ML20052A479

From kanterella
Jump to navigation Jump to search
Proposed Revision to Tech Spec 3/4.6.3.1,Table 3.6-1, Reflecting Addition & Deletion of Containment Isolation Valves
ML20052A479
Person / Time
Site: North Anna 
Issue date: 08/21/1980
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20052A476 List:
References
NUDOCS 8204280368
Download: ML20052A479 (19)


Text

_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _

00 M

C

=$A I

TABLE 3.6-1 g

  • g@

CONTAINMENT ISOLATION VALVES 1O MAxIMun z

VALVE ISOLATION TIME W

NUMBER FUNCTION (SEC.)

H A.

PHASE "A" ISOLATION 1.

MOV-2380 Reactor Coolant Pump Seal Water Return 10 2.

MOV-2381 Reactor Coolant Pump Seal Water Return 10 3.

HCV-2200A Reactor Coolant Letdown Line 10 4.

HCV-22008 Reactor Coolant Letdown Line 10 y

5.

HCV-2200C Reactor Coolant Letdown Line 10

[

6.

TV-2204 Reactor Coolant Letdown Line 10 h

7.

TV-SI200 Nitrogen to Pressurizer Relief Tank and 51 60 Accumulators 8.

TV-DG200A Primary Drains Transfer Tank Pump Discharge 60 9.

TV-DG2006 Primary Drains Transfer Tank Pump Discharge 60 10.

TV-DA200A Containment Sump Pump Discharge to Waste 60 Drain Tanks 11.

TV-DA2008 Containment Sump Pump Discharge to Waste 60 Drain Tanks

12. TV-BD200A Steam Generator Blowdown 60 13.

TV-BD2008 Steam Generator Blowdown 60

14. TV-BD200C Steam Generator Blowdown 60 0

E nj TABLE 3.6-1 (Cont.)

E z>

MAXIMUM i

VALVE ISOLATION TIME 53 NUMBER FUNCTION (SEC.)

=

--i 15.

TV-802000 Steam Generator Blowdown 60 l

16.

TV-80200E Steam Generator Blowdown 60 17.

TV-80200F Steam Generator Blowdown 60 18.

TV-RM200A Air Radiation Monitor Return 60 19.

TV-RM200D#

Air Radiation Monitor Return 60 20.

TV-RM2008 Air Radiation Monitor Supply 60 3:

21.

TV-RM200C Air Radiation Monitor Supply 60

][

22.

TV-2519A Primary. Grade Water 10 23.

TV-VG200A Primary Vent Header 60 24.

TV-VG2000 Primary Vent Header 60 25.

TV-SI201 Safety Injection Accumulators to Waste 60 Gas Charcoal Filters 26: HCV-2936 Safety Injection Accumulators to Waste 10 l

Gas Charcoal Filters 27.

IV-SS204A Pressurizer Relief Tank Sample 60

.\\

28.

TV-SS204B Pressurizer Relief Tank Sample 60 29.

TV-SS200A Pressurizer Liquid Space Sample 60 o,

30.

TV-SS2008 Pressurizer Liquid Space Sample 60 h

f=

31.

TV-SS206A Primary Coolant flot Leg Sample 60 32.

TV-SS2068 Primary Coolant Hot leg Sample 60 l

l e

i 5

4 TABLE 3.6-1 (Cont.)

Es MAXIMUM VALVE ISOLATION TIME b

NUMBER FUNCTION (SEC.)

-n n

33.

TV-SS202A Primary Coolant Cold Leg Sample 60 34.

TV-SS202B Primary Coolant Cold Leg Sample 60 35.

TV-LM200A Reactor Containment Leakage Monitoring Lines 60 to Open Pressure Taps 36.

TV-LM2008 Reactor Containment Leakage Monitoring Lines 60 to Open Pressure Taps 1

37.

TV-LM200C Reactor Containment Leakage Monitoring Lines 60 l

?

to Open Pressure Taps j

38.

TV-LM2000 Reactor Containment Leakage Monitoring Lines 60 to Open Pressure Taps 39.

TV-LM200E Reactor Containment Leakage Monitoring Lines 60 to Open Pressure Taps 40.

