Forwards SE Providing Results of Staff Review of Info in Util ,Forwarding Rev 11/92 to IST Plan for Class 1,2 & 3 Pumps & Valves for Plant.Staff Determined That Relief Not Required
ML20045B723
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 06/14/1993
From: Dyer J
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
Shared Package
ML20045B724 List:
References
GL-89-04, GL-89-4, TAC-M83016, TAC-M83017, TAC-M85479, TAC-M85480, NUDOCS 9306180358
Download: ML20045B723 (5)


Text

cx k h h e r atcg o

A

[.

UNITED STATES g 5,g NUCLEAR REGULATORY COMMISSION e

WASHINGTON. D C. 20555-0001 June 14, 1993 Docket Nos. 50-295 and 50-304 Mr. D. L. Farrar Manager, Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West 111, Suite 500 1400 OPUS P1 ace Downers Grove, Illinois 60515

Dear Mr. Farrar:

SUBJECT:

ZION NUCLEAR POWER STATION, UNITS 1 AND 2, INSERVICE TESTING PROGRAM RELIEF REQUESTS FOR PUMPS AND VALVES (TAC NOS. M83016, M83017, M85479 AND M85480)

The enclosed Safety Evaluation (SE) provides the results of the staff's review of information provided by Commonwealth Edison Company (CECO, the licensee) in their letter dated January 7,1993.

This letter forwarded Revision 11/92 to the Inservice Testing Plan for Class 1, 2, and 3 Pumps and Valves for Zion Station, Units 1 and 2.

This revision consists of two revised pump relief requests, PR-03 and PR-09, one new pump relief request, PR-ll, one new pump Technical Approach and Position, PP-08, and two revised valve relief requests, VR-01 and VR-33.

Revisions to Relief Requests PR-04, PR-05, VR-03, VR-08, VR-23, and VR-27 included in the October 15, 1991, submittal were not technical changes and, therefore, the previously granted relief continues to apply.

Revised Relief Request VR-02 deleted valves in the isolation valve seal water system which will now be seat leakage tested per inservice testing and Technical Specification 3.9.1.B requirements each refueling outage.

Previously granted relief for VR-02 remains in effect for the remaining valves.

New relief requests were included in the October 15, 1991, submittal ard are also evaluated in the enclosed SE.

The Code of Federal Regulations,10 CFR 50.55a, requires that inservice testing (IST) of certain American Society of Mechanical Engineers (ASME)

Boiler and Pressure Vessel Code (Code) Class 1, 2, and 3 pumps and valves be performed in accordance with Section XI of the ASME Code and applicable addenda, except where relief has been granted or proposed alternatives authorized by the Commission pursuant to 50.55a $T(f)(6)(i), (a)(3)(i), or (a)(3)(ii).

Guidance on acceptable alternatives to Section XI requirements was provided in Generic letter 89-04, " Guidance on Developing Acceptab7e inservice Testing Programs," for certain aspects of IST.

The staff has reviewed the requests for relief submitted by CECO for the Zion Station, Units 1 and 2, IST Program.

9306180358 930614 DR ADOCK 05000295 PDR b.L C Y.

Au;

-r s

o

F Mr. D. L. Farrar As detailed in the enclosed SE, fer relief request PR-ll the staff is authorizing use of the proposed alternative pursuant to 10 CFR 50.55a(a)(3)(ii).

For relief requests PR-03, PR-09, PR-10, VR-01, VR-33, VR-34, VR-36, VR-38, and VR-39, the staff has determined that relief is not required.

A summary of the staff's actions is provided in Table 1 of the SE.

If you have any questions, please contact me.

Sincerely, NNI$!n@d By:

James E. Dyer, Director Project Directorate 111-2 Division of Reactor Projects Ill/IV/V Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation cc w/ enclosure:

see next page DISTRIBUTION:

Docket file NRC & Local PDRs PDill-2 r/f J. Roe J. Zwolinski J. Dyer C. Moore C. Shiraki D. Fischer OGC E. Jordan ACRS (10)

OC/LFDCB G. Grant, 17G21 B. Clayton Rill 1

  • Please see previous concurrence

,J OFC [l(A: POIII-2 /

lPM:PDill-2 %

lD:PDIII-2 l0GC*

\\

\\ V tv NAME Qlyj0 ret lCSHIRAKI lJDYER y lJHULL l/o/jf/93 l(g ///j /93 l05/17/93 DATE l1 /pV93

g.

Mr. D. L. Farrar As detailed in the enclosed SE, for relief request PR-ll the staff is authorizing use of the proposed alternative pursuant to 10 CFR 50.55a(a)(3)(ii).

For relief requests PR-03, PR-09, PR-10, VR-01, VR-33, VR-34, VR-36, VR-38, and VR-39, the staff has determined that relief is not required. A summary of the staff's actions is provided in Table 1 of the SE.

If you have any questions, please contact me.

Sincerely, N08I$InAed By:

James E. Dyer, Director Project Directorate III-2 Division of Reactor Projects Ill/IV/V Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation cc w/ enclosure:

see next page DISTRIBUTION:

Docket File NRC & Local PDRs PDill-2 r/f J. Roe J. Zwolinski J. Dyer C. Moore C. Shiraki D. Fischer OGC E. Jordan ACRS (10)

OC/LFDCB j

G. Grant, 17G21 B. Clayton Rill 0 Please see previous concurrence OFC liA PDIll-2,/

lPM:PDIII-2 O lD:PDIll-2 l0GC*

NAME QCMOORE-lCSHIRAKI lJDYER g lJHULL DATE l,/1 793 llp /lf/93 l(p ///]/93 l05/17/93 1

p n

ll I

Mr. D. L. Farrar As detailed in the enclosed SE, for relief request PR-11 the staff is authorizing use of the proposed alternative pursuant to 10 CFR 50.55a(a)(3)(ii).

For relief requests PR-03, PR-09, PR-10 VR-01, VR-33, VR-34, VR-36, VR-38, and VR-39, the staff has determined that relief is not required.

A summary of.the staff's actions is provided in Table 1 of the SE.

If you have any questions, please contact me.

Sincerely, tMik -

N James E. Dyer, Director Project Directorate III-2 Division of Reactor Projects III/lV/V Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation cc w/ enclosure:

see next page i

i I

l

-I I

i l

g

]

T

+

Mr. D. L. Farrar Zion Nuclear Power Station-

[

Commonwealth Edison Company Unit Nos. I and 2 cc:

Michael I. Miller, Esquire Sidley and Austin One First National Plaza Chicago, Illinois 60690 Dr. Cecil Lue-Hing Director of Research and Development Metropolitan Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611 Phillip Steptoe, Esquire Sidley and Austin One first National Plaza Chicago, Illinois 60603 Mayor of Zion Zion, Illinois 60099 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive i

Springfield, Illinois 62704 i

U. S. Nuclear Regulatory Commission Resident Inspectors Office 105 Shiloh Blvd.

Zion, Illinois 60099

. Regional Administrator, Region 111 U. S. Nuclear Regulatory Commission 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 Robert Neumann Office of Public Counsel State of Illinois. Center 1

100 W. Randolph Suite 11-300 Chicago, Illinois 60601 i

l 4

_