Text
._
-~
~
NUREG-0580 Vol.11, No. 5 REGULATORY LICENSING STATUS
SUMMARY
REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS (BLUE BOOKt APRIL 20 - MAY 15,1982 1
UNITED STATES NUCLEAR REGULATORY COMMISSION p==ccoq bkY P R
Available from N RC/GPO Sales Program Superintendent of Doctments Government Printing Ol' ice Washington, D. C. 2040J A year's subscription consists of 12 issues for.
this publication.
Microfiche of single copies are available from NRC/GPO Sales Program Washington, D. C. 20555
NUREG 0580 Vol.11, No. 5 REGULATORY LICENSING STATUS
SUMMARY
REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS (BLUE BOOK) i APF.
0 - MAY 15,1982
$a'te fu $ishe ne 982 Prepared for: 0FFICE OF NUCLEAR REACTOR REGULATION Prepared br 0FFICE OF RESOURCE MANAGEMENT U.S. NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555
- y....,
~
P REFACE THE REGlit A TORY I TCrNSING ST ATtl5 Simil$RY PEPORT (BLUE DOOK) WILL BE PUBLISilE9 IN THE FUTURE AS A t10NIHL Y DOCUt!Lt; T.
STARTING !!ITl! TI:E 0'e/19/82 I SSilE, Tile BLt!E DOOK IS BEING ISSllED IN A NEW FORT!AT.
EACil PROJECT CONSISTS OF 0?iE PAGE (!!ITil Il!E LXCEPTION OF LflRICO ffD!!I AtlD GESSAR).
Il!E TOP PORTION OF Tile P AGE DISPL AYS Git;Ert.L Ft.C T L I T Y DATA.
bet:EA Til TIIIS. TliE LEFT IIALF OF TIIE PAGE IS DEVOTED TO T!!E CURREtiT STATUS OF Tile PPO. LECT, AND THE RIGili ilALF IS DEVOTED TO THE DISPLAY OF Tile KEY tlILEST0!!E T ARGET Alta C0t!PLETTON DATES IN TABLE f0R!it.T.
!!!STORICAL I N F0 Et!A T ION, PRESENTED IN Tile F DEriER BLilE BOOK, IS NOT PORTRAYED IN TifE HEU FORMAT.
A SEPARATE HISTORICAL DOCUt1EN T, TO DE DEVELOPED AND PUBLISilED ONCE EVERY SIX MONTilS, WILL REFLECT TilIS IHf 0Pf!ATI0ft.
^
F0REWDRD THIS MANAGEMENT REPORT. P EGlf t A T PPY_L_I C FN.S ING_S T A TilLSt!P'M A RY J EPOP T, TS DESIGNED TO PPOVIDE Tl!E NECESSAPY INFORf1ATION FOR CONTROLLIt4G THE l'ROGRESS OF RLVIllJ PI:UCI SSLS FOR CENTRAL STATION HUCLEAR REACTOR APPLICATI0ftS.
IT UTILIZES DATA COLLECTED FROM TifE OFFICE OF HUCLEfR REACTOR RECULATIOll, OFFICE OF Tile EXECUTIVE LEGAL DIRECTOR. OFFICE OF It4SPECTION & EHFORCEMENT, AND Tile NATIDH AL L t.BOR AT ORI ES. AND ANALYZED BY TifE OFFICE OF RESOURCE MANAGEt1Et!T IN Ti!E IMPLEMENTATION OF THE REGULATORY INFORt1ATION SYSTEM.
l SECTION I 0F THIS EDITION CONSISTS OF TifE THREE SUt! MARY OF ACCOMPLISitttENTS, Tile NElf APPLICATION FORECAST FOR OL'S AHD CP'S, AND AN ABBREVIATION KEY.
l SECTION II REPRESENTS TifE MAIN BODY OF Tile REPORT AND CONSISTS OF TifE FACILITY INFORt1ATION. ALL OL'S ARE LISTED FIRST, FOLLO!!ED BY CP'S, STANDARD DESIGN REVIEi!S. Differ REVIE!!S. AND FINALLY, A P:0N-POI!ER RE ACTOR
SUMMARY
EACH PROJECT CONSISTS OF GENERAL FACILITY DATA. Cur:R ENT ST ATUS FOR ALL PilASES OF Tile REVIEt!. AND TARGETED AHD ACTUAL COMPLETI0H DATEi!S FOR ALL KEY ?!ILESTONES IN THE REVIE!!.
l
L ICENS ING 0F HUCL EAR R EA CT0RS THE U.S.
NUCLEAR REGULATOPY COMMISSIOf4 REQUIRES Tuo SEPARATE LICENSES - ONE TO BUILD THE FACILITY AND ANOTHER TO OPERATE IT.
LISTED BELOW ARE THE STEPS IN THE PROCESS OF OBTAINING A CONSTRUCTION PERMIT AND OPERATING LICENSE.
THE UTILITY SUBMITS A FDPMAL APPLICATION DESCRIBING THE DESIGN, LOCATION, AND ENVIROMMENTAL IMPACT OF THE PROPOSED PLANT AND THE SAFEGUARDS TO DE PROVIDED.
THE APPLICATION ALSO COVERS THE UTILITY'S FINANCIAL QUALIFICATIONS.
THE NRC MAKES CCPIES OF THE APPLICATION AVAILABLE TO THE ACRS AND TO THE PUBLIC DOCUMENT ROOM.
TECHNICAL EXPERTS AMALYSE THE APPLICATI0H, AND PREPARE A SAFETY EVALUATION AND AN ENVIRONMENTAL IMPACT STATEMENT.
THESE DOCUMENTS ARE ALSO MADE AVAILABLE IN THE FUBLIC DOCUMENT ROOM.
THE STAFF'S ANALYSIS IS SUBMITTED TO THE NRC'S STATUTORY ADVISORY COMMITTEE ON REACTOR SAFEGUARDS, A COMMITTEE OF INDEPENDENT EXPERTS.
ACRS STUDIES THE APPLICATION IN DETAIL AND HOLDS CONFERENCES WITH THE APPLICANT. THE LICENSING STAFF AND OTHERS.
THE ACRS FINDINGS ARE REPORTED TO THE NRC AHD MADE PUBLIC.
A PUBLIC HEARING IS HELD, USUALLY HEAR THE PROPOSED SITE, BY AN NRC APPOINTED ATOMIC SAFETY 8 LICENSING DOARD.
PRIVATE CITIZENS, STATE AND LOCAL OFFICIALS, AND COMMUttITY GROUPS MAY PARTICIPATE.
AFTER REVIEWING THE HEARING RECORD INCLUDING THE NRC STAFF AND ACRS FINDING'S, THE BOARD DECIDES FOR OR AGAINST GRANTING A CONSTRUCTION PERMIT.
THE BOARD'S DECISION IS REVIEWED BY THE ATOMIC SAFETY AND LICENSING APPEAL BOARD, AND IS SUBJECT TO REVIEW BY THE FIVE-MEMBER NUCLEAR REGULATORY COMMISSION.
IF THE LICENSING BOARD AUTHORIZES THE ISSUANCE OF A CONSTRUCTION PERMIT, THE DIRECTOR OF THE DIVISIOff 0F LICENSING WILL ISSUE A CONSTRUCTION PERMIT.
AN EARLIER LIMITED WORK AUTHORIZATION TO DO PRELIMINARY SITE CONSTRUCTION MAY HAVE BEEN GRANTED IF THE SITE HAD BEEN DETERMINED TO BE SUITABLE BY THE NRC STAFF AND THE BOARD HAD RULED FAVORABLY ON THE ENVIRONMENIAL IMPACT ANALYSIS. CONSTRUCTION IS SUBJECT TO INSPECTIDH BY THE OFFICE OF INSPECTION AND ENFORCEMENT.
AS CONSTRUCTION PROGRESSES. ADDITIONAL INFORMATION IS DEVELOPED AND THE UTILITY APPLIES TO THE NRC FOR AN OPERATING LICENSE.
THE SAME CAREFUL ANALYSIS AS IS MADE AT THE CONSTRUCTION PERMIT STAGE IS MADE BY THE NRC IN DECIDING WHETHER OR NOT TO ISSUE THE OPERATING LICEHSE.
IN THE OPERATING LICENSE REVIEW PROCESS, OPPORTUNITY FOR HEARING IS PROVIDED. CONTRASTED WITH THE REVIEW PHASE, A HEARING IS HELD ONLY IF INTERVENTION IS GRANTED.
FINAL ISSUANCE OF AN CONSTRUCTION PERMIT IS SUBJECT TO THE APPROVAL OF BOTH THE DIRECTOR OF THE DIVISION OF LICENSING AND OF THE OPERATING PERMIT COMMISSION.
~
T A B L E O F C0N T ENTS PRINTED IN Tile ORDER LISTED S ECT ION I
SUMMARY
OF ACCOMPLISNMENTS OL StIt:M? RY OF ACC0f PLISilMENTS CP
SUMMARY
OF ACCOMPLISNMENTS COMBINED Nut!ERICAL SUflMARY OF ACCOMPLISilMENTS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING OPERATING LICENSES IN TifE NEXT FIVE YEARS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING CONSTRUCTIDH PERT 1ITS IN Tile NEXT FIVE YEARS NEW APPLICATION FORECAST:
OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEL!S SPECIAL REVIEWS COMMON ABBREVIATIONS USED WITHIN THE PUBLICATION SECT I ON I I PROJECT INDEX OPERATING LICENSE REVIEWS CONSTRUCTIDH PERMIT REVIEMS STANDARD DESIGN REVIEWS OTHER REVIEWS l
NON-POWER REACTORS l
$ECT ION I II 1
EXAMPLE REVIEW
,/
1 s
x
+
0
/
f 4
0 d
s
\\
N
\\
s 7/
-m j
i 0L
SUMMARY
0F ACC0MPL ISHMENTS AS OF MAY 15, 1982 s
UA1 FISCAL YEAR TO DATE FACILITY SCHEDULED ACTUAL FACILITY SCHEDULED ACTUAL i
f 5 Ee ' S SER ' S MIDLAND 1 8 2 05/11/82 05/11/82C BYRON 1 82 02/07/82 02/07/82C 1
CALLAWAY 1 10/07/81 10/07/81C CLINTON 1 8 2 01/05/82 02/17/82C l
MIDLAND 1 42 05/11/82 05/11/82C PALD VERDE 1,2,3 11/11/81 11/11/81C i
4 ST LUCIE 2 10/09/81 10/09/81C WASHINGTON NUCLEAR 2 03/31/82 03/31/82C WOLF CREEK 1 04/07/82 04/07/82C SS ER ' S SSEP ' S LASALLE 1 82 05/01/82 BYRON 1 42 03/30/82 03/30/82C
]
SUSQUEHANNA 1 8 2 05/00/82 CALLAWAY 1 01/15/82 01/15/82C CDMANCHE PEAK 1 &2 10/16/81 10/16/81C COMANCHE PEAK 1 &2 01/20/82 01/20/82C DIABLO-CANYON 1 8 2 10/02/81C i
ENRICO FERMI 2 01/26/82 01/29/82C GRAND GULF 1 &2 12/10/81C.
LASALLE 1 82 02/12/82 02/12/82C LASALLE 1 & 2_
04/16/82 04/16/82C LASALLE 1 82 05/01/82 PALO VERDE 1,2,3 02/05/82 02/05/82C i
SAN ONOFRE 2 4 3 01/22/82 01/22/82C d
S AN ONOFRE 2 8 3 02/16/32 02/16/82C y
SHOREHAM 03/12/82C ST LUCIE 2 12/30/81 12/3 0/81C SUMMER 1 01/08/82 01/08/82C l
SUSQUEHANNA 1 82 05/00/82 j
WATERFORD 3 10/09/81 10/13/81C WATERFORD 3 01/22/82 01/13/82C WATERFORD 3 04/30/82 04/30/82C ZIMMER 1 10/00/81 10/00/81C l
DES
'S DES ' S SEABROOK 1 8 2 05/11/82 05/11/82C BYRON 1 82 11/05/81 11/05/81C CLINTON 1 & 2 12/18/81 12/28/81C MIDLAND 1 82 02/05/82 02/05/82C PALO VERDE 1,2,3 10/26/81 10/26/81C l
PERRY 1 &2 02/26/82-02/26/82C d
SEABROOK 1 82 05/11/82 05/11/82C ST LUCIE 2 10/16/81 10/16/81C WOLF CREEK 1 01/05/82 01/05/82C n
)
lll CCCCCC 221 221 L
388883 A
/ /////
U 599131 T
020123 C
//////
A 41C342 001001 D
E E
22 221 22 T
L 88 888 88 a
U
/ / / //
//
D D
59 131 02 E
02 123 01 O
H
/ / / //
//
T C
41 342 42 S
00 001 00 R
A E
Y S
L A
T C
S 2
H I
F R
E A
E D
3 23, L
M Y
C E
8
& 2, T
U 2
H I
L 11 N
U 2
S I
2 FE2H S
E C
1 I
A LD O
1R F
YURET S
F 1 AGEIG EO L
W VCN I
LN P
2 NAD UI L. O 3
S OLNOLH t
M 9
RLAL S
SN YARATA S
AA 1
0 SCGPSW LS S
C 5
1 E
t C
Y F
O A
A M
F F
O 0 S A
Y L
R A
U A
T C
M A
M U
5 D
E L
U L
D E
O H
C S
M D
Y T
E I
L U
I C
S A
F S
I R
E S
E E
W N
N O
O S
O P
N N
S L
L E
L U
F F
0 l
llll1i
CC C
11 2
L 88 8
A
/ /
/
U 00 4
T 30 0
C
/ /
/
A 00 5
11 0
D E
E 11 2
T L
88 8
A U
//
/
D D
50 4
E 10 0
O H
//
/
T C
00 5
S 11 0
R A
E Y
S L
A T
C S
N I
F 2
2 E
8 8
D 1
1 M
Y T
1D D
E H
I R
R L
KO O
U I
EF F
C EN N
S I
A RA A
F CH H
S L
/
/
S ST T
I P 2 NI I
8 S
E EG S
G S
E E
M 9
N LA A
N N
1 O
R LK K
O S
O 0
H AS S
H N
R E
S S
C 5 E
S F
E P
1 C
Y S
S D
F C
A A
M F
F O 0 S A
C Y
2 L
8 R
A
/
U 4
A T
0 C
/
M A
5 0
M U
S D
E 2
L 8
U
/
P D
4 E
0 C
H
/
C 5
S 0
M 2
8 p
1 Y
T D
E I
R L
O U
I F
C N
S A
A F
H S
/
S T
I I
S E
E s
G S
E E
N H
A N
M O
R 0
K O
S O
N N
S N
N P
E S
S E
S E
E P
L S
S D
C
(l l
L A
T8 0
9 2
8 1
6 0
0 0
t C
1 A
D E
L EU TDa 0
8 2 8
1 5
0 2
0 1
A f DH C
O1 T
R A
E Y
S L
D D T
A C
E E N
S
)
)
I E
F
)
)
L P
)
)
)
)
U U M
L P
U C L
P L
P S S H
0 C
(
(
0 C D C 5 S S
(
(
S S
(
(
(
(
I I
I S
S S S S
S 2
R R S S L
5 9
P 1
R R
E E S S S
M E
E S S E E E E L
P 5
0 1
S S S S D D F F 0 C C
Y A
C M A
F C
S F
A L
A 0
U T1 0
0 0
1 1
0 0
0 0
C A
Y R
A M
M D
U E
t S
JD'1 0
2 0
1 1
0 0
0 0
E H
C S
D D E E
)
)
Y A
)
)
L P
)
)
)
)
U U U
L P
0 C L
P L
P S S 0
C
(
(
0 C 0 C S S
(
(
S S
(
(
(
C I
I R
S S
S s
S S
E W
S S O
R R
P R
R E E S S S
S L
E E S
S E E E E L
P L
U S 5 5 S D D F
F C C F
M 1
i j1 l
l llllll1l
LICENSING SCHEDULES FOR ALL PENDING OL APPLICATIONS REPORT AS oft 05/15/82 (INCLUDES SCHEDULES FOR ADDITIONAL UNITS WITH PROJECTED CONSTRUCTION COMPLETION IN CY 1982-1903)
(LISTED IN ORDER OF FACILITY HM1E)
%%ER EST.
STAFF TECH STAFF TECH AStB COMMM APPL.
DELAY ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.
CONST.
PLANT (MONTHS) Di$
TO DL iff mig
[FS TO DL SSFR OF HRG pfCISION pglg gnLit(.
QELLEFONTE 1 0
11/82 02/83 03/83 04/83 05/83 05/83 06/83 N/A N/A 09/83 09/83 l
BYRON 1 0
11/31C 01/82C 02/82C 03/82C 04/82C 05/82C 03/82C 08/82 03/83 04/83 04/83 CALLAWAY 1 0
09/81C 09/81C 10/8tC 11/81C 01/82C 01/82C 01/82C 11/8tC 09/82 10/82 06/83 i
CATAWBA 1 0
08/82 01/83 02/83 03/83 01/83 04/83 04/83 02/83 07/83 08/83 10/84 CLINTON 1 0
12/8tC 09/80C 02/82C 03/82C 05/82C 06/82 06/82 08/82 12/82 01/83 01/84 l
COMANCHE PEAK 1 0
05/81C 07/81C 07/8tC 11/8tc 09/8tC 01/83 07/82 12/8tC 09/82 10/82 06/83 COMANCHE PEAK 2 0
05/81C 07/81C 07/8tc 11/81C 09/81C 01/83 11/83 12/81C 09/82 12/83 12/84 i
DIABt0 CANYON 1 0
12/72C 01/75C 10/74C 07/76C 05/76C 06/82 07/82 12/76C '06/82 DIABLO CANYON 2 0
12/72C 01/75C 10/74C 07/76C 05/76C 06/82 N/$
12/76C 06/82 07/82 ENRICO FERMI 2 0
04/81C 05/77C 09/77C 08/81C 09/81C 01/82C 01/82C 03/82C 08/82 09/82 06/83 GRAND CULF 1 1
05/81C 08/81C 09/81C 10/81C 10/81C 07/82 06/82 N/A N/A 06/82 05/82 LASALLE 1 2
03/78C 02/81C 03/81C 04/&lC 11/78C 12/81C 06/82 N/A N/A 06/82 04/82G LASALLE 2 0
03/78C 02/81C 03/81C 04/81C 11/78C 12/81C 05/82 N/A N/A 06/82 01/83 MCGUIRE 2 0
10/75C 01/78C 03/78C 04/78C 04/76C 12/82 01/83 03/77C 06/81C 03/83 04/83 i
MIDLAND 1 0
02/82C 04/82C 05/82C 06/32 07/82 06/82 11/83 11/82 06/83 12/83 12/83 MIDLAND 2 0
02/82C 04/82C 05/82C 06/82 07/82 06/82 07/82 11/82 06/83 07/83 07/83 PALD VERDE 1 0
10/81C 10/81C 11/81C 12/81C 03/82C 07/82 07/82 04/82C 10/82 11/82 11/82 PALO VERDE 2 0
10/81C 10/81C 11/81C 12/81C 03/82C 07/82 10/83 04/82C 10/82 11/83 11/83 PERRY 1 0
02/82C 05/82C 05/82 07/82 07/82 07/82 07/82 11/82 04/83-05/83 11/83 4
RIVER BEND 1 0
07/82 09/82 10/82 11/82 12/82 11/82 11/82 04/83 09/83 10/83 04/85 SAN ONOFRE 2 4
01/8tC 01/81C 02/81C 02/81C 09/81C 05/82 06/82 06/81C 05/82C 06/82 02/82C SAN ONOFRE 3 0
01/81C 01/81C 02/81C 02/8tc 04/81C 05/82 07/82 06/81C 05/82C 04/82 11/82 SEABROOK 1 0
05/82C 08/82 09/82 10/82 10/82 10/82 10/82 03/83 10/83 11/83 11/83 SHOREHAM 3
03/77C 03/81C 04/81C 10/81C 10/77C.