TV-LM200F Reactor Containment Leakage Monitoring Lines 60 to Open Pressure Taps 41.

TV-LM200G Reactor Containment Leakage Monitoring Lines 60 to Open Pressure Taps 42.

TV-LM200H Reactor Containment Leakage Monitoring Lines 60 to Open Pressure Taps 43.

TV-SS201A Pressurizer vapor Space Sample 60

((

44.

TV-SS2018 Pressurizer Vapor Space Sample 60 o

45.

TV-SV202-1#

Condenser Air Ejector Vent 60 46.

TV-SV203 Condenser Air Ejector Vent 60

TABLE 3.6-1 (Cont.)

MAXIMUM y

VALVE ISOLATION TIME

=i NUMBER FUNCTION (SEC.)

Ng 47.

TV-CV250A Containment Vacuum Pump Suction 60 48.

TV-CV250B Containment Vacuum Pump Suction 60 5

49.

TV-CV250C Containment Vacuum Pump Suction 60 m

50.

TV-CV250D Containment Vacuum Pump Suction 60 51.

TV-SS203A Residual Heat Removal System Sample Lines 60 52.

TV-SS203B Residual Heat Removal System Sample Lines 60 53.

TV-LM201A Reactor Containment Leakage Monitoring Lines 60 to Reference System 54.

TV-LM201B Reactor Containment Leakage Monitoring Lines 60 u

];

to Reference System 55.

TV-LM201C Reactor Containment Leakage Monitoring Lines 60 4

to Reference System 56.

TV-LM201D Reactor Containment Leakage Monitoring Lines 60 to Reference System 4

57.

TV-2859 Safety Injection Test Line 10 58.

TV-2842 Safety Injection Test Line 10 59.

TV-SS212A Steam Generator Surface Sampic 60 60.

TV-SS212B Steam Generator Surface Sample 60 61..

TV-MS209#

Main Steam Drains to Condenser 60 62.

TV-MS210#

Main Steam to Blowdown 60 63.

TV-SV202-2#

Condenser Air Ejector Vent 60 64.

FCV-AS200A#

Condenser Air Ejector Steam Supply 60 65.

FCV-AS200Bf Condenser Air Ejector Steam Supply 60

TABLE 3.6-1 (Cont.)

5 MAXIMUM g

m VALVE ISOLATION TIME g

NUMBER FUNCTION (SEC) 5 66.

TV-IA201A Containment Instrument Air Supply 60 h

67.

TV-IA201B Containment Instrument Air Supply 60 s

N 68.

TV-TA202A Containment Instrument Air Return 60 69.

TV-IA202Bf Containment Instrument Air Return 60 70.

TV-DA203A Post Accident Sample System Containment 60 Return Line 71.

TV-DA203B Post Accident Sample System Containment 60 Return Line h

B.

PHASE "B" ISOLATION

[

1.

TV-CC203A Component Cooling Water from RHR System 60 o

and Excess Letdown Heat Exchanger 2.

TV-CC203B Component Cooling Water From RHR System 60 and Excess Letdown Heat Exchanger 3.

TV-CC201A Reactor Coolant Pump Thermal Barrier 60 Cooling Water Return 4.

TV-CC201B Reactor Coolant Pump Thermal Barrier 60 Cooling Water Return

E5 E

I TABLE 3.6-1 (Cont.)

E E

MAXIMUM

1 VALVE ISOLATION TIME NUMBER FUNCTION (SEC.)

s, 5.

TV-CC200A Chilled Water From Containment Air Recir-60 culation Coils 6.

TV-CC2000 Chilled Water from Containment Air Recir-60 culation Coils R'

7.

TV-CC200C Chilled Water From Containment Air Recir-60 culation Coils

((

8.

TV-CC205A Chilled Water From Containment Air Recir-60 F'

culation Coils 9.

TV-CC205B Chilled Water From Containment Air Recir-60 culation Coils 10.

TV-CC205C Chilled Water From Containment Air Recir-60 culation Coils 11.

TV-CC204A Reactor Coolant Pumps, Cooling Water In 60 12.

