ellov)
.
.
.
OCT 141981
Duke Power Company
ATTN: Mr. L. C. Dail, Vice President
Design Engineering
P. O. Box 33189
Charlotte, NC 28242
Gentlemen:
Subject: Report NosM91/81-213] 50-492/81-03 and 50-493/81-03
This refers to the routine safety inspection conducted by Mr. A. G. Debbage of
this office on September 8-11, 1981, of activities authorized by NRC Construction
Permit Nos. CPPR-167, CPPR-168 and CPPR-169 for the Cherokee facility.
Our
preliminary findings were discussed with Mr. K. Patterson, Resident Cashier, at
the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of ' his
letter and the enclosed report will be placed in the NRC's Public Document .,oom.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your inten-
tion to file a request for withholding; and (b) submit within twenty-five days
from the date of this letter a written application to this office to withhold
such information. If your receipt of this letter has been delayed such that less
than seven days are available for your review, please notify this office promptly
so that a new due date may be established. Consistent with section 2.790(b)(1),
such application must be accorranied by an affidavit executed by the owner of the
information which identifias the document or part thereof sought to be withheld,
and a full statement of th e r euans on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to aa&ess with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit. If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
8112160095 811200
PDR ADOCK 05000491
0
L
-
-
.
.
.
OCT 141981
Duke Power Company
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-491/81-03,
50-492/81-03 and 50-493/81-03
cc w/ encl:
J. T. Moore, Project Manager
bcc w/ encl:
Document Management Eranch
State of South Carolina
!
RII
RII
RII
RII
RII
RII
W
yd&ll
24
3 CI' anst;
ad t g PJK alogg
1
gwu
AGDebbage/RWright:aw
CUpright
C$Mur hy -ArGi': e
JBr9ano
jg/tc/81 ff/1/81
ggj/81
jp/f/81
(D/f/81
p/j3/81
(g /81
l