| ML20039B735 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 11/02/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20039B707 | List: |
| References | |
| NUDOCS 8112230495 | |
| Download: ML20039B735 (2) | |
See also: IR 05000324/1981028
Text
/ba)
.
.
.
+
-
.
NOV.0 21981
Carolina Power and Light-Company-
ATTN:
Mr. J. A. Jones, Senior Executive
Vice President and Chief
Operating Of ficer
411 Fayetteville Street .
Raleigh, NC 27602
Gentlemen:
Subject: Report No
5/81-2kd50-324/81-28
This refers to the routine safety inspection conducted by Mr. J. R. Wray of this
office on September 21-25, 1981, of activities authorized by NRC Operating
License Nos. DPR-71 and DPR-62 for the Brunswick facility.
Our preliminary .
findings were discussed with Mr. C. R. Dietz, General Manager, at the conclusion
of.the inspection.
Areas examined during the inspection and our findings are discussed in .the
enclosed inspection report. -Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the . inspection, it was found that certain activities under your license
appear to violate NRC requirements. These items and references -to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
We have examined actions you have taken with regard to previously identified -
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office
by telephone within ten days from the date of this letter of your intention to
file a request for withholding; and (b) sub9 t within twenty-five. days from the
date of this letter a written application to this office.to withhold such infor-
mation.
If -your -receipt of this letner has been delayed such that less- than
seven days are available for your *aview, please notify this office promptly so
that a new due date may be established. Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought te be withheld,
and a full statement of the reasons on'the basis of which -it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
8112230495 81121d*
PDR ADOCK 05000324
G
_ --_-_
- - _ .
- _ _ _ - _ _ .
..
'
'
.
NOV 0 21981
Carolina Power and Light Company
2
10 CFR 2.790(b)(4). The information sought te be withheld shall be incorporated
as far as possible into a separate part of the affidavit. If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
M
R. C. Lewi s, Director
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-325/81-28
and 50-324/81-28
cc w/ encl:
C. R. Dietz, Plant Manager
bec w/ enc 1:
NRC Resident Inspector
Document Management Branch
State of North Carolina
'
1
RII
RII
RII
RI
RII
FI
CHo&/,k
~
-
tJ
JNpay:ht
sey
AFGJbson
01
inski
C
o.
an
.CLewis
y* /$ /81
10/j/81
10/J1Y, 81
1080/81
10/30/81
hF /81
}l V