Text

.

Sh

's NUREG-0580 Vol.11, Nos.1, 2, 3, 4 a

} ::

REGULATORY LICENSING STATUS

SUMMARY

REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS

[ BLUE BOOK)

JANUARY 1 - APRIL 19,-1982.

UNITED STATES NUCLEAR REGULATbRY COMMISSION v"""*%

E#

9., sE (f%ff)

,, p** * * "

ro f

m s

e a

u r

s g

s t

e i

e o s

r r n c m

ei2 2

aP 5 f 0 1

s s 5 a

mf ie 4

f e5 g

uO 0 o.

pla0 r

m o

c g2 n

oS2 r

o s

o P

DiC.

t io c

n t

it leo C s

r s a P

f s

f n.

n i is C,

g e

oiD c

nG D.

le la r

ol

/

t P b

S n

la t

n, cb e

n u f

n R o O

n o op o

d ia P

n e

t Nt mg it is e

g vA G

e n

ph h

/

t ni ir i min t

c C

n r

h oh R

i e s c

f r s e v a s

of a r

N p oW b

r eW uG ic lb u

s S

Ma s

l

'r ia ae v

y a

s A

i 1

l1ll, l

l

P NUREG-0580 l

Vol.11, Nos.1, 2, 3, 4 REGULATORY LICENSING l

STATUS

SUMMARY

REPORT L

NUCLEAR POWER PLANTS DATA FOR DECISIONS (BLUE BOOK)

JANUARY 1 - APRIL 19,1982 ate ku$!ished ay 19 2 Prepared for: OFFICE OF NUCLEAR REACTOR REGULATION Y pc,t, Prepared by 0FFICE OF RESOURCE MANAGEMENT 9t U.S. NUCLEAR REGULATORY COMMISSION st 9 i

WASHINGTON, D.C. 20555 s

d g& *

]

t

PREFACE THE REGULATORY LICENSING STATUS

SUMMARY

REPORT (BLUE BOOK) WILL BE PUBLISHED IN THE FUTURE AS A MONTHLY DOCUMENT.

STARTING WITH THIS ISSUE, THE BLUE BOOK WILL BE ISSUED IN A NEW FORMAT.

EACH PROJECT WILL THE TOP PORTION OF THE CONSIST OF ONE PAGE (WITH THE EXCEPTIDH OF ENRICO FERMI AND GESSAR).

PAGE DISPLAYS GENERAL FACILITY DATA.

BENEATH THIS, THE LEFT HALF OF THE PAGE IS DEVOTED TO THE CURRENT STATUS OF THE PROJECT, AND THE RIGHT HALF IS DEVOTED TO THE DISPLAY OF THE KEY MILESludE TARGET AND COMPLETION DATES IN TABLE FORMAT.

HISTORICAL INFORMATION, PRESENTED IN THE FORMER BLUE BOOK, IS HOT PORTRAYED IN THE NEW FORMAT.

A SEPARATE HISTORICAL DOCUMENT, TO BE DEVELOPED AND PUBLISHED ONCE EVERY SIX MONTHS, WILL REFLECT THIS INFORMATION.

NUREG-0580 HAS BEEN SUBSTANTIALLY MODIFIED SINCE IT WAS LAST ISSUED.

THIS DOCUMENT IS BEING ISSUED AS A DRAFT IN ORDER TO SOLICIT COMMENTS ON THE MODIFIED FORMAT. NEXT MDNTH'S ISSUE WILL BE IN FINAL FORM WITH ALL ALL INFORMATION UPDATED.

F0REW0PD l

THIS MANAGEMENT REPORT. REGULATORY LICENSING STATUS SU" MARY PEP 0pT. IS DESIGNED TO PROVIDE THE NECESSARY INFORMATION FOR CONTROLLING THE PROGRESS OF REVIEW PROCESSES FOR CENTRAL STATION NUCLEAR REACTOR APPLICATIONS. IT UTILIZES DATA COLLECTED FROM THE OFFICE OF NUCLEAR REACTOR REGULATION. OFFICE OF THE l

EXECUTIVE LEGAL DIRECTOR. OFFICE OF INSPECTION 2 ENFORCER 1ENT, AND THE NATIONAL LABORATORIES. AND l

ANALYZED BY THE OFFICE OF RESOURCE MANAGEMENT IN THE IMPLEMENTATION OF THE REGULATORY INFORMATION SYSTEM.

l l

SECTION I 0F THIS EDITION CONSISTS OF THE THREE

SUMMARY

OF ACCOMPLISHMENTS, THE NEW APPLICATION FORECAST FOR GL'S AND CP'S, AND AN ABBREVIATION KEY.

ALL OL'S ARE SECTION II REPRESENTS THE MAIN BODY OF THE REPORT AND CONSISTS OF THE FACILITY INFCRMATION.NON-POWER REACTOR LISTED FIRST, FOLLOUED BY CP'S, STANLARD DESIGN REVIEWS, OTHER REVIEWS. AND FINALLY, A

SUMMARY

EACH PROJECT CONSISTS OF GENERAL FACILITY DATA. CURRENT STATUS FOR ALL PHASES OF THE REVIEW, AND TARGETED AND ACTUAL COMPLETION DATEWS FOR ALL KEY MILESTONES IN THE REVIEW.

I l

l l

1 i

LICEHSING 0F HUCLEAR REACT 0RS THE U.S. HUCLEAP REGULATORY COMMISSIDH REQUIRES TWO SEPARATE LICENSES - ONE TO BUILD THE FACILITY AND ANOTHER TO OPERATE IT.

LISTED BELOW ARE THE STEPS IN THE PROCESS OF OBTAINING A CONSTRUCTION PERMIT AND OPERATING LICENSE.

THE UTILITY SUBMITS A FORMAL APPLICATION DESCRIBING THE DESIGN, LOCATION, AND ENVIRONMENTAL IMPACT OF THE PROPOSED PLANT AND THE SAFEGUARDS TO BE PROVIDED.

THE APPLICATION ALSO COVERS THE UTILITY'S FINANCIAL QUALIFICATIONS.

THE HSC MAKES COPIES OF THE APPLICATION AVAILABLE TO THE ACRS AND TO THE PUBLIC DOCUMENT ROOM.

TECHNICAL EXPERTS ANALYSE THE APPLICATION, AND PREPARE A SAFETY EVALUATIDH AND AN ENVIRONMENTAL IMPACT STATEMENT.

THESE DOCUMENTS ARE ALSO MADE AVAILABLE IN THE PUBLIC DOCUMENT ROOM.

THE STAFF'S ANALYSIS IS SUBMITTED TO THE HRC'S STATUTORY ADVISORY COMMITTEE ON REACTOR SAFEGUARDS, A COMMITTEE OF INDEPENDENT EXPERTS.

ACRS STUDIES THE APPLICATION IN DETAIL AND HOLDS CONFERENCES WITH THE APPLICANT, THE LICENSING STAFF AND OTHERS.

THE ACRS FINDINGS ARE REPORTED TO THE NRC AND MADE PUBLIC.

A PUBLIC HEARING IS HELD, USUALLY HEAR THE PROPOSED SITE, BY AH HRC APPOINTED ATOMIC SAFETY & LICENSING BOARD. PRIVATE CITIZENS, STATE AND LOCAL OFFICIALS, AND COMMUNITY GROUPS MAY PARTICIPATE.

AFTER REVIEWING THE HEARING RECORD INCLUDING THE NRC STAFF AND ACRS FINDINGS, THE BOARD DECIDES FOR OR AGAINST GRANTING A CONSTRUCTION PERMIT.

THE BOARD'S DECISION IS REVIEWED BY THE ATOMIC SAFETY AND LICENSING APPEAL BOARD, AND IS SUBJECT TO REVIEW BY THE FIVE-MEMBER HUCLEAR REGULATORY COMMISSIDH.

IF THE LICENSING BOARD AUTHORIZES THE ISSUANCE OF A CONSTRUCTIDH PERMIT, THE DIRECTOR OF THE DIVISION OF LICENSING WILL ISSUE A CONSTRUCTION PERMIT.

AN EARLIER LIMITED WORK AUTHORIZATION TO DO PRELIMINARY SITE CONSTRUCTION MAY HAVE BEEN GRANTED IF THE SITE HAD BEEN DETERMINED TO BE SUITABLE BY THE NRC STAFF AND THE BOARD HAD RULED FAVORABLY ON THE ENVIRONMENTAL IMPACT ANALYSIS.

CONSTRUCTION IS SUBJECT TO INSPECTION BY THE OFFICE OF INSPECTIDH AND ENFORCEMENT.

AS CONSTRUCTION PROGRESSES, ADDITIONAL INFORMATION IS DEVELOPED AND THE UTILITY APPLIES TO THE NRC FOR AN OPERATING LICENSE.

THE SAME CAREFUL ANALYSIS AS IS MADE'AT THE CONSTRUCTION PERMIT STAGE IS MADE BY THE NRC IN DECIDING WHETHER OR HOT TO ISSUE THE OPERATING LICENSE.

IN THE OPERATING LICENSE REVIEW PROCESS, OPPORTUNITY FOR HEARING IS PROVIDED.

CONTRASTED WITH THE CONSTRUCTIDH PERMIT REVIEW PHASE, A HEARING IS HELD ONLY IF INTERVENTION IS GRANTED.

FINAL ISSUANCE OF AH OPERATING PERMIT IS SUBJECT TO THE APPROVAL OF BOTH THE DIRECTOR OF THE DIVISIDH OF LICENSING AND OF THE COMMISSION.

- _ = - _ - = =

TA BL E OF C0NTENTS PRINTED IN THE ORDER LISTED SECT ION I

SUMMARY

OF ACCOMPLISHMENTS OL

SUMMARY

OF ACCOMPLISHMENTS CP

SUMMARY

OF ACCOMPLISHMENTS COMBINED NUMERICAL

SUMMARY

OF ACCOMPLISHMENTS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING OPERATING LICEHSES IN THE NEXT FIVE YEARS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING CONSTRUCTION PERMITS IN THE NEXT FIVE YEARS HE'-! APPLIC ATION FORECAST:

I OPERATING LICENSE REVIEWS l

CONSTRUCTION PERMIT REVIEWS 1

COMMON ABBREVIATIONS USED WITHIN THE PUBLICATION l

SECT ION II PROJECT INDEX 1

OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS STANDARD DESIGN REVIEWS l

OTHER REVIEWS NON-POWER REACTORS SECTION III EXAMPLE REVIEW

l Z

O ke H

O uJ to

I OL SUMMARV OF ACC0MPLTSHMENTS A5 0F APRIL 19, 1902 APRIL EII.C A L YEAR TO DATE t

FACILITY SCHEDULED ACTUAL FACILITY SCHEDULED ACTUAL SER ' S SER ' S r

WOLF CREEK 1 04/07/82 04/07/82C BYRON 1 82 02/07/82 02/07/82C CALLAWAY 1 10/07/81 10/07/81C CLINTON 1 82 01/05/82 02/17/82C PALD VERDE 1,2,3 11/11/81 tt/11/81C ST LUCIE 2 10/09/81 10/09/8tc WASHINGTON NUCLEAR 2 03/12/82 03/12/82C WOLF CREEK 1 04/07/82 04/07/82C i

SSER ' S SSER ' S LASALLE 1 8 2 04/16/82

'04/16/82C BYRON 1 82 03/30/82 03/30/82C CALLAWAY t 01/15/82 01/15/82C COMANCHE PEAK 1 82 10/16/88 10/16/81C CDMANCHE PEAK.1 8 2 01/20/82 Ot/20/82C DIABLO-CANYON 1 82 10/02/81C ENRICO FERMI 2 01/26/82 Ot/29/82C GRAND GULF 1 82 12/10/81C LASALLE t 82 02/12/82 02/12/82C LASALLE 1 82 04/16/82 04/16/82C PALO VERDE 1,2,3 02/05/82 02/05/82C j

SAN ONOFRE 2 8 3 01/22/82 01/22/82C SAN ONOFRE 2 8 3 02/16/82 02/16/82C

+

SHOREHAM 03/12/82C i

ST LUCIE 2 12/30/81 12/30/8tC SUMMER t 01/08/82 01/03/82C WATERFORD 3 10/09/81 10/13/81C WATERFORD 3 01/22/82 Ot/13/82C ZIMMER 1 10/00/88 10/ 0 0/81C i

' S DES DES ' S BYRON f82 11/05/81 ft/05/8tc NONE CLINTON 1 82 12/18/81 12/28/8tC MICLAND 1 82 02/05/82 02/05/82C

.PALO VERDE 1,2,3 10/26/81 10/26/81C PERRY t 8 2 02/26/82 02/26/32C ST LUCIE 2 10/16/81 10/16/81C WOLF CREEK t 01/05/82 01/05/82C FES'S FFS *S BYRON 1 8 2 04/05/82 04/05/82C BYRON 1 82 04/05/82 04/05/82C CALLAWAY 1 01/29/82 Ot/29/82C GRAND GULF 1 82 10/09/8tC i

t r

lj C C 2

1 L

8 8 A

/ /

U t

1 T

t 3

C

/ /

A 3

2 0

1 D

E E

221 22 T

L 888 88 A

U

/ //

//

D D

151 02 E

113 01 O

H

///

//

T C

322 42 S

001 00 R

A E

Y 5

L A

T C

S 2

N I

F R

E A

u E

D 3

3, M

Y L

C E

8 2,

T U

2 H

I 1

N U

2 L

5 I

8 C

E2N S

E I

A D O 1R F

RET F

EIG EO L

VCN I

LN P 2 UI LO 8

S OLH A

M 9

L S

SN 1

ATA S

AA 0

PSW LS S

C 9

1 E

t C

L F

O A

I R

P A

F F

0 O S

A Y

L R

f U

A T

C M

A M

U S

D E

2 L

8 U

/

L D

0 E

0 0

H

/

C 4

S 0

L I

R P

A D

Y T

E I

2 L

U I

C S

1 A

F S

E I

L R

L E

S A

W S

O S

A P

L S

L L

E L

U F

F 0

W l

ll l

l lllllll11

CCC 11t L

888 A

///

U 010 T

330 C

/ / /

A 020 111 D

E E

111 T

L 888 A

U

/ //

D D

510 E

130 O

H

/ //

T C

020 S

111 R

A E

Y S

L A

T C

S N

I F

2 E

8 1

D M

Y 2

D E

T 1

N I

8R L

K O U

S I

E1F C

E N

S 2

A RXA F

CON S

L F/

S S

T I

P 2 NKI 3

S E

ECG S

E S

E E

M 9

N LAA N

N N

1 O

R LLK O

O S

O 0

N ABS N

N N

R E

S S

C 9

1 E

S E

E P

C L

S S

D F

C A

I R

P A

F F

0 O S

A Y

L R

A U

A T

C M

A M

U S

D E

L U

P D

E C

H C

S L

I R

P A

D Y

T E

I L

U I

C S

A F

S S

I S

E E

s E

S E

E N

N N

N N

O R

O O

O s

O N

N N

N N

R E

S S

E S

E E

P 5

S D

F C

I

SUMMARY

0F A CC0MPLISHMENTS AS OF APRIL 19, 1982 FISCAL Y F.A R TO DAlf APPIL iCILFJtiLF D ACTtifa iflifDULED ACTUAL

' S ( 0L )

1 1

SER 'S ( 0L )

7 7

SER

' S ( CP )

0 0

SER ' S( CP )

0 0

S ER SSER ' S( 0L )

1 1

SSER'S( 0L )

15 IS

' S ( CP )

0 0

SSER' S( CP) 3 3

SSER DES'S( 0L 1 0

0 DES'S( 0L )

7 7

' S ( CP )

0 0

DE$'S( CP )

0 0

DES l

FES ' S( 0L )

1 1

FES'S( 0L )

5 5

' S ( CP )

0 0

FES' S ( CP )

0 0

l FES 0L ' S ISSUEDu 1

0 0L

'S ISSUEDd 2

0 CP ' S ISSUED 0

0 CP 'S ISSUED 0

0 W FULL P0tlER i

LICENSING SCHEDULES FOR ALL PENDING OL APPLICATIONS REPORT AS OF2 04/19/82 (INCLUDE 3 SCHEDui_ES FOR ADDIVZCHAL UNITS WIVH PROJECTED CONSTRUCTZOH COMPLETION IN CY 1982-19G3)

(LfSVED IN ORDER OF FACZLITY NAME)

SER SSER EST.

STAFF TECH STAFF TECH ASLB COMMu APPL.

DELAY ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSU!

START INITIAL DEC.

CONST.

PLANT (MONTHS) 211 TO DL 11R U19 EE1 TO Q(

SSER OF HRG DECISION DATE CCMPL.

BELLEFONTE 1 0

11/82 02/83 03/83 04/83 05/83 05/83 06/83 N/A N/A 09/83 09/83 BYRON 1 0

11/81C 01/82C 02/82C 03/82C 04/82C 05/82C 03/82C 05/82 03/83 04/83 04/83 CALLAWAY 1 0

09/81C 09/81C 10/8tC 11/81C 01/82C 11/8tC 01/82C 11/81C 09/82 10/82 06/83 CLINTON 1 0

12/81C 12/31 02/82C 03/82C 04/82 06/82 06/82 03/82 12/82 01/83 01/83 COMANCHE PEAK 1 0

05/81C 07/81C 07/81C 11/81C 09/8tC 01/83 07/82 12/8tC 09/82 10/82 06/85 CATAWBA 1 0

05/82 07/82 08/82 09/82 10/82 09/82 09/82 02/83 07/83 08/83 08/83 DIABLO CANYON 1 0

12/72C 01/75C 10/74C 07/76C 05/76C N/S 07/82 12/76C 04/82 05/82 DIABLO CANYON 2 0

12/72C 01/75C 10/74C 07/76C 05/76C N/$

N/S 12/76C 04/82 05/82 07/82 ENRICO FERMI 2 0

04/81C 05/77C 09/77C 08/81C 09/81C 01/82C 01/82C 03/82C 08/82 09/82 06/83 GRAND GULF 1 0

05/8tC 08/81C 09/81C 10/81C 10/81C 05/82 05/82 N/A N/A 04/82 04/82 LASALLE 1 0

03/78C 02/81C 03/8tC 04/8tC 11/78C 12/81C 04/82C N/A N/A 04/82C 04/82C LASALLE 2 0

03/78C 02/8tC 03/81C 04/81C 11/78C 12/81C 05/82 N/A N/A 06/82 01/83 MCGUIRE 2 0

10/75C 01/78C 03/78C 04/78C 04/76C 12/82 01/83 03/77C 06/81C 03/83 04/83 MIDLAND 1 0

02/82C 04/82 05/82 06/82 07/82 06/82 11/83 11/82 06/83 12/83 12/83 MIDLAND 2 0

02/82C 04/82 05/82 06/82 07/82 06/82 07/82 11/82 06/33 07/83 07/83 PALO VERDE 1 0

10/81C 10/81C 11/81C 12/81C 03/82C 01/82C 02/82C 04/82 10/82 11/82 11/82 FALD VERDE 2 0

10/81C 10/81C 11/81C 12/8tC 03/82C 01/82C 10/83 04/82 10/82 11/83 11/83 PERRY 1 0

02/82C 04/82 05/82 06/82 07/82 06/82 06/82 11/82 04/83 05/83 11/83 RIVER BEND 1 0

07/82 09/82 10/82 11/82 12/82 11/82 11/82 04/83 09/83 10/83 04/85 SAN ONOFRE 2 0

01/8tC 01/81C 02/81C 02/81C 04/81C 02/82C 02/82C 06/8tC 05/82 06/82 02/82C SAN ONOFRE 3 0

01/81C 01/81C 02/81C 02/81C 04/81C 02/82C 07/82 06/81C 05/82 08/82 11/82 SEABROOK 1 0

05/82 08/82 09/82 10/82 10/82 10/82 10/82 03/83 10/83 11/83 11/83 SHOREHAM 1

03/77C 03/81C 04/81C 10/81C 10/77C 01/82 C 09/82 05/82 10/82 10/82 09/82 ST LUCIE 2 0

10/81C 09/81C 10/81C 11/81C 04/82 12/81C 12/81C N/A N/A 10/82 10/82 SUMMER 1 0

06/79C 12/80C 02/81C 03/8tC 05/81C 11/81C 01/82C 06/81C 05/82 06/82 05/82 SUSQUEHANNA 1 0

03/81C 03/81C 04/81C 08/81C 06/8tC N/A 05/82 10/8tC 04/82 05/82 07/82 SUSQUEHANNA 2 0

03/81C 03/81C 04/81C 08/81C 06/81C N/A 03/83 10/8tC 04/82 04/83 01/84 WASHINGTON NUCLEAR 2 0

07/81C 05/82 03/82C 07/82 12/81C 05/82 08/82 N/A N/A 09/82 03/83 l

WATERFORD 3 0

05/81C 05/81C 07/81C OS/81C 09/81C 01/82C 01/82C 03/82C 10/82 11/82 01/83 l

WATTS BAR 1 0

06/78C N/S N/S N/S 12/78C N/S N/S N/A N/A 07/82 08/83 WATTS BAR 2 0

06/78C N/S N/S N/S 12/78C N/S N/S N/A N/A 03/83 08/84 WOLF CREEK 1 0

01/82C 03/82C 04/82C 05/82 06/82 05/82 05/82 10/82 03/83 04/83 12/83 ZIMMER 1 0

10/76C 12/77C 01/ 7 9 C 03/79C 06/77C 05/82 06/82 02/82C 06/82 07/82 12/82

l

1933 LICENSING SCHEDULES FOR ALL TENDERED OL UNITS TO BE ISSUED AFTER CY l

ISSUE APPL. CONST.

PLANT SSER COMPLETE 09/84 BELLEFONTE 2 BRAIDWOOD 1 05/84 04/85 04/86 BRAIDWOOD 2 BYRON 2 H/S 12/84 CATAWBA 2 N/S 02/85 N/S CLINT0H 2 C0;1ANCHE PEAK 2 11/83 12/84 GRAND GULF 2 N/S HARRIS 1 N/S 12/84 HARRIS 2 H/S 06/88 lit 1ERICK 1 N/S 10/84 10/87 lit 1ERICK 2 PALO VERDE 3 N/S 11/85 05/87 PERRY 2 N/S RIVER BEND 2 SEABRODK 2 02/86 SOUTH TEXAS 1 08/83 12/86 SOUTH TEXAS 2 H/S 12/88 WASHINGTON NUCLEAR 1 01/84 12/85 l

REPORT AS OF 04/19/82 LICENSING SCHEDULES FOR ALL PENDING CP APPLICATIONS (LISTED IN ORDER OF FACILITY NAME)

SSER SER ASLB COMM STAFF TECH ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.

