$SMUD
~
SACRAMENTO MUNICIPAL UTILITY DISTR CT C 6201 S Street, Box 15830, Sacramento, California 05813; (916) 452 3211 March 22,.1982 e
DIRECTOR.0F NUCLEAR REACTOR RECUl.ATION ATTENTION DARREI.L G EISENilUT DIRECTOR C
4 DIVISION OF LICENSING U S NUCLEAR RECULATORY COMMISSION S
' RECg} ppg WASil1NGTON D C 20555 2
9
. APR 2 Ig C
sann% gggenmn & % p.Jg 9
DOCKET 50-312 g
a RANCI'O SECO NUCLEAR GENERATING STATION q
UNIT NO 1
/
NUREG 0612 CONTROL OF IIEAVY LOADS b
N As committed in a telephone discusalon among NRC (Mark Padovan and Fred Clemenson), Franklin Research Center (FRC) (Ian Sargent) cud the District (Jim Field) on January 26, attached is our written response to the Draft Technical Evaluation Report in which FRC examined our submittals called for by NUREG 0612.
The numbering of our response corrosponds to that of the Evaluation and Recommendations section of the draft FRC report.
L %ltLe J in J.lattimoe Assistant Ceneral Manay,er and Chief Engineer Attachment n
- 033
' sy '
e204050.m emo,22 DR ADoCK 05000312 PDR A s t t rcinic syst r u tipvNc voRt THAN c o c.c 9 0 IN THE HEAR ot CAttronnis
l 2.1.1 Oveg end llcavy Load llandling Systems As stated in our October '81 report hoist A-5 does not handle heavy loads over safety related equipment and is therefore excluded by Article 5.1.1 of NUREG 0612.
The District has implemented the requirements of NUREG 0612 for Auxiliary Bldg.
hoist A-1 as follows:
1.
The load path of this hoist is predetermined by the routing of the rail.
2.
SMUD Maintenance Procedure M135, Control of lleavy Loads, controls the use of this hoist.
3.
Only trained, qualified operators are permitted to operate this hoist.
- 4. No special lifting. devices are used with this hoist.
5.
Slings used with this hoist are controlled by SMUD Maintenance Procedure M133. Iland11ng, Inspection and Storage of. Lifting and Rigging Equipment.
f 6.
SMUD Surveillance Procedure 'SP201.06B provides for the periodic inspection f
of this hoist.
7.
A review of the hoist design against the requirements of CMAA-70 has been performed.
8.
The drop of all known heavy loads was analyzed.
Safety system equipment was not endangered by any-of-these drops.
The District has implemented the requirements of NUREC 0612 for the Reactor Building Jib Crane as follows:
1.
Load paths have been defined'for.the Jib Crane.
2.
SMUD Maintenance Procedure M30, Incore Monitor llandling and Disposal, controls the use of this crane.
3.
Only trained, qualified operators are permitted to operate this crane.
4.
No special lifting devices are used with this crane.
5.
Slings used with this hoist are controlled by SMUD Maintenance Procedure M133.
6.
SMUD Surveillance Procedure SP201.05B provides-for the periodic inspection of this hoist.
7.
A review of the hoist design against the requirements of CMAA-70 has been performed.
8.
Electrical interlocks and mechanical stops are being added to this crane to preclude traveling over the core.
\\
The District has implemented the requirements of NUREG 0612 for the Spent Fuel Pool stop log hoist as follows:
1.
There is no load path for this hoist since it can only make a vertical lift.
2.
SMUD is preparing a procedure for lifting the stop log.
3.
Only trained, qualified operators are permitted to cperate this hoist.
4.
No special lifting devices are used with this baist.
5.
Slings used with this hoist are controlled by SMUD Maintenance Procedure M133.
6.
SMUD Sutve111ance Procedure SP201.06C provides for the periodic inspection of this 1.oist.
7.
Since this hoist is to be replaced, no review.of its design has been performed.
The District has implemented the requirements of NUREC 0612 for the Turbine Building Gantry Crane as follows:
1.
Only trained, qualified operators are permitted to operate this crane.
2.
No special lifting devices are identified for lifts in or over the Spent Fuel Building.
Special lifting devices may be needed wh n handling a spent fuel shipping cask.
3.
Slings used with this hoist are controlled by SMUD Maintenance Procedure M133.
4.
SMUD Surveillance Procedure SP201.06 provides for the _ periodic inspection of this crane.
l 5.
A review of the cranc design against the requirements of CMAA-70 has l
been performed.
i l
6.
Limit switches control the movement of the crane in and over the Spent L
Fuel Building.
I i
l l
l ri
2.1.2 Safe Load Paths Load paths have been defined and placed in operating procedures. Changes to these procedures require plant safety review committee approval.
In defining these paths, the District used the following criteria:
1.
Travel over irradiated fuel and safe-shutdown equipment should be avoided.
2.
Path length shall be minimized.
3.
Changes in direction, elevation, and hoist and travel speeds shall be minimized.
4.
Path shall follow structural members if criteria 1-3 are not compromised in doing so.
It is the District's position that to extend load paths will result in a decrease in plant safety.
Load paths will not be marked on flonrs.
Superposition of numerous load paths would assuredly confuse the crane operator or spotter and increase the probability of a load drop. An "exclusioc zone" has been marked around the core.
2.1.3 Load llandling Procedures Procedures have been established for the handling of all identified " heavy loads" that are or could be handled over or in proximity to irradiated fuel or safe shutdown equipment. These procedures contain drawings on which the load paths are clearly marked.
In addition, Administrative Procedure 3. Work Request has been revised to require notification of a maintenance engineer or shift supervisor whenever a heavy load is moved in the Auxiliary Building, P.cactor Building, Reactor Yard or Spent Fuel Building.
If required, the engineer or shift supervisor would prepare a new procedure for the lift per District Maintenance Procedure M135, control of IIcavy Loads prior to moving the load.
2 L.
4 i
e 1
t
4 1
l i
2.1.4 Crane Operator Training I
.t I
(No response required) j I
e i
i l
I l
1 1
i I.
1 4
t i
t 4
i I
,[
i l
f l,
I
. t b
r I
h
,k a
i l
1 i
i i
k o
i e
s.
s t
L d
3 8
)
i 1
k i
I I
i e
i i
k L
l I<. _ _. _ _ _ _. _ _ _ _. _ _ _. _,. _.. _. _ _ _
~... _ _, _
2.1.5 Special Lifting Devices The District's special lif ting devices were designed and fabricated prior to the issuance of ANSI N14.6-1978. They were designed and fabricated to industry standards in effect and good engineering practice.
Our consultant, Quadrex Corporation, has made a comparison of the features of our special lifting devices and the.provisione of ANSI N14.6-1978 to the extent that available information' permitted.
Attached are the results of this exercise.
The District does not plan any modification to 'our special lif ting devices as a result of this investigation.
F s
4 v
f l
l l
l l
\\
l P
3 Evaluation of Polar Crane Lifting Devices t
The following documents were reviewed to evaluate the lifting devices used for load handling with the polar-crane.
a.
Head and Internals Handling Fixture Assembly i
- B&W Drawing No. 117830E (reference 11)
- B&W Drawing No. 117832E (reference 11) b.
Internals Handling Extension
- B&W Drawing No. 105737D (reference 12) c.
Internals Handling Adapter Pendant
- B&W Drawing No. 117809E (reference 19) d.
Internals Indexing Fixture
- B&W Drawing No. PD-28262 (reference 18) e.
Slings uaed for lifting missile shield
- Bechtel Drawing No. C-403 (reference 15) f.
Head and Service Structure Fixed Pendants
- B&W Drawing No. 196908E (reference 16)
- B&W Drawing No. 196910E (reference 17)
- B&W Drawing No. 178173C (reference 17)
[
l g.
Turnbuckle Pendant Assembly
- B&W Drawing No. 133311C (reference 14)
These lifting devices used with the polar Crane were evaluated to determine their adequacy in accordance with the applicable sections of ANSI N14.6-1978 and ANS1 B30.9-1971.
In this evaluation, a dynamic loading factor of 1.25 was used which is consistent with the previous evaluation reported in amendment 15, appendix 9A of the FSAR (reference 22).
Evaluation results showed that the lifting devices, except the Internals Handling Extension, satisfy the ANSI stress criteria. The nominal lifting load for this device is 352 kips, and the test load is 528 kips. The actual load is 237 kips.
Thus, even though its capacity per ANSI N14.6-1978 could not be determined, the device is considered adequate, as the test load far exceeds the actual load.
