel Air Start SIS
- Safety Injection FO
- Fuel Oil SF
- Spent Fuel H2V - Hydrogen Venting SW - Service Water MS - Main Steam WG - Waste Gas PEN - Containment Penetrations PROCEDURE Pressure test procedure number. Several test procedures may be required to examine a single system. Likewise, a single test procedure may encompass multiple systems.
An indication of "TBD" denotes that the procedure number has not yet been assigned. An indication of "MWR" denotes that the test is accomplished under a maintenance work request and associated work plan. " APP J" denotes that testing is accomplished under the 10 CFR 50, Appendix J, testing program.
TEST TYPE Indication of the type of test to be performed.
F = Functional H = Hydrostatic I = Inservice P = Pneumatic s
Page 1 of 19
POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC APPENDIX A PRESSURE TEST PROGRAM Revision 1 THIRD INTERVAL December 14, 1993 p)
\\'
PROGRAM SCHEDULE UNIT 1 AND COMMON CLASS The classification of a component for ISI as outlined in the " Basis for ASME Section XI Classification Boundaries" for the Third Inspection Interval (Units 1 and 2).
1
= ASME CLASS 1 2
= ASME CLASS 2 3
= ASME CLASS 3 2/3 = ASME CLASS 2 and 3 PRESSURE TESTS ASME Section XI Pressure Test Requirements.
TEST ASME Section XI Pressure Test Conditions.
CONDITIONS CATEGORY ASME Section XI Category. A category of " MULTI" is used for a test that encompasses more than one examination category.
FREQUENCY Indication of the frequency (in months) at which the system and/or component is required to be tested under the respective ten-year interval.
40 = 40 month interval 120 = 120 month interval (once during ten-year interval)
PLANT Special plant conditions required to complete the test procedure.
CONDITIONS A = No Special Conditions Required B = Refueling Outage C = Defueled DRAWINGS The Primary P&ID drawings of the system / component to be tested.
OUTAGE Relates to the designated outages within the inspection interval. Note that test SCHEDULE procedures which due not require an outage condition to accomplish may be performed at any time during the calendar year of the outage specified.
X
= Exam Due Y
= Exam Satisfactorily Completed
= No Exam Scheduled Os REMARKS Notes relating to the test. This field may include such references as relief request numbers, MWR numbers, IDR numbers, indication of ASME Code Case N-498 Reference, exam notes, and procedure notes.
Page 2 of 19
INT BEACH NUCL. EAR PLANT l
PRESSURE TEST PROGRAM
(
)
\\
SME SECTION XI PERIODIC PRESSURE APPENDIX A V
TESTING PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 1 AND COMMON Sys Pme Test Class Pressure Test Cat Freq Plant D= gs Ut UI Ut Ut UI UI Ut UI UI Ut Remarks Type Tests Conditions Cond R18 R19 R20 R21 R22 R23 R24 R25 R26 R17 TEST DESCRIPTION: Functional Pressure Test of the Turbine Driven Auxiliary Feedwater Pump IP-29 AF TT-200 F
3 IWA-5211(b)
IWA-3212 D-A 40 B
M-217 Sh 1 Y
X
- l IWA-5211(c)
IWA-5213 IWA-5211(d)
IWD-5220 g
IWD-5210 IWD-5230 TEST DESCRII' TION: Functional Pressure Teet of P-38 A Auxiliary Feedwster Purnp
/J fr-290 F
3 IWA-5211(b)
IWA-5212 D-A 40 B
M-217 Sh 1 Y
X IWA-5211(c)
IWA-5213 IWA-5211(d)
IWD-5220 IWD-5210 IWD-5230 TEST DESCRIPTION: Functional Pressure Test of P-35B Auxiliary Feedwater Purnp AF IT-290 F
3 IWA-5211(b)
IWA-5212 D-A 40 B
M-217 Sh i Y
X IWA-5211(c)
IWA-5213 IWA-52II(d)
IWD-5220 IWD-5210 IWD-5230 TEST DESCRIPTION: Hydromatic Pressure Test of the Class 2 Pmtion of Mein and Auxiliary Feedwater AF TBD H
2 IWA-5211(b)
IWA-5212 C-H 120 B
M-217 Sh 1 X
Nose 1 IWA-5213 M-202 Sh 2 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIITION: Hydrostatic Pressure Test of the Auxiliary Feedwater Suction Piping AF fr-1090-1 H
3 IWA-5211(b)
IWA-5212 D-A 120 B
M-217 Sh 1 X
IWA-5211(c)
IWA-5213 IWA-5211(d)
IWD-5220 IWD-5210 IWD-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of the Auxiliary Feedwater Discharge Piping AF fr-1090-3 H
3 IWA-3211(b)
IWA-5212 D-A 120 B
M-217 Sh i X
IWA-5211(c)
IWA-5213 IWA-5211(d)
IWD-5220 IWD-5210 IWD-5230 Page 3 'of !?
INT BEACH NUCLEAR PLANT '
PRESSURE TEST PROGRAM -
SME SECTION XI PERIODIC PRESSURE APPENDIX A v
TESTING PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 q
PROGRAM SCHEDULE UNIT 1 AND COMMON Sys Prec Test Class Pressure Test Cat Freq Plent Dwgs UI Ut UI Ut UI UI UI UI UI Ut Remorits Type Tests Conditions Cond RIS R19 R20 R21 R22 R23 R24 R25 R26 R27 TEST DESCRIFriON: Inservice Pressurs Test of the Class 2 Portion of Main and Auxiliary Feedwater AF fr-290 I
2 IWA-5211(b)
IWA-5212 C-H 40 B
M-217 sh 1 Y
X IWA-5213 M-202 Sh 2 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of the Component Coormg System inside containment CC fr-Il20-1 H
2 IWA-5211(b)
IWA-5212 C-H 120 B
110E018 Sh 2 X
Note 1 IWA-5213 IWA-52 t l(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Tem of Component Cooling System Outside Containment CC fr-ll20-2 H
2 IWA-32il(b)
IWA-5212 C-H 120 B
110E018 X
Note 1 IWA-52t l(c)
IWA-3213 Sh 1, 2, 3 IWA-5211(d)
IWC,D-5220 IWC,D-5210 IWC.D-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of the IP-1A RCP Corryonent Cooling Water System CC fr-1190-4 H
2 IWA-5211(b)
IWA-5212 C-H 120 C
110E018 X
Note 1 IWA-3211(c)
IWA-5213 Sh. I,2, 3 IWA-5211(d)
IWD-5220 IWD-5210 IWD-5230 TEST DESCRIPTION: Inservice Pressure Test of the Corrgonent Cooling System Inside Containment CC fr ll20-1 1
2 IWA-32t l(b)
IWA-5212 C-H 40 B
110E018 Sh 2 Y
X IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Inservice Pressure Test of the Cornponent Cooling Systent Outside Containment CC fr-ll20-2 I
2 IWA-5211(b)
IWA-5212 C-H 40 A
Il0E018
.X X
IWA-5211(c)
IWA-5213 Sh.1, 2, 3 IWA-5211(d)
IWC,D-5220 IWC,D-5210 IWC,D-5230 Page 4 of 19
~
-.,m....__.
p INT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM
(
SME SECTION XI PERIODIC PRESSURE APPENDIX A TESTING PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 1 AND COMMON Sys Proc Test Class Pressure Test Cat Freq Plant Dwas UI UI Ut UI UI UI UI
'UI-
-U1
' Ut Remads Type Tess conditions Cond R18 Rl9 R20 R21 R22 R23 R24 R25 R26 R27 TEST DESCRIPTION: Inservice Pressure Test of the Chemical and Volume control Symem Inside Containment i
Y X
CVC TBD I
2 IWA-5211(b)
IWA-5212 C-H 40 B
684J741 Sh 2 Nose 3 IWA-5211(c)
IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Inservice Pressure Test of the Chemical and Volume Control Symem Outside Containment CVC TBD I
2 IWA-5211(b)
IWA-5212 C-H 40 A
' 684J741 Y
X Nose 3 IWA-5211(c)
IWC-5220 541F092 Sh 1 IWC-5210 IWC-5230 684J%1 Sh 2 684J972 Sh 3 PBM-226
+
TEST DESCRIPTION: Hydromatic Pressure Test of the Boric /.cid Tanks and Transfer Purnps CVC TBD H
2 IWA-5211(b)
IWA-5212 C-II 120 A
684J471 Sh 1 X
Nde 1 IWA-521l(c)
IWA-5213 IWA-5211(d)
IWC 5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of the Chemical and Volume Control Symem Inside Containment CVC TBD H
2 IWA-5211(b)
IWA 5212 C-H 120 B
684J7415h 2
-X Nde t.
IWA-52tl(c)
IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIFTION: Hydrostatic Pressure Test of the Chemical and Volume Control System Outade Containmerm CVC TBD.
H 2
IWA-5211(b)
IWA-5212 C-H 120 B
6841741 X
Note I IWA-5211(c)
IWC-5220 541F092 Sh I IWC-5210 IWC-5230 684J%I Sh 2 684J972 Sh 3 PBM-226 s
Page 5 of 19 2.-.-.
.a.~..
