fj
/.
- - - r e.
.)
, Submitted:
/ n/
/(Av 5 p
.aw c-Approved:
J
/ f')
i i
/e(Plant Manacer)
'4"'
v-
-. =
d n-SP !! umber 61.018.01 Revision 1
Date Eff.
9/7/78 TPC TPC TPC RADIOLOGICAL SUP.V7.Y SCilEDULT..CD LOCATIO'!S 1.0 PURPOSE To provide instructions on the frecuency and locatiens of in-nlant radiologien1 surveys.
2.0 RESPONSIBILITY The Ilealth Physics Engineer shall be resoonsible for assuring inolementation of the requirements of this procedure.
4 9
e 5.fe'i'h
.x. -
PPF 1021.600-6.421
~
,s' il
. k%
8203190497 820209 PDR ADOCK 07002884 C
3.0 CISCUSSION s3.1 Routine surveys are performed to determine the radiation, contanination, and airborne radioactivity levels in the plant. The survey results are used for posting areas, updating the status board, and identifying areas where the radiological conditions have changed significantly.
3.2 These routine surveys provide information for personnel performing routine and/or operational tasks which do not require an RWP. They are not = cant to replace the specific surveys required to establish an RUP, but cay be used as such if appropriate.
3.3 The frequency at which an area should be surveyed is dependent on the purpose and use of the area, how often personnel enter the area, the probability of changing conditions, and the radiological conditions themselves. In an effort to li=it unnecessary exposure to surveying personnel,'several areas in the plant are not to be surveyed on a routine basis due to the high radiation levels, limited access, and infrequent occupation.
3.4 Topics covered in this precedure include:
- 2. age, 8.1 Survey Frequencies 3
8.2 System Ut111:ation 3
Appendix 12.1, Unrestricted Buildings, Routine Survey Schedule Appendix 12.2, Turbine Bldg., Reutine Survey Schedule Appendix 12.3, Reactor Bldg., Routine Survey Schedule Appendix 12.4, Radwaste Bldg., Routine Survey Schedule Appendix 12.5, Miscellaneous, Routine Survey Schedule Appendix 12.6, Daily Routine Survey, SPF 61.018.01-1 Appendix 12.7, Weekly Routine Survey, SPF 61.018.01-2 Appeniix 12.8, Monthly Routine Survey, SPF 61.018.01-3 4.0 PRECAUTIONS If unaware of the radiological levels in the area to be surveyed, consult status board or previous surveys for latest levels.
5.0 PREREQUISITES N/A 6.0 L DtITATIO::S AND ACTIONS N/A 7.0 ;!ATERIAMfiD10MEST EQUIPME::T N/A SP 61.018.01, Rev. 1 9/ 7 78 Page 2
8.0 PROCED E 8.1 Survey Frequencies 8.1.1 Radiological surveys of noratily accessible areas should be parformed at a frequency that will insure that the radiological status of each location is knem with reasonable certainty.
8.1.2 The intervals at which the var us plant areas should be surveyed are established as follows:
8.1.2.1 D - daily - once per normal work day.
8.1.2.2 U - weekly - once per work week.
\\
8.1.2.3 M - monthly - once per calendar month.
8.2 System Utilization 8.2.1 Appendices 12.1 through 12.5, Routine Survey Schedules, are grouped by buildings and are provided to give an overall view of the location, type, and respective frequency of routine surveys to be conducted.
8.2.2 The Routine Survey Sheets SPF 61.018.01 (Appendix 12.6) are grouped by frequency and building. These sheets shall be used by the Surveyor to check-of f each survey completed in the group he is working on.
8.2.3 Surveys shall be conducted and the. actual 1s.vels recorded in accordance with their respective station procedures (References 11.1, 11.2, and 11.3).
, 9.0 ACCEPTANCE CRITERIA N/A 10.0 FINAL CONDITIONS The completed Routine Survey Sheets shall be forwarded to the Health Physics Engineer for review and filing in the Permanent Plant Files.