STAFF TECH PLANT Rf1 70.pt sig HTS Ef1 TO DL 11[g 0F HRG DECISION DAIE (SP)FNP 1-8 (MANUF.)

07/74C OS/75C 09/75C 04/76C 10/75C 03/76C 09/81C 06/76C 06/82 08/82 ALLENS CREEK 1 07/74C 11/74C 11/74C 12/74C 11/74C 03/75C 10/81C 03/75C 08/82 11/82 BLACK FOX 1 82 07/76C 02/77C 06/77C 07/77C 02/77C N/S N/S 08/77C N/$

N/S CLINCH RIVER 02/76C Of/83 03/83 05/83 02/77C 06/83 07/83 08/82 05/84 06/84 PEBBLE SPRINGS 1 82 of/75C 12/75C 01/76C 02/76C 04/75C 12/77C N/S N/S N/$

N/S PERKINS 1,2,3 05/75C 03/77C 03/77C 04/77C 10/75C 07/77C N/S 04/76C N/S N/S SKACIT/NANFORD 182 04/82 08/77C 07/82 08/82 04/82C 06/82 07/75C 04/83 07/83 l

l

\\

NEW APPL 2 CAT ION F 0 R E C A S T --- 0 P E 3 A V I N G LICENSE REUIEW$

(ANVICIPATED TENDER DATES FOR ALL UNITS WITH CaMSTRUCTION PERMITS)

AS OF WEEK ENDING: 04/19/82 LICENSING APPL.

APPL.

IST UNIT DOCKET PROJECT SUBMITS SUDMITS CONST.

FACILITY NUMBER UTILITY MANAGER FSAR ENV. RPT. COMPLETE COUNSEL Fv82 WASHINGTON NUCLEAR 1 050-00460 WASHINGTON PUBLIC POWER SUPPLY

.bHASSIGNED 12/00/81 12/00/81 12/00/85 E.KETC.iEN l

WASHINGTON NUCLEAR 3 050-00508 WASHINGTON PUBLIC POMER SUPPLY

. UNASSIGNED 06/00/82 06/00/82 06/00/86 D.SWANSON I

t l

FY83 MARBLE HILL 1 82 054680547 PUBLIC SERVICE OF INDIANA E.DOOLITTLE 12/00/82 12/00/82 06/00/86 R.LES$Y MILLSTONE 3 050-00423 NORTNEAST NUCLEAR ENERGY J. GRANT 12/00/82 12/00/82 12/00/85 M.ROTHSC;ILD BEAVER VALLEY 2 050-00412 DUQUESHE LIGHT E.DOOLITTLE 12/31/82 12/31/82 12/00/85 J.GUTEIRREZ NINE MILE POINT 2 050-30410 NIAGARA MOHAWK POWER D. LYNCH 01/00/83 01/00/83 03/00/86 B.BORDENICK HOPE CREEK t 050-00354 PUBLIC SERVICE ELECTRIC & GAS

. UNASSIGNED 06/00/83 06/00/83 06/00/86 R. BLACK V0GTLE 1 82 0424-0425 GEORGIA POWER J. GRANT 09/00/83 09/00/83 09/0J/86 B.BORDENICK FY86l NORTH ANNA 3 050-00404 VIRGINIA ELECTRIC & POWER

. UNASSIGNED 04/00/86 04/00/86 04/00/89 R. GODDARD l

HEW APPLICA T IOH F0RECA S T -- C 0 N S T R U C T IOH P ERMI T S AS OF WEEK ENDING: 04/19/82


---------------------P.0 JECT-- ------------- -------------------------------l P

PROJECT APPL. ER APPL. PSAR l FACILITY nut 1BER t1AHAGER SUB. DATE Sur. DATE l l HAtlE UTILITY


J.tJILSON 10/00/84 10/00/A%

l l CARROLL 1 & 2 C0tif10NUEALTH EDISON 559 k

C0MM0N ABBREVIATI0HS USED WITH2N THE PUBL ICAVION ACRS:

'.0V150RY COMMITTEE ON REACTOR SAFEGUARDS L.A.:

LICENSING ASSISTANT AE ARCHITECT / ENGINEER LESR: LIMITED EARLY SITE REVIEW (ALSO ABBREVIATED LES)

AES:

ACCIDENT EVALUATION BRANCH LGR LICENSING GUIDANCE BRANCH l

I ASB AUXILIARY SYSTEMS BRANCH LMFBR: LIQUID METAL FAST BREEDER REACTOR ASLB ATOMIC SAFETY LICENSING BOARD LQB:

LICENSEE QUALIFICATIONS BRANCH B8R BURNS & ROE MEB:

MECHANICAL ENGINEERING BRANCH 88VI BLACK 8 VEACH MPA:

MANAGEMENT AND PROGRAM ANALYSIS 88W:

BABCOCK & WILCOX MTEB: MATERIALS ENGINEERING BRANCH BECH: BECHTEL MEW:

MEGAWATTS ELECTRIC BRRT: BROWN 8 ROOT MWT MEGAWATTS THERMAL BWR BOILING WATER REACTOR NSSS: NUCLEAR STEAM SYSTEMS SUPPLIER CES:

CHEMICAL ENGINEERING BRANCH OL:

OPERATING LICENSE COMB COMBUSTION ENGINEERING OLB:

OPERATOR LICENSING BRANCH CP CONSTRUCTIDH PERMIT OPS:

OFFSHORE POWER SYSTEMS CPB CORE PERFORMANCE BRANCH I

CSB CONTAINMENT SYSTEMS BRANCH l

CWE COMMONWEALTH EDISON PDA:

PRELIMINARY DESIGN APPROVAL PG8E PACIFIC GAS & ELECTRIC DES:

DRAFT ENVIRONMENTAL STATEMENT PID:

PARTIAL IHITIAL DECISION PM:

PROJECT MANAGER PS:

POWER SYSTEMS BRANCH l

EEB ENVIRONMENTAL ENGINEERING BRANCH PSAR: PRELIMINARY SAFETY ANALYSIS REPORT EPA:

ENVIRONMENTAL PROTECTION AGENCY PTRB PROCEDURES AND TEST REVIEW BRANCH EPLB EMERGENCY PREPAREDHESS LICENSING BRANCH PWR PRESSURIZED WATER REACTOR ER:

ENVIRONMENTAL REPORT l

EQB EQUIPMENT QUALIFICATION BRANCH ESRs EARLY SITE REVIEW QAB QUALITY ASSURANCE BRANCH ETSB EFFLUENT TREATMENT SYSTEMS BRANCH RAB:

RADIOLOGICAL ASSESSMENT BRANCH F.R.

FEDERAL REGISTAR RSB REACTOR SYSTEMS BRANCH l

FDA:

FINAL DESIGN APPROVAL FES:

FINAL ENVIRONMENTAL STATEMENT FSAR: FINAL SAFETY ANALYSIS REPORT

$8La SARGENT 8 LUNDY

$8W:

STONE & WEBSTER SAB SITING ANALYSIS BRANCH G8He GIBBS 8 HILL SAR:

SAFETY ANALYSIS REPORT GHDRs GIBBS 8 HILL SDA:

STANDARD DESIGN APPROVAL GIL:

GILBERT COMMONWEALTH SEB STRUCTURAL ENGINEERING BRANCH GSB GEOSCIENCES BRANCH SER:

SAFETY EVALUATION REPORT SIB:

SYSTEMS INTERACTION BRANCH SP:

SPECIAL PROJECT HGB:

HYDROLOGIC AND GEDTECHNICAL BRANCH SSC:

SOUTHERN SERVICES COMPANY HTGR HIGH TEMPERATURE GAS COOLED REACTOR TVA:

TENNESSEE VALLEY AUTHORITY ICB INSTRUMENTATION AND CONTROL BRANCH UEC UNITED ENG. & CONSTRUCTORS UFBI UTILITY FINANCE BRANCH WEST WESTINGHOUSE

M l

M Z

O M

H O

B; en

PR0 JECT INDEX SECTION II OPERATING LICENSE REVIEW CONSTRUCTION PERMIT REVIEUS STANDARD DESIGN REVIEMS OTHER REVIEWS 2.-

1 BELLEFONTE 1 82 2-33 ALLENS CREEK t 2-39 fBOP)RDPSSAR/BSAR-205 2-49 (SP)FFTF FSAR 2-2 BRI.!DMCOD 1 82 2-24 BLACK FOX 1 8 2 2-40 (BOP)ESSAR/BSAR-205 2-50 (SP)FHP 1-8 (MANUF.)

2-3 BYROH 1 &2 2-35 CLINCH RIVER 2-41 (BOP)ESSAR/CESSAR-80 2-51 BLUE HILLS SITE 2-4 CALLAWAY 1 2-36 PEEBLE SPRINGS 1 82 2-42 (BOP)ESSAR/RESAR-414 2-52 CARROLL SITE 2-5 CATAWBA 1 82 2-37 PERKINS 1.2.3 2-43 (BOP)GAISSAR 2-6 CLINTCH 1 &2 2-38 SKAGIT/HANFORD 182 2-44 (BOP)GIBBSSAR (W) 2-45 (BOP)SWESSAR/BSAR-205 2-7 COMANCHE PEAK 1 82 2-46 (HSS)CESSAR SYSTEM 80 2-8 DIABLO-CANYON 1 8 2 2-47 (HSS)GESSAR SEVERE ACC 2-9 ENRICO FERMI 2 2-48 (NSS)GESSAR-238 HI 2-10 FERMI 2 (FSAR RESUB) 2-11 GRAHD GULF 1 8 2 2-12 HARRIS 1 82 2-13 LASALLE 1 &2 2-14 LIMERICK 1 82 2-15 MCGUIRE 2 2-16 MIDLAND 1 &2 2-17 PALO VERDE 1.2.3 l

2-18 PERRY 1 &2 2-19 RIVER BEND 1 42 2-20 SAH OHOFRE 2 & 3 j

2-21 SEABROOK 1 82 2-22 SHOREHAM 2-23 SOUTH TEXAS 1 82 l

2-24 ST LUCIE 2 2-25 SUMMER 1 2-26 SUSQUEHANNA 1 82 2-27 WASHINGTON NUCLEAR 1 2-28' WASHINGTON NUCLEAR 2 2-29 WATERFORD 3 2-30 WATTS BAR 1 82 2-31 WOLF CREEK 1 2-32 ZIMMER 1 L

HRR L2CEH$ING

$YSYEM PAGE HO: 2-1 BELLEFONTE 1 8 2 0L CURREHT STATU$

REP 0RT REPORT AS OF 00/19/82 PLAN T CHARACTERIST I C St KEY PERS0NNELa DOCKET NO:

043840439 LIC. PM:

D. SCALETTI ASLB CHAIR: N/A APPLICANT:

TENNESSEE VALLEY AUTHORITY LIC. BC:

E. ADENSAM MEMBER 1 N/A LOCATION:

6 MI NE OF SCOTTSCORD. ALA LIC.

LA..

M. DUNCAH MEMBER 2:

N/A REGION:

2 AE:

TVA COUNSEL:

B. PATON CONST. INSP: J. WILCOX REAC. TYPE: PWR NSSS: B&W ANTI 1 RUST:

J. RUTBERG RESID. INSP DESIGN PHR: 3760 MWT/1235 MWE CONST: TVA MPA ANALYST: M. KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE As a result of applicant's construction delay, the revicw schedule has been delayed.

ER DOCKETED:

06/12/78 06/12/78C ER SITE VISIT COMPLETE:

06/11/82 INPUT TO CES TO PM:

09/30/82 ISSUE DES:

11/22/82 RESPONSE TO COMMENTS ON DES:

04/22/83 ISSUE FES:

05/20/83 I

l CURRENT ENV. STATUS:

As a result of applicant's construction dolay, the review schedule was delayed, and is being re-evaluated.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

02/03/78 02/03/78C SAR DOCKETED:

06/12/78C SAR C'S RECEIVED BY PM:

03/26/82 SAR APPL'. RESPONSE TO Q'S RECEIVED: 06/25/82 CURRENT HRG. STATUSt INPUT TO DRAFT SER TO PM:

08/13/82 No hearing is anticipated.

ISSUE DRAFT SER:

INPUT TO SER:

02/11/83 ISSUE SER:

03/10/83 ACR$ FULL COMMITTEE MEETING:

04/15/83 I

INPUTS TO SE SUPPLEMENT 1 05/27/83 l

ISSUE SE SUPPLEMENT 1:

06.24/83 l

CURRENT ANTITRUST Pending determination HEARING STARTED:

N/A ASLB INITIAL DECISIDH2 N/A ASLB FINAL DECISION:

N/S TECH SPECS COMPLETED:

07/29/83 COMMISSIDH DECISION:

09/00/83 ISSUE PARTIAL POWER LICENSE:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE:

09/00/83 SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:

Applicant has delayed its construction which has CONSTRUCTION COMPLETION - APPL.:

09/00/83 12/31/81 dolayed our review schedule.

m

- ~

PAGE NO: 2-2 NRR LICEN$ING SYSTEM BRAIDWOOD 1 82 0L CURRENT 5TATUS REP 0RT REPORT AS OF 04/19/82 KEY P E R S 0 N N E L:

PLANT C H A R A C T E R I S T I C 5:

LIC, PM:

K. KIPER ASLB CHAIR:

M. MILLER LIC. JC:

J. YOUNGBLOOD ttEMBER 1:

R. COLE DOCKET NO:

045650457 LIC.

LA..

M.

RUSHBROOK MEMBER 2:

D. CALLIHAN APPLICANT:

C0ftMONWEALTH EDISON REGION:

3 AE:

58L COUNSEL:

D. HASSELL CONST. INSP: C. JONES LOCATION:

24 MI SSW OF JOLIET. ILL REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP:

L. MCGREGOR DESIGN PWR 3425 MWT/1120 MWE CONST: CUE MPA ANALYST M. KING ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

11/30/78C Several portions are under contract review.

ER DOCKETEDI ER SITE VISIT C0ftPLETE:

04/15/83 INPUT TO DES TO PM:

ft/Of/83 01/00/84 ISSUE DES:

RESPONSE TO COMMENTS ON DES:

04/0t/84 06/00/84 ISSUE FES:

CURRENT EHV. STATUS:

Inactivn.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/26/78 06/26/78C 11/00/78 11/30/78C SAR DOCKETED:

SAR O'S RECEIVED BY PM:

09/0t/82 SAR APPL. RESPONSE 10 Q'S RECEIVED: 12/01/82 INPUT TO DRAFT SER TO PM:

03/01/83 CURRENT HRG. STATUS:

ISSUE DRAFT SER:

09/01/85 There will be a contested hearing.

INPUT TO SER:

11/01/83 ISSUE SER:

12/01/83 ACRS FULL COMMITTEE MEETING:

01/00/84 INPUTS.TO SE SUPPLEMENT 1:

04/01/84 ISSUE SE SUPPLER 1ENT 12 05/00/84 F Et1A LETTER RECEIVED:

N/S ANTITRUST:

HEARING STARTED:

10/00/84 CURRENT Applicant has submitted antitrust information pursuant to ASLB INITIAL DECISION:

03/00/85 Req. Guide 9.3.

ASLB FINAL DECISION:

TECH SPECS COMPLETED:

09/00/84 C0t: MISSION DECISION:

04/00/85 ISSUE PARlIAL P0llER LICENSE:

ISSUE FULL Poller LICENSE:

04/00/85 LATEST AMENDMENf:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.

04/03/85 12/31/81 t

NRR L7CEN3ING SVSTEM PAGE ND: 2-3 BYRON 1 83 0L CURRENT

$TA TUS R EPOOT REPORT AS OF 00/19/83 s

PLANT CHARACTERI5 TIC 5 KEY P E R S 0 N N E L:

> DOCKET NO:

045480455 LIC. Pit:

S. CNESNUT ASLB CNAIR:

M. MILLER APPLICANT:

CCMMONWEALTH EDISON LIC. EC:

J. YOUNGBLOOD MEf15ER 1:

R. COLE LOCATION:

17 MI SW OF ROCKFORD, ILL LIC. LA.

M. RUSNBRC0K MEMSER 2:

D. CALLINAN REGION:

3 AE 58L COUNSEL:

S. GOLCDERG CCHST. INSP: W. FORNEY REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. VOCLER RESID. INSP:

DESIGN PWR: 3425 MWT/1120 MWE CONST: CWE MPA ANALYST: M. KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER and Supplement I have been issued. Several outstanding and confirmatory issues remain to be ER DCCKETED:

11/30/78 C resolved prior to licensing.

ER SITE VISIT COMaLETE:

05/31/81 05/31/8tC INPUT TO DES TO PM:

03/15/81 08/15/81C ISSUE DES:

11/05/81 11/05/81C RESPONSE TO COMMENTS ON DES:

03/01/82 03/01/82C ISSUE FES:

04/05/82 04/05/82C CURRENT ENV. STATUS:

Environmental review completed and FES (NUREG-0848) pubIlshed in April 1982.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/26/78 06/26/78C SAR DOCKETED:

11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:

08/15/88 08/15/8tC SAR APPL. RESPONSE TO Q'S RECEIVED: 10/15/81 10/15/8tC CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

11/07/81 11/07/8tC In discovery. Hearing scheduled to commence in ISSUE DRAFT SER:

August 1982.

INPUT TO SER:

01/07/82 ISSUE SER:

02/07/82 02/07/82C ACRS LETTER RECEIVED:

03/10/82 03/10/82C INPUTS TO SE SUPPLEMENT 18 05/10/82 05/10/82C ISSUE SE SUPPLEMENT 18 03/30/82 03/30/82C FEMA LETTER RECEIVED:

N/S CURRENT ANI TRUST Applicant has submitted antitrust information pursuant HEARING STARTED:

08/00/82 to Reg. Guide 9.3.

ASLB INITIAL DECISION:

03/00/83 ASLB FINAL DECISION:

N/S TECH SPECS CGMPLETED:

03/30/82 CCMt1ISSIDH DECISION:

04/00/83 ISSUE PARTIAL POWER LICENSE:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE 04/00/83 FSAR - Amendment 37 SCHED. DATE RECEIPT DATE ER - Amendmont 3 NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

04/00/83 12/31/88

~

PAGE NO: 2-4 HRR LICEN5ING

$YSTEN 0L CURRENT STATU$

REPORT REPORT AS OF 04/19/82 CALLAWAY 1 KEY PERS0NNELa PLANT CHARACTERI5TICSt LIC. PM:

G. EDISON ASLB CHAIR J. GLEASON LIC. BC:

B. YOUNGBLOOD MEMBER I:

G. BRIGHT DOCKET NO:

05000483 LIC.

LA.'

N. RUSHBROOK NEMBER 2 J. KLINC APPLICANT:

UNION ELECTRIC REGION:

3 AE:

BECH COUNSEL:

R.

LESSY CCNST. INSP: J. KONKLIN LOCATION:

10 MI SE OF FULTON, M0 REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP: J. NEISLER DESIGN PWR 3579 MWT/1150 MWE CONST: DANIEL ftPA ANALYST D.

SCNUARZ ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SAR was docketed 08/08/80. OL review is in progress.

12/12/80 12/12/80C The SER was issued by HRC on 10/07/81 and the SER ER DOCKETED:

ER SITE VISIT COMPLETE:

12/00/81 12/00/81C Supplement No. I was issued on 01/15/82.

INPUT TO DES TO PM:

03/01/81 08/01/81C ISSUE DES:

09/29/81 09/29/8tC RESPONSE TO CCM!1ENTS DM DES:

12/01/81 12/01/81C l

01/29/82 01/29/82C ISSUE FES:

CURRENT ENV. STATUL' ER was docketed 12/12/80. OL review is in prooress.

The DES was issued by NRC on 09/29/81 and the FES was SAFETY / HEARING MILESTONES:

issued on 01/29/82.

APPLICATION TENDERED:

10/25/79 10/25/79C SAR DOCKETED:

08/08/80 08/08/80C SAR Q'S RECEIVED BY PM:

12/13/80 12/18/80C S AR APPL. RESPONSE 10 Q'S RECEIVED: 10/01/81 10/01/81C INPUT TO DRAFT SER TO Fit CURRENT NRG. STATUS:

ISSUE DRAFT SER:

A board has been appointed to rule on the intervention petition. Hearings were held on limited issues during INPUT TO SER:

09/11/81 09/11/81C November 1981.

The heartnq on the one remaining ISSUE SER*

10/07/81 10/07/81C contention, emergency preparedness, is expected to ACRS LETTER RECEIVED:

11/19/81 II/19/81C begin in mid-1982.

INPUTS TO SE SUPPLEiiENT 1 11/20/81 11/20/81C ISSUE SE SUPPLEt1ENT 12 01/15/82 Ot/15/82C FEMA LETTER RECEIVED:

01/01/82 Ot/Of/82C CURRENT ANTITRUST:

NEARING STARTED:

11/17/81 11/17/81C OL review is in progress.

ASLB INITIAL DECISION:

09/30/82 ASLB FINAL DECISI0H N/S TECH SPECS COMPLETED:

N/S COMMISSION DECISION:

10/00/82 ISSUE PARTIAL POWER LICENSE:

N/S ISSUE FULL POWER LICENSE:

06/30/83 LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE The Caseload Forecast Panel has revised construction CONSTRUCTION CortPLETIDH - APPL.:

06/00/83 10/00/81 I

NEW SLIPS / NOTES:

completion from February 1983 to June 1933.

The June 1983 estimate is based on the applicant's revised fuel lond da(e.

R 4

NRR LICENSING SYSTEM PAGE NO: 2-5 CATAWBA 1 82 0L CURRENT STA TUS REPORT REPORT AS OF 04/19/82 PL AN T CHARACTER IST I C S:

KEY P E R S 0 N N E La DOCKET NO:

041310414 LIC, PM:

K.

JABBOUR ASLB CHAIR:

J. KELLEY APPLICANT:

DUKE POWER LIC. BC:

E. ADENSAM MEMBER 1:

D. CALLINAN LOCATION:

6 MI NNW OF ROCK HILL. SC LIC. LA.

M.

DUNCAN MEMBER 2:

R.

FOSTER REGION:

2 AE:

DUKE COUNSEL:

G.

JOHNSON CONST. INSP: P. VANC00RN REAC. TYPE: PWR HSSS: WEST ANTITRUST:

B. V0GLF.R RESID, INSP K. VAN DOORN DESIGN PWR 3582 MWT/tt45 MWE CONST: DUKE MPA ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE FSAR acceptance review was completed on 05/22/81.

