| To: | Florida Power Corp, City of Alachua, FL, City of Bushnell, FL, City of Gainesville, FL, City of Kissimmee, FL, City of Leesburg, FL, City of New Smyrna Beach, FL, Utilities Commission, City of New Smyrna Beach, FL, City of Ocala, FL, City of Orlando, FL, Orlando Utilities Commission, Sebring Utilities Commission, Seminole Electric Cooperative, City of Tallahassee, FL |
| Shared Package | |
| ML20038C326 | List: |
| References | |
| TAC 47351, TAC 47352, DPR-72-A-045, TAC 47353 NUDOCS 8112100430 | |
| Download: ML20038C325 (7) | |
Text
.
'o, UNITED STATES
[/
NUCLEAR REGULATORY COMMISSION f
N et WASHINGTON, D. C 20555 0 42"" [4 f
P 89.% '
FLORIDA POWER CORPORATION CITY OF ALACHUA CITY OF BUSHNELL CITY OF GAINESVILLE CITY OF KISSIMMEE CITY OF LEESBURG CITY OF NEW SMYRNA BEACH AND UTILITIES COMMISSION, CITY OF NEW SMYRNA BEACH CITY OF OCALA ORLANDO UTILITIES COMMISSION AND CITY OF ORLANDO SEBRING UTILITIES COMMISSION SEMIt!0LE ELECTRIC COOPERATIVE, INC.
CITY OF TALLAHASSEE DOCKET NO. 50-302 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT
' AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 45 License No. DPR-72 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The applications for amendment by Florida Power Corpor' tion, et al a
(the licensees) dated November 17, 1981, comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the
~-
Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the applications, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of-the Commission's regulations and all applicable requirements have been satisfied.
8112100430 e11127 PDRADOCK05000g2 P
2 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-72 is hereby amended to read as follows:
(2). Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 45, are hereby incorporated in the license.
Florida Power Corporation shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its.
issuance.
FOR THE NUCLEAR REGULATORY COMMISSION k
h John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: November 27, 1981 l
L l
i l
l-I l
L
ATTACHMENT TO LICENSE ~ AMENDMENT NO.45 FACILITY OPERATING LICENSE NO. OPR-72 DOCKET NO. 50-302' Replace the following pages of Appendix "A" Technical - Specifications with-the enclosed pages. The revised pages are identified by Amendment number and contain vertical ~ lines indicating the area of change. The corresponding overleaf pages are also provided to maintain document completeness.-
3/4 7-25 3/4 7-29 6
9 e
e i
4 i
e
PLANT SYSTEMS 3/4.7.9 HYDRAULIC SNUBBERS LIMITING CONDITION FOR OPERATION 3.7.9.1 All hydraulic snubbers listed in Table 3.7-3 shall be OPERABLE.*
APPLICABILITY:
MODES 1, 2, 3 and 4.
ACTION:
With one or more hydraulic snubbers inoperable, replace or restore the inoperable snubber (s) to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE RE0VIREMENTS 4.7.9.1 Hydrculic snubbers will be demonstrated OPERABLE by performance of the following augmented inservice inspection program and the require-cents o'f Specification 4.0.5.
l Each hydraulic snubber with seal material fabricated from a.
ethylene propylene or other materials demonstrated compatible with the operating environment and approved as such by the NRC, shall be determined OPERABLE at least once after not less than 4 months but within 6 months of initial criticality and in accordance with the inspection schedule of Table 4.7-4 thereafter, by a visual inspection of the snubber.
Visual inspections of the snubbers shall include, but are not necessarily limited to, inspection of the hydraulic fluid reservoirs, fluid connections, and linkage connections co the piping and anchors.
Initiation of the Table 4.7-4 inspection schedule shall be made assuming the unit was previously at the 6 renth inspection interval.
b.
Each hydraulic snubber with seal-material not fabricated from ethylene propylene or other materials demonstrated compatible with the operating environment shall be determined OPERABLE at least once per 31 days by a visual inspection of the snubber.
Visual inspection of the snubbers shall include, but are not necessarily limited to, inspection of the hydraulic fluid re-servoirs, fluid connections, and linkage connections to the piping and anchors.
