ML20039C163

From kanterella
Jump to navigation Jump to search

Proposed Tech Spec Table 3.3-1 Re Reactor Protection Sys Instrumentation
ML20039C163
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/22/1981
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20039C161 List:
References
TAC-47464, NUDOCS 8112280520
Download: ML20039C163 (2)


Text

O

]

TABLE 3.3-1 h

REACTOR PROTECTION SYSTEM INSTRUMENTATION

'as E

    • 2 MINIMUM TOTAL NO.

CHANNELS CHANNELS APPLICABLE oo e FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES

' ACTION -

SE E o

q 1.

Manual Rector Trip 1

1 1

1, 2 and

  • 8 o

$3 u 2.

Nuclear Overpower 4

2 3

1, 2 2#

o~

4 3.

RCS Outlet Temperature-High 4

2 3

1,2 3#

0 Em" 4.

Nuclear Overpower Based on RCS Flow and AXIAL POWER IMBALANCE 4

2(a) 3 1,2 2#

5.

RCS Pressure-Low 4

2(a) 3 1, 2 3#-

3 6.

RCS Pressure-High 4

2 3

1, 2 3#

u k

7.

Variable Low RCS Pressure 4

2(a) 3 1, 2 3#

8.

Reactor Containment Pressure--High 4

2 3

1, 2 3#

9.

Intermediate Range, Neutron Flux and Rate 2

.0 2

1, 2 and

  • 4 10.

Source Range, Neutron Flux and Rate A. Startup 2

0 2

2## and

  • 5 B. Shutdown 2

0 1

3, 4 and 5 6

11.

Control Rod Drive Trip Breakers 2 per trip 1 per trip 2 per 1, 2 and

  • 7#

system system trip system 12.

Reactor Trip Module 2 per trip 1 per trip 2 per 1, 2 and

  • 7#

system system trip system 13.

Shutdown Bypass RCS Pressure-High 4

2 3

2**,3**

6#

4**,5**

14.

Reactor Coolant Pump Power Monitors 4

2(a, b) 3 1, 2 3#

TABLE 3.3-1 (Continued)

TABLE NOTATION With the control rod drive trip breakers in the closed position and the control rod drive system capable of rod withdrawal.

When Shutdown Bypass is actuated.

The provisions of Specification 3.0.4 are not applicable.

High voltage to detector may be de-energized above 10-10 amps on both Intermediate Range channels.

(a)

Trip may be manually bypassed when RCS pressure cl720 psig by actuating Shutdown Bypass provided that:

(1)

The Nuclear Overpower Trip Setpoint la $5% of RATED THERMAL POWER, (2)

The Shutdown Bypass RCS Pressure-High Trip Setpoint of 41720 psig is imposed, and (3)

The Shtudown Bypass is removed when RCS pressure 71800 psig.

(b)

Trip may be manually bypassed for a maximum of 15 minutes when reactor power is less than 40% to perform the following operations:

1)

Switchover between Startup and Unit Auxiliary Transformers, 2)

Energizing an idle Reactor Coolant Pump, 3)

De-energizing an active Reactor Coolant Pump, or 4)

Special Tests.

ACTION STATEMENT ACTION 1 -

With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement, restore the Inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and/or open the control rod drive trip breakers.

ACTION 2 -

With the number of OPERABLE channels one less than the Total Number of Channels STARTUP and/or POWER OPERATION may proceed provided all of the following conditons are satisfied:

The inoperable channel is placed in the tripped condition within one a.

hour.

b.

The Minimum Channels OPERABLE requirement is met; however, one additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.1.1.

CRYSTAL RIVER - UNIT 3 3/43-3

-.