N - Commonwrith Edixn
'[ 1 /' 1400 Opus Pires
\\ v Downers Grove, lilinois 60515 e
t
).
August 31,1993 Dr. Thomas E. Murley, Director l
y.
Office of Nuclear Reactor Regulation i
U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk
Subject:
Zion Station Units 1 and 2 Inservice Testing Program for Pumps and Valves, Third Interval NRC Docket Nos. 50-295 and 50-304
Reference:
(a)
June 14,1993 letter from J. Dyer to D.L. Farrar
Dear Dr. Murley:
Enclosed for your review is the Third Interval Inservice Testing (IST)
Program for Pumps and Valves. The Program is in compliance with 10CFR50.55a(f) and the ASME B & PV Code Section XI,1989 edition including OM 1987, Part 1 and addenda OMa 1988, Parts 6 and 10. The Third Interval was scheduled to commence on 12/31/93 for Unit 1 and 9/14/94 for Unit 2.
- However, per ASME Section XI,1980 edition with Winter 1981 Addenda, Article-IQA-2400(c), the inspection interval for inservice testing may be extended by as much as one year, enabling Zion to remain in the second Ten-Year Interval during?
the Dual Unit Outage. Commencement of the Third Ten Year Interval is scheduled for 3 months after the end of the Dual Outage, or approximately June, 1994.
The referenced letter transmitted a Safety Evaluation Report for Revision 11/92 of the second interval IST program. In that evaluation, Commonwealth Edison Company's proposal to establish a flow tolerance for certain pumps was determined to require specific relief. These relief requests are include < in the third interval program. For those pumps whose flow tolerance would be less than 2%, no reliefis required, but the method for establishing the variance should be documented in the IST program. Zion Station is currently assembling the required documentation, and it will be maintained on-site, available for staff review.
nwnn.e 9309070192 930831-I D[f gDR ADOCK 05000295 I k:nla: zion:nrcil' it g
L
B I
Dr. T.E. Murley August 31,1993 O
Attachment A contains a summary of the programs, which reconciles the i
third interval program to the current revision of the second interval program.
The program itselfis contained in Attachment B, and Attachment C contains marked-up P & ID's.
Please direct any questions regarding this matter to this ofIice.
t Respectfully, j
%).
T.W. Simpkin Nuclear Licensing Administrator Enclosure cc:
J.B. Martin, Regional Administrator - RIII l
C.Y. Shiraki, Project Manager - NRR J.D. Smith, Senior Resident Inspector - Zion i
i i
)
i s
i L'
k:nla:2ionsnrc:2 w
ATTACHMENT A 1
1 i
o 9
]
1 F
i I
l
}
l
!-l
)
k:nla: zion:nrc:3 i
h s
IST Program Plan Changes From the 2ND Ten Year Interval to the 3RD Ten Year Interval REttEF i IVALVE / PUMP EPN 6 la iIDESCRIPTION i13RD 10 YR 1 APPROVED PR-01 X
W 12'17/87 X
X PR-02 SWOO1-3 T
SW pumps tested in CSD or Refuel.
PR-01 3E 3/93 Added more pump information concerning autostarting pumps.
PR-03 OCCOO3 - 7 D
DELETED X
SE 6/14/93 CSOO1 - 3 Relief was to use OM-6 Enks on FWOO4 - 6 vibration measurements. Not RHOO1-2 necessary any longer da to switch S1003 - 4 to 1989 ASME Section XI Code.
SWOO1 - 3 VCOO6-7 NEW OCCOO3 - 7 T
Vibration Testing PR-02 NEW CSOO1 - 3 Use of RMS (root mean squarel vs.
FWOO4 - 6 peak velocity measurements.
RH001 - 2 JSIOO3-4 SWOO1 - 3 VCOO6-7 PR-04 OCCOO3 - 7 D
. DELETED X
SE 6/14/93 CSOO1 - 3 Bearing temps on pumps are SE 6/91 RHOO1-2 not required per OM-6.
