TABLE 3.3-1

]

h REACTOR PROTECTION SYSTEM INSTRUMENTATION

'as E

    • 2 MINIMUM

$ TOTAL NO. CHANNELS CHANNELS APPLICABLE oo e FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ' ACTION -

SE o E Manual Rector Trip 1, 2 and

  • 8 o q 1. 1 1 1

$3 u o~

2. Nuclear Overpower 4 2 3 1, 2 2#

40 3. RCS Outlet Temperature-High 4 2 3 1,2 3#

Em" 4. Nuclear Overpower Based on RCS Flow and AXIAL POWER IMBALANCE 4 2(a) 3 1,2 2#

5. RCS Pressure-Low 4 2(a) 3 1, 2 3#-

3 6. RCS Pressure-High 4 2 3 1, 2 3#

u k 7. Variable Low RCS Pressure 4 2(a) 3 1, 2 3#

8. Reactor Containment Pressure--High 4 2 3 1, 2 3#
9. Intermediate Range, Neutron Flux and Rate 2 .0 2 1, 2 and
  • 4
10. Source Range, Neutron Flux and Rate A. Startup 2 0 2 2## and
  • 5 B. Shutdown 2 0 1 3, 4 and 5 6
11. Control Rod Drive Trip Breakers 2 per trip 1 per trip 2 per 1, 2 and
  • 7#

system system trip system

12. Reactor Trip Module 2 per trip 1 per trip 2 per 1, 2 and
  • 7#

system system trip system

13. Shutdown Bypass RCS Pressure-High 4 2 3 2**,3** 6#

4**,5**

14. Reactor Coolant Pump Power Monitors 4 2(a, b) 3 1, 2 3#

l l

l TABLE 3.3-1 (Continued)

TABLE NOTATION

  • With the control rod drive trip breakers in the closed position and the control rod drive system capable of rod withdrawal.
    • When Shutdown Bypass is actuated.
  1. The provisions of Specification 3.0.4 are not applicable.
    1. High voltage to detector may be de-energized above 10-10 amps on both Intermediate Range channels.

(a) Trip may be manually bypassed when RCS pressure cl720 psig by actuating Shutdown Bypass provided that:

(1) The Nuclear Overpower Trip Setpoint la $5% of RATED THERMAL POWER, (2) The Shutdown Bypass RCS Pressure-High Trip Setpoint of 41720 psig is imposed, and (3) The Shtudown Bypass is removed when RCS pressure 71800 psig.

(b) Trip may be manually bypassed for a maximum of 15 minutes when reactor power is less than 40% to perform the following operations:

1) Switchover between Startup and Unit Auxiliary Transformers,
2) Energizing an idle Reactor Coolant Pump,
3) De-energizing an active Reactor Coolant Pump, or
4) Special Tests.

ACTION STATEMENT ACTION 1 -

With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement, restore the Inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and/or open the control rod drive trip breakers.

ACTION 2 - With the number of OPERABLE channels one less than the Total Number of Channels STARTUP and/or POWER OPERATION may proceed provided all of the following conditons are satisfied:

a. The inoperable channel is placed in the tripped condition within one hour.
b. The Minimum Channels OPERABLE requirement is met; however, one additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.1.1.

CRYSTAL RIVER - UNIT 3 3/43-3