SAR was docketed on 06/91/81 ER DOCKETED:

06/11/81 06/11/8tC ER SITE VISIT COMPLETE:

10/t5/81 to/15/8tC INPUT TO DES TO PM:

06/00/82 ISSUE DES:

08/05/82 RESPONSE TO COMMENTS ON DES:

09/01/82 ISSUE FES:

01/05/83 CURRENT ENV. STATUS:

ER acceptance review was completed on 05/22/81, and docketed on 06/11/81.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

04/07/81 04/07/81C SAR DOCKETED:

- 06/11/81 06/11/8 t C SAR Q'S RECEIVED BY PM:

12/15/81 12/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 06/00/82 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S Combined hearing anticipated to start 08/83.

ISSUE DRAFT SER:

INPUT TG SER:

01/00/83 ISSUE SER:

02/06/83 ACRS FULL COMMITTEE MEETING:

03/10/83 INPUTb TO SE SUPPLEllENT 12 05#82/83 ISSUE SE SUFPLEMENT 1:

N/30/83 FEf1A LETTER RECEIVED:

.9/30/82 l

CURRENT ANTITRUST:

Recaived one petition to intervono.

HEARING STARTED:

08/00/83 l

ASLB INITIAL DECISION:

01/00/84 ASLB FINAL DECISION:

i TECH SPECS COMPLETED:

1 COMilISSION DECISION:

02/00/84 ISSUE PARTIAL POWER LICENSE:

1 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE:

08/00/83 NEW SLIPS / NOTES:

l CP Amend. issued 12/23/80 indicating change in ownership.

CONSTRUCTION COMPLETION - APPL.:

02/00/84 12/31/81 Staff is reassessing standard assumptions for projecting i

hearino schedules for plants with const. completion dates boyffd '82.

This re-a p ss. may result in a now schedule.

l 1

l

_mi

HRR L ICEN$ING SYST EM PAGE NO: 2-6 CLINTON 1 82 0L CURRENT ST ATUS REPORT REPORT AS OF: 04/19/82 1

PL ANT CHARACTERI$T I C S:

KEY PERS0NNELa LIC. Pt1:

J. WIL LI Atl$

ASLB CHAIR:

H. CLARK COCKET NO:

046110462 LIC. BC:

J. MILLER MEMBER 1:

G. FERGUSON APPLICANT:

ILLINDIS POWER LOCATION:

6 til E OF CLINTON, ILL LIC. LA.

P.

ANDERSON MEMBER 2:

O. PARIS REGIDH:

3 AE:

58L COUNSEL:

R.

G30DARD CONST..INSP:

A. WAGNER REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP: H. LIVERMORE DESIGN PWR: 2894 MWT/0950 MWE CONST: BALDWIN t1PA ANAliST: M. KING ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

FSAR uas docketed 09/08/80.

ER DOCKETED:

03/01/81 09/08/80C ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

12/08/81 ISSUE DES:

12/18/81 12/28/81C RESPONSE TO COMMENTS ON DES:

03/25/82 ISSUE FES:

04/30/82 l

l CURRENT ENV. STATUS:

l The draft environmental statemont was completed Decenber SAFETY / HEARING MILESTONES:

l 1931 APPLICATION TENDERED:

12/01/J9 12/01/79C SAR DOCKETED:

09/08/80 09/08/80C l

SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

INPUT TO DRAFT SER TO PM:

CURRENT NRG. STATUS:

Two petitions for leave to intervene were filed.

The ISSUE DRAFT SER:

State of Illinois filed under 10 CFR 2.715(c).

INPUT TO SER:

12/05/81 A prehearing was held on 04/14/81 ISSUE SER:

01/05/82 02/17/82C ACRS LETTER RECEIVED:

03/09/82 INPUTS TO SE SUPPLEt1ENT 1:

06/16/82 ISSUE SE SUPPLEMENT 1:

06/30/82 i

FEr1A LETTER RECEIVED:

05/18/82 CURRENT ANTITRUST:

NEARING STARTED:

08/00/82 Operating license antitrust review completed riarch 18. 1982 (SECY-82-120).

ASLD INITIAL DECISION:

12/00/82 ASLL FINAL DECISION:

N/S TECH SPECS COMPLETE 0:

COMMISSION CECISIGH:

01/00/83 ISSUE PARTIAL POWER LICENSE:

ISSUE FULL POWER LICENSE:

01/0"/83 LATEST AMENDMENT:

FSAR Amendment 814, 03/82.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Casoload Forecast Panel 11/80 - Staff estimate indicated CONSTRUCTION C0t1PLETION - APPL.'

01/00/83 12/31/81 fuel load date of 08/83.

HRR LICEN$ING SYSTEN PAGE ND: 2-P COMANCHE PEAK 1 82 0L CUQR ENT ST A 7US REPOQT REP 00T AS OF: 00/19/83 PLANT C H A R A C T E R I 5 T I C 5:

KEY P E R S 0 N N E L:

DOCKET NO:

044580446 LIC. PM:

S. BURuELL ASLB CHAIR:

M.

MILLER APPLICANT:

TEXAS UTILITIES GENERATING LIC. BC:

B. YOUNGBLOOD MEMSER 1:

R. COLE LOCATION:

4 MI N OF GLEN ROSE, TEX LIC. LA.:

M.

RUSHBROOK MEMBER 2:

K. NCCOLLCM REGION:

4 AE:

G8N COUNSEL:

M. ROTHSCHILD CONST. INSP 2.

TAYLOR REAC. TYPE: PWR NS$$3 WEST ANTITRUST:

B. V0GLER RESID. INSP D. KELLY DESIGN PWR: 3411 MWT/ttSO MWE CONST: BRRT MPA ANALYST: M.

ANDERSON CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The SER was issued 07/14/81.

The staff deferred scheduling the Comanche Peak review by the ACRS until sufficient ER DOCKETED:

01/19/79 01/19/79C Information was provided to resolve a laroc number of open ER SITE VISIT COMPLETE:

06/20/80 08/07/80C issues. SSER 81 was issued 10/16/81 Application was INPUT TO DES TO Pfl:

08/15/63 04/27/81C reviewed by the ACRS on 11/13/83 SSER 82 responding to ISSUE DES:

04/30/81 05/22/8tC the ACRS was issued on 01/20/82. SSER 83 is scheduled RESPONSE TO COMMENTS ON DES:

07/19/81 08/28/8tC to be issued 07/16/82.

ISSUE FES:

09/18/81 09/24/8tC l

l L

I CURRENT ENV. STATUS:

l The DES was issued on 05/22/81. The EPA Federal Register Notice was printed on 05/29/81 and the corsent period SAFETY / HEARING MILESTONES:

I l

ended 07/13/81.

The FES was issued on 09/24/81 APPLICATION TENDERED:

03/01/78 03/01/78C SAR DCCKETED:

05/12/78 05/12/78C SAR Q'S RECEIVED BY PM:

12/30/78 02/22/75C l

SAR APPL. RESPONSE 10 Q'S RECEIVED: c5/08/79 01/31/80C l

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

04/13/79 0 3/11/81C The first hearing session was held 12/02/88 in Fort Worth.

ISSUE CRAFT SER:

03/3t/88 03/31/8tc Issues heard were financial qualifications and the INPUT TO SER:

05/22/81 07/08/81C j

operating QA program.

The second hearing session on ISSUE SER:

07/14/81 07/I4/8tC i

I QA/QC during construction is scheduled to start 06/07/82.

l The third hearing session on the remaining contention, ACRS LETTER RECEIVED:

11/17/81 11/17/8tC emergency plans, i s unscheduled.

INPUTS TO SE SUPPLEMENT 3:

01/00/83 ISSUE SE SUPPLEMENT 33 07/16/82 FEMA LETTER RECEIVED:

07/08/82 CURRENT ANTITRUST:

administrative Law Judge (ALJ) appointed on 02/23/82 to HEARING STARTED:

12/02/81 12/02/8tC replace ASLB.

Prehearing conference held on 04/13/82 to ASLB INITIAL DECISION:

09/00/82 determine status of parties. Briefs filed 05/04/82 ASLB FINAL DECISION:

09/00/82 requesting immediate imposition of settlement license TECH SPECS COMPLETED:

05/00/83 l

conditions. Matter pending before ALJ.

COM1ISSION CECISION:

10/00/82 ISSUE PARTIAL POUER LICENSE:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE:

06/00/83 30 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

The Caseload Forecast Panel site visit is scheduled for CONSTRUCTION COMPLETION - APPL.:

06/00/83 10/29/81 04/t5/E

PAGE NO: 2-0 NRR L? CENS1NG

$YSTEM DIABLO-CANYON 1 82 0L CURRENT STA TUS R EP0RT REPORT AS OF: 04/19/82

( EY PERS0NN E L:

PLANT C H A R A C T E R I S T I C S:

LIC. FM:

D. BUCKLEY ASLB CHAIR:

J. WOLF DOCKET NO:

027510323 APPLICANT:

PACIFIC GAS 8 ELECTRIC LIC. BC:

F. MIRAGLIA MEMBER 18 J. KLINE LOCATION:

12 MI WSW OF SAN LUIS OBISP0 LIC. LA.

J.

LEE MEMBER 2:

G. BRIGHT REGION:

5 AE:

PG8E CDUNSEL:

B. JONES CONST. INSP D.

KIRSCH REAC. TYPE: FWR HSSS: WEST ANTITRUST:

J. RUTBERG RESID. 1HSP:

J. CARLSON DESIGN PWR: 3333 MWT/1084 MWE CONST: PG1E MPA ANALYST: B. DULIN ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SSER 15 (Equip. Qualification) was issued on 10-02-31.

11/09/71 11/09/71C SSER 16 (Emergency Prep.) is estimated for 07/82.

A ER DOCKETED:

decision on a full-power license is proiccted for May 1982.

ER SITE VISIT COMPLETE:

Low power license was issued on 09-22-81 and suspended on INPUT 70 DES TO PM:

10/09/72 10/09/72C ISSUE DES:

12/12/72 12/12/72C l

November 19. 1951 RESPCNSE TO COMMENTS ON DES:

04/27/73 04/27/73C l

ISSUE FES:

09/15/75 05/23/76C CURRENT ENV. STATUS:

Complete SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

07/10/73 07/10/73C SAR DOCKETED:

10/02/73 10/02/73C SAR Q'S RECEIVED BY PM:

01/04/74 01/ 0 4/ 74C SAR APPL. RESPONSE TO 4'S RECEIVED: 11/01/74 ff/01/74C INPUT TO DRAFT SER TO PM:

01/24/75 01/24 / 75C l

CURRENT NRG. STATUS:

l LP hearinas were held 05-19-81 through 05-22-51.

A ISSUE DRAFT SER:

l favorable PID on low power operation was issued July INPUT TO SER:

01/24/75 01/24/75C 17, 1951 An Appeal Board decision concerning physical ISSUE SER:

10/04/74 10/16/74C security matters is projected for August.

A full pouar hearing was completed on January 26, 1982.

ACRS LETTER RECEIVED:

05/00/78 07/18/78C INPUTS TO SE SUPPLEMENT 9 N/S ISSUE SE SUPPLEMENT 98 07/00/82 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

HEARING STARTED:

10/29/75 12/07/76C Not required ASLB INITIAL DECISIDH:

04/00/82 ASLB FINAL DECISION:

N/S TECH SPECS COMPLETED:

06/15/80 09/15/81C CUMMISSION DECISION:

05/00/32 ISSUE PARTIAL POWER LICENSE:

09/22/81 09/22/81C ISSUE FULL POWER LICENSE:

05/00/82 LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

Est. of dates from end of LP hro to lic. complete dependent upon dev./ approval of State and local Energency Plans. Ongoing Design Verif. Program likely to identify olant nods.

Const. cornletion dr_gendant on mods.

PAGE NO: 3-9 NRR LICEN$ING SY$VEM

~

ENDICO FERMI 2 0L CURRENT STATUS REPORT GEPORT AS OF 04/19/82 PLANT C b A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET ND:

05000341 LIC. PM:

L. KINTNER ASLB CNAIR G. MILLNOLLIN APPLICANT:

DETROIT EDISON LIC. BC:

J. YOUNGBLOOD MEMBER la P. MORRIS LOCATION:

LAGUNA BEACH, MICN LIC. LA.:

M. RUSNBROOK MEMBER 2 D. SCHINK REGION:

3 AE SSL COUNSEL:

C. WOODHEAD CONST. INSP REAC. TYPE: BWR NSSS: GE ANTITRUST:

A. HODGDON RESID. INSP: B. LITTLE DESIGN PWR 3292 MWT/1093 MUE CONST DANIEL MPA ANALYST D. SCHWARZ CURRENT SAF. STATUS:

ENVIRONMENTAL TIILESTONES:

SCHED. DATE ACTUAL DATE An interim SER was issued on 09-29-77 and a final SER i

was issued on 07-10-81 (see second pagn for milestone ER DOCKETED:

04/04/75 04/04/75C summary.)

SSER No. I was issued 09-25-31.

SSER No. 2 was ER SITE v1 SIT COMPLETE:

09/27/78 10/31/78C issued 01-29-82 with 7 prelicensing issues outstanding.

INPUT TO DES TO PM:

07/31/88 04/24/8tC ISSUE DES:

05/01/81 04/30/8tC RESPONSE TO C0f0!ENTS ON DES:

07/31/81 06/29/8tc ISSUE FES:

08/31/81 09/04/8tC CURRENT ENV. STATUS:

Addendum No. I to the FES was issued 03-03-82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/22/74 10/22/74C SAR DDCKETED:

04/05/75 04/05/75C SAR Q'S RECEIVED BY PM:

06/15/75 08/tt/75C SAR APPL. RESPONSE 10 Q'S RECEIVED: 08/29/75 01/12/76C INPUT TO DRAFT SER TO PM:

10/24/75 03/08/76C CURRENT HRG. STATUS:

A hearing on tuo issues becan on 03-31-82 and ended on ISSUE DRAFT SER:

04-02-82.

The two contentions were (1) QA/QC during INPUT TO SER:

03/05/76 05/20/77C construction and (2) adequacy of evacuation plans for ISSUE SER:

08/01/77 09/29/77C the local community.

ACRS LETTER RECEIVED:

08/20/81 08/tt/8tC INPUTS TO SE SUPPLEf1ENT 28 01/04/82 01/29/82C ISSUE SE SUPPLEMENT 28 01/26/82 Ot/29/82C fella LETTER RECEIVED:

05/01/82 CURRENT ANTITRUST An ASLB decision on antitrust matters was issued on HEARING STARTED:

12/02/81 03/31/82C ASLB INITIAL DECISION:

08/31/82 04-25-78.

ASLB FINAL DECISION:

N/S TECH SPECS COMPLETED:

09/30/62 COMMISSION DECISION:

09/30/82 ISSUE PARTIAL POWER LICENSE N/S ISSUE FULL POWER LICENSE:

N/S LATEST AMENDMENT:

The latest final Safety Analysis Report Amendment is number SCHED. DATE RECEIPT DATE 41.

NEW SLIPS / NOTES:

1 The SSER and FES were cept. on an accol. sched. to allow CONSTRUCTION COMPLETION - APPL.:

06/01/83 03/29/82 more time for public hearings. Plant constr. is est. to be empl. by 06-08-83 per app. Itr. dated 03-29-82; however, Appliennt's tarnpt emol. dato is 9till 18-29-82.

)

PAGE NO: 2-10 NRR L ICEN5ING SYST EM OL CURRENT STATUS R EPORT REPORT AS OF 04/19/82 FERMT 2 (FSAR RESUB)

KEY P E R S 0 N N E L:

PLAHT CHARACTERISTICSt LIC. PM:

L. XINTNER ASLB CHAIR:

G. MILLHOLLIN LIC. EC:

J. YOUNGBLOOD NEMBER 1:

P.

MORRIS l

DOCKET NO:

00007341 LIC.

LA.'

M, RUSHBROOK MEf1B ER~ 2 :

D. SCHINK l

APPLICANT:

DETROIT EDISON LOCATION:

LAGUNA BEACH, MICH REGIGH:

3 AE:

S8L COUNSEL:

C. UD0DHEAD CONST. INSP:

REAC. TYPE: BWR NSSS: GE ANTITRUST:

A.

HODGDON RESID. INSP: B. LITTLE DESIGN PWR: 3292 MWT/1093 MUE CONST LANIEL MPA ANALYST

  • D.

SCHNARZ SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

All information on this page reflects the FSAR resubmittal.

The SAR resubmittal was docketed on 06-01-78 and the safety review was completed. A final SER was issued on 07-10-81.

Summary of later milestonos is on previous page.

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/22/74 10/22/74C SAR DOCKETED:

06/01/78 06/01/78C SAR Q'S RECEIVED BY PM:

07/0t/78 08/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/78 10/02/78C INPUT TO DRAFT SER TO Fil 09/08/78 03/27/81C CURRENT HRG. STATUS:

ISSUE DRAFT SER:

INPUT TO SER:

06/10/81 06/23/81C ISSUE SER:

06/30/81 07/10/81C CURRENT ANTITRUST:

LATEST AMENDMENT:

NEW SLIPS / NOTES:

All information on this page reflects the FSAR resubmittal. The schedule for input to the SER slipped due to slippage in the fuel load dato because of Till c a_u = n.

t

4 NRR L ICEN5ING SYST EN PAGE NO: 2-11 GRAND GULF 1 82 0L.

CURREN T 5TATUS REPQRT REPORT AS OF: 04/19/82 PLANT CHA RACTERI$T I C S:

K EY P E R S 0 N N E L:

DOCKET NO:

041680417 LIC. FM D. HOUSTON ASLB CHAIR: N/A APPLICANT:

MISSISSIPPI POWER 4 LIGHT COMPANY LIC. BC:

A.

SCitWENCER MEMBER 1:

N/A LOCATION:

25 MI 5 0F VICKSBURG, MISS LIC.

LA..

E. HYLTON MEMBER 2:

N/A REGION:

2 AE BECH COUNSEL:

M.

WAGNER CONST. INSP:

R.

VANDORN REAC. TYPE: PWR NSSS: GE ANTITRUST:

5. V0GLER RESID. INSP:

A.

WAGNER DESIGN PWR 3833 MWT/1250 MWE CONST: SECH MPA ANALYST:

B. DULIN CURRENT SAF. STATUS:

ENVIRONMENTAL NILESTONES:

SCHED. DATE ACTUAL DATE SER was issued cn September 10, 1981 ACRS meeting was held Oct. 15, 1981.

Post ACR$ $$ER was issued in ER DOCKETED:

06/05/78 06/30/78C l

December 1981 Another SSER is scheduled prior to 5%

ER SITE VISIT COMPLETE:

12/14/79C licensing in April 1982.

A second ACRS meeting is INPUT TO DES TO PM:

04/30/81 04/30/81C scheduled for June 1982 on Hydrogen and HCU floor loads.

ISSUE DES:

05/31/81 05/31/31C RESPONSE TO COMMENTS ON DES:

08/15/81 08/15/81C ISSUE FES:

09/15/81 10/09/81C CURRENT ENV. STATUS:

DES was issued in May 1981 FES was issued October 9, 1981 SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

04/28/78 04/28/78C SAR DOCKETED:

06/05/78 06/30/78C SAR Q'S RECEIVED BY PM:

04/24/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/01/80 09/30/80C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S No hearing is scheduled.

ISSUE CRAFT SER:

09/18/81C INPUT TO SER:

04/01/81 08/14/81C ISSUE SER:

06/00/81 09/10/81C ACRS LETTER RECEIVED:

06/04/82 INPUTS TO SE SUPPLEMENT 2:

05/15/82 ISSUE SE SUPPLEMENT 2:

05/14/82 FEMA LETTER RECEIVED?

06/00/82 CURRENT ANTITRUST:

OL review is in progress. No significant changes have HEARING STARTED:

N/A occurred since the CP.

ASLB INITIAL DECISION:

N/A ASLB FINAL DECISION:

TECH SPECS COMPLETED:

04/16/82 COMMISSION CECISION:

04/00/82 ISSUE PARTIAL POWER LICENSE:

04/23/82 LATEST AMENDNENT:

ISSUE FULL PLUER LICENSE:

07/00/82 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

In 11/80, the CFP updated Unit 1 construction completion CONSTRUCTION COMPLETION - APPL.:

04/00/82 05/30/82 date to 7/82. However, licensing review is proceeding on a schedule to meet applicant official estimated construction como(pt i on dato of 04/82.

PAGE NO: 2-12 HRR L ICEN5ING SY STEM 0L CURREN T ST A T US R EPORT REPORT AS OF: 04/19/82 HARRIS f 82 KEY P E R S 0 N N E L:

PLAN T C H A R A C T E R I S T I C 5:

LIC. PM:

E. LICITRA ASLB CHAIR:

J.

KELLEY LIC. BC:

F. MIRAGLIA METIBER i:

G. ERIGHT

  • DOCKET NO:

0400-0401 APPLICANT:

CAROLINA POWER 1 LIGHT LOCATION:

20 MI SW OF RALEIGH, NC LIC. LA.

J. (EE f1 EMBER 2:

J. CARPENTER REGION:

2 AE:

EBASCO CLUNSEL:

C. BARTH CONSI. INSP:

REAC. TYPE: PWR NSSS: MEST ANTITRUST:

J. RUTBERG RESID. IN5P: G. MAXUELL DESIGN PWR: 2775 MWT/0915 MWE CONST: DANIEL MPA ANALYST: M.

ANDERSON ENVIR0i: MENT AL flILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

ER DOCKETED:

12/22/81 12/22/81C FSAR was docketed on 12/22/81.

ER SITE VISIT COMPLETE:

04/03/82 04/08/82C INPUT TO DES TO fil:

05/30/82 ISSUE DES:

10/01/82 RESPONSE TO COMMENTS ON DES:

01/08/83 ISSUE FES:

03/31/83 1

CURRENT ENV. STATUS:

ER was docketed on 12/22/81.

SAFETY / NEARING MILESTCHES:

l AFPLICATIDH TENDERED:

06/26/80 06/26/80C SAR DOCKETED:

12/22/81 12/22/81C SAR Q'S RECEIVED BY PM:

07/15/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 00/02/82 INPUT TO DRAFT SER TO PM:

10/15/82 CURRENT HRG. STATUS:

Notice for Opportunity for Hearing was published in the ISSUE DRAFT SER:

12/01/82 Federal Register on January 27, 1982.