SiOO3 - 4 SWOO1 - 3 VCOO6-7 PR-05 OCCOO3 - 7 D
DELETED X
SE 6/14/93 CSOO1 - 3 Range requirements for Electronic SE 6/91 FWOO4 - 6 DigitalInstruments addresssed in RHOO1-2 OM-6 (4.6.1.2 (c)).
S1003-4 SWOO1 - 3 VCOO6-7 PR-06 X
W 10/1/90 X
' X PR-07 X
W 12/17/87 X
X PR-08 X
W 12/17/87 X
X PR-09 RHOO1 - 2 N
Instrument range for RHR pumps.
PR-03 SE 6/14/93 PR-10 FWOO4 - 6 D
DELETED X
SE 6/14/93 AFW pumps bearing temperatures not required per OM-6.
PR-11 CSOO3 N
Diesel driven CS pumps PR-04 SE 6/26/93 vibration limits.
SE 6/14/93 PR-12 SWOO1 - 3 T
SW pumps PMT during power PR-05 X
operation (added onsite maint.).
SE 6/25/93 1
IST Program Plan Changes From the 2ND Ten Year Interval to the 3RD Ten Year interval i
RELIEF i IVALVE / PUMP EPN Ila tIDESCRIPTION 613RD 10 YR lAPPROVED NEW FWOO4 - FWOO6 A
AFW flow tolerance band usage PR 06 NEW IResponse to SE 6/14/93.
NEW S1003 - S1004 A
Si flow tolerance band usage PR-07 NEW Response to SE 6/14/93.
j i
NEW OCC003 - 7 A
CC flow tolerance band usage PR-08 NEW Response to SE 6/14/93.
t NEW VC006 - 7 A
VC flow tolerance band usage PR-09 NEW i
Response to SE 6/14/93.
i NEW SWOO1 - SWOO3 A
SW flow tolerance band usage PR-10 NEW Response to SE 6/14/93.
1 VR-01 CS0016,21,26 D
DELETED X
SE 6/14/93..
N Added check valves to VR-34 disassembly relief (now VR-04).
l VR-02 LCV-DT1003
,D IDELETED X
SE 6/14/93 AOV-DT9159 A-B These are CIV's supplied by IVSW SE 6/91 AOV-DT9160A-B which will be tested per Zion's CIV DWOO30, 38 program. Thus, relief is no longer FCV-PR19-23 (A-B) needed.
l AOV-RC8025,26,28,29 AOV-RVOO5-6 FCV-RV111-114 l
FCV-SA01 A-B SFOO10, OSF0011-12 i
SF8767,8787 AOV-SS9354-57 (A-B) i MOV-VC8100 AOV-VC8152,3 VCB480A-B l
4 FCV-VF01 A-B FCV-VN02 A-8,WD17 A-B j
'VR-03 VC8481 A-B JD DELETED VO-01 SE 6/14/93 VC8546 N
Charginggmp check valves are SE 6/91 now in VO-01 for refueling frequency.
I VR 04 X
W 12/17/87 X
X f
I VR-05 RH8736A-B D
DELETED VO-02 SE 3/93 RH8949 A-B N
RHR check valves are now in VO-02 j
for refueling frequency.
1 VR-06 S18922A B D
DELETED VO-03 SE 3/93 N
Si pump discharge check valves are now in VO-03 for ref ueling frequency.
VR-07 S18900A-D, Sl8905A-B D
DELETED VO-04 SE 3/93 S18949C-D, S19004C-D N
SI system check valves are now in 1
Sl9012 A-D, Sl9032 VO-04 for refueling frecuency.
2
- =.
i I
IST Program Plan Changes From the 2ND Ten Year Interval to the 3RD Ten Year interval RELIEF I IVALVE / PUMP EPN Ila llDESCRIPTION 113RD 10 YR IAPPROVED VR-08 S18926 D
DELETED VO-05 SE 6/14/93
)
N Si pumps suction from RWST are SE 6/91 now in VO-05 for refueling frequency.
