ML20049J564
| ML20049J564 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 11/18/1981 |
| From: | Felton J NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Schnelker W COMMITTEE TO BRIDGE THE GAP |
| Shared Package | |
| ML20049J565 | List: |
| References | |
| FOIA-81-435 NUDOCS 8203180380 | |
| Download: ML20049J564 (1) | |
Text
-
fDL-O/h a
- pom,.9, UNITED sT ATEs
! y,.- ( 7 i NUCLEAR REGULATORY COMMISSION
/
C WASHINGT ON, D. C. 20555 o,% :. p"E s,,
November 18, 1981 Docket Nos. 50-275/323 Ms. Wendy Schnelker Committee to Bridge the Gap 1637 Butler Avenue #203 IN RESPONSE REFER Los Angeles, CA 90025 TO F01A-81-435
Dear Ms. Schnelker:
This is in response to your letter of October 26, 1981 in which you requested, pursuant to the Freedom of Information Act, copies of documents pertaining to the GA0 audit of the Diablo Canyon Nuclear Power Plant conducted between May 30 and June 10, 1977.
In a subsequent telephone conversation between Sarah N. Wigginton of ray staff and Dan Hirsch, the scope of your request was limited to those documents pertaining to the Diablo Canyon plant which were produced as a result of an agreement between the GA0 and the NRC, whereby the GA0 would apprise the NRC of any specific safety findings discovered in the seven nuclear plants studied.
Please find enclosed the seven documents listed on Appendix A.
In addition, a search is being conducted to determine if any documents currently in storage might be subject to your request. As soon as that search is completed, we will contact you.
Sinc rel,
l l
J. M. Felton, Director Division of Rules and Records Office of Administration l
l
Enclosures:
As stated l
o y
9'
\\i
=
NOV1919816 @
s u.a. =gggn== -e i
4 9