Forwards IE Insp Repts 50-269/82-04,50-270/82-04 & 50-287/82-04 on 820110-0210 & Notice of Violation
ML20050H710
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/05/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20050H492 List:
References
NUDOCS 8204140156
Download: ML20050H710 (2)


See also: IR 05000269/1982004

Text

r

4Jte

-

-

-

-

I

/

MAR 0 51982

Duke Power Company

ATTN: fir. W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

Subject:

Report Nos.M9/82-047 50-270/82-04, 50-287/82-04

This refers to the routine safety inspection conducted by Mr. W. Orders of this

office on January 10 - February 10, 1982, of activities authorized by NRC Opera-

ting License Nos. DPR-38, DPR-47 and DPR-55 for the Oconee facility.

Our

preliminary findings were discussed with f tr. J. E. Smith, Station llanager, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

'

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

One new unresolved item is identified in the enclosed inspection report. This

item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of itanagement and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

.

8204140156 820407

'

PDR ADOCK 05000269

0

PDR

m

.

.-

.

,

MAR 0 51982

Duke Power Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. J. Long, Acting Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosures:

1.

Appendix A, flotice of Violation

2.

Inspection Report fios. 50-269/82-04

50-270/82-04 and 50-287/82-04

cc w/encls:

J. E. Smith, Station flanager

bcc w/encls:

T4RC Resident Inspector

Document 11anageitient Rooni

State of South Carolina

I

l

l

l

l

!

RIl

RII

RI

f d onis

ht

F

g

3/ 2462

J/ /82

} /3 82

<