VR-09 Sl8948A-D, Sl8956 A-D T
Rewritten to test accum. check VR-01 X
valves by testing 1 set of 2 valves at refueling instead of disassembly.
i VR-10 X
W 6/17/86 X
X i
l VR-11 X
W 9/91, see VC-23 (now VC-17)
X X
VR-12 IWOO62-70,73 83,90,95 D
DELETED VO-06 SE 3/93 IWO181-186,198 N
IVSW check valves are now in l
VO-06 for refueling frequency.
VR-13 FCV-CC685
-D DELETED X
SE 3/93 i
MOV-CC9414, 38 CIVs to be tested per Appendix J l
MOV-CS002,4,6 as allowed per OM-10. (4.2.2.2).
.CS005,9,13,37,38,40,41 Thus, no longer need relief.
ICS0043-44 TAOV-DT9157, DT9158 l
TFCV-IA01 A-B PR0029 1
FCV-PR24 A-B l
SOV-PR25-26 (A-D)
ADV-RC8033 l
RC8047,RC8079 AOV-RV0001-4 l
AOV-S18880 i
L Sl8857, S18933 i
i VR-14 X
V/
12/17/87 X
X VR-15 X
W 6/17/86 X
X VR-16 X
W 10/1/90 X
X l
VR 17 HOV-MS001 -4 D
DELETED X
SE 3/93 l
SOV-PR25-26 (A-D)
POVs with < 2 sec max stroke tsme i
SOV-RC08-11 are now exempted from reference criteria, i.e. max = 2 secs.
MSIVs can determine reference value per OM-10, not previous result.
VR-18 X
W 9/91 X
X VR-19 X
W 9/91 X
X j
VR 20 X
W 9/91 X
X VR-21 X
W 9/91 X
X l
VR-22 X
W 12/17/87 X
X i
VR 23 VC8542A B T
VC pumps minimum flow check valves VR 02 X
use an indirect method to obtain data SE 6/14/93 i
Rearranged and reworced justification.
- SE 6/91 VR-24 X
W 9/91 X
X VR 25 X
TW 12/17/87 X
X 3
.~
- -. -. -. - -... ~.
l l
l l
l IST Program Plan Changes From the 2ND Ten Year interval to the 3RD Ten Year Interval i
RELIEF i IVALVE / PUMP EPN lia llDESCRIPTION ll3RD 10 YR IAPPROVED VR-26 X
W 12/17/87 X
X VR-2 7 _
S!9001 A-D, Sl9002A-D -
T RHR cold leg injection PlVs VR-03 X
i measure full flow indirectly, at CSD.
SE 6/14/93 Supplemental information deleted.
SE 6/91 VR-28 X
W 12/17/87 X
X VR 29 X
W 12/91 X
X VR-30 X
W 12/17/87 X
X VR-31 X
W 9/91 X
X VR-32 X
W 10/1/90 X
X I
VR-33 S!8958 D
DELETED VO-07 SE 6/14/93 N
RHR pumps suction from RWST now in VO-07 for refueling frequeracy.
VR-34 CC9486,CC9500 T
Check valves requinng disassembly.
VR-04 X
l CS0016,21,26 N
No changes to text other than adding SE 6/14/93 IWOO1, RC8046, 79 CS, IW, and SW valves.
S18958, SWOO10,11 D
VC8378 is passive, no longer OSWOO12 requires testing.
VC8246,8352A-B VC8379 A-3, 8440
[
l-i VR-35 MS0006, MS0007 N_ Turbine driven AFW pump steam VR-05 SE 6/14/93 supply check valves which is already tested full flow, closure by acoustics?
VR-36 IWOOO1 D
IVSW PW makeup check valve VR-04 SE 6/14/93 N
added to VR-34, now VR-04 for disassembly for closure.
