ML20056B457

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs,Making Editorial Revs to Tech Specs & ETS
ML20056B457
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/20/1990
From:
GEORGIA POWER CO.
To:
Shared Package
ML20056B454 List:
References
NUDOCS 9008280308
Download: ML20056B457 (10)


Text

(n

~-

- m.r y-,.,.-.

. =.

..c,

.-.,..., n 7,

r

.,3

~

x g.

,, _.,..., 3 3_,

y %"f

^

~ ',*'

7 ',

^,

.x.. m

~

z.;. >

-[..;

1a.f Table 4.2-22 7

X

~

W

'5 2 Check, Functional Tess'. ~and Calibration Minimus Frequency for Instrumentation.

y Which Initiates or Controls HPCI

'x w7%,

- Ref.

- Instrument Check -

Instrument Functional Test' Instrument Calibration-

^~ DO

-No.

Instrument Minimum Frequency

- Minianum Frequency :.

- Minimus Frequency

]@

ist (b)

-(c)

N I

Reactor Vessel Water Level

Once/ shift-

.Once/ month

. Once/ operating cycle 00 - '

(Level 2)

OW

~

Q' 2

Drywell Pressure Once/ shift.

.Once/ month Once/ operating cycle 04 13 HPCI Turbine Overspeed None

-N/A

- Once/ operating cycle U10 4

HPCI Turbine Enhaust Once/ shift Once/ month '.!

Once/ operating $ycle-

- Tobj Pressure UGJO

' O]

5 HPCI Pump Suction

_.Once/ shift Once/ month

Once/ operating cycle' l

Pressure m

6 Reactor Vessel Water Level Once/ shift Once/ month Once ' operating cycle -

r (tevel 8) g h

7 HPCI Pump Discharge Flow Once/ shift Once/ month-Once/ operating cycle' N

N 8

HPCI Emergency Area Once/ shift Once/ month once/ operating cycle l

Cooler Ambient Temperature 9

HPCI Steam. Supply Pressure Once/ shift Once/ month

.Once/ operating cycle 1

7 7O V

O i

in CD ch

-4 tn N

Ow U1 N

.O NwW cD 9W Nw

. y n

.~.

g m9 4,a.Fe-,.,.yw..

3,,__,,.,.

p.

p.

,g.

9

.g

,, j _,,, _,,

~,

, y'-

_ ~ n,-- -m

~

m - - - -- fgy s

~ _

^

'~~

e.

= " r,. ;, 3.

@7=:-7.,.qg,

t. 3 ---:1 c>.=

( g;g g.

-a.,

j

. c.

l

m ir g

~ TABLE 3.3.2i1?

[ 5.._. K e ;a ISOLATION ACTUATION INSTRtDENTATIDN

--i n-fI

. VALVE GROUPS

. MINI *1UN NUMBER -

~ APPLICABLE.

OPERATED BY.-

OPERABLE CHMesELS.

OPERATIOleAL. -

TRIP FUNCTION

. JIGNALia1

.PER TRIP SYSTEf9fbitc1-COISITION ACT1018

-4 1.

PRIMARY CONTAINMENT ISOLATLQH ru

-a.

Reactor Vessel Water Level

. 2

1. 2, 3_.

- 20.

q 1.

Low (Level 3);..

.-2, 6, 10, (2821-88680 A, B, C, D) -

-11. 12

-2.

Low-Low (Level 2).

5. *'

- 2.

1. - 2. 3 '

20

-(2B21-N682 A, B. C. D)'

' 20 1

2 1,2,13

3.. Low-Low-tow (Level 1) _

(2821-N681 A, B C, 0) b.

Drywell Pressure - High 2, 6, 7,~10..

'2

. 1, 2. 3 -

20 :

(2C71-N650 A B, C, D)

12.
  • c.

Main Steam Line

.I, 2, 3

-21 1

Radiation - High I, 12. ***.

2

( 6 11-K603 A B, C D) 2.

Pressure - Low I

2 1:

22-

-(2821-N015 A. B. C. D) w N

3.

Flow - High

- 1,

'2/line

1. 2. 3 21-(2B21-N686 A..B. C D) w (2BZl-N687 A. B. C. D)

/

(2B21-N688 A, B. C. D)

(2B21-N689 A, B, C D) d.