11.0 REFERENCES
11.1 SP62.010.01, General Radiation Survey Techniques 11.2 SP62.020.01, General Contamination Survey Techniques 11.3 SP62.030.01, General Airborne Activity Survey Techniques SP 61.018.01 Rev.1 9/ 7 /78 Page 3 l
4 12.0 APPE! DICES 12.1 Unrestricted Buildings Routine Survey Schedule 12.2 Turbine Buildine Routine Survey Schedule 12.3 Reactor Building Routine Survey Schedule 12.4 Radwaste Building Routine Survey Schedule i
12.5 Mlscellaneous Building Routine Survey Schedule 12.6 Daily Routine Survev. SPF 61.018.01-1 12.7 Weekly Routine Survey, SPF 61.013.01-2 12.8 Monthly Routine Survey, SPF 61.013.01-3 4
l 4
s J
I l
I r
I l
l SP 61.018.91, Rev. 1 l
9/ 7 /78 Page 4 i
l I
l _.
APPENDIX 12.1 UNR".STRICTE0 EUILDI' CS, LOUTINE SURVET SCnELULE
, 05TA:11 NATION RADIATIO:3 - l C
AIR 30?JE=
, SURVEYS '
SURVEYS.-
ACTIVITY SURVEY 5 ELEVATION 15 i
I fD i
D W
'M
! D W M 4
___W
,M 0*SB-T3 Access Control Point X
i:
X j
8?
Lunch Room X
/
l!
X
^}{
X Hallway X
'{
X-Locker and Shower Room X
X
}
Instrument Shop X
l X y Machine Shop and Tool Room X
l X
l
! X All Exterior Entrances and Exits X
l j
First Aid Room X
{'
i Stores Supervisor's Office X
Receiving and Storage X
l Emergency Switchgear and Battery Rooms X
(
Diesel Generator Rooms X
Aux 1111ary Boiler Room X
Motor-Generator Room ELEVATION 37' i
l; Entrance and Exit to Control Bldg.
, X t
t t
Entrance and Exit to Turbine Bldg.
'X j
h q
Hallways
- X i
X ]
2 Locker Room
- X i,
~;
Offices
~
A Classroom X
i X
4 Meeting Room X
'X HVAC Room X
}.
i Computer Rcom X
, Relay Room X
j Kitchen I
j
.j j
i MEZZANINE t
i j
j i
i i
Storage Area
,X HVAC Room X
l ELEVATION 63' s
i l
Control Rocm and Kitchen X
X X
Exit a,d Entrance to Turbine Deck lX l
Visitor's Callery and Stairwell X
X Centrol Rocm Storage X
1 Air Conditioning Units j
X ll i.
Chilled Water System Equipment
_i_
X _Li l.
l 1
SP 61.018.01, Rev. 1 9/. 7/73 Page 5 l,
i APPE:CIX 12.2 1
1 TURBINE BLDG., RO E1;iE SURVEY SCHEDULE l C03TA'!I;ATIO:;
RADIA!IO!i AIR 30?.';E SURVEYS SURVEYS ACTIVITY SURVEYS-~
ELEVATION 15' lM D
W M
D W
D 7
M Exterior Exits & Entrances
[
f Personnel Decon Area X
X l
Equipment Decon Area X
X Maintenance Work Area X
X X
HP Access Control Ares X
X X
Access & Egress Area X
X Elevator and Stair Landings X
Station Heating System and Drain Cooler Area X
X Reactor Feedwater Pump Doorways X
i X
Recombiner Doorways X
l X
Conde.Mer Air Removal Pump Doorways I
j X
Condenset Area (Accessible)
X X
X Condensate l' ump Area X
X X
Equipment Receiving and Storage Area X
X X
Booster Pump Area X
Xi Mornal Switchgear Room X
l Xj Z
ELEVATION 37' l
I I
i l
Calibration Rocm l
X X
i X
l Chemistry Lab & Counting Room
'X X
,7 Elevator and Stair Landings g
Accessible Condenser Area t
Heater Bay Dcorways I
X' Air Ejector Dcorways X
Hallways and Floor Space (0 pen)
X I
l X
R.W. - T.B. Doorway
,X i
ELEVATION 63' Moisture-Separator-Reheater Area j
Doorways X
X i
Elevator and Stair Landings I
RB-TB Doorway X
TB-Control Room Doorway X
j Decon Area X
j X
Floor Space (0 pen)
X X
X SP 61.fl8.01, Rev. 1 9 / 7 / 78 Page 6
lAliE5 DIX 12.3 Prg2 1 cf 2 REACT _0R BLDG., ROUTINE SURVEY SCHEDUL,E, TfTAMINATION
'i RADIATION AIRBORNE SURVEYS OSURVEYS ACTIVITY SURVE'lS I
~i i
ELEVATION 8'0" D
W M
\\D W
M t D W
M t
i General Arca X
f lX j
X Elevator and Stair Landings X
i ELEVATION 40'0" CRD !!ydraulic Pump Area X
i
.X Elevator & Stair Landings X
I General Area X
.X X
Truck Air Lock and Doorways X
X i
i ELEVATION 63'0" I
1 Elevator & Stair Landing:
TB-RB Doorway and Corridor Arca CRD Master Control Statica i,
Remote Shutdoun Panel X
j, i X j
RIIR Piping & Valve Area Doorways X
}X Cencral Area (North)
X
- h. [!