VR-37 OSWOO12, SWOO10,11 D
DELETED VR-04 SE 3/93 N
D/G coolers SW supply check valves added to VR-34 (VR-04) for disassembly for closure test.
VR-38 VC8367,68,75 (A-D)
D DELETED VO-08 SE 6/14/93 N
RCP seal water check valves now VO-08, for refueling frequency.
VR-39 VC8224 D
DELFTED VO-09 SE 6/14/93 N
RC loop fill header isolation valves in VO-09 now for refueling frequency.
VR-40 All POVs except D
DELETED X
SE 3/93 2 sec and MSIV vivs OM 10 based on reference values, not previous results.
VR41 MOV-Sl8811 A-B N
Containment recirculation sump VR-06 SE 3h'3 icolation ('CAN') valves relief to test one valve per refueling outage.
4
IST Program Plan Changes f
From the 2ND Ten Year Interval to the 3RD Ten Year interval REUEF 1 iVALVE / PUMP EPN t la llDESCRIPTION 3RD 10 YR lAPPROVED NEW Sl8900A-D, S19032 A
VC pump cold leg inject. check valves VR-07 NEW f
relief for testing valves in series.
J l
NEW VC8367A-D, VC8375A-D A
RCP seal water check valves VR-08 NEW l
1 relief for testing valves in series.
NEW SOV-SWO153 A
CS diesel engine cooler solenoid VR-09 NEW vivs relief for no ability to stroke time.
1I il ll il i
j CSDJ (VC) I IVALVE / PUMP EPN l ta ilDESCRIPTION t 13RD 10 YR I APPrtOVED l
i VC-01 CS0005,9,13 (CIVs)
D IDELETED - CS discharge check X
X valves, in VO-10 for Appendix J test.
VC-02 HOV-MS0001-4 N
Main Steam isolation Valves VC-01 X
VC-03 MOV-RH8703 T
RHR pump discharge to RC hot VC-02 X
j legs. Added more information and I
addressed fear of failure issue.
VC-04 PCV-455C, 456 T
PORVs, added information on LTOP VC-03 X
and GL90-06.
VC-05 MOV-RH8701, 2 N
RHR Pressure Isolation Valves VC-04 X
VC-06 MOV-Sl8802, 6,13,14 T
Si injection valves, fear of f ailure.
VC-05 X
MOV-VC8110,11 Added MOV-VC8110,11 i
i VC-07 AOV/MOV-MS0017-20
.D DELETED, Atmospheric relief valves X
X can ce tested quarterly.
I VC-08 MOV-FWOO16-19 T
Steam gens ator inlet isolation valves.
VC-06 X
Conditions for testing changed.
VC-09 MOV-Sl8812 A - B T
RHR pump suction isolation valves VC-07 X
fear of failure, added information.
j VC-10 DT9158 D
DELETED - RC drain tank CIVs X
X
- now in VO-10 for Appendix J testing.
i VC-11 MS0008 - 11 N
Main Steam isolation check valves.
VC-08 X
VC-12 PR0029 D
DELETED - Cont. air sampling check X
X j
CIVs now in VO-10 for Appdx J testing.
VC-13 RH0257,258 T
Rewritten for technical justification.
VC-09 X
VC-14 LCV-RC459, 460
- D DELETED, These are being X
X MOV-VCLCV-112B -E tested quarterly in PT-20-ST.
MOV-VC8105, 6,10,11 Charging and letdown isolation vivs.
AOV-VCB146, 8152, 53 D
AOV-VC8146 is passive, only PIT.
l i
VC-15 MOV-FWOO74 -76 D
DELETED, can test these AFW pump X
X suction isolation valves cuarterly.
rf 5
i
. ~ - - - -..
IST Program Plan Changes From the 2ND Ten Year Interval to the 3RD Ten Year Interval CSDJ (VC) i IVALVE / PUMP EPN Ila i tDESCRIPTION ll3RD 10 YR 1 APPROVED VC-16 S18957 A - B T
RHR cold leg injection check valves VC-10 X
Rejustified due to Unresolved item.