TV-CC2048 Reactor Coolant Pumps, Cooling Water In 60 13.

TV-CC204C Reactor Coolant Pumps, Cooling Water In 60 14.

TV-CC202A Reactor Coolant Pumps and Shroud Cooling 60 Cooling Water Out

{

15. TV-CC2028 Reactor Coolant Pumps and Shroud Cooling, 60 T'

Cooling Water Out 8

16.

TV-CC202C Reactor Coolant Pumps and Shroud Cooling, 60 Cooling Water Out

5

o 5$

TABLE 3.6-1 (Cont.)

E MAXIMUM VALVE ISOLATION TIME c:

NUMBER FUNCTION (SEC.)

m 17.

TV-CC202D Reactor Coolant Pumps and Shroud Cooling, 60 Cooling Water Out 18.

TV-CC202E Reactor Coolant Pumps and Shroud Cooling, 60 Cooling Water Out 19.

TV-CC202F Reactor Coolant Pumps and Shroud Cooling, 60 Cooling Water Out m

S 20.

TV-BD200A Steam Cenerator Blowdown 60

[

21. TV-BD2008 Steam Generator Blowdown 60 22.

TV-BD200C Steam Generator Blowdown 60 23.

TV-BD2000 Steam Generator Blowdown 60 24.

TV-BD200E Steam Generator Blowdown 60 25.

TV-80200F Steam Generator Blowdown 60 C.

CONTAINMENT PURGE AND EXHAUST (VENTILATION DUCTS) 1.

MOV-HV200A*

Purge Supply NA

{

2.

MOV-HV200B*

Purge Supply NA 3.

MOV-HV202*

Alternate Supply NA 7'

oo C'

4.

M0V-HV200C*

Purge Exhaust NA 5.

M0V-HV200D*

Purge Exhaust NA 6.

MOV-HV201*

Bypass NA

4 TABLE 3.6-1 (cont.)

MAXIMUM gx VALVE ISOLATION TIME g

NUMBER FUNCTION (SEC.)

's D.

MANUAL E

. 4 w

1.

2-SI-47*

Safety Injection Accumulator Make Up NA 2.

2-RH-38*

Residual Heat Removal System to Refueling NA Water Storage Tank 3.

2-RH-37*

Residual Heat Removal System to Refueling NA Water Storage Tank 4.

(Deleted) h 5.

(Deleted)

[

6.

(Deleted) w 7.

(Deleted) 8.

2-DA-7*

Primary Vent Pot Vent NA 9.

2-DA-9*

Primary Vent Pot Vent NA 10.

2-CH-233#*

Reactor Coolant Pump Seal Water Supply NA 11.

2-CH-237#*

Reactor Coolant Pump Seal Water Supply NA l

6

~

8 TABIE 3.6-1 (Cont.)

d x

Es MAXIMUM VALVE ISOLATION TIME E

NUMBER FUNCTION (SEC.)

M to 12.

2-CH-241#*

Reactor Coolant Pump Seal Water Supply NA 13.

2-SA-65*

Service Air NA 14.

2-SA-123*

Service Air NA 15.

(Deleted) 16.

NA*#

Fuel Transfer Tube (Penetration #65)

NA 17.

2-CV-4*

Air Ejector Suction NA w

18.

2-RC-143*

Dead Weight Pressure Calibrator NA

[

19.

2-RC-145" Dead Weight Pressure Calibrator NA

^

20.

1-RP-84*

Refueling Purification Outlet NA 21.

2-RP-7*

Refueling Purification Outlet NA 22.

2-RP-6*

Refueling Purification Inlet NA 23, 1-RP-50*

Refueling Purification Inlet NA 24.

(Deleted) 25.

(Deleted) 26.

(Deleted) 27.

2-WT-437*

Steam Generator Wet Layup NA 28.

2-WT-438*

Steam Generator Wet Layup NA 7

29.

2-WT-439*

Steam Generator Wet Layup MA y

30.

2-WT-446" Steam Generator Wet Layup NA

5 TABLE 3.6-1 (Cont.)

U x

E MAXIMUM B

VALVE ISOLATION TIME NUMBER FUNCTION (SEC.)

