Advises That Facility Can Be Safely Returned to Operation for One Addl Operating Cycle W/Assurance That Integrity of Reactor Coolant Pressure Boundary Will Be Maintained,Per Evaluation of IGSCC Insp
ML20043F801
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/12/1990
From: Capra R
Office of Nuclear Reactor Regulation
To: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
References
GL-88-01, GL-88-1, TAC-75976, NUDOCS 9006180166
Download: ML20043F801 (3)


Text

1 pauo o

UNITED STATES

,["

',h NUCLEAR REGULATORY COMMISSION s,

7 wAswiwotow, o. c. nossa k,

/

June 12, 1990 Docket No. 50-333 M

John C. Brons l

  • utive Vice President - Nuclear Generation Fswer Authority of the State of New York 123 Main Street White Plains, New York 10601

Dear Mr. Brons:

SUBJECT:

EVALUATIONOFINTERGRANULARSTRESSCORROSIONCRACKING(IGSCC)

INSPECTIONS CONDUCTED DURING THE 1990 REFUELING OUTAGE -

JAMES A. FITZPATRICK NUCLEAR POWER PLANT (TAC NO. 75976) 1 Dy letter dated Janaury 29, 1990, you submitted the IGSCC inspection plan for the 1990 refueling outage at the James A. FitzPatrick Nuclear Power Plant.

The NRC indicated that the plan was acceptable by letter dated April 11, 1990.

By letters dated May 25, and June 7,1990, you submitted the results of the inspections, repairs and crack growth analysis performed during the 1990 refueling outage to the NRC for review prior to startup.

In tiose letters you indicated that 76 welds were inspected by personnel certified in accordance with the Electric Power Research Institute - Boiling Water Reactor Owners Group IGSCC certification program to use an enhanced evaluation technique involving refracted longitudinal waves. As a result of the inspections, eight welds required overlay repair (seven as a result of new IGSCC indications and l

oneforapre-existi.ngindication). All weld overlays were of standard design i

and were installed in accordance with NUREG-0313 Revision 2, except one that was slightly undersized. Alloverlaysweresurfacefinishedandfinal-inspected with the exception of the overlay on a weld in the B Core Spray itne, which you plan to replace during the 1991 refueling' outage. You also plan to reexamine unrepaired Weld No. 28-53 during the 1991 maintenance outage because minor crack growth was found in the weld.

Based on our review of the information provided, we find that the inspections I

repairs, and crack growth analysis that were performed, meet the guidelines of Generic Letter 88-01. Therefore, we conclude that the FitrPatrict facility can bc safely returned to operation for at least one additional operating cycle with assurance that the integrity of the reactor coolant pressure boundary will be maintained.

1

/

me age w

F

(

'Mr. John C. Brons James A. FitzPatrick Nuclear o

Power Authority of the State of New York Power Plant Cc:

Mr. Gerald C. Goldstein Ms. Donna Poss Assistant General Counsel New York State Energy Office Power Authority of the State 2 Empire State Plaza of New York 16th Floor 1633 Broadway Albany, New York 12223 New York, New York 10019 Resicent inspector's Office Regional Administrator, Region 1 U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Comission Post Office Box 136 475 Allendale Road Lycoming New York 13093 King of Prussia, Pennsylvania 19406 Mr. William Fernandez Mr. A. Xiausman Resident Manager Senior Vice President Appraisal James A. FitzPatrick Nuclear and Compliance Services Power Plant Power Authority of the State Post Office Box al of New York Lycoming, New York 13093 1633 Broadway New York, New York 10019 Mr. J. A. Grey, Jr.

Mr. George Wilverding, Manager Director Nuclear Licensing - BWR Nuclear Safety Evaluation Power Authority of the State Power Authority of the State of New York of New York 123 Main Street 123 Main Street i

White Plains, New York 10601 White Plains, New York 10601 Supervisor tir. R. E. Beedle Town of Scriba Vice President Nuclear Support R. D. #4 Power Authority of the State Oswego, New York 13126 of New York 123 Main Street White Plains, New York 10601 fir. J. P. Bayne, President Power Authority of the State f

of New York fir. S. S. Zulla 1633 Broadway Vice Presi6.nt Nuclear Engineering New York, New York 10019 Power Authority of the State of New York 123 Main Street tir. Richard Patch White Plains, New York 10601 Quality Assurance Superintendent James A. FitzPatrick Nuclear Power Plant Post Office Box 41 Mr. William Josiger, Vice President Lycoming, New York 13093 Operations and Maintenance Power Authority of the State of New York 123 Main Street Charlie Donaldson, Esquire White Plains, New York 10601 Assi. tant Attorney General New York Department of Law 120 Broadway flew York, New York 10271 l

c, e

r Mr. John C. Brons 2-E June 12. 1990 The safety evaluation which provides the basis for the above conclusion will be transmitted under separate cover once the final shrinkage stress evaluations and as. built information for the newly. installed overlays has been rs.ceived and analyzed.

By your letter of May 25, 1990, you comitted to provide this information to the NRC within six weeks following plant startup.

i Sincerely, Original signed by Robert A. Capra, Director Project Directorate 1 1 Division of Reactor Projects. 1/11 Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION iDocket T11e NRC & L PDRs PDI.1 Rdg SVarga BBoger CVogan OGC DLaBarge EJordan ACRS(10)

RCapra JLinv111e p

//:EMCD

PDI.1:DIR OFC
PDI.1:LA
PDI.1:PM l'.. :..../ NRRg..:..... g....:..............:.............

.)

NAME CVogpn...A.......::DLaBarge/ Bah :CCheng

RCepra

.......:. g/./.. g...:..............:..............:.............

DATE -:. [h/J. G O

.....[90

. 6[t l.

8 -: M W.

)