Discusses Commission 820304 Approval of Mods & Recommendations in Secy 82-89 Re Util Plan to Conduct Independent Design Verification Program,Phase I
ML16341C482
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/09/1982
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Ahearne J
NRC COMMISSION (OCM)
Shared Package
ML16341C483 List:
References
NUDOCS 8207150625
Download: ML16341C482 (10)


Text

WDircks EDO Mail Rm OI &E OELD ACRS (16)

RVollmer REngelken DIST1.

~UTION:

Document Control (50-275)

NRC PDR LPDR TERA June 9,

1982 NSIC LB,¹3 Rdg FMiraglia JLee MHMORANDUM FOR:

Commissioner Ahearne HSchierling BBuckley FROM:

William J. Dircks RTedesco Executive Director for Operations DEisenhut/RPurple HDenton/ECase DIABLO CANYON DESIGN VERIFICATION PROGRAM PHASE I On March 4, 1982, the Commission approved with modifications, the staff recommendations in SECY 82-89 regarding the 'Pacific Gas

& Electric Co.

(PG&E) program plan for the conduct o'f"th'e D'iablo C'anyon Independent Design Verifi-cation Program (IDVP)-Phase I ~

The modification's ware identified in a memoran-dum from S. Chilk to W. Dircks, da'ted March 8, 1982 (Enclosure 1).

One of the modifications related to the tech'nical scope

'o'f the program (item (c) in ), the other addressed the selection'rocess and final selection of the independent auditor (item '(b) a'n'd spe'cifi'c instruction in Enclosure 1).

The staff followed the instructions of the Commission for the selection process.

A -Daily Highlight was issued on Magph 18, 1982, regardin0. the status of the selection process (Enclosure 2):

Pursuant to the Commission direction, the staff approved Teledyne as the 'inde'pendent company to conduct the IDVP-Phase I for Diablo Canyon by letter dated March 19, 1982 (Enclosure 3).

This letter indicated that certain issues with"respect to Phase I of the program remained to be resolved.

The staff met with PG&E and Teledyne on March 25, 1982, regarding the Phase I program plan to discuss: revisionsto the plan required prior to staff approval.

Teledyne submitted a consolidate'd

'and revised plan dated April 6, 1982.

The staff determined that some addit'ional cl'arificati'ons ip the plan were required; however, it was r esponsive to th'e it'ems 'tha't 'ha'd been identified by the Commission.

Pursuant to Commission direct'ion, 'th'e staff 'ap'proved the plan and inl'ormed PG&E by letter dated April 27, 198'2'Enclosure 4)'.

8207150625 820609 PDR ADOCK 05000275 P

PDR

Enclosures:

See next page

Contact:

Hans Schierling, ONRR 28423 Retyped in OEDO.

tSlgned) Vhll<am j. Dirc'~

William J. Dircks Executive Director for Operations See previous 318 for concurrences OFFICEI SURNAME/

DATEf

....OEDQ..

WJDirc s/

m

..0/9/AR.

NRC FORM 318 {10-80) NRCM 0240 OFFICIAL RECORD COPY USQPO: 1981-335.960

1 <

I

'hg IN

FROID:

SUB JECT:

William J, Dircks Executive Directo for Oper ations DIABLO CANYON DES IG VERIFICATION PHASE 'I t<EMORANDUlt FOR:

Coranissioner Ahear ne 0ISTRI BUTION Document Control (50-275)

NRC PDR L PDR TERA NSIC LB¹3 Reading SECY FMiraglia OPE JLee OGC HSchierling ACRS(l6)

BBuckley Ryollmer RLTedesco REngelken DEisenhut/RPurple HDenton/ECase WJDircks PROGRAfi - EDO Mail OI &E OELD On March 4, 1982, the Coamission approve with two modifications, the staff recommendations in SECY 82-89 regarding th Pacific Gas

& Electric Co.

(PG&E) program plan for the conduct of the Diablo anyon Independent Design Verifi-cation Program (IDVP)-Phase I.