VC-17 RH8730A - B N
RHR pump discharge check valves.
VC 11 X
VC-18 S19001 A - D, 9002 A - D T
RHR cold leg inject. PI Vs check vivs.
VC-12 X
Rejustified due to Unresolved item.
VC-19 FCV-1A01 A - B T
IA supply iso l. vivs. to containment VC-13 X
fear of failure, added more information.
VC-20 MOV-VC8100 N
RCPs seat return isolation valve.
VC-14 X
j (Approved thru VR-20, SE 6/91J VC-21 SOV-RC08 - 11 T
Reactor head vent valves. Added VC-15 X
more technical info for justification.
r VC-22 Sl8808A - D
~
Nl Si accumulator check vivs.
VC-16 X
VC-23
.FCV-CC685 T
VC-17 X
iMOV-CC9413A-B 14,15 Added more technical justification.
j RtwOV-CC9438 i
VC-24 S!8948 A - D, 8956A - D T
Si accum. check valves - rewritten to VC-18 X
restate justification more clearly.
l VC-25 SWOOO1, 4, 7 N
SW pumps discharge check vivs VC-19 X
P&lD number and coord. changes VC-26 RC8047, 8079, Sl8933 D
DELETED, Cont. isolation check vivs.
X
. X OM-10 uses Appendix J for CIV testing, i
VC-27 OCC9464, CC9463A - B D
DELETED, CC pumps discharge X
X check valves tested quarterly.
VC-28 MOV-CS0049, 50 D
DELETED, RHR supply to cont.
X X
spray isolation valve not needed.
1 NEW MOV-RH8716 A, B, C A
Multiple inoperabilities if test at power, VC-20 X
I MOV-RH9000 thus, these valves will be tested at CSD.
MOV-S18809A, B l
l I
I ROJ (VO) 1 ! VALVE / PUMP EPN Ila IiDESCRIPTION il3RD 10 YR 1 APPROVED l
VO-01 VC8481 A - B, VC8546
}R Charging pump check valves for VO-01 X
N refueling frequency, granted in SE 6/91 as VR-03.
VO-02 RH8736A -B, 894 9 A-D R
RHR hot leg injection check valves VO-02 X
l N
for refueling freq. (granted as VR 05 in SE 3/93).
l 1
i i
j 6
~ ~ -
_ ~ ~
IST Program Plan Changes From the 2ND Ten Year interval to the 3RD Ten Year Interval ROJ IVO) l IVALVE / PUMP EPN Ila lIDESCRI? TION ll3RD 10 YR l APPROVED VO-03 Sl8922A - B R
SI pumps discharge check valves for VO-03 X
N refueling frequency (VR-06 in SE 3/93).
VO-04 S18900A-D, 8905 A-D R
Si system check vivs, for refueling VO-04 X
S18949C-D, 9004C-D N
frequency with valves added to their S19012 A-D, S19032 descriptions in text (VR-07 in SE 3/93).
l VO-05 Sl8926 R
SI pumps suction from RWST VO-05 X
N check valve for refueling (VR-08 6/91).
VO-06 IWOO62 70,73-83,90,95 R
IVSW check valves, for refueling freq.
VO-06 X
4 IWO181 -186,198 N
(VR-12 granted in SE 6/91 + 3/93).
VO-07 S!8958 R
_RHR pumps suction from RWST VO-07 X
T check viv for refueling (VP-33 6/93 with conditions), minor rewording.
l VO-08 IWOOO1 R
- DELETED, IVSW PW makeup check X
X I
D valve added to VR-34 (now VR-04)
(before = VR-36 granted in SE 6/14/93).
VO-09 VCS367,68,75 (A-D)
R RCP seal water check valves for VO-08 X
N refueling freq. (VR-38 in SE 6/14/93j.