If lX X
Ceneral Area (South) jX X
X
,t i
lf I
ELEVATION 78'7" I
il i
L CRD Hydr.ulic Control Unit Areas X
jj jX l
CRD Repair Room / Doorway X
- X
':X l
X TIP Room / Doorway X
X
! X i
X Personnel and Equipment Hatch Areas X
'X I
Steam Tunnel Entrance X
Elevator & Stair Landings X
j j
Ceneral Area X
}
X X
l ELEVATION 112'9" Standby Liquid Control System Area X
RUCU Pump Doorways X
l l
'I Fuc1 Pool Cleanup Pump Area X
- X Elevator & Stair Landings X
General Area X
1
_X X
SP 61.018.91, Rev.1 9 / 7/78 Page 7
APPENDIX 12.3 Pags 2 of 2 RI%CTOR BLDG., ROUTI:E SU27EY SCHEDULE i CONTRIII;ATIO:I i RADIATI0II i AI230R:lE l
SU2VE,YS __
! SURVEYS
! ACTIVITY SURVE,Yd
- - -1 l..
_=
lM D'
W M
a ELEVATION 101' 6" l
D W__l M D
U t
i i
I Reactor Bldg. Standby Vent Systen Area l
X X
X ELEVATIO:: 126' 9" RWCU Heat Exchanger Doorvny X
X RWCU Frecoat Tank and Pu=p Area X,
X h
ELEVATIO:I 150' 9"
. l'.
l
{:.
- :'...u Systa La: Cpace 2:: changer a Z
X i
t
.;3 t x
y X
X 2
lX
..=: ::. ::
l 4
ELEVATIC'! 162' 10" e
s P.WCU Filter Demin Doorways X
i I
i X ELEVATICU 175' 9" Elevator and Stair Landings X
Hand Rails X
Shield Plugs X
Dryer & Separator Pool Ladder Landings (Top)
X
)X l General Area X
I X X
t I
SP 61.018.91, Rev. 1 9 /'7 /78 Page 8
APPE! DIX 12.l.
RADWASTE_ BLDG., ROUTINE SyRVEY_Sg ED y i'CONTA:!II:ATIO::
- ?J.3!ATIO:;
e AI?.20?J;Z SURVEYS _
i 5"RVEYS ACTI'/ITY SUR:??