INT BEACH NUCLEAR' PLANT '
PRESSURE TEST PROGRAM '
SME SECTION XI PERIODIC PRESSURE
. APPENDIX A.
TESTING PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 1 AND COMMON Sys Pree Test Class Preemare Test Cat Freq Plant Dwgs UI UI UI Ut UI UI UI U1
' U1 ~
UI Remorts Type Tests Conditions Cond R18 R19 R20 R21 R22 i R23 R24 R25 R26 R27 TEST DESCRIFIlON: Functional Pressure Test of the Boric Acid Tanks and Transfer Pungs CVC TBD F
2 IWA-5211(b)
IWA-5212 C-H 40 A
684D41 Sh l X
X IWA-52 t l(c)
IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIFTION: Functional Pressure Test of the emergency Diesel Generator (G-01) Air Start System DA TBD F
3 IWA-5211(b)
IWA-5212 D-A 40 A
M-209 Sh 12 X
X IWA-5211(c)
IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: ' Functional Pressure Test of the Emergen:y Diesel Generator (G-02) Air Start System DA TBD F
3 IWA-5211(b)
IWA-5212 D-A 40 A
M-209 5h 12 X
X IWA-5211(c)
IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Pneurnstic Pressure Test of the Air Start System for G-02 DA TT-Il80-2 P
3 IWA-5211(b)
IWA-5212 D-A 120 A
M-209 Sh 12 X-IWA-5211(c)
IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIFFION: Pneumatic Pressure Test of the Air Start System for G-01 DA TT-Il80-1 P
3 IWA-5211(b)
IWA-5212 D-A 120 A
M 209Sh12 X-IWA-5211(c)
IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Test of the Emergency Diesel Generator (G-02) Fuel Transfer System FO TBD F
3 IWA-5%11(b)
IWA-5212 D-A 40 A.
M-219 X
X IWA-52 tl(c)
IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 -
IWC-5230 Page 6 of 19
.v
,\\
OINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM
(
)
SME SECTION XI PERIODIC PRESSURE APPENDIX A
'V TESTING PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 1 AND COMMON Sys Proc Test Class Pressure Tea Cat Freq Ptard Dwgs UI UI UI UI UI UI UI UI UI UI Remarts Type Tests Conditions Cond RIS R19 R20 R21 R22 R23 R24 R25 R26 R27 TEST DESCRIPTION: Functional Pressun Test of the Emergency Diesel Generator (G-01) Fuel Transfer Symem FO TBD F
3 IWA-5211(b)
IWA-5212 D-A 40 A
M-219 X
X IWA-52tl(c)
IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of the Emergency Diem Generator Fuel Oil Symem (Day Tank T-31 A Portion)
3 IWA-5211(b)
IWA-5212 D-A 120 A
M-219 X
IWA-5211(c)
IWA-5213 IWA-52II(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Tem of Emergerry Diesel Generator Fuel Oil Symem (Day Tank T-31B Ibrtion)
FO fr-Il81-4 H
3 IWA-5211(b)
IWA-5212 D-A 120 A
M-219 X
IWA-5211(c)
IWA-5213 k
IWA-5211(d)
IWC-5220 l
IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of EDG Fuel Oil Symem (Emergency Fuel Tank Portion)
FO IT-il81-1 H
3 IWA-52t l(b)
IWA-5212 D-A 120 A
M-219 X
IWA-5211(c)
IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydroitstic Pressure Test of Emergency Diesel Generator Fuel Oil Symem (HB-22 Piping Portion) l FO IT-Il81-2 H
3 IWA-5211(b)
IWA-3212 D-A 120 A
M-219 X
IWA-5211(c)
IWA-5213 IW A-5211(d)
TEST DESCRIPTION: Pneumatic Pressure Tem of the Post Acciders Cornainmert Venting and Monitoring System l
H2V TBD P
2 IWA-5211(b)
IWA-5212 C-H 120 B
M-224 X
Note 1 IWA-5213 IWA-521I(d)
IWC-5220 IWC-5210 IWC-5230 Page 7 of 19
7m, (n
(V)
INT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM SME SECTION XI PERIODIC PRESSURE APPENDIX A TESTING PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 1 AND COMMON Sys Proc Test Claw Pressure Test Cat Freq Plant Dwas UI Ut Ut UI UI UI UI UI Ut U1 RemerLs Type Tens Conditions Cond R15 R19 R20 R21 R22 R23 R24 R25 R26 R27 TEST DESCRIF110N: Functional Pressure Test of the Main Steam to the Terry Turbine Outside Corsainment MS TT-290 F
2 IWA-5211(b)
IWA-5212 C-H 40 B
M-201 Sh 1 Y
X IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Test of the Main Steam System to the Terry Turbine inside Containmera MS IT-290 F
2 IWA-5211(b)
IWA-5212 C-H 40 B
M-201 Sh 1 Y
X IWA-5213 IWA-52II(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Ilydromatic pressure Test of the Main Steam Symem to the Terry Turbine Outside Containment MS TBD H
2 IWA-5211(b)
IWA-5212 C-H 120 B
M-201 Sh 1 X
Note i IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST D5SCRIPTION: Hydrostatic Pressure Test of the Main Steam System to the Terry Turbine inside Containment MS TBD H
2 IWA-5211(b)
IWA-5212 C-H 120 B
M-201 Sh 1 X
Note 1 IWA-5213 IWA-52 t I(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Test of Penetration P-33 A (Instrument Air)
PEN APPJ F
2 IWA-5211(b)
IWA-5212 C-H 40 B
M-209 Note 2 IWA-5213 Sh 7,11 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Test of Penetration P-71 (Containmera Sump Discharge)
PEN APP J F
2 IWA-5211(b)
IWA-5212 C-H 40 B
6841971 Note 2 IWA-5213 Sh 1 A IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 Page 8 of 19
INT BEACH NUCLEAR PLANT
(
PRESSURE TEST PROGRAM
(
)
SME SECTION XI PERIODIC PRESSURE
\\
APPENDIX A TESTING PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 1 AND COMMON Sys Proc Test Class Pressure Test Cat Freq Plant Dwgs UI UI UI UI UI UI UI UI Ut UI Remarks Type Tests Conditions Cond RIS R19 R20 R21 R22 R23 R24 R25 R26 R27 TEST DESCRIPTION: Functions 1 Pressure Test of Penetration P-33B (Instrumers Air)
PEN APPI F
2 IWA-5211(b)
IWA-5212 C-H 40 B
M-209 Note 2 IWA-5213 Sh. 7,11 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Test of Penetration P-33C (Service Air)
PEN APPJ F
2 IWA-5211(b)
IWA-5212 C-H 40 B
M-209 Note 2 IWA-5213 Sh.1, 2 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIFTION: Functional Pressure Test of Penetration P-30C(Pressurizer Relicf Tank)
PEN APPJ F
2 IWA-5211(b)
IWA-5212 C-H 40 B
541F091 Sh 2 Note 2 IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Test of Penetration P-52 (Auxiliary Steam Supply)
PEN APPJ F
2 IWA-5211(b)
IWA-5212 C-H 40 B
M-214 Sh i Note 2 IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TE3T DESCRIPTION: Functional Pressure Test of Penetration P@ (Reactor Coolant Drain Tank)
PEN APP J F
2 IWA-5211(b)
IWA-5212 C-H 40 B
684J971 Note 2 IWA-5213 sh. I A IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Test of Penetration P-VI PEN APP J F
2 IWA-52!!(b)
IWA-5212 C-H 40 B
M-215 Sh 1 Note 2 IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 Page 9 of 19
/"
N INT BEACH NUCLEAR PLANT
(
PRESSURE TEST PROGRAM
'j SME SECTION XI PERIODIC PRESSURE APPENDIX A TESTING PROGRAM THIRD INTERVAL Revision 1 December 14,1993 PROGRAM SCHEDULE UNIT 1 AND COMMON Sys Proc Test Cissa Pressure Test Cat Freq Plant Dwgs UI UI Ut UI Ut Ut UI UI UI UI Remerts Type Tests Conditions cond RIS R19 R20 R21 R22 R23 R24 R25 R26 R27 TEST DESCRIPTION: Furstional Pressure Test of Penetration P-12C (Containmera Vent Hender)
PEN APPJ F
2 IWA-5211(b)
IWA-5212 C-H 40 B
684J971 Note 2 IWA-5213 sh. I A IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Test of Penetration P-X2 PEN APPJ F
2 IWA-5211(b)
IWA-5212 C-H 40 B
M 215 Sh 2 Nose 2 IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Test of Perwtration P-V2 PEN APPI F
2 IWA-5211(b)
IWA-5212 C-H 40 B
M-215 Sh i Nose 2 IWA-5213 IWA-5211(d)
TEST DESCRIPTION: Functonal Pressure Test of Penetration P-28D (Dead Weight Teater Line)
PEN APPJ F
2 IWA-5211(b)
IWA-5212 C-H 40 B
M-215 Sh l Note 2 IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Test of Penetration P-34A (Pressurizer Relief Tank Gas)
PEN APP J F
2 IWA-5211(b)
IWA-5212 C-H 40 B
641F091 Sh 2 Nose 2 IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functenal Pressure Test of Penetration P-XI PEN APPJ F
2 IWA-5211(b)
IWA-5212 C-H 40 B
M-215 Sh 2 Note 2 IWA-5213 IWA-5211(d)
IWC-5220 J
IWC-5210 IWC-5230
~ Pege 10 of 19
~
m m
- m INT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM L SME SECTION XI PERIODIC PRESSURE APPENDIX A TESTING PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE 3
UNIT 1 AND COMMON Sys Proc Ted Claan Pressure Test Cat Freq Plant Dwgs Ut UI U1 UI Ut Ut UI Ut UI UI Remarks t
Type Tests Conditions Coad RI8 R19 R20 R21 R22 R23 R24 R25 R26 R27 4
TEST DESCRIPTION: Functional Pressure Test of Penetration P-34D (Reactor Coolant Drain Tank)
PEN APP J F
2 IWA-5211(b)
IWA-5212 C-H 40 B
6841971 Note 2 -
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIFflON: Functional Pressure Tem of Penetration P-53 (Condensate Return)
PEN APPJ' F
2 IWA-52il(b)
IWA-5212 '
C-H 40 B
M-214 Sh i Note 2 IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-4230 TIST DESCRIPTION: Functional Pressure Test of Penetration P-12A (De-lordzed Water)
PEN-APP J F
2 IWA-5211(b)
IWA-5212 C-H 40 B
PBM-231 Note 2 IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Test of Penetration P-14 A (Pressurizer Relief Tank)
PEN APP J F
2 IWA-5211(b)
IWA-5212 C-H 40 B
541F094 Sh 2 Note 2 IWA-5213 IWA-5211(d)
TEST DESCRIPTION: Hydrostatic Preswire Test of Penetration P-X1 PEN APPJ H
2 IWA-5211(b)
IWA-5212 C-H 120 B
M-215 Sh 2 Note 2 l
IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCP!FTION: Hydrostatic Pressure Test of Penetration P-28D (Dead Weight Temer Ilne)
PEN APP J
.H 2-IWA-5211(b)
IWA-5212 :
C-H 120 B.