08/82 09/82 05/82C 12/82 12/82 09/82 ST LUCIE 2 0
10/81C 09/81C 10/81C 11/81C 04/82C 06/82 07/42 N/A N/A 10/82 10/82 SUMMER 1 0
06/79C 12/80C 02/8tC 03/8tC 05/81C 11/81C 01/82C 06/81C 05/82 06/82-07/82
~
SUSQUEHANNA 1 0
03/81C 03/81C 04/81C 08/8tc 07/81C 05/82C 05/82 10/8tC 04/82C 05/82 07/82 SUSQUEHANNA 2 0
03/81C 03/81C 04/81C 08/81C 07/81C 05/82C 03/83 10/81C 04/82C 04/83 01/84 1
WASHINGTON NUCLEAR 2 0
07/8tC 05/82 03/82C 07/82 12/81C 07/82 08/82 N/A N/A 09/82 09/83 l
WATERFORD 3 0
05/81C 05/81C 07/81C 08/81C 09/81C 01/82C 07/82 03/82C 10/82 11/82 01/83 WATTS BAR 1 0
06/78C 06/82 06/82 08/82 12/78C 08/82 09/82 N/A N/A 08/83 08/83
}
WOLF CREEK 1 0
01/82C 03/82C 04/82C 05/82C 06/82 05/82 05/82 10/82 03/83 04/83 12/83 ZIMMER t 0
10/76C 12/77C 01/79C 03/79C 06/77C 05/82 06/82 02/82C 06/82 07/82 12/82 l
0 LICENSING SCHEDULES AND DECISION DATES DO NOT REFLECT POTENTIAL DELAY FROM EMERGENCY PREPAREDNESS REVIEW.
3 i
4
1983 LICEHSING SCHEDULES FOR ALL TENDERED OL UNITS TO BE ISSUED AFTER CY ISSUE APPL. CONST.
PLANT SSFR COMPLETE BELLEF0HTE 2 H/S 09/84 BRAIDWOOD 1 05/84 04/85 BR AID?!00D 2 04/86 j
l DYRON 2 N/S 12/84 CATAWBA 2 N/S 10/86 CLIHT064 2 N/S FERMI 2 (FSAR RESUB)
GRAND GULF 2 H/S H/S HARRIS 1 01/84 12/84 HARRIS 2 N/S 06/88 LIMERICK 1 10/83 10/84 LIMERICK 2 10/86 PALO VERDE 3 N/S 11/85 PERRY 2 05/87 RIVER BEND 2 H/S SEABROOK 2 02/86 SOUTH TEXAS 1 08/83 12/86 SOUTH TEXAS 2 H/S 12/88 UASHINGTON HUCLEAR 1 01/84 12/85 WATTS BAR 2 09/82 08/84
~~_ -
1 LICENSING SCHEDULES FOR ALL PENDING CP APPLICATIONS REPORT AS OF: 0$/15/82 (LISTED IN ORDER OF FACILITY HAME)
SER SSER STAFF TECH STAFF TECH ASLB COMM ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.
PLANT QL1 TO D(
1ER 51G
[f}
T O D1
- SSER OF HRG DFCISION P A_l[
07/74C 08/75C 09/75C 04/76C 10/75C 03/76C 09/8tC 06/76C 06/82' 88/82 ALLENS CREEK 1 07/74C 11/74C tt/74C 12/74C tt/74C 03/75C 10/8tC 03/75C 08/82 11/82 CLINCH RIVER 02/76C 01/83 03/83 05/83 02/77C 06/83 07/83 08/82 05/84 06/84 PEBBLE SPRINGS 1 8 2 Ot/75C 12/75C 01/76C 02/7tC 04/75C N/S N/S N/S N/S N/S SKAGIT/HANFORD 182 05/82C 07/77C 08/77C 07/82 08/82 04/82C 06/82 07/75C 04/83 07/83 l
f
NEW APPLICATION F 0 R E C A S T --- 0 P E R A T I N G LICENSE REVIEW $
(ANT 8CIPATED TENDER DAVES FOR ALL UNITS WZTH CONSTRUCTION PERMITS)
AS OF WEEK ENDING: 05/15/82 LICENSING APPL.
APPL.
1ST UNIT DOCKET PROJECT SUBMITS SUBMITS CONST.
FACILITY NUMBER UTILITY MANAGER FSAR ENV. RPT. COMPLETE COUNSEL FYG21 WASHINGTON NUCLEAR 1 050-00460 WASHINGTON PUBLIC POWER SUPPLY
. UNASSIGNED 12/00/81C 12/00/81C 12/00/85 J.TOURTELLOTTEl l WASHINGTON NUCLEAR 3 050-00508 WASHINGTON PUBLIC POWER SUPPLY
. UNASSIGNED 06/00/82 06/00/82 06/00/86 D.SWANSON l
.. ____..__________.________________________......._..__.._________________________._..._-_- -......___....=
FYB3 MARBLE HILL ' t2 054680547 PUBLIC SERVICE OF INDIANA E.DOOLITTLE 12/00/82 12/00/82 06/08/86 R.LESSY MILLSTONE 3 050-00423 NORTHEAST NUCLEAR ENERGY J. GRANT 12/00/82 12/00/82 12/00/85 M.ROTHSCHILD-BEAVER VALLEY 2.
050-00412 DUQUESNE LIGHT E.DOOLITTLE 12/31/82 12/31/82 12/00/85 J.GUTEIRREZ NINE MILE POINT 2 050-00410 NIAGARA MOHAWK POWER D. LYNCH 01/00/83 01/00/83 03/00/86 B.BORDENICK HOPE CREEK 1 050-00354 PUBLIC SERVICE ELECTRIC 8 GAS
. UNASSIGNED 06/00/83 06/00/83 06/00/86 R. BLACK V0GTLE 1 82 0424 0425 GEORGIA POWER J. GRANT 09/00/83 09/00/83 09/00/86 B.BORDENICK FYG6l NORTH ANNA 3 050 00404 VIRGINIA ELECTRIC & POWER
. UNASSIGNED 04/00/86 04/00/86 04/00/89 R. GODDARD l
._-_-____.__..........____________________________________________..__....____- ______________ _== -==--- ___ ___===...--...
4 fu f
4
.e 4
,--e-d
,/
% e
_A-
H PW APPL ICAT ION F 0 R E C A S T -- C 0 N S T R U C T I O N P E R Pt ITS AS OF WEEK ENDING: 05/15/82
_____.______________________________________,__________________ ___________,_____________________________________ APPL. PSARl PROJECT PROJECT APPL. ER NUMBER MANAGER SUB. DATE SUS. DATE I l FACILITY l NAME UTILITY
__g..________________________
.W._________
.._quS-.________
l CARROLL 1 &2 COMMONWEALTH EDISON 559 J. WILSON 10/00/84 10/00/84 l l
4 o
f
/
M
/
/
.Y g
l
/*
eJ
.s
/
t e
/
f d
/
P, T
~ f y
s e
a rv
=
e*',
- P wo es 9
1
~
l
C0MNON ABBREVIATIONS USED WITHIN THE PUBLICATION ACRS: ADVISORY COMMITTEE ON REACTOR SAFEGUARDS L.A.:
LICENSING ASSISTANT AE:
ARCHITECT / ENGINEER LESR: LIMITED EARLY SITE REVIEW (ALSO ABBREVIATED LES)
AEB ACCIDENT EVALUATION BRANCH LGR LICENSING GUIDANCE BRANCH ASB AUXILIARY SYSTEMS BRANCH LNFBR: LIQUID METAL FAST BREEDER REACTOR ASLB ATOMIC SAFETY LICENSING BOARD LQB LICENSEE QUALIFICATIONS BRANCH B8R:
BURNS 8 ROE MES:
MECHANICAL ENGINEERING BRANCH 58V:
BLACK 8 VEACH MPA:
MANAGEMENT AND PROGRAM ANALYSIS i
B8W:
BABCOCK 8 WILCOX MTER: MATERIALS ENGINEERING BRANCH BECH: BECH1EL MEW MEGAWATTS ELECTRIC BRRT: BROMN 8 ROOT MUT MEGAWATTS THERMAL BWR BOILING WATER REACTOR NSSS: NUCLEAR STEAM SYSTEMS SUPPLIER CEB:
CHEMICAL ENGINEERING BRANCH OL:
OPERATING LICENSE COMB: COMBUSTION ENGINEERING OLB:
OPERATOR LICENSING BRANCH CP:
CONSTRUCTION PERMIT OPS:
OFFSHORE POWER SYSTEMS CPB CORE PERFORMANCE BRANCH CSB CONTAINMENT SYSTEMS BRANCH CWE:
COMMONWEALTH EDISDN PDA:
PRELIMINARY DESIGN APPROVAL PGSE: PACIFIC GAS 8 ELECTRIC DES:
DRAFT ENVIRONMENTAL STATEMENT PID:
PARTIAL INITIAL DECISION PM:
PROJECT MANAGER PS:
P0MLR SYSTEMS BRANCH EEB:
ENVIRONMENTAL ENGINEERING BRANCH PSAR: PRELIMINARY SAFETY ANALYSIS REPORT EPA:
ENVIRONMENTAL PROTECTIDH AGFHCY PTRB: PROCEDURES AND TEST REVIEW BRANCH EPLB: EMERGENCY PREPAREDNESS LICENSING BRANCH PWR:
PRESSURIZED WATER REACTOR ER:
ENVIROMMENTAL REPORT l
EQB EQUIPMENT QUALIFICATION BRANCH ESR:
EARLY SITE REVIEW QAD:
QUALITY ASSURANCE BRANCH ETSB EFFLUENT TREATMENT SYSTEMS BRANCH RAB RADIOLOGICAL ASSESSMENT BRANCH F.R.:
FEDERAL REGISTAR RSB REACTOR SYSTEMS BRANCH FDA:
FINAL DESIGN APPROVAL t
FES:
FINAL ENVIRONMENTAL STATEMENT
)
FSAR: FINAL SAFETY ANALYSIS REPORT 58L SARGENT & LUNDY
[
S8W STONE a UEBSTER SAB:
SITING ANALYSIS BRANCH G8H GIBBS 8 HILL SAR:
SAFETY ANALYSIS REPORT GHDR: GIBBS 8 HILL SDA:
STANDARD DESIGN APPROVAL GIL:
GILBERT COMMONWEALTH SEB STRUCTURAL ENGINEERING BRANCH GSB:
GEOSCIENCES BRANCH SER:
SAFETY EVALUATION REPORT SIB:
SYSTEMS INTERACTION BRANCH SP:
SPECIAL PROJECT HGB:
HYDROLOGIC AND GE0 TECHNICAL BRANCH SSC:
SOUTHERN SERVICES COMPANY HTGR: HIGH TEMPERATURE GAS COOLED REACTOR SSER: SUPPLEMENT TO SAFETY EVALUATION j
TVA:
TENNESSEE VALLEY AUTHORITY ICB:
INSTRUMENTATION AND CONTROL BRANCH 4
UEC:
UNITED ENG. 8 CONSTRUCTORS UFB:
UTILITY FINANCE BRANCH WEST: WESTINGHOUSE
~
N M
2 O
M O
L.J th
PR0 JECT 3NDEX SECTION II OPERATING LICENSE REVIEW CONSTRUCTION PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS 2-1 BELLEFONTE 1 &2 2-33 ALLENS CREEK 1 2-37 (80P)BOPSSAR/BSAR-205 2-47 (SP)FNP 1-8 (MANUF.)
2-2 BRAIDWOOD 1 82 2-34 CLINCH RIVER 2-38 (BOP)ESSAR/BSAR-205 2-48 BLUE HILLS SITE 2-3 BYRON 1 42 2-35 PEBBLE SPRINGS 1 82 2-39 (BOP)ESSAR/CESSAR-80 2-49 CARROLL SITE 2-4 CALLAWAY 1 2-36 SKAGIT/HANFORD 182 2-40 (BOP)ESSAR/RESAR-414 2-5 CATAWBA 1 42 2-41 (BOP)GAISSAR 2-6 CLINTON 1 42 2-42 (BOP)GISBSSAR (W) 2-7 COMANCHE PEAK 1 42 2-43 (BOP)SWESSAR/BSAR-205 2-8 DIABLO-CANYON 142 2-44 (NSS)CESSAR SYSTEM 80 2-9 ENRICO FERMI 2 2-45 (NSS)GESSAR SEVERE ACC 2-10 FERMI 2 (FSAR RESUB) 2-46 (NSS)GESSAR-238 HI 2-11 GRAND GULF 1 42 2-12 HARRIS 1 82 2 L ASALLE 1 4 2 2-14 LIMERICK 1 &2 2-15 MCGUIRE 2 2-16 MIDLAND 1 &2 2-17 PALO VERDE 1,2,3 2-18 PERRY 1 &2 2-19 RIVER BEND 1 &2 2-20 SAN ONOFRE 2 & 3 2-21 SEABROOK 1 &2 2-22 SHOREHAM 2-23 SOUTH TEXAS 1 42 2-24 ST LUCIE 2 2-25 SUMMER 1 2-26 $USQUENANNA 1 82 2-27 WASHINGTON HUCLEAR 1 2-28 WASHINGTON NUCLEAR 2 2-29 WATERFORD 3 2-30 WATTS BAR 1 82 2-31 WOLF CREEK 1 2-32 ZIMMER 1
NRR LICENSING SVSTEM PAGE NO: 2-1 BELLEFONVE 1 82 0L CURRENT STATUS REPQRT REPORT AS OF 05/15/83 PLANT CHARACTERISTIC 52 KEY PERS0NNELa DOCKET NO:
043880439 LIC. PM:
D. SCALETTI ASLB CHAIR: N/A APPLICANT:
TENNESSEE VALLEY AUTHORITY LIC. BC:
E. ADENSAM MEMBER 18 N/A LOCATION:
6 MI NE OF SCOTTSBORD. ALA LIC. LA.:
M.
DUNCAN MEMBER 2:
N/A REGIDH:
2 AE TVA COUNSEL:
B. PATON CONST. INSP J. WILCOX REAC. TYPE: PWR NSSS: 88W ANTITRUST J. RUTBERG RESID. INSP J. WILCOX DESIGN PWR 3760 MWT/1235 MWE CONST: TVA MPA ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE As a result of appilcant's construction delay, the review schedule has been delayed.
ER DOCKETED:
06/12/78 06/12/78C ER SITE VISIT COMPLETE:
06/11/82 INPUT TO DES TO PM:
09/30/82 ISSUE DES:
11/22/82 RESPCNSE TO COMMENTS ON DES:
04/22/83 ISSUE FES:
05/20/83 CURRENT ENV. STATUS:
As a result of appilcant's construction delay, the review schedule was delayed, and is being re evaluated.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
02/03/78 02/03/78C SAR DOCKETED:
06/12/78C SAR Q'S RECEIVED BY PM:
07/03/80 04/02/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 06/25/82 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
08/13/82 No hearing is anticipated.
ISSUE DRAFT SER:
INPUT TO SER:
02/11/83 ISSUE SER:
03/10/83 ACRS FULL COMMITTEE MEETING:
04/15/83 INPUTS TO SE SUPPLEMENT 1 05/27/83 ISSUE SE SUPPLEMENT 1 06/24/83 FEMA LETTER RECEIVED:
CURRENT ANTITRUST Pending determination HEARING STARTED:
N/.A ASLB INITIAL DECISION:
N/A ASLB FINAL DECISION:
N/A TECH SPECS COMPLETED:
07/29/83 COMMISSION DECISION:
09/00/83 ISSUE PARTIAL POWER LICENSE:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE 09/00/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Applicant has delayed its construction which has CONSTRUCTION COMPLETION - APPL.:
09/00/83 12/31/81 c.
delayed our review schedule.
I,
PAGE No 2-2 NRR LICEN5ING
$YSTEM BRAIDWOOD 1 4 2 0L CURRENT STATUS R EPQRT REPORT AS OF 05/15/82 KEY PERS0NNEL PLAN T CHARACTERI$ TIC $8 LIC. PM:
K. KIPER ASLB CHAIR M. MILLER LIC. BC:
J. YOUNGBLOOD MEMBER 1 R.
COLE DOCKET NO:
045610457 LOCATION:
24 MI SSW OF JOLIET, ILL LIC. LA.:
M. RUSNBROOK MENBER 2:
D. CALLINAN APPLICANT:
COMMONWEALTH EDISON REGION:
3 AE2 SSL COUNSEL:
D. HASSELL CONST. INSP C. JONES REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP L. MCGREGOR DESIGN PWR 3425 MWT/1120 MWE CONST: CWE MPA ANALYST: M. KING ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
Several portions are under contract review.
ER DOCKETED:
11/30/78C ER SITE VISIT COMPLETE:
04/15/83 INPUT TO DES TO PM:
11/01/83 ISSUE DES:
01/00/84 RESPONSE TO COMMENTS ON DES:
04/01/84 ISSUE FES:
06/00/84 l
CURRENT ENV. STATUS:
Inactive.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/26/78 06/26/78C SAR DOCKETED:
11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:
12/01/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 03/01/83 INPUT TO DRAFT SER TO PM:
05/01/83 CURRENT HRG. STATUS:
ISSUE DRAFT SER:
09/20/83 There will be a contested hearing.
INPUT TO SER:
11/01/83 ISSUE SER:
12/01/83 ACRS FULL COMMITTEE MEETING:
01/00/84 INPUTS TO SE SUPPLEMENT 18 04/01/84 ISSUE SE SUPPLEMENT 13 05/00/84 FEMA LETTER RECEIVED:
N/S Applicant has submitted antitrust information pursuant to NEARING STARTED:
10/00/84 CURRENT ANTITRUST ASLB INITIAL DECISION:
03/00/85 Reg. Guide 9.3.
ASLB FINAL DECISION:
TECH SPECS COMPLETED:
09/00/84 COMMISSION DECISIGHz 04/00/85 ISSUE PARTIAL POWER LICENSE:
ISSUE FULL POWER LICENSE:
04/00/85 LATEST AMENDMENT:
FSAR Amendment No. 37 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
04/00/85 12/31/81 l
NRR LICENSING SYSTEM PASE NO: 2-3 BYRON 1 82 0L CURRENT STATUS REP 0RT REP 02T AS OF: 05/18/82 PLANT CHARACTER ISTICSt KEY PERSONN E La DOCKET NO:
045480455 LIC. PM:
S. CHESNUT ASLB CHA'IR M. MILLER APPLICANT:
COMMONWEALTH EDISON LIC. BC:
J. YOUNGBLOOD MEMBER 1 R. COLE LOCATION:
17 MI SW OF ROCKFORD, ILL LIC. LA.:
M.
RUSNBROOK MEMBER 2:
D. CALLINAM REGION:
3 AE2 S&L COUNSEL:
- 5. GOLDBERG CONST. INSP W. FORNEY REAC. TYPE: PWR HSSS: WEST ANTITRUST B. V0GLER RESID. INSP W. FORNEY DESIGN PWR 3425 MWT/1120 MWE CONST CWE MPA ANALYST: M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER and Supplement I have been issued.
Several outstanding and confirmatory issues remain to be ER DOCKETED:
11/30/78C resolved prior to licensing.
ER SITE VISIT COMPLETE:
05/31/81 05/31/81C INPUT TO DES TO PM 08/15/81 08/15/81C ISSUE DES:
11/05/81 11/05/81C RESPONSE TO COMMENTS ON DES:
03/01/82 03/01/82C ISSUE FES:
04/05/82 04/05/82C CURRENT ENV. STATUS:
Environmental review completed and FES (HUREG-0848) published in April 1982.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
06/26/78 06/26/78C SAR DOCKETED:
11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:
08/15/81 08/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/15/81 10/15/81C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
11/07/81 11/07/81C In discovery.
Hearing scheduled to commence in ISSUE DRAFT SER:
August 1982.
INPUT TO SER:
01/07/82 01/07/82C ISSUE SER:
02/07/82 02/07/82C ACRS LETTER RECEIdED:
03/10/82 03/10/82C INPUTS TO SE SUPPLEMENT 18 05/10/82 05/10/82C ISSUE SE SUPPLEMENT 18 03/30/82 03/30/82C FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST Applicant has submitted antitrust information pursuant NEARING STARTED:
08/08/82 to Reg. Guide 9.3.
ASLB IH7TIAL DECISION:
03/00/83 ASLB FINAL DECISION:
N/$
TECH SPECS COMPLETED:
03/30/83 COMMISSION LECISION:
04/00/83 ISSUE PARTIAL POWER LICENSE:
LATEST AMENDMENT:
ISSUE FULL POJER LICENSE:
04/00/83 FSAR - Amendment 37 ER - Amendment 3 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTIDH COMPLETION - APPL.:
04/00/83 12/31/81 l
l l
NRR L2CENSZNG SYST EM PAGE NO: 2-4 CALLAWAY 1 0L CURRENT
$7AVUS REPQRT REPORT AS OF 09/15/82 KEY P E R S O N N E L:
PLAN T CHARACTERI$TICSt LIC. PM:
G.