Main Steam Line Tunnel

' 1, 2. 3-

.21 Temperature - High..

1 2/line*

(2521-88623 A,.9, C.'D)

(2B21-N624 A, B, C, D)

(2B21-N625 A. B, C. D)

(2821-N626 A. B C. D)

T e.

Condenser vacuum '- Low.

I 2

1, 2.',3'

'~23 3

(2B21-N056 A, B, C, D)'

u 8

f.

Turbine Building Area (D

Temperature - High I

2*

1. 2, 3 21 (2U61-P001, ZU61-P002, 2061-P003

-4 2U61-P004)

(

i 1, 2. 3 29-g.

Drywell Radiation - High O$

(2Dil-K621 A B)'

<n J3 s-s

(.A) m 00

~

^

1 f

.g

_mm.._--_

.n

~,

,;_--n

,~

' + - ~

m3- ' O

~ - :'y.,

~

-- 3 _.,~

3..

M w

9

,. n?f

, ~ ~ -

Y F'

ee., - -

' ~

TABLE 3.3.2-1 (Continued) -

.x -

~

?.5. -

ISOLATION ACTUATION INSTRUE NTATION'

~

~

.H.

g px

_ MINIMUM NUPSER.

APPLICABLE

-- VAtVE GROUPS

'~

OPERATED BY OPERABLE CHAppeELS'

DPERATIONAL- -

- C TRIP FUNCTION

_ SIGNAlfal_

~PER TRIP SYSTEM (bifil CGIGITION

' AC.U911 2:5 4.

HIGH PRESSURE COOLANT INJECTION SYSIEM ISOLATION w

a.

HFCI Steam line Flow - High

. 3-1-

1, 2, 3 26..

(2E41-N657 A,B) c.d, b.

HPCI Steam Supply Pressure -

Low (2E41-N658 A.B.C.D)

. 3, 8 2

1,-2, 3 26 c.

HPCI Turbine Exhaust Diephrags

' Pressure - High (2E41-N655 A B.C.D) 3 2

11. 2. 3o 26' d.

HPCI Pipe Penetration Roocs

~

Temperature - High (2E41-N671 A B) 3

' i 1, 2, 3 -

26 4

R e.

Suppression Pool Area Ambient A

Temperature-High (2E51-N666 C, D) 3

. I

l. 2, 3 26 W

e "w

f.

Suppression Pool Area W Temp.-High (2E51-N665 C, D; 3

1 1, 2, 3 26 2E51-N663 C. D:

2E51-N664 C, D) 4 9

Suppau sion Pool Area Temperature Timer Relays (2E51-M601 A B) 3-1 1, 2, 3 '

26 -

h.

Emergency Area Cooler Temperature-High (2E41-N670 A, 8)'

-3"

- 1 1, 2, 3 -

26 -

yn@

i. Drywell Pressure-High o

(2Fil-N694 C, D) 8 I

I, 2, 3 26 m

to ct J.

Logic Power Moniter (2E41-KI)

NA N I

'l! 2, 3

.27

-4 (n

N OW mW

_O NwW 03 aW W

'Y wN+P-

- *+

.-w w

w

.sg es.

.g

, r w & f.

- y y.o es +,4-e-e--e e-314,-r p p +--

+w er vW -

_e

.ev.-.ws,-++.*ye.

.gW'P--

e

.g.e-

.c + g +.cr

3.,3 w yw e - r-3 v.w

-ww-g b*

a

M mX.

i

_1 Qg_ n.Y'd".L:

]

~.

_ 4 _ k

, y:, O' 4~ "

W

,4 S'

'F v

3 c.'.'

/

p F

m2'

~

a Y

p._

~

v (a~n.

- LrY,e 3.^. ;

l

>7

~

,I.q r

4

_r,

f.

_t.

x L,y

+

'h'

.s J

5,~;

~

ga

}4 :-;

4

.L NO I

~,

T 0

1 '

C 5'

5'

lf: ;.

A 2

l ~

4

-uQ,

Q-(-

r h

s'

/

p r

.T'

- c m

N-E

-t 0

Ms 0

0

.Er 1

1' i '

e Ra

- Ua e '~

o

- Se t

- A t^

S' N

.- E y

1 e

O M

0 h

I

~

0 t

T 1

0^

A n

TN<

i E

d P

e a

J.

r a

a P"

t Y

1 t

IT h

c s

RN

/ f

7 i

e l

n TI r

d I

./O

) -

m n

E MP a.