~
ELEVATION 15'
! D W
M D
O I
t t
Evaporator Room Doorways X
Truck Loading Area s'X t
I X
Exterior Exits and Entrances l
X l
X l
i Turbine Building Exit and Entrance X
j j
Elevator & Stair Landings X
p Vault & Container Storage Area X
X Decontamination Area X
l X
l
}X Cement Storage & Sample Tank Area Liquid Waste Tank Doorway X
- X l
l Corridors & Doorways X i l
X
- X Pump Room / Doorways X
C0!D. DEMIN REGEN AREA Doorways X
l X
X Recovered Acid Caustic & Water Area X
l X
.X
.I 5
i 4
1 ELEVATION 37'6" l
Radwaste Control Room f ::
l v
i v
Laundry Room
'l y
j X
X Corridors & Doorways X
j X
,X i
Elevator & Stair Landings Sample Room Licuid Wanta Tan % o r ni 4'.v/ATICU $0 ' 6_"
i e
t r
Elevators aad Stair Landings l
l Crane Operator Platform / Observatory X
X X
i S ent Resin Transfer Tank Doorway X j X
P i
Condensate Demineralizer Room / Doorways X {X X
Condensate Demineralizer Valve Corr, dor X
X i
1 Charcoal Decay Bed Train Area i X X
HEPA Filter Doorways X j X
Desicant Dryer Doorways X 1 IX SP 61. 718.01, Rev.1 9/ 7f 73 Page 9
APPENDIX 12.5 l
MISCELLANEOUS, ROUTINE SURVEY SCHEDULE The following surveys are conducted conthly:
- 1. Condensate Storage Tank Area Contan/ Rad
- 2. Dcmineralized Water Tank Area Contam/ Rad
- 3. Fire Pump House and Tank Area Contam/ Rad
- 4. Station Transformer Areas Contam/ Rad
- 5. Fuel Oil Cubicles Contam/ Rad
- 6. Screenwell Contam/ Rad
- 7. Building Perimeter Contam/ Rad
. 'Ifn' Contam/ Rad
~,:
The following surveys are conducted weekly:
- 1. Security Building Contam/ Rad SP 61.018.01, Rev.1 9 / 7/78 Page 10
-APPENDIX 12.6 Page 1 of 4 DAILY ROUTI"E SURVEY UNRESTRICTED BUILDINGS Date i
SURVEY (CONTAMINATION) 1 INITIALS f
i ELEVATION 15' i
\\
l 1.
O & S B - T3 Access Control Point i
2.
Lunch Roon 3.
Machine Shop and Tool Room 2LZVATION i7' 6
1.
O & S L - TB Doorway 2.
O & S li - CB Doorway 3.
Kitchen t
ELEVATION 63' 1.
Control Room and Kitchen a
4 2.
Exit and entrance to Turbine Deck 1
I i
I 3
SPF 61.018.01-1 SP 61.018.91, Rev. 1 977773 p3g,11 4
4 e e a.,--.
APPENDIX 12.6 Page 2 of '+
DAILY F.CCIII:I SURVET 273I;r I'JILDI::G DATE S '.' JI'!
(C Zid'._1.1::7.i)
! INITIALS ELIVATIO;i 15' 1.
Iquip=ent Decon Area 2.
Health Physics Office 3.
Access and 2gress Arca 4.
Elevator and Stair Landings S.
Reactor recdwater Pump Dcorways 6,
2ccc=biner Doorways 4
7.
Condenser Air Removal Pump Doorways 3.
';;rm ; M --: rear
- m s.
1.
Elavator and Stair Landings i
2.
Heater Bay Doorways 3.
Air Ejector Doorways 4.
Chemistry Lab & Counting Rocm ELEVATION 63' l.
Moisture - Seperator - Reheater Doorways 2.
Elevator and Stair Landings
).
3.
TB - Control Roce Doorway i
~
5.
Decon Area i
t SPF 61.018.01-1 SP 61.018.C1, Rev. 1 9/ 7/78 Page 12
DAILY ROUTINE SURVEY REACTOR EUILDING DATE SURVEY (CONTAMINATION)
INITIALS I
ELEVATION 8' 1.
Elevator & Stair Landings s
ELEVATION 40' 1.
CRD Hydraulic Pump Area 2.
Elevator & Stair Landings 3.
Truck Airlock & Doorways ELEVATION 63' s
1.
Elevator & Stair Landings 2.
RER Piping & Valve Area Doorways ELEVATION 78'7" 1.
CRD Hydraulic Control Unit Areas 2.
CRD Repair Room Doorway 3.
TIP Room Doorway 4.
Elevator & Stair Landings 5.
Steam Tunnel Entrance ELEVATION 112'9" 1.
RWCU Pump Doorways 2.
Fuel Pool cleanup Pump Area 3.
Elevator & Stair Landings ELEVATION 126'9 1.