EDISDN ASLB CHAIR:
J. GLEASON DOCKET NO:
05000483 APPLICANT:
UNION F:,ECTRIC LIC. BC:
B. YOUNGBLOOD MEMBER 1:
G.
BRIGHT LOCATION:
10 MI SE OF FULTON, M0 LIC. LA.:
M.
RUSNBROOK MEMBER 2:
J. KLINE REGION:
3 AEr BECN COUNSEL:
R.
LESSY CONST. INSP J. KONKLIN REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER '
RESID. INSP: J. NEISLER DESIGN PWR 3425 MWT/1188 MWE CONST DANIEL MPA ANALYST: D. SCHWARZ ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
SAR was docketed 08/08/80.
OL review is in progress.
12/12/80 12/12/80C The SER was issued by NRC on 10/07/81 and the SER ER DOCKETED:
Supplement No. I was issued on 01/15/82.
ER SITE VISIT COMPLETE:
12/00/81 12/00/81C INPUT TO DES 70 PM:
08/01/81 08/01/81C ISSUE DES:
09/29/81 09/29/81C RESPONSE TO COMMENTS ON DES:
12/01/81 12/01/81C ISSUE FES:
01/29/82 01/29/82C CURRENT ENV. STATUS:
ER was docketed 12/12/80.
OL review is in progress.
The DES was issued by HRC on 09/29/81 and the FES was SAFETY / HEARING MILESTONES:
i I
issued on 01/29/82.
APPLICATION TENDERED:
10/25/79 10/25/79C SAR DOCKETED:
08/08/80 08/08/80C SAR Q'S RECEIVED BY PM:
12/18/80 12/18/80C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/81 10/01/81C INPUT TO DRAFT SER TO PM:
CURRENT HRG. STATUS:
A board has been appointed to rule on the intervention ISSUE DRAFT SER:
N/A petition. Nearings were held on limited issues during INPUT TO SER:
09/11/81 09/11/81C November 1981.
The hearing on the one remaining ISSUE SER:
10/07/81 10/07/81C contention, emergency preparedness, is expected to ACRS LETTER RECEIVED:
11/19/81 11/19/81C l
begin August 31, 1982.
INPUTS TO SE SUPPLEMENT 18 01/01/82 01/01/82C ISSUE SE SUPPLEMENT 18 01/15/82 01/15/82C FEMA LETTER RECEIVED:
01/01/82 01/01/82C CURRENT ANTITRUST:
HEARING STARTED:
11/17/81 11/17/81C OL review is in progress.
ASLB INITIAL DECISION:
09/30/82 ASLB FINAL DECISION:
12/00/82 TECH SPECS COMPLETED:
N/S COMMISSION DECISI0Hz 10/00/82 ISSUE PARTIAL POWER LICENSE:
N/S i
l ISSUE FULL POWER LICENSE:
10/00/82 LATEST AMENDMENT:
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
The Caseload Forecast Panel has revised construction CONSTRUCTION COMPLETION - APPL.:
06/00/83 12/31/81 completion from February 1983 to June 1983.
The June 1
1983 estimate is based on the applicant's revised fuel load date.
NRR LICENS8NG SYSTEM PAGE NO 2-5 CATAWBA 1 &2 0L CURRENT 5TATUS REPORT REPORT AS OF 05/15/83 PLANT CHARACTERISTICSt KEY PERSONNELa DOCKET N0s 041380414 LIC. PM:
K. JABBOUR ASLB CHAIR:
J. KELLEY APP 1ICANT:
DUKE POWER LIC. BC:
E. ADENSAM MEMBER 1:
D. CALLINAN LOCATION:
6 MI MHW OF ROCK HILL, SC LIC. LA.:
M. DUNCAN MEMBER 2:
R.
FOSTER REGION:
2 AE DUKE COUNSEL:
G. JOHNSON CONST. INSP P. VAND00RN R E A::. TYPE: PWR NSSS: WEST ANTITRUST:
B.
V0GLER RESID. INSP K. VAN DOORN DESIGN PWR 3582 MWT/1145 MWE CONST DUKE MPA ANALYST L. LANIER CURREt.-T S AF. STATUS:
ENVIRONMENTAL MILESTONES
- SCHED. DATE ACTUAL DATE FSAR acceptance review was completed on 05/22/81.
SAR was docketed on 06/11/81 ER DOCKETED:
06/11/81 06/11/81C ER SITE VISIT COMPLETE:
10/15/81 10/15/81C INPUT TO DES TO PM:
06/00/82 ISSUE DES:
08/05/82 RESPONSE TO COMMENTS ON DES:
11/01/82 ISSUE FES:
01/05/83 CURRENT ENV. STATUS:
ER acceptance review was completed on 05/22/81, and docketed on 06/11/81.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
04/07/81 04/07/81C SAR DOCKETED:
06/11/81 06/11/81C SAR Q'S RECEIVED BY PM:
12/15/81 12/15/8tC SAR APPL. RESPONSE TO Q'S RECEIVED: 06/22/82 CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
07/02/82 Combined hearing anticipated to start 02/83.
ISSUE DRAFT SER:
INPUT TO SER:
01/00/83 ISSUE SER:
02/06/83 ACRS FULL COMMITTEE MEETING:
03/10/83 INPUTS TO SE SUPPLEMENT 18 04/12/83 ISSUE SE SUPPLEMENT 1:
04/30/83 FEMA LETTER RECEIVED:
03/30/83 CURRENT ANTITRUST:
Received one petition to intervene.
HEARING STARTED:
02/28/83 ASLB INITIAL DECISION:
07/31/83 ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISION:
08/00/83 ISSUE PARTIAL POWER LICENSE:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE:
10/00/84 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CP Amend. Issued 12/23/80 indicating change in ownership.
CONSTRUCTION COMPLETION - APPL.:
10/00/84 12/31/81 Staff is reassessing standard assumptions for projecting hearing schedules for plants with const. completion dates bevond '82.
This re-assess. may result in a new schedule.
PhGE NO: 2-6 NQR LZCENSYNG SY$ TEM CLINTON 1 4 2 0L CURRENT
$TATUS REPORT 2EPORT AS OF 05/15/82 KEY PERSONNELa PLA NT CHARACTERISTICSt LIC. PM J. WILLIAMS ASLB CHAIR H. CLARK DOCKET NO:
046180462 LIC. BC:
J. MILLER MEMBER 1 G. FERGUSON APPLICANT:
ILLINDIS POWER LOCATION:
6 MI E OF CLINTON, ILL LIC. LA.:
P. ANDERSON MEMBER 2
- 0. PARIS REGIDH:
3 AE 58L COUNSEL:
R. G00DARD CONST. INSP A. WAGNER REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP: H. LIVERMORE DESIGN PWR: 2894 MWT/0950 MWE CONST BALDWIN MPA ANALYST: M. KING ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
FSAR was docketed 09/08/80.
SER was issued 02/17/82.
Supplement No. 1 is scheduled for issuance 06/30/82.
ER DOCKETED:
03/01/81 09/08/80C i
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
12/08/81 12/08/81C l
ISSUE DES:
12/18/81 12/28/81C RESPONSE TO COMMENTS ON DES:
02/22/82 03/25/82C ISSUE FES:
05/20/82 05/20/82c CURRENT ENV. STATUS:
The draft environmental statement was completed December 1981.
The FES was completed May 1982.
SAFETY / HEARING MILESTCNES:
APPLICATION TENDERED:
12/01/79 12/01/79C SAR DOCKETED:
09/08/80 09/08/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
INPUT TO DRAFT SER TO PM:
CURRENT HRG. STATUS:
Two petitions for leave to intervene were filed.
The ISSUE DRAFT SER:
State of Illinois filed under 10 CFR 2.715(c).
INPUT TO SER:
12/05/81 09/08/80C A prehearing was held on 04/14/81.
A second ISSUE SER:
01/05/82 02/17/82C prehearing was held 05/04/82.
ACRS LETTER RECEIVED:
02/12/82 03/09/82C INPUTS TO SE SUPPLEMENT 18 06/01/82 ISSUE SE SUPPLEMENT 18 06/30/82 FEMA LETTER RECEIVED:
05/18/82 CURRENT ANTITRUST:
HEARING STARTED:
08/00/82 Operating license antitrust review completed ASLB INITIAL DECISION:
12/00/82 March 18, 1982 (SECY-82-f20).
ASLB FINAL DECISION:
N/S TECH SPECS COMPLETED:
COMMISSION DECISION:
01/00/83 ISSUE PARTIAL POWER LICENSE ISSUE FULL POWER LICENSE:
01/30/83 LATEST AMENDMENT:
FSAR Amendment #15, 04/82.
SCHI.D. DATE RECEIPT DATE NEW SLIPS / NOTES:
IPL announced fuel load date of 1/84 by letter dated CONSTRUCTION COMPLETION - APPL.:
01/00/84 04/21/82 04/21/82.
NQR L2 CENSING SYSTEN PAGE NO: 2#7 COMANCHE PEA % 1 &2 0L CURRENT STATUS REPORT REPORT AS OF 05/15/82 PLA NT C H A R A C T E R I S T I C 5:
KEY PER 5 0 N H E La DOCKET NO:
044580446 LIC. PM:
S.
BURWELL ASLB CHAIR:
M. MILLER APPLICANT:
TEXAS UTILITIES GENERATING LIC. BC:
B. YOUNGBLOOD MEMBER 1:
R. COLE LOCATION:
4 MI N OF GLEN ROSE, TEX LIC.
LA.'
N. RUSHBROOK MEMBER 2 K. MCCOLLOM REGION:
.4 AE:
G8H COUNSEL:
M.
ROTHSCHILD CONST. INSP R.
TAYLOR REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP D. KELLY DESIGN PWR 3411 MWT/1150 MWE CONST: BRRT MPA ANALYST M. ANDERSON CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The SER was issued 07/14/81.
The staff deferred scheduling the Comanche Peak review by the ACRS until sufficient ER DOCKETED:
01/19/79 01/19/79C information was provided to resolve a large number of open ER SITE VISIT COMPLETE:
06/20/80 08/07/80C issues.
SSER #1 was issued 10/16/81 Application was INPUT TO DES TO PM:
08/15/80 04/27/81C reviewed by the ACRS on 11/13/81 SSER 82 responding to ISSUE DES:
04/30/81 05/22/8tC the ACRS was issued on 01/20/82.
SSER #3 is scheduled RESPONSE TO COMMENTS ON DES:
07/19/81 08/28/81C to be issued 07/16/82.
ISSUE FES:
09/18/81 09/24/81C CURRENT ENV. STATUS:
The DES was issued on 05/22/81 The EPA Federal Register Notice was printed on 05/29/81 and the comment period SAFETY / HEARING MILESTONES:
ended 07/13/81 The FES was issued on 09/24/81 APPLICATION TENDERED:
03/01/78 03/01/78C SAR DOCKETED:
05/12/78 05/12/73C SAR Q'S RECEIVED BY PM:
12/30/78 02/22/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/08/79 01/31/80C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
04/13/79 03/11/81C The first hearing session was held 12/02/81 in Fort Worth.
ISSUE DRAFT SER:
03/31/81 03/31/81C Issues heard were financial qualifications and the INPUT TO SER:
05/22/81 07/08/81C operating QA program.
The second hearing session on ISSUE SER:
07/14/81 07/14/81C QA/QC during construction is scheduled to start 06/07/82.
The third hearing session on the remaining contention, ACRS LETTER RECEIVED 11/17/81 11/17/81C emergency plans, i s unscheduled.
INPUTS TO SE SUPPLEMENT 3 01/00/83 ISSUE SE SUPPLEMENT 38 07/16/82 FEMA LETTER RECEIVED:
07/01/82 CURRENT ANTITRUST:
ALJ appointed on 02/23/82 to replace ASLB. Prehrg HEARING STARTED:
12/02/81 12/02/81C conference held 04/13/82 to determine status of parties.
ASLB INITIAL DECISION:
09/00/S2 Briefs filed 05/04/82 request immediate imposition of ASLB FINAL DECISION:
09/00/82 settlement license conditions. A Memorandum and Order TECH SPECS COMPLETED:
09/00/82 approving settlemect agreements & proposed license COMMISSION DECISION:
10/00/82 conditions & dismissing proceedings was issued 05/06/82.
ISSUE PARTIAL POWER LICENSE:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE 06/00/83 31 H D. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.
06/00/83 12/31/81 l
~
l t
NRR LICEN$ING SY$ TEM PAGE NO: 2-8 DIABLO-CANYOH 1 &2 0L CURRENT
$TATUS REPORT REPORT AS OF 05/15/82 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET ND:
027540323 LIC. PM:
B. BUCKLEY ASLB CHAIR:
J. WOLF APPLICANT:
PACIFIC GAS 8 ELECTRIC LIC. BC:
F. MIRAGLIA MEMBER 13 J. KLINE LOCATION:
12 MI WSW OF SAN LUIS OBISPD LIC. LA :
J. LEE MEMBER 2:
G. BRIGHT REGION:
5 AE PG8E COUNSEL:
B. JONES CONST. INSP D. KIRSCH REAC. TYPE: PWR NSSS: WEST ANTITRUSTs J. RUTBERG RESID. INSP J. CARLSON DESIGN PWR 3338 MWT/1084 MWE CONST: PG4E MPA ANALYST B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SSER 15 (Equip. Qualification) was i ssued on 10-02-81.
SSER 16 (Emergency Prep.) is estimated for 07/82 (indicated ER DOCKETED:
11/09/71 11/09/71C as SSER9 on schedule). ASLB decision on a full power ER SITE VISIT COMPLETE:
license is projected for June 1982.
Low power license was INPUT TO DES TO PM:
10/09/72 10/09/72C issued on 09-22-81 and suspended on November 19, 1981 ISSUE DES:
12/12/72 12/12/72C RESPONSE TO COMMENTS ON DES:
04/27/73 04/27/73C ISSUE FES:
09/15/75 05/28/76C CURRENT ENV. STATUS:
Camplete SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
07/10/73 07/10/73C SAR DOCKETED:
10/02/73 10/02/73C SAR Q'S RECEIVED BY PM:
01/04/74 01/04/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/01/74 11/01/74C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
01/24/75 01/24/75C LP hearings were held 05-19-81 through 05-22-81 A
ISSUE DRAFT SER:
favorable PID on low power operation was issued July INPUT TO SER:
01/24/75 01/24/75C 17, 1981.
A full power hearing was completed on January ISSUE SER:
10/04/74 10/16/74C 26, 1982.
ACRS LETTER RECEIVED:
05/00/78 07/18/78C INPUTS TO SE SUPPLEMENT 9:
06/21/82 ISSUE SE SUPPLEMENT 9 07/00/82 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST Not required HEARING STARTED:
10/29/75 12/07/76C ASLB INITIAL DECISION:
06/00/82 ASLB FINAL DECISIGHz N/A
+
TECH SPECS COMPLETED:
06/f5/80 09/15/81C COMMISSION DECISION:
06/00/82 ISSUE PARTIAL POWER LICENSE:
09/22/81 09/22/81C LATEST AMENDMENT:
ISSUE FULL POWER LICENSE N/S SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Est. of dates from and of LP hrg to lic. complete CONSTRUCTION COMPLETION - APPL.:
dependent upon dev./ approval of State and local Emergency Plans. Ongoing Design Verif. Program Ilkely to identify olant mods.
Const. comoletion deoendent on mods.
i
NRR LICENSING SVSTEM PAGE NO: 2-9 ENR2C0 FERMI 2 0L CURRENY STATUS REP 0RT REPOR7 AS OF G5/15/82 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:
05000341 LIC. PM:
L. KINTHER ASLB CHAIR G. MILLNOLLIN APPLICANT:
DETROIT EDISON LIC. BC:
J. YOUNGBLOOD MEMBER 1 P. MORRIS LOCATION:
LAGUNA BEACH, MICH LIC. LA.:
M. RUSHBROOK MEMBER 2 D. SCHINK REGION:
3 AE S&L COUNSEL:
C. WOODHEAD CONST. INSP
'REAC. TYPE: BWR NSSS: GE ANTITRUST A.
HOD 0 DON RESID. INSP B.
LITTLE DESIGN PWR 3292 MWT/1093 MWE CONST DANIEL MPA ANALYST: D.
SCHWARZ CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE An interim SER was issued on 09-29-77 and a final SER was i ssued on 07-10-81.
(see second page for milestone ER DOCKETEDt 04/04/75 04/04/75C summary.)
SSER No. I was issued 09-25-81 SSER No. 2 was ER SITE VISIT COMPLETE:
09/27/78 10/31/78C issued 01-29-82 with 7 prelicensing issues outstanding.
INPUT TO DES TO PM:
07/31/81 04/24/81C ISSUE DES:
05/01/81 04/30/81C RESPONSE TO COMMENTS ON DES:
07/31/81 06/29/81C ISSUE FES:
08/31/81 09/04/81C CURRENT ENV. STATUS:
Addendum No. I to the FES was issued 03-03-82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/22/74 10/22/74C SAR DOCKETED:
04/05/75 04/05/75C SAR Q'S RECEIVED BY PM:
06/13/75 08/11/75C SAR APPL. RESPONSE TD Q'S RECEIVED: 08/29/75 01/12/76C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/24/75 03/08/76C A hearing on two issues began on 03-31-82 and ended on ISSUE DRAFT SER:
04-02-82.
The two contentions were: (1) QA/QC during INPUT TO SER:
03/05/76 05/20/77C construction and (2) adequacy of evacuation plans for ISSUE SER:
08/01/77 09/29/77C the local community.
ACRS LETTER RECEIVED:
08/20/81 08/11/81C INPUTS TO SE SUPPLEMENT 2:
01/04/82 01/29/82C ISSUE SE SUPPLEMENT 28 01/26/82 01/29/82C FEMA LETTER RECEIVED:
08/01/82 CURRENT ANTITRUST:
An ASLB decision on antitrust matters was issued on HEARING STARTED:
12/02/81 03/31/82C 04-25-78.
ASLB INITIAL DECISION:
08/31/82 ASLB FINAL DECISION:
N/S TECH SPECS COMPLETED:
09/30/82 COMMISSION DECISION:
09/30/82 ISSUE PARTIAL POWER LICENSE:
N/A LATEST AMENDMENT:
ISSUE FULL POWER LICENSE:
09/30/82 The latest final Safety Analysis Report Amendment is number 41.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
The SSER and FES were emp1. on an accel. sched. to allow CONSTRUCTION COMPLETION - APPL.:
06/01/83 03/29/82 more time for public hearings. Plant constr. is est. to be cmp 1. by 06-01-83 per app. Itr. dated 03-29-82; however, Acolicant's taraat emol. date is still 11-29-82.
HRR LICEN5ING SY$ TEM PATE Con 2-10 FERMI 2 (FSAR RESUB)
OL CURRENT STATUS REP 0RT REPORT AS OF8 05/15/82 PLANT C H A R A C T E R I S T I C S:
KEY PERS0NNELt DOCKET HO:
00007341 LIC. PM:
L. KINTNER
'ASLB CHAIR 8 G. MILLMOLLIN APPLICANT 2 DETROIT EDISON LIC. BC:
J. YOUNGOLOOD MEMB ER 18 P. MORRIS LOCATION:
LAGUHA BEACH, MICH LIC. LA.:
M. RUSHBROOK MEMBER 28 D. SCNINK REGION:
3 AE 58L COUNSEL:
C. WOODMEAD CONST. INSPs REAC. TYPE: BWR NSSS8 GE ANTITRUST
- A.
MODGDON RESID. INSPs B. LITTLE DESIGN PWRt 3292 MWT/1093 MWE CONST DANIEL MPA ANALYST D. SCHWARZ CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE All information on this page reflects the FSAR 1
resubmittal. The SAR resubmittal was docketed on 06-01-78 ER DOCKETED:
and the safety review was completed. A final SER was ER SITE VISIT COMPLETE:
issued on 07-10-81.
Summary of later milestones is on IHPUT TO DES TO PM:
previous page.
