Forwards Summary Rept Review of Crane Design & Their Load Paths for Rancho Seco Nuclear Station - Part 2,Unit 1, in Response to NRC 801222 & s.Commits to Replace Spent Fuel Stop Leg Hoist Per Util
ML20031C517
Person / Time
Site: Rancho Seco
Issue date: 09/30/1981
From: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20031C518 List:
References
REF-GTECI-A-36, REF-GTECI-SF, TASK-A-36, TASK-OR TAC-08079, TAC-8079, NUDOCS 8110070235
Download: ML20031C517 (1)


Text

/

4 O suun SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S Strec+, Box 15830. Sacramento. California 95813; (916) 452-3211 September 30, 1981 (s

C, DIRECTOR OF NUCLEAR REACTOR REGULATION

/

g f)h dILU ATTENTION DARRELL G EISENHUT DIRECTOR 1

DIVISION OF LICENSING i

OCT G iggg "'

U S NUCLEAR REGULATORY COMMISSION

-i u,3, m,,,

WASHINGTON D C 20555 y

camu

.s

,qy i )[~

DOCKET 50-312 RANCHO SEC0 NUCLEAR GENERATING STATION

~

UNIT N0 1 CONTROL 0F HEAVY LOADS Your letter of December 22, 1980 and February 3, 1981, requested a review of our controls of the handling of heavy loads. This review has been completed and our final report documenting this review is attached for your information.

I In addition to the inodifications to the Reactor Building jib crane committed to in our letter of June 23rd, we commit to replace the Spent Fuel Stop Log Hoist.

The results of the load drop analysis being performed by B&W, as described in Section 2.3.4.c of the attached report, will be submitted when available.

If we can provide any additional information, please advise.

b 7tik ohn Mattimoe Assistant General Manager and Chief Engineer A

//o33 Enclosure

///

8110070235 810930 DR ADOCK 05000 m