Y --

3 N

AE

- (

1 '

i v

F

.RT

't -

I LS i

3 R

- A--

i'm' O

E T

5 l

t I

B N

L e -

E'AS 4..

s' A

IN LNN a

T

.8OO I

e

>T N

. AII 3

l a

O

_CTT e

I IAI 2'

r LRW 2

T A

PE k

I PPO ac D

AOC 1

1 A

~

t R

s eh~.

t

..S s

L f n E

oo N'

i

.NE tt AL na 4

. HB ec CA c.ME 2 _

l i R

2 vi af UP ic MO ue I

qp

.N eS I

. M' el

_~_

m.

ha t c i

dn

=.& :f-eh

)

)

ec t - B sB ce r

xT n,.

o.

e w

.e'.A mtA l

m oi oa N

t 5

on5 tt 2

t 0

a 1

R o1 n

1 es6 M6 t e T

srrK l

R om A

aT o-oe-nn T

G tl rk1 o

N tii t a4 er E

f snD nt2 ui M

f oo on1 l v U O P M (2 CI(

an R

.Q VE T

lg S

N I

l '

2 8

h 4a.x, E M N w%4 " g 7OUOnDE

n. NOG (T.UDN p()A.Ce O slt D

sf t

_ '7

~

;=

~

f. <

.~q;,

fjhb%-

'i kr;,L

  • - CONTf.if'DL SG fEMS

- EURVE!LL ANC't REQUIREWENTS (Continued)=

'A t

U.

46 3..

Verifying a system flow rate of 4000 +0. -1000 cfm during system operation _when tested in.accordance with ANSI j

N510-1975.

4

-c; After svery 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> f charcoal adsorber operation by verifying within 31 days after removal that a laboratory.

' analysis of a representative carbon sample obtained in~ accord-y ance with. Regulatory Position C.6.b of Regulatory Guide 1-.52, l

Revision 1, July 1976, meets the laboratory testing criteria of Regulatory Position C.6.a of. Regulatory Guide 1.52, Revision 3

1, July 1976.

j d.

At least once per 18 months by:

l.

Verifying that ti,e pressure drop across the combined HEPA filters and charcoal adsorber banks is < 6 inc?es Water Gauge while operating the filter train at a flor rate of 4000 +0, -1000 cfm.

2.

. Verifying that the filter train starts and isolation l

. dampers open on each of the following test signals:

a.,Drywell pressure-high, b.

ni.' radiation on the; 3

1)

Refueling floor, l

2)

Reactor building.

c.

Reactor Vessel Water Level-Low Low (Level 2).

3, Verifying that the heaters dissipate 18.5.t 1.5'KW

}.

when tested in acccrdance with ANSI N510-1975.

ATCH - UNIT 2 3/4 6-41 Proposed TS/0357q/138-39

,.i...........

...ii,

+

^ "

M 3

7()

~

,[

  • 1..

+

y,

L-

. ELECTRICAL POWi3 5 ' STEMS

~A.C. CIRCUITS'!hS10E PRIMARY CONTAINMENTj i

'^

y

$0

. LIMITING' CONDITIONS FOR OPERATION t

4 4

3.8.2.5cThifollowingA.C.circuitsinsideprimarycontainmentshallbe de-en6rgized*:

a.: Br1aker Numbers 2, 4, 6, 8, 10, 12, 14,-40 and 42 in panel b

4 1

2151-S003,

.i q

.b.

Breaker Numbers 2, 4, 6, 8, 10, li, 40 and 42 in panel.2T51-

- l

S004, c.

Breaker Numbers 28 and 34 in panel 2R25-S105, and, l

]

I

d. -Frame IEL on MCC'2R24-5014.

[

i

. APPLICABILITY:

CONDITIONS 1. 2 and 3.

. ACTION:

]' :.

'With any of the above required circuits evrgized, trip the ricciated circuit breaker (s) in thF spec 1 fled panel ithin 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

1 Il SURVEILLANCE REQUIREMENTS I

4 1

3 4.8.2.5 Each of the above required A.C. circuits shall be determined to be de-energized at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying that the associated circuit breakers in the specified panels are-in the tripped.condi. tion.