It is noted here that the above evaluation was based on stress design factors specified in section 3.2.1.1 of ANSI N14.6-1978:
three for checking with the l
i
yield stress, and five'for checking with ultimate stress. Doubling these fictors per section 6 of ANSI Ni4.6-1978 (i.e., using six times and ten times tl'e static plus dynamic loads for checking with the yield stress and the ultimate stress, respectively),, is not considered justified for the following reasons:
a.
For conventional structural and stress analysis of tension members, a margin of safety of 1.5 is typically used, which is equivalent to using a stress design factor of 1.5.
Unless the uncertainties of the load, the material, and the analyses method are extreme, the use of a very high stress design factor does not increase the real margin of safety, f
In other words, if the reliability is likely to be close to 100 percent with a stress design factor of 3.0, increasing this factor to six cannot increase the reliability any further, b.
Lifting devices used in Rancho Seco Plant undergo periodic inspection and load test.
This reduces the uncertainties significantly and should enable the use of lower stress design factors.
i l
l l
)
S teru.mx A-1 RANCHO SECO NUCLEAR GENERATING STATION - UNIT 1
Subject:
Control of ifeavy Loads - Lifting Devices used with Polar Crane Review Check Sheet Review Area Stress Design Factors in Approved by "I
Accordance with Nf51 N14.6-1978 Reviewed by A. Adel-Afshari Date Co. S. S I Date 6-2-81
- S = SATISFACTORY M = MORE INFORMATION REQUIRED N = NOT SATISFACTORY IT'EM REVIEWED / REFERENCE STATUS
- COM:<ENT REFERENCE (5,M,N)
DOCUMENTS Liftino Device for Reactor Closure liead 1.
Head & Internals Handling B&W Drawing NJ. 117830h Fixture Assembly (Rev. 1) (Reference ell) a) " Tripod" S
b) Horiz. Members S
c) " Tripod" Pin S
2.
Internals Handling Extensiori.
M No.minal lifting load = 352,000 lb' B&W. Drawing No. 10573709 Test load - 528,000 lb (Reference 512)
Actual load lifted = 237,000 lb.
Material specification not availabic.
Hence, yield and ultimate capacity per ANSI N14.6-1978 cannot be checked.
/
APeco1/ A-1 RANCHO SEC0 N'JCLEAR GENERATING STATICN - UNIT 1
Subject:
Centrol of Heavy Loads - Lifting Devices used with Polar Crane Review Check Sheet O.
f ul tr Y Review Area Stress Design Factors in Approved by
\\
7 ccordance with ANSl N14.6-1978 Reviened by 5.
. <enathan Date C
b $l Date 6-2-81
- S = SATISFACTORY M = MORE INFO MATICN REQUIRED N = NOT SATISFACTORY ITEM REVIEWE0/ REFERENCE STATUS
- COMMENT REFERENCE (5,M,N)
DOCUMENTS 3.
R.V. head & Service Struc.
S Satisfies ANSI N14.6-1978 except for B&W Drawing 1969CSE Fixed Pendaats (including.
the following:
through 196910E and 17S173C lifting rod) a) Clovis Assembly - material property (References 16 and 17) not specified.
Is OK if A-533 Class 1 steel.
b) Lifting Lug (MK-34)on RV Head -
Material type not specified.
OK if A-36 steel assumed.
The full penetration weld material is not given.
OK if E60xx used.
(DWG.
13 696E) c) PIM - Yield strength is above 80".
of ultimate strength.
Is OK if safety factor of 5 ll.R.T. ultimate and 3 W.R.T. yield are applied.
b APPU; Dix A-1 RANCHO SECO NUCLEAR GENERATING STATION - UNIT 1 I
Subject:
Control of Heavy Loads - Lifting Devices used with Polar Crane Review Check Sheet
, p_p, f Review Area Stress Design Factors in Approved by 7.E6rdance with7NSI N14.6-1978 Reviewed by S. Chieam.baranathan Date
($. S1. G l 6-2-81~
- S = SATISFACTORY Date M = MORE INFORMATION REQUIRED N = NOT SATISFACTORY ITEM REVIEWED / REFERENCE STATUS
- COMMENT REFERENCE DOLUMENTS (S M,N)
B&W Drawing 196909E 4.
Turnbuckle Pendant Assembly S
(Reference #17)
B&W Drawing 133311C (Reference #16)
W
~
y m
n
APPEMD1X A-2 RANCHO SEC0 NUCLEAR GENERATING STATION - UNIT 1
Subject:
Control of Heavy Loads - Lifting Devices Used with Polar Crane Review Check Shaet Review. Area Stres's Design Factors in
[
Approved by
'1 6 t._f.
~
Tcordance wTtFAIT51 N14.6-1976 Re(iewed'by S: biidambaranathan Date db - fl $11
/ ;3
~s Date-6-4-81
- S = SATISFACTORY
/
M = MORE It; FORMATION REQUIRED N = NOT SATISFt.CTORY
~
4 ITEM REVIEWED STATUS =
COMMENT REFERENCE (S.M,N)
DOCUMENTS Interr.als Handling Pendant B&W Dwg. flo. 117812E, 117816E, 117818E, 1.
(Reference s19) 2.
Liftir.g Eye (Item MK263)
S 3.
Connecting Rod (Item MK 257)
S 4.
Pendant Assembly (A252)
S x
"v'.
e' e*
~
APPENDIX A-3 p
RANCHO SEC0 NUCLEAR GENERATING STATION - UNIT 1
Subject:
Control of Heavy Loads - Lifting' Devices Used with Polar Crane Review Check Sheet s
I
~
Review Area Stress Design Factors in
'ApprovedI)y Tc~orEnce witiGN51 N14.6-1978)
-n Date
- b.,Q. O.I
_ Revi2ued t,y A. Adel-Afshari Date 6-2-81
~
, S = SATISFACICRY
[
M = MORE IriFORMATION REQUIRED f
N = NOT SATISFACTLkY 1
l ITEM REVIEWED STATUS
- COMMENT REfEREtiCE I
- 6 M,N)
DOCU:lENTS i
Lifting Devices for Core Suncort and Plenum Assembly i
1.
Head & Internals Handling S
B&W Drawing 117830E Fixture (Reference #11) 2.
Internals Handling Adapter S
B&W Drawing 117800E Pendant
' (Reference #19),
3.
Internals Handling Extension M
See Coment under Lifting Devices for B&W Drawing 1057370 Reactor Closure Head & Service Struc-(Reference #12) ture.
b o
s,... u'.2 x
~ ~ ~ ~ '
.-+
\\
RANCHO SEC0 NUCLEAR GEflERATIfiG STATION - UNIT 1
}
Subject:
Control of Heavy Loads - Lifting Used with Polar Crane i
Review Check Sheet t
0 Approved by IW I
Review Area Stress Design Factors
_4 (ANSI N14.6-1978)
Date E-
- 29. $ /
Reviewed by A. Adel-Afshari t
- 5 = SATISFACTORY Date 5-27-81 3
M = !! ORE If;FOR'iATION REQUIRED N = NOT SATISFACTORY i
i ITEli REVIEWED STATUS
- C0!OtENT REFERENCE DCCUMENTS (5,M,N) j Sling for Liftina Missile Shield i
Bechtel Drawing )
1.
1.
Chain Shackle S
No. C403 (Rev. 3 S
(Reference #15) 2.
Wire Rope 5
3.
Lifting Lug S
4.
Link 5.
1.'al d S
6.
Embedded Plate S
S 7.
Concrete
2.1.6 Lifting Devices Due to the conservative design of cranes for nuclear power plant use, travel speeds and therefore dynamic loads are relatively low.
A?!SI R30.9-1971, the standard to which the District procures slings requires a factor of safety of 5 for wire rope slings and 9 for nylon slings.
The District has a formal inspection program for slings which is defined by Maintenance Procedure M133, Handling, Inspection and Storage of Lifting and Rigging Equipment.
For these reasons, it is the District's position that the application of an additional factor of safety will not measurably reduce the probability of a sling failure. Slings will be selected as dictated by the Rancho Seco Safety Manual (AP-5) and the manufacturer's rating.
a L
2.1.7 Cranes (Inspection, Testing and Maintenance)
All of the requirements for inspection, testing and maintenance of cranes called for in Chapter 2-2 of ANSI B30.2-1976 are contained within the maintenance and surveillance programs at Rancho Seco, with the er.ception that limit switches are verified at the beginning of each refueling outage rather than daily.
e I
i l
I
2.1.8 Crane Design Our consultant, Quadrex Corporation, has made a' comparison of the design features of our crar,es and the provisions of CMAA-70 and ANSI B30.2-1976.