M-215 sh 1 Note 2 IWA-5213
(
IWC-5220 IWC-5210 IWC-5230 Page 11 of 19
7 m
INT BEACH NUCLEAR PLANT f
PRESSURE TEST PROGRAM -
SME SECTION XI PERIODIC PRESSURE
\\
APPENDIX A TESTING PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 1 AND COMMON Sys Proc Test Class Presmre Test Cat Freq Piart Dwgs UI UI UI UI UI UI Ut Ut UI UI Reniseks Type Tests Conditions Cond R18 R19 R20 R21 R22 R23 R24 R25 R26 R27 TEST DESCRIPTION: Hydrostatic Pressure Test of Penetration P-53 (Condensate Return) i PEN APPJ H
2 IWA-5211(b)
IWA-5212 C-II 120 B
M-214 Sh l Note 2 IWA-5213 IWA-5211(d)
~
IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of Penetration P-12A (De-Ionized Water)
PEN APPJ H
2 IWA-5211(b)
IWA-5212 C-H 120 B
PBM-231 Nose 2 IWA-5213 IWA-52 t l(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of Penetration P-Vi l
PEN APP J H
2 IWA-5211(b)
IWA-5212 C-II 120 B
M-215 Sh 1 Note 2 IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of Penetration P-V2 PEN APPJ H
2.
IWA-52tl(b)
IWA-5212 C-II 120 B
M-215 Sh l Nose 2 IWA-5213 IWA-52II(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Ilydrostatic Pressure Teet of Penettstion '-X2 PEN APPJ H
2 IWA-3211(b)
IWA-5212 C-H 120 B
M-215 Sh 2 Note 2 IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of Penetration P-30C (Pretsurizer Relief Tank)
PEN APPJ H
2 IWA-5211(b)
IWA-5212 C-Il 120 B
$41I99t Sh 2 Nose 2 IWA-5213 IWA-52tl(d)
IWC-5220 IWC-5210 IWC-5230 Page 12 0f 19
INT BEACII NUCLEAR PLANT l
i PRESSURE TEST PROGRAM
(
SME SECTION XI PERIODIC PRESSURE V
APPENDIX A TESTING PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT I AND COMMON Sys Proc Test Class Pnnsun Test Cat Freq Ptars Dwg UI UI UI Ut UI UI Ut Ut UI UI Remarks Type Tests Cmutions Cond RIS R19 R20 R21 R22 R23 R24 R25 R26 R27 TEST DESCRIPTION: Hydromatic Pressure Test of Penetration P-71 (Containmers Sump Discharge)
PEN APP J H
2 IWA-5211(b)
IWA-5212 C-H 120 B
6841971 Note 2 IWA-5213 Sh.IA IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of Penetration P-12C (Centainmern Vent Header)
PEN APP J H
2 IWA-5211(b)
IWA-5212 C-II 120 B
6841971 Note 2 IWA-5213 Sh. I A IWA-521I(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pnssure Test of Penetration P-09 (Reactor Caulant Drain Tank)
PEN APPJ H
2 IWA-5211(b)
IWA-5212 C-H 120 B
684J971 Ncte 2 IW *-5' 8 3 Sh. I A
!WA-5211(d)
IW -5120 IWC-5210
"' 5e30 TEST DESCRIPTION: Hydrosratic Pressure Test of Penetration
- y N Ctolare Drain Tank)
PEN APP J H
2 IWA-5211(b)
IWA.
- I
(
'{
120 B
6841971 Note 2 IWA-5.
- Sh.1A IWA-521 f(d)
IWC-5220 l
IWC-5210 IWC-5230 TEST DESCRIPTION: Hydreastic Pressure Test of Penetration P-14A (Pressurizer Relief Tank)
PEN APP J H
2 IWA-5211(b)
IWA-5212 C-H 120 B
54IF091 Sh 2 Note 2 IWA-5213 PWA-5211(d)
IWC-5220 IWC-5210 f IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of Penetration P-34A (Pressurizer Relief Tank Ges)
PEN APPJ H
2 IWA-5211(b)
IWA-5212 C-II 120 B
$41F0915h 2 Nae 2 IWA-5213 IWA-521I(d)
IWC-5220 IWC-5210 IWC-5230 Page 13 of 19
INT BEACH NUCLEAR PLANT.
PRESSURE TEST PROGRAM SME SECTION XI PERIODIC PRESSURE APPENDIX A TESTING PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT I AND COMMON Sys Proc Test Class Pressure Test Cat Freq Plant Dwas UI UI UI UI Ut Ut UI UI UI UI Remarks Type Tests conditions Cend R18 R19 R20 R21 R22 R23 R24 R25 R26 R27 TEST DESCRIPTION: Pneutnatic Pressure Test of Penetration P-33C (Service Air)
PEN APPJ P
2 IWA-5211(b)
IWA-5212 C-H 120 B
M-209 Note 2 IWA-5213 Sh.1, 2 IWA-52II(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Pneumatic Pressure Test of Penetration P-33 A (Indrumes Air)
PEN APPI P
.2 IWA-52il(b)
IWA-5212 C-H 120 B
M-209 Nose 2 IWA-5213 Sh.7,1I IWA-52II(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Pneumatic Pressure Test of Penetration P-33B (Instrumem Air)
PEN APP I P
2 IWA-52t l(b)
IWA-5212 C-H 120 B
M-209 Note 2 IWA-5213 Sh.7,11 IWA-52II(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of the Reactor Coolam and Safety Injection Symems RC fr-1010 H
I IWA-52tl(a)
IWA-5212 B-P 120 B
541F091 X
Nose !
IWC-5220 IWB-5210 IWC-5230 TEST DESCRIPTION: Symem Leakage Test of Class 1 Congonents Following a Refueling Outage RC TT-0230 L
1 IWA-5211(a)
IWA-5212 B-P REF B
541F092 Y
Y Y
X X
X X
X X
IWA-5213 Sh.1,2,3 IWA-52tl(d)
TEST DESCRIPTION: Functional Pressure Test of the Residual Heat Remoral System RHR-TT-530 F
2 IWA-52il(b)
IWA-5212 C-H 40 B
110E018 Sh 1 Y
X IWA-5213 541F092 Sh I IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 Page 14 of 19 i
.;.m._.
..1
... ~...
I 1.
4 -
4 INT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM SME SECTION XI PERIODIC PRESSURE APPENDIX A TESTING PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 1 AND COMMON Sys Pruc Test Class Pressure Ten Cat Freq Ptara Dwgs UI Ut UI UI UI UI UI UI UI UI Remarks Type Tests Conditions Cond R18 R19 R20 R21 R22 R23 -
R24 R25 R26 R27 TEST DESCRIPTION: Ilydrostatic Pressure Tem of the Spers Fuel Cooling System SF rr-!!92 H
3 IWA-5211(b)
IWA-5212 D-C 120 A
Il0E018 Sh 4 X
IWA-5211(c)
IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIFilON: Inservice Pressure Test of the Spent Fuel Cooling System SF TBD I
3 IWA-5211(b)
IWA-5212 D-C 40 A
Il0ED18 Sh 4 X
X IWA-5211(c)
IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIFrlON: Functional Pressure Test of the Spray Additive Tank Piping SIS TT-ill0-2 F
2 IWA-5211(b)
IW A-5212 C-H 40 A
Il0E017 Sh 1 X
X IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Test of Refueling Water Storage Tank Piping SIS Tr-1070 F.