NEW VC8224 A
VC check valve on RC loop fill hne VO-09 X
for refueling (VR-39 granted 6/14/93).
NEW CS0005,9,13, DT9158 A
Appendix J CIVs check valves for VO-10
.X PR0029,RC8047,8079 ref ueling f requency.
S18933 ll Il il il I
POSITION I IVALVE/ PUMP SUBJECT Ila 11 DESCRIPTION ll3RD 10 YR IAPPROVED l
'i i
VP-01 FST testing method N
Method for testing failsafe valves VP-01 X
j VP-02 1 sol. vivs during power N
isol. valves during power operation VP-02 X
VP-03 T. Spec 4.4 stroking freq.
T Tech Spec 4.4 stroking frequency VP-03 X
i Added reference to UFS/ 't 16.3-3.
I VP-04 CC check valves N
Out of service potential.
VP-04 X
VP-05 Cold Shutdown defntn.
jT Added ROJ to CSD definition position.
VP-05 X
l VP-06 FST of sys. control vivs T
Added closed position.
VP-06 X
VP-07 MOV Sl8801 A-B,8803A-B D
BIT removal not affect vivs any more.
X X
VP-08 Augmented vivs testing N
Augmented valves scope and testing.
VP-07 X
l Minor rewording change.
PP-01 (Range hmits for pumps D
DELETED, not needed any longer.
X X
PP-02 lX W
- DELETED, not needed any longer.
X X
PP-03 Initial suct. press (pumps)
D DELETED, not needed any longer.
X
- X PP-04 X
W 9/91 X
X PP-05
,DFOTP testing N
Augmented program, no relief s, etc.
PP-01 X
PP-06
{X W
9/91 X
X PP-07 l Inlet press (SW pumps)
D
. Level of lake water used in determ.
X X
{
not necessary any longer (per OSR).
I PP-08 iPump reference values ID Resnonse to SE 6/14/93 in form of X
X I
l l relief s PR-06 thru PR 10.
I II il I!
Il I
i 7
4
..n_
_. ~. -.. -.. _ _ _... - -
. ~ -.
l l
From the 2ND Ten Year interval to the 3RD Ten Year interval IST ProDram Plan Changes 1
\\
l t
l t
i i ABBREVIATIONS i
PR PUMP RELIEF REQUEST
=
VALVE RELIEF REQUEST j
VR
=
COLD SHUTDOVvN JUSTIFICATION I
=
REFUELING OUTAGE JUSTIFICAT.
l VO
=
1 VP VALVE POSITION
=
PUMP POSITION l
PP
=
SYMBOL DENOTES THE CHANGE A
=
ABSOLUTELY NEW A
=
D DELETED
=
NONE / MINOR
'N
=
NEW (previously a VR, now a VO) l R
=
TECHNICAL l
T
=
W WITHDRAWN
=
NOT APPLICABLE X
=
I I
i I
h 9
- N could include:
- 1. Update to new Code (ar9 references) l
- 2. P&lD changes
- 3. Minor wording changes for clarity I
i Il li Il DEFINITIONS:
1i li ii AFW auxiliary feedwater
=
T CC component cooling
=
CIV containment isolation valve
=
=
i D/G diesel generator
=
DFOTP diesel generator fuel oil transfer pump
=
IA instrument air
=
IVSW isolation valve seal water
=
piping and instrumentation diagram l
P&lD
=
pressure isolation valve PlV
=
PMT post maintenance testing
=
PW pnmary water
=
RC freactor coolant
=
i RCP reactor coolant pump
=
=
SI safety injection
=
=
VC centrifugal charging
=
vivs valves
=
i i
8 ti t
I
..m
._r.,.
i i
i w
1 1
1 1
)
1 1
1 1
l l
l A'ITACHMENT B l
J i
h
?
i i
'?
i I
i
+
i i
1 i
i i
t, k
1 4
i 4
1 i
s 6
i kinlarzionsnrc:4
, -.