The results of this exercise is attached.
The District does not plan any modifications to our crancs as a result of this_ investigation.
4 A
4 1
l l
{
l l
1 l
l I
i i
/
Review of Cranes The Polar Crane and the Can:ry Crane were designed according to EOC1 and AISC specifications and USAS B30.2 standard. The design specifications of these cranes were reviewed for compliance with the applicable guidelines of CMAA specification 70.
The review result showed that the cranes satisfy the general guidelines and ir. tent of CMMA specification 70 which are applicable for evaluating the potential for heavy load drop, with the exceptions of few items for which additional data are necessary.
l l
l l
i 1
l l
l l
Evaluation Summary for the Polar Crane The following documents were reviewed to evaluate the Polar Crane Design:
- Bid Specification and Drawings, Invitation No. C18.1 (reference 7).
- Polar Crane Girder Design by Harnischfeger Corporation (SMUD No. 6292-C18.03-4-1) (reference 23).
The polar crane was originally designed in accordance with the EOC1 and AISC specifications and USAS B30.2 standard.
Quadrex's review of the above-mentioned crane documents showed that the crane design satisfies the pertinent guidelines of CMAA specification 70 (reference 6) and ANSI B30.2-1976 (reference 4), except as follows:
a.
Torsion in Girder - Review of the above documents did not s
provide data on torsion in the girder resulting,from the starting and stopping of the bridge motor. However, this is not considered significant because of_the following reasons:
1.
Torsional stresses are likely.to be small for box-section girders; and 2.
The girders have flexible end ties.
b.
Trolley Frame - Section 3.7 of reference 6 (CMAA70) specifies the allowable stresses in the trolley frame which are independent of the type of steel. The design specification (reference 7) refers to AISC specification for allowable stresses.
Even though a direct comparison is not possible, use of AISC allowables is considered adequate.
Gears - Section 7.04H of the purchase specification (reference 7) c.
identifies the general and design requirements qualitatively.
This meets the intent of section 4.6 of CMAA70. A quantitative evaluation was not considered necessary for meeting the objective of NUREG 0612.
d.
Bearings - According to CMAA70, section 4.6, the maximum allowable pressure on the bearings is 1000 psi, which is less than the allowable pressure (1300 psi) specified in the purchase specification. Hence, actual design pressure data is required for a conclusive evaluation.
However, because of the margin of safety inherent in the code allowable values, the use of 1300 psi allowable bearing pressure would not cause any safety problem.
Shafts - Section 7.02G of the purchase specification (reference 7) e.
identifies the general and design requirements qualitatively.
This meets the intent of section 4.9 of CMAA70.
A quantitative evaluation was not considered necessary for the overall safety assessment of the crane.
t I'
f.
Wheels ; Section '4.11 of.'ChA70 provides, among other requirements, '
recommended-maximum' wheel loads to be used as'a. guide for-determining wheel sizes' based primarily on the objective of reducing undue wear. Section 7.04F of the purchase specification (reference?7) does not provide.any such specific recommendation.
However, che general and qualitative design requirements
?specified therein meet-the guidelines of CMAA70.
g.
Bumpers and Stops - Section 4.12.3 of CMAA70 provides requirements for trolley bumpers.which.should be capable of stopping the
~
trolley with power off (not' including'the lifted load).
Even though no's'uch spe'cific requirement has been~specified in the purchase specification-(reference 7),: evaluation of.the bumpers and stops per general AISC-stress. criteria is. considered 1
. adequate.
Evaluation Summary of Jib Crane i
a%>
.y
' The following documents were revidwed, to evaluate -the j ib crane design.
9
~
a.
Bid and Specifications for Miscellaneous 'Crancs and Hoists, Bid Request No. C29.0l;(reference [8); l'!;;i.F g
- b. 'Heco-Pacific Manufactu'ing Company Drawing No.-D-1774-1 (SMUD r
No. 6292-C29.01-49 1) (referende.27)'.!
l' 7
7 Telecon'between W. Nichis of Yale industrial Products'and-f c.
l:
P. Kaul of Quadrex (reference 25)r
\\'
e i
d.
Whiting Crane l' Handbook- (4th Edit f*oE)~
The above listed documents -have,been reviewed f or compliance with i
' the pertinent guidelines of' C}UVi Specification 70. ' Review results
^
sh' owed that the crane design meets CMAA70 guidelines except as follows:
a.
Running Sheaves - From reference 25, the pitch diameter of the-running sheaves was determined to be 8.4375 inches'which is.
lesn'than the. minimum pitch diameter of'10.5l inches specified-
~
in section 4.3.2 of CMAA70. However,-since this requirement is based on an approximate criteria (i.e., 24 times the diameter of the rope).
the deviation is considered within the margin-of-safety built into the criteria, and'is not considered.significant from a safety point-of-view.
Auxiliary Bridge Crane Quadrex reviewed the-following documents to evaluate the adequacy of the auxiliary bridge crane per.CMAA70 specification.
l a.
. Request for Bid and Specifications for the purchase of Miscellaneous l
Bridge Crane and Hoists - Bid Request No. C29.01 (reference 8).
l l-b.
Heco-Pacific Manufacturing, Incorporated Drawing No. D-1704-1 (Bechtel No. C29.01-1-S1) (reference 29).
r
SMUD review showed that no heavy loads are moved by this crane over the reactor vessel or any other safety-related component. Hence, this crane can be excluded from the list of cranes in table 2-1.
New Fuel Handling Bridge Crane Quadrex reviewed the following documents to verify the new fuel handling bridge crane design per CMAA70 specifications.
a.
Request for Bid and Specifications for the Purchase of Miscellaneous Bridge Crane and Hoists - Bid Request No. C29.01 (reference 8).
b.
Heco-Pacific Manufacturing, Incorporated Drawing No. D-1704-3 (Bechtel No. 6292-C29.01-3-2 (reference 30).
However, since this crane is used to move loads which are either fuel assemblies or which weigh less than a single fuel assembly, no additional review was considered necessary for the purpose of satisfying the intent of NUREG 0612.
Evaluation Summary of Gantry Crane The following documents were reviewed to evaluate the gantry crane design:
a.
Bid Specification and Drawings, Invitation No. C18.1 (reference 7).
b.
Design Calculations for Gantry Crane by Lakeside Bridge and Smeel Company (SMUD No. 6292-C18.02-9-1) (reference 24).
The gantry crane was originally designed in accordance with the EOCI and AISC specification. Quadrex's review of the above-mentioned crane documents showed that the crane design satisfies the pertinent guidelines of CMAA specification No. 70 (reference 6) and ANSI B30.2-1976 (reference 4),
except the items listed in section 2.2.1(a) through (f).
Auxiliary Building Monorail Hoists l
Table 2-1 lists the heavy loads handled by the two 10-ton monorail hoists in the auxiliary building. The weights of the floor plugs were calculated from the building structural drawings. The hoists were reviewed using the relevant sections of CMAA70 specification. Lifting device (slings) data are not available and so these could not be evaluated.
It is recommended that the evaluation be done by either direct field measurements or by obtaining data from the vendor, if available.
Evaluation Summary of the Monorail Hoists The following documents were used to evaluate the monorail hoist design:
a.
Request for Bid and Specifications for the Purchase of Miscellaneous l
Bridge Crane and Holsts - Bid Request No. C29.01 (reference 8).
b.
Detroit Hoist and Machine Company Drawing No. 15049 (Bechtel No. 6292-C29.01-22-1) for item A-1 (reference 31).
i
I c.
Detroit Holst and Machine Company Drawing Nos. 15054-B and 15110 (Bechtel No. 6292-C29.01-34-0 and No. 6292-C29.01-31-0 for item A-1) reference 35).
d.
Heco-Pacific Manufacturing,-Incorporated Drawing No. W-168611 (Bechtel Log No. 6292-C29.01-15-S1),.for item A-5 (reference 33).
~
c.
Heco-Pacific Manufacturing, Incorporated Drawing No. D-1704-18 (Bechtel Log No. 6292-C29.01-18-1) for item A-5 (reference 32).
f.
Bechtel Corporation Drawing No. C-566 sheet 13 Showing Monorail Plans (reference 34).
g.
Telecon between P. Kaul of Quadrex and Ms. Lil of Detroit-Holst and Machine Com any for item A-1 (reference 26).
y h.
Telecon between P. Kaul'of'Quadrex and+W. Nicois of Yale Industrial Products for item A-5 (reference 25).
The monorail hoists. satisfy the pertinent guidelines of CMAA70 (reference 6) except as follows:
Trolley Frame for Both Monorai_ls - See section 2.2.l(b).
a.
b.
