MONTHYEARML20041D0201982-02-0303 February 1982 Notifies That plant-specific Ref to GE 810506 & 28 Position Is Acceptable Basis for Request to Extend Burnup for All Fuel Types.Limits Inherent in 10CFR51.20 Re Environ Effects from Transport of Irradiated Fuel Should Not Be Neglected Project stage: Other ML20072T0491983-01-31031 January 1983 Suppl Reload Licensing Submittal for Edwin I Hatch Nuclear Plant Unit 2,Reload 3 (Cycle 4) Project stage: Other ML20072T0451983-03-30030 March 1983 Proposed Tech Spec Reflecting Changes to Reactor Core Design for Cycle 4 Project stage: Other ML20072T0371983-03-30030 March 1983 Application for Amend to License NPF-5 Changing Tech Specs to Reflect Changes to Reactor Core Design for Cycle 4 Project stage: Request ML20074A8671983-05-10010 May 1983 Amends 830330 Submittal Re Extension of Malphgr Limits.Eccs Analysis Results Justify Operation of All Facility Fuel Types at Exposures Greater than 30,000 Mwd/St Project stage: Other ML20076G6081983-05-12012 May 1983 Notice of Consideration of Issuance of Amend to License NPF-5 & Proposed No Significant Hazards Consideration Determination & Opportunity for Hearing Project stage: Other ML20076E0751983-05-20020 May 1983 Submits GE Info Assuring That crud-induced Local Corrosion Failures Will Not Occur During Cycle 4,in Response to NRC 830519 Request Project stage: Other ML20076E9811983-05-26026 May 1983 Proposed Tech Specs Re Addl Surveillance Requirements for High Reactor Water Level Trip Function & Main Turbine Bypass Valves Project stage: Other ML20076E9671983-05-26026 May 1983 Application for Amend to License NPF-5,proposing Addl Tech Spec Surveillance Requirements for High Reactor Water Level Trip Function & Main Turbine Bypass Valves Project stage: Request ML20023E2371983-06-0909 June 1983 Forwards Revised Page B 3/4 3-6 of Proposed Tech Spec Changes Re Reactor Vessel Water Level Submitted on 830526,in Response to NRC 830512 Request Project stage: Other ML20023E2411983-06-0909 June 1983 Revised Page B 3/4 3-6 of 830526 Proposed Tech Spec Changes Re Reactor Vessel Water Level Project stage: Other ML20076M4141983-06-29029 June 1983 Safety Evaluation Supporting Amend 33 to License NPF-5 Project stage: Approval ML20076M4101983-06-29029 June 1983 Amend 33 to License NPF-5,providing Addl & Revised Trip Setpoints Reflecting Design Mods to Reduce Containment Loads from Plant Transients Project stage: Other ML20076M4071983-06-29029 June 1983 Requests Fr Notice of Issuance of Amend 33 to License NPF-5 Providing Addl & Revised Trip Setpoints to Reflect Design Mods Reducing Containment Transient Loads Project stage: Approval 1983-05-12
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
e e
900 T NOTE: SCAtz IN INCIES ABOVE VESSEL ZERO 5
WAIER IIVEL NOENCIATUPI 800 --
HEIGifT ABOVE NO.
VESSEL ZERO READING INSTRLHENT (INCIES) 750 --
(8) 575
+58 YARWAY (7) 559
+42 CE/MAC VESSEL (4) 549
+32 GE/MAC 722.75 FIANCE-(3) 529.5
+12.5 BARTON (LL1) l (2) 479
-38 YARWAY (LL2) 700 --.
(1) 370.5
-146.5 YARWAY (LL3)
(0) 313.5
-203.5
.YARWAY
~~
-640 MAIN SIEAM LIE YARWAY YARWAY
@/MAC BARTON
~$77
+60 - -
+60 - -
+60 -
+60 - -
- 575 (e)
(8)~58
-38
- 559(7)
HPCI &
(7)-42 HI AIARM RCIC 550 -=$49(4)
(4)-32 LO ALARM TRIPS
- 529.5(3)
(3) - 12.5 LLI YARWAY
~ BOTTOM OF STEAM REACER DRYER SKIRT 2ERO 0-SCRAM 517 -
0-0 0 -
500 --
3
~ FEED
'83*
WATE R
-479(2)
-38 LL2 (2)
' 465 CORE INITIAIE RCIC, MAIN TURBIME SPRAY HPCI, TRIP RECIBC.
TRIPS U,4p 450--
PLHPS.
400 --
-370.5(1)
- -146.5 LL3 (1)
-367
-150 -- INITIAIE RHR, C.S.,
- 352.56 START DIESEL.
350-il CLOSE MSIV'S AND COTTRIBUTE TO A.D.S.
2/3 CORE
-203.5 HEICHT 313.5(0)
PERMISSIVE 30c-.
ACTIVE FUEL 250---
U
- 08 M
-317 - -
20e RECIRC.
j
-178.56 -DISCHARGE RECIRC.
N0ZZLE SUCTION-161.5-N012tz 15>-
I#~
REACTOR VESSEL WATER LEVEL Bases Figure B 3/4 3-1 8306150232 030609 PDR ADOCK 05000366 p
PDR 0--
HATCH - UNIT 2 B 3/4 3-6 4