Forwards IE Insp Repts 50-443/81-12 & 50-444/81-10 on 811005-1116 & Notice of Violation
ML20039B507
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 12/03/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Tallman W
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20039B508 List:
References
NUDOCS 8112230168
Download: ML20039B507 (2)


See also: IR 05000443/1981012

Text

'

n . i s - y,

m 03 $

Docket Nos. 50-443

50-444

t- g

S

9

Public Service Company of New Hampshire

NECsjg.,

.\\

ATTN:

Mr. W. C. Tallman

p

A C

Chairman and Chief Executive Officer

gEc

^i

Manchester, New Hampshire 03105

t ; g.

e21sgih.

1000 Elm Street

__!

f

Gentlemen:

s

Subject:

Inspection No. 50-443/81-12 and 50-444/81-10

' 17 E

This refers to the routine safety inspection conducted by Mr. A. Cerne of this

office on October 5 - November 16, 1981 at the Seabrook Station, Units 1 and

2, Senbrook New Hampshire of activities authorized by NRC and to the discussiens

of our findings held by Mr. Cerne with Messrs. Herrin, Singleton, and others

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in

the Notice of' Violation, enclosed herewith as Appendix A.

This item of noncompli-

ance has been categorized into the levels described in the Federal Register

Notice (45 FR 66754) dated October 7, 1980. You are required to respond to

this letter and in preparing your response, you should follow the instructions

in Appendix A.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractors)

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this letter of your intention to file a request for withholding; and

p ) submit within 25 days from the date of this letter a written application

to this office to withhold such information. Consistent with section 2.790(b)(1),

any such application must be accompanied by an af ifavit executed by the owner

b

I:DETIfJd:

'

DETI

RI:D PI

Ebneter

Gallg

B; o ryer

erne / gwc

Tripp

11/24/81

db

11 %

,j p

W/>

OMICIAL RECORD COPY

6[

P112230168 811203

)[5

PDR ADOCK 05000443

o

PDR

t (

>

.

Public Service Company of New Hampshire 2

DEC 0 31981

of the information which identifies the document or part sought to be withheld,

and which contains a full statement of the reasons on the basis which it is

claimed that the information should be withheld from public disclosure.

This

section further requires the statement to address with specificity the consider-

ations listed in 10 CFR 2.790(b)(4). The information sought to be withheld

shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted

above, the report will be placed in the Public Document Room. The telephone

notification of your intent to request withholding, or any request for an

extension of the 10 day period which you believe necessary, should be made to

the Supervisor, Files, Mail and Records, USNRC Region I, at (215) 337-5223.

Your cooperation with us in this matter is appreciated.

Sincerely,

Origina1 Signed 1 hit

Eldon J. Brunner, Chief, Projects

Branch No. 1, Division of Resident

and Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined Office of Inspection and Enforcement Inspection

Report Numbers 50-443/81-12 and 50-444/81-10

cc w/encis:

John DeVincentis, Project Manager

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of New Hampshire

NRC Resident Inspector

bcc w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

,

OFFICIAL RECORD COPY