Sheaves for Both Monorails - From reference 25 and 26, the pitch diameter of the running sheaves was determined to be 10.0 inches (for monorail A-1) and 10.63 inches (for monorail A-5).
CMAA70 requires a minimum diameter of 13.5 inches and 12.0 inches respectively for A-1 and A-5.
However, since these requirements are based on an approximate criteria, the deviations in the sheave diameters are within the margin of safety built into the criteria, and are not considered significant for the purpose of evaluating the potential of dropping heavy load.
c.
Drums for Monorail A The actual pitch diameter of the drum is 11.61 inches which is less than CMAA minimum requirement of 13.5 inches. Again, for the reasons stated in item b above, this deviation is not considered significant.
d.
Trolley and Holst Brakes - From the discussion with the manufacturer of monorail A-1, it seems that it is a common industry practice to provide these brakes capable of withstanding 100 to 125% of the motor torque, which would satisfy CMAA criteria.
c.
Bumpers and Stops - See section 2.2.l(g).
Evaluation of Electrical Equipment The electrical components of the cranes listed in table 2-1 were reviewed to determine their conformance to CMAA70 specification (section 5.0).
This review was concentrated mainly on the safety-features, such as limit switches, and controls.
Review of the purchase specifications (references 7 and 8) indicates that the requirements specified there would meet the intent of the CMAA70 specifications.
~
Aw u o u, A RANCHO SEC0 NUCLEAR GENERATING STATION - UNIT 1.
Subject:
Control of Heavy Loads (Review of Poiar Crane Design)
Review Check Sheet a
1 MR i.
Review Area Structural / Mechanical Approved by 1,
- w Reviewed by Arvind Gupta Date Co - O bf Date 6-4-81
- S = SATISFACTORY M = MORE INFORMATION REQUIRED
!! = NOT SATISFACTORY ITEM REVIEWED / REFERENCE STATUS
- COMMENT NEFERENCE (S,M,N)
DOCUMENTS C.M.A.A. SPECIFICATI0N #70 A. Structural Design
- 1. Invitation fio. C18.1 by
- 1. Section 3.1: Material S
Bechtel Corporction, December 22, 1959 (Rev.,f)
- 2. Section 3.2: Welding S
- 3. Section 3.3: Girders (a) Sub-Section 3.3.1: General 5
- 2. Girder Design Data by (b) Sub-Section 3.3.2: Loadings M
See Gantry Crane Review (Appendix E)
Harnischfeccr Corporation, 292-C13 03 *-1 IfR (c) Sub-Section 3.3.3.1: Welds S
2 in box girders (d) Sub-Section 3.3.3.1.1: Box S
girder proportions (e) Sub-Section 3.3.3.1.2:
S Longitudinal Stiffeners
iacu,u t s a RANCHO SECO NUCLEAR GENERATIN3 STATION - UNIT 1
Subject:
Centrol of Heavy Loads (Review of Polar Crane Design)
Review Check Sheet D
7 kcSA
(.
Review Area structural / Mechanical Approved by I
!. oLM Revie'..ad by Arvinti Gunta Date (o
S S l Date 6-4-81
- 5 = SATISFACTORY M = MORE INF0F0:ATIO" REQUIRED N = NOT SATISFACTORY
! TEM REVIEWED / REFERENCE STATUS
- COMMENT RE)ERENCE (5,M,N)
DOCUMENTS t,
(f) Sud-Section 3.3.3.1.3: Basic S
allcuable stresses (g) Seb-S ctica 3.3.3.1.4:
S Stiffened plates in ccm-pressicn (h) Sub-Section 3.3.3.1.S: Dia-S pirain and vertical stiff-Oners (i) Sub-Secticn '3.3.3.1.5: De-S flection and camber
~
- 4. Secticn 3.4:
Bridge and trucks S
S. Section 3.S:
Fcotwalks and S
Handrails
- 6. Section 3.S: Cperator's Cab S
- 7. Section 3.7: Trolley Frames M
Cesign calculation not available to verify actual stresses.
6
\\
'Appu.uix A RANCHO SEC0 fiUCLEAR GE!!ERATING STATION - UNIT 1
Subject:
Control of Heavy Loads (Review of Polar Crane Design)
Review Check Sheet Review Area Structural / Mechanical Approved by h
i ;;
Reviewed by Arvind Gupta Date (o 8. $ !
Date 6-4-81
- S = SATISFACTORY M = MORE INF0PJ4ATION REQUIRED fl = NOT SATISFACTORY s
ITEM REVIEWED / REFERENCE STATUS
- COMMENT REFERENCE (5,M,N) 00CUMENTS
- 8. Section 3.8:
Rails S
- 9. Section 3.10:
Repeated load S
condition B. Mechanical Design
- 1. Section 4.1:
Lead blocks S
- 2. Secticn 4.2:
Hoisting ropes S
- 3. Section 4.3: Sheaves S
- 4. Section 4.4:
Drum S
- 5. Section 4.5: Gearing M
Purchase spec. in Sec. 7.04H not directly comparable.
- 6. Section 4.6: Bearings M
Allo. able bearing pressure of 1300 psi per purchase spec. exceeds CMAA allow-able of 1000 psi.
Hence, actual de-sign bearing pressure data is needed.
Aa e.s;x A RANCHO SECO t'UCLEAR GENERATING STATION - UNIT 1
~
Subject:
Control of Heavy Loads (Review of Polar Crane Design)
Review Check Sheet uM[ ar ]
Review AreaStructural/ Mechanical Approved by 1
a Revietted by Arvir.d Gupta Date Date 6-4-81
- S = SATISFACTORY M = MORE INFORMATION REQUIRED N.=
NOT SATISFACTORY ITEM REVIEWED / REFERENCE STATUS
- COMMENT REFERENCE (S,M,N)
C0CUMENTS 7.'Section 4.7:
Brakes 5
- 8. Section 4.8:
Bridge drive S
- 9. Section 4.9:
Shafts M
Information not available to allow comparisen with purchase spec. Sec.
7.02G.
- 10. Section 4.10: Coupiings S
- 11. Section 4.11: Wheels M
No information available in purchase spec. for comparison with CMAA spec.
4.11.3 to 4.11.S.
- 12. Section 4.12: Bumpers & stops M
No information available in purchase spec. to check CMAA spec 4.12.1.1 to 4.12.4
7
'y.
^
sec e u.a u :.
RANCHO SEC0 NUCLEAR GENERATING STATION - UNIT 1 I
Subject:
Control of Heavy Loads (Review of Polar Crane Design)
Review Check Sheet Approved by k-Review Area tructural/ Mechanical s
t.
Reviewed by Arvind Gupta Date C. S. Sl Date 6-4-81
- S = SATISFACTORY M = MORE INFORMATION REQUIRED N = NOT SATISFACTORY ITEM REVIEUED/ REFERENCE STATUS
- COMMENT REFERENCE (S,M,N)
DOCUMENTS CHAFTER 2-1 0F ANSI B30.2-1976 Section 2-1.1: Marking.
S Section 2-1.2:
Clearances S
Section 2-1.4:
Crane Construction S
Section 2-1.5:
Cabs S
Section 2-1,6: Lubrication S
Section 2-1.7:,Footwalks & Ladders S
Secticn 2-1.8:
Stops, bumpers, M
Not enough information available in Rail sweeps & guards purchase specs for verification.
Section 2-1.9:
Brakes S
Section 2-1.11: Hoisting equipment S
t
APPU.att u
[
RANCHO SECO fiUCLEAR GEt;ERATIriG STATI0ti - UNET 1 Control of Heavy Loads (ST Jib Crane - Reactor Sidg)
Subject:
Review Check Sheet D
bAM tc
\\.
fs Approved by Review Area Mechanical Design bo 54
$}I Date S. Chidambaranathan Reviewed by
- S = SATISFACTORY 6-2-81 Date M = MORE IriFOR'4ATION REQUIRED t1 = tiOT SATISFACTORY ITEM REVIEWED STATUS' COMMENT REFERE!;CE DOCU 4EtiTS (S,M,ti)
MECHA'ilCAL DESIGil Ct!An SPEC. c70
- 1. Bid Request flo. C29.01.
5 (Reference #8) 4.1 Load Blocks
- 2. SMUD Drawing tio.