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT EHV. STATUS:
SAFETY / NEARING MILESTONES 8 APPLICATION TENDERED:
10/22/74 10/22/74C SAR DOCKETED:
06/01/78 06/01/78C SAR Q'S RECEIVED BY PM 07/01/78 08/02/78C SAR APPL. RESPONSE TD Q'S RECEIVED: 08/08/78 10/02/78C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
09/08/78 03/27/81C a
ISSUE DRAFT SER INPUT TO SER:
06/ IS/81 06/23/81C ISSUE SER:
06/30/81 07/10/81C ACRS FULL COMMITTEE MEETING i
INPUTS TO SE SUPPLEMENT 1
ISSUE SE SUPPLEMENT :
FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
NEARING STARTED:
ASLB INITIAL DECISION:
ASLB FINAL DECISIDH8 TECH SPECS COMPLETED 8 COMMISSION DECISION:
ISSUE PARTIAL POWER LICENSE LATEST AMENDMENT 2 ISSUE FULL POWER LICENSE SCNED. DATE RECEIPT DATE NEW SLIPS / NOTES:
All information on this page reflects the FSAR CONSTRUCTION COMPLETION - APPL.
resubmittal. The schedule for input to the SER slipped due to slippage in the fuel load date because of TMI oause.
I
NRR LICENSING SVSTEM PAGE NO: 2-11 GRAND GULF 1 4 2 0L CURRENT STATUS REPORT REPORT AS OF 05/15/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:
041630417 LIC. PM:
D. HOUSTON ASLB CHAIR N/A APPLICANT:
MISSISSIPPI POWER 8 LIGHT COMPANY LIC. BC:
A.
SCHWENCER MEMBER 18 N/A LOCATION:
25 MI S OF VICKSBURG, MISS LIC. LA.:
E. HYLTON MEMBER 2:
N/A-REGION:
2 AE:
BECH COUNSEL:
M. WAGNER CONST. INSP R. VANDORN REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP A. WAGNER DESIGN PWR 3833 MWT/1250 MWE CONST: BECH MPA ANALYST B.
ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER was issued on September 10, 1981.
ACRS meeting was held Oct. 15, 1981 Post ACRS SSER was issued in ER DOCKETED:
06/05/78 06/30/78C December 1981.
Another SSER is scheduled prior to 5%
ER SITE VISIT COMPLETE:
12/14/79C licensing in June 1982.
A second ACRS meeting is INPUT TO DES TO PM:
04/30/81 04/30/81C scheduled for July 1982 on Hydrogen and HCU floor loads.
ISSUE DES:
05/31/81 05/31/81C RESPONSE TO COMMENTS ON DES:
08/15/81 08/15/81C ISSUE FES:
09/15/81 10/09/81C.
CURRENT ENV. STATUS:
DES was issued in May 1981 FES was issued October 9, 1981 SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
04/28/78 04/28/78C SAR DOCKETED:
06/05/78 06/30/78C SAR Q'S RECEIVED BY PM:
04/24/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/01/80 09/30/80C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S No hearing is scheduled.
ISSUE DRAFT SER:
09/18/81C INPUT TO SER:
04/01/81 08/14/81C ISSUE SER:
06/00/81 09/10/81C ACRS LETTER RECEIVED:
07/10/82 INPUTS TO SE SUPPLEMENT 28 07/15/82 ISSUE SE SUPPLEMENT 28 06/06/82
. FEMA LETTER RECEIVED:
06/00/82 CURRENT ANTITRUST:
OL review is in progress. No significant changes have HEARING STARTED:
N/A occurred since the CP.
ASLB INITIAL DECISION:
N/A ASLB FINAL DECISICH:
TECH SPECS COMPLETED:
05/31/82 COMMISSION DECISION:
06/00/82 ISSUE PARTIAL POWER LICENSE:
06/06/82 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE 06/00/82 SCHED.'DATE RECEIPT DATE NEW SLIPS / NOTES:
In 11/80, the CFP updated Unit 1 construction completion CONSTRUCTION COMPLETION - APPL.:
05/08/82 05/18/82 date to 7/82. However, licensing review is proceeding on a schedule to meet applicant official estimated construction comoletion date of 05/82.
1
~%
NRR LICEN3ING SVSTEM PAGE NO: 2-12 HARRIS 1 &2 0L ' CURRENT STATUS REP 0RT REPORT AS OF 05/15/82 PLANT CHARACTERISTIC 5:
KEY P E R S 0 N N E La DOCKET NO:
0400-0401 LIC. PM:
E. LICITRA ASLB CHAIR:
J. KELLEY APPLICANT:
CAROLINA POWER & LIGHT LIC. BC:
F. MIRAGLIA MEMBER 1:
G.
BRIGHT LOCATION:
20 MI SW OF RALEIGH, NC LIC. LA.:
J.
LEE MEMBER 2 J. CARPENTER REGION:
2 AE EBASCO COUNSEL:
C. BARTH CONST. INSP REAC. TYPE: PWR NSSS: WEST-ANTITRUST:
J. RUTBERG RESID. INSP G. MAXWELL DESIGN PWR 2775 MWT/0915 MWE CONST DANIEL MPA ANALYST M. ANDERSON i
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE FSAR was docketed on 12/22/81 Review has started.
Questions from a number of review branches have been ER DOCKETED:
12/22/81 12/22/81C sent to the applicant.
ER SITE VISIT COMPLETE:
04/08/82 04/08/82C INPUT TO DES TO PM:
08/30/82 ISSUE DES:
10/01/82 RESPONSE TO COMMENTS ON DES:
01/08/83 ISSUE FES:
03/31/83 I
i CURRENT ENV. STATUS:
ER was docketed on 12/22/81. Review has started. The site vi sit was complete on 04/08/82 and questions were sent to SAFETY / HEARING MILESTONES:
applicant on 04/28/82.
APPLICATION TENDERED:
06/26/80 06/26/80C SAR DOCKETED:
12/22'81 12/22/81C SAR Q'S RECEIVED BY PM:
07/1.82 SAR APPL. RESPONSE TO Q'S RECEIVED: 08/02/82 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/15/82 Notice for Opportunity for Hearing was published in the ISSUE DRAFT SER:
12/01/82 Federal Register on January 27, 1982.
Several petitions INPUT TO SER:
06/01/83 were filed. Prehearing conference on petitions scheduled ISSUE SER:
07/08/83 for June 14-15, 1982.
ACRS FULL COMMITTEE MEETING:
08/11/83 l
INPUTS TO SE SUPPLEMENT 1 12/01/83 ISSUE SE SUPPLEMENT 18 01/09/84 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST Status to be determined.
HEARING STARTED:
06/01/84 ASLB INITIAL DECISION:
11/01/84 ASLB FINAL DECISION:
TECH SPECS COMPLETED:
11/01/84 COMMISSION' DECISION:
12/04/84 ISSUE PARTIAL POWER LICENSE:
12/01/84 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE:
12/01/84 No. 2 SCHED. DATE. RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
12/01/84 12/31/81 l
NQR LECEN$2HG SY$ TEM PAGE NO: 3-13 LASALLE 1 82 0L CUQRENT STATU9 R EPQRT REPORT AS OF 05/15/82 PLAHT C H A R A C T E R I S T I C S:
KEY PER50NHEL DOCKET NO:
037340374 LIC. PM:
A.
BOURNIA ASLB CHAIR:
M. MILLER APPLIC?NT:
COMMONWEALTH EDISDN LIC. BC:
A.
SCHWENCER MEMBER 1 F. SHON LOCATION:
11 MI SE OF DTTAWA, ILL LIC. LA.:
E. HYLTON MEMBER 2:
- 0. PARIS REGION:
3 AE 58L COUNSEL:
C. WOODHEAD CONST. INSP H. WESCOTT REAC. TYPE: BWR HSSS: GE ANTITRUST B. V0GLER RESID. INSP: W. GULDEMOND DESIGN PWR 3293 MWT/1078 MWE CONST CWE MPA ANALYST D. SCHWARZ CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SSER-1 was issued in June 1981.
SSER-2 was issued in February 1982.
SSER-3 was issued on April 16, 1982.
A low ER DOCKETED:
01/17/77 05/12/77C power Ifcense to permit fuel load and low power testing was ER SITE VISIT COMPLETE:
01/12/77 06/15/77C issued on Apell 17, 1982.
INPUT TO DES TO PM:
02/17/78 02/17/78C ISSUE DES:
03/22/78 03/29/78C RESPONSE TO COMMENTS ON DES:
07/14/78 07/14/78C ISSUE FES:
09/22/78 11/ 03/78 C CURRENT ENV. STATUS:
Environmental Protection Plan has been issued.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
09/01/76 09/01/76C SAR DOCKETED:
04/08/77 05/12/77C SAR Q'S RECEIVED BY PM:
07/08/77 07/27/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/20/77 08/18/78C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/06/78 11/08/78C Ho hearing.
ISSUE DRAFT SER:
INPUT TO SER:
12/29/78 02/27/81C ISSUE SER:
09/05/80 03/05/81C ACRS LETTER RECEIVED:
04/09/81 04/16/81C INPUTS TO SE SUPPLEMENT 4 12/09/81 12/09/81C ISSUE SE SUPPLEMENT 48 06/04/82 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST Complete.
HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A ASLB FINAL DECISION:
N/A TECH SPECS COMPLETED:
04/12/82 04/12/82C COMMISSIDH DECISION:
06/00/82 ISSUE PARTIAL POWER LICENSE:
04/17/82 04/17/82C LATEST AMENDMENT:
ISSUE FULL POWER LICENSE:
06/00/82 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
A fuel load and low power test (5%) license was issued CONSTRUCTION COMPLETION - APPL.
04/17/82C 12/13/81 on Apell 17, 1982.
/%
i
HRR L7 CENSING SYSTEM PAGE Nos 2 LIMERICK 1 12 0L CURRENT STATUS REPORT REPORT AS OF 05/15/82' PLANT CHARACTERISTIC 5:
KEY PERS0NNEL DOCKET NO:
035280353 LIC. PM:
H. ABELSON ASLB CHAIR L. 3RENNER APPLICANT:
PHILADELPHIA ELECTRIC LIC. BC:
A. SCHWENCER MEMBER 1:
R. COLE LOCATIDH:
35 MI HW OF PHILADELPHIA, PA LIC. LA.:
E. HYLTON MEMBER 2 P. MORRIS REGIUN 1
AE:
BECH COUNSEL:
S. LEWIS CONST. INSP:
REAC. TYPE: BWR HSSS: GE ANTITRUST B. V0GLER RESID. INSP J. DURR DESIGN PWR: 3440 MWT/1065 MWE CONST: BECH MPA ANALYST M. ANDERSON CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Applicant submitted Probabilistic Risk Assessment with FSAR on March 17, 1981.
SAR was docketed on 07/27/81.
ER DOCKETED 07/27/81 07/27/81C PRA under review by Brookhaven National Laboratory; ER S.ITE VISIT COMPLETE:
08/20/82 NUREG/CR on PRA scheduled for issuance 11/30/82.
INPUT TO DES TO PM:
03/25/83 ISSUE DES:
05/06/83 RESPONSE TO COMMENTS ON DES:
09/06/83 ISSUE FES:
10/31/83 CURRENT ENV. STATUS:
i ER was tendered with the FSAR on March 17, 1981 and I
was docketed on 07/27/81.
SAFETY / HEARING MILESTONES:
l APPLICATION TENDERED:
01/00/81 03/17/81C SAR DOCKETED:
07/27/81 07/27/81C SAR Q'S RECEIVED BY PM:
07/08/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 10/07/82 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
01/07/83 Notice of Opportunity of Hearing was published in the ISSUE DRAFT SER:
02/04/83 Federal Register on August 21, 1981 Pre-hearing INPUT TO SER:
07/01/83 conference held January 6-8, 1982.
ISSUE SER:
08/08/83 ACRS FULL COMMITTEE MEETING:
09/08/83 INPUTS TO SE SUPPLEMENT 18 10/07/83 ISSUE SE SUPPLEMENT 1:
10/30/83 FEMA LETTER RECEIVED:
10/07/83 CURRENT ANTITRUST:
Status to be determined.
HEARING STARTED:
04/03/84 ASLB INITIAL DECISION:
10/01/84 ASLB FINAL DECISION:
N/S TECH SPECS COMPLETED:
N/S COMMISSION DECISI0H:
10/31/84 ISSUE PARTIAL POWER LICENSE:
N/S LATEST AMENDMENT:
ISSUE FULL POWER LICENSE:
10/31/84 29, March 31, 1982 (FSAR and ER OL)
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
10/00/84 05-00-81
NRR LICENSING SYST EM PAGE NO: 2-15 MCGUIRE 2 0L CURRENT STATUS REPORT REPORT AS OF: 05/15/82 PLANT CHARACTERISTICS KEY P E R S O N N E L:
DOCKET NO:
05000370 LIC, PM:
R.
BIRKEL ASLB CHAIR:
R. LAZO APPLICANT:
DUKE POWER LIC. BC:
E. ADENSAM MEMBER 1:
X. HAND LOCATION:
17 MI N OF CHARLOTTE, NC LIC. LA.:
M. DUNCAN MEMBER 2:
E.
LUEBKE REGION:
2 AE DUKE COUNSEL:
J. CUTCHIN CONST. INSP M. HUNT REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP P.
BEMIS DESIGN PWR: 3411 MWT/1180 MWE CONST: DUKE MPA ANALYST: B. ST MARY CURRENT SLF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Input for SSER 6 (SSER for unit 2) is due to DL on 12/01/82, with issuance of the supplement scheduled ER DOCKETED:
05/31/74 05/31/74C for 01/31/83.
ER SITE VISIT COMPLETE:
01/30/75 01/30/75C INPUT TO DES TO PM:
08/29/75 08/29/75C ISSUE DES:
11/07/75 10/29/75C RESPONSE TO COMMENTS ON DES:
ISSUE FES:
05/07/76 04/20/76C.
CURRENT ENV. STATUS:
Complete.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
04/05/74 04/05/74C SAR DOCKETED:
04/29/75 05/05/75C SAR O'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Complete.
ff3hfh0SER 05/01/77 01/16/78C ISSUE SER:
02/21/78 03/01/78C ACRS LETTER RECEIVED:
04/14/78 04/14/78C INPUTS TO SE SUPPLEMENT 6 12/01/82 ISSUE SE SUPPLEMENT 6:
01/31/83 FEMA LETTER RECEIVED:
I CURRENT ANTITRUST:
Complete.
HEARING STARTED:
03/15/77 03/28/77C i
ASLB INITIAL DECISI0H:
06/00/81 06/08/81C ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISION:
05/01/83 ISSUE PARTIAL POWER LICENSE LATEST AMENDMENT:
ISSUE FULL POWER LICENSE:
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
04/00/83 12/31/81 i
HRR LICEN5YHG SV$ TEM PAGE NO: 2-16 MIDLAND 1 8 2 0L CURRENT
$TATUS REPQRT REPORT AS OF 05/15/82 PLANT CHARACTERI$ TIC 5:
KEY P E R S 0 N N E La DOCKET NO:
033080329 LIC. PM:
R. HERNAN ASLB CHAIR C. BECNHOEFER APPLICANT:
CONSUMERS POWER LIC. BC:
E. ADENSAM MEMBER 1:
F. COWAN LOCATION:
SW BOUNDARY OF MIDLAND MICH.
LIC. LA.:
M. DUNCAN MEMBER 2 J. HARBOUR REGION:
3 AE:
BECH COUNSEL:
W. PATON CONST. INSP R. COOK REAC. TYPE: PWR NSSS: B&W ANTITRUST:
B. V0GLER RESID. INSP R. COOK DESIGN PWR: 2452 MWT/0818 MWE CONST: BECH MPA ANALYST: M. ANDERSON CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Utilization of National Laboratories or other agencies to complete some review areas is currently ER 00CKFTED:
04/01/78 04/14/78C in progress. CP extension issued 12/28/82. ACRS ER SITE VISIT COMPLETE:
09/08/78 09/08/78C Subcommittee meetings were held on 04/29/82, 05/20-21/82 INPUT TO DES TO PM:
N/S and 06/02/82.
ISSUE DES:
02/05/82 02/05/82C RESPONSE TO COMMENTS ON DES:
06/15/82 ISSUE FES:
07/05/82 CURRENT ENV. STATUS:
The DES was issued 02/05/82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
08/31/77 08/31/77C SAR DOCKETED:
09/30/77 tt/18/77C SAR Q'S RECEIVED BY PM:
03/20/78 10/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/08/78 12/08/78C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
11/01/78 12/01/78C Three prehearings ending 04/27-28/81'were held for a ISSUE DRAFT SER:
separate hearing on soils settlement. Hearing on soils INPUT TO SER:
04/23/82 04/23/82C settlement began July 7, 1981 and is continuing.
ISSUE SER:
05/11/82 05/11/82C ACRS FULL COMMITTEE MEETING:
06/06/82 INPUTS TO SE SUPPLEMENT 1:
06/10/82 ISSUE SE SUPPLEMENT 1:
07/01/82 FEMA LETTER RECEIVED:
07/30/82 CURRENT ANTITRUST:
Proceeding completed. License was amended 10/20/80.
HEARING STARTED:
11/16/82 ASLB INITIAL DECISION:
06/30/83 ASLB FINAL DECISION:
N/S TECH SPECS COMPLETED:
06/25/82 i
COMMISSION DECISION:
07/00/83 i
ISSUE PARTIAL POWER LICENSE LATEST AMENDMENT:
ISSUE FULL POWER LICENSE:
103 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
l CONSTRUCTION COMPLETION - APPL.:
.07/31/83 12/31/81 I
l
I NRR LICEN5ING SYSTEM PAGE NO: 2-17 PALO VERDE 1,2,3 0L CURRENT STATUS REPQRT REP 0Q7 AS OF 05/15/82 PLANT C H A R A C T E R I S T I C S:
KEY PERS0NNELa DOCKET NO:
0528-0530 LIC. PM:
E. LICITRA ASLB CHAIR:
R. LAZO APPLICANT:
ARIZONA PUBLIC SERVICE LIC. BC:
F. MIRAGLIA MEMBER 13 R. COLE LOCATICN:
36 MI W OF PHOENIX, AZ LIC. LA.:
J. LEE MEMBER 2:
D. CALLIHAN REGION:
5 AE BECH COUNSEL:
L. DEWEY CONST. INSP: L. VBRUEGGEN REAC. TYPE: PWR NSSS: COMB ANTITRUST:
B. V0GLER RESID. INSP G.
FIORELLI DESIGN PWR 3817 MWT/1304 MWE CONST: BECH MPA ANALYST D. SCNWARZ CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The safety OL review is in progress. Several " Independent Design Review" meetings have been completed. The SER
.R DOCKETED:
07/01/80 06/20/80C was issued on November 11, 1981.
The SER supplement en SITE VISIT COMPLETE:
01/30/81 01/30/81C Nos. 1 and 2 were issued on February 5, 1982 and May 17, INPU TO DES TO PM:
10/05/81 10/05/81C 1982, respectively. SSER-3 is scheduled to be issued on ISSUE Dt; 10/26/81 10/26/81C July 30, 1982.
RESPONSE T'J (O""ENTS ON DES:
02/25/82 02/25/82C ISSUE FES:
03/11/82 03/11/82C CURRENT ENV. STATUS:
The ER (OL) review is complete. A site visit was completed on January 30, 1981.
The DES was issued on SAFETY / HEARING MILESTONES:
I October 26, 1981 and the FES was issued on March 11, l
1982.
APPLICATION TENDERED:
10/05/79 10/05/79C SAR DOCKETED:
06/20/80 06/20/80C I
SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Five contentions were admitted by ASLB order dated ISSUE DRAFT SER:
Apell 21, 1981.
Two contentions have been subsequently INPUT TO SER:
10/30/81 10/30/81C dropped by the intervenor and two others were ISSUE SER:
11/11/81 11/11/81C summarily disposed of by Board Order dated March 17, 1982.
The remaining contention deals with water ACRS LETTER RECEIVED:
12/18/81 12/18/81C availability. The hearing started on April 27, 1982.
INPUTS TO SE SUPPLEMENT 3 07/09/82 The hearing recessed on April 30, 1982 and will resume ISSUE SE SUPPLEMENT 3:
07/30/82 on May 25, 1982.
FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST Antitrust OL review is in progress.
HEARING STARTED:
04/27/82 04/27/82C ASLB INITIAL DECISION:
10/30/82 i
ASLB FINAL DECISION:
N/S' TECH SPECS COMPLETED:
11/01/82 COMMISSION DECISION:
11/00/82 ISSUE PARTIAL POWER LICENSE:
N/S 1
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE:
11/01/82 FSAR Amendment No. 8 ER Supplement No. 4 SCHED. DATE RECEIPT DATE l
NEW SLIPS / NOTES:
Caseload Forecast Panel estimates for construction CONSTRUCTION COMPLETION - APPL.:
11/01/82 02/00/82 completion on Units 1, 2, and 3 are being j
re evaluated as a result of a March 1982 site visit.
