r --
<Ku
'
<
-
-
-
.
,
.
.
.
/
'
.
"
NOV 131981
Florida Power Corporation
ATTN: Mr. J. A. Hancock
Assistant Vice President
fluclear Operations
P. O. Box 14042, Mail Stop C-4
St. Petersburg, FL 33733
Gentlemen:
Subject:
Report No. 50-302/81-21
This refers to the routine safety inspection conducted by fir. T. Stetka of this
office on September 23 - October 23, 1981, of activities authorized by NRC
Operating License No. DPR-72 for the Crystal River facility. Our preliminary
findings were discussed with fir. D. Poole, and other members of your staff at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During this inspection it was found that certain activities under your license
appear to violate NRC requirements. These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
With regard to Item C, corrective actions to prevent recurrence were
completed prior to conclusion of this inspection; therefore, a reply is not
requested.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty five
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been delayeo such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the infonnation should be withheld from public
disclosure. This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4). The information
sought to be withheld shall be incorporated as far as possible into a separate
8203250500 820318
PDR ADOCK 05000302
G
.
,
,
.
,
_
fW I 31%1
..
.
Florida Power Corporation
2
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be place'd in the Public Document
Room.
The responses directed by this Notice are not subject to the clearance procedures
of the Office of Management and Budget as required by the Paperwork Reduction Act
of 1980, PL 96-511.
Sincerely,
Paul J. Kellogg, Chief
Reactor Projects Branch
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-302/81-21
cc w/ encl:
D. C. Poole, Nuclear Plant Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of Florida
l
l
RII
RII
RII
TS
dt
VBr w lee
PJ
ogg
11/Q/81
11/6/81
11/p81
1