DPERATINS DATA REPDRT r

i DOCKET NO 50-369 SATEDecesber 15. 1993 DPERATING STATUS COMPLETED BY R.A. Williees TELEPHONE 704-332-5346

1. Unit Nase: McGuire 1
2. Reporting Period: Novesber 1, 1993-Novesber 30,1993
3. Licensed Thersal Power (NWt): 3411
4. Nameplate Rating (Gross MWe): 1305* Notes
  • Nameplate Rating  ;
5. Design Electrical Rating (Net MWe): 1180 (Gross MWel calculated as
6. Ratisus Dependable Capacity (Bross MWe):  !!71 1450.000 MVA x .90 poner ,
7. Ganisus Dependable Capacity (Net MWe): 1129 factor per Fage iii, B. If Changes Dccur in Capacity Ratings (Itess Number 3 Through 7) Since Last NUREG-0020.

Report. Give Reasons: i I

9. Power Level To Which Restricted, if Any (Net MWe): i
10. Reason For Restrictions, if an):

This Month Yr.-to-Date Cusulative ,

11. Hours in Reporting Period 720.0 0016.0 105192.0
12. Nusber Of Hours Reactor Was Critical 704.8 4420.3 73276.5
13. Reactor ReserYe Shutdown Hours --0-- --0-- - -
14. Hours Senerator Dn-Line 693.7 4353.0 72475.5 .
15. Unit Reserve Shutdown Hours --0-- --0-- --0--
16. Stoss Thersal Energy Benerated (MWH) 2338426 14410062 224192103
17. Gross Electrical Energy Benerated (MWH) 805606 4905872 77094202
19. Net Electrical Energy Eenerated (MWH) 774430 4672642 73580977
19. Unit Service Factor 96.3 54.3 69.9  ;
20. Unit Availability Fatter 96.3 54.3 68.9
21. Unit Capacity Factor (Using MDC Net) 95.3 51.6 60.8 l
22. Unit Capacity factor (Using DER Net) 91.2 49.4 59.3 )
23. Unit Forced Outage Rate 3.7 26.3 14.4
26. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each): l None I

E5. If Shut Dean At End Of Report Period. Estisated Date of Startup:

26. Units in Test Status (Prior to Coseercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l l

1 9312210242 931215 gDR ADOCK 05000369 '

PDR i

. t i

^

I 4

1 DPERATING DATA REPORT i i

DDCKET ND 50-369 .

I UNIT McGuire 1 DATE Detenber 15,1993 I

CDMPLETED BY R.A. Williams TELEPHONE 704-382-5346 MONTH _ Nevesber 1993 I;Al AVERABE DAILY POWER LEVEL pfAl AVERABE DAILY PDWER LEVEL (MWe-Net) (MWe-Net)

I 1127 17 1132 2  !!28 18 1131 3 1130 19 1130 4 1130 20 1131 5 1131 21 1130 6 75 22 1131 7 533 23 1130 E 1130 24 1130 9 1131 25 1128 10 1130 26 1128 11 1130 27 1129 12 1132 28 1133 13 1133 29 1135 16 1134 30 1134 15 1133 16 1130

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 UNIT NAME MCUU1HE 1 DATE 12/13/93 REPORT MONTH November 1993 COMPLETED BY K. A. WILLIAMS TELEPHONE (/u4)-332-3J46 (1) (2 (31 (4) (5)

A)

E MEi-HOD T A OF LICENSE M Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 8 93 6 F 26.28 A 3 HA INSTRU REACTOR / TURBINE TRIP DUE TO ERRONEOUS LOSS OF LOAD SIGNAL 17-P 93 7 S --

A --

CB XXXXXX REACTOR COOLANT SYSTEM CHEMISTRY (1) (2) (3) (4)

F Forced Reason

  • Method: Exhibit G - Instructions S Scheduled A-Equipment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of, Data 2-Manual Scram Ent y Sheets For Licensee C-Refueling 3-Automatic-Scram Event Report (LER D-Regulatory Restriction , , 4-Other (Explain) File (NUREG-0161))

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error (Explain) Exhibit I - Same Source H-Other (Explain)

I i

?