1 O
PAGE NO: 2-10 NRR LICENSING SYSTEM 0L CURRENT STATUS REPQRT REPORT A5 0F: 05/15/82 PERRY 1 82 KEY PERSONNEL PLANT CHARACTER I $ T I C S:
LIC. PM:
J. STEFAND ASLB CHAIR:
P. BLOCH DOCKET NO 044080441 LIC. BC:
A.
SCHWENCER MEMBER 1:
J. KLINE APPLICANT:
CLEVELAND ELECTRIC ILLUMINATING LIC. LA.:
E. NYLTON MEMBER 2:
F. SH3N LOCATION:
7 MI NE OF PAINESVILLE, OHIO REGION:
3 AE2 GIL COUNSEL:
J. THESSIN CONST. INSP ANTITRUST B. V0GLER RESID. INSP M. GILDNER REAC. TYPE: BWR NSSS: GE DESIGN PWR: 3758 MWT/1205 MWE CONST: KAISER MPA ANALYST D. SCHWARZ ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE STATUS:
CURRENT SAF.
The Safety Evaluation Report is scheduled to be ER DOCKETED:
06/26/81 06/19/81C completed May 1982.
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
01/01/82 01/01/82C 02/26/82 02/26/82C ISSUE DES:
RESPONSE TO CGMMENTS ON DES:
06/01/82 07/05/82 ISSUE FES:
j CURRENT ENV. STATUS:
Environmental acceptance review was completed on June SAFETY / HEARING MILESTONES:
9, 1981.
The ER was docketed June 19, 1981.
APPLICATION TENDERED:
05/26/80 06/26/80C 01/09/81 01/30/81C SAR DOCKETED:
SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
INPUT TO DRAFT SER TO PM:
02/24/82 02/24/82C 02/26/82 02/26/82C CURRENT HRG. STATUS:
A prehearing conference was held June 2-3, 1981 in ISSUE DRAFT SER:
04/10/82 05/10/82C INPUT TO SER:
05/24/82 Painesville, Ohio.
ISSUE SER:
ACRS FULL COMMITTEE MEETING:
07/08/82 INPUTS TO SE SUPPLEMENT 1:
07/16/82 ISSUE SE SUPPLEMENT 1:
07/29/82 FEMA LETTER RECEIVED:
09/01/82 11/30/82 CURRENT ANTITRUST:
CP antitrust review has been completed. OL antitrust HEARING STARTED:
ASLB INITIAL DECISION:
04/00/83 status i s under review.
ASLB FINAL DECISION:
N/S TECH SPECS COMPLETED:
N/S COMMISSION DECISION:
05/24/83 ISSUE PARTIAL POWER LICENSE:
11/00/83 ISSUE FULL POWER LICENSE N/S LATEST AMENDMENT:
Humber 6.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
11/00/83 02/08/82
NRR LICENSZNG SYSYEM PAGE NO: 2-19 RIVER DEND 1 82 0L CURRENT 3TATUS REPQRT REPORT AS OF 05/15f82 PLANT C H A R A C T E R I S T I C S:
KEY PERS0NNELa DOCKET NO:
045380459 LIC. PM:
. UNASSIGNED ASLB CHAIR:
B. COTTER APPLICANT:
GULF STATES UTILITIES LIC. BC:
A.
SCHWENCER MEMBER 1 F. REMICK LOCATION:
24 MI NNW OF BATON ROUGE, LA LIC. LA.:
E. HYLTON MEMBER 2*
R. COLE REGIGH:
4 AE:
S8W COUNSEL:
L. DEWEY CONST. INSP R. TAYLOR REAC. TYPE: BWR NSSS: GE
- NTITRUST B. V0GLER RESID. INSP
- 5. BEACH DESIGN PWR: 3015 MWT/0934 MWE CONST. 54W MPA ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Applicant tendered FSAR for docketing on 04/24/81 FSAR was docketed on 08/25/81.
ER DOCKETED:
08/25/81 08/25/81C ER SITE VISIT COMPLETE:
01/22/82 01/22/82C INPUT TO DES TO PM:
08/00/83 ISSUE DES:
07/05/82 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
12/05/82 CURRENT ENV. STATUS:
Appilcant tendered ER for docketing on 04/24/81 ER was docketed on 08/25/81.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
04/24/81 04/24/81C SAR DOCKETED:
08/25/81 08/25/81C SAR Q'S RECEIVED BY PM:
12/07/81 12/16/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/14/82 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
12/17/82 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:
04/04/82 Federal Register on 09/04/81 INPUT TO SER:
09/04/82 ISSUE SER:
10/04/82 ACRS FULL COMMITTEE MEETIN3 11/05/82 INPUTS TO SE SUPPLEMENT 1 11/08/82 ISSUE SE SUPPLEMENT 1:
11/29/82 FEMA LETTER RECEIVED:
11/30/82 CURRENT ANTITRUST Status to be determined.
HEARING STARTED:
04/00/83 ASLB INITIAL DECISIDH:
09/00/83 ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISION:
10/00/83 ISSUE PARTIAL POWER LICENSE:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE:
04/00/85 Humber 3.
NEW SLIPS / NOTES:
SCHED. DATE RECEIPT DATE NRR/0L is assessing advisability of lowering the priority.
CONSTRUCTION COMPLETION - APPL.:
04/00/85 12/31/81 of the review on this case due to the recent 18 month slip in construction schedule.
PAGE NO: 2-20 HRR LICENS ING SYSTEM SAN ONOFRE 2 8 3 LIC CURRENT STATU$
REPORT REPORT AS OF: 05/15/82 PLANT CHARACTERIST I C St KEY P E R S 0 N N E L:
LIC. PM:
H.
ROOD ASL6 CHA.R:
J. KELLEY t
DOCKET HO:
036180362 LIC. BC:
F. MIRAGLIA MEMBER 1 C. HAND APPLICANT:
SOUTHERH CALIFORNIA EDISON LOCATION:
5 MI S OF SAN CLEMENTE, CA LIC. LA.
J.
LEE MEMBER 2 E. JOHNSON REGION:
5 AE:
BECH COUNSEL:
L.
CHANDLER CONST. INSP:
R.
PATE REAC. TYPE: PWR HSSS: COMB ANTITRUST:
B. V0GLER RESID. 1HSP: A. CHAFFEE DESIGN PWR: 3410 MWT/1100 MWE CONST: BECH MPA ANALYST:
M.
ANDERSON ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
SER on geological and seismological matters was issued on 12/31/80.
ACRS subcommittee meeting was held 01/30/81, and ER DOCKETED:
03/01/77 03/23/77C full committee meetings were held 02/5/81 and 03/12/81.
ER SITE VISIT COMPLETE:
05/20/77 C5/20/77C SER (Non-TMI matters), was issued on 02/06/81.
SER INPUT TO DES TD PM:
10/01/77 12/01/80C supplement on TMI issues was issued on 02/25/81. SER ISSUE DES:
01/27/78 01/20/81C supplement No. 2,3,4 and 5 addressing open items were RESPONSE TO COMMENTS ON DES:
04/06/81 04/06/81C issued 05/08/81, 09/16/81, 01/22/82, and 02/16/82. A ISSUE FES:
04/00/81 04/29/81C partial initial decision was rendered on 01/11/82 and an ASLB initial decision was issued on 05/14/82.
CURRENT ENV. STATUS:
DES addressing class 9 accidents was issued 01-20-81, SAFETY / HEARING MILESTONES:
FES was issued 04-29-81.
APPLICATION TENDERED:
11/29/76 11/29/76C SAR DOCKETED:
03/01/77 03/23/77C SAR Q'S RECEIVED BY PM:
08/15/77 09/29/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/18/77 12/08/77C INPUT TO DRAFT SER TO PM:
02/10/78 08/11/78C STATUS:
ISSUE DRAFT SER:
01/15/81 01/15/81C CURRENT HRG.
Motions for summary disposition were granted by ASLB.
Hearing started 06/22/81 and ended 09/31/81.
A INPUT TO SER:
06/23/78 01/15/81C deci sion on low power operation was issued on 01/11/82.
ISSUE SER:
08/01/80 02/05/81C An ASLB initial decision on full power operation was ACRS LETTER RECEIVED:
03/17/81 03/17/81C i ssued on 05/14/82.
INPUTS TO SE SUPPLEMENT 6:
05/27/82 ISSUE SE SUPPLEMENT 6:
06/01/82 FEMA LETTER RECEIVED:
12/01/81 12/01/81C The Staff is reviewing the OL antitrust information.
HEARING STARTED:
06/22/81 06/22/81C CURRENT ANTITRUST:
ASLB INITIAL DECISIDH:
05/14/82 05/14/82C ASLB FINAL DECISION:
TECH SPECS COMPLETED:
02/16/82 02/16/82C COMMISSIDH DECISION:
06/15/82 ISSUE PARTI AL POWER LICENSE:
02/16/82 02/16/82C ISSUE FULL POWER LICENSE:
06/26/82 LATEST AMENDMENT:
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
02/12/82C 02-09-82
NRR LICEN3ING 3YSTEM PAGE NO: 2-21 SEABROOK 1 8 2 0L CURRENT STATUS REP 0RT REPORT AS OF 05/15/82 PLANT C H A R A C T E R I $ T I C S:
KEY P E R S 0 N N E La DOCKET NO:
044340444 LIC. PM L. WHEELER ASLB CHAIR:
H. H0YT APPLICANT:
PUBLIC SERVICE OF HEW HAMPSHIRE LIC. BC:
F. MIRAGLIA MEMBER 1 E. LUEBKE LOCATION:
10 MI 5 0F PORTSMOUTH, NH LIC. LA.:
J. LEE MEMBER 28
- 0. PARIS REGION:
1 AE UEC COUNSEL:
R. LESSY CONST. INSP:
A.
TOTH
'REAC. TYPE: PWR NSSS: WEST ANTITRUST:
A. HODGDON RESID. INSP: A. CERNE DESIGN PWR 3411 MWT/1198 MWE CONST: UEC MPA ANALYST B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The FSAR acceptance review was completed in September 1981.
The FSAR was docketed October 5, 1981.
ER DOCKETED:
10/05/81 10/05/81C ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
03/01/82 03/01/82C ISSUE DES:
05/11/82 05/11/82C RESPONSE TO COMMENTS ON DES:
08/18/82 ISSUE FES:
10/05/32 CURRENT ENV. STATUS:
ER was tendered June 1981.
ER acceptance review was completed September 1981 The ER was docketed SAFETY / HEARING MILESTONES:
October 5, 1981 APPLICATION TENDERED:
06/29/81 06/29/81C SAR DOCKETED:
10/05/81 10/05/81C SAR Q'S RECEIVED BY PM:
01/20/82 03/05/82C SAR APPL. RESPONSE TO Q'E *ECEIVED: 03/12/82 04/13/82C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
05/25/82 Notice for Opportunity for Hearing was published in ISSUE DRAFT SER:
05/31/82 the Federal Register on October 19, 1981 ASLB Memorandum INPUT TO SER:
08/07/82 and Order dated March 12, 1982 establishes prehearing ISSUE SER:
09/07/82 conference May 6-7, 1982 to consider intervention petitions and specific contentions.
ACRS FULL COMMITTEE MEETING:
10/08/82 INPUTS TO SE SUPPLEMENT 18 10/10/82 ISSUE SE SUPPLEMENT 1:
10/30/82 FEMA LETTER RECEIVED:
10/30/82 CURRENT ANTITRUSf:
Status to be determined.
HEARING STARTED:
03/00/83 ASLB INITIAL DECISION:
10/00/83 ASLB FINAL DECISION:
~"
TECH SPECS COMPLETED:
COMMISSIDH DECISION:
11/00/83 ISSUE PARTIAL POWER LICENSE:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE:
11/00/83 44 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
11/00/83 03/25/82
PAGE ND: 2, 32 NRR LI CENSING SYSTEM 0L CURRENT STA TUS REPQRT REPORT,AS OF 05/15/82 SHOREHAM PLANT CHARACTERIST I C 5:
KEY PERSONNEL LIC. PM:
R. GILBERT ASLB CHAIR:
L. BRENNER DOCKET NO:
05000322 LIC. BC:
A. SCHWENCER MEMBER 1:
P. MORRIS LIC. LA.*
E. HYLTON MEMBER 2:
J. CARPENTER APPLICANT 4 LONG ISLAND LIGHTING CD.
REGIDH:
1 AE S8W CDUHSEL:
B. BORDEHICK CONST. INSP: L. HARROW f
LOCATION:
BROOKHAVEN, NY (LI)
ANTITRUST J. RUTBERG RESID. INSP: J. HIGGENS REAC. TYPE: BWR NSSS: GE MPA ANALYST:
L.
LANIER DESIGH PWR: 2436 MWT/0849 MWE CONST: 58W ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
The ACRS meeting was held in October 1981.
SER 01/26/76 01/26/76C Supplement 2 was issued in March 1982.
An additional ER DOCKETED:
Supolement is scheduled for Sept. 1982 or earlier ER SITE VISIT COMPLETE:
08/06/76 08/03/76C INPUT TO DES TO PM 11/22/76 11/29/76C SER 03/11/77 03/24/77C to address resolution of all remaining outstanding ISSUE DES:
matters.
RESPONSE TO COMMENTS ON DES:
07/22/77 07/22/77C 10/21/77 10/18/77C ISSUE FES:
CURRENT ENV. STATUS:
The environmental review is complete.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
09/00/75 09/04/75C 12/15/77 01/26/76C SAR DOCKETED:
SAR Q'S RECEIVED BY PM:
06/04/76 07/09/76C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/23/76 07/23/76C INPUT TO DRAFT SER TO PM:
07/15/77 08/01/77C CURRENT HRG. STATUS:
ISSUE DRAFT SER:
OL hearing is scheduled to start May 4, 1982.
03/10/81 03/10/81C INPUT TO SER:
04/10/81 04/10/81C ISSUE SER:
ACRS LETTER RECEIVED:
09/18/81 10/19/81C INPUTS TO SE SUPPLEMENT 3:
08/01/82 ISSUE SE SUPPLEMENT 38 09/00/82 FEMA LETTER RECEIVED:
06/00/82 CURRENT ANTITRUST:
HEARING STARTED:
N/A Not required.
ASLB INITIAL DECISION:
12/00/82 ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISION:
12/00/82 ISSUE PARTIAL POWER LICENSE ISSUE FULL POWER LICENSE:
LATEST AMENDMENT:
SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:
CONSTRUCTION COMPLETION - APPL.:
09/30/82 05/00/80 l
l
NRR LICENSING SYSTEM PAGE NO: 2-23 SOUTH TEXAS 13 2 0L CURRENY SToTUS REP 0RT REPORT AS OF: 05/15/82 PLANT CHARACTERI5TICSt KEY PERS0NNEL DOCKET NO:
0498&C999 LIC. PM:
D. SELLS ASLB CHAIR:
C. BECHH0EFER APPLICANT:
HOUSTON LIGHTI'G AND POWER COMPANY LIC. BC:
F. MIRAGLIA MEMBER t:
J. LAM 8 LOCATION:
12 MI SSW OF BAY CITY, TEX LIC. LA.:
J. LEE MEMBER 2:
E. HILL REGION:
4 AE BECH COUNSEL:
J. GUTIERREZ CONST. INSP REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP: W. HILL DESIGN PWR: 3800 MWT/1250 MWE CONST EBASCO MPA ANALYST L. LANIER i
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Limited work being performed due to higher priorities.
Work on QA programs and management qual. being compl. for ER DOCKETED:
07/17/78C expedited hearing on these issues. B8R is being ER SITE VISIT COMPLETE:
09/26/78 09/26/78C replaced by Bechtel as the A/E.
B 3 R has been replaced INPUT TO DES TO PM:
03/01/83 by Ebasco as the constructor. Restart of non-safety ISSUE DES:
04/01/83 related constr. is sched. for June '82 8 safety related RESPONSE TO COMMENTS ON DES:
08/15/83 constr. in July '82.
Current FLD is 12/86.
Changes ISSUE FES:
09/02/83 in rev. schedule will be rec'd. in July '82.
I CURRENT ENV. STATUS:
I No activity scheduled pending revision of construction completion date by applicant in July '82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
05/10/78 05/10/78C SAR DOCKETED:
07/17/78C l
SAR Q'S RECEIVED BY PM:
01/22/79 02/08/82C i
SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
12/01/82 As provided in a Commission Order of 9/22/80, there will ISSUE DRAFT SER:
12/27/83 be an expedited hearing on QA programs and manag. Phase I.
INPUT TO SER:
06/04/83 The ASLB will determine whether the appl. is qualified ISSUE SER:
07/01/83 to be licensed to operate in view of its past actions and failures to act in the construction of the facility.
ACRS FULL COMMITTEE MEETING:
08/07/83 Phase II of hearing will consider all aspects of Quadrex INPUTS TO SE SUPPLEMENT 1:
08/14/83 Report. Phase II is expected to begin in late '82 or ISSUE SE SUPPLEMENT 18 08/31/83 early '83.
FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Intervonor comments filed 11-12-80; replies filed 11-24-80.
HEARING STARTED:
01/08/84 The hearing schedule has been suspended.
ASLB INITIAL DECISION:
06/00/84 ASL3 FINAL DECISION:
TECH SPECS COMPLETED:
08/15/83 COMMISSION DECISION:
07/00/84 ISSUE PARTIAL POWER LICENSE:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE:
Admondment 825 was issued 03/15/82.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
l Amendment 25 dated 03/15/82 to FSAR received. Further CONSTRUCTION COMPLETION - APPL.:
12/00/86 03/00/82 l
slips and additional staff review will be required as a result of AE change.
j
._...m
.._m
_.__-_______._m NRR LICENS2NG SVSTEM PAGE NO: 3-24 ST LUCIE 2 0L CURRENT STATUS REPORT REPORT AS OF: 05/15/82 PLANT C N A R A C T E R I S T I C S:
KEY PERS0NNEL:
DOCKET NO:
05000389 LIC. PM:
V. HERSES ASLB CHAIR:
E. BOWERS APPLICANT:
FLORIDA POWER & LIGHT LIC. BC:
F. MIRAGLIA MEMBER 1:
P. MORRIS LOCATION:
12 MI SE OF FT. PIERCE, FLA LIC. LA.:
J. LEE MEMBER 28
- 0. PARIS REGION:
2 AE:
EBASCO COUNSEL:
J. THESSIN CONST. INSP: R. WRIGHT REAC. TYPE: PWR NSSS: COMB ANTITRUST:
B. V0GLER RESID. INSP S. ELROD DESIGN PWR 2700 MWT/0842 MWE CONST: EBASCO MPA ANALYST: M. ANDERSON CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Status of Q-1 and Q-2 review is complete. The SER was issued on 10/09/81 SE Supplement No. I was issued ER DOCKETED:
02/17/81C j
on 12/30/81.
ER SITE VISIT COMPLETE:
02/18/81 02/18/81C 4
INPUT TO DES TO PM:
08/07/81 08/07/81C 1
ISSUE DES:
10/16/81 10/16/81C RESPONSE TO COMMENTS ON DES:
02/08/82 02/08/82C
]
ISSUE FES:
04/23/82 04/23/82C
\\
f CURRENT ENV. STATUS:
The DES was issued on 10/16/81 and the FR Notice was published 10/30/81 The FE% was issued on 04/23/82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
03/31/80 03/31/80C SAR DOCKETED:
02/17/31C SAR Q'S RECEIVED BY PM:
06/15/81 06/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
08/03/81 08/03/81C There have been no petitioners on matters dealing with ISSUE DRAFT SER:
08/10/81 08/10/81C health, safety and environment.
INPUT TO SER:
09/11/81 09/11/81C ISSUE SER:
10/09/81 10/09/81C ACRS FULL COMMITTEE MEETING:
11/12/81 11/12/81C I
INPUTS TO SE SUPPLEMENT 2:
06/30/82 ISSUE SE SUPPLEMENT 2:
07/23/82 FEMA LETTER RECEIVED:
06/30/82 CURRENT ANTITRUST:
settlement amongst the Department of Justice, the NRC Staff NEARING STARTED:
N/A and the licensee has been agreed upon. No contested ASLB INITIAL DECISION:
N/A I
hearing i s expected.