E 31.

2-WT-447*

Steam Generator Wet Layup NA 32.

2-WT-448*

Steam Generator Wet Layup NA 33, 2-51-83*

liigh Head Safety Injection, MA (Boron Injection Tank Bypass) 34.

NA*

Fire Protection Supply (Penetration 34)

NA w2 E.

REMOTE MANUAL i

T 1.

MOV-QS201A*

Quench Spray Pump Discharge NA 2.

MOV-QS201B*

Quench Spray Pump Discharge NA 3.

MOV-RS255A#*

Recirc. Spray Pump Suction NA 4.

MOV-RS2558#*

Recirc. Spray Pump Suction NA 5.

MOV-2860A#*

LilSI Pump Suction From Containment Sump NA 6.

MOV-2860B#*

LHS1 Pump Suction From Containment Sump NA 7.

MOV-RS256A*

Recirculation Spray Pump Discharge NA 8.

MOV-RS256B*

Recirculation Spray Pump Discharge NA 9.

H0V-SW203A*

Service Water to Recirculation Spray Coolers NA 10.

MOV-SW2038*

Service Water to Recirculation Spary Coolers NA h

h

11. MOV-SW203C*

Service Water to Recirculation Spray Coolers NA 12.

MOV-SW203D*

Service Water to Recirculation Spray Coolers NA

,f

13. MOV-SW204A*

Service Water from Recirculation Spray Coolers NA

TABLE 3.6-1 (Cont.)

8y MAXIMUM m

VALVE ISOLATION TIME 3

NUMBER FUNCTION (SEC.)

I 14.

MOV-SW204B*

Service Water from Recirculation. Spray NA y

Coolers w

15.

MOV-SW204C*

Service Water from Recirculation Spray NA Coolers 16.

MOV-SW204D*

Service Water from Recirculation Spray NA Coolers 17.

TV-CV200*

Containment Air Ejector Suction NA 18.

MOV-2869A*

High Head Safety Injection to RCS Except NA Boron Injection Line u,

D 19.

MOV-2836*

High Head Safety Injection to RCS Except NA l3 Boron Injection Line cn 20.

MOV-2869B*

High Head Safety Injection to RCS Except NA-Boron Injection Line 21.

HCV-2142*

Reactor Coolant Letdown Line From RHR System NA 22.

(Dele ted',

23.

(Deleted) 24.

MOV-2890A*

LHSI Pump Discharge to Reactor Coolant System NA Hot Legs 25.

MOV-2890B*

LHSI Pump Discharge to Reactor Coolant System NA Hot' Legs 26.

MOV-2890C*

LHSI Pump Discharge to Reactor Coolant System NA Cold Legs

TABLE 3.6-1 (Cont.)

5 MAXIMUM y

VALVE ISOLATION TIME g

NUMBER FUNCTION (SEC.)

5 27.

MOV-2890D*

LHSI Pump Discharge to Reactor Coolant NA e

System Cold Legs g

N 28.

FCV-2160*

Loop Fill Header NA I u 29.

MOV-2289A*

Charging Line NA 30.

MOV-2867C*

High Head Safety Injection, Boron Injection NA Tank 31.

MOV-2867D*

High Head Safety Injection, Boron Injection NA Tank 32.

MOV-RS-200A*

Casing Cooling to Outside Recirculation Spray NA Pump 33.

MOV-RS-200B*

Casing Cooling to Outside Recirculation Spray NA w);

Pump 34.

MOV-RS-201A*

Casing Cooling to Outside Recirculation Spray NA os 4

Pump 35.

MOV-RS-201B*

Casing Cooling to Outside Recirculation Spray NA Pump 36.

TV-HC-208A Containment Atmosphere Sample Line NA 37.

TV-HC-208B Containment Atmosphere Sample Line NA 38.

TV-HC-200A Suction Hydrogen Analyzer NA 39.

TV-HC-2003 Suction Hydrogen Analyzer NA 40.

TV-HC-201A Discharge Hydrogen Analyzer NA 41.

TV-HC-201B Discharge Hydrogen Analyzer NA 42.