Several petitions INPUT TO SER:

06/01/83 were filed. Prehearing conference on petitions scheduled ISSUE SER:

07/08/83 for June 14-15, 1982.

ACRS FULL CCMt11TTEE MEETING:

08/11/83 INPUTS TO SE SUPPLEMENT 1:

12/01/83 ISSUE SE SUPPLEllENT 1:

N/S FEt1A LETTER RECEIVED:

N/S CURRENT ANTI 1 RUST:

HEARING STARTED:

06/01/84 Status to be determined.

ASLB INITIAL DECISION:

11/01/84 ASLB FINAL CECISION:

TECH SPECS COTIPLETED:

11/01/84 COM;11SSION DECISIGH:

12/04/84 ISSUE PARTIAL P0uCR LICENSE:

12/01/84 ISSUE FULL PONER LICENSE:

12/01/84 LATEST AMENDMENT:

No. 2 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.

12/01/84 12/31/81

NR R L ICEN S ING SYST EM PAGE NO: 2-13 LASALLE 1 3 2 0L CURREN T STA TUS REP 0RT REPORT AS OF: 04/19/82 PL AN T CH A R A CT EF I ST I C 5:

K EY P ERS0NN E L:

=

DOCKET NO:

037380374 LIC. FM:

A.

BOURNIA ASLB CHAIR:

M.

MILLER APPLICANT:

C0"MOUWEALTH EDISDN LIC. PC:

A.

SCMWENCER MEMBER 1:

F.

SHON LOCATION:

18 MI SE OF OTTAWA. ILL LIC. LA.

E. HYLTON MEMBER 22

0. PARIS REGION:

3 AE:

51L COUNSEL:

C. W30DNEAD CONST. INSP:

H. WESCOTT REAC. TYPE: BWR HSSS: CE ANTITRUST:

B.

V0GLER RESID. INSP:

W.

GULDE!!DHD DESIGN rWR: 3293 MUT/1078 MUE CONST: CNE MPA ANALYST:

D. SCHutRZ CURRENT SAF. STATUS:

ENVIRONTIENTAL MILESTONES:

SCHED. DATE ACTUAL DATE

$5ER-1 was issued in June 1951 SSER-2 was is ued in Tobruary 1982.

SSER-3 :a5 issued on April 16. 1932.

A low ER COCAETED:

01/17/77 05/12/77C power license to permit fuel load and low power testing was ER SITE VISIT C0t:PLETE:

01/12/77 06/15/77C issued on April 17, 1982.

INFUT TO DES TO FM:

02/17/78 02/17/78C ISSUE DES:

03/22/78 03/29/78C RESPONSE TO COMMENTS ON DES:

07/14/78 07/14/78C ISSUE FE5:

09/22/78 11/03/78C CURRENT ENV. STATUS:

Environmental Protection Plan has boon issued.

SAFETY / HEARING F1ILESTONES:

APPLICATION TENDERED:

09/01/76 09/01/76C SAR DOCKETED:

04/08/77 05/12/77C SAR C'S RECEIVED BY PM:

07/08/77 07/27/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/20/77 08/IS/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/06/78 11/08/78C No hearino.

ISSUE DRAFT SER:

INPUT TO SER:

12/29/78 02/27/31C ISSUE SER:

09/05/80 03/05/81C l

ACRS LETTER RECEIVED:

04/09/81 04/16/81C INFUTS TO SE SUPPLErlENT 3:

12/09/81 12/09/8tC ISSUE SE SUPPLE!!ENT 3:

04/16/82 04/16/82C FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Completo.

HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A l

ASLD FINAL DECISION:

N/A TECH SFECS COTTLETED:

04/12/82 04/12/82C C0 fir 1ISSION DECISION:

04/17/82 04/17/82C ISSUE PARTIAL POWER LICENSE:

04/17/82 04/17/82C LATEST AMENDMENT:

ISSUE FULL POWER LICENSE:

06/00/82 NEW SLIPS / NOTES:

SCHED. DATE RECEIPT DATE A fuel load and low power test (5%) license was issued CONSTRUCTION C0t1PLETION - APPL..

04/17/82C 12/13/81 on April 17. 1982.

NRR LICENSING SYST EN PAGE NO: 2-14 LIMERICK 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF 04/19/82 PLANT C H A R A C T E R I S T I C 5:

KEY PERS0NNELa DOCKET NO:

035210353 LIC. PM:

H. ADELSON ASLB CHAIR:

L. 8RENNER APPLICANI:

PHILADELPHIA ELECTRIC LIC. BC:

A. SCinMEHCER MEMBER 1:

R. COLE LOCATION:

35 MI NW OF PHILADELPHIA. PA LIC. LA.

E. HYLTON MEMBEP. 2:

P. MORRIS REGION:

1 AE:

BECH COUNSEL:

S. LEWIS CONST. INSP REAC. TYPE: BWR NSSS:. GE ANTITRUST:

B. V0GLER RESID. INSP J. DURR DESIGN ruR: 3440 Mk!T/1065 MWE CONST DECH MPA ANALYST: M. ANDERSON CURRENT SAF. STATUS:

ENVIROMMEllTAL MILESTONES:

SCHED. DATE ACTUAL DATE Applicant submitted Probabilistic Risk Assessment with FSAR on March 17, 1981 SAR was docLoted on 07/27/81 ER DOCKETED:

07/27/81 07/27/81C PRA under reviou by Breckhaven National Laboratory; ER SITE VISIT COMPLETE:

05/14/82 NUREG/CR on PRA scheduled for issuance 11/30/82.

INPUT TO DES TO PM:

03/25/83 ISSUE Dest 05/06/83 RESPONSE TO COMMENTS ON DES:

09/06/83 ISSUE FES:

10/31/83 CURRENT ENV. STATUS:

ER was tendered with the FSAR on March 17, 1981 and was docketod on 07/27/81.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

01/00/81 03/17/81C SAR DOCKETED:

07/27/81 07/27/8tC SAR Q'S RECEIVED BY PM:

07/08/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 10/07/82 CURRENT HRG. STATUS:

INPHT TO DRAFT SER TO PM:

01/07/83 Notice of Opportunity of Hearing was published in the ISSUE DRAFT SER:

02/04/83 Federal Register on August 21, 1931 Pre-hearing INPUT 10 SER:

07/01/83 conference hold January 6-8, 1982.

ISSUE SER:

08/08/83 ACRS FULL COMMITTEE MEETING:

09/08/83 INPUTS TO SE SUPPLEMCHT 1:

10/07/83 ISSUE SE SUTPLEMENT 1 10/30/83 FEMA LETTER RECEIVED:

10/07/83-CURRENT ANTITRUST:

Status to be determined.

HEARING STARTED:

04/03/84 ASLB INIIIAL DECISION:

10/00/84 ASLB FINAL DECISION:

N/S TECH SPECS COMPLETED:

N/S COM!IISSION DECISIDH 10/31/84 ISSUE PARTIAL POWER LICENSE:

N/S LATEST AMENDMENT:

ISSUE FULL POWER LICENSE:

10/31/84

29. March 31. 1932 2

NEW SLIPS / NOTES:

SCHED. DATE RECEIPT DATE CONSTRUCTION COMPLETION - APPL.:

10/00/84 05-00-81

NQR L ICEN$ING

$YSTEM PAGE ND: 2-15 MCGUIRE 2 0L CURRENT STATUS 2EPQRT REPORV AS OF: 06/19/82 PLANT CHARACTER ISTIC5:

KEY P E R S 0 N N E L:

DOCKET NO:

05000370 LIC, FM:

R.

BIRKEL ASLB CHAIR:

R. LAZO APPLICANT:

DUKE POWER LIC. BC:

E. ADENSAM MEMBER 1:

X. HAND LOCATION:

17 MI N OF CHARLOTTE, NC LIC.

LA.*

M.

DUNCAN MEMBER 2:

E.

LUEBKE REGION:

2 AE:

DUKE COUNSEL:

J. CUTCHIN CONST. INSP: M.

HUNT REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B.

V0GLER RESID. INSP P.

BEMIS DESIGN PWR: 3411 NWT/1180 MWE CONST: DUKE MPA ANALYST:

B.

DULIN CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Input for SSER 6 (SSER for unit 2) is due to DL on 12/01/82, with issuance of the suppIcmont scheduled ER DOCKETED:

05/31/74 05/31/74C for 01/31/83.

ER SITE VISIT COMPLETE:

01/30/75 01/30/75C INPUT TO DES TO PM:

08/29/75 08/29/75C ISSUE DES:

11/07/75 10/29/75C RESPONSE TO COMMENTS ON DES:

ISSUE FES:

05/07/76 04/20/76C CURRENT ENV. STATUS:

Complete.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

04/05/74 04/05/74C SAR DOCKETED:

04/29/75 05/05/75C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE 10 Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Complete.

ISSUE DRAFT SER:

INPUT TO SER:

06/01/77 01/16/78C ISSUE SER:

02/21/78 03/01/78C ACRS LETTER RECEIVED:

04/14/78 04/14/78C INPUTS TO SE SUPPLEMENT 6:

12/01/82 ISSUE SE SUPPLEMENT 6 01/31/83 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

Complete.

HEARING STARTED:

03/15/77 03/28/77C ASLB INITIAL DECTSION:

06/00/81 06/08/81C ASLB FINAL DECISION:

TECH SPECS COMPLETED:

COMMISSION DECISION:

03/01/83 ISSUE PARTIAL POWER LICENSE:

LATEST AMENDMENT ISSUE FULL POWER LICENSE:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

04/00/83 12/31/81 l

l l

_o

PAGE NO: 2-16 NRR LICENSING SYSTEM 0t CURRENT STATUS REPORT REPORT AS OF: 04/19/82 MIDLAND 1 82 KEY P E R S 0 N N E L:

PLANT C H A R A C T E R I S T I C S:

LIC. PM:

R. HERNAN ASLB CHAIR:

C. BECHHOEFER LIC. BC:

E. ADENSAM MEMBER 1:

F. COWAN DOCKET HD:

033080329 LIC. LA.

M. DUNCAN MEMSER 2:

J. HARDOUR APPLICANT:

CONSUMERS POWER LOCATION:

$W BOUNDARY OF MIDLAND. MICH.

REGION:

3 AE:

BECH COUNSEL:

W. PATON CONST. INSP: R. COOK REAC. TYPE: PWR NSSS: B8W ANTITRUST:

d. V0GLER RESID. INSP: R. COOK DESIGN PWR: 2452 MWT/0818 MWE CONST: BECH MPA ANALYST: M. ANDERSON ENVIRONMENTAL MILESTONES:

SCHED DATE ACTUAL DATE CURRENT SAF. STATUS:

Utilization of National Laboratories or other ER DOCKETED:

04/01/78 04/14/78C aqcncies to complete some review areas is currently in progress.

CP extension issued 12/28/82.

ACRS ER SITE VISIT COMPLETE:

09/08/73 09/08/78C Subcommittee meeting on soils remedial measures is INPUT TO DES TO PM:

N/S ISSUE DES:

02/05/82 02/05/82C scheduled for 04/29/82.

RESPONSE TO COMMENTS ON DES:

06/15/82 07/05/82 ISSUE FES:

CURRENT ENV. STATUS:

The DES was issued 02/05/82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

08/31/77 08/31/77C SAR DOCKETED:

09/30/77 11/18/77C SAR O'S RECEIVED BY PM:

03/20/78 10/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/08/78 12/08/78C INPUT TO DRAFT SER TO PM:

11/01/78 12/01/78C CURRENT HRG. STATUS:

ISSUE DRAFT SER:

Three prehearings ending 04/27-28/81 were held for a 04/23/82 separate hearing on soils settlement. Hearing began INPUT TO SER:

~

0S/06/32 ISSUE SER:

July 7, 1981 and is continuing.

ACRS FULL COMMITTEE MEETING:

06/06/82 INPUTS TO SE SUPPLEMENT 1r 06/10/82 ISSUE SE SUPPLEMENT 1:

07/01/82 FEMA LETTER RECEIVED:

07/30/82 CURRENT ANTITRUST:

Proceeding completed. License was amended 10/20/80.

HEARING STARTED:

11/16/82 ASLB INITIAL DECISIDH:

06/30/83 ASLB FINAL DECISION:

N/S TECH SPECS COMPLETED:

06/25/82 l

COMMISSION DECISION:

07/00/83 ISSUE PARTIAL POWER LICENSE:

ISSUE FULL POWER LICENSE:

LATEST AMENDMENT:

103 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.'

07/31/83 12/31/81

NRR L ICEN$VNG 3Y$T EM PAGE HO: 2-17 PALD UERDE 1.2.3 0L CURR EN T STATUS REPQRT REPORV AS OF: 04/19/82 PLAN T CHA RA CT ER I S T I C S:

K EY PERS0NN E L:

DOCKET NO:

0528-0530 LIC. PM:

E.

LICITRA ASLB CHAIR: R LA20 APPLICANT:

ARIZONA PUBLIC SERVICE LIC. EC:

F. MIRAGLIA MEMBER 1:

R$ COLE LOCATION:

36 !!! u 0F PHOENIX. AZ LIC. LA.

J.

LEE T1 EMBER 2:

D. CALLINAN REGION:

5 AE:

BECH COUNSEL:

L. DEWEY CONST. INSP L.

VBRUEGGEN REAC. TYPE: PWR NSSS: C Cf1B ANTITRUST:

B.

V0GLER RESID. INSP: G. FICRELLI DESIGN PUR: 3817 MuT/1304 MuE CONST DECH MPA ANALYST: D.

SCHUARZ CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The safety OL review is in progress.

Several " Independent Dosien Review" meetings have been completed.

The SLR ER D3CKETED:

07/01/80 06/20/80C was issued on November 11, 1981.

The SER supplement ER SITE VISIT COMPLETE:

01/30/81 01/30/8tC No. I was issued on February 5.

1982.

INPUT TO DES TO Pit:

10/05/89 10/05/8tc ISSUE DES:

10/26/81 10/26/8tC RESPONSE TO CCKitENTS ON DES:

02/25/82 02/25/82C ISSUE FES:

03/11/82 03/11/82C CURRENT ENV. STATUS:

The ER (OL) review is complete. A site visit was completed on January 30, 1981.

The DES was issued on SAFETY / HEARING MILESTONES:

October 26. 1981 and the FES was issued on March 11, 1982.

APPLICATION TENDERED:

10/05/79 10/05/79C

)

SAR DOCKETED:

06/20/80 06r20/80C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO O'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO CRAFT SER TO PM:

Five contentions were admitted by ASLB order dated ISSUE DRAFT SER:

April 21 1931.

Interrocatories have been issued by INPUT TO SER:

10/30/81 10/30/8tC l

all parties.

Two contentions have been subsequently ISSUE SER:

11/ts/81 11/tt/8tC dropped by the intervenor and two others were summarily disposed of by Board Order dated tiarch ACRS LETTER RECEIVED:

12/18/81 12/18/81C 17, 1982.

The remaining contention deals with water INPUTS TO SE SUPPLEMENT I:

01/29/82 01/29/82C availability. A combined prehearing conference is ISSUE SE SUPPLEttENT 18 02/05/82 02/05/82C scheduled for April 27-30. 1982.

FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Antitrust OL review is in progress.

NEARING STARTED:

04/27/82 ASLB INITIAL DECISION:

10/30/82 ASLB FINAL DECISION:

N/S TECH SPECS COMPLETED:

11/0f/82 Com!ISSION DECISION:

11/00/82 ISSUE PARTIAL PCHER LICENSE:

N/S LATEST AMENDMENT:

ISSUE FULL POWER LICENSE:

11/01/82 SCHED. DATE RECEIPT DATE HEu SLIPS / NOTES:

Casoload Forecast Panel estimates for construction CONSTRUCTION C0tfPLETION - APPL.:

11/01/82 02/00/82 completion on Units 1, 2. and 3 are beino re-evaluated as a result of a tiarch 1982 site visit.

s_

l

r PAGE NO: 2-18 NRR LICEN$ING SYST EM PERRY 1 12 0L CURRENT STATUS REPQRT REPORT AS OF 04/19/82 KEY P E R S 0 N N E L:

PLAN T CHARACT E R I S T I C 5:

LIC. PM:

J. STEFAND ASLB CHAIR:

P. BLOCH LIC. DC:

A.

SCHUENCER MEMDER 1:

J. KLINE DOCKET NO:

044040441 APPLICANT:

CLEVELAtID ELECTRIC ILLUMINATING LIC. LA.

E.

HYLTON MEMBER 2:

F. SHON LOCATION:

7 MI NE OF PAINESVILLE. OHIO REGIDH:

3 AE GIL COUNSEL:

J.

THESSIN CONST. INSP:

REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP: M. GILDNER DESIGN PWR: 3758 MWT/1205 MUE CONST: KAISER MPA ANALYST:

D.

SCHUARZ ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

The Safety Evaluation Report is scheduled to be ER DOCKETED:

06/26/81 06/19/81C completed May 1982.

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

01/01/82 01/01/82C J

ISSUE DES:

02/26/82 02/26/82C RESPONSE TO COMMENTS ON DES:

06/01/82 ISSUE FES:

07/05/82 CURRENT ENV. STATUS:

Environmental acceptance review was completed on June SAFETY / HEARING MILESTONES:

9, 1981 The ER was docketed Juno 19. 1988.

APPLICATION TENDERED:

06/26/80 06/26/80C SAR DOCKETEb:

01/09/81 Ol/30/81C SAR G'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

INPUT TO DRAFT SER TO PM:

02/24/82 02/24/82C CURRENT HRG. STATUS:

ISSUE DRAFT SER:

02/26/82 02/26/82C A prehearinq conference was ht;u June 2-3, 1981 in 04/20/82 INFUT TO SER:

Painnsville, Ohio.

ISSUE SER:

05/10/82 ACRS FULL C0f2tITTEE MEETING:

06/11/82 INPUTS TO SE SUPPLEMENT 18 06/15/82 ISSUE SE SUPPLEMENT 18 06/30/82 FEMA LETTER RECEIVED:

09/01/82 CP antitrust revicu has boon completed. OL antitrust HEARING STARTED:

11/30/82 l

CURRENT ANTITRUST:

ASLB INITIAL DECISIGHz 04/00/83 status is under review.

ASLB FINAL DECISIGN:

N/S TECH SPECS COMPLETED:

N/S COMMISSION DECISION:

05/24/83 ISSUE PARTIAL POWER LICENSE:

N/S ISSUE FULL POWER LICENSE:

11/00/83 LATEST AMENDMENT:

Humber 6.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETI0H - APPL.

11/00/83 02/08/82

NRR LICENSING SY$ TEM PAGE NO: 3-19 RIVER BEND 1 82 0L CURRENY

$TA TUS REPQRT 3EPORT AS 07 04/19/G2 PLANT CHA R A C T E R I S T I C 5:

KEY P E R S 0 N N E L:

DOCKET NO:

0458I0459 LIC. PM:

. UNASSIGNED ASLB CHAIR:

B. COTTER l

APPLICANT GULF STATES UTILITIES LIC. BC:

A.

SCHUENCER NETIBER 1:

F.

REMICK i

LOCATION:

24 MI NNW OF BATON ROUGE. LA LIC. LA.

E. HYLTON TIEi1SER 2:

R.

COLE REGION:

4 AE:

SIW COUNSEL:

L.

DEUEY CONST. INSP:

R.

TAYLOR REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP B.

BEACH DESIGN PWR 301S MWT/0934 MUE CONST: SIM MPA ANALYST: M.

KING l

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE I

Applicant tendered FSAR for docketing on 04/24/81 FSAR was docketed on 08/2S/81 ER DOCKETED:

03/25/81 08/25/81C ER SITE VISIT COMPLETE:

01/22/82 01/22/82C INPUT TO DES TO PM:

08/00/83 ISSUE DES:

07/05/82 RESPONSE TO CCi1MENTS ON DES:

ISSUE FES:

12/05/82 CURRENT ENV. STATUS:

Applicant tendered ER for docketing on 04/24/81 ER was docketed on 08/25/81 S AFETY/ HEARING F1ILESTONES:

APPLICATION TENDERED:

04/24/81 04/24/81C SAR DOCKETED:

08/25/81 08/25/81C SAR Q'S RECEIVED BY PM:

12/07/81 SAR APPL. RESPONSE TO Q'S RECEIVED: 05/14/F2 CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

12/17/82 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

04/04/82 Federal Register on 09/04/81 INPUT TO SER:

09/04/82 ISSUE SER:

10/04/82 ACRS FULL COMt1ITTEE MEETING:

11/05/82 INPUTS TO SE SUPPLEMENT 1:

11/08/82 ISSUE SE SUPPLEMENT 1:

11/29/82 FEi1A LETTER RECEIVED:

11/33/82 CURRENT ANTITRUST:

l Status to be determined.

HEARING STARTED:

04/00/83 ASLB INITIAL DECISION:

09/00/83 ASLB FINAL DECISION:

TECH SPECS C0ilPLETED:

COMilISSIO N DECISION:

10/00/83 ISSUE PARTIAL POWER LICENSE:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE:

04/00/85 Humber 3.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

NRR/0L is assessing advisability of leuering the priarity CONSTRUCTION COMPLE! ION - APPL..

04/00/85 12/31/81 of the review on this case due to the vacant 18 month slip in construction schedule.

PAGE NO: 2-20 NRR LICENSING S Y S T E r1 SAN ONOFRE 2 8 3 L IC CURRENT STATUS REPQRT REPORT AS OF: 04/19/82 PLANT CHARACTERIST I C S:

KEY P E R S 0 N N E L:

LIC. PM:

H.

RCOD ASLB CHAIR:

J.

KELLEY DOCKET NO:

036180362 APPLICANT:

SOUTHERN CALIFORNIA EDISON LIC. DC:

F. t11RAGLIA MLMBER 1:

C. HtND LOCATION:

5 MI S OF SAN CLEMENTE, CA LIC. LA.

J.

LEE MEr13ER 2:

E.

JOHNSON REGION:

5 AE:

BECH COUNSEL:

L.

CHANDLER CONSI. INSP:

R. PATE REAC. TYPE: PWR HSSS: CDMB ANTITRUST:

B. V0GLER RESID. INSP:

A.

CHAFFEE DESIGN PWR: 3410 MWT/1100 MWE CONST: BECH MPA ANMYST: fl. ANDERSON ENVIRONMEHfAL TIILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SER on geolooical and seismological matters was issued on 12/31/80.

ACRS subcommittee meeting was held 01/30/81, and ER DOCKETED:

03/01/77 03/23/77C full committee meetings were held 02/5/81 and 03/12/31.

