Letter Sequence Other |
|---|
|
|
MONTHYEARML20041D0201982-02-0303 February 1982 Notifies That plant-specific Ref to GE 810506 & 28 Position Is Acceptable Basis for Request to Extend Burnup for All Fuel Types.Limits Inherent in 10CFR51.20 Re Environ Effects from Transport of Irradiated Fuel Should Not Be Neglected Project stage: Other ML20072T0491983-01-31031 January 1983 Suppl Reload Licensing Submittal for Edwin I Hatch Nuclear Plant Unit 2,Reload 3 (Cycle 4) Project stage: Other ML20072T0451983-03-30030 March 1983 Proposed Tech Spec Reflecting Changes to Reactor Core Design for Cycle 4 Project stage: Other ML20072T0371983-03-30030 March 1983 Application for Amend to License NPF-5 Changing Tech Specs to Reflect Changes to Reactor Core Design for Cycle 4 Project stage: Request ML20074A8671983-05-10010 May 1983 Amends 830330 Submittal Re Extension of Malphgr Limits.Eccs Analysis Results Justify Operation of All Facility Fuel Types at Exposures Greater than 30,000 Mwd/St Project stage: Other ML20076G6081983-05-12012 May 1983 Notice of Consideration of Issuance of Amend to License NPF-5 & Proposed No Significant Hazards Consideration Determination & Opportunity for Hearing Project stage: Other ML20076E0751983-05-20020 May 1983 Submits GE Info Assuring That crud-induced Local Corrosion Failures Will Not Occur During Cycle 4,in Response to NRC 830519 Request Project stage: Other ML20076E9671983-05-26026 May 1983 Application for Amend to License NPF-5,proposing Addl Tech Spec Surveillance Requirements for High Reactor Water Level Trip Function & Main Turbine Bypass Valves Project stage: Request ML20076E9811983-05-26026 May 1983 Proposed Tech Specs Re Addl Surveillance Requirements for High Reactor Water Level Trip Function & Main Turbine Bypass Valves Project stage: Other ML20023E2371983-06-0909 June 1983 Forwards Revised Page B 3/4 3-6 of Proposed Tech Spec Changes Re Reactor Vessel Water Level Submitted on 830526,in Response to NRC 830512 Request Project stage: Other ML20023E2411983-06-0909 June 1983 Revised Page B 3/4 3-6 of 830526 Proposed Tech Spec Changes Re Reactor Vessel Water Level Project stage: Other ML20076M4141983-06-29029 June 1983 Safety Evaluation Supporting Amend 33 to License NPF-5 Project stage: Approval ML20076M4101983-06-29029 June 1983 Amend 33 to License NPF-5,providing Addl & Revised Trip Setpoints Reflecting Design Mods to Reduce Containment Loads from Plant Transients Project stage: Other ML20076M4071983-06-29029 June 1983 Requests Fr Notice of Issuance of Amend 33 to License NPF-5 Providing Addl & Revised Trip Setpoints to Reflect Design Mods Reducing Containment Transient Loads Project stage: Approval ML20080P6201983-09-29029 September 1983 Proposed Changes to Tech Specs Re MAPLHGR Curve Design for Core Reconstitution Project stage: Request ML20080P6161983-09-29029 September 1983 Application to Amend License DPR-57,changing Tech Specs to Allow Increased Flexibility in Core Design for Core Reconstitution Schedule for Nov 1983 Replacement of Damaged Fuel Project stage: Request ML20081C6501983-10-24024 October 1983 Clarification to 830929 Application to Amend License DPR-57, Revising Tech Specs to Support Planned Shutdown for Core Reconstitution Project stage: Supplement ML20078Q9831983-10-27027 October 1983 Notice of Consideration of Issuance of Amend to License DPR-57 & Proposed NSHC Determination & Opportunity for Hearing Project stage: Other ML20082B9341983-11-15015 November 1983 Responds to Inquiries Re Amplification of Plans for Current Core Reconstitution Due to Leaking Fuel Rods.Ge Developed Program to Minimize Future Crud Induced Localized Corrosion Failures Project stage: Other ML20082V3441983-12-0606 December 1983 Amend 96 to License DPR-57,modifying Tech Specs to Reflect Changes to Core Design Associated W/Replacement of Leaking Fuel Assemblies & Extending Allowable Fuel Burnup Limit from 30 Gwd/T to 40 Gwd/T Project stage: Other ML20082V3521983-12-0606 December 1983 Safety Evaluation Supporting Amend 96 to License DPR-57 Project stage: Approval 1983-03-30
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
.