The modifica ions are identified in a memor-andum from S. Chilk,to W. Dircks, dated March, 1982 (Enclosure 1).

One of, the modifications relates to the technical sco of the program (item (c) in ). the other addresses the selection rocess and final selection of the independent auditor (item (b) and specific instruction in Enclosure 1).

The staff followed the instructions of the Commissi for the selection process.

An NRR Daily Highlight was issued on March 18, 1982, regarding the status of the selection process (Enclosure 2).

Pursuant to the Comission direction, the staff approved Telene as the independent company to onduct the IDVP-Phase I for Diablo Canyon by letter dated March 19. 1982 (Enclo ure 3).

This letter indicated that certain issues with respect to Phase I o the program remain to be resolved.

i The staff met with PG&E and Teledyne on thrch 25, 1982, reg rding the Phase I program plan to discuss revisions to the plan required prior to staff approval.

Teledyne submitted a consolidated and revised plan dated Apri 6, 1982.

The staff determined that some additional clarifications in the pl are required; however, it was responsive to the items that had been identifie by the Comission.

Pursuant to Coraoission direction (Enclosure 1), the staff approve the plan and informed PG&E by letter dated April 27, 1982 (Enclosure 4).

Enclosures:

See next page 8423

Contact:

Hans Schierling, 0

R X2 tlilliam J.';IDircks Executive Director for Operations OFFICE/

SUANAMEQ OATE Q DL:LB¹3 HSchierli

~ 0 ~ ~ 0 ~ 0 ~ 0 ~ 0 ~ ~ ~ 0 ~ 0 ~ ~ ~ ~

~ ~

06/4 /82

~ 0 ~ 0 ~ ~ OTi 0 ~IHI~i~ 0 ~ ~ ~ ~ 0 b

F aglia

~ ~ ~ ~ ~i~ ~

~\\

Oi ~ 00 ~ ~ ~i 06/ 5/82

~i~ \\ ~ 0 ~1ttttO

~ ~ ~ ~ ~ ~ ~ 0 ~ ~

~ 0

~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

esco

~ ~ ~ 0 ~ ~ 0 ~ ~ ~ ~ ~ 0 ~ AORS

'PO ~ ~ ~

06/cy(82

~ ~ 0 ~ ~ 0 ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~

~ ~ ~

~ ~

DG s

~ ~ ~ ~ ~ ~ 0 ~

~\\ ~

~ ~

~ ~

~ P 06

/82

~ ~ ~ ~ ~ ~ ~ ~ ~

0 ~ 0 ~ ~ ~ ~ ~ ~

EGCase

~ ~ ~

~ ~ ~ ~ ~ ~ 0)0/2 06/

NRR HRDenton 06/ /82 EDO WJDircks

"($'/'"'782'""

NAG FOAM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USOPO: 1081~960

e

~

~it REGS e (4

P i'o O

/p +**gc+

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 MEMORANDUM FOR:

Commiss ioner Ahearne FROM:

SUB JECT:

William J, Dircks Execu ive Director for Operations DIABLO 'YON DESIGN VERIFICATION PROGRAM-PHASE I On March 4, 1982, the Commission approved with CS5 odifications, the staff recommendations in SECY 82-89 bqgarding the Pacific Gas

& Electric Co.

(PG&E) program plan for the conduct of the Diablo Canyon Independent Design Verifi-cation Program (IDVP)-Phase I.

Ttle modifications'% identified in a me~rQ andum from S. Chilk to W

Dircks, dated March 8, 1982 (Enclosure 1).

One of the modifications relate) to the tec nical scope of the program ('tem (c} in ), the other addressed th selection process and final selection of the independent auditor (item (b) d specific instruction in Enclosure 1).

The staff followed the instructions of he Commission for the selection process.

An NRR Daily Highlight was issued on Mar h 18, 1982, regarding the status of the selection process (Enclosure 2).

Pu uant to the Commission direction, the staff approved Teledyne as the independent company to conduct the IDVP-Phase I for Diablo Canyon by letter dated March 19, 1982 (Enclosure 3).