ER SITE VISIT COMPLETE:

05/20/77 05/20/77C SER (Non-TMI matters), was issued on 02/06/81.

SER INPUT TO DES TO Pri:

10/01/77 12/01/80C supplement on TNI i ssues was issued on 02/25/81.

SER ISSUE DES:

01/27/78 01/20/8tC supplement No. 2, 3, 4 and 5 addressing open items were RESPONSE TO COMMENTS ON DES:

04/06/81 04/06/8tC issued 05/08/81, 09/16/81, 01/22/82, and 02/16/82.

A ISSUE FES:

04/00/81 04/29/81C partial initial decision was rendered on 01/11/82 and an ASLB initial decision is expected for 05/82.

CURRENT ENV. STATUS:

DES addressing class 9 accidents was issued 01-20-81 SAFETY /ilEARING MILESTONES:

FES was issued 04-29-81.

APPLICATION TENDERED:

11/29/76 11/29/76C SAR DOCKETED:

03/01/77 03/23/77C SAR Q'S RECEIVED BY PM:

08/15/77 09/29/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/18/77 12/08/77C INPUT TO DRAFT SER TO PM:

02/10/78 08/11/78C CURRENT HRG. STATUS:

Motions for summary disposition were granted by ASLB.

ISSUE DRAFT SER:

01/15/81 01/15/81C Third prehearing conference was beld 04/29/81 Hoaring INPUT TO SER:

06/23/78 01/15/81C started 06/22/81 and ended 09/31/81.

A decision on low ISSUE SER:

08/01/80 02/06/81C power operation was issued on 01/11/82.

A decision on full power operation is expected in 06/82.

ACRS LETTER RECEIVED:

03/17/81 03/17/81C INPUTS TO SE SUPPLEMENT 58 02/05/82 02/05/82C ISSUE SE SUPPLEMENT 5:

02/16/82 02/16/82C FEt1A LETTER RECEIVED:

12/01/81 12/ 01/81C CURRENT ANTITRUST:

The Staff is reviewing the OL antitrust information.

HEARING STARTED:

06/22/81 06/22/81C ASLB INITIAL DECISION:

05/00/82 ASLB FINAL DECISION:

TECH SPECS COMPLETED:

02/16/82 02/16/82C i

COMMISSION DECISIGH:

06/00/82 ISSUE P ARTI AL POWER LICENSE:

ISSUE FULL PCUER LICENSE:

LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CCHSTRUCTION COMPLETION - APPL.*

02/12/82C 02-09-82 l

NRR LICEN$ING

$YSTEM PAGE NO: 2-21 SEABROOK 1 83 0L CURRENT STATUS REPQRT REPORT AS OF: 04/19/82 PLANT CHARACTER I 5 T I C 5:

KEY P ERS0NNELa

  • DOCKET NO:

044380444 LIC. PM:

L. WHEELER ASLB CHAIR:

H. H0YT APPLICANT:

PUBLIC SERVICE OF HEW HAMPSHIRE LIC, BC:

F. MIRAGLIA MEMBER 1:

E. LUEBKE LOCATION:

10 MI S OF PCRTSMOUTH, NH LIC. LA.:

J. LEE MEMBER 2:

0. PARIS REGION:

1 AE:

UEC COUNSEL:

E. REIS CONST. INSP A. TOTH REAC. TYPE: PWR N S J.5 : UEST ANTITRUST:

A. H0DGDON RESID. INSP A. CERNE DESIGN PWR: 3411 MMT/1198 MWE CONST: UEC MPA ANALYST:

B.

DULIN CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The FSAR acceptance review was completed in September 1981 The FSAR was docketed October 5, 1988.

ER DOCKETED:

10/05/81 10/05/8tC ER SITE VISIT COMPLETE:

INPUT TO DES TO P!1:

03/08/82 ISSUE DES:

05/05/82 RESPONSE TO COMMENTS ON DES:

08/18/82 ISSUE FES:

10/05/82 CURRENT ENV. STATUS:

ER was tendered June 1981.

ER acceptance review was comp 1nted September 1981.

The ER was docketed SAFETY / HEARING MILESTONES:

October 5, 1981 APPLICATION TENDERED:

06/29/81 06/29/8tC SAR DOCKETED:

10/05/81 10/05/8tC SAR Q'S RECEIVED BY PM:

01/20/82 03/05/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/12/82 04/13/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

05/07/82 Notico for Opportunity for Hearing was published in ISSUE DRAFT SER:

05/31/82 the Fcdcral Register on October 19, 1981 ASLB Memorandum INPUT TO SER:

08/07/82 and Order dated flarch 12, 1982 establishes prehearing ISSUE SER:

09/07/82 conference May 6-7, 1982 to consider intervention petitions and specific contentions.

ACRS FULL COMMITTEE MEETING:

10/08/82 INruTS TO SE SUPPLEMENT 18 10/10/82 ISSUE SE SUPPLEMENT 1 10/30/82 FEMA LETTER RECEIVED:

10/30/82 CURRENT ANTITRUST Status to be determined.

HEARING STARTED:

03/00/83 ASLB INITIAL DECISION:

10/00/83 ASLB FINAL DECISION:

TECH SPECS C0fiPLETED:

COMMISSION DECISION:

11/00/83 ISSUE PARTIAL POWER LICENSE:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE:

11/00/83 44 SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

11/00/83 03/25/82 8

m d

-- l w

l NRR LICEN$ING SYST EM PAGE NO: 2-22 0L CURRENT

$TATUS REPORT REPORT AS OF 04/19/82 SHOREHAM PLA N T CHARACT ERIST I C S:

KEY P E R S 0 N N E L:

LIC. PM:

R.

GILBERT ASLB CHAIR:

L. BRENHER DOCKET NO:

05000322 APPLICANT:

LONG ISLAND LIGHTING CO.

LIC. BC:

A.

SCHWENCER MEMBER *1:

P. MORRIS LOCATION:

BROOKHAVEN, NY (LI)

LIC. LA.

E. HYLTON MEMBER 2:

J. CARPENTER REGION:

1 AE:

StW COUNSEL:

B. BORDENICK CONST. INSP: L. HARROW REAC. TYPE: BWR NSSS: GE ANTITRUST:

J. RUTBERG RESID. INSP:

J. HIGGENS DESIGN PWR: 2436 MWT/0849 MWE CONST: S&W MPA ANALYST:

L. LANIER ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

The 4CRS meeting was held in October 1981 SER Supnicmont 2 was issued in March 1932.

An additional ER DOCKETED:

01/26/76 01/26/76C SLR Supplement is scheduled for Sept. 1982 or earlier ER SITE VISIT COMPLETE:

08/06/76 08/03/76C to address resolution of all remaining outstanding INPUT TO DES TO rn:

11/22/76 11/29/76C ISSUE DES:

03/11/77 03/24/77C matters.

RESPONSE TO COMMENTS ON DES:

07/22/77 07/22/77C ISSUE FES:

10/21/77 10/18/77C CURRENT ENV. STATUS:

The environmental review is complete.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

09/00/75 09/04/75C SAR DOCKETED:

12/15/77 01/26/76C SAR Q'S RECEIVED BY PM:

06/04/76 07/09/76C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/23/76 07/23/76C INPUT TO DRAFT SER TO PM:

07/15/77 08/01/77C CURRENT HRG. STATUS:

OL hearing is scheduled to start May 4, 1982.

ISSUE DRAFT SER:

INPUT TO SER:

03/10/81 03/10/81C ISSUE SER:

04/10/81 04/10/81C ACRS LETTER RECEIVED:

09/18.'81 10/19/81C INPUTS TO SE SUPPLEMENT 3:

08/20/81 01/08/82C ISSUE SE SUPPLEMENT 3:

09/00/82 FEMA LETTER RECEIVED:

06/00/82 CURRENT ANTITRUST:

HEARING STARTED:

N/A Not required.

ASLB INITIAL DECISION:

10/00/82 ASLB FINAL DECISION:

TECH SPECS COMPLETED:

COMMISSION DECISION:

10/00/82 ISSUE PARTIAL POWER LICENSE:

ISSUE FULL POWER LICENSE:

LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

09/30/82 05/00/80 t

h NRR L ZCEN57NG SVSYEM PAGE NO: 2-83 SOUTH TEXAS 1 82 0L CURRENV STA TUS REP 03T REPORT AS OF 04/19/82 PLANT CHARACTER I $ T I C S:

KEY PERS0NN EL DOCKET ND:

049880499 LIC. PM:

D. SELLS ASLB CHAIR:

C. BECHHOEFER APPLICANT:

HOUSTON LIGHTING AND POWER COMPANY LIC. BC:

F. MIRAGLIA MEMBER 1:

J. LAMB LOCATION:

12 MI SSW OF BAY CITY, TEX LIC. LA.

J.

LEE MEMBER 2:

E. HILL REGION:

4 AE2 BECH COUNSEL:

J. GUTIERREZ CONST. INSP: S. PHILLIPS REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP: H. PHILLIPS DESIGN PWR: 3800 MWT/1250 MWE CONST: EBASCO MPA ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Limited work being performed due to higher priorities.

Work on QA programs and management qual. being comp 1. for ER DOCKETED:

07/17/78C expedited hearing on these issues.

B4 R is being ER SITE VISIT CONPLETE:

09/26/78 09/26/78C replaced by Bechtel as the A/E.

B1 R has been replaced INPUT TO DES TO PM:

03/01/83 by Ebasco as the constructor. Restart of non-safety ISSUE DES:

04/01/33 related constr. is sched. for June '82 & safety related RESPONSE TO COMMENTS ON DES:

08/15/83 constr. in Sept.

'82.

Current FLD is 12/86.

Changes ISSUE FES:

09/02/83 in rev, schedule will be rec'd. in July '82.

CURRENT ENV. STATUS:

No activity scheduled pending revision of construction completion date by applicant in July '82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

05/10/78 05/10/78C SAR DOCKETED:

07/17/78C SAR Q'S RECEIVED BY PM:

01/22/79 02/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

12/01/82 As provided in a Commission Order of 9/22/80, there will ISSUE DRAFT SER:

12/27/83 be an expedited hearing on QA programs and manag. Phasa I.

INPUT TO SER:

06/04/83 i

The ASLB will determine whether the appl. is qualified ISSUE SER:

07/01/83 to be licensed to oparate in view of its past actions and failures to act in the construction of the facility.

ACRS FULL COMMITTEE MEETING:

08/07/83 Phase II of hearing will consider all aspects of Quadrex INPUTS TO SE SUPPLEMENT 1:

08/14/83 Report 8 Phase 1 is exoected to begin in late '82 or ISSUE SE SUPPLEMENT 1:

08/31/83 l

l early '83.

FEMA LETTER RECEIVED:

N/S I

CURRENT ANTITRUST:

1 Intervenor conments filed 11-12-80; replies filed 11-24-80.

HEARING STARTED:

01/00/84 The hearing schedule has been suspended.

ASLB INITIAL DECISION:

06/00/84 ASLB FINAL DECIaION:

TECH SPECS CCMPLETED:

08/15/83 COMMISSION DECISION:

07/00/84 ISSUE PARTIAL PCUER LICENSE:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE:

Admendment 425 was issued 03/15/82.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Amendment 25 dated 03/15/82 to FSAR received. Further CONSTRUCTICH COMPLETION - APPL.'

12/00/86 03/00/82 slips and additional staff review will be required as a result of AE change.

l l

1

Wv HRR L ICEN5ING SYST EM PAGE NO: 2-24 ST LUCIE 2 0L CURRENT STA TUS REP 0RT REPCRT AS OF: 04/19/82 PLANT CHARACTER IST I C S:

KEY PERS0NNELa DOCKET NO:

0$000389 LIC. Pfl:

V.

HERSES ASLB CHAIR:

E.

BOWERS APPLICANT:

FLORIDA POWER 8 LIGHT LIC. BC:

F. t11RAGLIA MEMBER 1:

P. MORRIS LOCATION:

12 MI SE OF FT. PIERCE, FLA LIC. LA.6 J.

LEE MEi!BER 2:

O. PARIS REGION:

2 AE:

EBASCO COUNSEL:

J.

THESSIN CONST. INSP:

R. WRIGHT REAC. TYPE: PWR HSSS: COMB ANTITRUST:

B. V0GLER RESID. INSP: S.

ELROD DESIGN PWR: 2700 MWT/0842 MWE CONST: EBASCO NPA ANALYST: N.

ANDERSON CURREN! SAF. STATUS:

ENVIRONf1 ENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Status of Q-1 and Q-2 review is complete.

The SER was issued on 10/09/81.

SE Supplement No. 1 was issued ER DOCKETED:

02/17/81C ER SITE VISIT C0:1PLETE:

02/18/81 02 /18 / 81C INPUT TO DES TO PM:

08/07/81 08/07/81C ISSUE DES:

10/16/8 1 10/16/81C RESPONSE TO COMMENTS ON DES:

02/08/82 02/08/82C ISSUE FES:

02/15/82 CURRENT ENV. STATUS:

The DES was issued on 10/16/81 and the FR Notice was published 10/30/81. The FES was issued on 04/23/82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/31/80 03/31/80C SAR DOCKETED:

02/17/81C SAR Q'S RECEIVED BY PM:

06/15/81 06/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED:

INFUT TO DRAFT SER TO PM:

08/03/81 08/03/81C CURRENT HRG. STATUS:

There have been no petitioners on matters dealing with ISSUE PRAFT SER:

03/10/61 08/10/81C health, safety and environment.

INPUT TO SER:

09/11/81 0 9 /11/81C ISSUE SER:

10/09/81 10/09/81C ACRS FULL COMMITTEE MEETING:

11/12/81 11/12/81C INPUTS TO SE SUFFLEf1ENT 1:

12/23/81 12/23/81C ISSUE SE SUPPLEMENT 1:

12/30/81 12/30/81C FEMA LETTER RECEIVED:

06/30/82 CURRENT ANTITRUST:

settIcmont amongst the Department of Justice, the NRC Staff HEARING STARTED:

N/A and the licensee has been agreed upon.

No contested ASLB INITIAL DECISION:

N/A ASLB FINAL DECISION:

N/A hearing is expected.

TECH SPECS C0f'PLETED:

COMf1ISSION DECISION:

10/00/82 l

ISSUE PARTIAL POWER LICENSE:

l LATEST AMENDMENT:

ISSUE FULL P0t!ER LICENSE:

j No. 9 SCHED. DATE RECEIPT DATE i

NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.'

10/28/82 12/31/81

NRR LICENSING SV5VEM PAGE NO: 2-25

$UMMER 1 0L CURRENT SVA T US REPORT REPORT AS OF 04/19/82 PLANT CHARA C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05000395 LIC. PM:

W.

KANE ASLB CHAIR:

H. GROSSMAN i

APPLICANT:

SOUTH CAROLINA ELECTRIC A GAS CO.

LIC. BC:

8. YOUNGBLOOD MEMBER 1:

G.

LINENBERGER j

l LOCATION:

26 MI NW OF COLUMBIA, SC LIC. LA.

M.

RUSHBROOK MEMBER 2:

F. N00PER 1

REGION:

2 AE:

GIL COUNSEL:

S.

GOLDBERG CONST. INSP l

REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B.

V0GLER RESID. INSP:

J. SKDLDS j

DESIGN PWR: 2785 MWT/0900 MWE CONST: DANIEL MPA ANALYST:

D.

SCHNARZ l

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER Supplement No. I was issued 04/28/81.

Supplement No. 2 to the SER was issued on 05/23/81 Supplement No.

ER DOCKETED:

01/21/77 02/24/77C 3 was issued in January 1982.

Projected date for ER SITE VISIT COMPLETE:

06/30/78 06/07/78C issuance of a low power license is May, 1982.

INPUT TO DES TO FM:

09/21/78 05/29/79C ISSUE DES:

10/30/78 06/22/79C RESPONSE TO COMMENTS ON DES:

07/01/80 07/24/80C ISSUE FES:

05/15/81 05/21/81C CURRENT ENV. STATUS:

DES supplement on Class 9 accidents was issued in November 1980.

The FES was issued in May 1981 SAFETY / HEAP.ING MILESTONES:

APPLICATION TENDERED:

12/10/76 12/10/76C SAR DOCKETED:

01/21/77 02/24/77C SAR Q'S RECEIVED BY PM:

02/03/78 03/08/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 04/21/78 09/18/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

06/16/78 02/21/79C On 04/31/81 the ASLB by order granted the FUA intervention ISSUE DRAFT SER:

N/A on 10 contentions.

The ASLAB on 06/01/81 reversed the ASLB INPUT TO SER:

06/02/80 12/15/80C decision to admit FUA as an intervonor.

The contested ISSUE SER:

08/01/80 02/06/81C hearing began 06/81 and was completed in January 1982.

ASLB initial decision is estimated for 05/82.

ACRS LETTER RECEIVED:

03/18/81 03/18/81C INPUTS TO SE SUPPLEMENT 3:

11/01/81 11/01/81C ISSUE SE SUPPLEMENT 3:

01/08/82 01/08/82C FEMA LETTER RECEIVED:

11/13/81 11/13/81C CURRENT ANTITRUST:

The Attorney general sent his advice on significant HEARING STARTED:

06/22/81 06/22/81C changos to the Commission on 10/10/80.

The Commission ASLB INITIAL DECISION:

05/00/82 on 06/26/81 denied Central Electric Power Coop., Inc.

ASLB FINAL DECISION:

05/00/82 petition for antitrust review.

TECH SPECS Cor!PLETED:

05/00/82 C0ffi11SSION DECISION:

06/00/82 ISSUE PARTIAL POWER LICENSE:

05/00/82 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE:

06/00/82 Number 30.

j SCHED. DATE RECEIPT DATE i

NEW SLIPS / NOTES:

1 CONSTRUCTION COMPLETION - APPL.:

05/31/82

- m

PAGE ND: 2-26 HRR LICEN$IHG S Y S T E T1 SUSQUEHANNA 1 32 OL CURREHT ST ATUS REPQRT REPORT AS OF: 04/19/82 KEY P E R S 0 N N E L:

PLANT CHARACTER I S T I C S:

LIC. PM:

R. PERCH ASLB CHAIR:

J. GLEASON APPLICANT:

PENNSYLVANIA POWER I LIGHT LIC. BC:

A.

SCHWENCER MEMBER 1:

G.

BRIGHT DOCKET HO:

038710388 LOCATION:

7 MI NE OF BERWICK, PA LIC. LA.

E. HYLTON MEMBER 2:

P. PURDOM

(

REGION:

1 AE CECH COUNSEL:

J. CUTCHIH CONST. INSP: L. HARROW l

REAC. TYPE: BWR NSS3: GE ANTITRUST:

A.

H0DGDON RESID. 'INSP: G. RHOADS l

DESIGN ryg: 3440 MWT/1052 MWE CONST: BECH MPA ANALYST:

L.

LANIER ENVIRONMENT AL T11LESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SER was issued 04/06/81.

SSER 81 was issued 07/07/81.

06/10/78C Post ACRS SSER #2 was i ssued 09/10/81.

SSER 83 to be ER COCKETED:

ER SITE VISIT COMPLETE:

10/20/78 10/20/78C INPUT TO DES TO PM:

03/30/81 03/30/81C issued in May 1982.

ISSUE DES:

03/30/81 03/30/81C RESPONSE TO COMMENTS ON DES:

05/21/81 05/21/81C ISSUE FES:

06/I5/81 06/15/81C CURRENT ENV. STATUS:

DES was issued on 03-30-81.

FES was issued 06-15-81.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/05/78 04/10/78C SAR DOCKETED:

07/31/78 07/ 31/ 7 8C StR Q'S RECEIVED BY PM:

11/17/78 05/15/79C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S INPUT TO DRAFT SER TO PM:

04/07/80 04/07/80C CURRENT HRG. STATUS:

The OL hearing is complete; Initial decision issued on ISSUE DRAFT SER:

INPUT TO SER:

03/23/81 03/23/81C 04-12-82.

ISSUE SER:

04/06/81 04/06/81C 08/15/81C ACRS LETTER RECEIVED:

INPUTS TO SE SUPPLEMENT 3:

ISSUE SE SUPPLEMENT 3:

05/00/82 FEMA LETTER RECEIVED:

12/22/81 OL antitrust review presently being conducted by staff for HEARING STARTED:

10/06/81 10/06/81C CURRENT ANTITRUST:

the purpose of determining whether significant changes have ASL8 INITIAL DECISIDH:

04/00/82 i

occurred since our last antitrust review took place.

ASLB FINAL DECISION:

i TECH SPECS COMPLETED:

C0f1 MISSION DECISION:

05/25/82 ISSUE PARTIAL POWER LICENSE:

ISSUE FULL POWER LICENSE:

LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:

CONSTRUCTION COMPLETI0H - APPL.:

07/01/82 12/31/81

NRR LICEN$ING SVSTEM PAGE NO: 2-27 WASHINGTON NUCLEAR 1 PCP CURRENY

$TATUS QEPOQT REPORY AS CF: 04/19/82 PLA N T CHARACTERIST I C S:

KEY PER S0NN E L:

DOCKET NO:

05000460 LIC. PM:

. UNASSIGNED ASLB CHAIR:

APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:

B. YOUNGBLOOD MEMBER 1:

LOCATIDH:

30 MI NW OF RICHLAND, WASH LIC. LA.:

M.

RUSHBROOK NEMBER 2:

REGION:

S AE UEC COUNSEL:

E. KETCHEN CONST. INSP W. ALBERT REAC. TYPE: PWR NSSS: B&W ANTITRUST:

RESID. INSP A.

TOTH DESIGN PWR 3760 MWT/1267 MWE CONST: BECH MPA ANALYST L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Application was tendered on 11-25-81.

This schedule is being reconsidered in light of a notice of deferral from ER DOCKETED:

C2/00/82 the applicant.

ER SITE VISIT COMPLETE:

INPUT TO DES TO Pit:

ISSUE DES:

08/00/83 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

01/0C/B4 CURRENT ENV. STATUS:

DES to be issued 08/83.

SAFETY / HEARING MILES!ONES:

APPLICATION TENDERED:

11/25/81 11/25/81C l

SAR DOCKETED:

02/00/82 SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Notice of Opportunity for Hearing is to be published ISSUE DRAFT SER:

in the Federal Register.

