- ge* *%q'o j((
UNITED STATES g
8
NUCLEAR REGULATORY COMMISSION
/IOb MMN o
<f ADVISORY COMMITTEE ON REACTOR SAFEGUARDS gy wAsmNoTou, p. c. rosss January 22, 1982 g
so j
fi,
'Q b
C-6
'b
~
PPP2 C1932 n b un
/S Honorable Nunzio J. Palladino
^
y,
, ~, /c Chairman 7,
n :m x. >
m U. S. Nuclear Regulatory Commission C
/p Washington, DC 20555
Subject:
WO-HUNDRED-SIXTY-FIRST MEETING 0F THE ADVISORY COMMITTEE ON REACTOR SAFEGUARDS, JANUARY 7-9, 1982
Dear Dr. Palladino:
The Advisory Committee on Reactor Safeguards held its 261st meeting in Washington, DC on January 7-9, 1982.
Items considered at this meeting are summarized below:
261st ACRS Meeting The Committee met with representatives of the Office of Nuclear Regulatory Research to discuss the NRC Safety Research Program budget for Fiscal-Year 1983.
Committee members discussed the proposed ACRS report to the U.S. Congress on the NRC safety research budget request to be submitted to the President for congres-sional action. The Committee plans to complete this report during the 262nd ACRS meeting.
The Committee approved a memorandum to the ED0 concerning the need for Staff
~
action regarding systens interactions that might lead to significant degradation of safety. The ACRS requests an NRC Staff response with respect to plans for a systems interaction study of Indian Point Unit 3, as well as for other nuclear plants. A copy of this memorandum has been sent to you.
The Committee heard and briefly discussed a presentation by representatives of the General Electric Company regarding a proposed BWR standard plant design which will incorporate several design improvements as well as a nuclear island arrangement that will provide a more integrated plant design. The Committee was l
favorably inclined toward this approach, but concluded that additional changes I
may be appropriate before such a plant can be licensed. The ACRS plans to continue interaction with the NRC Staff and the General Electric Company regard-ing the adequacy of this design.
The Committee heard and briefly discussed a presentation by representatives of the Westinghouse Electric Corporation regarding a proposed PWR standard plant design which will incorporate a number of design improvements including use of a nuclear island that will provide a more integrated plant arrangement. The Committee was encouraged by this approach, particularly by some innovative thinking regarding improved provisions for decay heat removal, control of occu-pational exposure, and physical separation of redundant systems. The Members DESIGNATED ORIGINAL 8205050100 820122 3
. led By A
SL-0270 PDR
Honorable Nunzio J. Palladino January 22, 1982 e
observed, however, that additional changes may be appropriate before such a plant is considered suitable for licensing. The ACRS plans to continue inter-action with the NRC Staff and the Westinghouse Electric Corporation regarding the suitability of this design development.
The Committee met with representatives of the NRC Staff to discuss human factors k
considerations expressed in NUREG-0700, " Guidelines for Control Room Design,"
NUREG-0801, " Evaluation Criteria for Detailed Control Room Design Review," and NUREG-0835, " Human Factors Acceptance Criteria for the Safety Parameter Display System." The Committee was infonned that these documents will be referred to the NRC Committee to Review Generic Requirements for further evaluation.
Members of the Committee presented ACRS' and personal views at a briefing of the Commissioners on Reactor Pressure Yessel Water Level Indicators held on January 8, 1982.
The Committee was briefed by members of the NRC Staff regarding the status of the CRBR project and the plan for regulatory review of the proposed site and planned design.
ACRS Subcommittee Activity Since the last report of ACRS activities, the following subcommittee meetings have been held:
Class 9 Accidents, in Denver, C0 on December 16-17, 1981 Joint Waste Management and Reactor Radiological Effects, in Washington, DC on December 18-19, 1981 Human Factors, in Washington, DC on January 5,1982 Reliability and Probabilistic Assessment, in Washington, DC on January 5,1982 Nuclear Safety Research Program, in Washington, DC on January 6,1982 Advanced Reactors, in Washington, DC on January 6,1982 Future Schedule The following items are tentatively scheduled for consideration during the 262nd ACRS Meeting, February 4-6, 1982:
Reactor Safety Research Program Budget for FY 1983--ACRS Report to Congress NP.C Long Range Research Program Plan--initial review (tentative)
I
Honorable Nunzio J. Palladino January 22, 1982 Proposed NRC Policy Statement Regarding Severe Accident Rulemaking--briefing by the NRC Staff Proposed Rule on Quantitative Safety Goals--briefing by the NRC Office of Policy Evaluation Proposed Policy and Program Guidance--briefing by the NRC Office of Policy Evaluation and the EDO Regulatory Refom--briefing regarding activities of the Regulatory Refom Task Force Meeting with NRC Commissioners Policy statement regarding severe accidents Meeting with the Regulatory Reform Task Force Quantitative risk criteria and Commission safety goals Sincerely,
.J Ray Act ng ACRS Chairman
.