2 IWA-5211(b)
IWA-5212 C-H 40 A
Il0E017 Sh 1 X
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIFFION: Functional Pressure Test of Containmert Sump B Suction Ilne (Refueling Shutdown)
SIS TT-531 F.
2 IWA-5211(b)
IWA-5212 C-H 40 B
110E017 Y
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIFrlON: Functional Pressure Test of the Safety Insectaan System SIS TT-520A F
2 IWA-5211(b)
IWA-5212 C-H 40 B
110E017 Y
X IWA-5213 Sh 1, 2
(
IWA-5211(d)
i Psge 15 of to i
vtN1 HEACH NUCLEAR PLANT -
N ME SECTION XI PERIODIC PRESSURE PRESSURE TEST PROGRAM i
APPENDIX A ING PROGRAM THIRD INTERVAL Revision 1 December 14,1993 PROGRAM SCHEDULE UNIT 1 AND COMMON Sys Proc Test Class Pressure Tea Cat Fieq Piera Dwgs UI UI UI Ut UI UI Ut Ut Ut UI Remarks Type Testa Confitions Cond RIS R19 R20 R21 R22
- R23 R24 R25 R26 R27 ia:s DESCRIPTION: Functional Pressure Tem of the Ce t---.ra Sprey Portion of the Safety injuim Syment SIS fr-540A F
2 IWA-5211(b)
IWA-5212 C-H 40 B
llom17$h 3 Y
X IWA-5213 IWA-52 t l(d)
TEST DESCRIPT10N: Hydrostatic Pressure Tem of Refueling Water Storage Tanic Piping 515 Tr-1070 H
2 IWA-5211(b)
IWA-5212 C-H 120 A
I t0E017 Sh 1 X
IWA-5213 Note 1 '
IWA-52 t l(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Mesure Test of the Sprey Additive Tank Piping
$15 1T-1110-2 H
2, IWA-5211(b)
IWA-5212 C-H 120 A
Il0E017 $h 1 X
IWA-5213 Ncee !
IWA-52II(d)
IWC-5220 IWC-5210 IWC-5230 itst DESCRIPTION: Hydrostatic Pressues Test of the %*einmera Sprey Ps.Go of the Safety Injection System r
t SIS TT-1040 H
2 IWA-5211(b)
IWA-5212 C-H 120 B
110E017 Sh 3
.X IWA-5213 Nose l IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Tem of the SI Symem (SI P-,v Discharge)
SIS Tr-1170-3 H
2 IWA-5211(b)
IWA-5212 C-H 120 B
110E017 X
Nae 1 IWA-5213 Sh 1,2 IWA-3211(d)
IWC-5220 IWC-5210 IWC-5230 T'. ' OESCRIPTION: Hydrostatic Pressure Tem of the rwe,;nment Spray Noozles -(Air Tew) 17 H-2 IWA-5211(b)
IWA-5212 C-H 120 B.
Ilom17Sh 1 X
Nae 1 IWA-5213 IWA-521I(d)
IWC-5220 IWC-5210,
IWC-5230 Page 16 of 19
N INT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM
)
ME SECTION XI PERIODIC PRESSURE APPENDIX A TESTING PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 i
PROGRAM SCHEDULE UNIT 1 AND COMMON Sys Prec Test Class N asure Test Cat Freq Plant Dwgs UI Ut UI UI UI UI UI UI UI UI Remarks Type Testa Conditions cond RIS R19 R20 R21 R22 R23 R24 R25 R26 R27 TEST DESCRIPTION: Ilydrostatic Pressure Test of Containment Sump B Suction Une (Refueling Shutdown)
SIS IT-531 H
2 IWA-5211(b)
IWA-5212 C-H 120 B
110E017 X
Note !
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of the SI system B Accumulator
$13 TBD H
2 IWA-5211(b)
IWA-5212 C-H 120 B
110E017 Sh '.
X Note 1 IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCR13 TION: Hydroststic Pressure Test of the SI system A Accumulator SIS TBD H
2 IWA-5211(b)
IWA-5212 C-H 120 B
110E017 Sh 1 X
Note 1 IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Inservice Pressuis Test of the SI System B Accumulator
$15 TT-520A I
2 IWA-5211(b)
IWA-5212 C-H 40 B
110E017 Sh 1 Y
X IWA-5213 IWA-5211(d)
IWC-5220 l
IWC-5210 IWC-5230 TEST DESCRIPTION: Inservice Pressure Test of the $1 System A Accurmlator SIS TT-520A I
2 IWA-5211(b)
IWA-5212 C-H 40 B
110E017 Sh 1 Y
X IWA-5213 IWA-5211(d)
TEST DESCRIPTION: Hydrostatic Pressure Test Service Water System (Main Supply Imy)
SW TT-Il50-1 H
3-IWA-5211(b)
IWA-5212 D_B 120 A
M-207 5h t-4 X
IWA-521!(c)
IWA-5213 M-208 Sh 2,4 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 Page 17 of 19
r~T.
INT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ME SECTION XI PERIODIC PRESSURE APPENDIX A.
TESTING PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 1 AND COMMON Sys Pme Test Class Presane Test Cat Freq Placa Dwgs UI UI UI UI UI Ut Ut UI Ut UI Remarts Type Tens Conditions Cond RIS R19 R20 R21 R22 R23 R24 R25 R26 R27 TEST DESCRIPTION: Hydmetatic Pressure Test of ee Service Water Symem Inside Cornsinment SW fr-1080-1 H
3 IWA-5211(b)
IWA-5212 D-B 120 B
M-207 Sh 4 X
IWA-5211(c)
IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test Service Water (Coraminmera Cooling SW System)
SW fr 1150-2 H
3 IWA-52t l(b)
IWA-5212 D-B 120 B
M-207 5h 4 X
IWA-5211(c)
IWA-5213 IWA-5211(4)
- SCRIFFION: Inservice Pressure Test of the Service Water System inside Corsainment SW.
IT-1080-1 I
3 IWA-52]I(b)
IWA-5212 D-B 40 B
M-207 Sh 4 Y
X IWA-5211(c)
. IWA-5213 IWA-5211(d)
IWC-5220 l
IWC-5210 IWC-5230 TEST DESCRIPTION: Inservice Pressure Test of the Gas Decay System WG TBD I
3 IWA-5211(b)
IWA-5212 D-A 40 A
684J972 Sh 1 X
X IWA-5211(c)
IWA-5213 PBM-129 sh 1 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIFriON: Pneumatic Pressure Test of Gas Decay Tanks T-20A and B WG TT-1133-1 P
3 IWA-5211(b)
IWA-5212 D-A 120 A.
684J972 Sh 1 X
IWA-5211(c)
IWA-5213 PBM-229 Sh I IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 Page 18 of 19
~
m.
INT BEACH' NUCLEAR PLANT
[,
PRESSURE TEST PROGRAM ~
)'
~
ME SECTION XI PERIODIC PRESSURE APPENDIX A TESTING PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 m
1 PROGRAM SCHEDULE UNIT.1 AND COMMON Y
Sys Proc Ten Class Pressure Test Cat Freg Ptars Dwgs UI Ut UI Ut UI UI Ut Ut UI U1 Remarks Type Tens Conditions Cond Rlt R19 R20 R21 R22 R23 R24 R25 R26 R27 TEST DESCRIFilON: Pneumatic Pressure Ten of One Decay Tanks T-20C and D WO 1T-1133-2 P
3 IWA-5211(b)
6841972 Sh 1 X
IWA-5211(c)
IWA-5213 PBM-229 Sh 1 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 REMARKS
' Note 1: ASME Code Case N-498.
Nose 2: Containtness fa a.&w are tested unter the 10 CFR 50, Appenfix J, teming program. Duplicate teming under the ASME Sectmo XI Preneure Teming Program is as performed. See Relief Reques PTP-3 02 (Appendix C).
Nose 3: Tem performed during UlR20 accounplished under MW1930445.
l Page 19 of 19 I
l
- - - ~
=-
POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC APPENDIX B -
PRESSURE TEST PROGRAM Revision 1 THIRD INTERVAL December 14, 1993 PROGRAM SCHEDULE UNIT 2 i
The database shown is a schedule for the implementation of the pressure test pregem for PBNP Unit 2. Preceding the table is a brief description of the fields that are used in the Umt 2 program.
I FIELD NAME DESCRIPTION l
TEST Description of the type of test to be performed and an explanation of what l
DESCRIPTION system / component the test pertains to.
SYSTEM A portion of the plant that performs a particular function and is usually identified by an acronym of the function performed.
- Auxiliary Feedwater RC Reactor Coolant f
- Component Cooling Water -
RIIR - Residual Heat Removal CVC - Chemical & Volume Control SC Sampling DA
- Diesel Air Start SIS Safety Injection FO
- Fuel Oil SF Spent Fuel II2V - Hydrogen Venting SW - Service Water MS - Main Steam WG - Waste Gas PEN - Containment Penetrations PROCEDURE Pressure test procedure number. Several test procedures may be required to examine a single system. Likewise, a single test procedure may encompass multiple systems.
