ML20050C632
| ML20050C632 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 03/24/1982 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Fiedler P GENERAL PUBLIC UTILITIES CORP. |
| Shared Package | |
| ML20050C633 | List: |
| References | |
| NUDOCS 8204090191 | |
| Download: ML20050C632 (2) | |
See also: IR 05000219/1981009
Text
_ _ _
_
_ _ _
_ _ _ _ _ _ _ - _ _
__ _________________-_________
-
,
.
.
24 MAR 1982
Docket No. 50-219
GPU Nuclear Corporation
g
ATTN: Mr. P. B. Fiedler
a
Vice President and Director
N
~
g
gg jED
0
Oyster Creek Nuclear Generating Station
P.O. Box 388
ppo o S W32 >{[.
-
Forked River, NJ 80731
O
93 ,", 7 ., .,.c. ~c a L
Gentlemen:
A
Es
un ky
n
-
Subject:
Inspection 50-219/81-09
- b,x
'
,
o, f W \\
This refers to the routine safety inspection conducted by Mr. K. PiiinTit of
this office on April 27-30, 1981, at the Oyster Creek Nuclear Generating
Station, Forked River, New Jersey, of activities authorized by NRC License No.
DPR-16 and to the discussions of our findings held by Mr. Plumlee with Mr. J.
Carroll and others of your staff on May 1,1981.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of procedures and representative records,
interviews with personnel, measurements made by the inspector, and observations
by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the requirements
of 2.790(b)(1).
The telephone notification of your intent to request withholding,
or any request for an extension of the 10 day period which you believe necessary,
should be made to the Supervisor, Files, Mail and Records, USNRC Region I, at
(215) 337-5223.
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
W
[DivisionofEngineeringandTechnical
. mas T. Mart
, Director
.],[f,
-
c ~h+
Programs
'
Q
RI:FRPS
RI:FRPS
TIB
Plumlee/mjd
Knapp
ogner
3/)l/82
3/;3/82
3/47/82
3/13/O
~r
/
OFFICIAL RECORD COPY
e204090191 820324
PDR ADOCK 03000
o
, e et
gj
-
__ ___- __ -- _ n f A
O
4 MNS IO02
GPU Nuclear Corporation
2
Enclosure:
Region I Inspection Report Number 50-219/81-09
cc w/ encl:
M. Laggart, Licensing Supervisor
J. Knubel, BWR Licensing Manager
Public Document Room (PDR)
local Public Docusent Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
bcc w/ encl:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
Director, DPRP
OFFICIAL RECORD COPY