RWCU Heat Exchanger Doorway 2.
RUCU Precoat Tank and Pump Area ELEVATION 150'9" 1.
Contaminated Equipment Storage Room Doorway 2.
Elevator & Stair Landings ELEVATION 162'10" 1.
RWCU Filter Demin Doorways I
ELEVATION 175' 9" 1.
Elevator & Stair Landings 2.
Dryer & Separator Pool Ladder Landings (Top)
SPF 61.018.01-1 SP 61.018.01, Rev.I 9 / 7 / 78 Page 13
~
e-APPENDIX 12.6 Ptge 4 of 4 DAILY ROUTINE SURVEY RADWA3TE BLDG.
DATE SURVEY (CONTAMINATION)
IMillALS ELEVATION 15' 1.
Evaporator Room Doorways j
I 2.
3.
Elevator & Stair Landings 4.
Decon Area I
t 5.
Liquid Waste Tank Doorways 6.
Pump Room Doorways 7.
Cond Demin Regen Area Doorways 8.
Recovered Acid / Caustic 6 Vater Area
{
ELETATION 17' 6" i
1.
Raduaste Control Rocm l
2.
Laundry Rocm 3.
Elevator & Stair Landings I
4.
Sample Room 5.
Liquid Waste Tank Doorway.
i ELEVATION 50' 6" 1.
Elevator & Stair Landings 1
2.
Spent Resin Transfer Tank Dooruay
!j 3.
Condensate Demineralizer Room Doorways 4.
HEPA Filter Doorways i
5.
Desicant Dryer Doorways l
l-l
\\
Sir 61.018.01-1 SP 61.01S.C1, Rev.1 9/7pS page 14 i
APPE! DIX 12.7 Paga 1 of L UEEKLY ROUTINE SURVEY UNRESTRICTED BUILDINGS TYPE SURVEY C/R/A INITLtLS DATE ELEVATION 15' 1.
Hallway C
2.
Locker & Shower Room C/R 3.
Instrument Shop C
i 4.
Exterior Entrances & Exits C
5.
Receiving Area Office C
6.
Receiving & Storage C
i 4
7.
Emerg. Suitch Gear ar.d Battery Rooms C
i 8.
Diesel Generator Rooms C
9.
Auxilliary Boiler Room C
- 10. Motor Generator Room C
- 11. Lunch Room R/A ELEVATION 37' 1.
Hallway C
2.
Locker Room C
l 3.
HVAC Room C
4.
Computer Room C
l S.
Relay Room C
l MEZZANINE 1.
HVAC Room C
ELEVATION 63' 1.
Control Room & Kitchen R/A 2.
Visitors Callery and Stairvell C
3.
Control Roen Storage C
!!ISCELLANEOUS 1.
Security Eu11 ding C/R SPF 61.018.01-2 SF 61.018.01, Rev.1 9 / 7 /78 Page,15 i
J P
APPENDI'I 12.7 Pega 2 of 4 WEEKLY ROUTINE SURVEY TUREINE EUILDING C/R/Al INITIALS TYPE SURVEY DATE ELEVATION 15' 1.
Personnel Decon Area C
j 2.
Equipment Decon Area R
l I
3.
Maintenance Work Area C
i 4.
Station Ecating System & Drain Cooler Area lC I
5.
Condenser Area (Accessible)
C 6.
Condensate Pucp Area C
g i
7.
Equipment Receiving & Storage Area C
i 8.
Booster Pump Area C
l i
9.
Exterior Exits and Entrances fC/R
[
ELEVATION 37'
+
1.
Accessible Condenser Area
-C 2.
Hallways & Floor Space (0 pen)
C j
i 3.
Chemistry Lab & Counting Room R/A l
I 4.
Calibration Room C
i i
ELEVATION 63' i
1.
Decon Area E
I 2.
Floor Space (0 pen)
C l
t SPF 61.018.01 - 2 SP 61.01S.01, Rev. 1 9/ 7/ 73 Page.16 1
APPENDIX 12.7 Paga 3 of 4 WEEKLY ROUTINE SURVEY REACTOR EUILDING TYPE SURVEY C/R/A INITIALS DATE ELEVATION 8' 1.