ASLB FINAL DECISION:
N/A
' TECH SPECS COMPLETED:
COMMISSION DECISION:
10/31/82 a
ISSUE PARTIAL POWER LICENSE:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE:
10/31/82 No. 9 (FSAR); No. 4 (ER)
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL (
10/28/82 12/31/81 i
s.
NRR L ICENSING SYST EM PAGE NO: 2-25 SUMMER 1 0L CURRENT STATUS REPORT REPORT AS OF: 05/15/82 PLANT C H A R A C T E R I $ T I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05000395 LIC. PM:
W. KANE ASLB CHAIR:
H. GROSSMAN APPLICANT:
SOUTH CAROLINA ELECTRIC & GAS CO.
LIC. BC:
B. YOUNGBLOOD MEMBER 1:
G.
LINENBECGER LOCATION:
26 MI NW OF COLUMBIA, SC LIC. LA.4 M.
RUSHBROOK MEMBER 2 F.
HOOPER REGION:
2 AE:
GIL COUNSEL:
S. GOLDBERG CONST. INSP:
REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP: J. SK0LDS DESIGN PWR: 2785 MWT/0900 MWE CONST: DANIEL MPA ANALYST:
D. SCHWARZ l
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER Supplement No. 1 was issued 04/28/81. Supplement No. 2 to the SER was issued on 05/28/81. Supplement No.
ER DOCKETED:
01/21/77 02/24/77C 3 was issued in January 1982.
Projected date for ER SITE VISIT CGMPLETE:
06/30/78 05/07/78C issuance of a low power license is May, 1982.
INPUT TO DES TO CM:
09/21/78 05/29/79C ISSUE DES:
10/30/78 06/22/79C RESPONSE TO COMMENTS ON DES:
07/01/80 07/24/80C ISSUE FES:
05/15/81 0 5/21/81C 4
CURRENT ENV. STATUS:
DES supplement on Class 9 accidents was issued in November 1980.
The FES was issued in May, 1981 SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
" 12/10/76 12/10/76C SAR DOCKETED:
'01/21/77 02/24/77C SAR Q'S RECEIVED BY PM:
02/03/78 03/08/78C OtR APPL. RESPONSE TO Q'S RECEIVED: 04/21/78 09/18/78C CURRENT HRG. STATUS:
intervention ISSUE DRAFT SER:
N/A INPUT TO DRAFT SER TO PM:
06/16/78 02/21/79C On 04/31/81 the ASLB by order granted the FUA on 10 contentions. The ASLAB on 06/01/81 reversed the ASLB INPUT TO SER:
06/02/80 12/15/80C decision to admit FUA as an intervenor. The contested ISSUE SER:
08/01/80 02/06/81C hearing began 06/81 and was completed in January 1982.
ASLB initial decision is estimated for 05/82.
ACRS LETTER RECEIVED:
03/18/81 03/18/81C INPUTS TO SE SUPPLEMENT 3:
11/01/81 11/01/81C ISSUE SE SUPPLEMENT 3:
01/08/82 01/08/82C FEMA LETTER RECEIVED:
11/13/81 11/13/81C CURRENT ANTITRUST:
The Attorney general sent his advice on significant HEARING STARTED:
06/22/81 06/22/81C changes to the Commission on 10/10/80.
The Commission ASLB INITIAL DECISION:
05/00/82 on 06/26/81 denied Central Electric Power Coop., Inc.
ASLB FINAL DECISIGH:
N/S petition for antitrust review.
TECH SPECS COMPLETED:
05/00/82 COMMISSION DECISION:
06/00/82 ISSUE PARTIAL POWER LICENSE:
05/00/82 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE:
07/00/82 Number 31.
NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
07/00/82
NRr LICENSING SVSTEM PAGE NO: 2-36 SUSQUEHANNA 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF: 05/15/82 KEY PER50NNEL:
PLANT C H A R A 0 T E R I S T I C S:
LIC. PM:
R. PERCH ASLB CHAIR:
J. GLEASON DOCKET NO:
038780388 LIC. BC:
A.
SCHWENCER MEMBER 1:
G. BRIGHT APPLICANT:
PENNSYLVANIA POWER 8 LIGHT LIC. LA.:
E. HYLTON MEMBER 2:
P. PURDOM LOCATION:
7 MI HE OF BERWICK, PA RECION:
1 AE BECH COUNSEL:
J. CUTCHIN CONST. INSP: L. HARROW REAC. TYPE: BWR NSSS: GE ANTITRUST:
A. HODGDON RESID. INSP G. RHOADS DESIGN PWR: 3440 MWT/1052 MWE CONST: BECH MPA AHALYST L. LAHIER ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
SER wa=
sued 04/06/81. SSER 81 was issued 07/07/81 06/10/78C Post ACR1 SSER 82 was issued 09/10/dt. SSER 83 to be ER DOCKETED:
ER SITE VISIT COMPLETE:
10/20/78 10/20/78C issued in May 1932.
INPUT TO DES TO PM 03/30/81 03/30/81C ISSUE DES:
03/30/81 03/30/81C RESPONSE TO COMMENTS ON DES:
05/21/81 05/21/81C ISSUE FES:
06/15/81 07/02/81C CURRENT ENV. STATUS:
DES was issued on 03-30-81 FES was issued 07-02-82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/05/78 04/10/78C SAR DOCKETED:
07/31/78 07/31/78C SAR Q'S RECEIVED BY PM:
11/17/78 05/15/79C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S.
INPUT TO DRAFT SER TO PM:
04/07/80 04/07/80C CURRENT HRG. STATUS:
The OL hearing is complete; Initial decision issued on ISSUE DRAFT SER:
INPUT TO SER:
03/23/81 03/23/81C 04-12-82.
ISSUE SER:
04/06/81 04/06/81C ACRS LETTER RECEIVED:
08/15/81C INPUTS TO SE SUPPLEMENT 3:
04/30/82 ISSUE SE SUPPLEMENT 3:
05/00/82 FEMA LETTER RECEIVED:
06/00/82 CURRENT ANTITRUST:
OL antitrust review presently being conducted by staff for HEARING STARTED:
10/06/81 10/06/81C the purpose of determining whether significant changes have ASLB INITIAL DECISIDH:
04/12/82 04/12/82C ASLB FINAL DECISION:
occurred since our last antitrust rev:ew took place.
TECH SPECS COMPLETED:
COMMISSION DECISIDH:
05/00/82 ISSUE PARTIAL POWER LICENSE:
ISSUE FULL POWER LICENSE:
LATEST AMENDMENT:
FSAR:
No. 29; ER:
No. 5 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
07/01/82 12/31/81
NRR LICEN3ING SYSTEM PAGE NO: 2-27 WASHINGTON NUCLEAR 1 PCP CURRENT STATUS 3EPORT REPORT AS OF: 05/15/82 PLANT CHARACTERI5TICSt KEY P E R S 0 N N E L:
DOCKET NO:
05000460 LIC. PM:
. UNASSIGNED ASLB CHAIR:
APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:
B. YOUNGBLOOD MEMBER 1 LOCATION:
30 MI NW OF RICHLAND, WASH LIC. LA.:
M. DUNCAN MEMBER 2:
REGION:
5 AE:
UEC COUNSEL:
J. TOURTELLOTTE CONST. INSP: W. ALBERT REAC. TYPE: PWR NSSS: B&W ANTITRUST:
RESID. INSP: A. TOTH DESIGN PWR: 3760 MWT/1267 MWE CONS! BECH MPA ANALYST: L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE l
Application was tendered on 11-25-81 This schedule is being reconsidered in light of a notice of deferral from ER DOCKETED:
05/00/82 l
the applicant.
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
08/00/83 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
01/00/84 CURRENT ENV. STATUS:
DES to be issued 08/83.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
11/25/81 11/25/81C SAR DOCKETED:
05/00/82 SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Notice of Opportunity for Hearing is to be published ISSUE DRAFT SER:
in the Federal Register.
INPUT TO SER:
ISSUE SER:
07/00/83 ACRS FULL COMMITTEE MEETING:
09/00/83 INPUTS TO SE SUPPLEMENT 1 ISSUE SE SUPPLEMENT 18 01/00/84 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
HEARING STARTED:
06/00/84 ASLB INITIAL DECISION:
11/00/84 ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISION:
ISSUE PARTIAL POWER LICENSE LATEST AMENDMENT:
ISSUE FULL POWER LICENSE:
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
12/00/85 12/31/81 A
NRR LICEN5ING SYSTEM PAGE NO: 2-28 WASHINGTON NUCLEAR 2 0L CURRENT STATUS REPQRT REPORT AS OF: 05/15/82 PLANT C H A R A C T E R I S T I C 5:
KEY P E R S 0 N N E L:
LIC. PM:
R. AULUCK ASLB CHAIR:
E. BOWERS DOCKET NO:
05000397 APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:
A. SCHWENCER MEMBER 1:
R. COLE LOCATIONt 30 MI NW OF RICHLAND, WASH LIC. LA.:
E. HYLT'ON MEMBER 2:
E. HILL REGION:
5 AE:
BAR COUNSEL:
W. PATON CONST. INSP: A. TOTH REAC. TYPE: BWR NSSS: GE ANTITRUST B. V0GLER RESID. INSP R. FEIL DESIGN PWR: 3323 MWT/1103 MWE CCNST: BECH MPA ANALYST: L. LANIER ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
SER was issued 3/31/82. Geology / Seismology reviews 02/28/77 04/20/77C will be included in SSER Ho. 1 to be issued in August ER DOCKETED:
ER SITE VISIT COMPLETE:
07/13/77 07/14/77C 1982.
INPUT TO DES TO PM:
06/30/81 06/30/81C ISSUE DES:
07/31/81 07/31/81C RESPONSE TO COMMENTS ON DES:
09/28/81 09/28/81C ISSUE FES:
12/31/81 12/31/81C CURRENT ENV. STATUS:
FES was issued 12-31-81.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/30/76 12/30/76C SAR DOCKETED:
04/01/78 06/22/78C SAR Q'S RECEIVED BY PM:
01/05/79 03/07/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/11/79 07/26/79C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/12/81 10/12/81C Not required ISSUE DRAFT SER:
11/17/81 11/17/81C INPUT TO SER:
05/30/82 ISSUE SER:
03/31/82 03/31/82C ACRS FULL COMMITTEE MEETING:
07/08/82 INPUTS TO SE SUPPLEMENT 18 07/22/82 ISSUE SE SUPPLEMENT 1:
08/20/82 FEMA LETTER RECEIVED:
10/01/82 CURRENT ANTITRUST:
Not required HEARING STARTED:
N/A ASLB INITIAL DECISIDH N/A ASLS FINAL DECISION:
TECH SPECS COMPLETED:
08/30/82 COMMISSION DECISION:
09/00/82 ISSUE PARTIAL POWER LICENSE LATEST AMENDMENT:
ISSUE FULL POWER LICENSE:
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Geology review ic pacing item and requires a pre-ACRS CONSTRUCTION COMPLETION - APPL.:
09/03/83 05/00/82 SSER supplement now estimated for early June.
July ACRS is predicted on resolution of this issue.
(
NRR L2CENS8NG SYSTEM PAGE NO: 3-39 WATERFORD 3 0L CURRENT
$TATUS REPORT REPORT AS OF: 05/15/82 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET HO:
05000382 LIC. PM:
S. BLACK ASLB CHAIR:
S. WOLFE APPLICANT:
LOUISIANA POWER 8 LIGHT LIC. BC:
F. MIRAGLIA MEMBER 1 W. JORDAN LOCATIDH:
20 MI W OF NEW ORLEANS, LA LIC. LA.:
J. LEE MEMBER'2:
H. FOREMAN REGION:
4 AE:
EBASCO COUNSEL:
S. TU'K CONST. INSP W. HUBACEK i
REAC. TYPE: PWR HSSS: COMB ANTITRUST:
B. V0GLER RESID. INSP L. CONSTABLE DESIGN PWR 3560 MWT/1151 MWE CONST: EBASCO MPA ANALYST: M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The safety review was expedited. The SER was issued July 9, 1981 Fuel load date delayed until 01/83 by ER DOCKETED:
12/00/78 12/00/78C applicant from 10/82.
ER SITE VISIT COMPLETE:
12/05/80 12/05/80C INPUT TO DES TO PM:
04/06/81 04/06/81C ISSUE DES:
05/01/81 05/01/81C RESPONSE TO COMMENTS ON DES:
07/24/81 08/19/81C ISSUE FES:
09/30/81 09/30/81C CURRENT ENV. STATUS:
The DES was completed on May 1981.
FES was completed September 1981.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
09/28/78 09/28/78C SAR DOCKETED:
12/18/78C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/80 12/15/80C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
'10/03/80 08/15/81C Contested hearing started 03/82.
Discovery among the ISSUE DRAFT SER:
parties has been held.
INPUT TO SER:
05/08/81 05/15/81C ISSUE SER:
07/09/81 07/09/81C ACRS LETTER RECEIVED:
08/08/81 08/08/81C INPUTS TO SE SUPPLEMENT 48 12/22/81 01/06/82C ISSUE SE SUPPL EMENT 42 07/30/82 FEMA LET(ER RECEIVED:
11/30/82 CURRENT ANTITRUST:
Staff is reviewing OL Antitrust information.
HEARING STARTED:
03/00/82 03/23/82C ASLB INITIAL DECISIDH 10/00/82 ASLB FINAL DECISION:
TECH SPECS COMPLETED:
06/30/82 COMMISSION DECISION:
11/00/82 ISSUE PARTIAL POWER LICENSE:
I LATEST AMENDMENT:
ISSUE FULL POWER LICENSE:
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
To date State of Louisiana does not have an approved CONSTRUCTION COMPLETION - APPL.:
01/16/83 09/00/80 emergency plan, i
NRR L1 CENSING SYSTEM
,PAGE NO: 3-30 0L CURRENT STATUS REPQRT REPORT AS OF: 05/15/82 WATTS BAR 1 82 KEY PERS0NNEL PLANT CHARACTERISTICSt LIC. PM:
T. KENYON ASLB CHAIR N/A DOCKET NO:
039010391 LIC. BC:
E. ADENSAM MEMBER 1:
N/A APPLICANT:
TENNESSEE VALLEY AUTHORITY LIC. LA.:
M. DUNCAN MEMBER 28 N/A LOCATION:
10 MI S OF SPRING CITY. TENN REGION:
2 AE:
TVA COUNSEL:
M. YOUNG CONST. INSP J. MCDONALD REAC. TYPE: PWR NSSS: WEST ANTITRUST:
J. RUTBERG RF.SID. INSP: R. CRLENJAK DESIGN PWR: 3411 MWT/1165 MWE CONST: TVA MPA ANALYST M. KING ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
Additional applicant information is needed on non-TMI and 01/05/77 11/23/76C TMI issues. CFP predicted earliest Unit 1 completion date ER DOCKETED:
Havertheless, schedule is being expedited by ER SITE VISIT COMPLETE:
03/18/77 02/25/77C INPUT TO DES TO PM:
07/06/77 08/18/77C at 08/83.
requiring concurrent review with Sequoyah for all areas (non-site specific matters).
ISSUE DES:
11/29/77 06/02/78C l
l where the plants are identical RESPONSE TO COMMENTS ON DES:
N/A 11/24/78 12/29/78C' ISSUE FES:
CURRENT ENV. STATUS:
Complete except for environmental tech specs.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/30/76 06/30/76C SAR DOCKETED:
10/04/76 10/04/76C SAR Q'S RECEIVED BY PM:
12/15/76 05/20/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/23/77 02/10/78C INPUT TO DRAFT SER TO PM:
06/18/80 04/20/82C CURRENT HRG. STATUS:
ISSUE DRAFT SER:
No hearings are assumed.
INPUT TO SER:
06/04/82 ISSUE SER:
06/25/82 ACRS FULL COMMITTEE MEETING:
08/00/82 INPUTS TO SE SUPPLEMENT 18 08/27/82 ISSUE SE SUPPLEMENT 1:
09/10/82 FEMA LETTER RECEIVED:
04/00/83 CLRRENTANTITRUSp HEARING STARTED:
N/A Complete ASLB IHITIAL DECISION:
N/A ASLB FINAL DECISION:
TECH SPECS COMPLETED:
11/00/82 COMMISSION DECISION:
08/00/83 ISSUE PARTIAL POWER LICENSE:
ISSUE FULL POWER LICENSE:
LATEST AMENDMENT:
FSAR Ho. 46 SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:
CONSTRUCTION COMPLETI0H - APPL.:
08/00/83 04/09/82 1
NRR LICENSING SYSTEM PAGE NO: 2-31 4
WOLF CREEK 1 0L CURRENT STATUS REPQRT REPORT AS OF 05/15/82 PLANT C H A R A C T E R I S T I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05000482 LIC. PM:
J. HOPKINS ASLB CHhlR: J.'GLEASON APPLICANT:
KANSAS GAS 8 ELECTRIC LIC. BC:
B. YOUNGBLOOD M EMB ER 1:
J. LEEDS LOCATION:
3.5 MI NE OF BURLINGTON, KAN LIC. LA.:
M.
RUSHBROOK MEMBER 2:
G. ANDERSON REGION:
4 AE:
BECH COUNSEL:
M. KARMAN CONST. INSD REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP: T. VANDEL DESIGN PWR: 3425 MWT/1150 MWE CONST DANIEL MPA ANALYST D. SCHWARZ CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The SER was issued in April 1982. SSER-1 is expected to be issued on May 30, 1982.
ER DOCKETED:
11/25/80 11/25/80C ER SITE VISIT COMPLETE:
07/28/81 04/21/81C INPUT TO DES TO PM:
10/01/81 10/01/81C ISSUE DES:
01/05/82 01/05/82C RESPONSE TO COMMENTS ON DES:
05/14/82 05/14/82C ISSUE FES 06/05/82 CURRENT ENV. STATUS:
The DES was issued in January 1982.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
02/21/80 02/21/80C SAR DOCKETED:
08/07/80 08/07/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
l l
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
03/12/82 03/12/82C Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:
1 Federal Register on 12/18/80.
Two petitions for INPUT TO SER:
03/19/82 03/19/82C leave to intervene were filed. A special combined ISSUE SER:
04/07/82 04/07/82C l
prehearing conference was held on 4/15/81.
ACRS LETTER RECEIVED:
05/11/82 05/11/82C l
INPUTS TO SE SUPPLEMENT 12 05/10/82 l
ISSUE SE SUPPLEMENT 1:
05/30/82 i
FEMA LETTER RECEIVED:
05/30/82 CURRENT ANTITRUST:
OL antitrust review is in progress.
HEARING STARTED:
10/00/82 ASLB INITIAL DECISION:
03/00/83 ASLB FINAL DECISION:
N/S TECH SPECS COMPLETED:
N/S COMMISSION DECISION -
04/23/83 ISSUE PARTIAL POWER LICENSE N/S LATEST AMENDMENT:
ISSUE FULL POWER LICENSE:
12/00/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Caseload Forecast Panel estimates construction CONSTRUCTION COMPLETION - APPL.:
12/00/83 03/00/82 completion on 6/84.
g PAGE NO: 2-32 1
NRR LICENSING SYSTEM 0L CURRENT STATUS REP 0RT REPORT AS OF 05/15/82 Z2MMER 1 KEY P E R S 0 N N E La l
PLANT CHARACTERI$ TIC 5:
LIC. PM:
G. EDISDN ASLB CHAIR J. FRYE DOCKET NO:
05000358 LIC. BC:
B. YOUNGELOOD MEMBER 1:
F. HOOPER APPLICANT:
CINCINNATI GAS 8 ELECTRIC LIC. LA.:
M. RUSHBROOK MEMBER 28 M. LIVINGSTON LOCATION:
24 MI SE OF CINCINNATI, OH REGION:
3 AE 58L COUNSEL:
C. BARTH CONST. INSP D. HUNTER REAC. TYPE: BWR NSSS GE ANTITRUST S. LEWIS RESID. INSP F. CHRISTIANSON DESIGN PWR 2436 MWT/0810 MWE CONST: KAISER MPA ANALYST M. ANDERSON ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
SE Supplement was issued on 06/04/81. SE Supplement 82 was 09/10/75 09/10/75C ER DOCKETED:
issued 10/00/81. SE Supplement 93 is scheduled to be ER SITE VISIT COMPLETE:
10/09/75 10/09/75C issued 06/82. Licensing completion is estimated for INPUT TO DES TO PM:
08/20/76 08/19/76C 12/00/82.