{

i i

  • Except during entry into the drywell.

u.

+

1

>l 7/

HATCH Uhli 2 3/4 5-17 Proposed TS/0367q/178-0

(

-w

f:

k' p >

.7

.n r

TABLE 3.8.2.6 '

'X PRIMARY CONTAINMENT: PENETRATION-CONDUCTOR 0VERCURRENT PROTECTIVE DEVICES DEVICE: NUMBER-SYSTEM / COMPONENT AND LOCATION

  • POWERED a,

Type 1:

g 1.

4KV CKT BRKR REACTOR RECIRC HTR PUMP'

?

2R22-S001, FR 5 MG SET 2A DRIVE MOTOR 2831-S001A 1

2.

4KV CKT BRKR RECIRC A PUMP MOTOR i

2R22-S008, FR 2 2B31-C001A

't 3 '.

4KV CKT BRKR REACTOR RECIRC WTR PUMP 2R22-S002, FR 5 HG SET 2B DRIVE MOTOR 2831-S001B l

4.

4KV CKT-BRKR RECIRC B PUMP MOTOR 2R22-S009, FR 2 2831-C001B b.

Type 2:

.l.

.600 VAC, MCB, TH~

DRvHELL AREA COOLING UNIT 2R24-S012, FR 2DL 2T47-8009B 2.

600 VAC, MCB. TM DRYHELL AREA COOLING UNIT 2R24-S012, FR 20R 2T47-B0098 3.

600 VAC, MCB, TM DRYNELL AREA COOLING UNIT 2R24-S012, FR 3FL 2T47-B008B t

1 4.

600 VAC, MCB', TM ORYNELL AREA COOLING UNIT--

4 2R24-5012, FR 3FR 2T47-80088 5.

600 VAC, MCB, 'M DRYHELL AREA COOLING UNIT h

2R24-S0ll, FR :DL 2T47-8008A 6.

600 VAC, MCB, TM DRYHELL AREA COOLING UNIT.

2Ri4-S011, FR 1DR 2T47-B008A 7.

600 VAC, MCB, TM DRYLL AREA C00LI3 UNIT.

2R24-5011, FR 20AR 2T47-8009A 8.

600 VAC, MCB, TM DRYNELL AREA COOLING UNIT 2R24-3011, FR 20E 2T47--8009A

  • MCB - molded caso circuit brcaKer MO - magnetic oniy TM-- thermal magnetic cHATCH - UNIT 2 3/4 8-20 Praposed TS/0367q/178-60 p

i

y

[ [.6 q..

. g f

9 f

g TABLE 3.8.2.6-1 (Continued)

N-PRIMARY CONTAINMENT PENETRATION CONDUCTOR--

i OVERCURRENT PROTECTIVE DEVICES.

ti 3

f

' DEVICE NUMBER SYSTEM / COMPONENT lc

~ AND LOCATION *-

POWERED r

c.

-Type 3:

l '.

600 VAC, MCB, TM RECIRC PUMP MOTOR HEATER 1

SR24-S014 FR SE-2B31-C0018 u

b J

-2, 600 VAC,-MCB, TM RECIRC PUMP MOTOR'

'2R24-S013, FR SB HEATER 2B31-C001A l

d.

Type 4:

1, 120'VAC, MCB, TM CABLES BHE808M01 AND 2R25-S102, BRKR 10 BHE808M02 i

2.

120 VAC, MCB, TM CABLES BGE708M01 AND i

1R25-S101, BRKR 10 BGE708MO' s

e.

Type 5:

1.

600 VAC, MCB, MO DRYWELL EQUIP DR SUMP PUMP 2R24-5014, FR 2A DISCH MOV 2G11-F018 2.

600'VAC, MCB, M0 ORYWELL EQUIP OR SUMP PUMP 2R24-5014, FR 6C DISCH MOV 2G11-F015 3.

600 VAC, MCB, M0 RCIC STEAM SUPPLY 2R24-S012B, FR 4A ISOLATION MOV 2E51-F007:

4.

600 VAC, MCB, M0 REACTOR HEAD SPRAY VALVE f

2R24-S0ll, FR'9A MOV 2 Ell-F022

!q

~ 5.

600 VAC, MCB, MO' HPCI INBOARD STEAM 2R24-S0llA, FR 4A ISOLATION MOV 2E41-F0021 t

6.