INPUT TO SER:

ISSUE SER:

07/00/83 ACRS FULL COMMITTEE MEETING:

09/00/83 INPUTS TO SE SUPPLEMENT 1:

ISSUE SE SUPPLEMENT 1:

01/00/84 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

1 HEARING STARTED:

06/00/84 l

ASLB INITIAL DECISION:

11/00/84 l

ASLB FINAL DECISIO;i:

TECH SPECS COMPLETED:

C0ttMISSION DECISION:

ISSUE PARTIAL POWER LICENSE:

LATEST AMENDMENT ISSUE FULL POWER LICENSEt SCHED. DATE RECEIPT DATE NEW SLIPS /H0rES:

CONSTRUCTION COMPLETION - APPL.:

12/00/85 12/31/81

PAGE NO: 2-28 NRR LICENSING SYS T EM 0L CURRENT STATUS REPQRT REPORT AS OF: 04/19/82 WASHINGTON NUCLEAR 2 K Ef P E R S 0 N N E L:

PL ANT CHARACT ER ISTICS-LIC. PM:

R.

AULUCK ASLB CHAIR:

E. BOWERS l

DOCKET NO:

05000397 LIO. BC:

A.

SCHWENCER MEMBER 1:

R.

COLE l

APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LI2. LA.

E. HYLTON NEMBER 2:

E. HILL REGION:

5 AE:

B8R COUNSEL:

W. PATON CCNST. INSP A.

TOTH LOCATION:

30 MI HW OF RICHLAND, WASH REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP:

R.

FEIL DESIGN PWR: 3323 fC4T/1103 MWE CONST: BECH MPA ANALYST:

L. LAHIER ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SER was issund 3/12/82. Geology / Seismology reviews 02/23/77 04/20/77C will be included in SSER to be issued in June 1982.

ER DOCKETED:

ER SITE VISIT COMPLETE:

07/13/77 07/14/77C INPUT 10 DES TO PM:

06/30/81 06/30/81C 07/31/81 07/31/81C ISSUE DES:

RESPONSE TO COMMENTS ON DES:

09/23/81 09/28/8tc 12/3t/81 12/ 31/81C ISSUE FES:

CURRENT ENV. STATUS:

FES was issued 12-31-81.

SAFETY / HEARING MILESTONES:

APPLICATI0H TENDERED:

12/30/76 12/30/76C 04/01/78 06/22/78C SAR DOCKETED:

SAR Q'S RECEIVED BY PM:

01/05/79 03/07/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/11/79 07/26/79C INPUT TO DRAFT SER TO PM:

10/12/81 CURRENT HRG. STATUS:

ISSUE CRAFT SER:

11/17/81 11/17/81C Not required INPUT TO SER:

05/30/82 03/12/82 03/12/82C ISSUE SFR:

ACRS FULL COMMITTEE MEETING:

07/08/82 INFUTS TO SE SUPPLENENT 1:

05/24/82 ISSUE SE SUPPLEMENT 1:

06/04/82 FEMA LETTER RECEIVED:

10/0t/82 CURRENT ANTITRUST:

HEARING STARTED:

N/A Not required ASLB INITIAL DECISIDH:

N/A ASLB FINAL DECISION:

TECH SPECS COMPLETED:

08/30/82 CON 11SSION DECISION:

09/00/82 ISSUE PARTIAL POWER LICENSE:

ISSUE FULL POWER LICENSE:

LATEST AMENDMENT:

SCHED. DATI RECEIPT DATE Geology review is pacing item and requires a pre-ACRS CONSTRUCTION COMPLETION - APPL.:

03/00/83 10/00/81 NEW SLIPS / NOTES:

SSER supplement now estimated for early June.

July ACRS is predicted on resolution of this issue.

NRR LICEN$ING SYSVEN PAGE NO: 2-29 WATERFORD 3 0L CURRENT STA TU$

REPQRT REPORT AS OF: 04/19/82

{

l PLANT C H A R A C T E R I $ T I C S:

KEY PERS0NNELa DOCKET NO:

05000382 LIC. PM:

S.

BLACK ASLB CHAIR:

S. WOLFE APPLICANT:

LOUISIANA POWER S LIGHT LIC. BC:

F. MIRAGLIA MEMBER 12 W. JORDAN LOCATION:

20 NI W OF NEW ORLEANS, LA LIC. LA.

J.

LEE MEMBER 2:

N. FOREMAN REGION:

4 AE:

EBASCO COUNSEL:

S.

TURK CONST. INSP W. HUBACEK REAC. TYPE: PWR NSSS: COMB ANTITRUST:

B. V0GLER RESID. INSP L. CONSTABLE DESIGN PWR: 0000 MWT/1151 MWE CONST: EBASCO MPA ANALYST: M.

KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILEST:.'IS:

SCHED. DATE ACTUAL DATE The safety review was expedited.

The SER was issued Julv 9, 1981 Fuel load date delayed until 01/83 by ER DOCKETED:

12/00/78 12/00/78C applicant from 11/82.

ER SITE VISIT COMPLETE:

12/05/80 12/05/80C INPUT TO DES TO FN:

04/06/81 04/06/81C ISSUE DES:

05/01/81 05/01/81C RESPONSE TO COMMENTS ON DES:

07/24/81 08/19/81C ISSUE FES:

09/30/81 09/30/81C CURRENT ENV. STATUS:

The DES was completed on May 1981 FES was completed September 1981.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

09/28/78 09/28/78C SAR DOCKETED:

12/18/78C SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/80 12/15/80C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/03/80 08/15/81C Contested hearing started 03/82.

Discovery among the ISSUE DRAFT SER:

parties has been held.

INPUT TO SER:

05/08/81 05/15/81C ISSUE SER:

07/09/81 07/09/81C ACRS LETTER RECEIVEDr 08/08/81 08/08/81C INPUTS TO SE SUPPLEMENT 2 12/22/81 01/06/82C ISSUE SE SUPPLEMENT 2:

01/22/82 01/13/82C FEMA LETTER RECEIVED:

01/31/82 CURRENT ANTITRUST:

Staff is reviewing OL Antitrust information.

HEARING STARTED:

03/00/82 03/23/82C l

ASLB INITIAL DECISION:

10/00/82 ASLB FINAL DECISION:

TECH SPECS C0flPLETED:

06/30/82 COMf1ISSION DECISION:

11/00/82 ISSUE PARTIAL POWER LICENSE:

1 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE:

l NEW SLIPS / NOTES:

SCHED. DATE RECEIPT DATE To dato State of Louisiana does not have an approved CONSTRUCTION COMPLETION - APPL.:

01/16/83 09/00/80 cmcrooney plan, t

NRR L ICENSING SYS T EN PAGE NO 2-30 WATTS BAR 1 8 2 0L CURRENT STA TUS REPORT REPORT AS OF: 04/1% d2 PLAN T CHARA CT ER I$T ICSt KEY PERS0NNEL LIC. FM:

T.

KENYON ASLB CNAIR: N/A DOCKET NO:

039080391 APPLICANT:

TENNESSEE VALLEY AUTHORITY LIC. BC:

E. ADENSAtt MEMBER 1:

N/A LOCATION:

10 MI 5 0F SPRING CITY, TENN LIC. LA.

N.

DUNCAN MEMBER 2:

N/A REGIDH:

2 AE:

TVA COUNSEL:

E. KETCHEN CONST. INSP:

J. MCDONALD REAC. TYPE: PWR NSSS: WEST ANTITRUST:

J.

RUTEERG RESID. INSP:

DESIGN PWR: 3411 MWT/1165 MWE CONST: TVA MPA ANALYST: M. KING l

ENVIRON!1ENT AL r1ILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

Additional applicant information is nocdod on non-TMI issues and updated FSAR with it1I requirements.

CFP ER DOCKETED:

01/05/77 11/23/76C predicted earliest Unit 1 completion c'ato at 08/83.

ER SITE VISIT COMPLETE:

03/1S/77 02/25/77C Hevertholess, schedule is beinq expedited by requiring INPUT TO DES TO FM:

07/06/77 08/18/77C concurrent review with Sequoyah for all areas where the ISSUE DES:

11/29/77 06/02/78C plants are identical (non-site specific matters).

RESPONSE TO COMMENTS ON DES:

N/A ISSUE FES:

11/24/78 12/29/78C CURRENT ENV. STATUS:

Complete except for environmental tech specs.

SAFETY / NEARING MILESTONES:

APPLICATION TENDERED:

06/30/76 06/30/76C SAR DOCKETED:

10/04/76 10/04/76C SAR O'S RECEIVED BY PM:

12/15/76 05/20/77C SAR APPL. RESPONSE 10 Q'S RECEIVED: 03/23/77 02/10/78C INPUT TO DRAFT SER TO PM:

04/30/82 CURRENT NRG. STATUS:

ISSUE DRAFT SER:

No hearings are assumed.

INPUT TO SER:

N/S ISSUE SER:

N/S ACRS FULL COMMITTEE MEETING:

N/S INPUTS TO SE SUPPLEMENT 18 N/S ISSUE SE SUPPLEMENT 1:

N/S FEf1A LETTER RECEIVED:

04/15/82 CURRENT ANTITRUST:

NEARING STARIED:

N/A Complete ASLB INITIAL DECISION:

N/A ASLB FINAL DECISIDH:

TECH SPECS CCMPLETED:

11/01/82 COMMISSION DECISION:

07/00/82 ISSUE PARTIAL POWER LICENSE:

ISSUE FULL POWER LICENSE:

LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

TVA has informed the NRC staff of its intent to use waste CONSTRUCTION COMPLETION - APPL.:

08/01/83 LTR. DATE heat from this plant in an adjacent waste heat park.

Staff consideration of such an amendment to the application would innprt both safetv and environmn_n_lal revirus.

u

NRR LICEN$ING SVSTEM PAGE NO: 2-31 WOLF CREEK 1 0L CURRENT STA TUS R EP0RT REPORT AS OF: 04/19/82 PLANT CHARACTER IST I C 5:

KEY P E R S 0 N N E L:

DOCKET NO:

05000482 LIC, PM:

J. HOPKINS ASLB CHAIR:

J. GLEASON APPLICANT:

KANSAS GAS & ELECTRIC LIC. BC:

B. YOUNGBLOOD MEMBER 1:

J.

LEEDS LOCATION:

3.5 MI NE OF BURLINGTON, KAN LIC. LA.

M.

RUSHER 00K MEMBER 2:

G.

ANDERSON REGION:

4 AE:

BECN COUNSEL:

M.

KARMAN CONST. INSP:

REAC. "YPE:

PWR NSSS: WEST ANTITRUST:

B.

V0GLER RESID. INSP: T. VANDEL DESICH PWR: 3425 MMT/1150 MWE CONST: DANIEL MPA ANALYST:

D.

SCHNARZ CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The FSAR review is underway.

The SER was i ssued in April 1982.

ER DOCKETED:

11/25/80 11/25/80C ER SITE VISIT CONPLETE:

07/28/81 04/21/81C INPUT TO DES TO PM:

10/01/81 10/01/8lC ISSUE DES:

01/05/82 01/ 0 5/ 82C RESPONSE TO COMMENTS ON DES:

05/01/82 ISSUE FES:

06/05/82 CURRENT ENV. STATUS:

The ER(OL) review is underway.

The DES was issued in January 1982.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

02/21/80 02/21/80C SAR DOCKETED:

08/07/80 08/07/80C SAR Q'S RECEIVED BY PM:

(

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

03/12/82 03/12/82C Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

1 Federal Register on 12<18/80.

Two petitions for INPUT TO SER:

03/19/82 03/19/82C l

leave to intervene were filed.

A special combined ISSUE SER:

04/07/82 04/07/82C I

prehearing conference was held on 4/15/81 l

l ACRS FULL C0fMITTEE MEETING:

05/07/82 l

INPUTS TO SE SUPPLEMENT 1:

05'10/82 I

l ISSUE SE SUPPLEMENT 1:

05/30/82 FEMA LETTER RECEIVED:

05/30/82 CURAdNT ANTITRUST:

OL antitrust review is in progress.

HEt. RING STARTED:

10/00/82 ASLB INITIAL DECISION:

03/00/83 ASLB FINAL DECISION:

N/S TECH SPECS COMPLETED:

N/S t

COMMISSICN DECISION:

04/23/83 ISSUE PARTIAL POWER LICENSE:

N/S LATEST AMENDMENT:

ISSUE FULL POWER LICENSE:

12/00/83 I

f SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

l Caseload Forecast Panel estimates construction CONSTRUCTION C0t1PLETION - APPL. '

12/00/83 03/00/82 l

completion on 6/84.

l l

l

v NRR LICENSING

$Y$ TEM PAGE NO: 2-32 82MMER 1 0L CURRENT STATUS REPQRT REPORT AS OF 04/19/82 PLANT C H A R A C T E R I $ T I C 5:

KEY PERS0NNELa LIC. PM:

G.

EDISON ASLB CHAIR:

J. FRYE DOCKET NO:

05000358 APPLICANT:

CINCINHATI CAS 8 ELECTRIC (IC. BC:

B. YOUNGDLOOD MEMBER 1 F. NCOPER LOCATION:

24 MI SE OF CINCINNATI. OH LIC. LA.

N.

RUSHBROOK MEMBER 2:

M.

LIVINGSTON REGIGH:

3 AE 58L COUNSEL:

C.

DARTH CONST. INSP D. HUNTER RfAC. TYPE: BWR NSSS: GE ANTITRUST:

S. LEUIS RESID. INSP:

F. CHRISTIANSON DESIGN PWR: 2436 MWT/0810 MWE CONST: KAISER MPA ANALYST: M.

ANDERSON ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE l

CURRENT SAF. STATUS:

l SE Supplement was issued on 06/04/81 SE Suppicment 82 was 09/10/75 09/10/75C 1

issued 10/00/81.

SE Supplement 33 is scheduled to be ER DOCKETED:

issued 06/82.

Licensing completion is estimated for ER SITE VISIT COMPLETE:

10/09/75 10/09/75C INPUT TO DES TO FM:

08/20/76 08/19/76C ISSUE DES:

10/15/76 10/15/76C l

01/00/83.

RESPONSE TO COMMENTS ON DES:

03/25/77 04/01/77C ISSUE FES:

06/10/77 06/10/77C CURRENT ENV. STATUS:

Complete SAFETY / HEARING NILESTONES:

APPLICATION TENDERED:

08/15/75 05/09/75C SAR DOCKETED:

09/15/75 09/10/75C SAR Q'S RECEIVED BY PM:

10/29/76 01/06/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/31/76 07/29/77C INPUT TO DRAFT SER TO PM:

01/28/77 08/11/77C CURRENT HRG. STATUS:

Hearing was completed March 5, 1982.

Board decision ISSUE DRAFT SER:

N/A INPUT TO SER:

05/20/77 12/07/77C expected June, 1982.

ISSUE SER:

07/29/77 01/31/79C I

ACRS LETTER RECEIVED:

09/i6/77 03/13/79C INPUTS TO SE SUPPLEMENT 3 05/17/82 ISSUE SE SUPPLEMENT 3 06/00/82 FEMA LETTER RECEIVED:

04/15/82 04/15/82C CURRENT ANTITRUST Antitrust review is now closed. Federal Register Hotice HEARING STARTED:

02/26/82 02/26/82C AStB INITIAL DECISION:

06/26/82 was published 04/09/82.

ASLB FINAL DECISION:

N/S TECH SPECS COMPLETED:

07/29/82 COMMISSION DECISION:

07/30/82 ISSUE P ARTI AL POWER LICENSE ISSUE FULL POWER LICENSE:

12/00/82 LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Applicant has slipped construction completion to 12/82.

CONSTRUCTION COMPLETI0H - APPL.4 12/00/82 06/30/80 Therefore, Zimmer is no longer an impacted plant.

NRR L ICENSING SYSTEM PAGE NO: 2-33 ALLENS CREEK 1 CP CURRENT STATUS REPORT REPORT AS OF 04/19/82 PLANT CNARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:

05000466 LIC. PM:

C. MOON ASLB CNAIR:

S. WOLFE APPLICANT:

NOUSTON LIGHTING AND POWER COMPANY LIC. PC:

E.

ADENSAN MEMBER 18 E. CNEATUM LOCATION:

45 MI W OF HOUSTON, TX LIC. LA.:

M.

DUNCAN MEMBER 2:

G. LINENBERGER REGION:

4 AE EBASCO COUNSEL:

R. BLACK CONST. INSP REAC. TYPE: BWR NS$$2 GE ANTITRUST:

A. HODGDON RESID. INSP DESIGN PWR 3758 MWT/1150 MWE CONST: EBASCO MPA ANALYST B. DULIN CURRENT SAF. STATUS:

ENVIROHNENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SSER3 on TMI issues, was issued August 6.

The ACRS does not plan to review TMI ER DOCKETED:

12/07/73 12/07/73C issues for Allens Creek.

SSER4 on non-TMI issues including ER SITE VISIT COMPLETE:

03/08/74 03/08/74C emergency planning financial capability; unresolved safety INPUT TO DES TO PM 06/07/74 06/07/74C issue; containment, ultimate heat sink, and fuel designs ISSUE DES:

07/05/74 07/05/74C was issued October 30, 1981.

RESPONSE TO COMMENTS ON DES:

09/23/74 10/01/74C ISSUE FES:

11/18/74 11/18/74C CURRENT ENV. STATUS:

A draft second FES supplement was issued in December, 1930.

The final second supplement was issued Mac.h 13, 1981.

SAFETY / NEARING MILESTONES:

APPLICATION TENDERED:

08/24/73 08/24/73C SAR DOCKETED:

12/07/73 12/07/73C SAR Q'S RECEIVED BY PM:

03/22/74 03/22/74C SAR APPL RESPONSE TO Q'S RECEIVED: 06/03/74 07/03/74C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

08/09/74 09/20/74C Env. hearing commenced 01/12/81 and was completed on ISSUE DRAFT SER:

05/15/81. Safety sessions were held flay 18-22 and June INPUT TO SER:

10/11/74 11/01/74C 1-12.

Further sessions were held on 10/5-9/81, ISSUE SER:

1t/07/74 11/f5/74C 10/26-30/81, 11/16-20/81 and 12/7-11/81 The Board did not dismiss 18 contentions and posed questions on another.

ACRS LETTER RECEIVED:

12/20/74 12/13/74C An additional hearing is scheduled to start on April 12, ~

INPUTS TO SE SUPPLEMENT 48 01/10/75 03/28/75C 1982 to take additional testimony on technical ISSUE SE SUPPLEMENT 4 10/15/81 10/30/8tc qualifications of the applicant.

CURRENT ANTITRUST:

A set of proposed license conditions has been submitted HEARING STARTED:

03/11/75 03/11/75C to the Licensing Board in the South Texas antitrust ASLB INITIAL DECISION:

08/09/82 proceeding. If the South Texas Board approves the ASLB FINAL DECISION:

conditions, they will be attached to the Allens Creek TECH SPECS COMPLETED:

CCHf1ISSION DECISIDH:

11/00/82 Iicense.

CP ISSUED:

11/00/82 LATEST AMENDMENT:

NEW SLIPS / NOTES:

a

PAGE NO: 2-34 NRR L ICEN$IHG SYST EM BLACK FOX 1 12 CP CURREHT STA TUS REP 0RT REPORT AS OF: 04/19/82 KEY P E R S 0 N H E L:

PLANT CHARACTER I S T I C S:

LIC. PM:

D. SCALETTI ASLB CHAIR:

S. WOLFE DOCKET NO:

055680557 LIC. B0:

E. ADENSAM met 1BER 1:

P. PURDOM APPLICANT:

PUBLIC SERVICE OF OKLAHOMA LIC. LA.

M.

DUNCAH met 1BER 2:

F. SHON LOCATION:

23 MI E OF TULSA, OK REGIOH:

4 AE:

B3V COUNSEL:

J.

THESSIH CONST. INSP REAC. TYPE: EWR HSSS: GE ANTITRUST B. V0GLER RESID. INSP:

DESIGN PWR: 3579 MWT/1150 MWE CONST PUBSERVE MPA ANALYST: M.

ANDERSON ENVIRONMEHTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

A Supplement No. 3 to the SER, addressing the impact of 12/23/75 12/23/75C TMI-2 on Black Fox Station was issued December 31, 1981.

ER DOCKETED:

ER SITE VISIT COMPLETE:

12/29/75 12/29/75C INPUT TO DES TO FN:

06/07/76 06/07/7aC Pro ject was cancelled in February, 1982.

07/19/76 07/19/76C ISSUE DES:

RESPONSE 10 COMMENTS ON DES:

12/16/76 12/16/76C 01/21/77 02/08/77C ISSUE FES:

CURRENT ENV. STATUS:

Complete.

Project was cancelled in February, 1982.

SAFETY /HEARIHG MILESTONES:

APPLICATION TENDERED:

08/08/75 08/08/75C 12/31/75 12/23/75C SAR DOCKETED:

S AR Q'S kECEIVED BY Pri 02/17/76 03/10/76C SAR APPL. RESP 0 HSE TO Q'S RECEIVED: 05/17/76 05/21/76C INPUT TO DRAFT SER TO PM:

07/12/76 07/21/76C CURRENT HRG. STATUS:

Proicct was cancelled in February, 1982. Applicant's ISSUE DRAFT SER:

response on site redress due May 14, 1982.

Staff response INPUT TO SER:

12/06/76 02/15/77C ISSUE SER:

01/31/77 06/27/77C due by end of May.

ACRS LETTER RECEIVED:

07/22/77 07/22/77C INPUTS TO SE SUPPLEMENT 4:

N/S ISSUE SE SUPPLEMENT 4:

H/S CURRENT ANTITRUST HEARING STARTED:

03/11/77 08/22/77C Not applicable.

ASLB INITIAL DECISIDH N/S ASLB FINAL DECISION:

TECH SPECS C0f1PLETED:

COMMISSION DECISIDH N/S 02/00/83 CP ISSUED:

LATEST AMENDMENT:

HEU SLIPS /HOTES:

^

HQR L ICEN$2NG SYSTEN PAGE NO: 2-35 CLINCH RIVER CP CURRENT STATUS REPQRT CEPORV AS OF 04/19/82 l

PLANT CHARACTERI$ TICS KEY PERS0NNEL DOCKET NO:

05000537 LIC. FM R. STARK ASLB CNAIR:

M. MILLER APPLICANT:

PROJECT MANAGEMENT CORP.; 00E;TVA LIC. BC:

C.

TH0t1A S MEMBER 1:

G. LINENBERGER LOCATION:

25 MI W OF KNOXVILLE, TH LIC. LA.:

P.

