MONTHYEARML20041D0201982-02-0303 February 1982 Notifies That plant-specific Ref to GE 810506 & 28 Position Is Acceptable Basis for Request to Extend Burnup for All Fuel Types.Limits Inherent in 10CFR51.20 Re Environ Effects from Transport of Irradiated Fuel Should Not Be Neglected Project stage: Other ML20072T0491983-01-31031 January 1983 Suppl Reload Licensing Submittal for Edwin I Hatch Nuclear Plant Unit 2,Reload 3 (Cycle 4) Project stage: Other ML20072T0451983-03-30030 March 1983 Proposed Tech Spec Reflecting Changes to Reactor Core Design for Cycle 4 Project stage: Other ML20072T0371983-03-30030 March 1983 Application for Amend to License NPF-5 Changing Tech Specs to Reflect Changes to Reactor Core Design for Cycle 4 Project stage: Request ML20074A8671983-05-10010 May 1983 Amends 830330 Submittal Re Extension of Malphgr Limits.Eccs Analysis Results Justify Operation of All Facility Fuel Types at Exposures Greater than 30,000 Mwd/St Project stage: Other ML20076G6081983-05-12012 May 1983 Notice of Consideration of Issuance of Amend to License NPF-5 & Proposed No Significant Hazards Consideration Determination & Opportunity for Hearing Project stage: Other ML20076E0751983-05-20020 May 1983 Submits GE Info Assuring That crud-induced Local Corrosion Failures Will Not Occur During Cycle 4,in Response to NRC 830519 Request Project stage: Other ML20076E9811983-05-26026 May 1983 Proposed Tech Specs Re Addl Surveillance Requirements for High Reactor Water Level Trip Function & Main Turbine Bypass Valves Project stage: Other ML20076E9671983-05-26026 May 1983 Application for Amend to License NPF-5,proposing Addl Tech Spec Surveillance Requirements for High Reactor Water Level Trip Function & Main Turbine Bypass Valves Project stage: Request ML20023E2371983-06-0909 June 1983 Forwards Revised Page B 3/4 3-6 of Proposed Tech Spec Changes Re Reactor Vessel Water Level Submitted on 830526,in Response to NRC 830512 Request Project stage: Other ML20023E2411983-06-0909 June 1983 Revised Page B 3/4 3-6 of 830526 Proposed Tech Spec Changes Re Reactor Vessel Water Level Project stage: Other ML20076M4141983-06-29029 June 1983 Safety Evaluation Supporting Amend 33 to License NPF-5 Project stage: Approval ML20076M4101983-06-29029 June 1983 Amend 33 to License NPF-5,providing Addl & Revised Trip Setpoints Reflecting Design Mods to Reduce Containment Loads from Plant Transients Project stage: Other ML20076M4071983-06-29029 June 1983 Requests Fr Notice of Issuance of Amend 33 to License NPF-5 Providing Addl & Revised Trip Setpoints to Reflect Design Mods Reducing Containment Transient Loads Project stage: Approval 1983-05-12
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
r ly O
Georgia Power Corrpany 333 Piedmont Avenue Atlanta. Georgia 30308 Telephone 404 526 6526 Machng Address:
Post Off.ce Box 4545 Atlanta, Georg:a 30302 Georgia Power L T. Cucwa the southem electnc sptem Cinef Nuclear Eng:neer Power Generation Department NED-83 -338 June 9, 1983 Director of Nuclear Reactor Regulation Attention:
Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 NRC DOCKET 50-366 OPERATING LICENSE NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNIT 2 REVISION OF THE RESPONSE TO REQUEST FOR TECl-NICAL SPECIFICATIONS Gentlemen:
On May 26, 1983, Georgia Power Company (GPC) submitted proposed Technical
. Specification changes for Plant Hatch Unit 2 in response to your letter of May 12, 1983.
Several minor errors have been identified recently on one of the proposed change pages contained in that submittal. The discrepancies were found on the Reactor Vessel Water Level figure, page B 3/4 3-6.
The enclosed Unit 2 Technical Specification page B 3/4 3-6 (Bases Figure B 3/4 3-1) has been revised to correct these errors, and should act as a replacement for the page B 3/4 3-6 which was enclosed with the May 26, 1983 letter.
Vertical lines in the right-hand margin of this enclosed page indicate the changes to the current Technical Specification page proposed by the May 26 submittal, and the Low Low Set Logic submittal, dated February 23, 1983.
h-L. T. Gucwa CBS/mb xc:
J. T. Beckham, Jr.
H. C. Nix, Jr.
J. P. O'Reilly (EC-Region II)
Senior Resident Inspector 8306150228 830609 PDRADOCK05000g j