s,
-
.
,
,
,
htN
DEC 0 81981
Florida Power Corporation
ATTN: Mr. J. A. Hancock
Vice President Nuclear Operations
P. O. Box 14042, Mail Stop C-4
St. Petersburg, FL 33733
Gentlemen:
Subject: Report No. 50-302/81-25
This refers to the routine safety inspection conducted by Mr. W. H. Miller, Jr.,
of this office on November 17-20, 1981, of activities authorized by NRC Operating
License No. DPR-72 for the Crystal River facility. Our preliminary findings were
discussed with Mr. D. C. Poole, Nuclear Plant Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
I
8203250553 820318
l
PDR ADOCK 05000302
G
i
l
-
.
.
.
.
,
,
,
,
DEC 0 81981
Florida Power Corporation
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
hyrof
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-302/81-25
cc w/ encl:
D. C. Poole, Nuclear Plant Manager
bcc w/ encl:
Document Management Branch
State of Florida
9
RII
g
RI
I
WH5hler:ht
TEConlon
CEMu
O.
t ,own h
Ji@ logg
1W g/81
M/g/81
J1/
11/ /81
12lp//81
/ % j /81
/P