SHUTTLEWORTH NEf1BER 2:

C. HAND REGION:

2 AE BIR COUNSEL:

S. TREBY CONST. INSP:

REAC. TYPE: LMFBR HSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP:

DESIGN PWR: 0975 MWT/0350 MWE CONST SIW MPA ANALYST:

B. DULIN CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Safety review was reinitiated in October 198 1 ER DOCKETED:

04/11/75 04/11/75C ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

02/12/76C RESPONSE TO C0Kt1ENTS ON DES:

ISSUE FES:

02/07/77 02/07/77C CURRENT ENV. STATUS:

The FES was issued in February 1977.

A document updating the FES is being prepared for issuance on June 22, 1982.

SAFETY / HEARING NILESTONES:

1 APPLICATION TENDERED:

10/15/74 10/15/74C SAR DOCKETED:

06/13/75 06/13/75C SAR Q'S RECEIVED BY PM:

04/09/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 05/15/82 CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/16/82 l

The ASLB held a prehearing conference on 2/9-10/82, and ISSUE DRAFT SER:

08/27/82 April 6-7, 1982.

INPUT TO SER:

01/14/83 ISSUE SER:

03/04/83 ACRS FULL COMMITTEE MEETING:

05/06/83 INPUTS TO SE SUPPLEMENT 1:

06/10/83 ISSUE SE SUPPLEMENT 12 07/01/83 CURRENT ANTITRUST:

HEARING STARTED:

08/24/82 ASLB INITIAL DECISION:

05/01/84 ASLB FINAL DECISION:

TECH SPECS C0t1PLETED:

COMMISSION DECISION:

06/01/84 CP ISSUED:

06/01/84 LATEST AMENDMENT:

NEW SLIPS / NOTES:

l

PAGE ND: 2-34 NRR LICEh$ING SYSTEM PEBBLE SPRINGS 1 82 CP CURRENT 5TA TUS REPORT REPORT AS OF 04/19/82 KEY PERS0NNEL PLANT CNARACTERISTICS:

LIC, PM:

D. SCALETTI ASLB CHAIR:

I. SMITH DOCKET NO:

051480515 APPLICANT:

PORTLAND GENERAL ELECTRIC LIC. BC:

E. ADENSAM MEMBER 12 0.

PARIS LOCATION:

3 MI NW OF ARLINGTON, ORE LIC. LA.:

M.

DUNCAN met 1BER 2:

W.

JORDAN REGIDH 5

AE:

BECH COUNSEL:

B. BORDENICK CONST. INSP:

REAC. TYPE: PWR HSSS: B8W ANTITRUST:

B.

V0GLER RESID. INSP:

DESIGN PWR: 3760 MWT/1260 MWE CONST: BECH MPA ANALYST: L. LANIER ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

u Amendment 13 to the PSAR in response to 10CFR50.34(f) 08/06/74 08/06/74C (CP/ML rule) was filed 1/29/82.

The staff's review of ER DOCKETED:

the TMI-2 issues is presently in a hold status awaiting ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

10/11/74

% 2/11/7 4 C a decision by PGE whether or not to continue their application at a different site (see Environmental Status).

ISSUE DES:

11/15/74 01/06/75C RESPONSE TO COMMENTS ON DES:

03/07/75 03/22/75C A decision is expected within 2 months.

ISSUE FES:

04/07/75 04/16/75C CURRENT ENV. STATUS On 4/9/82, PGE withdrew their application, before the Oregon Energy facility siting council, for the Pebble SAFETY / HEARING MILESTONES:

Springs site.

The alternative sites hearing before the APPLICATION TENDERED:

06/07/74 06/07/74C ASLB scheduled for 4/20 was cancelled.

SAR DOCKETED:

10/18/74 10/18/74C SAR Q'S RECEIVED BY PM:

12/13/74 01/13/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/14/75 02/04/75C INPUT TO DRAFT SER TO PM:

04/11/75 05/23/75C CURRENT NRG. STATUS:

ISSUE DRAFT SER:

A prehearing conference on alternative sites was held INPUT TO SER:

09/01/75 12/08/75C on December 1,

1981.

ISSUE SER:

01/05/76 01/12/76C ACRS LETTER RECEIVED:

11/12/76 02/12/76C INPUTS TO SE SUPPLEMENT 6 09/09/76 12/14/77C ISSUE SE SUPPLEMENT 6:

N/S CURRENT ANTITRUST:

HEARING STARTED:

Antitrust review is complete.

ASLB INITIAL DECISION:

N/S ASLB FINAL DECISION:

TECH SPECS C0i1PLETED:

COMMISSION DECISI0H:

N/S CP ISSUED:

N/S LATEST AMENDMENT:

Amendment 13 to the PSAR in response to 10CFR50.34(f).

NEW SLIPS / NOTES:

~

NRR LYCENSING SVSTEM PAGE NO: 2-37 PEtKINS 1,2,3 CP CURQENT STATUS REP 0RT REP 00T AS OF 04/19/82 PtANT CHARACTER I S T I C S:

K EY P E R S 0 N N E L:

DOCKET NO:

0488-0490 LIC, FM:

C. N00N ASLB CHAIR:

E. BOWERS APPLICANT:

DbKE POWER LIC. BC:

E. ADENSAM MEMBER 1:

D.

DESYLVA LOCATION:

7 MI ESE OF MOCKSVIL LE, NC LIC. LA.

E.

AD EN S At1 MEMBER 2:

W. JORDAN REGION:

2 AE:

DUKE COUNSEL:

S.

TURK CONST. INSP REAC. TYPE: PWR HSSS: C0!1B ANTITRUST:

B. V0GLER RESID. INSP:

DESIGN PWR: 4018 NWT/1280 MWE CONST: DUKE FIPA ANALYST:

L.

LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE In February 1982, applicant announced cancellation of this project.

ER DOCKETED:

06/28/74 06/28/74C ER SITE VISIT COMPLETE:

07/26/74 07/26/74C INPUT TO DES TO PM:

03/07/75 04/14/75C ISSUE DES:

05/02/75 05 v;/75C RESPONSE TO COMMENTS ON DES:

09/03/75 09/05/75C ISSUE FES:

10/21/75 10/21/75C CURRENT ENV. STATUS:

Project cancelled 02/82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/29/74 03/29/74C SAR DOCKETED:

05/24/74 05/24/74C SAR C'S RECEIVED BY PM:

08/16/74 09/06/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/04/74 12/31/74C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

02/12/75 02/25/75C On March 2.

1982 the applicant requested that its ISSUE CRAFT SER:

application for permits to construct Perkins Nuclear INPUT TO SER:

09/17/76 03/04/77C Station Units 1,2 and 3 be withdrawn without prejudice. By ISSUE SER:

11/02/76 03/12/77C memorandum and order (ALAB-668) of March 24, 1982.

The Appeal Board vacated three previously issued partial ACRS LETTER RECEIVED:

12/18/76 04/14/77C initial decisions on the ground of mootness.

The issue INPUTS TO SE SUPPLEMENT 2:

01/08/77 07/08/77C of uhother the termation should be with prejudice is ISSUE SE SUPPLEMENT 2:

N/S before the Licensing Board.

CURRENT ANTITRUST:

The antitrust review has been completed.

HEARING STARTED:

11/25/75 04/26/76C ASLB INITIAL DECISION:

N/S ASLB FINAL DECISION:

TECH SPECS COMPLETED:

COMitISSION DECISION:

N/S CP ISSUED:

N/S LATEST AMENDMENT:

HEW SLIPS / NOTES:

4

PAGE NO: 2-38 NRR L I CENS ING SYSTEM SK AGIT/f' ANFORD 182 CP CURRENT ST AT US REP 0RT REPORT AS OF: 04/19/82 PLANT CHARA CTERIST I C S:

KFY P ERS0NN E L:

LIC. PM:

M. MALLORY ASLB CHAIR:

J. WOLF DOCKET NO:

052210523 APPLICANT:

PUGET SOUND POWER 1 LIGHT LIC. BC2 E.

ADENSAM MEMBER 18 F. HOOPER LOCATION:

30 NI. NW OF RICHLAND. WA.

LIC.

LA.*

M.

DUNCAN MEMBER 2:

G.

LINENBERGER i

l REGION:

5 AE:

BECH COUNSEL:

R. BLACK CONST. INSP:

REAC. TYPE: BWR HSSS: GE AHiliRUST:

D. V0GLER RESID. INSP l

DESIGN PWR: 3833 MWT/1277 ItWE CONST: BECH MPA ANALYST: D. SCHWARZ ENVIRONf1ENT AL MILESTONES:

SCHED. D AT E ACTUAL DATE CURRENT SAF. STATUS:

Supplement No. 2 to the SER was issued 10/81 on TMI-related action items.

Site relocation ER amendecnt and PSAR ER DOCKETED:

09/30/74 09/30/74C amendment ucre submitted on 12/31/81 The applicant is ER SITE VISIT COMPLETE:

02/05/82 02/05/82C relocating the site to the Hanford Reservation.

INPUT TO DES TO Pil:

04/v9/82 04/09/82C Suppicment No. 3 to the S[R is expected to be issued in ISSUE DES:

04/27/82 RESPONSE TO COMMENTS ON DES:

03/06/82 6/82.

ISSUE FES:

08/00/82 CURRENT ENV. STATUS:

Site relocation (to Hanford) DES was i ssued 4/82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

08/06/74 08/06/74C SAR D3CKETED:

01/15/75 01/15/75C SAR O'S RECEIVED BY Pft:

02/10/82 02/10/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/18/82 03/18/82C INPUT TO DRAFT SER TO PM:

CURRENT HRG. STATUS:

A special prehearing conference is scheduled for 5/05/82.

ISSUE DRAFT SER:

INPUT TO SER:

ISSUE SER:

08/31/77 08/31/77C ACRS FULL COMMITTEE MEETING:

07/00/82 l

INPUTS TO SE SUPPLEf1ENT 3:

04/09/82 04/09/82C l

ISSUE SE SUPPLEf1ENT 3:

06/30/82 CURRENT ANTITRUST:

NEARING STARTED:

?7/15/75 07/15/75C Complete ASLB INITIAL DECISIDH:

04/00/83 ASLB FINAL DECISION:

N/$

)ECH SPECS C0f:PLETED:

N/S COMMISSI0t4 DECISIDH:

07/00/83 CP ISSUED:

07/00/83 LATEST AMENDMENT:

NEW SLIPS / NOTES:

HR2 LICEN5ING SY$ TEN PAGE NO: 2-39 (BOP)BOPSSAR/BSAR-205 PDO CURRENV STA TUS OEPQRT QEP0QT AS OF: 94/19/82 PLANT CHARACTERISTICSt KEY PERS0NNELa

  • DOCKET NO:

05000560 LIC. PM:

. MILLER MEMBER 1:

UNASSICHED ASLB CNAIR APPLICANTI FLUOR POWER SERVICES LIC. EC:

J.

LOCATIDH N/A LIC. LA.:

P. ANDERSON MEMSER 2:

REGIDH 1

AE COUNSEL:

N/A CONST. INSP REAC. TYPE: BOP HSSS:

ANTITRUST:

RESID. INSP DESIGN PWR 0000 MWT/0000 MWE CONST:

MPA ANALYST: D. SCHWARZ CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization.

ER DOCKETED:

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/31/77 10/31/77C SAR DOCKETED:

10/31/77 10/31/77C SAR Q'S RECEIVED BY PM:

04/14/78 06/20/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 06/02/78 07/31/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

05/2S/78 07/07/78C ISSUE DRAFT SER:

INPUT TO SER:

08/21/78 10/17/78C ISSUE SER:

10/02/78 12/29/78C ACRS LETTER RECEIVED:

11/17/78 02/16/79C INPUTS TO SE SUPPLEMENT 1 12/08/78 03/21/79C ISSUE SE SUPPLEMENT 18 N/S CURRENT ANTITRUST:

HEARING STARTED:

ASLB INITIAL DECISION:

COMMISSIDH DECISION:

SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

NEW SLIPS / NOTES:

i

NRR L ICENSING SYSTEM PAGE NO: 2-40 (BOP)ESSAR/BSAR-205 PDA CURRENT STATUS REPQRT REPORT AS OF 04/19/82 PLANT C H A R A C T E R I $ T I C 5:

KEY P E R S O N N E L:

LIC. FM:

. UNASSICHED ASLB CHAIR:

DOCKET NO:

00002591 APPLICANT:

EBASCO SERVICE 5 LIC. BC:

J. MILLER MEMBER 1:

LIC. LA.

P.

ANDERSON MEMBER 2:

LOCATION:

N/A REGION:

0 AE:

COUNSEL:

U. NASSIGNED CONST. INSP REAC. TYPE: BOP NSSS:

ANTITRUST:

RESID. INSP:

DESIGN FWR: 0000 MWT/0000 MWE CONST:

MPA ANALYST:

M.

K!hG ENVIRONMENTAL MILESTONES:

SCNED. DATE ACTUAL DATE CURRENT SAF. STATUS:

I Review in abeyance pending the future of standardization, ER DOCKETED:

and resources to conduct review.

ER SITE VISIT CCMPLETE:

i INFUT TO DES TO PM:

l ISSUE DES:

l RESPONSE TO COMMENTS ON DES:

ISSUE FES:

l CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TEt:DERED:

11/23/77 11/23/77C SAR DOCKETED:

02/02/78 02/02/78C SAR Q'S RECEIVED BY PM:

N/S SAR APFL. RESPONSE TO Q'S RECEIVED: N/S CURRENT NRG. STATUS:

IhPUT TO DRAFT SER TO PM:

N/S ISSUE DRAFT SER:

INPUT TO SER:

N/S ISSUE SER:

N/S ACRS FULL COGNITTEE MEETING:

N/S IMFUTS TO SE SUPPLEMENT 1:

N/S ISSUE SE SUPPLEt1ENT 1 N/S CURRENT ANTITRUST:

HEARING STAR (ED:

ASLB INITIAL DECISIGN:

COMMISSION DECISION:

SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

NEW SLIPS / NOTES:

HQR L ICEN3ING

$Y$ TEM PAGE NO: 2-41 (BOP)ESSAR/CESSAR-89 PDA CURRENT STATUS REPOQT REPORT AS OF 00/19/82 PLA NT CHARACTERI5T I C 5:

KEY P E R S 0 N N E La DOCKET NO:

05000591 LIC. PM:

, UNASSIGNED ASLB CHAIR:

APPLICANT:

EBASCO SERVICES LIC. BC:

J. MILLER MEMBER 1:

LOCATION:

N/A LIC. LA.:

P. ANDERSON MEMBER 2:

REGION:

0 AE:

EBASCO COUNSEL:

U. NASSIGNED CONST. INSP REAC. TYPE: BOP NSS$8 ANTITRUST:

RESID. INSP DESIGN PWR: 3800 MWT/0000 MWE CONST:

MPA ANALYST: M. KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization, and resourcos to conduct review.

ER DOCKETED:

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

11/23/77 tt/23/77C SAR DOCKETED:

02/02/78 02/02/78C SAR Q'S RECEIVED BY PM:

K.* $

SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO FM N/S ISSUE DRAFT SER:

INPUT TO SER:

N/S ISSUE SER:

N/S ACRS FULL COMMITTEE MEETING:

N/S INPUTS TO SE SUPPLENENT 1 N/$

ISSUE SE SUPPLEMENT 18 N/S CURRENT ANTITRUST:

HEARING STARTED:

ASLB INITIAL DECISION:

C0lif1ISSION DECISION:

SPECIAL PROJECT C0r1PLETE:

N/S LATEST AMENDMENT:

HEW SLIPS / NOTES:

~

HRR L ICEH$IHG SYST EM PAGE NO: 2-42

~

(BOP)ESSAR/RESAR-414 PDA CURRENT STA TUS REP 0RT REPORT AS OF 04/19/82 PLAHT CHARACT ERI$T I C S:

KEY PERS0HN E L:

LIC. PM:

. UNASSIGNED ASLB CHAIR:

DOCKET NO 00007591 LIC. BC:

J. MILLER MEMBER 1:

APPLICANT:

EBASCO SERVICES LIC.

LA..

P. ANDERSON NEttBER 2:

REGION:

0 AE:

EBASCO COUNSEL:

U. NASSIGNED CONST. INSP:

LOCATION:

N/A REAC. TYPE: BOP HSSS:

ANTITRUST:

RESID. JHSP:

DESIGH PWR 0000 MWT/0000 MWE CONST:

MPA ANALYST: N. KING ENVIRONMENTAL MILESTCHES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

Review in abeyance pending the future of standardization, ER DOCKETED:

and resources to conduct review.

ER SITE VISIT C0tiPLETE:

l INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAF."TY/HEARIt!G MILESTONES:

APPLICATION TENDERED:

11/23/77 11/23/77C SAR DOCKETED:

02/02/78 02/02/78C SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE T0 Q'S RECEIVED: N/S INPUT TO DRAFT SER TO PM:

N/S CURRENT HRG. STATUS:

ISSUE DRAFT SFR:

INPUT TO SER:

N/S ISSUE SER:

N/S ACRS FULL COMMITTEE MEETING:

H/S l

INPUTS TO SE SUPPLEt1ENT 1:

N/S l

ISSUE SE SUPPLEMENT 1:

N/S l

CURRENT ANTITRUST:

HEARING STARTED:

ASLB INITIAL DECISION:

COMMISSIGH DECISIDH:

SPECIAL PROJECT COMPLETE:

N/S 1

l LATEST AMENDt1ENT:

1 HEW SLIPS / NOTES:

l

NRR LICENSING SYSTEM PAGE NO: 2- 03 (BOP)GAISSAR PDA CURRENT STATUS REP 03V REPORT AS OF 04/19/82 PLANT CHARACTERI$TICSt K EY P E R S 0 N N E L:

DOCKET NO:

05000595 LIC. PM:

. UNASSIGNED ASLB CHAIR *.

APPLICANT:

GILBERT COMMONWEALTH LIC. BC:

J. MILLER NEMBER 1:

LOCATIDH:

N/A LIC. LA.:

P.

ANDERSON MEMBER 2:

REGIDH:

4 AE2 WEST COUNSEL:

M. KARMAN CONST. INSP:

REAC. TYPE: BOP NSSS:

ANTITRUST:

RESID. INSP:

DESIGN PWR: 0000 MWT/0000 MWE CONST:

MPA ANALYST:

B. DULIN CURRENT SAF. STATUS:

ENVIRONTIENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization and resources to conduct review.

ER DOCKETED:

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO C0t?lENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

j SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

02/24/78 02/24/78C SAR DOCKETED:

08/21/78C SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S ISSUE CRAFT SER:

N/S INPUT TO SER:

N/S ISSUE SER:

N/S ACRS FULL C0ftMITTEE MEETING:

N/S INPUTS TO SE SUPPLEMENT 1 N/S ISSUE SE SUPPLEf1ENT 1 N/S CURRENT ANTITRUST NEARING STARTED:

ASLB INITIAL DECISION:

COM:11SSION DECISION:

SPECIAL PROJECT CottPLETE:

N/S l

LATEST AMENDMENT:

i NEW SLIPS / NOTE I

A-

PAGE NO: 2-44 NRR LICEN5ING SYSTEM PDA CURRENT

$TATUS REPORT REPORT AS OF 04/19/82 (90P)GIBBSSAR (W)

KEY PERS0NNEL:

PLANT CHARACTERI$TICSt LIC. PM:

. UNASSIGNED ASLB CHAIR:

DOCKET NO:

05000584 LIC. BC:

J. MILLER MEMBER 1:

APPLICANT:

GIBBS & HILL LIC. LA.:

P. ANCERSON MEMBER 2:

REGION:

0 AE:

GNDR COUNSEL:

M. WAGNER CONST. INSP:

LOCATION:

N/A REAC. TYPE: BOP NSSS:

ANTITRUST:

RESID. INSP:

DESIGN PWR: 0000 MWT/0000 MWE CONST MPA ANALYST: M. ANDERSON ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

Review in abeyance pending the future of standardization ER DOCKETED:

and resources to conduct review.

ER SITE VISIT COMPLETE:

INPUT TO DES TO Prt:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATICN TENDERED:

10/1S/76 10/15/76C SAR DOCKETED:

04/08/77 05/10/77C SAR Q'S RECEIVED BY PM:

02/03/78 03/16/79C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S INPUT TO DRAFT SER TO PM:

N/S CURRENT NRG. STATUS:

ISSUE DRAFT SER:

INPUT TO SER:

N/S ISSUE SER:

N/S ACRS FULL COMMITTEE MEETING:

N/S INPUTS TO SE SUPPLEMENT 1:

N/S ISSUE SE SUPPLEMENT 1:

N/S CURRENT ANTITRUST:

HEARING STARTED:

ASLB INITIAL DECISIDH:

COMMISSION DECISION:

SPECIAL PROJECT C0t1PLETE:

N/S LATEST AMENDMENT:

HEW SLIPS / NOTES:

HRR L ICEN3ING SYSVEM PAGE NO: 2- 05 (80P)SWESSAR/BSAR-205 PDA CURRENV 5TA TU$

REPQRT REPORT AS OF 04/'.9/82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:

DOCKET NO:

00000595 LIC. PM:

. UNASSIGNED ASLB CHAIR:

APPLICANT:

STONE 8 WEBSTER LIC. BC:

J. MILLER MEMBER 1:

LOCATICH:

N/A LIC. LA.:

P.

ANDERSON MEMBER 2:

REGIDH:

0 AE COUNSEL:

U. NASSIGNED CONST. INSP:

REAC. TYPE: BOP NS$$:

ANTITRUST:

RESID. INSP DESIGN PWR: 0000 MWT/0000 MWE CONST: N/A MPA ANALYST M. KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization, and resources to conduct review.

ER DOCKETED:

N/A ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

12/95/75 12/22/75C SAR DOCKETED:

12/22/75 12/22/75C SAR Q'S RErlIVED BY PM:

11/12/76 04/04/77C SAR APPL. MESPONSE TO Q'S RECEIVED: 01/t4/77 05/20/77C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM N/S ISSUE DRAFT SER:

INPUT TO SER:

09/09/77 10/13/77C ISSUE SER:

10/19/77 12/02/77C ACRS LETTER RECEIVED:

01/15/78 01/13/78C INPUTS TO SE SUPPLEMENT 18 N/S ISSUE SE SUPPLEMENT 1 N/S CURRENT ANTITRUST:

HEARING STARTEDr ASLB INITIAL DECISION:

C0ftt1ISSION DECISION:

SPECIAL PROJECT C0t1PLETE:

N/3 LATEST AMENDMENT:

NEW SLIPS / NOTES:

PAGE NO: 2- 04 NRR L ICEN5ING SY$ TEM (HSS)CESSAR SYSTEM 80 FDA CURRENT STA TUS REPQRT REPORT AS OF 04/19/82 PLAN T CHARACT ERIST I C 5:

KEY PERS0NNELa LIC. PM:

C. GRIMES ASLB CHAIR:

DOCKET ND:

05000470 LIC. BC:

J. MILLER MEMBER 1:

APPLICANI:

COMBUSTION ENGINEERING LIC. LA.:

P. ANDERSON NEMBER 2:

LOCATIOHs N/A COUNSEL:

M. WAGNER CONST. INSP REGIDH:

0 AE:

REAC. TYPE: PWR HSSS: COMB ANTITRUST:

RESID. INSP DESIGN PWR: 3500 MWT/1295 MWE CONST:

MPA ANALYST: M.