General Area C
ELEVATION 40' C
1.
General Area ELEVATICN 63' 1.
Area CRD Master Control Station C
2.
Remote Shutdown Panel C
3.
General Area (North) i C
4.
General Area (South)
C i
ELEVATION 78' 7" l-l 1.
Fersennel & Equiptent Hatch Areas C
2.
General Area C
1 ELIVATICN 101' 6" l
l
~.. IId;. Stanchy Vent. Syste: Area C
a
{
ELZ7ATICN 112' 9" 1.
Standby Liquid Control System Area C
2.
General Area C
ELEVATION 126' 9" 1.
RWCU Heat Exchanger Doorway R
ELEVATION 150' 9" 1.
Fuel Pool Cooling System Heat Exchanger C/R 2.
RBCLCW Pump Area C
3.
Contaminated Equipment Storage Room C/R/A 4.
General Area (North)
C 5.
General Area (South)
C ELEVATION 162' 10" 1.
RWCU Filter Demin Doorways R
}
ELEVATION 175' 9" 1.
Hand Rails C
2..
Shield Plugs C
3.
Dryer & Seperator Pool Ladder Landings (Tcp)
R 4.
General Area C
SPF 61.018.01-2 SP 61.018.01, Rev.1 9 / 7/78 Page 17
_~
T APPE: DIX 12.7 Page 4 of'a WEEKLY ROUTINE SURVEY RADUASTE BUILDING TYPE SURVEY C/R/A INITIALS DATE ELEVATION 15' 1.
Evaporator Room Doorways R
2.
Truck Loading Area C/R 3.
Exterior Exits & Entrances C/R 4.
Vault & Container Storage Ar2a C /.,
5.
Deecn Area 6.
L2qatd u._
7.
Corridors & Dooruays C/2.
ELEVATION 37' 6" 1.
Raduaste Control Rocm R/A' 2.
Laundry Room R/A f
3.
Corridors & Doorways C/R 4.
Sample Room R/A l
i 5.
Liquid Waste Tank Doorway R/A i
ELEVATION 50' 6" i
1.
Crane Operator Platform / Observatory
'C/R/A 2.
Spent Resin Transfer Tank Dooruay R
3.
Condensate Decineralizer Room R
4.
Ccndensate Denincralizer Valve Corridor C
i 5.
Charcoal Decay Dcd Train Area C/R i
6.
Hepa Filter Doorways R
j 7.
Desicant Dryer Doorways R
SPF 61.018.01 - 2 SP 61.018.01, Rev. 1 9 / 7/78 Pace la
APPENDIX 12.8 P4ga 1 of 5 l
MONTHLY ROUTIME SURVEY Unrestricted Euildings TYPE I
SURVEY C/R/A INITIALS DATE s
l ELEVATION 15' t
1.
0 & S B - TB Access Contrcl Point R
2.
Hallway A
I 3.
Instrument Shop R
l 4.
Machine Shop and Tool Room R/A 5.
First Aid Room C
ELEVATION 37' j
1.
Hallways R/A i
2.
Offices C/r 3.
Clescrec C/a 4.
Meeting Rec =
C/R
{
i MEZZANINE 1.
Storage Area 1
- 2. Visitors Callery & Stairwell R/A 3.
Air Conditioning Units C
4.
Chilled k'ater System Equipment C
i i
i I
i 4
k SPF 61.018.01 - 3 SP 61.918.01, Rev. ]
9/ 7/78 Fage 19
APPENDIX 12.8 Page 2 of 5 MONTHLY ROUTINE SURVEY TURBINE BUILDII'G I TYPE i
SURVEY i C/R/A INITIALS DATE j
ELEVATION 15' t
1.
Personnel Decon Area R
i i
i 2.
Maintenance Work Area j
R/A 3.
Health Physics Office R/A y
4.
o
'c-4 van 5.
Statica
=n cys t en u r. sin Cc:12: '.r u 2
i 6.
Reactor Feeduster Pump Dcorways R
7.
Recombiner Dooruays R
8.
Condenser Air Renovel Pucy Doorways R
~
9.