TV-HC-202A Suction Hydrogen Analyzer NA 43.

TV-HC-202B Suction Hydrogen Analyzer NA 44.

TV-HC-203A Discharge Hydrogen Analyzer NA

TABLE 3.6-1 (Cont.)

2 O

MAXIMUM y

VALVE ISOLATION TIME p

ll NUMBER FUNCTION (SEC.)

45.

TV-HC-203B Discharge Hydrogen Analyzer NA Ei y

46.

TV-HC-204A Suction Hydrogen Recombiner NA w

47.

TV-HC-204B Suction Hydrogen Recombiner NA 48.

TV-HC-205A Discharge Hydrogen Recombiner NA 49.

TV-HC-205B Discharge Hydrogen Recombiner NA 50.

TV-HC-206A Suction Hydrogen Recombiner NA 51.

TV-HC-206B Suction Hydrogen Recombiner NA hh 52.

TV-HC-207A Discharge Hydrogen Recombiner NA

[

53.

TV-HC-207B Discharge Hydrogen Recombiner NA E

j F.

CHECK 1.

2-CC-194 Component Cooling Water to RHR System and NA Excess Letdown Heat Exchanger 2.

2-CC-199 Component Cooling Water to RHR System and NA Excess Letdown Heat Exchanger 3,

2-SI-93 High Head Safety Injection, Boron NA Injection to RCS 1

4.

2-CC-302 Component Cooling Water to Containment Air NA Recirculation Coils i

5.

2-CC-289 Component Cooling Water to Containment Air NA Recirculation Coils

.j

,c l

1 E

t Az TABLE 3.6-1 (Cont.)

N g

max! Nun VALVE ISOLATION TIME ez NUMBER FUNCTION (SEC.)

q

-4 n

t' 6.

2-CC-276 Component Cooling Water to Containment Air Recircu-lation Colls MA i'

7.

2-CH-335 Charging Line NA 8.

2-CC-152 Component Cooling Water to Reactor Coolant Pumps MA 9.

2-CC-115 Component Cooling Water to Reactor Coolant Pumps MA i

10.

2-CC-78 Component cooling Water to Reactor Coolant Pumps MA 1

11. 2-CH-331 Reactor Coolant Pumps, Seal Water R'eturn NA

[

12. 2-51-136 Safety Injection Accumulator Make Up NA
13. 2-51-85 High Head Safety Injection.o RCS except Boron 1

Injection Line NA d

14. 2-HC-20 Discharge From Containment Atmosphere Clean-up System MA i
15. 2-HC-15 Discharge From Containant Atmosphere Clean-up System NA 16.

2-CH-308#

Reactor Coolant Pump Seal Water Supply NA

17. 2-CH-260f Reactor Coolant Pump Seal Water Supply NA 18.

?- 01-284#

Reactor Coolant Pump Seal Water Supply NA

19. 2-IA-428 Air Radiation Monitor Return NA Y
20. 2-RC-162 Primary Grade Water NA 21.

2-CH-332 Loop Fill Header NA 22.

2-IA-250 Containment Instrument Air Return NA e

1 E

=$

TABLE 3.6-1 (Cont.)

Ez#

MAXIMUM VALVE ISOLATION TIME E

NUMBER FUNCTION (SEC.)

-4 m

23.

2-51-132 Nitrogen to Pressurizer Relief Tank and SI Accumulators NA 24.

2-51-126 LHSI Pump Discharge to Reactor Coolant System Hot Legs NA 25.

2-51-128 LHSI Pump Discharge to Reactor Coolant System Hot Legs NA y

26.

2-SI-91 LHSI Pump Discharge to Reactor Coolant System Cold Legs NA

[

27.

2-51-99 LHSI Pump Discharge to Reactor Coolant System Cold Legs NA e

28.

2-51-105 LHSI Pump Discharge do Reactor Coolant System Cold Legs NA 29.

2-QS-2?**

Quench Spray Pump Discharge NA 30.

2-QS-11**

Quench Spray Pump Discharge NA 31.

2-RS-30**

Recirculation Spray Pump Discharge NA 32.