KING ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SER (HUREG-0552) issued 11/81 Awaiting documentation to l

ER DOCKETED:

resolve ACRS. open, and confirmatory issuet.

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE O COMMENTS,0N DES:

ISSUE FES CURRENT ENV. STATUS:

N/A.

SAFETY /flEARING MILESTCHES:

APPLICATION TENDERED:

10/27/78 10/27/78C SAR DOCKETED:

12/21/79 12/21/79C SAR Q'S RECEIVED BY PM:

09/05/80 09/01/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 01/01/81 07/85/8tc INPUT TO DRAFT SER TO PM:

N/S CURRENT HRG. STATUS:

ISSUE DRAFT SER:

11/01/81 11/13/81C N/A.

INPUT TO SER:

ISSUE SER:

05/01/82 tt/10/81C ACRS LETTER RECEIVED:

06/21/82 12/15/8tC INPUTS TO SE SUPPLEMENT 12 M/S ISSUE $E SUPPLEMENT 12 05/14/82 CURRENT ANTITRUST HEARING STARTED:

N/A ASLB INITIAL DECISIDH:

N/A COMMISSION DECISIO 4:

SPECIAL PROJECT COMPLETE:

05/23/82

/

LATEST AMENDMENT:

NEW SLIPS / NOTES:

NRR LICEN$ZNG SVSTEM PAGE NO: 2-47 (NSS)CES$4R SEVERE ACC FDA CURRENV STATUS REP 0RT REPORV AS OF 00/19/82 PLANT CHARACTERI$TICSt KEY PERS0NNELa DOCKET NO:

00007447 LIC. PM:

N.

F4ULKNER ASLB CHAIR: N/A APPLICANT:

GENERAL ELECTRIC COMPANY LIC. BC:

J. MILLER MEMBER 1:

N/A LOCATION:

N/A LIC. LA.:

P. ANDERSON MEMBER 2:

N/A REGION:

0 AE BRAUN COUNSEL:

B. BORDENIK CONST. INSP REAC. TYPE: BWR NS$$r GE ANTITRUST:

RESID. INSP:

DESIGN PWR 3579 MWT/1220 MWE CONST:

MPA ANALYST:

B.

DULIN CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82; review is in progress.

Some generic issues are being identified / resolved in ER DOCKETED:

conjunction with LRG-II.

Dates shown reflect review ER SITE VISIT COMPLETE:

for the severe accident design.

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

l l

CURRENT ENV. STATUS:

l SAFETY / NEARING MILESTONES:

APPLICATION TENDERED:

03/31/80 03/31/80C SAR DOCKETED:

02/22/82 02/22/82C SAR 9'S RECEIVED BY PM:

09/01/82 i

SAR APPL. RESPONSE TO Q'S RECEIVED: 02/01/83 CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

l ISSUE DRAFT SER:

INPUT TO SER:

02/01/84 ISSUE SER:

03/01/84 ACRS FULL COMMITTEE MEETING:

04/06/84 INPUTS TO SE SUPPLEMENT 1:

04/21/84

(

ISSUE SE SUPPLEt1ENT 16 0S/25/84 CURRENT ANTITRUST:

FDA antitrust review is in progress.

HEARING STARTED:

ASLB INITIAL DECISION:

COMMISSION DECISION:

SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

FDA Amendment No. 2 was received in March, 1982.

NEW SLIPS / NOTES:

PAGE ND: 2-49 HRR LICENSIHG SYSTEM FDA CURREHT STATUS REPORT REPORT AS OF: 04/19/82 (HS$1GESSAR-238 HI PLAHT CHARACTERIST I C St KEY PERS0HHEL LIC. FM H.

FAULKNER ASLB CHAIR: N/A

  • DOCKET HO:

0500D447 LIC. EC:

J. MILLER NENBER 18 N/A APPLICAN!:

GENERAL ELECTRIC COMPANY LIC. LA.

P.

ANDERSON MEMBER 2 N/A LOCATIDH N/A COUNSEL:

B. BORDENICK CONST. INSP:

REGION:

0 AE:

BRAUH RESID. IHSP:

REAC. TYPE: BWR HSSS: GE ANTITRUST:

MPA ANALYST: B. DULIN DESIGN PWR 3579 MWT/1220 MWE C0HST:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

GESSAR II was docketed 02/82; review is in progress.

ER DOCKETED:

Some generic issues are being identified / resolved in ER SITE VISIT COMPLETE:

conjunction with LRG-II.

Dates shown reflect review INPUT TO DES TO PM:

for the 238 Huclear Island.

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/31/80 03/31/80C 02/22/82 02/22/82C SAR DOCKETED:

SAR Q'S RECEIVED BY PM:

07/16/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 11/26/82 INPUT TO DRAFT SER TO PM:

CURRENT HRG. STATUS:

ISSUE DRAFT SER:

IHPUT TO SER:

02/01/83 03/02/83 ISSUE SER:

ACRS FULL COMMITTEE MEETING:

04/08/83 INPUTS TO SE SUPPLEMENT 13 04/IS/83 ISSUE SE SUPPLEMENT 1:

05/12/83 CURRENT ANTITRUST:

HEARINO STARTED:

FDA antitrust review is in progress.

ASLB INITIAL DECISION:

COM:11SS10H DECISIGH:

SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

FDA Amendment No. 2 was received in March, 1982.

HEW SLIPS /HOTES:

\\

NRQ L ICEN5ING SYSTEM PAGE NO: 2-49 (SP)FFTF FSAR SPC CURREN T STA TUS REPQR T REPORT AS OF: 04/19/32 PLA NT CHARACT ERIST I C S:

KEY P E R S 0 N N E L:

DOCKET ND:

00007448 LIC. PII:

H.

NOLZ ASLB CHAIR:

APPLICANT:

DOE LIC. BC:

P.

CHECK MEMBER 1:

LOCATION:

12 MI S OF RICHLAND, WASH.

LIC. LA.4 U. NASSIGNED MEMBER 2:

REGION:

0 AE BECH C D'JN S E L :

CONST. INSP REAC. TYPE: T NS$$:

N/A ANTITRUST:

RESID. INSP:

DESIGN PWR: 0400 MWT/0400 MWE CONST: BECH MPA ANALYST M.

KING l

I CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Completed June 1 1979.

ER DOCKETED:

ER SITE VISIT COMPLETE:

INPUT TO DES TO PN:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

Not applicable.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

04/02/76 04/02/76C SAR DOCKETED:

08/13/76 C8/13/76C SAR Q'S RECEIVED BY PM:

12/05/76 06/15/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/25/77 08/10/77C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

06/02/77 02/15/78C Not applicable.

ISSUE DRAFT SER:

INPUT TO SER:

10/14/77 06/01/78C ISSUE SER:

12/01/77 08/04/78C ACRS LETTER RECEIVED:

04/10/78 ft/08/78C INPUTS TO SE SUPPLEMENT 1 10/14/77 01/15/7 9 C ISSUE SE SUPPLEMENT 1:

07/15/78 05/30/79C CURRENT ANTITRUS1:

HEARING STARTED:

ASLB INITIAL DEC' 20N:

COMMISSION DECISION:

SPECIAL PROJECT COMPLETE:

06/01/79 06/01/79C LATEST AMENDMENT:

NEW SLIPS / NOTES:

PAGE NO: 2-50 NRR L ICENSING

$YSTEM (SP)FNP 1-8 (MANUF.)

SPC CURRENT STA TUS REPORT REPORT AS OF 04/19/82 PL ANT CHARACTERIST I C S:

KEY PERS0NN E L:

LIC. PM:

M. MALLORY ASLB CHAIR S. WOLFE DOCKET NO:

05000437 LIC. BC:

E. ADENSAM MEMBER 1:

D. SCHINK APPLICANI OFFSHORE POWER SYSTEMS LIC. LA.

M. DUNCAN MEMBER 2:

G.

BRIGHT LOCATION:

JACKSONVILLE, FLA.

REGION:

2 AE:

OPS COUNSEL:

R.

BLACK CONST. INSP:

REAC. TYPE: PWR HSSS: WEST ANTITRUST:

J.

RUTBERG RESID.-INSP:

DESIGN PWR 3411 PMT/1150 MUE CONST: OPS MPA ANALYST:

B. DULIN ENVIRONMENTAL MILESTONES:

SCHED. D AT E ACTUAL DATE CURRENT SAF. STATUS:

ML matters have been addressed by arplicant. SSER 4, 07/05/73 07/05/73C ER DOCKETED:

covering IMI requircments and other previous unresolved ER SITE VISIT COMPLETE:

08/16/73 08/16/73C issues, was issued 09-29-81.

An ACRS subcommittee 07/01/74C mccting was held on 10-15-81.

The ACRS sont a favorable INPUT TO DES TO PM:

04/12/74 07/24/74C ISSUE DES:

letter on 10-19-81.

RESPONSE TO COM:1ENTS ON DES:

10/06/75 10/06/75C ISSUE FES:

l l

l CURRENT ENV. STATUS:

All environmental statements have been issued.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

05/07/73 05/07/73C SAR DOCKETED:

07/05/73 07/05/73C SAR Q'S RECEIVED Bf PM:

02/15/74 02/15/74C SAR APPL. RESPONSE 10 Q'S RECEIVED: 04/08/74 04/08/74C INPUT TO DRAFT SER TO PM:

07/25/75 07/25/75C CURRENT HRG. STATUS:

Suppl. 4 to the SER was entered into the record on 12-4-81.

ISSUE DRAFT SER:

Hearing reopened and closed on 12-4-81.

Licensing INPUT TO SER:

08/22/75 08/22/75C 09/30/75 09/30/75C ISSUE SER:

Board i s reviewing the record.

ACRS LETTER RECEIVED:

10/ i9/81 10/19/81C INPUTS TO SE SUPPLEMENT 4:

02/23/76 03/05/76C ISSUE SE SUPPLEMENT 4:

09/00/81 09/29/81C CURRENT ANTITRUST:

HEARING STARTED:

06/17/76 06/15/76C ASLB INITIAL DECISION:

06/00/82 COMMISSION DECISION:

08/00/82 SPECIAL PROJECT COMPLETE:

08/00/82 LATEST AMENOMENT:

NEW SLIPS / NOTES:

NRR LICENS8NG SVSTEM PAGE NO: 3-51 BLUE HILLS SIVE ESR CURRENT SVAVUS REP 0RV REPORT AS OF 04/19/82 PLANT CHARACTERISTICSt KEY PERS0NNEL DOCKET NO:

05007510 LIC. PM:

J. WILSON ASLB CHAIR M. MILLER APPLICANT:

GULF STATES UTILITIES LIC. BC:

J. MILLER NEMBER 1:

L. KORHBLITH LOCATION:

NEWTON COUNTY, TEXAS LIC. LA.:

P.

ANDERSON MEMBER 2:

L. LITTLE REGION:

4 AE BECH COUNSEL:

C. WOODHEAD CONST. INSP REAC. TYPE: PWR NS$$r COMB ANTITRUST:

B. V0GLER RESID. INSP:

DESIGN PWR: 0000 MWT/0000 MWE CONST:

MPA ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE l

ER DOCKETED:

08/26/76 08/26/76C l

ER SITE VISIT COMPLETE:

09/03/76 09/03/76C l

INPUT TO DES TO PM:

02/25/77 02/25/77C l

ISSUE DES:

03/21/77 06/02/77C l

RESPONSE TO COMMENTS ON DES:

08/23/77 05/05/78C l

ISSUE FES:

10/14/77 07/17/78C CURRENT ENV. STATUS:

Complete except for hearing.

SAFETY." HEARING MILESTONES:

APPLICATION TENDERED:

06/28/74 06/28/74C SAR DOCKETED:

08/23/74 08/23/74C SAR Q'S RECEIVED BY PM:

01/31/75 02/13/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/21/75 07/21/75C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

11/20/75 11/20/75C On 04/23/31 the ASLB issued a Partial Initial Decision ISSUE DRAFT SER:

approving Blue Hills site as suitable for location of INPUT TO SER:

08/06/76 10/04/76C a nuclear power plant.

ISSUE SER:

03/07/77 Of/07/77C ACRS LETTER RECEIVED:

04/15/77 03/16/77C INPUTS TO SE SUPPLEMENT 18 05/06/77 05/06/77C ISSUE SE SUPPLEMENT 18 05/27/77 06/23/77C CURRENT ANTITRUST:

Complete HEt. RING STARTED:

04/05/79 04/05/79C ASLB INITIAL DECISION:

04/28/81C SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

NEW SLIPS / NOTES:

l PAGE NO: 2-Sa NRR LICEN$ING SYSTEM CARROLL SITE ESR CURRENT STATUS REP 0RT REPORT AS oft 04/19/82 KEY PERSONNELa PLANT CNARACTERISTICSt LIC. PMt J. WILSON ASLB CHAIR J. WOLF l

DOCKET NO:

05000599 LIC. BC:

J. MILLER MEMBER 1 G. BRIGHT LIC. LA.:

P. AMOERSON MEMBER 2:

R. HOLTON APPLICANT COMMONWEALTH EDISON l

LOCATION:

CARROLL COUNTY, IL.

COUNSEL R. LESSY CONST. INSP l

REGION:

3 AEt REAC. TYPE:

NSSS: WEST ANIITRUST A. NODGDON RESID. INSP MPA ANALYST

  • D. SCHWARZ l

DESIGN FURt 0000 MWT/1120 MWE CONSTt l

l l

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS l

The commercial operation date has been ER DOCKETED:

04/07/79 04/07/79C i

postponed untlI 1999 - 2000.

This license ER SITE VISIT COMPLETE:

N/S is not under active review.

INPUT TO DES TO PMt N/S N/S ISSUE DES:

RESPONSE TO COMMENTS ON DES:

N/S N/$

ISSUE FEst CURRENT ENV. STATUS:

l Portions of the alternate site study are under review SAFETY / NEARING MILESTONES:

l I

by DOE.

APPLICATION TENDERED:

12/20/78 12/20/78C SAR DOCKETED:

SAR Q'S RECEIVED BY PM SAR APPL. RESPONSE TD Q'S RECEIVED:

INPUT TO DRAFT SER TO PMt l

CURRENT HRG. STATUS:

ISSUE DRAFT SER Five intervenors have been admitted.

INPUT TO SER:

ISSUE SER:

ACRS FULL COMMITTEE MEETING

)

INPUTS TO SE SUPPLEMENT j

ISSUE SE SUPPLEMENT l

N/S CURRENT ANTITRUSTt HEARING STARTED:

Awaiting updated Antitrust information from applicant.

ASLB INITIAL DECISI0H N/S l

SPECIAL PROJECT COMPLETE:

N/S 1

l 1

l LATEST AMENDMENT:

NEW SLIPS / NOTES:

i

NRR L 'CEN$ING SYSTEN AS OF 04/19/82 N0N-POWER REAC70RS INPUT ISSUE EARLIEST ISSUEa TO SER ISSUE FES OR START ISSUE NON-PCWER FACILTTY DOCKET RE1 TO PM ila 113 NEARING QL COMMENTS 1000.0000W TANK ESTIMATED DATE: 10/80 N/A 01/82 01/82 05/82 11/82 CONTESTED CASE AFRRI, TRIGA 01/82C ACTUAL DATE:

10/80C 10.0000W T ESTIMATED DATE: 12/80 02/82 09/82 05/82 09/82 POWER INCREASE TO 20 MW NBSR INCLUDED IN RENEWAL ACTUAL DATE:

12/80C 02/82C 1000.0000W POOL ESTIMATED DATE: 07/79 N/A 06/82 06/3*

06/82 TEXAS A8M, TRIGA ACTUAL DATE:

07/79C 100.0000W GRAPH ESTIMATED DATE: 01/81 N/A 03/82 05/82 05/82 N/A 05/82 U. OF FLA., ARCONAUT ACTUAL DATE:

01/81C 2000.0000W POOL ESTIMATED DATE: 03/77 N/A 05/82 05/82 05/82 N/A 05/82 U. OF VA.

ACTUAL DATE:

03/77C 10.0000W ESTIMATED DATE: 07/79 N/A 05/82 05/82 N/A 05/82 WORCHESTER POLY TECH ACTUAL DATE:

07/79C a FOR TEST REACTORS ONLY f

s?

t

M M

Z o

M H

O LU LO

PAGE NO: 2-NRR LICENSfNG SV3 TEM 0L CURRENT STATUS REPORT REPORT AS OF KEY PERS0NNELa PLANT C N A R A C T E R I S T I C 5:

~

LIC. PM:

Licensing Project Manager ASL B CH AIR: ASLB Chairman DOCKET NO:

Docket No.or Project No.,if not docketed LIC. BC:

Licenwng Branch Chief MEMBER 1 on panel APPLICANT:

Utihty LIC.

LA..

Licensing Assistant MEMBER 22 on panet REGION:

1 through 5 AE:

Architect / Engineer COUNSEL:

Attorney assipad to case CONST. INSP Construction inspector LOCATION:

Miles and direction from nearest major town REAC. TYPE:

PWR, BWR, HTGR or LMFBR NSSS: Nuclear Steam Systems Supplier

'NTITRUST Antitrust Attorney RESID, INSP Resident inspector DESIGN PWR: Megawatts electric & thermal CONST: Constructor C?A ANALYST: MPA analyst assigned to track progect ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

Safety status for this reporting period only. It consists of accomplishments and schedule ER DOCKETED:

Environmental Report changes occurring since the last issue of Blue Book. Outstanding issues and late input from review branches should be indicated. along with indication of the eritical path.

P O

T Project Manager IESUE DES:

Draft Environmental Statement RESPONSE TO COMMENTS ON DES:

Final Environmental Statement ISSUE FES:

CURRENT ENV. STATUS:

Environmental status for this reporting period only. It consists of accompGshments and SAFETY / NEARING MILESTONES:

schedule changes occurring since the last issue of Blue Book. Outstanding issues and late input from review branchesihould be indicated.

APPLICATION TENDERED:

SAR DOCKETED:

Safety Analysis Report SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

INPUT TO DRA.~ SER TO Pli:

ISSUE DRAFT SER:

Safety Evaluation Report CURRENT HRG. STATUS:

Changes in the hearing dates since the last issue of Blue Book. Changes in intervention and INPUT TO SER:

contentions should be indicated.

ISSUE SER:

ACRS LETTER RECEIVED:

_ Advisory Committee INPUTS TO SE SUPPLEMENT 3:

on Reactor Safeguards ISSUE SE SUPPLEMENT 3:

j FEMA LETTER RECEIVEL4 Safety Evaluation Supplement CURRENT ANTITRUST:

NEARING STARTED' Changes in the antitrust status since the last issue of Blue Book.

ASLB INITIAL DECISION:

Atomic Safety & Licensing Board ASLB FINAL DECISION:

TECH SPECS COMPLETED:

COMMISSION DECISION:

ISSUE PARTIAL POWER LICENSE:

ISSUE FULL POWER LICENSE:

LATEST AMENDMENT The latest amendment submitted by the applicant.

SCNED. DATE RECEIPT DATE te '

NEW SLIPS / NOTES:

CONSTRitcTTON COMPLETION - APPL.

,Y,,,nt

"' e f

not ce o ang Slips or potential problems that should be brought to management's attention.

construction in construction completion completion

BE R (Auved br DOCJ

'U""

U S NUCLE AR REGUL ATORY COMMISSIOGd 17 776 NUREG-0580 Vol. 11. Nos. 1,2,3,4 BIBLIOGRAPHIC DATA SHEET 2 (Leave blek) 4 TIT LE ant) SUB1lT LE (Add Votuner No s! approprontel Regulatory Licensing Status Sumary Report 3 RECIPIENT'S ACCESSION NO.

j (Bluebook)

I

5. DATE REPORT COMPLE TED 1 AUTHORISI M ON TH l YEAR May 1982 DATE REPORT ISSUEO
9. PE RF ORMING ORGANIZATION N AME AND M AILING ADDRESS (Include I<a Codel I*"

Office of Resource Management Mv N

Management Infontiation Branch

,,Lt ve bien *I U. S. Nuclear Regulatory Conunission Washington, D.C.

20555 8.,t,,,,,,,,,

12 SPONSORING ORGANIZ ATION N AME AND M AILING ADDRE SS (lactude I,p Code' 10 PROJECT /T ASK/ WORK UNIT NO.

Office of Resource Management

11. CONT R ACT NO Management Information Branch U.S. Nuclear Regulatory Commission Washington, D.C.

20555 PE RIOD COVE RE D (inclus ve dates) 13 TYPE OF REPORT January 1,1982 - April,19,1982 14 IL '*ve O'* * /

15 SUPPLEMENT ARY NOTES

16. ABSTR ACT (200 words or less)

Provide a review of the status of the progress of the licensing reviews for all construction permits, operating licenses,special project and non-power reactor renewals under review, as reported to Congress.

17e DE SC RIP T ORS 17 AE Y WORDS AND DOCUME NT AN ALYSIS 17b IDENTIF IE RS OPE N ENDE D TE RMS 19 SE CURITY CLASS iTn,s reoorrs 21 NO OF P AGES IS AV AIL ABILITY ST ATE MENT itncla ec m art Unlimi ted 20 SECURITY CL ASS (Ta.s peset

?? PR6CE l

Unclassified s

  • U.S. GOVE3tNMa.NT PRINTING OFFICE: '982 361-302/531

UNITED STATES einst etass can NUCLEAR REGULATORY COMMISSION Postact a ass: Paso (1

WASHINGTON, D.C. 20555 usant wasa o t Ptsurf 43111 I

r OFFICIAL SUSINESS PENALTY FOR PRIVATE USE,4300 a

f, s

[

d S

A l

g

=

. 4 w i

l 4

' I e

,[

j i

r e

b 4 ) $

g l

l l

w_

_