Condenser Arec (Accessible)
R/A
- 10. Condensate Pump Area R/A
- 11. Equipment Receiving & Storage Area R/A I
l
- 12. Ecoster Pump Area R
l i
ELEVATION 37' i
1.
Accessible Condenser Area R/A i
2.
Heater Bay Doorways R
3.
Air Ejector Doorways R
4.
Hallways and Floor Space R/A 5.
Calibration Room R/A ELLTATION 63' I
i 1.
Mositure - Separator - Reheater Area Doorways R
4 2.
Floor Space (open)
R/A SPF 61.018.01 - 3 SF 61.018.01, Rev. I 9/7/78 Page 20
l APPENDIX 12.8 Page 3 of 5
-MONTHLY ROUTINE SURVEY REACTOR EUILDING TYPE SURVEY C/R/A INITIALS DATE I
ELEVATION 8' l.
General Area R/A ELEVATION 40' l.
CRD Hydraulic Pu=p Arca R
2.
Genaral Area R/A 3.
Truck Air Lock & Door: rays.
R 7.: ~_V? TIG:: 63' c --
R R
.. a :::c.-
R
-_nera. Area s.;c e ;.1, R/A
'5.
General Area (Scuth)
R/A I
ELEVATION 73' 7" 1.
CRD Hydraulic Control Unit Areas R
g 2.
CRD Repair Room C/R/A 3,
3.
TIP Room C/R/A l
4.
Personnel & Equipment Hatch Areas R
j
'5.
Cencral Area R/A-i ELEVATION 101' 6" l.
Reactor Bldg. Standby Vent System Area R/A ELEVATION 112' 9" 1.
RWCU Pump Doorways
.R 2.
Fuel Pool Cleanup Pump Area R
1 3.
General Area R/A t
ELEVATION 126' 9" r
^
1.
RWCU Precoat Tank and Pump Area R
i i
ELEVATION 150' 9" l
1.
RECLCT1 Pump Area R
{
i 2.
General Area,(North)
R/A 3.
General Area (South)
R/A i
ELEVATION 175' 9" 1.
General Area R/A I
SPF 61.018.01 - 3 SP 61.018.01, Rev. 1 9/7/ 78 pcge 21 I
~
t I
APPE!! DIX ! 2.3 Page 4 of }
s P.02.TriLY KOL*!I:iE fi.7'lLY P.m..,.,. e... u., L.., s, i..:s n..
$URVEY C,
la I. ;I I.i'. i
' ' ~ ~.
ELEVATION 15' 1
I.
Truck Loading Area 2.
Cccent Storage & Sample Tar}. Area 0/2/A 3
i 3.
Corridora A
t i
4.
, Pump Room E
s ELS*ATIO 1 37 ' 6" i
l 1.
Corridors A
i l
I j
EI.EVATION 50' 6" i
i 1.
ec...<.cate ^- i. ora..ir n '!alve Corridar
\\
t 2.
Chermal
~- -
i I
l l
I I
I r
4 l
I i
I'
,s
.3 i
I i
f t
c I
I I
SPF 61.018.01 - 3 SP 61.018.01. Rev. 1 9 / 7 / 78 Page 2
i 4
i
. = - _ -. = ~ __
i APPE'OIX 12.0 Pass 5 of 5 MONTHLY ROUTINE SURVEY HISCELLANEOUS i
- I TYPE SURVEY t
C/R/A INITIALS IDATE
/
1.
Condensate Storage Tank Area C/R
)
i 2.
Demineralized k'ater Tank Area C/R 1
3.
Fire Pump House & Tank Area i C/R i
4.
Station Transformer Areas C/R
?
9 T :,1 0il C9 5 -1en C/R
,}
k wmtell C/R I
I 7.
Euilding Perimeter C/R 3
i t
8.
Protected Arca Fence Line C/R e
t i
I L
t i
4 5
t I
i
(
e j
\\
i
(
i i
I l
l t
l l
t l
SPF 61.018.01 - 3 SP 61.018.91, Rev. 1 j
9/ 7 / 78 Page 23 l
l 9 9 m---r c
79,y,-
y_m
-,y,.
,y-,-_..m
-es e.e-
_