6292-C29.01-49-1 (Reference.27) 4
- 3. Telecon of June 1,1931 S
4.2 Hoisting Ropes to U. flicols of Yale Industrial Products.
(Reference #25)
- 4. Whiting Crane handbcok (4th Edition) 9
...A APPU.uix u RANCHO SEC0 NUCLEAR GENERATING STATION - UNIT 1
Subject:
Control of Heavy Loads (ST Jib Crane - Reactor Bldg)
Review Check Sheet Approved by
\\
Review Area Nechanical Design _ _
Date
- b. b. 9 l Reviewed by S. Chidambaranathan
- S = SATISFACTORY l
Date 81 M = MORE INFOR'4ATION REQUIRED l
N = NOT SATISFACTORY ITEM REVIEWED STATUS
- COMMENT F
i (5,M,N) 4.3 Sheaves 4.3.1 Material S
4.3.2 Pitch diameter of running sheaves N
Bottom block sheave pitch diameter =
8-7/16" minimum = 24x7/16 = 10.5" not OK (Reference 25) 4.4 Drum 4.4.1 Material S
4.4.2 Wrapping of hoisting S
rope 4.4.3 Groove types 4.4.3.1 Groove Depth 5
4.4.3.2 Groove Pitch S
4.4.4 Pitch Diameter of Drum S
4.5 Gearing M
No infomation available.
M No information available.
4.6 Bearings e
APPu.ut x u RANCHO SECO NUCLEAR GENERATING STATION - UNIT 1
Subject:
Control of Heavy Loads (ST Jib Crane - Reactor Bldg)
Review Check Sheet WN Revie.i Areallechanical. Design Approved by b
k SI Date Reviewed byS. Chidambaranathan Date 6-2-81
- S = SATISFACTORY M = MORE INFORMATION REQUIRED N = NOT SATISFACTORY ITEM REVIEWED / REFERENCE STATUS
- COMMENT REFERENCE 00CUMENTS (S,M,N) 4.7 Brak.cs 4.7.3.3 Trolley M
No informat. ion available.
4.7.4 Hoist (Holding)
M Holding brake is provided but the torque rating is not given.
4.7.5 Hoist (Control S
4.11 Wneels 4.11.1 Treads M
Trolley wheels should have straight treads and drive wheels should have matching diameters within certain tolerances.
This information not given.
4.11.2 Material S
4.11.3 Loads S
4.11.4 Clearance S
4.12 Bumpers and Stops 4.12.3 S
~
4.12.4 S
l
APPLMDix C
~
RANCHO SECO NUCLEAR GEfiERATING STATION - UNIT 1
Subject:
Control of Heavy Loads - Auxiliary Bridge Crane (Reactor Bldg.)
Review Check Sheet O '(
\\
\\c t'
' Review Area Mechani' cal / Structural Design Approved by T
evvu Reviewed by S. Chidambaranathan Date (3. f C. 9,l Date 6-8-81
- S = SATISFACTORY M = l' ORE INFORMATION REQUIRCD N = NOT SATISFACTORY ITEM REVIEWED STATUS
- COMMENT REFEREt:CE (5,M,N)
DOCU"ENTS C.M.A.A. #70 70-3 STRUCIURAL DESIGN 3.1 Matarial M
Structural steel material type not
- 1. Bid Request No. C29.01.
specified.
(Reference e8) 3.2 Walding M
Uelding design and procedures not described.
- 2. Hecc-Pacific Orawing No. D-1704-1.
3.3 Girdars 3.3.1 S
(Reference #29) 3.3.2 M
Vertical, lateral, torsion design leadincs could not be verified be-cause of lock of data.
3.3.2.2 M
Dasign load combinations not given for verification.
3.3.3 Not Applic able (fi/A) 3.3.3.3 M
Maximum vertical deflection not given to check with allcwable bending stresses also could not be verified due to lack of, data.
RANCHO SEC0 NUCLEAR GENERATING STATION - UNIT I
Subject:
Control of Heavy Loads - Auxiliary Bridge Crane (Reactor Bldg.)
Review Check Sheet
' [) 7 m -]'
k' Review Area Mechanical / Structural Design Approved by Reviewed by S. Chidambaranathan Date' sk. f('>. f3 /
_ 81
- S = SATISFACTORY 6
Date M = MORE INFOR!iATION REQUIRED N = UOT SATISFACTORY ITEM REVIEWED STATUS
- COMMENT REFERENCE (5,M,N)
DOCUMENTS 3.4 Bridge End Trucks 3.4.1 S
3.4.2 S
3.4.3 M
OK except no information is available on prevention of excessive drop in case of axle failure and vertical stresses not given to check with allowable.
3.5 Footwalks and Handrails N/A 3.6 Operator's Cab N/A 3.7 Trolley Frames M
Trolley frame material not specified.
Vertical stresses not.given.
3.8 Rails N/A 3.9 Gantry Cranes N/A 0
l
=
RANCHO SEC0 NUCLEAR GENERATING STATION - UNIT 1
Subject:
Control of Heavy Loads - Auxiliary Bridge Crane (Reactor Bldg.)
Review Check Sheet L
D Review Area Mechanical / Structural Design Approved by N
G fO'$}
S. Chidambaranathan Date Reviewed by 6-8-81
-
- S.=
SATISFACTORY q
Date M = MORE INFORMATION REQUIRED N = NOT SATISFACTORY t
STATUS
- COMMENT REFERENCE DOCUMENTS ITEli REVIEUED (S,M,N),
5 70-4 MECHANICAL DESIGN _,
M The hook material is'not specified -
I; 4.1 Load Blocks it is, however, a standard hoist.
k S
OK if 6x37 wire rope assumed 4.2 Hoisting Ropes (Whiting Crane Handbook - P.133) _
l M
. No information is available for 4.3 Sheaves M
verification.
M No information is available for
, 4.4 Drum 4.5 Gearing M
verification.
{
4.6 Bearings l
4.7 Brakes The brake torque rating not given for M
J 4.7.2.3 Bridge checking with requirements.
. Same comment as above.
M 4.7.3.3 Trolley 4.7.4 Holst-(Holding)
M Specific information is not available for the holding brake to check the' requirements.
q
~ ~ '
' ~ ~ ' ' '
g RANCHO SEC0 NUCLEAR GEt4ERATIrlG STATI0tl - UNIT 1
Subject:
- Auxiliary Bridge Crane (Reactor Bldg.)
Review Check Sheet
' t)
T tOul
. '_ J.
Review AreaMechanical/ Structural Design Approved by i
i
__ -s Date
($. IC). b}
Reviewed by S. Chidambaranathan
- S = SATISFACTORY Date 6-8-81 M = MORE IflF0Ff4ATION REQUIRED N = NOT SATISFACTORY IhEMREVIEWED STATUS
- COMMENT REFEREtiCE DOCUMENTS (S,M,N)
'4.7.5 Hoist (Control)
M Same as above.
4.8 Bridge Drives 4.8.1.1 S
4.9 Shafts 4.9.1 N/A 4.9.2 M
Angular shaft deflection not speci-fied for verification with allowable.
~4.10 Couplings 4.10.1 M
Coupling material not specified.
4.11 Wheels S
9
- - - ~,,
[
~
RANCHO SEC0 NUCLEAR GENERATING STATION - UNIT 1
Subject:
Control of Heavy Loads - Auxiliary Bridge Crane (Reactor Bldg.)
Review Check Sheet i
3 (W?
)
Approved by r.
Revicw Area Mechanical / Structural Ddsign Date
($
I C) - $)l Reviewed by S. Chidambaranathan
- S = SATISFACTORY Date 6-8-81 M = MORE INFORMATION REQUIRED N = NOT SATISFACTORY REFERENCE STATUS
- COMMENT DOCUMENTS ITEM REVIEWED (5,M,N).
4.12 Bumpers and Stop,s
- M Bridge bumpers not shown.
4.12.1 M
Bridge Runway stops not specified.
4.12.2 N
From Dwg. No. D-1704-01, it does not 4.12.3 appear trolley bumpers are provided as required.
S 4.12.4 S
~ ~ ' ' ~
"T.
weu.uu u i
RANCHO SEC0 NUCLEAR GENERATING STATION - UNIT 1
Subject:
Control of Heavy Loads - New Fuel Handling Bridge Crane (Fuel Storage Bldg.)
Review Check Sheet W
\\
Approved by
%).
Review Areastructural/ Mechanical Design 4
b I6.$l Date Revicwed byS. Chidambaranathan
- S = SATISFACTORY Date 6-8-81 M = MORE INFORMATION REQUIRED N = NOT SATISFACTORY REF$RENCE ITEM REVIEWED STATUS
- COMMENT DOCUMENTS (S,M,N) f
{
CMAA SPEC #70
'/0-3 ST'nUCTURAL DESIGN M
Structural steel material not speci-
- 1. Bid Request C29.01 l
(Reference #8) 3.1 Material fied.