I-I l DOCKET: 50-369 UNIT: McGuire 1 Date: 12/15/93 ,

NARRATIVE

SUMMARY

l MONTH: November 1993 McGuire Unit 1 began the month of November at 100% power. On 11/06/93 at 0220 the unit experienced a reactor / turbine trip due to an erroneous loss of load signal. Unit was placed on-line on 11/07/93 at 0435. The unit held at 20% power on 11/07/93 at 0550 for reactor coolant system chemistry evaluation.

Unit retumed to full power on 11/07/93 at 2205 and operated at or near 100% for the remainder of the month.

l 6

l l

1 1

1 l

l Prepared by R. A. Williams Telephone: 704-382-5346

  • a

. l MONTHLY REFUELING INFORMATION REOUEST 'i

1. Facility name: McGuire. Unit 1 i
2. Scheduled next refueling shutdown:Auaust 1994
3. Scheduled restart following refueling: october 1994 'j THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION'OF  !

ANY T.S. CHANGE OR LICENSE AMENDMENT. .THEREFORE, QUESTIONS 4 l THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.- 1 1

4. Will refueling or resumption of operation thereafter require ai -l technical specification change or otherslicense amendment?  ;

I If yes, what will these be? i If no, has reload design and core configuration'been reviewed by ,

Safety Review Committee regarding unreviewed snfety questions?

5. Scheduled date(s) for submitting propose licensing action !and supporting'information.- )

l . . , .

l 6. Important licensing considerations (new or Edifferent' design Lor - I l

cupplier, unreviewed design or.. performance -ana'ysis. methods, significant changes in design or'new operating-procedures). .

l

7. Number of Fuel assemblies ( 9) in the core:-1.91 .]

(41 in the spent fuel pool: ABl q l

P Present licensed fuel pool capacity: 1463 j "ize of requested or planned increase:

j

9. Projected date of last refueling .thich - can be accommodated by:

present licensed capacity: March 2006 DUKE POWER COMPANY DATE:. December 15. 1993 Name of

Contact:

R. A. Williams Phone: 704-382-5346 i-I

, i l

.I i

~

'l

6 OPERATING EATA REPORT l

l DOCKET ND 50-370 DATE Detesber 15. 1993 OPEM TING STATUS COMPLETED Bf R.A. Willins l TELEPHONE 704-382-5346 l 1. Unit Nase: Mc5 aire E

2. Reporting Period
Nevenber 1, 1993-November 30,1993 i 3. Litensed Thersal Power (MWt): 3411 ,-

l 4. Naseplate Rating (Bross MWe): 130$e Notes tNaseplate Rating l 5. Design Electrical Rating (Net nWe): 1180 (Gross MWel calculated as l

6. Maximus Dependable Capacity (Bross MWe): 1171 1450.000 MVA x .90 peuer l
7. Maxinus Dependable Capacity (Net MWe): 1129 facter per Fage iii,
8. If Changes Occur in Capacity Ratings (!tess Nuster 3 Through 7) Since Last - NUREG-0020.  :

Report. Give Reasons:

9. Przer Level To Which Re.stricted, If Any (Net MWels
10. Reason for Restrictions, If anyr l

l This Month Yr.-to-Date Cuaulative

11. Hours in Reporting Period 720.0~ 6016.0 B5488.0'
12. Number Of Hours Reactor Was Critical 720.0 5779.6 65196.0
13. Reactor Reserve Shutdown Hours --0-- - --0--
14. Hours Senerator On-Line 720.0 5733.0 64230.1
15. !! nit Deserve Shutdenn Hours - - --0--
16. Gross Thernal Energy Generated (MWH) 2422534 18387097 209794653
17. Gross Electrical Energy Generated (MWH) B46169 6403462 73323163
10. Net Electrical Energy Generated (MWH) 814004 6109471 70270436
19. Unit Service Factor 100.0 71.5 75.1
20. Unit Availability Factor 100.0 71.5 75.1
21. Unit Capacity Facter (Using NDC Net! 100.1 67.5 71.9
22. Unit Capacity Factor (Using DER Net) 95.B 64.6 69.7
23. Unit Forced Outage Rate 0.0 1.7 7.1
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Eachl:

None

25. If Shut Down At End Of Report Period. Estimated Date of Stattup:
26. Units in Test Status (Prior to Ceasercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OFERATION

OPERATINS DATA REPORT DOCKET ND 50-370 UNIT McGuire 2 DATE Detenber 15. 1993

- COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 GONIH Nevesber. 1993 EE1 AVERASE DAILY PDWER LEVEL EEL AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1139 17 1147 2 1140 10  !!46 3 1142 .19 1145 4 1144 20 1146' 5 1144 21 1145 6  !!40 22 1145 7 1097 23 1145 8 1144 24 1145 9  !!45 25 1144 10 1145 26 1143 11 815 27 1144 12 1099 2B 1147 13 1147 29 1147 14 1147 30 1146 15 1148 16 1146

h UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME Mwulut; z DATE 12 /1:>/ 9 3 REPORT MONTH November 1993 COMPLETED BY M. A. WILLIAMS TELEPHONE t/v4)-Juz-3340 (1) {2) g_ (4) (5)

, E HOD T A OF LICENSE N Y S SHUT EVENT SYS- 7,AUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO ,

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 23-P 93-11-11 F --

A --

MA VALVEX REPAIR LIQUID WASTE RECYCLE SYSTEM VALVE i

i i

i i

(1 (2) (3) (4) 1

~

Forced Reason

  • Method:- Exhibit G - Instructions S Scheduled 1-Manual for Preparation of Data A-Equipment FailureB-Maintenance or test (Explain) 2-Manual Scram EntW Sneets For Licensee {

C-Refueling 3-Autonatic Scram Event Report (LER ,.

D-Regulaton' Restriction 4-Other (Explain)

File (NUEG-0161) )

, E-Operator Training & License Examination i F-Administrative (5) erator Errgr Exhibit I - Same Source G-Okher H-O (Explain) (Explain) .

1  :

f s

4 E

1

' . , . . _ _ _ _ _ _ _ . .. ___. __ _ _...._.._....__..____.--..--.---,~,-.~.-..--,...._4.. _ - _ . - - . - - _ . . - . . . - . _l..~,...__..... _ _ . . . . _ . . . . . . .

. __.-_ ~. . -. - . _ _ , . ~ - - .

- . , .- .--s-, _. . , .

I DOCKET: 50-370 l

' UNIT: McGuire 2' Date: 12/15/93 s;

i j NARRATIVE

SUMMARY

)

MONTH: November 1993 .;

McGuire Unit 2 began the month of November operating at 100% full power.- On 11/07/93 at 0130 the -!'

- unit began power decrease to 87% power due to the failure of a main feedwater pump's steed control.

Unit was retumed to 100% power on 11/07/93 at 1915. Unit began power reduction to 15% power on ' i

! 11/11/93 at 1305 to repair leaking liquid waste recycle system valve.: The unit was at 15% power from l

l 1700 to 1905. Unit returned to full power on 11/12/93 at 0810 and operated at 'or near.100% the : j

!- remainder of the month. l i

i j

i l

t q

j I

)

)

i l

l

)

Prepared by R. A. Williams Telephone: 704-382-5346

{s MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: McGuire, Unit 2
2. Scheduled next refueling shutdown: November 1994 i

! 3. Scheduled restart following refueling: January 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF.

ANY T.S. CHANGE OR LICENSE AMENDMENT. _THEREFORE, QUESTIONS 4 t THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

l l 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by -

Safety Review Committee regarding unreviewed safety questions?  ;

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core:-111 (b) in the spent fuel pool: 312
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: ---
9. Projected date of last refueling which can be accommodated by present licensed capacity: December 2003 DUKE POWER COMPANY DATE: December 15, 1993 Name of

Contact:

R, A . Williams Phone: '/04-382-5346 l

i