ISSUE DES:
10/15/76 10/15/76C RESPONSE TO COMMENTS ON DES:
03/25/77 04/01/77C ISSUE FES:
06/10/77 06/10/77C CURRENT ENV. STATUS:
Complete SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
08/15/75 05/09/75C SAR DOCKETED:
09/15/75 09/10/75C SAR Q'S RECEIVED BY PM:
10/29/76 01/06/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/31/76 07/29/77C INPUT TO DRAFT SER TO PM:
01/28/77 08/11/77C CURRENT HRG. STATUS:
Hearing was completed March 5, 1982.
Board decision ISSUE DRAFT SER:
N/A INPUT TO SER:
05/20/77 12/07/77C ISSUE SER:
07/29/77 01/31/79C expected June, 1982.
ACRS LETTER RECEIVED:
09/16/77 03/13/79C INPUTS TO SE SUPPLEMENT 38 05/17/82 ISSUE SE SUPPLEMENT 38 06/00/82 FEMA LETTER RECEIVED:
04/15/82 04/15/82C Antitrust review is now closed. Federal Register Notice HEARING STARTED:
02/26/82 02/26/82C CURRENT ANTITRUST ASLB INITIAL DECISION:
06/26/82 was published 04/09/82.
ASLB FINAL DECISION:
N/S TECH SPECS COMPLETED:
07/29/82 COMMISSION DECISION:
07/30/82 ISSUE PARTIAL POWER LICENSE ISSUE FULL POWER LICENSE 07/30/82 LATEST AMENDMENT:
SCHED. DATE RECEIPT DATE CONSTRUCTION COMPLETION - APPL.:
12/00/82 12/31/81 NEW SLIPS # NOTES:
Applicant has slipped construction completion to 12/82.
Therefore, Zimmer is no longer an impacted plant.
l l
NRR LICENSING SYSTEN PAGE NO: 2-33 ALLENS CREEK 1 CP CURRENT STATUS REP 0RT REPORT AS OF 05/15/82 PL4NT CNARACTERI5 TICS KEY P E R S 0 N N E L:
DOCKET NO:
05000466 LIC. PM:
C. 100N ASLB CHAIR:
S. WOLFE APPLICANT:
HOUSTON LIGHTING AND POWER COMPANY LIC. BC:
E. ADENSAM MEMBER 1:
E. CHEATUM LOCATION:
45 MI W OF HOUSTON, TX LIC. LA.:
M. DUNCAN MEMBER 2 G. LINENBERGER REGION:
4 AE EBASCO COUNSEL:
R. BLACK CONST. INSP REAC. TYPE: BWR NSS$2 GE ANTITRUST:
A.
H0DGDON RESID. INSP:
DESIGN PWR 3758 MWT/1150 MWE CONST EBASCO MPA ANALYST: B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SSER3 on TMI issues, was issued August 6.
The ACRS does not plan to review TMI ER DOCKETED:
12/07/73 12/07/73C issues for Allens Creek. SSER4 on non-TMI issues including ER SITE VISIT COMPLETE:
03/08/74 03/08/74C emergency planning financial capability; unresolved safety INPUT TO DES TO PM:
06/07/74 06/07/74C issue; containment, ultimate heat sink, and fuel designs ISSUE DES:
07/05/74 07/05/74C was istued October 30, 1781 RESPONSE TO COMMENTS ON DES:
09/23/74 10/01/74C ISSUE FES:
11/18/74 11/18/74C CURRENT ENV. STATUS:
A draft second FES supplement was issued in December, 1980.
The final second supplement was issued March 13, 1981.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
08/24/73 08/24/73C SAR DOCKETED:
12/07/73 12/07/73C SAR Q'S RECEIVED BY PM:
03/22/74 03/22/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 06/03/74 07/03/74C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
08/09/74 09/20/74C Env. hearing commenced 01/12/81 and was completed on ISSUE DRAFT SER:
05/15/81 Safety sessions were held May 18-22 and June INPUT TO SER:
10/11/74 11/01/74C 1-12.
Further sessions were held on 10/5-9/81, ISSUE SER:
11/07/74 11/15/74C 10/26-30/81, 11/16-20/81 and 12/7-11/81.
The Board did not dismiss 18 contentions and posed questions on another.
ACRS LETTER RECEIVED:.
12/20/74 12/13/74C An additional hearing is scheduled to start on April 12, INPUTS TO SE SUPPLEMENT 48 01/10/75 03/28/75C 1982 to take additional testimony on technical ISSUE SE SUPPLEMENT 4:
10/15/81 10/30/81C qualifications of the applicant.
CURRENT ANTITRUST:
A set of proposed license conditions has been submitted HEARING STARTED:
03/11/75 03/11/75C to the Licensing Board in the South Texas antitrust ASLB INITIAL DECISION:
08/00/82 l
proceeding. If the South Texas Board approves the ASLB FINAL DECISION:
conditions, they will be attached to the Allens Creek TECH SPECS COMPLETED:
license.
COMMISSION DECISION:
11/00/82 CP ISSUED:
11/00/82 LATEST AMENDMENT:
NEW SLIPS / NOTES:
PAGE NO: 2 '34 NRR LICEN5ING SYSTEM REPORT 55 0F 05/15/82 CP CURRENT STATUS REP 0RT CLINCH RIVER KEY PERS0NNEL PLANT C H A R A C T E R I S T I C S:
LIC PM:
. STARK LEECH ASLB CHAIR:
M. MILLER DOCKET NO:
05000537 LIC. BC:
C. THOMAS MEMBER 13 G. LINENBERGER APPLICANT:
PROJECT MANAGEMENT CORP.; DOE;TVA LIC. LA.:
P. SHUTTLEWORTH MEMBER 2 C. HAND LOCATION:
25 MI W OF KNOXVILLE, TN COUNSEL:
S. TREBY CONST. INSP REGION:
2 AE:
BAR REAC. TYPE: LMFBR NSSS: WEST ANTITRUSTs J. RUTBERG RESID. INSP MPA ANALYST B. ST MARY DESIGN PWR 0975 MWT/0350 MWE CONST: 53W ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
Safety review was reinitiated in October 1981.
04/11/75 04/11/75C ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
02/12/76C ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
02/97/77 02/07/77C.
CURRENT ENV. STATUS:
The FES was issued in February 1977. A document updating the FES is being prepared for issuance on June 22, 1982.
SAFETY /HEARIhG MILESTONES:
APPLICATION TENDERED:
10/15/74 10/15/74C SAR DOCKETED:
06/13/75 06/13/75C SAR Q'S RECEIVED BY PM:
04/09/82 04/09/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/15/82 INPUT TO DRAFT SER TO PM:
07/16/82 The ASLB held a prehearing conference on 2/9-10/82, and ISSUE DRAFT SER:
08/27/82 CURRENT NRG. STATUS:
INPUT TO SER:
01/14/83 on April 6-7, 1982.
ISSUE SER:
03/04/83 ACRS FULL COMMITTEE MEETING:
05/06/83 INPUTS TO SE SUPPLEMENT 18 06/10/83 ISSUE SE SUPPLEMENT 18 07/01/83 CURRENT ANTITRUST:
ASLB INITIAL DECISION:
05/01/84 ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISION:
06/Of/84 06/01/84 CP ISSUED:
LATEST AMENDMENT:
NEW SLIPS / NOTES:
HRR L2 CENSING SYSTEM PAGE NO: 2-35 PEBBLE SPRINGS 1 12 CP CURRENT STATUS REP 0RT REPORT AS OF: 05/95/82 PLANT C H A R A C T E R I S T I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
051480515 LIC. PM:
D. SCALETTI ASLB CHAIR:
I. SMITH APPLICANT:
PORTLAND GENERAL ELECTRIC LIC. BC:
E. ADENSAM MEMBER 1:
D. PARIS LOCATION:
3 MI NW OF ARLINGTON. ORE LIC. LA.:
M. DUNCAN MEMBER 2:
W. JORDAN REGION:
5 AE2 BECH COUNSEL:
B. BORDENICK CONST. INSP REAC. TYPE: PWR NSSS: B&W ANTITRUST:
B. V0GLER RESID. INSP DESIGN PWR: 3760 MWT/1260 MWE CONST: BECH MPA ANALYST L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Amendment 13 to the PSAR in response to 10CFR50.34(f)
(CP/ML rule) was filed 1/29/82.
The staff's review of ER DOCKETED:
08/06/74 08/06/74C the TMI-2 issues is presently in a hold status awaiting ER SITE VISIT COMPLETE:
a decision by PGE whether or not to continue their INPUT TO DES TO PM:
10/11/74 12/11/74C application at a different site (see Environmental Status).
ISSUE DES:
11/15/74 01/06/75C A decision is expected within 2 months.
RESPONSE TO COMMENTS ON DES:
03/07/75 03/22/75C ISSUE FES:
04/07/75 04/16/75C l
CURRENT ENV. STATUS:
On 4/9/82, PGE withdrew their application, before the Oregon Energy facility siting council, for the Pebble SAFETY / HEARING MILESTONES:
Springs site.
The alternative sites hearing before the ASLB scheduled for 4/20 was cancelled.
APPLICATION TENDERED:
06/07/74 06/07/74C SAR DOCKETED:
10/18/74 10/18/74C SAR Q'S RECEIVED BY PM:
12/13/74 01/13/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/14/75 02/04/75C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
04/11/75 05/23/75C A prehearing conference on alternative sites was held ISSUE DRAFT SER:
on December 1, 1981.
INPUT TO SER:
09/01/75 12/08/75C' I
ISSUE SER:
01/05/76 01/12/76C ACRS LETTER RECEIVED:
11/12/76 02/12/76C l
INPUTS TO SE SUPPLEMENT 6:
N/S' ISSUE SE SUPPLEMENT 6:
N/S CURRENT ANTITRUST:
Antitrust review is complete.
HEARING STARTED:
ASLB INITIAL DECISION:
N/S ASLB FINAL DECISION:
TECN SPECS COMPLETED:
COMMISSION DECISION:
N/S CP ISSUED:
N/S LATEST AMENDMENT:
Amendment 13 to the PSAR in response to 10CFR50.34(f).
NEW SLIPS / NOTES:
NRR LICENSING SYSTEM PAGE NO: 3-36 CP CURRENT STATUS REPQRT REPORT AS OF 05/15/82 SKAGIT/NANFORD 182 KEY PERS0NNEL PLANT CNARACTERISTICSt LIC. PM:
C. MOON ASLB CHAIR:
J. WOLF LIC. BC:
E. ADENSAM M EMB ER 1 F. N00PER DOCKET NO:
052280523 APPLICANT:
PUGET SOUND POWER 8 LIGHT REGION:
5 AE BECH COUNSEL:
R. BLACK '
MEMBER 2:
G. LINENBER0ER LIC. LA.:
M. DUNCAN LOCATION:
30 MI. NW OF RICHLAND, WA.
CONST. INSP REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP DESIGN PWR 3833 MWT/1277 MWE CONST BECH MPA ANALYST D. SCHWARZ ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
Supplement No. 2 to the SER was issued 10/81 on TMI-related action items. Site relocation ER amendment and PSAR ER DOCXETED:
09/30/74 09/30/74C amendment were submitted on 12/31/81. The applicant is ER SITE VISIT COMPLETE:
02/05/82 02/05/82C INPUT TO DES TO PM:
04/09/82 04/09/82C relocating the site to the Nanford Reservation.
Supplement No. 3 to the SER is expected to be issued in ISSUE DES:
05/04/82 05/04/82C RESPONSE TO COMMENTS ON DES:
08/06/82 6/82.
ISSUE FES:
08/00/82 CURRENT ENV. STATUS:
Site relocation (to Hanford) DES was issued on SAFETY / NEARING MILESTONES:
May 4, 1982.
APPLICATION TENDERED:
08/06/74 08/06/74C SAR DOCKETED:
01/15/75 o t/15/75C SAR Q'S RECEIVED BY PM:
02/10/82 02/10/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/18/82 03/18/82C I
INPUT TO DRAFT SER TO PM:
CURRENT NRG. STATUS:
ISSUE DRAFT SER:
A special prehearing conference was held on May 5, '1982.
INPUT TO SER:
07/11/77 07/11/77C ISSUE SER:
08/31/77 08/31/77C ACRS FULL COMMITTEE MEETING:
07/00/82 INPUTS TO SE SUPPLEMENT 3 04/09/82 04/09/82C ISSUE SE SUPPLEMENT 3:
06/30/82 CURRENT ANTITRUST:
NEARING STARTED:
07/15/75 07/f5/75C Complete ASLB INITIAL DECISION:
04/00/83 ASLB FINAL DECISION:
N/S TECH SPECS COMPLETED:
N/A COMMISSION DECISION:
07/00/83 CP ISSUED:
07/00/83 LATEST AMENDMENT:
NEW SLIPS / NOTES:
NRR LICENSING SYSTEM PAGE NO: 2-37 (80P)BOPSSAR/BSAR-205 PDA CURRENT STATUS REPORT REPORT AS OF: 05/15/82 PLANT CNARACTERISTICSt KEY PERS0NNELa DOCKET NO:
05000560 LIC. PM:
UNASSIGNED ASLB CHAIR:
APPLICANT:
FLUOR POWER SERVICES LIC. BC:
J. MILLER MEMBER 1:
LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
REGION:
1 AE:
FLUOR COUNSEL:
N/A CONST. INSP REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP DESIGN PWR: 0000 MWT/0000 MWE CONST MPA ANALYST: D. SCHWARZ CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/31/77 10/31/77C SAR DOCKETED:
10/31/77 10/31/77C SAR Q'S RECEIVED BY PM:
04/14/78 06/20/78C SAR APPL. RESPONSE TD Q'S RECEIVED: 06/02/78 07/31/78C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM 05/25/78 07/07/78C ISSUE DRAFT SER:
INPUT TO SER:
08/21/78 10/17/78C ISSUE SER:
10/02/78 12/29/78C ACRS LETTER RECEIVED:
11/17/78 02/16/79C INPUTS TO SE SUPPLEMENT 13 12/08/78 03/21/79C ISSUE SE SUPPLEMENT 1 N/S
)
CURRENT ANTITPUST:
NEARING STARTED:
ASLB INITIAL DECISION:
COMMISSION DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
PAGE NO 2-38 NRR LICENSING SY$ TEM (BOP)ESSAR/BSAR-205 PDA CURRENT STATUS REPORT REPORT AS OF 05/15/82 KEY P E R S O N N E La PLANT C H A R A C T E R I S T I C S:
LIC. PM:
. UNASSIGNED ASLB CHAIR:
DOCKET NO:
00002591 LIC. BC:
J. MILLER M EMB ER 1:
APPLICANT:
EBASCO SERVICES LIC. LA.:
P. ANDERSON MEMBER 2:
REGION:
0 AE:
EBASCO COUNSEL:
. UNASSIGNED CONST. INSP LOCATION:
N/A REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP:
DESIGN PWR: 0000 MWT/0000 MWE CONST:
MPA ANALYST: M. KING ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
Review in abeyance pending the future of standardization, ER DOCKETED:
I and resources to conduct review.
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
l ISSUE DES:
l RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/23/77 11/23/77C SAR DOCKETED:
02/02/78 02/02/78C SAR Q'S RECEIVED BY PM:
N/S i
SAR APPL. RESPONSE TO Q'S RECEIVED: N/S INPUT TO DRAFT SER TO PM:
N/S CURRENT NRG. STATUS:
ISSUE DRAFT SER:
INPUT TO SER:
N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 1 N/S ISSUE SE SUPPLEMENT 18 N/S CURRENT ANTITRUST:
NEARING STARTED:
ASLB INITIAL DECISIGHz COMMISSION DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
)
q NRR LYCENSING SYSTEM PAGE NO: 2* 39 (BOP)ESSAR/CESSAR-80 PDA CURRENT STATUS REP 0RT REPORT AS OF 05/15/82 PLANT C H A R A C T E R I S T I C 5:
KEY PERS0NNELa DOCKET NO:
05000591 LIC. PM:
. UNASSIGNED ASLB CHAIR APPLICANT:
EBASCO SERVICES LIC. BC:
J. MILLER MEMBER 1:
LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
REGION:
0 AE:
EBASCO COUNSEL:
. UNASSIGNED CONST. INSP:
REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP:
DESIGN PWR: 3800 MWT/0000 MWE CONST:
MPA ANALYST: M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization, and resources to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/23/77 11/23/77C SAR DOCKETED:
02/02/78 02/02/78C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER:
INPUT TO SER:
N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 18 N/S ISSUE SE SUPPLEMENT 18 N/S CURRENT ANTITRUS HEARING STARTED:
ASLB INITIAL DECISION:
COMMISSION DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
HRR L% CENSING SYSTEM PAGE NO: 2-40 (BOP)ESSAR/RESAR-414 PDA CURRENT STATUS REP 0RT REPORT AS OF 05/15/82 PLANT CHARACTERISTICS:
KEY P E R S O N H E L:
DOCKET NO:
00007591 LIC. PM:
. UNASSIGNED ASLB CHAIR:
APPLICANT:
EBASCO SERVICES LIC. BC:
J. MILLER MEMBER 18 LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
REGION:
0 AE:
EBASCO COUNSEL:
. UNASSIGNED CONST. INSP:
REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP:
DESIGN PWR: 0000 MWT/0000 MWE CONST:
MPA ANALYST: M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization, I
and resources to conduct review.
ER DOCKETEO:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/23/77 11/23/77C i
l SAR DOCKETED:
02/02/78 02/02/78C SAR Q'S RECEIVED BY PM:
N/S SAR. APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER:
INPUT TO SER:
N/S ISSUE SER:
N/S
.ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 1 N/S ISSUE SE SUPPLEMENT 1:
N/S CURRENT ANTITRUST:
NEARING STARTED:
ASLB INITIAL DECISION:
COMMISSION DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
NRR LICENSING SYSVEM PAGE NO: 2-41 j
(BOP)GAISSAR PDA CURRENV STATUS REP 0RT REPORT AS OF: 05/13/82 PLANT C H A R A C T E R I S T I C S:
KEY P E R S 0 N N E L:
UNASSIGNED ASLB CHAIR:
DCCKET NO:
05000S9S LIC. PM:
. MILLER MEMBER 1:
APPLICANT:
GILBERT COMMONWEALTH LIC. BC:
J.
LOCATION:
N/A LIC.
LA..
P. ANDERSON MEMBER 2:
REGION:
4 AE:
WEST COUNSEL:
M. KARMAN CONST. INSP REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP:
DESIGN PWR: 0000 MWT/0000 MWE CONST:
MPA ANALYST: B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization and resources to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
l l
l l
CURRENT ENV. STATUS:
SAFETY / NEARING MILESTONES:
(
APPLICATION TENDERED:
02/24/78 02/24/78C SAR DOCKETED:
08/21/78C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TD Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER:
N/S INPUT TO SER:
N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S l
INPUTS TO SE SUPPLEMENT 1:
N/S I
l ISSUE SE SUPPLEMENT 1:
N/S CURRENT ANTITRUST
- HEARING STARTED:
ASLB INITIAL DECISION:
COMMISSION DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
HEW SLIPS / NOTES:
NRR LICENSING SYSTEM
,PAGE NO: 2-42 PDA CURRENT STATUS REP 0RT REPORT AS OF 05/15/82 (BOP)GIBBSSAR (W)
KEY PERS0NNEL PLANT CHARACTERISTICSt LIC. PM:
. UNASSIGNED ASLB CHAIR:
DOCKET NO:
05000584 LIC. BC:
J. MILLER MEMBER 1:
APPLICANT:
GIBBS 8 HILL LIC. LA.:
P. ANDERSON MEMBER 2 1
REGION:
0 AE2 GNDR COUNSEL:
M. WAGNER CONST. INSP:
LOCATION:
N/A ANTITRUST:
RESID. INSP:
REAC. TYPE: BOP HSSS:
DESIGN PWR: 0000 MWT/0000 MWE CONST:
MPA ANALYST M. ANDERSON ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
I Review in abeyance pending the future of standardization ER DOCKETED:
and resources to conduct review.