M Welding design and procedure not
- 2. HECO-PACIFIC Dwg. No.
D-1704-3 (SMUD No. 6292-3.2 Welding specified.
C29.01-3-51) (Reference 30) 3.3 Girders S
3.3.1 The vertical, lateral and torsional
- 3. HEC 0-PACIFIC Instruction M
and Maintenance Manual 3.3.2.1 design loadings not given.
3.3.2.2 and 3.3.2.3 M
Load combinations not indicated.
Not Applicable (N/A) 3.3.3 Dead plus live load deflection and M
3.3.3.3 bending stresses not specified.
3.4 Bridge End Truck S
3.4.1 S
3.4.2 OK except vertical stresses not given.
M 3.4.3 C-
~ ~ ' ~ ~ ~
aet.nuu u O
RANCHO SEC0 fiUCLEAR GENERATING STATI0't - UNIT 1
Subject:
Control of Heavy Lcads - New Fuel Handling Bridge Crane (Fuel Storage Bldg.)
Review Check Sheet I
Review AreaStructural/ Mechanical Design' Approved by A,
Revieaed by S. Chidambaranathan Date C. (0 9)
Date 6-8-81
- S = SATISFACTORY M = MORE INFOR'4ATION REQUIRED N = NOT SATISFACTORY ITE!! REVIE'.:ED STATUS
- COMMENT REFERENCE (5,M,N)
DOCUMENTS 3.5 Footwalk and Handrail,
N/A 3.6 Operator's Cab N/A 3.7 Trolley Frames il Information on stresses in frame not 3.8 Rails N/A available.
3.9 Gantry Crane N/A 70-4 MECHANICAL DESIGN 4.1 Load Blocks M
Material type not indicated.
4.2 Hoisting Ropes S
OK if 6x37 wire rope assumed.
(Refer to Whiting Crane Handbook 4th Edition, Page 133) 4.3 Sheaves M
No information available.
4.4 Drums M
fio information available.
4.5 Gearing M
No information available.
4.6 Bearings M
No information available.
I
I APPT.nDix D
\\
1 f
RANCHO SEC0 NUCLEAR GENERATING STATION - UNIT 1
Subject:
Control of Heavy Loads - New Fuel Handling Bridge Crane (Fuel Storage Bldg.)
Review Check Shaet d
Approved by Review Area Structural / Mechanical Design
$.IO $}
Date Reviewed byS. Chidanbaranathan
- S = SATISFACTORY Date 6-8-81 M = MORE INFORMATION REQUIRED N = NOT SATISFACTORY ITEM REVIEWED STATUS
- C0i'J4ENT REFERENCE DOCUMENTS (S,M,N) 4.7 Brakes Torque rating of brake not given.
4.7.2.3 (Bridge)
M 4.7.3.3 (Trolicy)
M Torque rating of brake not given.
S 4.7.4.1 Torque rating of hoist holding brake 4.7.4.2 (Hoist)
M not specified.
5 4.7.4.3 No indication given of number of M
4.7.4.4 holding brakes used; S
4.7.5.1 S
4.7.5.2 4.8 Bridge Drives 5
4.S.1.1 4.9 Shafts M
Shaft speed not given.
~
4.9.1 M
Angular deflection of shaft not shown 4.9.2
i APPENDIX 0 RANCHO SEC0 NUCLEAR GENERATING STATION - UNIT 1
Subject:
Control of Heavy Loads - ?!ew Fuel Handling Bridge Crane (Fuel Storage Bldg.)
Raview Check Sheet 2)
Structural / Mechanical Design Approved by x (_h Review Area
()
f d)
- b) l
~
S. Chidambaranathan Date Reviewed by 6-8-81
- S = SATISFACTORY Date M = MORE IriFORMATION REQUIRED ti = NOT SATISFACTORY ITEli REVIEWED STATUS
- COMMENT REFEREllCE (S,M,N) 00CUMENTS 4.i0 Couplings M
Cross Shaft Coupling raaterial not specified.
4.11 Wheels 4.11.1 M
Type of bridge and trolley wheel threads not specified.
4.11.2 M
Wheel material not given.
4.11.3 M
flax. allowable wheel loadings not specified.
4.11.4 f4 Cnly 1/8" clearance.provided between wheel flange and rail head.
4.12 Curpers and Stops 4.12.1 M
No information on bridge butt. par.
4.12.2.1 S
4.12.2.2 5
4.12.3 M
tio information on trolley bumper.
4.12.4 S
e
l APPENDIX E RANCHO SECO NUCLEAR GENERATING STATION'-' NIT 1
Subject:
Control of' Heavy Loads - Gantry Crane (Turbine Bldg)
Review Check Sheet -
~
f Review Arer. Strucpgal/Mechanica1' f~
Approved by 4,
Dacign Date b kD'bf Reviewed by S. Chidambaranathan y
Date 6-9-81
/* 3,=, SATISFACTORY j
M'= MORE INFORMATION REQUIRED N=E0TSATISFACTORY I
l7 l l'..,
y'
~
ITEM REVIEWED / REFERENCE STATUS
- COMMENT
'REFEliENCE
-(S.M,N)
DOCUMENTS C.M.A.A. SPECIFICATION N0. 70 A.
STRUCTURAL DESIGN 3.1 Material S
- 1. Invitation No. C18.1 by 3.2 Welding S
Cechtel Corp. dated 3.3 Girdars 12.22-69. (Reference #7) 3.3.1 General S
~ Gear'ratic'-between motor and cross 2.g85,'35TonGanpyCrane 3.3.2 Loadings M
esign calculations for shaft not"available for obtaining the required design twisting moment.
e ca; n (SMUD No. C292-C18.02-9-1).
(Reference #24)
~
- 3. Lakeside Bridge & Steel Co.
~
Dwgs. No. 8863-01, 8S63.3 (Reference #35)
- 4. Harnischfeger Corporation Dag. No. 100A4794-57 (Reference v37) i
i APPENDIX E RANCHO SECO NUCLEAR GENERATING STATION - UNIT 1 j
i
Subject:
Control of Heavy Loads - Gantry Crane (Turbine Bldg) l Design Review Review Check Sheet ld' nd-Review Area Structural / Mechanical Approved by
\\
Design Revie.,ed by S. Chidambaranathan Date bo Io. O I Date 6-9-81
- S = SATISFACTORY M = MORE INFORMATION REQUIRED N = NOT SATISFACTORY ITEM REVIEWED / REFERENCE STATUS
- COMMENT REFERENCE (5,M,N) 00CUMENTS 3.3.3.1 Welds S
3'.3.3.1.1 Box Girder Proporticns S
3.3.3.1.2 Longitudir.al Stiffeners S
3.3.3.1.3 Alloacble Stresses S
3.3.3.1.5 Diaphragm 5
3.3.3.1.6 Deflection & Camber S
3.4 Bridge End Trucks Not Applic able (N/A) 3.5 Footualks and Handrails S
3.5 Operator's Cab S
3.7 Trolley Framas M
Vertical stress calculations for trolley frame not available.
3.8 Rails S
6
i APPD. Dix E
)
RANCHO SECO NUCLEAR GENERATING STATION - UNIT 1
Subject:
Control of Heavy Loads - Gantry Crane (Turbine Bldg)
Design Review Review Check Sheet O
- tul t
Review Area Structural / Mechanical Approved by j
Design
~
b.fD bl l
Reviewed by S. Chidambaranathan Date r
Date 6-9-81
- S = SATISF'.CTORY M = MORE INFORMATION REQUIRED N = NOT SATISFACTORY ITEM REVIEWED / REFERENCE STATUS
- COMMENT REFERENCE DOCUMENTS (S,M,N) 3.9 G.antry Cranes S
B'ending stresses for leg and sill satisfy AISC.
Shear stress, end tie and strut calculations not available, but are not considered significant.
B.
MECilANICAL DESIGN 4.1 Lead Blocks S
S 4.2 Hoisting Ropes 4.'3 Sheaves S
4.4 Orum S
4.5 Gearing 4.5.1 S
4.5.2 M
For lack of design data, ccmparison of horsepower rating not possible.
4.5.3 to 4.5.4 M
information regarding rating and horse-power imposed on gearing not available.
