Text
f
[ '
%g
.s UNITED STATES
~
i"h NUCLEAR REGULATORY COMMISSION
',:. e%j.
2C
.. y WASHINGTON, D. C. 20555 QM6
'E
%' "..'.. /
~
APR 2 7 1932.
Philip A. Crane, Jr., Esq.
Pacific Gas & Electric Company P. O. Box 7442 San Francisco, California 94120
Dear Mr. Crane:
We have reviewed the proposed plan by Teledyne Engineering Services (TES) for Phase I of the Independent Design Verification Program (IDVP).
We have determined that the plan responds to item (3) of Comission Order CLI-81-30 of November '19,1981 and includes.the design verification elements identified in item (l.a) of the Order.
We also tetermined that the plan responds to the staff recommendations contained in SECY-82-89, as revised and voted upon by the Commission on March 4, 1982, and to the concerns and requests raised by the staff in meetin'gs on February 3 and March 25, 1982 and in my letter of March 19, 1982. We find that some additional clarification is needed as stated in the enclosure and request that this be done in a prompt revision to the plan.
Based on our above findings, pursuant to the Comission's direction of March 8, 1982 pe hereby approve the TES plan for Phase I of the IDVP.
We also reviewed your plan for the PG&E Technical Program which responds to the staff request made in the meeting on March 25, 1982. We have determined that the plan adequately covers those activities which PG&E as the licensee for Diablo Canyon Unit 1 is required to perform. We hereby approve the plan.
Our approval of the TES program plan for Phase I is limited to the activities covered by the plan and does not apply to the adequacy of the Phase I activities as the bases for reinstating the license which was suspended by the Commission Order.
As you know, we have expressed some concerns on the adequacy of the scope of Phase I with respect to the reinstatement of the license for Diablo Canyon Unit 1.
The concerns are based on the findings by R. F. Reedy, Inc. of the audit of the PG&E (and contractors) qu'ality assurance activities as applied to the seismic design of Diab.lo Canyon Unit 1.
We discussed the matters with Mr. Reedy in a meeting on April 1, 1982, which was also attended by your staff.
We are currently evaluating the Reedy findings and your comments on these findings which you provided by letter dated Apiil 15, 1982. We will inform you promptly of any changes, if any, that are required to meet the objective of the Phase I program as stated in item (5) of the Commission Order.
Sincerely, f
N$ k l
Harold R. Denton, Director '
~
',/
Office of Nuclear Reactor Regulation l
Enclosure:
As stated
{gc[O.Skr6 h cc:
W. Cooper, TES
$PP FPYi
"'"P
r
~
Mr. Malcolm H. Furbush Vice President - General Counsel Pacific Gas & Electric Company P.O. Box 7442
~ -
San Francisco, California 94120 cc:
Philip A. Crane, Jr., Esq.
~
Pacific Gas & Electric Com'pany P.O. Box 7442 San Francisco, California 94120 Janice E. Kerr, Esq.
California Public Utilities Commission 350 P.: Allister Street San Francisco, California 94102' Mr. Frederick Eissler, President
~
Scenic Shoreline Preservation Conference, Inc.
4623 More flesa Drive Santa Barbara, California 93105
'Ms Elizabeth Apfelberg 1415 Cozadero San Luis 03ispo, California 93401 Mr. Gordon A. Silver fis. Sandra A. Silver 1760 Alisal Street San Luis Obispo, California 93401 Harry M. Willis, Esq.
Seymour & Willis 601 California Street, Suite 2l00 San Fran:isco, California 94108 Mr. Richard HJbbard i1HB Technical A,ssociates Suite K 1723 Hamil ton Avenue San Jose, California 95125 Mr. John Marrs, !*anaging Editor San Luis Obispo County Telegram-Tribune 1321 Johnson Avenue P. O. Box 112
~
San Luis Obispo, California 93406 i
e, N
e
- 9
\\
l.
Mr. Malcolm H. Furbush.
cc:
Resident Inspector /Diablo Canyon NPS c/o U. S. Nuclear Regulatory Commission P. O. Box 369 j
Avila Beach, California 93424 Hs. Raye Fleming i
1920 Mattie Road Shell beath, California 93440 Joel Reynolds, Esq.
John R. Phillips, Esq.
Center for Law in the Public Interest
~
i 10951 West Pico Boulevard
~
j Thira Floor Los Angeles, California 90064 Paul C. Valentine, Esq.
321 Lyttun Avenue Palo Alto, California 94302 1
i Mr.9hyron 5. Georgiov Legal Affairs Secretary Governor's Office State Capitol Sacramento, California 95814
~
Herbert H. Brown, Esq.
Hill, Christopher & Phillips, P.C.
1900 h Street, N.W.
ashington, D.C.
20036
~
1 Mr. Dick.Blankenburg, Editor & Co-Publisher South County Publishing Company P. 0.. box 460 j -
Arroyo Grance,. Cali fornia 93420 Mr. Jar.:es 0. Schuyler Vice President
-Nuclear Generation Department Pacific Gas & Electric Conipany 1
P.O. box 7442 l
San Francisco, California 94120 brucehorton,thq.
Suite 202 3216 north 3rd Street l
Phoenix, Arizona 85012 N
e e e
m
Mr. Malcolm H. Furbush -
i Mr. W.
C'. Gangloff Westinghouse Electric Corporation P. O. Box 355 Pittsburgh, Pennsylvania 15230 David F. Fleischaker, Esq.
,P. O. Box 1178'.
Oklahoma City, Oklahoma 73101 Arthur C. Gehr, Esq.
Snell & Wilmer 3100 Valley Center Phoenix, Arizona 85073
~
Mr. Owen H. Davis, Director Federal Agency Relations Pacific Gas and Electric Company 1050.17th Street, N.W.
Suite 1180 Washington, D.c.
20036 e
e M
P 4
I-l l
l Am l
l i
M e e O
I
- 5 Enclosure Requests for Additional Clarification in the Independent Design Verification Program (IDVP) Plan of Teledyne Engineering Services 1.
The ID P plan should include additional information on the professional qualificati,on and background of the structural review team (Section 7.4.6).
2.
The inclusion of structural element samples in response to a Commission request is identified in Section 3.0 and in Appendix D, Sections 5.1 gnd 5.4.1.2(e).
Table I of Appendix D should identify the specific structural element samples included in the IDVP.
P 9
0 e
e
&g M
e e m
_ _ _ _ _ _ _ _