An indication of "TBD" denotes that the procedure number has not yet been assigned. An indication of "MWR" denotes that the test is accomplished under a maintenance work request and associated work plan. " APP J" denotes that testing is accomplished under the 10 CFR 50, Appendix J, testing program.
[
TEST TYPE Indication of the type of test to be performed.
-l F = Functional II = Hydrostatic j
I = Inservice P = Pneumatic Page 1 of 18 i
POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC APPENDIX B PRESSURE TEST PROGRAM Revision 1 THIRD INTERVAL December 14, 1993 PROGRAM SCHEDULE UNIT 2 CLASS The classification of a component for ISI as outlined in the " Basis for ASME Section XI Classification Boundaries" for the Third Inspection Interval (Units 1 and 2).
1
= ASME CLASS 1 2
= ASME CLASS 2 3
=.ASME CLASS 3 l
2/3 = ASME CLASS 2 and 3 PRESSURE TESTS ASME Section XI Pressure Test Requirements.
TEST ASME Section XI Pressure Test Conditions.
CONDITIONS CATEGORY ASME Section XI Category. A category of " MULTI" is used for a test that-encompasses more than one examination category.
PREQUENCY Indication of the frequency (in months) at which the system and/or component is required to be tested under the respective ten-year interval.
.40 = 40 month interval 120 = 120 month interval (once during ten-year interval).
i PLANT Special plant conditions required to complete the test procedure.
CONDITIONS A = No Special Conditions Required B = Refueling Outage C = Defueled j
DRAWINGS The Primary P&ID drawings of the system / component to be tested.
OUTAGE Relates to the designated outages within the inspection interval. Note that test SCHEDULE procedures which due not require an outage condition to accomplish may be e
performed at any time during the calendar year of the outage specified.
X
= Exam Due
.Y
= Exam Satisfactorily Completed l
= No Exam Scheduled '
REMARKS Notes relating to the exam / test. This field may include such references as l
relief request numbers, MWR numbers, IDR numbers, indication of ASME
~
Code Case N-498 Reference, exam notes, and procedure notes.
Page 2 of 18
INT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM -
SME SECTION XI PERIODIC PRESSURE APPENDIX B -
TEST PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 2 Sys Proc Ted Claes Pressure Test Cat Freq Plant Dwgs U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 Remarks Type Tests Conditions Cond R19 R20 R21 R22 R23 R24 R25 R26 R27 R28 TEST DESCRIPTION: Functional Pressure Tea of the Turbine Ddven Auxiliary Feedwater Pump 2P-29 AF IT-295 F
3 IWA-5211(b)
IWA-5212 '
D-A 40 B
M-217 X
X IWA-5211(c)
IWA-5213 Sh 1 IWA-52II(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIITION: Hydrostatic Pressure Test of the Clas 2 2 Portion of Main and Auxiliary Feedwater AF TBD H
2 IWA-5211(b)
IWA-5211(b)
C-H 120 B
M-217 X
Note 1 IWA-5211(c)
Sh 1 IWA-52II(d)
IWA-52II(d)
M-2202 IWC-5210 IWC-5210 Sh 2 TEST DESCRIPTION: Hydrostatic Presmre Test of the Auxiliary Feedwater Suction Piping r
AF fr-1095-1 H
3 IWA-5211(b)
IWA-5212 D-A 120 B
M-217 X-IWA-52il(c)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of the Auxiliary Feedwater Discharge Piping AF IT-1095-3 H
3 IWA-5211(b)
IWA-5212 D-A 120 B
M-217 X
IWA-5211(c)
IWA-5213 Sh I IWA-52I1(d)
1 Page 3 of IS
f INT BEACH NUCLEAR PLANT-PRESSURE TEST PROGRAM SME SECTION XI PERIODIC PRESSURE v
APPENDIX B c
TEST PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 2 Sys Proc Ten Class Pressure Ten Cat Freq Plant Dwas U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 Remarks Type Tens Conditions Cond Rl9 R20 R21 R22 R23 R24 R25 R26 R27 R28 TEST DESCRIPTION: Inaervice FressureTem of the clans 2 Portion of the Main and Auxiliary Feedwater AF fr-295 I
2 IWA-5211(b)
IWA-5212 C-H 40 B
M-217 X
IWC-5230 Sh I TEST DESCRIPTION: Hydrostatic Pressure Tem of the Componera Cooling Symem Iriside Containment CC TBD H
2 IWA-5211(b)
IWA-5212 C-H 120 B
110E029 X
Nste 1 IWA-5213 Sh 2 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Tem of the Corryonent Cooling System Outside Containment CC TBD H
2 IWA-5211(b)
IWA-5212 C-H 120 B
Il0E029 X
Note 1 IWA-5211(c)
IWA-5213 Sh 1, 2, 3 IWA-521I(d)
IWC,D-5220 IWC,D-5210 IWC D-5230 TEST DESCRIFilON: Hydromatic Prer.sure Tem of the 1P-I A RCP Component Cooling Water System CC IT-1195-4 H
2 IWA-5211(b)
IWA-5212 -
CH 120 C
ll0E029 X
Nose I -
IWA-5213 Sh 1. 2,3 IWA-5211(d)
IWC-5220 PBM-230 IWC-5210 IWC-5230 t
Pege 4 of 18
INT BEACH NUCLEAR PLANT PRESSURE TEST h)ROGRAM ME SECTION XI PERIODIC PRESSURE APPENDIX B TEST PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 2 Sys Proc Test Class Pressure Test Cat Freq -
Plant Dwgs U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 Remarks Type Tema Conditions Cond R19 R20 R21 R22 R23 R24 R25 R26 R27-R28 TEST DESCRD' TION: Ineervice pressure Test of the Cornponent Cooling System Inside Corsainmera CC fr-1125-1 1
2 IWA-5211(b)
IWA-5212 C-H 40 B
110E029 Y
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: laservice Pressure Tem of the Componem Cooling Symem outside Corsainment CC fr-Il25-2 I
2 IWA-5211(b)
' IWA-5212 C-H 40 A
Il0E029 X
X IWA-5211(c)
IWA-5213 Sh 1, 2, 3 IWA-52 t i(d)
IWC,D-5220 PBM-230 IWC D-5210 IWC.D-5230 TEST DESCRIPTION: Inservice Pressure Test of the Chemical and Volume Comrol System Outside Containment CVC TBD I
2 IWA-5211(b)
IWA-5212 C-H 40 E
685J175 X
X IWA-5213 sh 1, 2 IWA-5211(d)
IWC-5220 541F448 IWC-5210 IWC-5230 684J961 Sh 2 684J972 4-Sh 3 PBM-226 TEST DESCRIPTION: Innervice Pressure Test of the Chemical and Volume Cortrol System inside Contauuneat
~
CVC TBD I
2 IWA-5211(b)
IWA-5212 C-H 40 B
685J175 X
X IWA-5213 Sh 2 j
IWA-52II(d)
Page 5 of 18
... _. -...~,
.m..
INT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM SME SECTION XI PERIODIC PRESSURE APPENDIX B TEST PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 2 Sys Proc Test Class Pressure Ten Cat Freq liarut Dwas U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 Remarts Type Tens Conditions Cond R19 R20 R21 R22 R23 R24 R25 R26 R27 R28 TEST DESCRIPTION: Hydmetatic Pressure Test of the Chemical and Volume Contml Symem outside Containment CVC TBD H
2 IWA-5211(b)
IWA-5212 C-H 120 B
685J175 X
Note !
IWA-5213 Sh 1,2 IWA-52il(d)
IWC-5220 541F448 IWC-5210 IWC-5230 6841961 sh 2 684J972 Sh 3 PBM-226 TEST DESCRIPTION: Hydrostatic Pressure Test of the Chemical and Volume Contml System Outside Containment CVC.
