ML20056H098

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Establishing Consistent Language Between Actions 14,22 & 25 of Table 3.3-2
ML20056H098
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/27/1993
From:
GEORGIA POWER CO.
To:
Shared Package
ML20056H094 List:
References
NUDOCS 9309080223
Download: ML20056H098 (1)


Text

._ .__ ______

1 TABLE 3.3-2 (Continued) j l

( TABLE NOTATIONS ,

a Trip function may be blocked in this MODE below the P-11 (Pressurizer  ;

Pressure Interlock) Setpoint. l f b Trip function automatically blocked above P-11 and may be blocked below ,

.P-11 when Safety Injection on low steam line pressure is not blocked.  :

c During movement of irradiated fuel or movement of loads over irradiated l fuel within containment.  ;

d h p m ;; M ; ; f h -: f im . i ! . 0. 0. 4 e. . ..e t .y ri; .',1..

. Ned Lib.

A .. s % '

e During movement of irradiated fuel or movement e loads over tradiated fuel. ,

s f Not applicable if one main steam isolation valve and associated bypass iso- l 1ation valve per steamline is closed. I g Containment Ventilation Radiation (RE-2565) is treated as one channel and is considered OPERABLE if the particulate (RE-2565A) and iodine monitors (RE-2565B) are OPERABLE or the noble gas monitor (RE-2565C) is OPERABLE.  !

h Manual initiation of Auxiliary Feedwater is accomplished via the pump handswitches.

l i Whenever irradiated fuel is in either storage pool.

j For actions associated with inoperable instrumentation, follow actions specified in Specification 3.9.12.

th -Me mo N I* cbP"ef ACTION STATEMENTS do OfE8A8/8 M M/ d M/  ;

or ACTION 14 - With the number of OPERABLE cha els one less than the Minimum  ;

Channels OPERABLE requirement, e in at least HOT STANDBY Oc Ded 6 [ within*/ hours.and 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, inmay one channel COLD be bypassedSHUTDOWN for up to 4 within the for surveillance testing per Specification 4.3.2.1, provided the other channel is OPERABLE.

. ACTION 15 ith the number of OPERABLE channels one less than the Total NumberofChannels,operationmayproceeduntilperformanceo]f the next required ANALOG CHANNEL OPERATIONAL TEST provided the inoperable channel is placed in the tripped condition within L1 hour.

ACTION 16 - With the number of OPERABLE channels less than the Minimum Channels OPERABLE requirement, comply with the ACTION p requirements of Specification 3.9.9 .

Mia the maerbes d OPEukf ekanel.t one ku d4u(Mode*

die 6)%6/ Wod* Of O"*h evermG esmMe eAnmelnJrkeed h adh Org.f**M%=

die A cona% mbe praemdpredoGd t'he E reeniensel *nel. / '

r. ihr /Wa:M 6'emed chnael ney be hpastal dv y de 2 An4 sukeW/ene sian'iy 7.4"M~h 4.3.21.

V0 GILE UNITS - 1 & 2 3/4 3-25 9309080223 930827 C PDR ADOCK 05000424 h P PDR d i