APPENDIX E s
RANCHO SECO NUCLEAR GENERATING STATION - UNIT 1
Subject:
Control of Heavy Loads - Gantry Crane (Turbine Bicg)
/
Design Review a
Rcview Check Sheet I) v
?. v // x (j s
Revie'w Area Structural /ttechanical Approved by i
Design (o
f 0 b) I Date Reviewed by S. Chidambaranathan_
3
- S = SATISFACTORY Date 6-9-81 M = MORE INFORMATION REQUIRED N = NOT SATISFACTORY ITEM REVIEWED / REFERENCE STATUS
- COMMENT REFERENCE DOCUMENTS (5,M,N)
I 4.6 Bearings M
Allowable bearing pr. specified in Purchase Spec. is 1300 psi which is greater than 1000 psi stipulated in CRAA70.
I!ence, actual design bearing pressure data needed.
4.7 Brakes S
4.8 Bridge Drives S
4:9 Shafts M
Information not available to allow comparison with Purchase Spec.
4.10 Couplings S
4.11 Uheels M
Tapered treads are used for trolley wheels wnere'straicht treads are re-quired as per CMAA70.
4.12 Bumpers and Stops S
i e
- W 1
RA'1CHO SECO i:UCLEAR GEilERATING STATION - UNIT 1
Subject:
Control of Heavy Loads - Gantry Crane (Turbine Building)
Design Review Review Check Sheet k
Approved by f'8 M-Review Area Structural /i*echanical Revicued by S. Chidambaranathan Date
(,
iC-@l Cate 6-2-31
- S = SATISFACTORY M = MORE INFORtATION REQUIRED N = NOT SATISFACTORY
~ l ITE:t REVIE!!ED/ REFERENCE STATUS
- CO.91ENT REFERENCE s
(S,M,N)
DOCUMENTS CHAPTER 2-1 0F ANSI B30.2-1976 2.1.1 Marking S
2.1.2 Clearance S
2.1.4 Crana Construction S
2.1.5 Cabs S
2.1.6 Lubrication S
2.1.7 Footualks and Ladders S
2.1.3 Stops, Bumpers S
2.1.9 Brakes S
2.1.11 Hoisting Equipment S
v 0
1[$
0J1f>llDh!
.1!
1lll-4 1l, 5
)
C
.o
,c.
2
)
C t e 3
os c e
)
1',
a0 1
ti r.
n 1
4 n'
ce
,i l 2 3
i1 0
1M r y r. C 7 h r h5 9
5 e b c.
nS c1 D
2
- tf f9 a o( e a E
C 2i e 3'.2 c.
i6 c ME
)
R
- oR C r cC n 1
I 6 r( 0; - a a5 e &5) 0 U
o) t 5
2 r r r
5 Q
N8 de.
1 t9 e aC c : 43 9
]
E ES 3
eC o s2f p
f t5 =
g2 a iC R
CT t
t C
.l 6 e r
' b dC se af oo R
coR a5 e ii: r Y
EE ec d ce NH
.(
C :. (
H1 c i
t S
O R R:
un n
o n
o I
O EC qe nl i gtN
)
l g. tge W
~ (0 i
T T FC er oih ni 1
en4 inr
.N x
x Y A C E0 R e cLc i cD5 ti oi e r '. f t
ut R
A R0 f
e a wrU - h w.
te 0M\\
b
- w As M a t :: 2 cav t aa f
F de l
OT 0 S iR es re52 ere arR e
t
- u C F I
B( TM& DD(
q s
A T
I te F
I A
sR v~
S S
1 2
3 4
5 i
i od b
I E
T R T Hi B d
A O O e
S M N e
l t
if v
ao o
=
=
=
e
.a r
r e
htsu.
o1 p
t S M N t
b qe
,dl el n-p a
rj,db e
1 eA A
D aa M
ec9 l
T n
re4si I
Te u j gi a N
0t
.tb o v
U 1I eecu h a
(
l l asrc N
d l
bbf oit T
s aaue h o l
E l l nbd wn O
a M
iia a
I o
M aamnc
,n T
L O
vv aino A
C aaec ai T
y h
gpt S
v nsa n n t l,i a
- a.. m oc G
e r
iioa N
H ttt rrt o m m g n -. f f I
aa oo T
f n
A o
rrne. 4i R
t ooim 2
E l
e ffd c
n N
o e
n n [0 nag E
r h
iio8o i
G t
S c! crs n
ooc 0 oe R
e k
MNA4 afD A
C c
E e
I L
h C
C
)
U t
N c
w S N, U
e e
T M, MMS M
0 j
i A
C b
v E
u e
TS S
S R
n S(
g O
i g
H s
C e
D A'!
R l)a u c
/
n i
a n
h E
a c t
C h
e a.
N cp r
E eT a
R
)
r E
M/T a
F l
lE b
i E
a m
R ar rC a
/
o e
u d
D n
m l
t r
i 1
E c e h
8 G'
o a
M r
u f
C E'.
I S
(
F r e 1
I E
l tR V
C ags y
ST S
6 E
nr e
i a
y R
L rie l
e b
r M
A.
edd l
P tl r o
A d
E e
T U
aei r
T MkG T
I s
C e
e U
i i
e R
123 7
v v
t T
e e
a S
333 3
R R
C
{
APPENDIX F RANCHO SEC0 NUCLEAR GENERATING STATION - UNIT 1
Subject:
Ccatrol of Heavy Loads (10T Monorail Hoist - Aux. Bldg.
Item A-1 of Bid Request No. C29.01)
Review Check Sheet t
tW Review Areastructural/Machanical
_ p_)
Approved by I
Design (Refer CMAA Spec. #70)
(9.Io.9l Date Reviewed byS. Chidambaranathan
- S = SATISFACTORY Date 6-1-81 M = MORE INFORMATION REQUIRED N = NOT SATISFACTORY ITEM REVIEWED / REFERENCE STATUS
- COMMENT REFERENCE 00CUMENTS (S,M,N)
MECHANICAL DESIGN S
4.1 Load Biccks S
4.2 Hoisting Ropes 4.3 Sheaves 4.3.1 Material M
Material type not known, 4.3.2 Pitch Dia. Running Sheaves N
10 in. (Actual).
For 9/16" dia.
req'd. dia. = 24x9/16 = 13.5 in, for 6x37 rope, CMAA does not specify pitch dia. for 18x7 rope.
4.4 Drum 4.4.1 Material S
S 4.4.2 4
9
APPENDIX F RANCHO SECO NUCLEAR GEllERATIt;G STATION - UNIT 1
~
Subject:
Control of Heavy Loads (10T Manorail Hoist - Aux. Bldg.
Item A-1 of Bid Request No. C29.01)
Review Check Sheet V)!,, il' Review Arcastructural/ Mechanical Approved by i
~ _
Design (Refer CMAA Spec. #70)
Revie. Sed byS. Cnidambaranathan Date (b f t>-9 I Date 6-1-81
- S = SATISFACTORY M = MORE It;F0T3.ATION REQUIRED N = NOT SATISFACTORY ITEM REVIEUED/ REFERENCE STATUS
- COMMENT
'REFERE.\\CE (S,M,N)
C0CUMENTS 4.4.3.1 S
4.4.3.2 S
4.4.4 N
The pitch dia, of drum shall not be less than 24x9/16 = 13.5 (for 6x37 rope) CMAA does not specify req'd.
pitch dia. for 18x7 rope.
Actual pitch dia. of drua = 11.505 in.
I3 (Reference #26) 4.7 Brakes 4.7.3 Trolley S
4.7.4 Hoist (Holding)
S 1
APPENDIX F 1.
RANCHO SECO NUCLEAR GENERATING STATION - UNIT 1
Subject:
Control of Heavy Loads (10T Monorail Hoist - Aux. Bldg.
Item A-1 of Bid Request No. C29.01)
Raview Check Sheet p
1 L k.['
L Approved by Review Areastructural/Mechanica_l Dxtign (Refer CMAA Spec. #70) b.To OI Date Reviewed by.S._Chidambaranathan
- S = SATISFACTORY Date 6-1-81 M = MORE INFORMATION REQUIRED N = NOT SATISFACTORY i
REFERENCE ITEM REVIEWED /xEFERENCE STATUS
- COMMENT DOCUMENTS (S M,N) 4.7.5 Hoist (Control S
4.10 Couplings Not Applicable (N/A) 4.10.1 Motor couplings to be specified by M
i 4.10.2 crane manufacturer.
Information not available.
4.11 Wheels Information not available.
h 4.11.1 kheel Spec.
4.1 h 2 Material S
4.11.3 Allow Wheel Loading M
Design information not available.
l
APPas;x F RANCHO SEC0 f;UCLEAR GEf;ERATING STATION - UNIT 1
Subject:
Contrcl of Heavy Leads -(10T Monorail Hoist - Aux. Sidg.