TBD H
2 IWA-5211(b)
IWA-5212 C-H 120 8
6851175 X
Note 1 IWA-5213 Sh 2 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TE3T DESCRWilON: Pneumatic Pressure Test of the Post Accident Containmera Venting and Monitoring System H2V TBD P
2 IWA-5211(b)
IWA-5212 C-H 120 B
M-224 X
Note i IWA-5213 IWA-5211(d)
TEST DESCRIPTION: Functional Pressure Test of the Main Steam System to the Terry Turbine Outside Containmers MS Tr-295 F
2 IWA-5211(b)
IWA-5212 C-H 40 B
M-2201 X
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Test of the Main Steam System to the Terry Turbine Inside Containmers MS IT-295 F
2 IWA-5211(b)
'C-H 40 B
M 2201 X
IWC-5220 IWC-5210 IWC-5230 Page 6 of 18
.~,
INT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM SME SECTION XI PERIODIC PRESSURE APPENDIX B TEST PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 2 Sys Proc Test Class Preseu o Tea Cat Freq I%t Dwgs U2 U2 U2 U2 U2 U2 U2 U2 U2 U2-Remarks Ty,w Tens Conditions cond R19 R20 R21 R22 R23 R24 R25 R26 R27 R28 TEST DESCRIPTION: Hydrostatic Pressure Tem of the Main Steam Symem to the Terry Tbrbine (2P-29) Outside MS..
fr-295 H
2 IWA-5211(b)
IWA-5212 C-H 120 B
M-2201 f-X Note i IWA-5213 Sh 1 IWA-5211(d)
l TEST DESCRIP110N: Hydmetatic Pressure Test of the Main Steam Symem to the Terry Turbine (IP-29) I, side I
MS IT-295 H
2 IWA-52 t i(b)
IWA-5212 C-H 120 B
M-2201 X
Note 1 IWA-5213 Sh i IWA-5211(d)
TEST DESCRIPTION: Functional Pressure Test af Penetration P-V2 PEN APPJ F
2 IWA-5211(b)
IWA-5212 C-H 40 B
M-2215 Note 2 IWA-5213 0- 1 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functmnal Pressure Test of Penetration P-71 (Cornainment Sump Discharge)
PEN APPJ F
2 IWA-5211(b)
IWA-5212 C-H 40 B
684J971 Note 2 IWA-5213 Sh I A IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Test of Penetration P-53 (Condensate Return)
PEN APPJ F
2 IWA-5211(b)
IWA-5212 C-H 40 B
M-2214 Nose 2 IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 Page 7 er 18
s m
INT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ME SECTION XI PERIODIC PRESSURE APPENDIX B TEST PROGRAM THIRD INTERVAL Revision 1-December 14, 1993 PROGRAM SCHEDULE UNIT 2 Sys Proc Tea Cisse Pressure Test Cat Freq Ptars Dwas U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 Remarks Type Tests ~
Conditions Cond R19 R20 R21 R22 R23 R24 R25 R26 R27 R28 TEST DESCRIPTION: Functional Pressure Test of Penetration P-52 (Auxiliary Steam Supply) -
PEN APPJ F
2 IWA-5211(b)
IWA-5212 C-H 40 B
M-2214 Note 2 IWA-5213 IWA-52tl(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functions] Nasure Test of Penetration P-34D (Reactor Coolant Drain Tank)
PEN APPJ F
2 IWA-5211(b)
IWA-5212 C-H 40 B
684J971 Note 2 IWA-5213 Sh IA IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Test of Penetration P-34A (Pressurizer Relief Tank Ges)
PEN APP J F
2 IWA-5211(b)
IWA-5212 C-H 40 B
541F445 Note 2 IWA-5213 Sh 2 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Test of Penetration P-33C (Service Air)
PEN APPJ F
2 IWA-5211(b)
IWA-5212 C-H 40 B
M-209 5h Noss 2 IWA-5213 1, 2 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Furetional Pressure Test of Penetration P-33B (Instrurnent Air)
PEN APPJ F
2
. IWA-3211(b)
IWA-5212 C-H 40 B
M-209 Note 2 IWA-5213 Sh 7,11 o
IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 Pege 8 of 18
f.-q INT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM 4
ME SECTION XI PERIODIC PRESSURE APPENDIX B.
TEST PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 2.
Sys Proe Test Class Pressure Test Cat Fmi Flant Dwas U2 U2 U2 U2 U2 U2 U2 U2-U2 U2 Remerts Type Tests Conditions Cood R19 R20 R21 R22 R23 R24 R25 R26 R27 R28 TEST DESCRIFilON: Functional Pressure Test of Penetration P-33A (Instrument Air)
PEN APP J F
2 IWA-5211(b)
IWA-$212 C-H 40 B
M-209 Note 2 IWA-5213 Sh 7,11 IWA 5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPT10N: Functional Pres?vre Tem of Penetration P-30C (Nasurizer Relief Tank)
PEN APPJ F
2 IWA-5211(b) -
IWA-5212 C-H 40 B
541F445 Nose 2 IWA 5213 sh 2 IWA-521I(d)
IWC-5220 l
IWC-5210 IWC-5230 TEST DESCRIPIlON: Functional Pressure Test of Penetration P-28D (Dead Weight Tester Line)
PEN APPJ F
2 IWA-5211(b)
IWA-5212 C-H 40 B
M-2215 Nose 2
' lWA-5213 Sh I IWA-52I1(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Test of Penetration P-14 A (Pressurizer Relief Tank)
PEN APP J F
2 IWA-5211(b)
IWA-5212 C-H 40 B
541F445 Note 2 IWA-5213 sh 2 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Funeicnal Pressure Test of Penetration P-12C (Containment Vent Header)
PEN APP J F
2 IWA-5211(b)
IWA-5212 C-H.
40 B
684J971 Nose 2 IWA-5213 Sh I A IWA-5211(d)
IWC-5220 IWC-5210 '
IWC-5230 Page 9 of I8
.. - ~ - - --
p OINT BEACH NUCLEAR PLANT l
)
PRESSURE TEST PROGRAM
(
)
\\
s"/
SME SECTION XI PERIODIC PRESSURE
'v'-
APPENDIX B TEST PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 2 Sys Proc Test Class Pressure Test Cat Freq Plant Dwgs U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 Remarks Type Tests Conditions Cond R19 R20 R21 R22 R23 R24 R25 R26 R27 R28 TEST DESCRIPTION: Functional Pressure Tem of Penetration P-12A (De-lonized Water)
PEN APPJ F
2 IWA-5211(b)
IWA-5212 C-H 40 B
PBM-231 Note 2 IWA-5213 IWA-52il(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRII' TION: Functional Pressure Test of Penetration P-09 (Reactor Coolant Drain Tank)
PEN APP J F
2 IWA-52 t l(b)
IWA-5212 C-H 40 B
684J971 Note 2 IWA-5213 Sh I A IWA-5211(d) twC-5220 IWC-5210 IWC-5230 TEST DESCRH' TION: Functional Pressure Test of Penetration P-VI PEN APP J F
2 IWA-5211(b)
IWA-5212 C-H 40 B
M-2215 Note 2 IWA-5213 Sh 1 IWA-52I1(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRH' TION: Functional Pressure Test of Penetration P-X2 PEN APP J F
2 IWA-5211(b)
IWA-5212 C-H 40 B
M-2215 Note 2 IWA-5213 Sh 2 IWA-52II(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of Penetration P-X2 PEN APPJ H
2 IWA-5211(b)
IWA-5212 C-H 120 B
M-2215 Note 2 IWA-5213 Sh 2 IWA-5211(d)
Page 10 of 18
(V)
PRESSURE TEST PROGRAM I
OINT BEACH NUCLEAR PLANT APPENDIX B
'd SME SECTION XI PERIODIC PRESSURE TEST PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 2 Sys Proc Ten Class Preuure Test Cat Freq Piers Dwgs U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 Remarts Type Tens Conditions Cond R19 R20 R21 R22 R23 R24 R25 R26 R27 R28 TEST DESCRIPTION: Hydrostatic Pressure Test of Penetration P-X1 PEN APP J H
2 IWA-5211(b)
IWA-5212 C-H 120 B
M-2215 Note 2 IWA-5213 Sh 2 IWA-5211(d)
IWC-5220 I
IWC-5210 IWC-5230 TEST DESCRIPTION: Hydromatic Pressure Test of Penetration P-V2 PEN APP J H
2 IWA-5211(b)
IWA-3212 C-H 120 B
M-2215 Note 2 IWA-5213 Sh 1 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of Penetration P-33B (Instrument Air)
PEN APPJ H
2 IWA-52il(b)
IWA-5212 C-H 120 B
M-209 Note 2 IWA-5213 Sh 7,11 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TE5T DESCRIPTION: Hydromatie preneure Test of Penettstion P-09 (Reactor Coolara Drain Tank)
PEN APPJ H
2 IWA-5211(b)
IWA-5212 C-H 120 B
6841971 Note 2 IWA-5213 Sh I A IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Prea.sna Test of Penetration P-52 (Condeneste Return)
PEN APPJ H
2 IWA-5211(b)
IWA-5212 C-H 120 B
M-2214 Note 2 IWA-5213 IWA-521I(d)
IWC-5220 IWC-5210 IWC-5230 Page 11 o f 18
(V)
PRESSURE TEST PROGRAM
(
)
OINT BEACH NUCLEAR PLANT SME SECTION XI PERIODIC PRESSURE APPENDIX B C'
TEST PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 2 Sys Proc Ten Class Pressure Ten Cat Freq Plant Dwg U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 Remarks Type Tests Conditions Cond R19 R20 R21 R22 R23 R24 R15 R26 R27 R28 TEST DESCRIFFION: PrjrMstic P: essure Test of Penetration P-28D (Dead Weight Tester une)
PEN APP J H
2 IWA-5211(b)
IWA-5212 C-H 120 B
M-2215 Note l IWA-5213 Sh i IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of Penetration P-12A (De-lonized Water)
PEN AFP J H
2 IWA-5211(b)
IWA-5212 C-H 120 B
PBM-231 Note 2 IWA-5213 IWA-52II(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydmetatic Pressure Test of Penetration P-52 (Auxiliary Steam Supply)
PEN AFP J H
2 IWA-5211(b)
IWA-5212 C-H 120 B
M-2214 Note 2 IWA-5213 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydromade Precoure Test of Penetration P-12C (Containment Vent Header)
PEN APP J H
2 IWA-5211(b)
IWA-5212 C-H 120 B
684J971 Note 2 IWA-5213 Sh 1A IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrosa:ic Pressure Test of Penetration P-14A (Pressurizer Relief Tank)
PEN APP J H
2 IWA-5211(b)
IWA-5212 C-H 120 B
541F445 Note 2 IWA-5213 Sh 2 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 Psge 12 of I8
INT BEACH NUCLEAR PLANT
. PRESSURE TEST PROGRAM SME SECTION XI PERIODIC PRESSURE APPENDIX B TEST PROGRAM THIRD INTERVAL Revision I December 14, 1993 PROGRAM SCHEDULE
..~e UNIT 2 Syr Pme Test Class Pressure Test Cat Freq Plant Dwgs U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 Renserts Type Tests Conditions Cond R19 R20 R21 R22 R23 R24 R25 R26 R27 R28 TEST DESCRIPTION: Hydrostatic Pressure Test of Penetration P-V1 PEN APPJ H
2 IWA-5211(b)
IWA-5212 C-H 120 B
M-2215 Nose 2 IWA-5213 Sh I IWA-5211(d)
IWC-5220 -
IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of Penetration P-71 (Containmern Surne Discharge)
PEN APPI H
2 IWA-5211(b)
IWA-5212 C-H 120 B
684!971 Nose 2 IWA-5213 Sh 1 A IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydmetatic Pressure Test of Penetration P-30C (Pressurizer Relief Tank)
PEN APP J H
2 IWA-5211(b)
IWA-5212 C-H 120 B
541F445 Note 2 IWA-5213 sh 2 IWA-5211(d)
IWC 5220 IWC-5210 IWC-5230 TEST DESCRIFTION: Hydrostatic Pressure Tess of Penetration P 34D (Reactor Coolant Drain Tank) i PEN APP J H
2.