FEBRUARY (i $ 282 V(?
J DISTRIBUTION:
L PDR AE0D Docket File TERA IE-3 flRC PDR NSIC ACRS-10 Dockets Hos. 50-321 ORB #4 Rdg Gray File-2 LDsD in a
and 50-366 DEisenhut
't MFairtile im RIr. gram C
'C
}
y OELD C
@Bg IOS23
!!r. J. T. Beckhan, Jr.
[
Vice President - Engineering g7y,&
Georgia Power Company A
P. O. Box 4545 N
NiTTg' Atlanta, Georgia 30302
Dear Mr. Beckham:
The General Electric Company (GE) requested (Refs.1-2) that credit for approved, but unapplied ECCS evaluation model changes be used to i
offset MAPLHGR penalties on operating reactors due to high burnup fission gas release. Should you fin 6 the positions stated in those letters applicable to the llatch Nuclear Plant Units 1 and 2, and wish to apply the GE proposal to offset potential, or previously applied, ifAPLilGR penalties, we would find a plant-specific reference to the GE position an acceptable basis for a request to extend burnup for all fuel types. Itowever, do not neglect the linits on burnup inherent in 10 CFR Dart 51.20g(2)(iii) regarding the environnental effects from the transportation of irradiated fuel.
1.
R. E. Engel (GE) to T. A. Ippolito (fiRC) on " Extension of ECCS Performance Limits" dated May 6,1931.
2.
R. E. Engel (GE) to _T. A. Ippolito (llRC) on " Extension of ECCS Performance Limits" dated !!ay 28, 1981.
S Sincerely, aoaIGI:U.L 3:aa ar J0r n. m L4" John F. Stolz, Chief Operating Reactors Dranch #4 Division of Licensing cc:
See next page B203040072 820203 PDR ADOCK 05000321 f
P PDR
$ 1 mJ
" ORB #dDI
C f #4?OL o,nc,, lWsTRTTE~&"JE :""""'" ;""'"""""'""
" " " ~ " ' " " " " '
suRme >
2
..../../. 82 2
..../...l../.82 onre >
NRC FORM 318 0o-80) NRCM ovo OFFiClAL RECORD COPY usc : mi-m.co
~
Hatch 1/2 G:orgia Power Company 50-321/366 ccw/ enclosure (s):
Mr. James P. O'Reilly, Regional Administrator ha,
ots$ndTrowbridge R io I
II*
,,ho'rga b3 i g on 20036 3
Ruble A. Thomas Vice President P. O. Box 2625 Southern Services, Inc.
Birmingham, Alabama 35202 Ozen Batum Charles H. Badger P. O. Box 2625 Office of Planning and Budget Southern Services, Inc.
Room 610 Birmingham, Alabama 35202 270 Washington Street, S.W.
Atlanta, Georgia 30334 Appling County Commissioners County Courthouse Baxley, Georgia 31513 Mr. L. T. Gucwa Georgia Power Company
- Engineering Department P. O. Box 4545 Atlanta, Georgia 30302
.Mr. Max.Manry Georgia Power Company Edwin I. Hatch Plant P. O. Box 442 Baxley, Georgia 31513 a
Regional Radiation Representative EPA Region IV 345 Courtland Street, N.E.
Atlanta, Georgia 30308 Appling County Public Library 301 City Hall Drive Baxley, Georgia 31513 Mr. R. F. Rodgers.,
U.S. Nuclear Reaulatory Conmission Route 1, P. O. Box 279 Baxley, Georgia 31513
.