Item A-1 of Sid Request No. C29.01)
Review Check Sheet 9
Oh)J
.,_f Revie.: Area Structural /.'*echanical Approved by Cesign (Refer CMAA Spec. #70) b - (0 $. !
S Date Raviewad by. Chidambaranathan
- S = SATISFACTORY Cate 6-1-81 M = MORE INFORMATION REQUIRED N = f;0T SATISFACTORY
'RE F ERE.*CE ITE!! REVIEi!ED/ REFERENCE STATUS
- COMMENT COCUMENTS (S,M,N) 4.11.5 M
The type of axle and wheel mounting not given to see whether they are compatible with CMAA spec.
4.12 Bumpers and Stops 4.12.1 to 4.12.1.3 N/A 4.12.2.3 5
4.12.2.2 M
Information regarding design forces used for runway stops nct available.
4.12.3 Trolley Bumpers M
Inforaction not available.
4.12.3.1 N/A 4.12.3.2 M
The code specified trolley bumcers to be rigidly mounted (bolts).
No data available.
4.12.4 S
l APPENDIX G RANCHO SECO NUCLEAR GENERATING STATION - UNIT 1
Subject:
Control of Haavy Loads - 10T Monorail Hoist - Aux. Bldg.
(Item A-S of Bid Request No. C29.01)
Review Check Sheet l
1 1
~. '\\LS i
Review Areast uctural/ Mechanical Approved by I
d.
j
-(7IfeF C'ECSpec. if /0)
Reviev ed by. Chidambaranathan Date
.(c.SJ r
S Date June 1, 1981
- S = SATISFACTORY M = MORE INFCRMATION REQUIRED N = NOT SATISFACTORY ITEM RE'!IE' LED / REFERENCE STATUS
- COMMENT REFERENCE DOCUMEriTS (S.M,N)
STRU-CTURAL CESIGN 3.1 M necial M
No information available.
- 1. Bid Request No. C29.01
( eference #8)
M No information available.
3.2 Kelding
- 2. Telecen bet.een P. Kaul of 3.3 Girders (Monorall)
S According to the manufacturer, the Quadrex & W. Nicols/ Yale 20I85 monorail can be subaected to a Industria Prcuccts.
4 conc. working load of 3S29,,,ibs. Tor (Reference #25) a 2, ft. span, which is adequate.
3.
o-M Design information not available.
0 e
3 3.7 Trolley Frame C29.01-18-1). (Ref. =32)
- 4. Heco-Pacific Cra. ir.g No.
'!-16 & 611 (Sachtal No.
C-29.01-1E-51) (Raf. 523) 9 6
h
- - - - - - ~ ~.. - -.
APPENDIX G RANCHO SEC0 NUCLEAR GENERATING STATION - UNIT 1 l
~
I
Subject:
~ Control of Heavy Loads - 10T Monorail Hoist - Acx. Bleg.
(Item A-5 of Bid Request No. C29.01) j Review Check Sheet b
M
{
Review AreaStructural/ Mechanical Approved by I-(Refer CMAA Spec. #70) fg (o 9I S
Date Reviewed by. Chidambaranathan Date 6-1-81
- S = SATISFACTORY M = MORE INFORMATION REQUIRED N = NOT SATISFACTORY ITE:4 REVIEUED/ REFERENCE STATUS
- COMMENT REFERENCE DOCUMENTS (5,M,N)
MECHANICAL CESIG!!
S
- .1 Lead Block 4.2 Hoisting Ropes S
4.3 Sheaves
4.3.1 Material (Ref 2)
S 4.3.2 Pitch Diameter (Ref 2)
M Required minitura pitch diameter of Running Sheaves running sheaves = 24 x 1/2 = 12 in.
4.3.3 Pitch Diameter (Ref 2)
S Actual pitch diameter = 10.63 in.
Idler Sheaves 4.4 Drum S
Bechtel No. C29.01-15-51) 4.7 Brakes
'M M S. torque rating reg'd = 50% of (Reference !33) 4.7.3 Trolley Motion 4.7.4 Hoist Brake (Holding)
S t.,
ir.
Information not available.
4.7.5 Hoist Brake (Control)
S e
APPENDIX G RANCHO SEC0 NUCLEAR GENERATING STATION - UNIT 1 Control of Heavy Loads - 10T Monorail Hoist - Aux. Eldg.
(Item A-5 of Bid Request No. C29.01)
Subject:
L i
Review Check Sheet
?
N()
1 t
\\
,4 J Aporoved by Review AreaStruclur3 pMrt_anic_q1 1
(P.efer CMAA Spec. ii70) b fo kl r
Date Reviewed byS. Chidambaranathan
- S = SATISFACTORY Date 6-1-81 M = MORE INFORMATION REQUIRED N = NOT SATISFACTORY REFERENCE ITEM REVIEWED / REFERENCE STATUS
- COMMENT 00CUMENTS (S,M,N)
Motor couplings to be specified by 4.10 Couplings M
Crane manufacturer.
Information not 4.10.2 available.
Trolley wheels should have straight 4.11 Wheels M
4.11.1 treads.
Drive, wheels are matched pair within certain' diameter tolerances.,
Information not available.
Wheel material not specified.
M 4.11.2 Material Design information not available.
4.11.3 Allow wheel loadings M
The type of axle and wheel mount is-4.11.5 M
not given to check compliance with CMAA70.
4.12 Bumpers and Stops I
m
- - + -
APPENDIX G RANCHO SEC0 NUCLEAR GENERATING STATION - UNIT 1
~
Subject:
Control of Heavy Leads - 10T Monorail Hoist - Aux. 3169 Review Check Sheet I :
7 Review Area Structural / Mechanical Approved by
\\ )ce t
i
)'
(Refer CMAA Spec. #70)
L_v '
Reviewed by S. Chidambaranathan Date k) - ( <>
9 l Date 6-1-81 S = SATISFACTORY x
M = MORE INFORMATIO:! REQUIRE 0 N = NOT SATISFACTORY ITEM REVIEWE0/ REFERENCE STATUS" COMMENT REFERENCE (S,M,N)
CJCUMENTS 4.12.1 to 4.12.1.3 Not Applicable (N/A) 4.12.2.3 S
4.12.2.2 M
Information regarding design forces used for runway stops not available.
4.12.3 Trolley Bumpers M
Infonration on trolley bumpars not available.
4.12.4 S
O e
i m
1 1
APPENDfX H Q
RANCHO SEC0 NUCLEAR GEtiERATING STATION - UNIT 1
Subject:
Centrol of Heavy Loads - Polar Crane, Jib Crane, Gantry Crane
& Auxiliary Bldg. Monorail Hoists Review Check Sheet f
h Review AreaElectrical Equipment Approved by f,
b.(0. 9 l M
Date Reviewed by. Shah 6-2-81
- S = SATISFACTORY Date M=NOREIllFORMATIONREQUIRE0 I
N = fiOT SATISFACTORY ITEM REVIEUED/ REFERENCE STATUS
- COMMENT REFEREf?CE DOCUMEtlTS (S,M,N)
Polar Crane, Jib Crane,. Gantry.
M All the cranes meet CMAA Spec #70.
- 1. Bid Request Ho, C29.01.
Crane, Monorail Hoists in. Auxiliary Following information needed to com-(Reference #8)
Bldg.
plete the review:
- 2. Bid Request Specific
- 1. Voltage
- drop (Ref. CMAA Spec #70,
& Drawings (Invitation Mo. C18.1. (Reference #7)
- 2. Grot bd n Ref. HEC Article 610, Sect. 610-61.
- 3. Heco-Pacific Drawings
- 3. Distance between insulating sup-D-1744-4 (Rev. 1) &
ports (Ref. NEC Article 610, D-1774 -1 (Rev. 2).
- 4. Detroit Hoist & "achine
.f.$E Article 610, Company Drawings.
- 4. C e a.
Sect. 610-57)
Drawings No. 0292-C29.01 -
- 5. How resistors are mounted?
(Ref.
21-S1, 51, 51.
CMAA Spe: #70, Sec. 5.S)
- This Cor.nent does not apply to Gantry Crane.
b.
i-j' 2.2.1 Technical Specificatio'.
(No response required)
I i
i l
j 4
I I
f I
l f
4 3 =
..I
)
l'
2.2.2 Administrative Controls (No response required) f i
t 1
e i
I
'l y
f I
1 1
J I
i
~ - - -
2.2.3 Special Reviews for Heavy Loads Over the Core SMUD Response:
.The District has completed this'special review.
e w
(
w I
.g
- 4
?
2
+
l
.