o ncw s
g$
It UNITED STATES
[ [?
.ji j NUCLEAR REGULATORY COMMISSION
<4gg j
WASHINGTON. D.C. 20555-0001 u<
SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMDANY THE CITY OF RIVERSIDE. CALIFORNIA THE CITY OF ANAHEIM. CALIFORNIA DOCKET NO. 50-361 SAN ON0FRE NUCLEAR GENERATING STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.108 License No. NPF-10 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Southern California Edison Company, et al. (SCE or the licensee) dated November 20, 1994 [ sic 1992], complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and i
l E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
i 9308230055 930803 PDR ADOCK 05000361 P
1
. 1 2.
Accordingly, the license is amended by changes to the Technical Speci-fications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-10 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 108, are hereby incorporated in the license.
Southern California Edison Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance and must be fully implemented no later than 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY; COMMISSION k
Theodore R. Quay, Director Project Directorate V Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
August 3, 1993 i
ATTACHMENT TO LICENSE AMENDMENT l
AMENDMENT N0.108 TO FACILITY OPERATING LICENSE NO. NPF-10 1
DOCKET NO. 50-361 Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages.
The revised pages are identified by the captioned amendment number and contain marginal lines indicating the areas-i of change. The corresponding overleaf pages are also provided to maintain document completeness.
REMOVE INSERT 3/4 4-18 3/4 4-18 I
+
REACTOR COOLANT SYSTEM OPERATIONAL LEAKAGE LIMITING CONDITION FOR OPERATION 3.4.5.2 Reactor Coolant System leakage shall be limited to:
a.
No PRESSURE BOUNDARY LEAKAGE, b.
I gpm UNIDENTIFIED LEAKAGE, c.
I gpm total primary-to-secondary leakage through all steam generators and 720 gallons per day through any one steam generator.
d.
10 gpm IDENTIFIED LEAKAGE from the Reactor Coolant System, and e.
1 GPM leakage at a Reactor Coolant System pressure of 2235120 psig from any Reactor Coolant System Pressure Isolation Valve specified in Table 3.4-1.
1 APPLICABILITY: MODES 1, 2, 3 and 4 ACTIQN:
a.
Jith any PRESSURE BOUNDARY LEAKAGE, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b.
With any Reactor Coolant System leakage greater than any one of the limits, excluding PRESSURE B0UNDARY LEAKAGE and leakage from Reactor Coolant System Pressure Isolation Valves, reduce the leakage rate to within limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
c.
With any Reactor Coolant System Pressure Isolation Valve leakage greater than the above limit, isolate the high pressure portion of the affected system from the low pressure portion within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least two closed manual or deactivated automatic valves, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
i SURVEILLANCE RE0VIREMENTS 4.4.5.2.1 Reactor Coolant System leakages shall be demonstrated to be within each of the above limits by:
a.
Monitoring the containment atmosphere gaseous or particulate 4
radioactivity monitor at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
J b.
Monitoring the containment sump inlet flow at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
SAN ONOFRE - UNIT 2 3/4 4-17
jr%q f.
I UNITED STATES t
[,,1;C ( ~ j NUCLEAR REGULATORY COMMISSION c
WASHINGTON D.C. 20555-0001 l
% r' c'
SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE. CALIFORNIA THE CITY OF ANAHEIM. CALIFORNIA QOCKET NO.50-36R SAN ON0FRE NUCLEAR GENERATING STATION. UNIT NO. 3 I
AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 97 License No. NPF-15 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Southern California Edison Company, et al. (SCE or the licensee) dated November 20, 1994 [ sic l
1992], complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common I
defense and security or to the health and safety of the public; and i
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable i
requirements have been satisfied.
i l
-2 2.
Accordingly, the license is amended by changes to the Technical Speci-fications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No NPF-15 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 97
, are hereby incorporated in the license. Southern California Edison Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance and must be fully implemented no later than 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION a
lf f Y
1 Theodore R. Quay, Director Project Directorate V Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: August 3, 1993 4
4 I
d l
a i
4
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 97 TO FACILITY OPERATING LICENSE NO. NPF-15 DOCKET NO. 50-362 Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the areas of change. The corresponding overleaf pages are also provided to maintain document completeness.
REMOVE INSERT 3/4 4-19 3/4 4-19
REACTOR COOLANT SYSTEM SURVEILLANCE RE0VIREMENTS (Continued) c.
Performance of a Reactor Coolant System water inventory balance at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> during steady state operation.
If a transient evolution is occurring 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the last water inventory balance, then a water inventory balance shall be performed within 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> of the last water inventory balance.
d.
Monitoring the reactor head flange leakoff system at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
4.4.5.2.2 Each Reactor Coolant System Pressure Isolation Valve specified in Table 3.4-1 shall be demonstrated OPERABLE by verifying valve leakage to be within its limit:
a.
At least once per refueling interval.
b.
Prior to entering MODE 2 whenever the plant has been in COLD SHUTDOWN for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or more and if leakage testing has not been performed in the previous 9 months.
c.
Prior to returning the valve to service following maintenance, repair or replacement work on the valve.
d.
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following valve actuation due to automatic or manual action or flow through the valve (for valves in Section B of Table 3.4-1).
The provisions of Specification 4.0.4 are not applicable for entry into MODE 3 or 4.
SAN ONOFRE - UNIT 3 3/4 4-19 AMENDMENT NO:67-97