2-R5-20**

Reciruclation Spray Pump Discharge NA 33.

2-VP-24 Air Ejector Vent NA 34.

2-51-119 High Head Safety Injection to RCS Except Boron Injection Line NA 4

35.

2-51-107 High Head Safety Injection to RCS Except Baron "g,

Injection Line NA o

36.

2-FW-62#

Feedwater to Steam Generators NA 1

o 5

1 5

]

I TABLE 3.6-1 (Cont.)

?

E MAXIMUM gq VALVE ISOLATION TIME NUMBER FUNCTION (SEC.)

37.

2-FW-94#

Feedwater to Steam Generators NA 38.

2-FW-126#

Feedwater to Steam Generators NA 39.

2-WT-41#

Chemical Feed Lines NA 40.

2-WT-53#

Chemical Feed Lines NA t>

41.

2-WT-69#

Chemical Feed Lines NA

[

42.

2-FW-70#

Auxiliary Feedwater to Steam Generator NA 43.

2-FW-102#

Auxiliary Feedwater to Steam Generator NA 44.

2-FW-134#

Auxiliary Feedwater to Steam Generator NA 45.

2-RS-103#

Casing Cooling to Outside Recirculation Spray Pump NA 46.

2-RS-118#

Casing Cooling to Outside Recirculation Spray Pump NA 47.

NA Fire Protection Supply (Penetration 34)

NA

)

i M

b O

4

a f

n

r TABLE 3.6-1 (Cont.)

E MAXIMUM VALVE c

ISOLATION TIME z

NUMBER FUNCTION (SEC.)

a N

G.

STEAM LINE ISOLATION 1.

TV-MS201A#

Main Steam Line Trip Valve 5

2.

TV-MS2018#

Main Steam Line Trip Valve 5

3.

TV-MS2010#

Main Steam Line Trip Valve 5

M

[

H.

RELIEF s

1.

RV-2203 Letdown Line Relief Valve NA

  1. Valve not subject to Type "C" leakage test.
  • Valve position maintained by administrative control NA - Not applicable

b

a.-

0 e

4 e

ATTACllMENT 2 f

i i

h 1

DISCUSSION OF PROPOSED TECHNICAL SPECIFICATION CHANGE The proposed Technical Specification Change reflects a revision to Technical Specification 3/4.6.3.1 Table 3.6-1 to reflect the addition and deletion of containment isolation valves.

The addition of one direct-acting solenoid valve (TV-SS203A) is being used to replace two air-operated trip valves (TV-SS207A and TV-SS207B) to improve post-accident sampling capabilities.

The double isolation direct-acting solenoid valve is being installed to insure more reliable operation during accident conditions.

The addition of two air-operated trip valves (TV-DA203A and TV-DA203B) are being installed on the sample return line for the Post-Accident Sampling System in order to reduce radiation levels outside the containment when post-accident samples are being withdrawn from the reactor coolant system and containment sump. These valves will be normally closed and receive a Phase A signal to assure they are tripped closed on a safety injection signal.

The replacement of four manual valves (2-HC-13, 2-HC-29, 2-HC-18 and 2-HC-33) with sixteen remote operated manual valves (HC series valves) and the addition of remote manually operated double barrier isolation valves decreases personnel exposure to put the hydrogen analyzer and hydrogen recombiner into service and it also provides the capability of double isolation between containment atmosphere and all other systems.

The probability of occurrence or the consequences of a malfunction of equipment important to safety and previously evaluated in the FSAR is not increased because sampling system valve additions are designed consistent with codes and standards of the existing system and the replacement of containment isolation valves and the addition of double barrier isolation valves will maintain containment isolation capabilities.

The possibility of a different type of accident or malfunction than was previously evaluated in the FSAR has not been created because the sampling system valve additions do not change the characteristics of any system in operation during reactor operation and the containment atmospheric cleanup system is designed to Seismic Class 1 and single failure criteria.

The margin of safety as described in the BASIS section of any part of the Technical Specifications is not reduced because the upgrade and installation of containment isolation valves satisfies the seismic design criteria for safety related systems and continues to provide containment isolation integrity.

O