IWA-3211(b)
IWA-5212 '
C-H 120 B
6841971 Nose 2 IWA-5213 Sh I A IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Preesure Test of Penetration P-33A (Instrumers Air)
PEN APP J H
2 IWA-52tl(b)
IWA-5212 C&H 120 B
M-209 Ncee 2 IWA-5213 Sh 7.11 IWA-5211(d)
4 i
Page 13 of 18 '
1
.m.
,, ~.. _.. - _...,
OINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM SME SECTION XI PERIODIC PRESSURE APPENDIX B TEST PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 2 Sys Proc
-Ten Close Pressure Test Cat Freq Plant Dwas U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 Remarks Type Tess Corahtions Cormi R19 R20 R21 R22 R23 R24 R25 R26 R27 R28 TEST DESCRIPTION: Hydrostatic Pressure Test of Penetration P-34A (Pressurizer Relief Tank Gas)
PEN APPJ H
2 IWA-5211(b)
IWA-5212 C-H 120 B
541F445 Note 2 IWA-5213 sh 2 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of Penetretion P-33C (Sersice Air)
PEN APPJ H
2 IWA-5211(b)
IWA-5212 C-H 120 B
M-209 Note 2 IWA-5213 sh 1, 2 IWA-5211(d) -
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of the Reactor Coolant and Safety Injection Systems I
RC IT-1015 H
I IWA-5211(a)
IWA-5212 B-P 120 B
341F445 X
Note 1 4
IWA-5213 Sh 1, 2, 3 IWA-52II(d)
TWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: System Leakage Test of Class 1 Components Followirqt a Refueling Outage r
RC Tr-0235 L
1 IWA-5211(a)
IWA-5212 B-P REF B
541F445 Y
X X
X X
X X
X X
IWA-5213 Sh 1, 2. 3 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Test of the Residual Heat Reinoval System
(* Arta
)
tr-535 F
2 IWA-5211(b)
IWA-5212 C-H 40 B
110E029 X
IWC-5220 541F448 IWC-5210 IWC-5230 Page 14 of 18
p INT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM L
SME SECTION XI PERIODIC PRESSURE.
APPENDIX ' B
~
TEST PROGRA.M THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 2 Sys Proc Test Class Pressure Test Cat Freq Plant Dwgs
'U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 Remaria Type Tests Cormiitions Coral R19 R20 R21 R22 R23 R24 R25 R26 R27 R28
. j.
TEST DESCRIFTION: Hydecatatic Pressare Test of the Residual Heat Remova! System RHR fr-1035-H 2
IWA-5211(b)
IWA-5212 C-H 120 B
110E029 X
Note !
IWA-5213 sh !
IWA-5211(d)
IWC-5220 541F448 f
IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pre.sure Test of Refueling Water Storage Tank Piping SIS TT-1075 F
2 IWA-5211(b)
IWA-5212 C-H 40 A
Il0E035 X
X IWA-5213 sh !
IWA.5211(d)
TEST DESCRIPTION: Functional Pmasure Test of the Spray Additive Tank Piping l
2 IWA-5211(b)
IWA-5212 C-H 40 A
!!0ED35 X
IWC-5220 IWC-5210
' IWC-5230 l
TEST DESCRIPTION: Functional Pressure Test of the Safety Injection System in TT-525A F
2 IWA-5211(b)
IWA-5212 C-H 40 B
!!OE035 X
X IW A-5213 Sh 1,2 IWA-5211(d)
IWC-5220 l
IWC.5210 -
IWC-5230 r
TEST DESCRIPTION: Functional Pressurs Test of the Containmerd Spray Portion of the Safety Injection System SIS IT-545A F
2 IWA-5211(b)
IWA-5212 C-H 40 B
110E035 X
~-
X IWA-5213 sh 3 IWA4211(d)
Page 15 of 18
..-...... - -..- _.-.. ~, - - - -. E,'. :., :
.e..
.a.
, + -.
o INT BEACH NUCLEAR PLANT I
PRESSURE TEST PROGRAM SME SECTION XI PERIODIC PRESSURE APPENDIX B TEST PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 2 Sys Proc Test Class Pressum Test Cat Freq Plant Dwas U2 U2 U2 U2 U2 U2 U2 U2 -
U2 U2 Remarks '
Type Tens Conditions Cond R19 R20 R21 R22 R23 R24 R25 R26 R27 R28 TEST DESCRIPTION: Functional Presourc Test of Containment Sump B Suction Line SIS IT-536 F
2 IWA-5211(b)
IWA-5212 C-H 40 B
110E035 Y
X IWA-5213 Sh 1, 2 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of Refueling Water Storage Tank Piping i
SIS Tr-IO75 H
2 IWA-5211(b)
IWA-5212 C-H 120 A
Il0E035 X
Nose 1 IWA-5213 Sh 1 IWA-521I(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Tem of the Spray Additive Tank Piping SIS TBD H
2 IWA-5211(b)
IWA-5212 C-H 120 A
Il0E035 X
Note 1 IWA 5213 Sh 1 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydruetatic Pressure Tem of the Containment Spray Portion of t!w Safety Injection Symem SIS TT-1045 H
2 IWA-5211(b)
IWA-5212 C-H 120 B
110E035 X
Nose i IWA-5213 Sh 3 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of Corsainment Sump B Suction Une SIS TBD H
2 IWA-5211(b)
IWA-5212 C-H 120 B
110E035 X
Note 1 IWA-5213 Sh 1,2 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 Page 16 of 18
- ~ -.
R4T BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM SME SECTION XI PERIODIC PRESSURE APPENDIX B TEST PROGRAM THIRD INTERVAL Revision 1 December 14,1993 PROGRAM SCHEDULE UNIT 2 Sys Proc Test Class Pressare Test Cat Freq Plant Dwgs 12 U2 U2 U2 U2 U2 U2 U2 U2 U2 Remorts Type Teas Ccmditions Cond R19 R20 R21 R22 R23 R24 R25 R26 R27 R28 TEST DESCRIPTION: Hydrostatic Pressure Tem of the SI Symem A Accumulator SIS TBD H
2 IWA-52tl(b)
IWA-5212 C-H 120 B
110ED35 X
Note 1 IWA-5213 sh 1 IWA-52I1(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of the SI Symem (SI Puuv Discharge)
SIS IT-Il75-3 H
2 IWA-5211(b)
IWA-5212 C-H 120 B
110E035 X'
Nose 1 IWA-5213 Sh 1. 2 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of the SI System B Accunnlator SIS TBD H
2 IWA-5211(b)
IWA-5212 C-H 120 B
110E035 X
Note 1 IWA-5213 sh 1 IWA-5211(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydmetatic Pressure Tem of the Containment Spray Nozzles Check - (Air Test)
SIS ORT-14 H
2 IWA-5211(b)
IWA-5212 C-H 120 B
110E035 X
Note 1 IWA-5213 Sh 1 IWA-52 tl(d)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Inservice Pressure Test of the SI System B Accumulator SIS IT-525A I
2 IWA-5211(b)
IWA-5212 C-H 40 B
110E035 X
X IWA-5213 Sh i IWA-521I(d)
IWC-5220 IWC-5210 IWC-5230 Page 17 ef 18
INT BEACH NUCLEAR PLANT.