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
l ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/15/76 10/15/76C SAR DOCKETED:
04/08/77 05/10/77C SAR Q'S RECEIVED BY PM:
02/03/78 03/16/79C SAR APPL. RESPONSE TO Q'S LECEIVED: N/S INPUT TO DRAFT SER TO PM N/S CURRENT NRG. STATUS:
ISSUE DRAFT SER:
INPUT TO SER:
N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 1:
N/S ISSUE SE SUPPLEMENT 1 N/S CURRENT ANTITRUST:
HEARING STARTED:
ASLB INITIAL DECISI0Hz COMMISSION DECISION:
SPECIAL PROJECT COMPLETE:
N/S f
LATEST AMENDMENT:
NEW SLIPS / NOTES:
HRR L2CENSTHG SYSTEM PAGE NO: 2-43 (BOP)SWESSAR/BSAR-203 PDA CURRENT STATUS REP 0RT REPORT AS OF 05/15/82 PLANT C H A R A C T E R I S T I C S:
KEY PERS0NNEL DOCKET NO:
00000595 LIC. PM:
APPLICANT:
STONE & WEBSTER LIC. BC:
J. MILLER MEMBER 1 LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
REGION:
0 AE:
S&W COUNSEL:
UNASSIGNED CONST. INSP REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP DESIGN PWR 0000 MWT/0000 MWE CONST: N/A MPA ANALYST: M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization, and resources to conduct review.
ER DOCKETED:
N/A ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
l ISSUE DES:
1 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/15/75 12/22/75C SAR DOCKETED:
12/22/75 12/22/75C SAR Q'S RECEIVED BY PM:
11/12/76 04/04/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 01/14/77 05/20/77C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER:
INPUT TO SER:
09/09/77 10/13/77C ISSUE SER:
10/19/77 12/02/77C ACRS LETTER RECEIVED:
01/15/78 01/13/78C INPUTS TO SE SUPPLEMENT 1:
N/S ISSUE SE SUPPLEMENT 1 N/S.
CURRENT ANTITRUST HEARING STARTED:
ASLB INITIAL DECISION:
COMMISSION DECISIDH SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
I 4
PAGE NO: 2-44 NRR LICENSING SYSTEM (NSS)CESSAR SYSTEM 80 FDA CURRENT STATUS REP 0RT REPORT AS OF 05/15/82 KEY PERSONNELa PLANT CHARACTERI$TICSt LIC. PM:
C. GRIMES ASLB CHAIR:
DOCKET NO:
05000470 LIC. BC:
J. MILLER MEMBER 1 APPLICANT:
COMBUSTION ENGINEERING LIC. LA.:
P. ANDERSON MEMBER 2:
LOCATION:
N/A COUNSEL:
M. WAGNER CONST. INSP:
REGION:
0 AE REAC. TYPE: PWR NSSS: COMB ANTITRUST:
RESID. INSP MPA ANALYST M. KING DESIGN PWR 3800 MWT/1295 MWE CONST:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
SER (NUREG-0852) i ssued 11/81 Awaiting documentation to ER DOCKETED:
resolve ACRS, open, and confirmatory issues.
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
l l
l l
l CURRENT ENV. STATUS:
l N/A.
SAFETY / NEARING MILESTONES:
l APPLICATION TENDERED:
10/27/78 10/27/78C SAR DOCKETED:
12/21/79 12/21/79C SAR Q'S RECEIVED BY PM:
09/01/80 09/01/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 01/01/81 07/15/8tC INPUT TO DRAFT SER TO PM:
N/S CURRE'NT NRG. STATUS:
ISSUE DRAFT SER:
1 t/01/81 ft/13/8tc N/A.
INPUT TO SER:
ISSUE SER:
05/01/82 ft/10/81C ACRS LETTER RECEIVED:
06/21/82 12/15/81C INPUTS TO SE SUPPLEMENT 18 07/01/82 ISSUE SE SUPPLEMENT 13 08/30/82 CURRENT ANTITRUST NEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A COMMISSION DECISIDH SPECIAL PROJECT COMPLETE:
11/31/82 LATEST AMENDMENT:
NEW SLIPS / NOTES:
HRR LICENSING SYSTEM PAGE NO: 2-45 (NSS)GESSAR SEVERE ACC FDA CURRENT
$TATUS REP 0RT REPORT AS OF: 05/15/82 PLANT C H A R A C T E R I S T I.C St KEY P E R S 0 N N E L:
DOCKET HO:
00007447 LIC. PM:
H. FAULKHER ASLB CHAIR: N/A APPLICANT:
GENERAL ELECTRIC COMPANY LIC. BC:
J. MILLER MEMBER 12 N/A LOCATION:
N/A LIC. LA.:
P.
ANDERSON MEMBER 2 N/A REGION:
0 AE:
BRAUN COUNSEL:
B. BORDEHIK CONST. INSP REAC. TYPE: BWR NSSS: GE ANTITRUST:
RESID. INSP:
DESIGN PWR 3579 MWT/1220 MWE CONST MPA ANALYST B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82; review is in progress.
Some generic issues are being identified / resolved in ER DOCKETED:
conjunction with LRG-II.
Dates shown reflect review ER SITE VISIT COMPLETE:
for the severe accident design. PRA for severe accident INPUT TO DES TO PM:
design was submitted 4/82.
Severe accident design ISSUE DES:
modifications are scheduled to be submitted 5/82.
RESPONSE TO COMMENTS ON DES:
l ISSUE FES:
l l
l CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
03/31/80 03/31/80C SAR DOCKETED:
02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:
09/01/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 02/01/83 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
ISSUE DRAFT SER:
INPUT TO SER:
02/01/84 ISSUE SER:
03/01/84 ACRS FULL COMMITTEE MEETING:
04/06/84 INPUTS TO SE SUPPLEMENT 18 04/21/84 ISSUE SE SUPPLEMENT 1:
05/25/84 CURRENT ANTITRUST:
FDA antitrust review is in progress.
HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A COMMISSION DECISION:
05/00/84 SPECIAL PROJECT COMPLETE:
05/00/84 LATEST AMENDMENT:
1982.
FDA Amendment No. 3 was received in May, NEW SLIPS / NOTES:
NRR L8 CENSING SYSTEM PAGE NO: 2 '46 FDA CURRENT STATUS REPORT REPORT 'AS OF 05/15/42 (NSS)GESSAR-238 HI KEY PERS0NNELa PLANT CHARACTERISTICS:
LIC. PM:
N. FAULKNER ASLB CHAIR: N/A DOCKET NO:
05000447 LIC. BC:
J. MILLER MEMBER 18 N/A APPLICANT:
GENERAL ELECTRIC COMPANY LIC. L A. :
P. ANDERSON MEMBER 28 N/A REGIDH:
0 AE BRAUN COUNSEL:
B. BORDENICK CONST. INSP LOCATION:
N/A REAC. TYPE: BWR NSSS: GE ANTITRUST:
RESID. INSP DESIGN PWR 3579 MWT/1220 MWE CONST:
MPA ANALYST: B. ST MARY ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
l GESSAR II was docketed 02/82; review is in progress.
Some generic issues are being identified / resolved in ER DOCKETED I
conjunction with LRG-II.
Dates shown reflect review ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
l for the 233 Nuclear Island.
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
03/31/80 03/31/80C SAR DOCKETED:
02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:
07/16/82 SAR APPL. RESPONSE TO Q'S RECEIVED 11/26/82 INPUT TO DRAFT SER TO PM:
CURRENT HRG. STATUS:
ISSUE DRAFT SER INPUT TO SER:
02/Of/83 ISSUE SER:
03/02/83 ACRS FULL COMMITTEE MEETING:
04/08/83 INPUTS TO SE SUPPLEMENT 13 04/15/83 ISSUF SE SUPPLEMENT 1:
05/12/83 CURRENT ANTITRUST:
HEARING STARTED:
N/A FDA antitrust review is in progress.
ASLB INITIAL DECISIDH N/A COMMISSION DECISION:
05/08/84 SPECIAL PROJECT COMPLETE:
05/00/84 LATEST AMENDMENT:
FDA Amendment No. 3 was received in May, 1982.
NEW SLIPS / NOTES:
NRR LICENSING SYSTEM PAGE NO: 2-47 (SP)FHP 1-8 (MANUF.)
SPC CURRENT STATUS REPORT REPORT AS OF 05/15/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:
05000437 LIC. PM:
M. MALLORY ASLB CHAIR:
S. WOLFE APPLICANT:
OFFSHORE POWER SYSTEMS LIC. BC:
E. ADENSAM MEMBER 13 D. SCHINK LOCATION:
JACKSONVILLE, FLA.
LIC. LA.:
M. DUNCAN MEMBER 2:
G. BRIGHT REGION:
2 AE:
OPS COUNSEL:
R. BLACK CONST. INSP:
REAC. TYPE: PWR NSSS: WEST ANTITRUST:
J. RUTBERG RESID. INSP DESIGN PWR 3411 MWT/1150 MWE CONST: OPS MPA ANALYST: B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE ML matters have been addressed by applicant. SSER 4, covering TMI requirements and other previous unresolved ER DOCKETED:
07/05/73 07/05/73C issues, was issued 09-29-81.
An ACRS subcommittee ER SITE VISIT COMPLETE:
08/16/73 08/16/73C meeting was held on 10-15-81 The ACRS sent a favorable INPUT TO DES TO PM:
07/01/74C letter on 10-19-81 ISSUE DES:
04/12/74 07/24/74C RESPONSE TO COMMENTS ON DES:
ISSUE FES:
10/06/75 10/06/75C CURRENT ENV. STATUS:
All environmental statements have been issued.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
05/07/73 05/07/73C SAR DOCKETED:
07/05/73 07/05/73C SAR Q'S RECEIVED BY PM:
02/15/74 02/15/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 04/08/74 04/08/74C l
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
07/25/75 07/25/75C Suppl. 4 to the SER was entered into the record on 12-4-81.
ISSUE DRAFT SER:
Hearing reopened and closed on 12-4-81 Licensing INPUT TO SER:
08/22/75 08/22/75C Board is reviewing the record.
ISSUE SER:
09/30/75 09/30/75C ACRS LETTER RECEIVED:
10/19/81 10/19/81C INPUTS TO SE SUPPLEMENT 4:
02/20/76 03/05/76C ISSUE SE SUPPLEMENT 42 09/00/81 09/29/81C l
CURRENT ANTITRUST:
i HEARING STARTED:
06/17/76 06/15/76C l
ASLB INITIAL DECISION:
06/00/82 l
COMMISSION DECISION:
08/00/82 1
SPECIAL PROJECT COMPLETE:
08/00/82 l
LATEST AMENDMENT:
j NEW SLIPS / NOTES:
NRR L ICENSING SYSTEM PAGE NO: 2-48 BLUE HILLS SITE ESR CURRENT STATUS REP 0RT REPORT AS OF 05/15/82 PLANT CHARACTERIST I C 5:
KEY P E R S 0 N N E L:
LIC. PM:
J. WILSON ASLB CHAIR:
M. MILLER DOCKET NO:
05007510 APPLICANT:
GULF STATES UTILITIES LIC. BC:
J. MILLER MEMBER 1:
L. KORNBLITH LOCATION:
NEWTON COUNTY, TEXAS LIC. LA.:
P. ANDERSON MEMBER 2:
L. LITTLE REGION:
4 AE:
BECN COUNSEL:
C. WOODHEAD CONST. INSP REAC. TYPE: PWR HSSS: COMB ANTITRUST:
B. V0GLER RESID. INSP DESIGN PWR: 0000 MWT/0000 MWE CONST:
MPA ANALYST: L. LANIER ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
ER DOCKETED:
08/26/76 08/26/76C ER SITE VISIT COMPLETE:
09/03/76 09/03/76C INPUT TO DES TO PM:
02/25/77 02/25/77C ISSUE DES:
03/21/77 06/02/77C RESPONSE TO COMMENTS ON DES:
08/23/77 05/05/78C ISSUE FES:
10/14/77 07/17/78C CURRENT ENV. STATUS:
Complete except for hearing.
SAFETY /HEARIhG MILESTONES:
APPLICATION TENDERED:
06/28/74 06/28/74C SAR DOCKETED:
08/23/74 08/23/74C SAR Q'S RECEIVED BY PM:
01/31/75 02/13/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/21/75 07/21/75C INPUT TO DRAFT SER TO PM:
11/20/75 11/20/75C CURRENT HRG. STATUS:
On 04/28/81 the ASLB issued a Partial Initial Decision ISSUE DRAFT SER:
INPUT TO SER:
08/06/76 10/04/76C approving Blue Hills site as suitable for location of ISSUE SER:
03/07/77 01/07/77C a nuclear power plant.
ACRS LETTER RECEIVED:
04/15/77 03/16/77C INPUTS TO SE SUPPLEMENT 18 05/06/77 05/06/77C ISSUE SE SUPPLEMENT 18 05/27/77 06/23/77C CURRENTANTITRUS[:
HEARING STARTED:
04/05/79 04/05/79C Complete ASLB INITIAL DECISION:
04/28/81C SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
NR3 LICENS ING SYSTEM PAGE NO: 2-49 CARROLL SITE ESR CURRENT STATUS REPORT REPORT AS OF 05/15/82 PLANT C H A R A C T E R I S T I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05000S99 LIC. PM:
J. WILSON ASLB CHAIR:
J. WOLF APPLICANT:
COMMONWEALTH EDISON LIC. BC:
J. MILLER MEMBER 1 G. BRIGHT LOCATION:
CARROLL COUNTY, IL.
LIC.
LA.+
P. ANDERSON MEMBER 2:
R. HOLTON REGION:
3 AE:
COUNSEL:
R.
LESSY CONST. INSP REAC. TYPE:
NSSS: WEST ANTITRUST:
A.
HODGDON RESID. INSP DESIGH PWR: 0000 MWT/1120 MWE CONST:
MPa ANALYST: D. SCHWARZ CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The commercial operation date has been postponed until 1999 - 2000.
This license ER DOCKETED:
04/07/79 04/07/79C is not under active review.
ER SITE VISIT COMPLETE:
N/S IHPUT TO DES TO PM:
N/S ISSUE DES:
N/S RESPONSE TO COMMENTS ON DES:
N/S ISSUE FES:
N/S CURRENT ENV. STATUS:
Portions of the alternate site study are under review by DOE.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/20/78 12/20/78C SAR DOCKETED:
SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Five intervenors have been admitted.
ISSUE DRAFT SEP:
INPUT TO SER:
ISSUE SER:
ACRS FULL COMMITTEE MEETING:
INPUTS TO SE SUPPLEMENT ISSUE SE SUPPLEMENT CURRENT ANTITRUST:
Awaiting updated Antitrust information from applicant.
HEARING STARTED:
N/S ASLB INITIAL DECISION:
N/S SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
I
NRR LICEN$ING SYS7EM AS OF805/15/82 NON-P0WER REACT 0RS INPUT ISSUE EARLIEST ISSUEM TO SER ISSUE FES OR START ISSUE NON-POWER FACILITY DOCKET DL1 TO PM 11R EIA HEARING DL COMMENTS 1000.0000W TANK ESTIMATED DATE3 10/80 N/A 01/82 N/S 09/81 N/S CONTESTED CASE AFRRI. TRIGA ACTU.L DATE:
10/80C 10.0000W T ESTIMATED DATE: 12/80 02/82 09/82 05/82 10/82 POWER INCREASE TO 20 MW NBSR INCLUDED IN RENEWAL ACTUAL DATE:
12/80C 02/82C 1000.0000W POOL ESTIMATED DATE: 07/79 N/A 07/82 N/S 08/82 TEXAS A&M, TRIGA ACTUAL DATE:
07/79C U OF FLA., ARGONAUT 100.0000W GRAPH ESTIMATED DATE: 01/81 N/A 03/82 06/82 N/S N/A 07/82 ACTUAL DATE:
01/81C 2000.0000W POOL ESTIMATED DATE: 03/77 N/A 07/82 07/82 N/A 07/82 U. OF VA.
ACTUAL DATER 03/77C WORCHESTER POLY TECH 10.0000W ESTIMATED DATE: 07/79 N/A 06/82 N/S N/A 07/82 ACTUAL DATE:
07/79C N FOR TEST REACTORS ONLY l
HRR L ICENS ING SYSTEM PAGE NO: 2-0L CURRENT STATUS REPQRT REPORT AS OF:
PLANT C H A R A C T E R I S T I C S:
KEY PERS0NNEL DOCKET NO:
Docket No. or Project No'.. if not docketed LIC. PM:
Licensing Project Manager ASL B CH AIR : ASLB Chairman APPLICANT:
Utility LIC. BC:
Licensing Branch Chief MEMBER 1:
on panet LOCATIOH:
Miles and direction from nearest major towa LIC.
LA.*
Licensing Assistant MEMBER 2:
on panet REGION:
1 through 5 AE:
Architect / Engineer COUNSEL:
Attorney assigned to case CONST. INSP : Construction Inspector REAC. TYPE:
PWR, BWR, HTGR or LMFBR NSSS: Nuclear Steam Systems Supplier ANTITRUST:
Antitrust Attorney RESID. INSP: Resident inspector DESIGN PWR: Megawatts electric & thermal CGNST: Constructor MPA ANALYST: MPA analyst assigned to track project ENVIRONMENTAL MILE 3 TONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
Safety status for this reporting period only. It consists of accomplishments and schedale ER DOCKETED:
Environmental Report changes occurring since the last issue of Blue Book. Outstanding issues and late input from review branches should be indicated, along with indication of the critical path.
P O
T Project Manager ISSUE DES:
Draft EnWronmental Statement
)
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
Final Environmental Statemert CURRENT ENV. STATUS:
Environmental status for this reporting period only. It consists of accomplishments and schedule changes occurring since the last issue of Blue Book. Outstanding issues and late SAFETY / HEARING MILESTONES:
input from review branches should be indicated.
APPLICATION TENDERED:
$AR DOCKETED:
Safety Analysis Report SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
ISSUE DRAFT SER:
Safety Evaluation Report Changes in the hearing aiates since the last issue of Blue Book. Changes in intervention and ER:
contentions should be indicated.
ACRS LETTER RECEIVED:
Advisory Committee INPUTS TO SE SUPPLEMENT 3:
on Reactor Safeguards ISSUE SE SUPPLEMENT 3:
FEMA LETTER RECEIVED:
Safety Evaluation Supplement CURRENT ANTITRtiST:
HEARING STARTED:
Changes in the antitrust status since the last issue of Blue Book.
ASLB INITIAL DECISION:
Atomic Safety & Licensing Board ASLB FINAL DECISI0H j
TECH SPECS COMPLETED:
COMMISSIDH DECISION:
ISSUE PARTIAL POWER LICENSE:
LATEST AMENDMENT-ISSUE FULL POWER LICENSE:
The latest amendment submitted by the applicant.
SCHED. DATE RECEIPT DATE H%f SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.s hfmate f tice o go Slips or potential problems that should be brought to management's attention.
construction in construction completion corapletion
NRC e oRu 33s
'^"'r# t b" ooc)
U S NUCLE AR REGUL ATORY COMMISSION (7 77)
BIBLIOGRAPHIC DATA SHEET NUREG-0580 Vol.11 No. 5 l
4 TITLE AND SUUTIT LE (Add Volume No., of apartersatel
- 2. (teave blank)
Regulatory Licensing Status Summary Report (Blue Book)
- 3. RECIPIENT'S ACCESSION NO.
- 7. AUTHOR (S)
- 5. DATE REPORT COMPLE TED M ON TH l YE AR June 1982 G. PE RF ORMING ORGANIZATION N AME AND M AILING ADDRESS (/nclude lea Codel DATE REPORT ISSUED MONTH l YEAR Office of Resource Management June 19R2 Management Infonnation Branch 3
ft,,,, y,,,,
U. S. Nuclear Regulatory Commission Washington, D.C.
20555
- 8. (t, ave var > > >
- 12. SPONSORING ORGANIZ ATION NAME AND MAILING ADDRESS (Include lip Code /
- 0. PROJE CTsTASK/ WORK UNIT NO.
Office of Resource Management Management Infonnation Branch
- 11. CONT RACT NO.
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 13 TYPE OF REPORT PE RIOD COVE RE D (inclusere dates)
April 19,1982 - May 15,1982 15 SUPPLE MENTARY NOTES 14 (Leave deal 16 ABSTR ACT (200 words or less)
Provide an review of the status of the progress of the licensing reviews for all construction pennits, operating license, special project and non-power reactor renewals under review, as reported to Congress.
- 17. KE Y WORDS AND DOCUME NT AN ALYSIS 1 74 DE SC RIP T O RS 17b IDE N TIF IF RS OPE N E N DE D TE RMS 18 AV AIL ABILIT Y ST ATE f/E N T l ') ST CURi T Y C L A 55 /IM l '*porff 21
',0 Li P A GE S Unclusifled Unlimited n m ct 20 s6cuiass,t wSdrm..we iTvcfie nc i
s
- U. S. GOVERNMENT PRINTING OFFICE: 1982 0-361-302/534