600 VAC, MCB, MO RWCU INBOARD ISOLATION 2R24-S011, FR 14C VALVE MOV 2G31-F001 7.

600 VAC, MCB, M0 MAIN STEAM LINE DRAIN 2R24-S011,'FR ISB VALVE MOV 2821-F016

ifATCH - UNIT 2 3/4 8-21 Proposed TS/0367q/178-64 7

o.

+

y.J.;

?

j;! }.

P TABLE 3.8.2.6-1 (Continued) h i

PRIMARY CONTAfNMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES l

T DEVICE NUMBER-SYSTEM / COMPONENT-I AND LOCATION *-

POWERED Mn f.-

Type 6:

l.

600 VAC, MCB,1 M0 RECIRC PUMP SUCTION VAL'VE 2R24-5018A, FR 2A MOV 2B31-F023A 2.

-600 VAC, MCB, M0 RECIRC PUMP' DISCHARGE VALVE 2R24-5018A, FR 2B~

MOV 2B31-F031A 3.

600 VAC, MCB, M0 RECIRC PUMP SllCTION VALVE 2R24-50188, FR 3A MOV 2B31-F023B 4.

600 VAC, MCB,' MO RECIRC PUMP DISCHARGE ~ VALVE:

2R24-S0188~ FR 3B MOV 2B31-f031B u

5.

600 VAC, MC8, MC

-DRYWELL EQUIP DRAIN SUMP 2R24-5014, FR iB PUMP B 2Gil-C0 '

j i

6.

600 VAC, MCB, FU DRYWELL FLCL

.fN SUMP 2R24-5014. FR 70-PUMP B 2C ' ' l'001B t

7.

600 VAC, MCB, M()

DRYWELL FLOOR DRAIN SUMP 2R24-50li, FR 4,,

PUMP 1A 2G11-C001A-8.

600 VAC.-ML2. 50-ORYWELL EQUIP DRAIN SUMP-2R24-5013, FR 4B-

-PUMP A 2Gil-C006A 9.

600 VAC' MCB, M0 DRYWELL AREA COOLING UNIT 2R24-5012, FR 18B 2T47-80078 10, 600 VAC, MCB, MO DRYWELL RETURN AIR FAN 2R24-S012, FR 19A 2T47-C0018 11.

600 VAC MCB, MO RHR SHUTDOWN COOLING SUCTION-2R24-S011, FR 6C VALVE HOV 2El1-F009-12.

r,00 VAC,'t.CB, M0 DRYWELL AREA COOLING UNIT 2R24-S011, FR'18A 2T47-6007A L

.M0 magnetic only TM - thermal magnetic HATCH - UNIT 2 3/4 8-22 Proposed TS/0367q/178-60

,H'

y:

.c.

='

mQt

~

TABLE 23.8.'2.6-1 (Contin 6eA;.

. PRIMARY CONTAINMENT PENE1 RATION CONDUCTOR.

OVERCURRENT PROTECTIVE DEVICES

{

DEVICE NUMBER SYSTEM / COMPONENT.

'AND LOCATION * -

POWERED-13, 600'VAC, MCB, MO ORYWELL RETURN AIR FAN 2R24-5011. FR 18C 2T47-C001A q

14.

600 VAC,.MCB, M0 ORYHELL COOLING UNIT 2R24-S013, FR 3B 2T47-B010A

15. 600 VAC,.MCB, M0 DRYNELL COOLING UNIT 2R24-S014', FR 8A 2T47-8010B.

16, 600 VAC. MCB, TH DRYHELL COOLING. UNIT 2R24-5013,- FR 3B

'2T47-8010A 17.

600 VAC, MCB TM DRYWELL COOLING UNIT

-2R24-S014, FR 8A-2T47-8010B ll g..

Type 7:

1.

208 VAC, MCB,-MO-DRYWELL CHEMICAL DRAIN 2R24-S013,.FR-11D SUMP PUMP 2G11-C101 2.

208 VAC, MCB, MO ORYWELL RETURN AIR FAN 2R24-S012, FR 23C 2T47-C002B r

3-208 VAC,.MCB, M0 DRYWELL RETURN AIR FAN.

-l 2R24-S011, FR 22C

'2T47-C002A i

i i