PRESSURE TEST PROGRAM SME SECTION XI PERIODIC PRESSURE APPENDIX B TEST PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 2 Sys Proc Test Class Pressare Test Cat Freq Plant Dwgs U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 Remarts Type Tens Conditions Cond R19 R20 R21 R22 R23 R24 R25 R26 R27 R28 1T.ST DESCRIPTION: Inservice Pressure Tea of the SI System A Accunmistor SIS fr-525A I
2 IWA-52t l(b)
IWA-5212 C-H 40 B
110EQ35 X
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressun Test Service Water (Containmes Cooling SW Symem)
SW fr-Il55-1 H
3-IWA-52 t l(b)
IWA-5212 D-B 120 B
M-2207 X
IWA-5211(c)
IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Innervice Pressure Test of the Service Water System in Containment SW IT-1085-1 1
3 IWA-5211(b)
IWA-5212 D-B 40 B
M-2207 Y
X IWA-5211(c)
IWC-5220 IWC-5210 IWC-5230 REMARKS Note 1: ASME Code Case N-498.
None.2: Comminrnes penetrations are tested under the 10 CFR 50, AppendixJ, testing program. Duplicate testing under the ASME Section XI Pnssure Testing Program is not performed. See Relief Request PTP-3-02 (Appendix C).
i d
o Page18 ofI8
,a
POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC APPENDIX C PRESSURE TEST PROGRAM Revision 1 THIRD INTERVAL -
December 14, 1993
,o
(
RELIEF REQUESTS RELIEF REOUEST PTP-3-01 COMPONENTS:
ASME Class 1,2, and 3 Bolting (' Units 1&2).
ASME SECTION XI REOUTREMENT:
IWA-5250 CORRECTIVE h!EASURES (a)
The source of leakages detected during the conduct of a system pressure test shall be located and evaluated by the Owner for corrective measures as follows:
(2) ifleakage occurs at a bolted connection, the bolting shall be removed, VT-3 visually examined for corrosion, and evaluated in accordance with IWA-3100; PROPOSED ALTERNATE REOUIREMENT:
(a) he source ofleakages detected during the conduct of a system pressure test shall be located and evaluated by the Owner for corrective measures as follows:
(2)(a) if leakage occurs at a bolted connection of boric acid systems, the evaluation shall be conducted as follows:
/
t
\\
(i) If the bolting material is fabricated of a material other than an austenitic stainless steel (e.g. low alloy B-7, etc.), one bolt shall be removed, VT-1 examined, and evaluated in accordance with IWA-3100. He bolt selected shall be the one closest to the source of leakage. When the removed bolt has evidence of degradation, all remaining bolting in the connection shall be removed, VT-1 examined, and evaluated in accordance with IWA-3100. The cause of the leakage shall be corrected. An evaluation of the effect of the leakage on adjacent components and equipment shall be made.
NOTE - All removed bolting shall be subject to a surface examination when required by Wisconsin Electric's response to IE Bulletin No. 8242.
(ii) If the botting material is fabricated of an austenitic stainless steel material a VT-3 examination of the bolted joint shall be performed and evaluated in accordance with IWA-3100. In addition, an examination of adjacent components and equipment will be conducted to determine the effects of the boric acid. He leakage shall be evaluated in accordance with the requirements of the Owner's limits acceptable for continued service, ne evaluation shall consider the effects of the leakage on adjacent components and equipment The cause of the leakage shall be corrected when the Owner's limits for continued service are exceeded or when practical.
(2)(b) if the leakage occurs at a bolted connection of systems other than boric acid systems, the i
evaluation shall be conducted as follows:
I i
Page 1 of 4
POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM l
ASME SECTION XI PERIODIC APPENDIX C PRESSURE TEST PROGRAM Revision 1 THIRD INTERVAL December 14, 1993
.l %
RELIEF REQUESTS l
(i) The bolted connection shall be VT-3 examined and evaluated in accordance with the
)
requirements of IWA-3100. The leakage will be evaluated in accordance with the requirements of the Owner's limits for continued service. He evaluation shall consider the effects of the leakage on adjacent components and equipment. The cause of the leakage shall be corrected when the Owner's hmits for continued service are exceeded or when practical.
BASIS FOR RELIEF:
The leakage of boric acid onto carbon and lov alloy steel bolting is known to cause excessive corrosion rates. The attemate examination requirement will reci: ire evaluation ofleakage from bolted connections of boric acid systems.
The bolt closest to the leakage will bc the bolt that exhibits the maximum corrosion and degradation. Therefore, examination of this bolt will be a conservative representation of the remainder of the bolts in the bolted connection. If the bolt shows evidence of degradation all remaining bolting in the connection shall be removed and examined. His is consistent with the reouirements of IWA-5250 of the 1989 edition of ASME Section XL A VT-1 examination, in lieu of the ASME Section XI requirement of a VT-3 examination, is a more accurate and qualitative examination of bolting. By removing only one bolt of a bohed connection that exhibits leakage significant man-rem may be saved without compromising the integrity of the bolted connection or the pressure boundary.
Leakage of boric acid on austenitic stainless steel bolting does not indicate a great potential for excessive corrosion. A VT-3 examination of the bolted connection will adequately determine any degraMon of the bolted connection or of the
('
pressure boundary as a result of the leakage from that connection. Evaluation of the effuts of the leakage on adjacent components and equipment is above and beyond the requirements of ASME Section XI nd serves to further insure that the leakage has no adverse effects on surrounding components.
Technical Specification requirements have been established to permit acceptable limits of leakage. Leakage at a bolted connection does not indicate failure of a pressure boundary. Ifleakage occurs at an austenitic sialnless steel bolted connection that does not exceed these requirements, then continued operation shall be permitted provided the leakage does not affect adjacent components or equipment and that the integrity of the pressure boundary is not affected.
For those systems that do not contain boric acid, leakage at a bolted connection does not indicate a great potential for excessive corrosion of the bolting as a result of the leakage. By conducting a VT-3 examination of the bolted connection, evidence of any corrosion / degradation of the bolting or bolted connection can be adequately made to insure the integrity of the pressure boundary.
STATUS:
Awaiting NRC Response. Request originally submitted to the NRC as ISI Program Relief Request RR-1-15 (Unit 1) and RR-2-16 (Unit 2) on March 4,1993 (VPNPD-93-056/NRC-93-032). Request incorporated into Third Interval Pressure Testing Program, Revision 0, with the issuance of that document.
r%
iv) -
Page 2 of 4
a n
-,u a
POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM-ASME SECTION XI PERIODIC APPENDIX C PRESSURE TEST PROGRAM Revision 1 THIRD INTERVAL December 14, 1993 1f RELIEF REQUESTS RELIEF REOUEST I'rP-3-02 i
COMPONES ASME Class 2 Contamment Penetrations Associated With Non-ASME Classed Systems (Units 1&2)
ASME SECTION XI REOUIREMENT:
I IWA-5211 TEST DESCRIPTION The pressure retaining components within each system boundary shall be subject to system pressure tests under l
which conditions visual examination VT-2 is performed in accordance with IWA-5240 to detect leakages.
IWC-5210 TEST i
(a)
The pressure retaining components within each system boundary shall be subjected to the following system pressure tests and visually examined by the method specified in Table IWC-2500-1, l
Exammation Category C-H:
(1) a system pressure test conducted during a system functional test of those [IWA-5211(b)]
l systems (or components) not required to operate during normal plant operation but for 1
which periodic systern (or component) function.1 tests are performed to meet the Owner's -
requirements; (2) a system pressure test conducted during a system inservice test of those [IWA-5211(c)]
systems (or cotuponents) required to operate during normal plant operation; (3) a system hydrostatic pressure test [lWA-5211(d)] for each system or portions of systems and for repaired or replaced components, or alte ed portions of systems, i
(b)
The system pressure tests and visual exammations shall be conducted in accordance with IWA-5000 and this Article. The contained fluid in the system shall serve as the pressurizing medium, except that i
in steam systems either air or water may be used. Where air is used, the test pressure shall permit the l
detection and location of through-wall leakages in components of the systems tested.
PROPOSED AITERNATE REOUIREMENT:
ASME Section XI pressure testing requirements for ASME Class 2 containment penetrations associated with non-ASME classed systems shall be satisfied by the testing performed to meet the requirements of 10 CFR 50, Appendix J.
Containment penetrations included within larger ASME classed systems shall be pressure tested normally in accordae:e with Code requirements as part of the larger system pressure test.
I BASIS FOR RELIEF:
All containment penetration piping, regardless of whether or not the penetration is part of a larger ASME classed system, is classified as ASME Class 2. For those containment penetrations which are not part of larger ASME classed systems, the only function important to safety associated with the ASME classification of this piping and/or conponents.
l is the contamment isolation function.
Page 3 of 4 i
.I
I POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC APPENDIX C PRESSURE TEST PROGRAM Revision 1 THIRD INTERVAL December 14, 1993 g-V RELIEF REQUESTS l
~
- Re pressure retaining components within each of these contamment penetrations is adequately tested through the 10 CFR 50, Appendix J, testing program, and additional testing under Section XI would only be redundant. Testing in accordance with 10 CFR 50 Appendix J, is fully capable of detecting and locating leakage associated with the pressure retaining components of contauunent penetrations, i
STATUS:
Awaiting NRC Response. Request submitted to the NRC with transmittal of Third Intenal Pressure Testing Program, Revision 1.