This letter indicated that certain issues with respect t Phase I of the program remai,net to be resolved.

The staff met with PG&E and Teledyne on March 2

, 1982, regarding the Phase I program plan to discuss revisions to the plan re uired prior to staff approval.

Teledyne submitted a consolidated and revised pla dated April 6, 1982.

The staff determined that some additional clarificationp in the plan required; however, it was responsive to the items that had bedq identified by he Commission.

P C

i i

Ch i ~,

t ff pp d

t p1 d

informed PG&E by letter dated April 27, 1982 (Enclosur+e4).

Enclosures:

See next page

Contact:

Hans Schierling, ONRR X28423 William J.. Dircks Executive Director for Operations

4 J

~

\\

c

~ I

~ t t

It

gUN 8 )iN k

flEflORANDUfl FOR:

Co is ioner Ahearne STRIBUTION:

Document Control (50-275)

NRC PDR L PDR WDircks TERA EDO Mail Rm NSIC OI&E LB ¹3 Rdg OELD FMiraglia ACRS (16)

JLee RVollmer HSchierling REngelken BBuckley RTedesco DEisenhut/RPurple HDenton/ECase FROM:

SUBJECT:

lfillia J. Dircks Executi e Director for Operations DIABLO CA ON DESIGN VERIFICATION PROGRAfl PHASE I On March 4, 1982, the Commissi p approved with modifications, the staff recommendations in SECY 82-89 rhgarding the Pacific Gas

& Electric Co.

(PG&E) program plan for the conduct of t e Diablo Canyon Independent Design Verifi-cation Program (IDVP)-Phase I.

Th modifications were identified in a memoran-dum from S. Chilk to W. Dircks, dat d tlarch 8, 1982 (Enclosure 1).

One of the modifications related to the technical scope of the program (item (c) in ), the other addressed the election process and final selection of the independent auditor (item (b) and ecific instruction in Enclosure 1).

The staff, followed the instructions of t q Commission for the selection process.

An NRR Daily Highlight was issued on.tlarcA 18, 1982, regarding the status of the selection process (Enclosure 2).

Pursu nt to the Commission direction, the staff approved Teledyne as the independent c fnpany to conduct the IDVP-Phase I for Diablo Canyon by letter dated March 19-, 19)2 (Enclosure 3).

This letter indicated that certain issues with respect to 0 ase I-of the program remained to be resolved.

The staff met wi.,th PG&E and Teledyne on Miarch 25, 1/82, regarding the Phase I

program plan to discuss revisions to the p'lan requited prior to staff approval.

Teledyne submitted a consolidated and revised plan da ed April 6, 1982.

The staff determined that some additional clarifications vn the plan were required; however, it was responsive to the items that had been i entified by the Commi'ssion.,

Pursuant to Commission direction, the staff approved th plan and informed PG&E by letter dated April 27, 1982 (Enclosure 4).

Enclosures:

See next page (Signe1 william J.

Dirc'filliam J. Dircks Executive Director for Operations

Contact:

Hans Schierling, ONRR REWRITTEN IN DENTON'S OFFICE -

SEE PREVIOUS RC 318 OFFICEI SURNAME/

oATE Ip R:

IR

~.RD 6/

0.'.dfJH

/82

~ ~ ~ ~ ~ ~

I

~ ~ ~ ~ ~ ~ ~

EDO ugi.rcks.........

6/

(82 NRG FORM 318 (10.80) NRCM 0240 OFFICIAL RECORD COPY USOPO: 1981~6.960

~

~

Commissioner Ahearne

Enclosures:

1.

Memorandum dated March 8, to W. Dircks 2.

NRR Daily Highlight dated 3.

Letter from H.

R. Denton, PG&E dated March 19, 1982 4.

Letter from H.

R. Denton, PG&E dated April 27, 1982 cc:

Chairman Palladino Comm. Gilinsky Comm.

Roberts Coma. Asselstine SECY OPE OGC 1982, from S. Chilk March 18, 1982 NRR, to M. H. Furbush, NRR, to P.

A. Crane

1