ML20049J591

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 770711-0803
ML20049J591
Person / Time
Site: Diablo Canyon 
Issue date: 08/23/1977
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20049J565 List:
References
FOIA-81-435 50-275-77-17, NUDOCS 8203180432
Download: ML20049J591 (1)


Text

-

O D

~

~

\\..s s'

..e'.-

APPENDIX A c-L

'Q

.1 m

.x..

53

@M Pacific Gas an'd EleItric Company

~

f 77 Beale. Street

~

W San Francisco, California 94106 l'

~.

.m.-

.. y..

Sh Docket No.

S0-275 7

~

70#

Construct. ion Pennit.No.

CPPR-39 9

9 NOTICE OF VIOLATION

..g c4 Y

Based on the results of HRC investigation conducted during the period

.K from July 11, 1977 to August 3,1977, it appears that one of your 77 i

..._ activities was notl conducted in full compliance with NRC requirements 1 i

4.3 as1 indicated belowT-

<J./

m..

a_

A.

.a 10 CFR 50, Appendix' B, Criterion V, and th'e FSAR, Section k' W<

17.1.5, requires that activities affecting quality shall be l1 prescribed by documented instructions, procedures, or drawings Ij of a type appropriate to the circumstances and shall be

!;:u accomplished in accordance with these instructions, procedures,

'N or drawings.

y fyA M. W. Kellogg Engineering Specification No. ESD-243 (" Pipe M

Rupture Restraints"). requires that inspections be performed to h

verify fitup, preheat temperature, root pass, weld completion g~ '

.and final visual examination and further requires that all

. operations be documented on a pipe restraint process sheet.

W.

k$

' Contrary to.,th6 Qove requirements:,

%,. e

.'l. '- Field weld FW-40 of restraint' number Bent 9 (Drawing r

a

@n

' No. 1000111) had not beencins'pected, as required, at M

'. entered ih' th'e appropiiate block of the restraint process' the time of. root pass completion as evidenced' by "NA" h,:

M

' s heet.-

?-J 1.,...

^'

lc.;

qq q ?.'

2.. The final visual :inspec_tions:of. field weld numbers Rf-22A, 228, 23A.,23B; 23C,24A. '24B, 24C 29A, 29B, 30A, 308, 31 and,32, of. restraint' nuinber: Bent 9B (Drawing No..'-

w L9:-

1000111), h'ad not been performed, as required; as~ evidenced d'

7' by the entry "NA'! in the final visual block of, the

.Q associated restraint process sheets.-