Proposed Tech Specs Establishing Consistent Language Between Actions 14,22 & 25 of Table 3.3-2
ML20056H098
Person / Time
Site: Vogtle  
Issue date: 08/27/1993
From:
GEORGIA POWER CO.
To:
Shared Package
ML20056H094 List:
References
NUDOCS 9309080223
Download: ML20056H098 (1)


Text

,

TABLE 3.3-2 (Continued) j

(

TABLE NOTATIONS a Trip function may be blocked in this MODE below the P-11 (Pressurizer Pressure Interlock) Setpoint.

l f

b Trip function automatically blocked above P-11 and may be blocked below

.P-11 when Safety Injection on low steam line pressure is not blocked.

c During movement of irradiated fuel or movement of loads over irradiated l

fuel within containment.

d h p m ;; M ; ; f h -: f im. i !. 0. 0. 4 e..

..e t.y ri;

.',1.. Ned Lib.

A.. s %

e During movement of irradiated fuel or movement e loads over tradiated fuel.

f Not applicable if one main steam isolation valve and associated bypass iso-l s

1ation valve per steamline is closed.

I g Containment Ventilation Radiation (RE-2565) is treated as one channel and is considered OPERABLE if the particulate (RE-2565A) and iodine monitors (RE-2565B) are OPERABLE or the noble gas monitor (RE-2565C) is OPERABLE.

h Manual initiation of Auxiliary Feedwater is accomplished via the pump handswitches.

l i Whenever irradiated fuel is in either storage pool.

j For actions associated with inoperable instrumentation, follow actions specified in Specification 3.9.12.

th -Me mo N I* cb "ef P

ACTION STATEMENTS do OfE8A8/8 M M/ d M/

or ACTION 14 - With the number of OPERABLE cha els one less than the Minimum Channels OPERABLE requirement, e in at least HOT STANDBY Oc Ded 6 [ within*/ hours.and in COLD SHUTDOWN within the 4

30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, one channel may be bypassed for up to for surveillance testing per Specification 4.3.2.1, provided the other channel is OPERABLE.

ACTION 15 NumberofChannels,operationmayproceeduntilperformanceo]f ith the number of OPERABLE channels one less than the Total the next required ANALOG CHANNEL OPERATIONAL TEST provided the inoperable channel is placed in the tripped condition within L1 hour.

ACTION 16 - With the number of OPERABLE channels less than the Minimum Channels OPERABLE requirement, comply with the ACTION requirements of Specification 3.9.9 Mia the maerbes d OPEukf ekanel.t one ku d4u(Mode 6)%6/ Wod* Of O"*h p

die esmMe eAnmelnJrkeed h die A *nel. /

evermG mbe praemdpredoGd t'he E reeniensel h ad Org.f**M%=

cona%

r.

ihr /Wa:M 6'emed chnael ney be hpastal dv y de 2 An4 sukeW/ene sian'iy 7.4"M~h 4.3.21.

V0 GILE UNITS - 1 & 2 3/4 3-25 9309080223 930827 C

PDR ADOCK 05000424 h

P PDR d

i