For the durstion of Lycle four, hydraulic sn'ubbers in locations out-side the reactor building shall be considered OPERABLE if analysis has shown that unacceptable stresses will'not result from snubber lock-up during operation.
' CRYSTAL RIVER - UNIT 3 3/4 7-25 am ndnant No. 45
PLANT SYSTEMS HYDRAULIC SNUBBERS (Continued) i SURVEILLANCE REQUIREMENTS (Continued) c.
At least once per 18 months during shutdown a representative sample of at least 10 hydraulic snubbers or at least 10% of all snubbers listed in Table 3.7-3, whichever is less, shall be selected and functionally tested to verify correct piston movement, lock up and bleed.
Snubbers greater than 50,000 lbs capacity may be excluded from functional testing requirements.
Snubbers selected for functional testing shall be selected on a rotating basis. Snubbers identified in Table 3.7-3 as either "Especially Difficult to Remove" or in "High Radiation Zones" may be exempted from functional testing provided these snubbers were demonstrated OPERABLE during previous functional tests. Snubbers found inoperable during functional testing shall be restored to OPERABLE status prior to resuming opera-tion. For each snubber found inoperable during these func-tional tests, an additional minimum of 10% of all snubbers or 10 snubbers, whichever is less, shall also be functionally tested until no more failures are found or all snubbers have been functionally tested.
e em D
CRYSTAL RIVER - UNIT.3 3/4 7-26
n 3
TABLE 3.7-3 a
E SAFETY RELATED HYDRAULIC SNUBBERS
ON, LOCATION ** AND ELEVATION INACCESSIBLE ZONE ****
TO REMOVE g
(A or 1)
(Yes or No)
(Yes or No)
[
Make-up and Purification System (Continued)
MUH-35 110'-6" I
Yes No MUH-36 109'-0" A
No Yes MUH-37 109'-0" A
No No MUH-38 123'-10" I
Yes Yes MUH-39 112'-0" I
Yes No w2 MUH-40 112'-0" I
Yes No MUH-41 129'-1" I
Yes No y
a MUH-42 119'-0" I
Yes No e
MUH-43 114'-0" I
Yes No MUH-44 114'-0" A
No No MUH-45 114'-0" A
No No MUH-46 114'-0" I
Yes No MUH-47 114'-0" A
No Yes MUH-48 114'-0" A
No Yes MUH-49 108'-6" A
No Yes MUH-50 129'-9" I
Yes Yes MUH-51 117'-0" I
Yes Yes MUH-52 110'-0" A
No No MUH-53 110'-0" A
No No*s MUH-80 108'-0" I
Yes
,e MUH-81 108'-7" A
No No MUH-82 108'-7" A
No No MUH-83 108'-7" A
No No MUH-84 108'-7" A
No No MUH-85 104'-0" A
No No I
,--q TABLE 3,7 /
SAFETY RELATED llYDRAUI.:C SNUBBERSD n
P SNUBBER SYSTEM SNUBBER INSTALLED ACCESSIBLE OR lilGli RADIATION ESPECIALLY DIFFICULT x
j NO.
_ ON, LOCATION *
- AND ELEVATION _
INACCESSIBLE ZONES **
TO REMOVE (A or 1)
(Yes or No)
(Yes or No)
SE;
--i w
Decay lieat Removal System DHii-35 152'-5'3 I
Yes No DilH-36 152'-5" I
Yes No DHil-37 159'-7" I
Yes Yes DHH-38 160'-1" I
Yes Yes Dilli-39 165'-9" l
Yes No DilH-661 8 6'-6" * *
- I Yes No DHR-18 8 4'-7" * *
- I Yes No DilR-21 10 3'-6" * *
- A No No m1 DIIR-24U 129'-6" " *
- A No No DIIR-24L 12 9'.-6" * *
- A No No y
L DH R-28 13 4'-4" * *
- A No No DH R-31 8 4'-9" * *
- I Yes No DHR-37 8 5'-6" * *
- I Yes No DHR-49 8 5'-6" * *
- I Yes No N
9!i 9n e
3 I